HomeMy WebLinkAboutContract 61577-AR4CSC No. 61577-AR4 FORT WORTH . City of Fort Worth Construction Allowance Request Project Name Park Vista Boulevard -Keller Haslet Road to Timberland Boulevard City Sec # 161577 Client Project #(s) 1103281 Project Park Vista Boulevard -Keller Haslet to Timberland -Roadway, Drainage and Illumination Improvements Description Contractorl McClendon Construction Company, Inc. I CA#I 4 I Datel 3/27/2025 I City Project Mgr.I Mitch Aiton I City Inspectorl Steve Johnson I UNIT or DEPT Original Contract Amount Extras to Date Credits to Date Current Contract Amount JAmount of Proposed Allocation Original Allowance Available to Allocation Allowance Funds Previously Allocated Revised Allowance Balance Unit I - Paving $3,309,611.75 Unit II - Storm $572,305.00 I Totals $3,881,916.75 $3 309 611.75 $572 305.00 $3 881 916.75 $9 660.00 $0.00 $0.00 $0.00 $9 660.00 $300,000.00 $214,928.62 $300,000.00 $214,928.62 $75,411.38 $0.00 $0.00 $0.00 1 $75 411.38 NMI JUSTIFICATION (REASONS) FOR CONSTRUCTION ALLOWANCE IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST, THE CONTRACT SHALL: As part of the settlement conditions to grant an easement, Steadman Farms HOA requested (3) 3" PVC sleeves for the HOA to add irrigation and landscaping to the median in the future through the Adopt -a -Median Program. The contractor has agreed to match the $46.00/LF for 3" PVC installed via bore for the 103276 Keller Hicks Phase 2 bid. Staff deems the proposed price reasonable. It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Construction Allowance Request. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. McClendon Construction Company, Inc. I Justin Blair I',,— ate; IApr4, 2025 Inspector/Inspection Supervisor Date Project and Contract Compliance Manager Date �hJ1i Apr7,2025 Ataf(96f ' Apr4,2025 Program Manager Date Senior Capital Project Officer Date Apr 9, 2025 '_k Apr 9, 2025 Assistant Director (Dept) Date Director, Contracting Department (Dept) Date Patricia G. wadsanR Apr 14, 2025 Apr 14, 2025 nt City Attorney Date As ' Date JUI oo 11-11 Apr 16, 2025 Apr 19, 2025 ATTEST: p c� ...... 0 Oro .10 PV= a=C Jannette Goodall, City Secretary CaQn nEX6 644 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Construction Allowance SUMMARY Page 1 of 4 FORT WORTH, City of Fort Worth Construction Allowance Additions Project Name I Park Vista Boulevard - Keller Haslet Road to Timberland Boulevard pity Sec # 1 61577 1 Client Project # 1 103281 1 Contractorl McClendon Construction Company, Inc. PMI Mitch Aiton Inspector) Steve Johnson Construction Allowance Submittal # ate I 3/27/"1U25 I ADDITIONS ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total 74E 2605.3026 3" CONDT PVC SCH 80 (B) Unit I - Paving 210.00 LF $46.00 $9,660.001 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 Unit I - Paving $9,660.001 Unit II - Storm $0.001 $0.001 $0.001 Total Additions $9,660.001 Construction Allowance Additions Page 2 of 4 FORT WORTH. City of Fort Worth Construction Allowance Value Project Name I Park Vista Boulevard - Keller Haslet Road to Timberland Boulevard I City