CITY OF FORT WORTH, TEXAS
STANDARD AGREEMENT FOR ENGINEERING RELATED DESIGN SERVICES
This AGREEMENT is between the City of Fort Worth, a Texas home-rule
municipality ('the "CITY'), and, P,eloton Land, Solutions, LLLP, authorized to do business in
Texas, (the "ENGINEER"), for a PROJECT generally described as: Roundabout at North
Riverside Drive and Shiver Road.
Article 1,
Scope of Services
A. The Scope of Services is set forth in Attachment A.
Article 11
Compensation
A. The ENGINEER's compensation, shall be in the amount of' $491, 960.00, as
set forth, in Attachment B.
Article III
Term ayment
Payments,to the ENGINEER will be made as follows:
A. Invoice and Payment
(1) The; Engineer shall provide the, City sufficient, documentation, including but
not limited to meeting the requirements set forth in Attachment D to this
AGREEMENT, to reasonably substantiate the invoices.
(2) The ENGINEER will issue monthly 'invoices for all work, performed under this
AGREEMENT. Invoices are due and, payable within 30 days of'receipt.
(31) Upon completion of services enumerated in Article 1, the final payment of
any balance will be due within 30 days of receipt of the final '
City of Fort Worth,Texas 1128,12013 OFFICIAL RECORD
Standard Agreement for Engineering Related Design Services
OF
'y
0 LR
11 AR
PMO Official Release Date: 7SECUTA
Page I of 161 Cir RY'
I TX
FtWwog
X
T
Nam
momomma"Mi , I I
(4) In the event of' a disputed or contested billing, only that port,i,on so contested
will be withheld, from payment,, and, the, undisputed portion will be paid. The
CITY will exercise, reasonableness in contesting any bill or portion thereof.
No interest will accrue on any contested portion of the billing until mutuallily
resolved.
(5), If the CITY fails to make payment in full to ENGINEER for billings contested
in good faith within 60 day's of the amount due, the ENGINEER may, after
giving 7 days' written notice to CITY,, suspend services under this
AGREEMENT until plaid in full. In the event of suspension of services, the
ENGINEER, shall have no liability to CITY fore delays or damages, caused the
CITY because of such suspension of services.
Art cle IV
01611"gations of the Engli,neeir
Amendments to Article IV,1 if any, are included in Attachment C.
A. General
The ENGINEER will serve as the CITY's professional engineering
representative under this Agreement, providing professional engineering
consultation and advice and furnishing customary services, incidental
thereto.
B, Standard of'Care
The standard of care applicable to the ENGINEER's services will be the
degree of skill and d,iligence normally employed in the State of Texas by
professional engineers or consultants performing the same or similar
services at the time such services are performed.
al
C, Subsurface, Investigations
(1) The ENGINEER shall advise the CITY with, regard to they necessity for
subcontract work such as special surveys, tests, test borings,, or other
subsurface investigations in connection with design and engineering
work to be performed hereunder. The ENGINEER shall also advise
the CITY concerning the results of same. Such surveys, tests, and
investigations shall be furnished by the CITY, unless otherwise
specified in Attachment A.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
P Official Release Date:112812013
Page 2 of 16,
In soils, foundation, groundwater, and other subsurface investigations,
the actual characteristics may vary significantly between, successive
test points and sample Intervals and at locations other than where
observations, exploration, and investigations have been mad�e.
Because of the inherent uncertainties in subsurface evaluations,
changed or unanticipated underground conditions may occur that
could affect the total PROJECT cost and/or execution. These
coin,ditions, and cost/execution effects are not the responsibility of the
ENGINEER.
D. Preparation of Engineering Drawings
The ENGINEER will provide to the CITY the original drawings of I all plans in
ink on reproducible mylar sheets and electronic files in pdf format, or as
otherwise approved by CITY, which shall become the property of the CITY.
CITY may use such drawings in any manner it desires; provided, however,
that the ENGINEER shall not be liable for the use of such drawings for any
project other than the PROJECT described herein.
