HomeMy WebLinkAboutContract 61577-AR4CSC No. 61577-AR4
FORT WORTH . City of Fort Worth
Construction Allowance Request
Project Name Park Vista Boulevard -Keller Haslet Road to Timberland Boulevard City Sec # 161577
Client Project #(s) 1103281
Project Park Vista Boulevard -Keller Haslet to Timberland -Roadway, Drainage and Illumination Improvements
Description
Contractorl McClendon Construction Company, Inc. I CA#I 4 I Datel 3/27/2025 I
City Project Mgr.I Mitch Aiton I City Inspectorl Steve Johnson I
UNIT or DEPT
Original Contract Amount
Extras to Date
Credits to Date
Current Contract Amount
JAmount of Proposed Allocation
Original Allowance Available to Allocation
Allowance Funds Previously Allocated
Revised Allowance Balance
Unit I - Paving
$3,309,611.75
Unit II - Storm
$572,305.00
I Totals
$3,881,916.75
$3 309 611.75
$572 305.00
$3 881 916.75
$9 660.00
$0.00
$0.00
$0.00
$9 660.00
$300,000.00
$214,928.62
$300,000.00
$214,928.62
$75,411.38
$0.00
$0.00
$0.00
1 $75 411.38
NMI JUSTIFICATION (REASONS) FOR CONSTRUCTION ALLOWANCE
IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST, THE CONTRACT SHALL:
As part of the settlement conditions to grant an easement, Steadman Farms HOA requested (3) 3" PVC sleeves for the HOA to add irrigation and
landscaping to the median in the future through the Adopt -a -Median Program. The contractor has agreed to match the $46.00/LF for 3" PVC
installed via bore for the 103276 Keller Hicks Phase 2 bid. Staff deems the proposed price reasonable.
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and
satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Construction
Allowance Request. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and
administration of this contract, including ensuring all performance and reporting requirements.
McClendon Construction Company, Inc. I Justin Blair I',,— ate; IApr4, 2025
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
�hJ1i
Apr7,2025
Ataf(96f '
Apr4,2025
Program Manager
Date
Senior Capital Project Officer
Date
Apr 9, 2025
'_k
Apr 9, 2025
Assistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
Patricia G. wadsanR
Apr 14, 2025
Apr 14, 2025
nt City Attorney
Date
As '
Date
JUI oo 11-11
Apr 16, 2025
Apr 19, 2025
ATTEST:
p c� ......
0
Oro .10
PV= a=C
Jannette Goodall, City Secretary
CaQn nEX6 644
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Construction Allowance SUMMARY
Page 1 of 4
FORT WORTH, City of Fort Worth
Construction Allowance Additions
Project Name I Park Vista Boulevard - Keller Haslet Road to Timberland Boulevard pity Sec # 1 61577 1
Client Project # 1 103281 1
Contractorl McClendon Construction Company, Inc. PMI Mitch Aiton Inspector) Steve Johnson
Construction Allowance Submittal # ate I 3/27/"1U25 I
ADDITIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
74E 2605.3026 3" CONDT PVC SCH 80 (B) Unit I - Paving 210.00 LF $46.00 $9,660.001
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Unit I - Paving $9,660.001
Unit II - Storm $0.001
$0.001
$0.001
Total Additions $9,660.001
Construction Allowance Additions
Page 2 of 4
FORT WORTH. City of Fort Worth
Construction Allowance Value
Project Name I Park Vista Boulevard - Keller Haslet Road to Timberland Boulevard I City Sec # I b1 b/ /
Client Project # 1 103281 1
Contractor McClendon Construction Company, Inc. I PM1 Mitch Aiton I Inspector) Steve Johnson
Construction Allowance Submittal # Date I 3/2/f2U2b I
CONSTRUCTION ALLOWANCE VALUE BEING USED
ITEM DESCRIPTION Qty Unit Unit Cost Total
Unit 1
Item 70 9999.0000 Construction Allowance 0.032200 LS $300,000.00 $9,660.00
Construction Allowance Value
3of4
M/SBE for this Construction Allowance Request
M/SBE Sub I Type of Service I Amount for this CAR
Total $0.00 I
Previous Construction Allowance Requests
CAR # DATE AMOUNT
1 11/6/2024 $25,589.27
2/18/2025 $171,585.00
3/10/2025 $17,754.35
Total 1 $214,928.62
Construction Allowance MSBE Data
Page 4 of 4
No x
Ji
x
11' CONC -T
Proposed 3" PVC- 70 LF PER SECTDN 321313
w/soxiow, ----------- I -------- I--
7 Bid"
C) Q11 11' 11.1 INNT TEI
PER SECTON 32 13 13
16 31A 010f, J.EI ... ifi,d E-- b, N,. .1991
STA 14 P 17 k Wrl 31240 C G.NG F-T EEIAI. ARTERIAPc�fa
L
18 j(flg `f
1 31711111 24
ST- 2 .9" 49 G' -� 1 1. . - ER 32 01 29
LUNG R_ B2 - —1 V�11]3
B
DD 20 321-BB KL�d LI. 3111241 .
