HomeMy WebLinkAboutContract 59935Date Received: Aug 17, 2023
Time Received: 7:13 a.m.
City Secretary
Contract No.: 59935
FUTURE IMPROVEMENTS AGREEMENT
FOR INFRASTRUCTURE IMPROVEMENTS
SUMMER CREST - SOUTH HULEN STREET (W. CLEBURNE ROAD)
This FUTURE IMPROVEMENTS AGREEMENT ("Agreement"), is made and entered into
by and between the City of Fort Worth ("City"), a home -rule municipal corporation of the State of
Texas, acting by and through its duly authorized Assistant City Manager, and Hawkins Family Joint
Venture ("Developer"), a joint venture, acting by and through its duly authorized representative. City and
Developer are referred to herein individually as a "party" and collectively as the "parties."
WHEREAS, Developer is the owner of a tract of land within the City of Fort Worth located at
10401 W. Cleburne Road, Fort Worth, Texas 76036 ("Property"); and
WHEREAS, Developer is developing the Property by constructing a residential subdivision
known as Summer Crest ("Project"); and
WHEREAS, in connection with the Project, the City approved a preliminary plat for the Project,
PP-20-062; and
WHEREAS, the City desires to ensure that all developments are adequately served by public
infrastructure that is constructed according to City standards; and
WHEREAS, in review of PP-20-062, the City determined that, based upon the increased traffic
demands created by the Project, Developer is responsible for constructing paving and storm drainage
improvements on South Hulen Street (aka W. Cleburne Road) as more specifically described herein
("Improvements"); and
WHEREAS, City Staff have determined that it is not feasible for Developer to construct the
Improvements at this time because the right-of-way necessary to construct the majority of the
Improvements is located on adjacent property that is not owned by Developer; and
WHEREAS, in lieu of the Developer constructing the Improvements pursuant to a community
facilities agreement, the City has agreed to construct the Improvement(s) with Developer contributing the
funds necessary to construct the Improvements and the City constructing the Improvements at a later
time; and
WHEREAS, the determination of the amount Developer pays to the City pursuant to this
Agreement for construction of the Improvements is not an assessment pursuant to Chapter 313 of the
Texas Transportation Code;
NOW THEREFORE, in consideration of the above recitals, City and Developer, acting by and
through their duly authorized representatives, do hereby agree as follows:
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Future Improvements Agreement
Paving and Storm Drain Improvements for Summer Crest — South Hulen Street (W. Cleburne Road)
Hawkins Joint Family Venture
Page 1 of 10
1.
Incorporation of Recitals
The City and Developer agree that the foregoing recitals are true and correct, form the basis upon
which the City and Developer have entered into this Agreement and are incorporated into this Agreement
by reference.
2.
Improvements
The Improvements shall consist of approximately 1,235 linear feet of paving improvements, with
sidewalks and associated storm drain improvements as more specifically described in Exhibit "A" which
is attached hereto and incorporated herein by reference.
3.
Future Improvement Funds
Concurrently with the execution of this Agreement, Developer has paid to the City $525,951.00,
which amount represents one hundred twenty-five percent of the estimated cost of constructing the
Improvements ("Future Improvement Funds"). The Future Improvement Funds shall serve as the entire
amount of Developer's contribution for the cost to construct the Improvements.
4.
Construction of Improvements
The City may construct, or cause to be constructed, the Improvements at a time convenient to the
City provided that adequate public funds, including the Future Improvement Funds, for construction of
the Improvement are secured.
5.
Use of Future Improvement Funds
By accepting the Future Improvement Funds and by execution of this Agreement, City agrees that
the Developer will have no further obligation to pay any amounts in addition to the Future Improvement
Funds or take any further action with regard to the construction of the Improvements, even if: (a) the
actual costs to construct the Improvements exceeds the costs expected by the City as of the date of this
Agreement; (b) the specifications, composition, or other characteristics of the Improvements hereafter
change for any reason; (c) a mistake has been made (mutual or unilateral) in computing the costs of the
Improvements; or (d) the costs or scope of the Improvements change for any reason. No refund of any
balance of the Future Improvement Funds shall be made by City to Developer.
Notwithstanding anything to the contrary herein, City may use the Future Improvement Funds to
construct improvements that are located in the vicinity of the Project that address transportation demands
caused by the Project. If some or all of the Future Improvement Funds are used to construct such adjacent
improvements, City shall be responsible for constructing or causing the construction of the Improvements
contemplated by this Agreement at a time convenient to the City
6.