4:
E., Engineees Personnel at Construction Site
(1) The presence or duties of the ENGINEER's personnel at a construction site,
whether as on-site representatives or otherwise, do not make the
ENGINEER or its personnel in any way responsible for those duties that
belong to the CITY and/or the CITY's construction contractors or other
entities, and do not relieve, the construction contractors or any other entity of
their obligations, duties, and responsibilities, including, but not limited to, all
construction methods, means, techniques, sequences, and procedures
necessary for coordinating and completing all portions of the construction
work in accordance with the Contract Documents and any health or safety
precautions required by such construction work. The ENGINEER and its
personnel have no authority to exercise any control over any construction
contractor or other entity or their employees in connection with their work or
any health or safety precautions.
(2) Except to the extent of specific site visits expressly detailed and set forth in
Attachment A, the ENGIINEER or its personnel shall, have no obligation or
responsibility to visit the construction site to become familiar with the
progress or quality of the completed work on the PROJECT or to determine,,
in general, if the, work on the PROJECT is being performed in a manner
indicating that the PROJECT, when completed, will be in accordance with
the Contract Documents, nor shall anything in the Contract Documents or
the agreement between CITY and ENGINEER be construed as requiring
City of Fort Worth,Texas
Standard Agreement for,Engineering Related Design Services,
PMO Of Release Date.-1/2,8/2013
Page 3 of 16,
ENGINEER to make exhaustive or continuous, on-site inspections, to
discover latent defects in the work or otherwise check the quality or quantity
of the work on the PROJECT. If the ENGINEER makes on-site
observation(s) of a deviation from, the Contract Documents, the ENGINEER
shall Inform the CITY.
(3) When professional certification of performance or characteristics of
materials, systems or equipment is reasonably required to perform the
services, set forth in the Scope of Services, the ENGINEER shall be entitled
to rely upon such certification to establish materials, systems or equipment
and performance criteria to be required in the Contract Documents.
F. Opinions of Probable Cost, F'I*nancli*lal Cons ide ratio ns, and Schedules
(1), The ENGINEER shall provide olpinions of probable costs based on the
current available info rmation at the time of preparation, in accordance
with Attachment A.,
(2), In providing opinions of cost, financial, analyses, economic, feasibility
projections, and schedules for the PROJECT, the ENGINEER has no
control over cost or price of labor and materials; unknown or latent
conditions of existing equipment or' structures that may affect operation,
or maintenance costs; competitive bidding procedures and market
conditions; time or quality of performance by third parties,- quality,, type,
management, or direction of operating personnel; and other economic
and operational factors that may materially affect the ultimate
PROJECT cost or schedule. Therefore, the ENGINEER makes, no
warranty that the CI 's actual PROJECT costs, financial aspects,
economic feasibility, or schedules will not vary from the ENGINEER's
opinions, analyses, projections, or estimates.
G, Construction Progress Payments
Recommendations by the, ENGINEER to the CITY for periodic construction,
progress payments to the construction contractor will be based on the
ENGINEER's knowledge, information, and belief from selective sampling:,
and observation that the work has progressed to the point indicated. Such
recommendations do not represent that continuous or detailed, examinations
have been made by the ENGINEER to ascertain that the construction
contractor has completed the work in exact accordance with the Contract
Documents; that the final work will be acceptable in all respects; that the
ENGINEER, has made an examination to ascertain how or for what purpose
the construction contractor has used the moneys plaid; that title to any of the
work, materials, or equipment has passed to the CITY free and clear of Heil
claims, security interests, or encumbrances; or that there are not other
City of Fort Worth,Texas,
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 1/'2,8,12013
Page 4 of'116
matters at
issue between the CITY and the construct-ion contractor that
affect the amount that should be paid.
H. Record Drawings
Record drawings, if required, will be prepared,, in part, on the bas's of
Information compiled and furnished by others, and may not a,lway' s represent
the exact location, type of various components, or exact manner in which the
PROJECT was finally constructed. The ENGINEER is not, responsible for
any errors or omissions 'in the Information from others that is incorporated
into the record drawings.
1, Minority Business, and Small Business Enterprise (MBE)(SBE)
Participation
In accord with the City of Fort Worth Business Diversity Ordinance No.