Sec # I b1 b/ / Client Project # 1 103281 1 Contractor McClendon Construction Company, Inc. I PM1 Mitch Aiton I Inspector) Steve Johnson Construction Allowance Submittal # Date I 3/2/f2U2b I CONSTRUCTION ALLOWANCE VALUE BEING USED ITEM DESCRIPTION Qty Unit Unit Cost Total Unit 1 Item 70 9999.0000 Construction Allowance 0.032200 LS $300,000.00 $9,660.00 Construction Allowance Value 3of4 M/SBE for this Construction Allowance Request M/SBE Sub I Type of Service I Amount for this CAR Total $0.00 I Previous Construction Allowance Requests CAR # DATE AMOUNT 1 11/6/2024 $25,589.27 2/18/2025 $171,585.00 3/10/2025 $17,754.35 Total 1 $214,928.62 Construction Allowance MSBE Data Page 4 of 4 No x Ji x 11' CONC -T Proposed 3" PVC- 70 LF PER SECTDN 321313 w/soxiow, ----------- I -------- I-- 7 Bid" C) Q11 11' 11.1 INNT TEI PER SECTON 32 13 13 16 31A 010f, J.EI ... ifi,d E-- b, N,. .1991 STA 14 P 17 k Wrl 31240 C G.NG F-T EEIAI. ARTERIAPc�fa L 18 j(flg `­f 1 31711111 24 ST- 2 .9" 49 G' -� 1 1. . - ER 32 01 29 LUNG R_ B2 - —1 V�11]3 B DD 20 321-BB KL�d LI. 3111241 . 21 321105M Treatment 22 3233.01 1�211 RE GE-XO�,-,�R -2D CO ♦ -A DED 3213.02F P21L 2.. �j Cotj=1 32 B '26 "'1 4- CONC GID-I-E (B-) 25 3-0322 C .-' B-GfIld-11, 12.2 -1 G 8:. C CONTROL POINT NO S1PER SECDON 32 13 20 tc) 26 -301CA rnlr-l-j.. P-1 32�26 EA 0 1 + N IDG-TIAG C) 327 321SB507 Pill F R--P-2 32— EA lr 329114 1EE BLOC' SOO PLACEMENT 9 3292DIVIDG PI-1111t 111 IN 32 12 11 �2 E 247' 24, + 8 3251.01 PtETO'E�C.1IL E- INN ... .... .... 3 'T� '2 IA V1 31 A ip: 40 330501 A Aj,—�.- 33 EA B PER SECTON � 91 19 �GG - - - - - - - - - - - 41 330S01 'B: 3 o k. 'D -.w' THAOU CONTROL PONT E- KFCoi-d B BE41 15� I'd co z♦ Lu :3 ------ �ja7cvARD ------ ---------- �STA 14+7584, 1700 FT PARK VISTA CILURff-DATA N 7034104 28 E 2347664 57✓PI 5120835 - 5 MATCH EXST TP 721 9± A 107' 4Y T T 2083 2 - - - - - - L - 24059 PI18+04 - - - - - - - . . . "'o1050, 11 11A � 14.431E T4 2081' z IT STA - lG'. LF 24111 1C. 412NI'S P� STA - - - - - - - - - - UN C TIIO - - - - - - - - - -- - - - - - - - - - - - - - - DE R NONO 740 7411 736 I �iiI E/ 711 TH SE PLANS ARE ISSUED FOR 60% THE FEE ` PIPE F 1111]"NA11 R AN HOT ET... FOR CC STRUCTON NEIE D ARE 712✓ SUBMITTAL W 712 FINAL FGRM"1C`EE�B�"E- BE FOR PREUMNARY SEAUED, SIGNED AND BATED DESIGN REVIEW RESPONSIBLE ENGINEER INC P 728 7211 1. 2. TEXAS REG STER NGINEERING FIR FTjoE F CARL T NIP E All 1- -AS RECISTRATONROGNESNS, O. 91869 NO I M., 11, Cl2l i rREI DESCRIPTION 11 DATE 724 - - - - - - - - - - 720 1 T 77, 7211 ORTWORT CITY OF FORT WORTH, TX TRANSPORTATION & PUBLIC WORKS 716 711 PARK VISTA BOULEVARD IMPROVEMENTS PAVING PLAN & PROFILE 712 712 PARK VISTA BOULEVARD STA 113+50 TO STA 17-00 711 708 0 N : n DESIGNED C DRAWN SHIK � DATE PROJECT NO Sheet 704 704 /LF 20 13+156 4+6i 4.- 116 tdli, 7, 0 CHECKED C`IA3 .AY 2G 23 10732-01 0 130 a '„ „' 8 z e I LE{1END `°°.>aa ¢ - X __ _ _ ___ tar-Ds-� N ¢ s=s is�ree ar`.M _ , . 1.32 X r.a,er ONC e rya � .se _ '+•' �wxrwxsa 10' TYPE P-I mu I i W - LAi-D6- - - - - Imo rh PERC ECIION 1313 CURB .1 J T � � .. . - . - •�—a °`_ -' I F —roc—Tot— ur oc—TM���rpc BIEIIs[ Item Descrlphan spec No U.It QtYI PER 3ECn PONM3 TES Item Number 2 PROPSGRADE O ly,�c'ri 18 3123.0101 URcl.