Notices
Future Improvements Agreement
Paving and Storm Drain Improvements for Summer Crest — South Hulen Street (W. Cleburne Road)
Hawkins Joint Family Venture
Page 2 of 10
All notices required or permitted under this Agreement may be given to a party by hand -
delivery or by mail, addressed to such party at the address stated below. Any notice so given shall be
deemed to have been received when deposited in the United States mail so addressed with postage
prepaid:
CITY:
Development Coordination Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
With conies to:
City Attorney's Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
and
City Manager's Office
City of Fort Worth
200 Texas Street
Fort Worth, Texas 76102
DEVELOPER:
Hawkins Joint Venture
7201 Hawkins View Drive, Ste. 101
Fort Worth, Texas 76132
Or to such other address one party may hereafter designate by notice in writing addressed
and mailed or delivered to the other party hereto.
7.
Applicable Law; Venue
This Agreement shall be construed under and in accordance with Texas law. Venue shall be in
the state courts located in Tarrant County, Texas or the United States District Court for the Northern
District of Texas, Fort Worth Division.
8.
Headings
The paragraph headings contained herein are for the convenience in reference and are not
intended to define or limit the scope of any provision of this Agreement.
9.
Severability
In the event that any clause or provision of this Agreement shall be held to be invalid by any
Future Improvements Agreement
Paving and Storm Drain Improvements for Summer Crest — South Hulen Street (W. Cleburne Road)
Hawkins Joint Family Venture
Page 3 of 10
court of competent jurisdiction, the invalidity of such clause or provision shall not affect any of
the remaining provisions hereof.
10.
Review of Counsel
City and Developer, and if they so choose, their attorneys, have had the opportunity to
review and comment on this Agreement; therefore any rule of contract construction or interpretation
that would normally call for the document to be interpreted as against the drafting party shall not
apply in interpretation of this Agreement, and each section, portion, and provision of this Agreement
shall be construed solely on the basis of the language contained therein, regardless of who authored
such language.
11.
Amendment
No amendment, modification, or alteration of the terms of this Agreement shall be binding unless
the same is in writing, dated subsequent to the date hereof, and duly executed by the City and Developer.
12.
No Third -Party Beneficiaries
The provisions and conditions of this Agreement are solely for the benefit of the City and
Developer, and any lawful assign or successor of Developer, and are not intended to create any rights,
contractual or otherwise, to any other person or entity.
13.
Prohibition on Boycotting Israel
Developer acknowledges that in accordance with Chapter 2271 of the Texas Government Code,
the City is prohibited from entering into a contract with a company with 10 or more full-time employees
that has a value of $100,000 or more that is to be paid wholly or partly from public funds of the City for
goods or services unless the contract contains a written verification from the company that it: (1) does not
boycott Israel; and (2) will not boycott Israel during the term of the contract. The terms "boycott Israel"
and "company" have the meanings ascribed to those terms by Chapter 2271 of the Texas Government
Code. To the extent that Chapter 2271 of the Government Code is applicable to this Agreement, by
signing this Agreement, Developer certifies that Developer's signature provides written verification to the
City that Developer: (1) does not boycott Israel; and (2) will not boycott Israel during the term of this
Agreement.
14.
Prohibition on Boycotting Energy Companies
Developer acknowledges that in accordance with Chapter 2274 of the Texas Government Code
(as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2), the City is prohibited from entering into a contract
for goods or services that has a value of $100,000 or more, which will be paid wholly or partly from
public funds of the City, with a company with 10 or more full-time employees, unless the contract
contains a written verification from the company that it: (1) does not boycott energy companies; and (2)
Future Improvements Agreement
Paving and Storm Drain Improvements for Summer Crest — South Hulen Street (W. Cleburne Road)
Hawkins Joint Family Venture
Page 4 of 10
will not boycott energy companies during the term of the contract. The terms "boycott energy company"
and "company" have the meaning ascribed to those terms by Chapter 2274 of the Texas Government
Code (as added by Acts 2021, 87th Leg., R.S., S.B. 13, § 2). To the extent that Chapter 2274 of the
Government Code is applicable to this Agreement, by signing this Agreement, Developer certifies
that Developer's signature provides written verification to the City that Developer: (1) does not
boycott energy companies; and (2) will not boycott energy companies during the term of this
Agreement.
15.