20020-12-2011, as amended, the City has goals for the participation of
minority business enterprises and/or small business enterprises in City
contracts. Engineer acknowledges the E and SERE goals established for
this contract and its accepted written commitment to MBE and SBE
participation. Any misrepresentation of facts (other than, a negligent
misrepreisentation) and/or the, commission of fraud by the Engineer may
result in the termination of this Agreement and debarment from participating
in City contracts for a period of time of not less than three (3) years.
jai Right toi Audit
(11) ENGINEER agrees that the CITY shall, until the expiration of five (5) years
after final payment under this contract, have access to and the right to
examine and photocopy any directly pertinent books, documents, papers
and records of the ENGINEER involving transactions relating to this
contract. ENG11NEER agrees,that the CITY shall have access during normal
work,ing hours to all necessary ENGINE EER facilities and shall be, provided
adequate and appropriate work space, in order to conduct audits in
compliance: with the provisions of this section. The CITY shall give
ENGINEER reasonable advance notice of intended audits.
(2) ENGINEER further agrees to include in all its subconlisultant, agreements
hereunder a provision to the effect that the subconsultant agrees, that the
CITY shall, until the expiration of five (5) years after final payment under the
subcontract, have access to and the, right to examine and photocopy any
directly pertinent books, documents, papers and records of such
subconsult,ant I involving, transactions to the subcontract, and further, that the
CITY shall have access during normal working hours, to all subconisultant
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date: 1/28/2013
Page 5,of 16
facilities, and shall be provided adequate and appropriate work space, in
ordeir to conduct audits in compliance with the provisions of this article,
together with subsection (31) hereof. CITY shall give subconsultant
reasonable advance notice of intended audits.
(3) ENGINEER and subconsultant agree to photocopy such documents as may
be requested by the CITY. The CITY agrees to reimburse ENGINEER for
the cost of' pies at -the rate published in the Texas Administrative Code in
effect as of the time copying i,si performed.
Kai INSURANCE
(1 ENGINEER)S INSURANCE
a. Commercial General Liability — the ENGINEER shall maintain
commercial general liability (CGL) and, if necessary, commercial,
umbrella insurance with a limit of not less than $1,g 'g 000.0O per each
occurrence with a $2,000,000.00 aggregate. If such Commercial General
Liability insurance, contains a general aggregate limit, it shall apply
separatell y to this PROJECT or location.
i. The CITY shall be included as an insured under the CGLI using,
ISO additional insured endorsement or a substitute providing
equivalent coverage, and under the commercial umbrella, if any.
This insurance shall apply as primary insurance with respect to
any other insurance or self-insurance programs afforded, to the
CITY. The Commercial General Liability insurance policy shall
have no, exclusions by endorsements that would alter or nullify"
premises/operations, prod ucts/colmp leted operations, contractual,
personal injury, or advertizing injury, which are normally contained
within the policy, unless the CITY approves such exclusions in
writing
ri
ii. ENGINEER waives all rights against the CITY and its agents,,
offi cers, directors and employees, for recovery of damages to the
extent these damages, are covered by the commercial general
liability or commercial umbrella liability insurance maintained in
accordance with this agreement.
b. Business Auto — the ENGINEER shall maintain business auto: liability
and, if necessary, commercial umbrella liability insurance with a limit of
not less, than $,1,000,000 each accident. Such insurance shall cover
liability arising out of "any auto"", including owned, hired, and non-owned
autos, when said vehicle is used in the course of the PROJECT. If the
engineer owns no vehicles, coverage for hired or non-owned is
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
PMO,Official Release Date-112812013
Page 6 of 16
acce-ft P table�.
i. ENGINEER waives all rights, against the CITY and its agents,
officers, directors and employees for recovery of damages to the
extent these damages are covered by the business auto liability or
4
commercial umbrella liability insurance obtained by ENGINEER
pursuant to this agreement or under any applicable auto physical
damage coverage.
ic. Workers" Compensation —ENGINEER shall maintain workers
compensation and employers liability insurance and, if necessary,
commercial umbrella liability insurance with a, limit of not less than
$100,0001.,00 each accident for bodily in.u by accident or $100,000.00
each employee for boidily injury by d�iiseasel, with $500,00oO.00 policy limit.
i. ENGINEER waives all rights against, the CITY and its agents,
officers) directors and employees for recovery of damages to the
extent these damages are covered by workers compensation and
employer's liability or commercial umbrella insurance obtained by
ENGINEER pursuant,to this agreement.
d. Professional Liability; �— the, ENG,INEER shall maintain professional
liability, a claims-made policy, with a minimum of $11,000,000.00 per
claim and aggregate. The policy shall contain a retroactive date prior to
the date of the contract or the first date of service's to: be performed,
whichever is earlier. Coverage sh�a:ll be maintained for a period of 5 years
following the completion of the contract. An annual certificate of
insurance specifically is project shall be submitted to the
eci ically referencing this
CITY for each year following completion of the contract.