21 321105M Treatment 22 3233.01 1�211 RE GE-XO�,-,�R -2D CO
♦ -A DED
3213.02F
P21L 2.. �j Cotj=1 32 B
'26 "'1 4- CONC GID-I-E (B-)
25 3-0322 C .-' B-GfIld-11, 12.2 -1 G 8:. C
CONTROL POINT NO S1PER SECDON 32 13 20
tc) 26 -301CA rnlr-l-j.. P-1 32�26 EA 0 1
+
N IDG-TIAG C) 327 321SB507 Pill F R--P-2 32— EA
lr 329114 1EE BLOC' SOO PLACEMENT
9 3292DIVIDG PI-1111t 111 IN 32 12 11
�2 E 247' 24, + 8 3251.01
PtETO'E�C.1IL
E- INN ... .... .... 3 'T� '2 IA V1 31 A
ip: 40 330501 A Aj,—�.- 33 EA B PER SECTON � 91 19
�GG - - - - - - - - - - - 41 330S01 'B: 3 o
k. 'D -.w' THAOU CONTROL PONT
E- KFCoi-d B BE41 15�
I'd co
z♦ Lu
:3 ------ �ja7cvARD ------ ----------
�STA 14+7584, 1700 FT PARK VISTA CILURff-DATA
N 7034104 28
E 2347664 57✓PI 5120835
- 5
MATCH EXST TP 721 9± A 107' 4Y T
T 2083
2 - - - - - - L - 24059 PI18+04
- - - - - - - . . . "'o1050,
11 11A � 14.431E T4 2081' z
IT STA - lG'. LF 24111 1C.
412NI'S P� STA
- - - - - - - - - -
UN C TIIO - - - - - - - - - --
- - - - - - - - - - - - - - DE R NONO
740 7411
736
I �iiI E/ 711 TH SE PLANS ARE ISSUED FOR
60% THE FEE `
PIPE F 1111]"NA11
R AN HOT ET...
FOR CC STRUCTON
NEIE D ARE
712✓ SUBMITTAL W
712 FINAL FGRM"1C`EE�B�"E- BE
FOR PREUMNARY SEAUED, SIGNED AND BATED
DESIGN REVIEW RESPONSIBLE ENGINEER
INC
P 728 7211 1. 2. TEXAS REG STER NGINEERING
FIR FTjoE
F CARL T NIP E
All 1- -AS RECISTRATONROGNESNS, O. 91869
NO I M., 11, Cl2l
i rREI DESCRIPTION 11 DATE
724
- - - - - - - - - -
720 1 T 77, 7211 ORTWORT CITY OF FORT WORTH, TX
TRANSPORTATION &
PUBLIC WORKS
716 711 PARK VISTA BOULEVARD IMPROVEMENTS
PAVING PLAN & PROFILE
712 712 PARK VISTA BOULEVARD
STA 113+50 TO STA 17-00
711 708 0
N : n
DESIGNED C DRAWN SHIK � DATE PROJECT NO Sheet
704 704 /LF 20
13+156 4+6i 4.- 116 tdli, 7, 0 CHECKED C`IA3 .AY 2G 23 10732-01 0
130
a '„ „' 8 z e I LE{1END
`°°.>aa ¢ - X
__
_ _ ___
tar-Ds-� N ¢ s=s is�ree ar`.M _ , . 1.32 X
r.a,er
ONC
e rya �
.se
_ '+•' �wxrwxsa
10' TYPE P-I mu I i W - LAi-D6- - - - - Imo rh PERC ECIION 1313
CURB .1
J T � � .. . - . -
•�—a °`_ -' I F —roc—Tot— ur oc—TM���rpc BIEIIs[ Item Descrlphan spec No U.It QtYI PER 3ECn PONM3 TES Item Number 2
PROPSGRADE O ly,�c'ri 18 3123.0101 URcl.-fiml Exca t-by Plan 31231E CY 1]34
I_� _ Proposed 3" PVC - 70 LF I 3124.O10 EmbankmeMWPlan 312900 Cl- ]
18 3201.061 o Print Repair,—.1 32013� S✓ 102 CCONNC3 P or REPAIR, ARTERIAL
rII 10'ttPE P-1 « ` �,«,««�fe««««f••pc 2
`CURB RAMP / 19 32110113 Flexible Base. T— A. GR-1 311123 SY 0
q ON1R POINT �50 20 3211.04W H ate¢ Lime 321129 TN m
tz /s /S 21 3213 3102 8""CG Treatment 32 3129 SY 164E
O �s N/8034434 411 « « + 22 3313.010E 11" Coot Prml 321313 SY ]84 PER SEC110N 32TI3 20 CONC