Prohibition on Discrimination Against Firearm and Ammunition Industries
Developer acknowledges that except as otherwise provided by Chapter 2274 of the Texas
Government Code (as added by Acts 2021, 87th Leg., R.S., S.B. 19, § 1), the City is prohibited from
entering into a contract for goods or services that has a value of $100,000 or more which will be paid
wholly or partly from public funds of the City, with a company (with 10 or more full-time employees)
unless the contract contains a written verification from the company that it: (1) does not have a practice,
policy, guidance, or directive that discriminates against a firearm entity or firearm trade association; and
(2) will not discriminate during the term of the contract against a firearm entity or firearm trade
association. The terms "discriminate," "firearm entity" and "firearm trade association" have the meaning
ascribed to those terms by Chapter 2274 of the Texas Government Code (as added by Acts 2021, 87th
Leg., R.S., S.B. 19, § 1). To the extent that Chapter 2274 of the Government Code is applicable to
this Agreement, by signing this Agreement, Developer certifies that Developer's signature provides
written verification to the City that Developer: (1) does not have a practice, policy, guidance, or
directive that discriminates against a firearm entity or firearm trade association; and (2) will not
discriminate against a firearm entity or firearm trade association during the term of this
Agreement.
16.
Signature Authority
The person signing this Agreement on behalf of Developer warrants that he or she has the legal
authority to execute this Agreement on behalf of the Developer, and that such binding authority has been
granted by proper order, resolution, ordinance or other authorization of the entity. The City is fully
entitled to rely on this warranty and representation in entering into this Agreement.
17.
Counterparts
This Agreement may be executed in multiple counterparts, each of which will be deemed an
original, but which together will constitute one instrument.
18.
Entire Agreement
This written instrument (together with any attachments, exhibits, and appendices) constitutes the
entire understanding between the City and Developer, and any prior or contemporaneous, oral or written
agreement that purports to vary from the terms hereof shall be void.
Future Improvements Agreement
Paving and Storm Drain Improvements for Summer Crest — South Hulen Street (W. Cleburne Road)
Hawkins Joint Family Venture
Page 5 of 10
IN WITNESS WHEREOF, the City and Developer have each executed this Agreement by their
duly authorized signatories to be effective on the date executed by the City's Assistant City Manager.
CITY OF FORT WORTH DEVELOPER:
Hawkins Joint Family Venture
a a� -te✓e Hawxihs
Dana Burghdoff (Aug 2023 CDT) steve hawkins (Aug 15, 202310:24 CDT)
Dana Burghdoff Steve Hawkins
Assistant City Manager President
Aug 16, 2023 Aug 15, 2023
Date Date
Recommended by:
-da..,
Dwayne Hollars (Aug 15, 2023 10:26 CDT)
Dwayne Hollars
Contract Compliance Specialist
Development Services
APPROVED AS TO FORM AND LEGALITY
2—
Richard A. McCracken (Aug 16, 202314:11 CDT)
Richard McCracken
Sr. Assistant City Attorney
4 d4440R�
p o�Fonr°a Contract Compliance Manager: ATTEST: o 0
By signing, I acknowledge that I am the p �9=;
person responsible for the monitoring and °o��ooe000.00000 ��
administration of this contract, including ensuring A s °°an nEXAg4p
all performance and reporting requirements.
Jannette S. Goodall
City Secretary
Name: Tyson Thompson, PE
Title: Assistant Director
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Future Improvements Agreement
Paving and Storm Drain Improvements for Summer Crest — South Hulen Street (W. Cleburne Road)
Hawkins Joint Family Venture
Page 6 of 10
1*14111:311W.1
I avotiamana�m
X
aVoa Nmn" s
Noll am 1,3� D
�anaa-i� Uy0 +�
a 0
w P:.
Awn U9310 OHOHV9
0� 0
W OL
w
J
s~q CL
Z -
0°
J
W
1� J
Future Improvements Agreement
Paving and Storm Drain Improvements for Summer Crest — South Hulen Street (W. Cleburne Road)
Hawkins Joint Family Venture
Page 7 of 10
PARKWAY
ROADWAY
PROPOSED STORM
.I I. ; Ka
In 3t. P20 7-016955
C.R.T.C.T.
PARKWAY --,,
.1
I
I I
I I
SCREEN WALL
I i
I �
I
I I
I
I
LEGEND
pill
aciOn45rnGP�CprTr
yi
My
I0
l
u_nnrrE aalvcmTE
WrE CO ;AFIT
7
FW,EWENnaEEW 1L,(
PrNwasE6hTf aT Trw4sjrI::h
II.