(2) GENERAL INSURANCE REQUIREMENTS
a. Certificates of insurance evidencing that the ENGINEER has obtained all
I
required 'insurance shall be delivered to the C,I,W prior to ENGINEER
proceeding, with the PROJECT.,
b. Applicable policies shall be endorsed to name the CITY an Additional
Insured thereon, as its interests may appear. -rhe term CITY shall
include: its employees, officers, officials, agents, and volunteers as
respects the contracted services.
c. certificiate(s) of insurance, shall document that insurance, coverage
specified in this agreement are provided under applicable policies
documented thereon.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date, 1128/2013
Page 7 of 16
d. Any failure on part of the CITY to request required insurance
documentation shall not constitute a waiver of the *insurance
requirements.
e. A minimurn of thirty (30) days notice of cancellation or material change in
coverage shall, be provided to the CITY. A, ten (1 0) days notice, shall be
acceptable in the event of non-payment of premium. Notice shall be sent
to the respective Department Director (bey name), City of Fort Worth,
1000 Thro ickmorton, Fort,Worth, Texas 76102.
f. Insurers for all policies must be authorized to do buis:iness In the State of
Texas, and have a minimum rating of AM or greater, in the current A,.,M.
Best Key Rating Guide or have reasonably equivalent financial strength
and solvency to the satisfaction of Risk Management.
g. Any deductible or self insured retention in excess of $25,000.00 that
would change or alter the requirements herein is subject, to approval by
the CITY in writing,,, if coverage is not provided on a first-dollar basis., The
CITY, at it sole discretion, may consent to alternative coverage
maintained through insurance pools or risk retention groups. Dedicated
financi�al resources or letters of credit may also be acceptable to the
CITY.
h. Applicable policies shall each be endorsed with a waiver of subrogation
0
in favor of the CITY as respects the PROJECT'.
L The CITY shall be entitled, upon its request and without incurring
expense, to review the ENGINEER's insurance policies including
endorsements thereto and, at the CI 's discretion; the ENGINEER may
be required to provide proof:of insurance premium payments.
j. Lines of coverage, other than Professional Liability, underwritten on a
claims-made basis, shall contain a retroactive date coincident with or
prior to the date of the contractual agreement. The certifi cate of
i is
shall state both the retroactive date and that the coverage s
claims-made.
k. Coverages, whether written on an occurrence or claims-made basis,
shall be maintained without, interruption nor restrictive modification or
changes from date of commencement of' the PROJECT until, final
payment and termination of any coverage required to be maintained after
final, payments.
L. The CITY shall not be responsible for the direct payment of any
insurance premiums required by this agreement.
pity of Fort Worth,Texas,
Standard Agreement for Engineering Related Design Services
PMO Official Release Date:1128/2013
Page 8 of 16
Sub consultants and subcontractors to/of the ENGINEER shall be
required by the ENGINEER to maintain the same or reasonably
equivalent insurance coverage, as required for the ENGINEER. When
sub consultants/subcontractors maintain insurance nsurance coverage,
ENGINEER shall provide CITY with documentation thereof on a
certificate of insurance,
L Independent Consultant
The ENGINEER agrees to perform all services as an independent
consultant and not as a subcontractor, agent, or eirriployee of'the CITY.
K DI"sclosure
The ENGINEER acknowledges to the CITY that it has made full disclosure
in writing of any existing conflicts of interest or potential conflicts of interest,
including personal, financial interest, direct or indirect in property abutting the
proposed PROJ,ECT'and business relationships with abutting property cities.
The ENGINEER further acknowledges that it will make disclosure in writing
of any conflicts of interest that develop subsequent to the signing I _3 of this
contract and prior to final payment under the contract.
N. Asbestos or Hazardous Substances
(1) If asbestos or hazardous substances in any form are encountered or
suspected, the ENGINEER will stop its own work in the affected portions
of the PROJECT to perm,it testing and evaluation.