-fiml Exca t-by Plan 31231E CY 1]34 I_� _ Proposed 3" PVC - 70 LF I 3124.O10 EmbankmeMWPlan 312900 Cl- ] 18 3201.061 o Print Repair,—.1 32013� S✓ 102 CCONNC3 P or REPAIR, ARTERIAL rII 10'ttPE P-1 « ` �,«,««�fe««««f••pc 2 `CURB RAMP / 19 32110113 Flexible Base. T— A. GR-1 311123 SY 0 q ON1R POINT �50 20 3211.04W H ate¢ Lime 321129 TN m tz /s /S 21 3213 3102 8""CG Treatment 32 3129 SY 164E O �s N/8034434 411 « « + 22 3313.010E 11" Coot Prml 321313 SY ]84 PER SEC110N 32TI3 20 CONC 23 3213.0206 11" CORc Print HES 321313 SY b6] EL 24 3213.0301 4"ConcS —11, 321320 SF 6195 Q I v4]236 Oil 25 3213.0322 Conc Corbat13-11Sleewalk 321320 LF 0 " CONC SID WALK ID546) F- ® PER EECTIONE32 13 20 26 3213.050E Bamer Free Ramp, TYpe P-1 32 T3 20 EA 2 3213.050]Ba Mer Free Ramp, Tvpe P-2 321320 EA 0 3391.0100 6"T9�all 329119 CY 208 PLO ERCI EGO NT SIC— 32 B2E111 � t6.0� ` . .� -e y� W 39 32:2.0100 Blacka Placement 32 9214 SY 1243 PER SE -ON 32 91 19 40 3305010�AanM1ole A��••{{ men[, Mala 33051d EA 0 41 Valve Box AduustmeM 330514 EA 0 �! �9999A0015"Colored T.—dGannet¢ 999999 SF 697 nn CONTROL POINT _-- V Q 17+ - - ----- _ - F- STA EXE T2,477017E o TA -- STA 1 +8933� 00 N ]34]]2669, 23.11 IT ATCH TP Pi PARK VISTA BOULEVARDol ]" N 34771194� ]� (colucRE1ET MATCH EXST TP 7221. 12081' - JT p = 2456' « ` R - 105000' - e « e PPT SC STTA A = 16+89+24 513,95�- t - r � = 1 r n I 1 4 I I I i CN NOERGROON I I FIBER I I I I oem I i e eaa,w Vm 736 732 728 724 20 16 712 FZF7 512I I I I I I I 115SI I I I I I I I I R 8 1 I I I I I I I I5I8I I I I I I I I IdII I I I I I I I Inwl I I I I I I 11511 I I I I I I I I$w 704 17+00 17+50 18A0 18+50 19A0 19-•50 20A0 20T50 60N/0 THESE PLANE ARE ISSUED FOR RE lRPlIE OFNOT ETEN.. SUBMITTAL FDR `D" "'DGDDN IN FINALWFORM STIEYE WILL BE FOR PRELMJARY SEALBD, SIGNED AND DATED DESIGN REVEW RESPONSIBLE ENGINEER PONEcIN SOE INC. `1. 2.� R%A5 REFIRMERFTloEN6GINEERING CRL J KROGNEOGNE5P.E. scA,a , w. TEXASE REGISTRATNO. 0. 91669 REV DESCRIPTION BY }1 02JDATE ORTWORT CITY OF FORT WORTH, TX TRANSPORTATION & PUBLIC WORKS PARK VISTA BOULEVARD IMPROVEMENTS PAVING PLAN & PROFILE PARK VISTA BOULEVARD STA 17+00 TO STA 20.50 re PE1AeM.o-ere� ftaeies Ne E-,p4a DESIGNED CJK DATE PROJECT NO SM1eet DRAWN. SHAF 21 CHECKED CWG MAY 2023 10732-01 0 130 aaa, ao,m, ,, ,.�«,a:« ma'�`wn :o «,a« ,a•. n....m I I I ®„� pmNi rzo,a I ,e ,a„ I I wTM^, _Y—___ -------- ______ a'rmro roae _ - - _ \ ___ BIE�II^st Ifem scriPEon De ass 17 aroc 3123.0101/Inclaszifled Ersavabon by NO, 313AOIO cmbankmen[bl�Plan roczoczocFoKA nq`zocz Fr G�''r`G'.'rf4 l4ti-'�Gik�Shk\ c'rl��'s�?•AXrV^!-!��'G'c'z�cA \c��a �}\ c `G 0. Proposed 3" PVC - 70 LF 19 3211.01138"Flexible �ase! Twe A.aGR-1 --Ft,-4'k4 - _ _ - _ _ _ 20 3211.0400 H/yv�l"d Llme 21 22 3211— B"Elms Treatme —11)06 IS"Cans Pvmt 23 3213.0206 11" CP4c PVPB NES 24 3213.1311 4"CmcE,dewalk —3.03 7- CPrbat Back M5ldewalk 3313.03 er Free Ramp Twe P-] O « O 25 O 28 } } 27 3213.09arrier Free Ram .'i eP-2 P w N 38 M7 39 3391.D100 6"TPPsdI 3292.O100'3I.k3Pd Placement Q H �' A Q 40 41 3311.0106i V. E.IAd �,tmeM. Major 3303.0111 Ive Box{^jlJ�IeslmeM 105°�y. 9999.00° ' Cd..;.)Lred Canoe. - - t_� �p-�t_� tea- - Zt - -f-Y sf •—�-a-- -« « a « a « a « a a a a a • « • « « « « a « a « a « a « a a_�at « • « • « • « • « ate, J J PARK VISTA BOULEVARD F- CONCUT an ConCaErE (c9xcRErE) <I 2 / NL s a a 47747.567 1 a • /« Ea • a « - • ,.