1 , �IfI
ft30P�SSEtr fYALP
V
$ � 11G4rA fIt-
—107rR
FP'-}
PROPCO aCI-MI .CT
L�
PROPGOEP8T04"t LINE
5
,.LrrufoT m 9-aWMA%
PROPWID UMATMT9 ON rN1. MET
E LOTO N
.Y ..
DINT
NEWLEB PI
EXHIBIT
' LANo &CLUTIO141111
Y4E�TCLEBURNEIHULEN ROAD
E
1
Future Improvements Agreement
Paving and Storm Drain Improvements for Summer Crest — South Hulen Street (W. Cleburne Road)
Hawkins Joint Family Venture
Page 8 of 10
PARKWAY
CRO'AIEYISD 0
r �
LEGEND
PROPOSED 10• REINFORCED CONCAfTE
PROPOSED V STABILIZED SUDGR.gDE
Ii'!II PEL T N
�II LAND �OLU *IOH�
alrr LIMITS
�
FuOhY
_ DEDICaTlOH
009F,7EPROW
=
wEAITUGEOF�AITM
CWISTljkN CENTER
3w
WY _
M RCLAD54AY
MESURIFED ROW
-
I
9r�F FR WALL
�
F
SLOPE
9LQPEiTYF) — 27%SLOPEi'•'Y.�i M1sj
7 � _xlsilnu +
LY ULBURNE R13 ROACODEWCH
�EM4S'ING
FEhcaLjiw PPRRCPEFlR6lY z FFEEHICELINE
LINE
SECTION B-B ,"0-m yam
ULTIMATE V L 691a v IjVFM
WEST CLEBURNU HULEN ROAD am ?r a ,� a W WAMR
dA NOT-f}SCJU F
SUMMER CREST
ULTIMATE BUILDOUT
FORT WORTIJ TE M
mGuvr2ml
NOT TO SCALE 0
Summer Crest
_ P E LOTO N
II L A N D s 0 L U T 1 o N s
969�IFlL OD PNWT.,S 250 I FORT WORTH,TK7617i1617.562,3-
1 Gross Acres
1,285 LF of 34' B-B (2 Lanes)
PAVING MPROVEMENTS
ITEM # DESCRIPTION
1 9" Conc Pvmt
2 6" Lime Treatment
3 Hydrated Lime @ 32lbs/SY
TOTAL PAVING
STORM DRAIN IMPROVEMENTS
ITEM #
DESCRIPTION
1
21" RCP, Class III
2
36" RCP, Class III
3
42" RCP, Class III
4
10' Curb Inlet
5
4' Storm Junction Box
6
5' Storm Junction Box
7
Remove EAsting Headwall
8
Remove 36" Storm Line
TOTAL STO_'M DRAIN
MISCELLANEOUS COSTS
ITEM #
DESCRIPTION
1
Engineering & Surveying
2
PPM Bond (3%of CC)
3
Inspection Fee (P, SD, SL)
4
Materials Testing Fee (P, SD, SL)
5
Geotechnical Testing (1 % of CC)
TOTAL MISCELLANEOUS
Construction Costs
Miscellaneous Costs
Contingecny Costs (10%)
TOTAL PHASE HULEN ST COST
OPINION OF PROBABLE COST FOR:
Summer Crest, Hulen St.
Project Number:
Prepared For:
Date:
UNIT
SY
SY
SY
UNIT
LF
LF
LF
LF
EA
EA
EA
LF
QTY
3,141
3,358
60
QTY
120
170
750
8
1
1
1
60
UNIT QTY
LS $47,382.98
3%
4%
2%
1%
HCH2O001
Hawkins Custom Homes
September 2, 2021
UNIT PRICE
TOTALI
$65.00
$204,165.00
$3.25
$10,912.27
$185.00
$11,180.88
$226,258.14
UNIT PRICE
TOTALI
$60.00
$7,200.00
$125.00
$21,250.00
$127.00
$95,250.00
$3,200.00
$25,600.00
$5,000.00
$5,000.00
$7,500.00
$7,500.00
$5,000.00
$5,000.00
$30.00
$1,800.00
$168,600.00
TOTAL
$47,382.98
$11,845.74
$15,794.33
$7,897.16
$3,948.58
$86,868.79
$394,858
$86,869
$44,224
$525,951
Per LF: $409
Future Improvements Agreement
Paving and Storm Drain Improvements for Summer Crest — South Hulen Street (W. Cleburne Road)
Hawkins Joint Family Venture
Page 10 of 10