(2) If asbestos or other hazardous substances are suspected, the CITY' miay
request the ENGINEER to assist in obtaining the services of a qualified
subcontractor to manage the remediati,on activities of the PROJECT,.
owl Pleirmiffi ng Authorities - Design Changes
If permitting authorities require design changes so as to comply with
I
published design criteria and/or current engineering practice standards
which the ENGINEER should have been, aware of at the, time this
Agreement was executed, the ENGINEER shall revise plans and
specifications, as required, at its own cost and expense. However I if design
changes are required due to the changes in the permitting authorities'
published, design criteria and/or practice standards criteria which are
published after the date of this Agreement which the ENGINEER could not
have been reasonably aware of the ENGINEER shall notify the CITY of
such changes and an adjustment in compensation will be miade through an
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
PM ,Official Release Date-,1/2,8/2013
Page 9 of 1 6
an to this AGREEMENT.,
P. Schedule
ENGINEER shall manage the PROJECT in accordance with the scheddile
,developed per Attachment D to this AGREEMENT.
Article V
-
Obatimon 1 ty
s of the C
Amendments to Article V, if any; are included in Attachment C.
A. Cif-Furnished Data
ENGINEER may rely upon the accuracy, timeliness, and completeness of
the information provided by the CITY.
a a
B. Access to, Facifities and Property
The CITY will make its facilities, accessible to,the ENGINEER as required for
the ENGINEER's performance of its services. The CITY will perform,,, at no
cost to the ENGINEER, such tests of equipment, machinery, pipelines, and
other components of the CITYs 'facilities as may be required: in connection
with the EN GIN EER"s services. The CITY will be responsible for all acts of'
the CITY's personnel.
ca Advert isements, Perm-its, and Access
Unless otherwise agreed to in the Scope of Services, the CITY will obtain,
arrange, and pay for all advertisements for bids, permits, and licenses
required by local, state, or federal authorities; and land, easements, rights-
of-way, and acces,s, necessary for the ENGI NEE R's services or PROJECT
construction.
City of Worth,Texas
Standard Agreement for Engineering Related Design Services
PM O Officia[Release DaW 1128/2013
Page 10 of 16
D, Timely Review
The CITY will examine the ENGINEER"s studies, reports, sketches,
drawings, specifications, proposals, and other documents; obtain advice of
an attorney, insurance cou�niselor, accountant, auditor bond and financial
advisors, and other consultants as, the CITY deems appropriate; and render
in writing decisions required ired by the CITY in a timely manner in accordance
w ith the project'ect schedule prepared in accordance with Attachment D.
I
E. Prompt Notice
The CITY will give prompt written notice to, the ENGINEER whenever CITY
observes or becomes aware of any development, that affects the scope or
timing of the ENGINEER's services or o f any defect in the work o f t he
ENGINEER or construction contractors.
F, Asbestos or Hazardous Substances Release.
(1) CITY acknowledges ENGINEER will perform part of the work at CI'TY's
facilities that may contain hazardous materials, including asbestos
containing materials, or conditions, and that ENGINEER had no prior
role in the generation, treatment, storage, or disposition of such
materials. In consideration of the associated risks, that may give rise to
claims by third parties or employees of City, City hereby releases
ENGINEER from any damage or liability related to the presence of'
such materials.
(2) The release required above shall not apply in the event the discharge,
release, or escape of hazardous substances, contaminants, or asbestos
is a result of ENGINEERY s negligence or if ENGINEER brings such
hazardous substance, contaminant or asbestos onto the project.
G. Contractor Indemnifflication and Claims
The CITY agrees, to include in all construction contracts the provisions of
Article IV.E,., regarding the ENGINEER"s Personnel at Construction Site, and
provisions providing contractor 'indemnification of the CITY and the
ENGINEER for contractor's negligence.
H. Contractor Claims and Third-Plarty Beneficiaries
(1) The CITY agrees: to include the following clause in all contracts with
construction contractors: and equipment or materials suppliers.*
"Contractors, subcontractors and equipment, and materials,
suppliers on the PROJECT, or their sureties, shall maintain
pity of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
PMO Offidal Release Date:1/28/20,13
Page I I of 16
no direct action against the ENGINEER, its officers,
employees, and subcontractors, for any claim arising out of
in connection with, or resulting -from, the engineering
services, performed. Only the CITY will be, the beneficiary
of any undertaking by the ENGINEER.";
(2) This AGREEMENT gives no rights or benefits to anyone other than the CITY
and the! ENGINEER and there are no third'-pa rty beneficiaries.