23 3213.0206 11" CORc Print HES 321313 SY b6]
EL 24 3213.0301 4"ConcS —11, 321320 SF 6195
Q I v4]236 Oil 25 3213.0322 Conc Corbat13-11Sleewalk 321320 LF 0 " CONC SID WALK ID546)
F- ® PER EECTIONE32 13 20
26 3213.050E Bamer Free Ramp, TYpe P-1 32 T3 20 EA 2
3213.050]Ba Mer Free Ramp, Tvpe P-2 321320 EA 0
3391.0100 6"T9�all 329119 CY 208 PLO
ERCI EGO NT
SIC— 32 B2E111
� t6.0� ` . .� -e y� W 39 32:2.0100 Blacka Placement 32 9214 SY 1243 PER SE -ON 32 91 19
40 3305010�AanM1ole A��••{{ men[, Mala 33051d EA 0
41 Valve Box AduustmeM 330514 EA 0
�! �9999A0015"Colored T.—dGannet¢ 999999 SF 697 nn CONTROL POINT
_-- V
Q
17+ - - ----- _ - F-
STA EXE T2,477017E o TA -- STA 1 +8933� 00 N ]34]]2669, 23.11 IT
ATCH TP Pi PARK VISTA BOULEVARDol
]" N 34771194� ]� (colucRE1ET MATCH EXST TP 7221.
12081' -
JT p = 2456'
« ` R - 105000' -
e « e
PPT SC STTA A = 16+89+24 513,95�- t -
r � = 1
r n
I 1 4 I I I i CN
NOERGROON
I I FIBER I I
I I
oem I i e
eaa,w
Vm
736
732
728
724
20
16
712
FZF7
512I I I I I I I 115SI I I I I I I I I R 8 1 I I I I I I I I5I8I I I I I I I I IdII I I I I I I I Inwl I I I I I I 11511 I I I I I I I I$w 704
17+00 17+50 18A0 18+50 19A0 19-•50 20A0 20T50
60N/0 THESE PLANE ARE ISSUED FOR
RE lRPlIE OFNOT ETEN..
SUBMITTAL FDR `D" "'DGDDN
IN
FINALWFORM STIEYE WILL BE
FOR PRELMJARY SEALBD, SIGNED AND DATED
DESIGN REVEW RESPONSIBLE ENGINEER
PONEcIN
SOE INC.
`1. 2.� R%A5 REFIRMERFTloEN6GINEERING
CRL J KROGNEOGNE5P.E.
scA,a , w. TEXASE REGISTRATNO. 0. 91669
REV DESCRIPTION BY }1 02JDATE
ORTWORT CITY OF FORT WORTH, TX
TRANSPORTATION &
PUBLIC WORKS
PARK VISTA BOULEVARD IMPROVEMENTS
PAVING PLAN & PROFILE
PARK VISTA BOULEVARD
STA 17+00 TO STA 20.50
re PE1AeM.o-ere� ftaeies
Ne E-,p4a
DESIGNED CJK DATE PROJECT NO SM1eet
DRAWN. SHAF 21
CHECKED CWG MAY 2023 10732-01
0 130
aaa, ao,m, ,, ,.�«,a:« ma'�`wn :o «,a« ,a•. n....m
I I I ®„� pmNi rzo,a I ,e ,a„ I I wTM^,
_Y—___ --------
______ a'rmro roae
_ - -
_
\
___
BIE�II^st
Ifem scriPEon
De
ass 17
aroc
3123.0101/Inclaszifled Ersavabon by NO,
313AOIO cmbankmen[bl�Plan
roczoczocFoKA nq`zocz Fr
G�''r`G'.'rf4 l4ti-'�Gik�Shk\ c'rl��'s�?•AXrV^!-!��'G'c'z�cA \c��a �}\
c
`G 0. Proposed 3" PVC - 70 LF 19
3211.01138"Flexible �ase! Twe A.aGR-1
--Ft,-4'k4
- _ _ - _ _ _ 20
3211.0400 H/yv�l"d Llme
21
22
3211— B"Elms Treatme
—11)06 IS"Cans Pvmt
23
3213.0206 11" CP4c PVPB NES
24
3213.1311 4"CmcE,dewalk
—3.03 7- CPrbat Back M5ldewalk
3313.03 er Free Ramp Twe P-]
O
«
O 25
O 28
}
} 27
3213.09arrier Free Ram .'i eP-2
P w
N 38
M7 39
3391.D100 6"TPPsdI
3292.O100'3I.k3Pd Placement
Q
H
�'
A
Q 40
41
3311.0106i V. E.IAd �,tmeM. Major
3303.0111 Ive Box{^jlJ�IeslmeM
105°�y.