- « a -,_ a a :..^! «_ a a a a «_-. _- . a ... a . __. a .._� _- ----- -------_ I f- - - uxoia¶OouNo 6ER 736 I 60 0' VC 732 FfL iL rir liA9 NP•;p GI.' �� 728 L I 724 720 Am --If go LE{1ENo gz� PER CEClI0NM321313 o',JJ Q41N] 3P1e2a 3124, 141 CVPER E-ON32 I1313 320129 SYJ 0 321123 S� 389 331129 TN 23 NNG o 9 T REPAIR, ARTERIAL 2 331129 S J 9]31 321313 S J 896 20 CO" 321313 SY 3213% SF 32 13 LF 0 7- 0 PER SECTION 32113 321 EA 321 EA 0 0 ® 4" CONC SIDEWALK (0646) PER SECTION 32 13 20 33 9 262 329213 SV 15]l BLOCK 5°DNP 321211 330S 14 EA 33051� EA 0PtETO 0 3 PER SECTION 32 91 19 99999 SF 0 15, CONTROL POINT 732 60% .. 11RROSE OFEPIE-1 FOR SUBMITTAL NOT INT „°E° 728 RE °wµrl"' 'S"ED IN FOR PRELIMINARY SCALOD, ,SIGNED AND WILLTEo DESIGN REVEW RESPONSIBE L EN EER BGE INC.GIN 724 1. .-I1. . TExas FEFIRMER Fm Og6GINEERING CARL J KROGNESS, P.E. ecuc 1 w. TEXAS REGISTRATION NO. 91869 REV DESCRIPTION BY 3 29210ATE 720 716 716 ORTWORT CITY OF FORT WORTH, TX TRANSPORTATION & PUBLIC WORKS 712 712 PARK VISTA BOULEVARD IMPROVEMENTS I sT p k� ; itl PAVING PLAN 6 PROFILE 708 it 708 PARK VISTA BOULEVARD STA 31.50 TO STA 35.00 704 I - - - 704 n u.�s,.s,�re,999 Fm wo,n. TX Te,m xm FBI-OaTslaP.,...,weo-emm Re1AaNmaao� No E-1P4e DATE PROJECT NO Sheet 700 'd w ma, `v`: m� `a4d NT u w 700 DESIGNED CJK DRAWN. SHAF 2`J 31+5i 1 ` ;2AO 16 ;12+5 5 I +0 ( :3+5 i l ;4+ai 14+51 1 ` ;5+00 NAY 2023 10]32-01 CHECKED CWG 1130 FORT WORTH:,: Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: Park Vista CA #4 M&C: N/A CPN: 103281 CSO: 61577 Date: 3/27/2024 To: Name 1. Jessica Rodriguez 2. Mitch Aiton 3. Justin Blair 4. Steve Johnson (Inspector) 5. Raul Lopez 6. Lissette Acevedo 7. Patricia Wadsack 8. Lauren Prieur 9. Doug Black 10. Jesica McEachern 11. Jannette Goodall 12. TPW Contracts Department Initials TPW - Review TPW - Signature All McClendon - Signature TPW — Signature ��S�Y/� Donald Watson TPW - Signature -0c7- TPW — Signature TPW — Signature PL IA/ TPW — Signature LIP xv Legal — Signature Doug�Black CMO — Signature CK CSO - Signature 7,-40-- DOC#: N/A Date Out Apr 4, 2025 Apr 4, 2025 Apr 4, 2025 Apr 7, 2025 Apr 9, 2025 Apr 9, 2025 Apr 14, 2025 Apr 14, 2025 Apr 16, 2025 Apr 19, 2025 Apr 21, 2025 CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW Contracts DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review and take the next steps. NEEDS TO BE NOTARIZED: ❑YES ®No RUSH: []YES ®No SAME DAY: []YES ®No NEXT DAY: ❑YES ®No ROUTING TO CSO: ®YES ❑No Action Required: ❑ Attach Signature, Initial and Notary Tabs ❑ As Requested ® For Your Information ® Signature/Routing and or Recording ® Comment ❑ File Return To: Please notify TPWContracts(& ,fortworthtexas.tiov for pickup when complete. Call ext. 7233 or ext. 8363 with questions. Thank you!