(3) The CITY will include: in each agreement it enters, into with any other entity
or person regarding the PROJECT a provision that such entity oir person
I
shall have no third-party beneficiary rights under,this Agreement.,
(4) Nothing contained in this section V.H. shall be construed as a waiver of any
right the CITY has to bang a claim against ENGINEER,.
L CI 's Insurance
(1) The CITY may maintain property insurance on certain pre-existing structures
associated with the PROJECT.
(2) The CITY will, ensure that Builders Risk/linstallat,ion insurance is maintained
I
at the replacement cost value of the PROJECT'. The CITY may provide
ENGINEER a copy, of the, policy or documentation of such on a certificate of
insurance.
(3) The CITY will specify, that the Builders Risk/Instal,lation 'insurance shall be
comprehensive in coverage appropriate to the PROJECT risks.
J. Litigation Assistance
The Scope of Services does not include costs of the ENGINEER for required
or requested assistance to support, prepare, document, bring,, defend, or
assist in litigation undertaken or defended by the CITY. In the event CITY
requests such services of the ENGINEER, this AGREEMENT shall be
amended or a separate agreement will be negotiated between the pasties.
K. Changes
The CITY may make or approve changes, within the general Scope, of
Services in this AGREEMENT. If such changes affect the ENGINEER's cost
of or time required for performance of the services, an equitable adjustment
will be made, through an amendment to this AGREEMENT with appropriate
CITY approval.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date." 112812013
Page 12 of 18
If
Article A
General Legal, Provi'sions
Amendments to Article VI, if any, are included in Attachment C.
A. Authorization to Proceed
ENGINEER shall be authorized to proceed with this AGREEMENT upon
receipt of a written Notice to Proceed from the CITY.
B. R e of Project Documents,
All designs, drawings, specifications, documents, and other work products of
the ENGINEER, whether in hard copy or in electronic form, are instruments
of service for this PROJECT, whether the PROJECT is completed or not.
Reuse, change, or alteration by the CITY or by others acting through or on
behalf of the CITY of any such instruments of service without the written
permission of'the ENGINEER will be at the CITY"s, sole risk. The CITY shall
own the final designs, drawings, specifications and documents.
C. Force Majeure
The ENGINEER is not responsible for damages or delay in performance
caused by acts of God, strikes,, lockouts, accidents,, or other events beyond
the control of the ENGINEER that prevent ENGII,NEER's performance of its
obligations hereunder.
D, Term i"nati0on
(1) This AGREEMENT may be terminated only by the City for convenience on
3,0 days,' written notice. Thi's, AGREEMENT may be terminated by either the
CITY or the ENGINEER for cause if either party fails substantially to perform
through no fault of the other and does not commence correction of such
nonperformance with in 5 days of written notice and diligently complete the
correction thereafter.
(2) If this AGREEMENT is terminated for the convenience of the City, the
ENGINEER will be paid for termination expenses as follows:
a.) Cost of reproduction of partial or compilete studies, plans,,
specifications or other forms of ENGINEER'S work product,
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services
PMO Official Release Date.112812013
Page 1,3 of 1 6
b.) Out-of-pocket expenses, for purchasing electronic data files and other
data storage supplies or services;
C.) The time re i,rements for the ENGINEER'S personnel to docume�nt
the work underway; at the time of the CITY'S termination for
convenience so that the work effort, is suitable for long time storage.
(3) Prior to proceeding with termination services, the ENGINEER will
submit to the CITY an itemized statement of al�l, teanination expenses,. The
CITY'S approval will be obtained In writing prior to proceeding with
termination services.
go
E. Suspension, Dellay, or Interruption to Work
The CITY may suspend, delay, or interrupt the services of the ENGINEER
for the convenience of the CITY. In the event of such suspension, iBela , or
interruption, an equ itable adjustment in the PROJECT"s, schedule,
commitment and cost of the ENGINE R's personnel and subcontractors,
and ENGINEER's compensation will be made,.