9999.00° ' Cd..;.)Lred Canoe.
- - t_� �p-�t_� tea- -
Zt
- -f-Y sf •—�-a-- -«
« a « a « a « a a a a a • « • « « « « a « a « a « a « a a_�at « • « • « • « • « ate,
J J
PARK VISTA BOULEVARD F-
CONCUT an ConCaErE (c9xcRErE)
<I
2
/ NL s
a a
47747.567
1
a • /« Ea • a « - • ,.- « a -,_ a a :..^!
«_ a a a a «_-. _- . a ... a . __. a .._�
_- ----- -------_ I f- - - uxoia¶OouNo
6ER
736
I 60 0' VC
732 FfL iL rir liA9
NP•;p GI.' ��
728 L
I
724
720
Am --If
go
LE{1ENo
gz�
PER CEClI0NM321313
o',JJ Q41N]
3P1e2a
3124, 141
CVPER E-ON32 I1313
320129 SYJ 0
321123 S� 389
331129 TN 23
NNG o 9 T REPAIR, ARTERIAL
2
331129 S J 9]31
321313 S J 896
20 CO"
321313 SY
3213% SF
32 13 LF
0
7-
0
PER SECTION 32113
321 EA
321 EA
0
0
® 4" CONC SIDEWALK (0646)
PER SECTION 32 13 20
33 9 262
329213 SV 15]l
BLOCK 5°DNP 321211
330S 14 EA
33051� EA
0PtETO
0
3
PER SECTION 32 91 19
99999 SF 0
15, CONTROL POINT
732
60% .. 11RROSE OFEPIE-1 FOR
SUBMITTAL NOT
INT „°E°
728 RE °wµrl"' 'S"ED IN
FOR PRELIMINARY SCALOD, ,SIGNED AND WILLTEo
DESIGN REVEW RESPONSIBE
L EN EER
BGE INC.GIN
724 1. .-I1. . TExas FEFIRMER
Fm Og6GINEERING
CARL J KROGNESS, P.E.
ecuc 1 w. TEXAS REGISTRATION NO. 91869
REV DESCRIPTION BY 3 29210ATE
720
716
716
ORTWORT CITY OF FORT WORTH, TX
TRANSPORTATION &
PUBLIC WORKS
712
712
PARK VISTA BOULEVARD IMPROVEMENTS
I
sT p k�
; itl
PAVING PLAN 6 PROFILE
708
it
708
PARK VISTA BOULEVARD
STA 31.50 TO STA 35.00
704 I
-
-
-
704
n u.�s,.s,�re,999 Fm wo,n. TX Te,m
xm
FBI-OaTslaP.,...,weo-emm
Re1AaNmaao� No E-1P4e
DATE PROJECT NO Sheet
700 'd w
ma,
`v`:
m�
`a4d
NT
u w
700
DESIGNED CJK
DRAWN. SHAF 2`J
31+5i
1 `
;2AO
16
;12+5 5
I
+0 (
:3+5 i
l
;4+ai
14+51
1 `
;5+00
NAY 2023 10]32-01
CHECKED CWG 1130
FORT WORTH:,:
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Park Vista CA #4
M&C: N/A CPN: 103281 CSO: 61577
Date: 3/27/2024
To:
Name
1.
Jessica Rodriguez
2.
Mitch Aiton
3.
Justin Blair
4.
Steve Johnson (Inspector)
5.
Raul Lopez
6.
Lissette Acevedo
7.
Patricia Wadsack
8.
Lauren Prieur
9.
Doug Black
10.
Jesica McEachern
11.
Jannette Goodall
12.
TPW Contracts
Department
Initials
TPW - Review
TPW - Signature
All
McClendon - Signature
TPW — Signature
��S�Y/�
Donald Watson
TPW - Signature
-0c7-
TPW — Signature
TPW — Signature
PL IA/
TPW — Signature
LIP xv
Legal — Signature
Doug�Black
CMO — Signature
CK
CSO - Signature
7,-40--
DOC#: N/A
Date Out
Apr 4, 2025
Apr 4, 2025
Apr 4, 2025
Apr 7, 2025
Apr 9, 2025
Apr 9, 2025
Apr 14, 2025
Apr 14, 2025
Apr 16, 2025
Apr 19, 2025
Apr 21, 2025
CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW
Contracts
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: []YES ®No SAME DAY: []YES ®No NEXT DAY: ❑YES ®No
ROUTING TO CSO: ®YES ❑No
Action Required: ❑ Attach Signature, Initial and Notary Tabs
❑ As Requested
® For Your Information
® Signature/Routing and or Recording
® Comment
❑ File
Return To: Please notify TPWContracts(& ,fortworthtexas.tiov for pickup when complete. Call ext.
7233 or ext. 8363 with questions. Thank you!