F. Indemnification
In accordance;with Texas Local Government Code Section 271.9041, the
ENGINEER shall' indemnify, hold harmless, and defend the CITY
against liability for any damage caused by or resulting from an act of
negligence, intentional tort, intellectual property infringement,, or
failure to pay a subcontractor or supplier committed by the ENGINEER
or ENGINEER's agent consultant under contract or another entity
over which the ENGINEER exercises control.
G. Assignment
Neither party shall assign all or any part of this AGREEMENT without the
prior written consent of the other party.
H. Interpretation
Limitations on liability and indemnities in this AGREEMENT are business
understandings between the parties and shall apply to all the different
theories of recovery, including breach of contract or warranty, tort including
negligence, strict or statutory liability, or any other cause of action, except for
willful misconduct or gross negligence for limitations, of liability and solle
negligence for indemnification. Parties mean the CITY and the ENGINEER,
and their officers, employees,, agents, and subcontractors.
City of Fort Worth,Texas
Standard Agreement for Engineering Related Design Services,
PM0 Official Release Date-1128,12013
Page 14 of'16
Judsdi'otion
The law of the State of Texas shall govern the validity of this AGREEMENT,
Its interpretation and performance, and any other claims related to it. The
wen ue for any litigation related to this AGREEMENT shall be Tarrant County,
Texas.
J. Severabi"fifty and Survival
If any of the provisions contained in this AGREEMENT are held for any
reason to be invalid, illegal, or unenforceable in any respect, such invalidity,
illegality, or unenforceability will not affect, any othier provision, and this
AGREEMENT shall be construed as if such Invalid, illegal, or unenforceable
provision had never been contained herein. Articles V.F., VI.B., VI.D., VI.F.,
WHI., and V1.1 shall survive termination of this AGREEMENT for any cause.
K. Observe and Comply
ENGINEER shall, at all times observe and comply with all federal and State
laws and regulations and with all City ordinances and regulations which, in
any way affect this AGREEMENT and the work hereunder, and shall
observe and comply with all orders, laws ordinances and regulations wn,icn
may exist or may be enacted later by governing bodies having Jurisdiction or
authority for such enactment. No plea of misunderstanding or ignorance
thereof shall be considered. ENGINEER agrees to defend, indemnify and
hold harmless CITY and all of' Its officers, agents and employees, from and
against all claims or liability arising out of the violation of any such order, law,
ordinance, or regulation, whether it be by itself or Its employees.
Article V11,
Attachments, Schedules, and Signatures
This AGREEMENT, including its attachments and schedules, constitutes I the entire
AGREEMENT, supersedes all prior written or oral understandings, and may only be
changed, by a written amendment executed by both parties,. The following attachments
and schedules are hereby made a part of this AGREEMENT:,
Attachment A- Scope of Services
Attachment B — Compensation
Attachment C -Amendments to Standard Agreement for Engineering Services
Attachment D - Project Schedule
City of Fort,Worth,Texas
Standard Agreement for Engineering Related Design Services
PM,O Official Release Date:1128120113
Page 15 of 16
,Attachment E - Location Map
I
Executed and effeI cti,ve this the 17 day of September, 2,01 3.
BY: BY:
CITY OF FORT'WORTH ENGINEER
For- Pelot Solutions,
on, L I
wid, ons, LL,LP
BYV P J, n1d_,"ions, G.C.
Flerniado C,o:sta P
Assistant City Manager Manager
Date.- Date.-
..........
APPROVAL RECOMMENDED:
/ZA
LBy:
Doug,las*_ 'Wiersig,, P.E.
Director, Transportation And Public
Works
APPROVED AS, TO FORM AND M&C, No.:
LEGALITY
M&C, Date:
By . .......
Douglas W. Black
Assistant ,City Aftorney
ATTEST.-
0
00, 0
li
Vj
�4ry J.
City Secretary
7r,I
OFFICIAL RECORD
C% of Fort,Worth,Texais,
Standard Agreement for Engineering Related Design Services CITY SECRETARY �
PMO Official Release Date,1/28/2013
Page 1 6 of 16
Prepare invoices, in accordance with Attachment B to this Standard Agreement and
submit monthly in the format requested by the CITY.
Coordinate with other agencies and entities as necessary for the design of the
proposed infrastructure, and provide and obtain information needed to prepare the
design
With respect to coordination with permitting authorities, ENGINEER shall
communicate with permitting authorities such that their regulatory requirements are
appropriately reflected in the designs. ENGINEER shall work with regulatory
authorities to, obtain aipproval of the designs,, and make changes necessary to meet
their requirements, as part of the design: scope.
Personnel and Vehicle Identification: When conducting site visits to the project
location, the ENGINEER or any of its sub-consultants shall carry readily visible
information identifying the name of the company and the companly representative.
ASSUMPTIONS
DELIVERABLES
A. Meeting summaries with action items
B. Monthly invoices,
C. Monthly progress reports
TASK 3.1 PRELIMINARY DESIGN (60 PERCENT).
Preliminary plans and specifications shall be submitted to CITY per the approved Project
Schedule.,
ENGINEER will develop the preliminary design of the infrastructure as follows.
3.1. Development, of Preliminary Design, Drawings and Specifications shall include the
following:
0 Traffic Control Plan updated to reflect any changes as a result of the conceptual
design submittal while also including all construction, signage and pavement
markings,which will be in accordance with the latest edition of the Texas Manual
on Uniform Traffic Control Devices.,
o A Project Control Sheet, showing all Control Points, used or set while gathering
data. Generally on a scale of not less than 1:400. The following information shall,
be indicated for each Control Point: Identified (existing, City Monument#8901,' PK
Nall,, 518" Iron Rod); X, Y and Z Coordinates, in an identified coordinate system,
and a referred bearing base. Z coordinate on City Datum only; descdptive location
(i.e. set in the centerline of the inlet in the South curb line of North Side Ddve at the
East end of radius at the Southeast comer of North Side Ddive and North Main
Street).
0 Preliminary 1S,WM Checklist in accordance with the current CITY is Criteria
Manual for Site Development and Construction.
0 Updated, existing and proposed,typical section sheets,.
City of Fort Worth,Texas
Attachment A
PMO Release Date:07.23.20 2
Page 2 of 111
• Updated roadway plan and profile sheets displaying station and coordinate data for
all horizontal alignment P.,C.'s, P.T'."s,, P.I.,'s; station and elevation data of all
vertical profile P.C.'s, P.T.'s, P.I.'s, low points, and high points; lengths of vertical
curves, raid s, K values, e, and vertical clearances where required.
• No less than,two bench marks plan/profile sheet.
• Bearings given on all proposed cent dines, or baselines.
• Station equations relating utilities to paving, when appropriate.
• Overall project easement layout sheet(s).
• Intersection layout sheets including ROW lines, horizontal alignments, utilities,,,
curbs, sidewalks, driveways, lane dimensions and arrows, and existing and
proposed contours (1.0 intervals)
Preliminary roadway details,to include curbs, curb expansion joints, driveways,
s"delwalks, I
ill and pavement details.
ENGINEER will delineate the,watershed based on contour data and field
verification and document existing street, right-of-way and storm drain capacities
for the subject site. A,drainage area map will be drawn at maximum 11" = 21001
scale from available 2-foot contour data with,the contours labeled. Data source
and year will be provided by the CITY. Calculations, regarding street and right-of-
way capacities and design discharges (5-year and 100-year frequencies) at
selected critical locations,will be provided. Other frequencies as required by
iSWIVI criteria may be appropriate for outfalls and sensitive locations. Capacities
of existing storm drain will be calculated and shown. All calculations shall,
conform to CITY criteria delineated in the CITY's current is Criten0a Manual
for Site Development and Construction. All locations in the project, area where
100-year runoff exceeds available storm drain and right-of-way capacities shall
be clearly identified. The ENGINEE,la's responsibility includes, recommendations
for improvements of the existing system as deemed reasonable and consistent
with CITY standards.
Storm drain layout sheets showing location and size of all inlets, manholes,
junction boxes, culverts, and piping to include storm drain profiles showing, existing
and proposed fl ow lines, flows, lengths, and slopes, of pipe,,, top of ground profile
over pipe and connections to existing or proposed storm sewer systems.
0 Preliminary signing, paviemeint m,arking, illumination, and signal layouts.
3.2. Constructability Review
0 Prior to the 60, percent review meeting with the CITY, the ENGINEER shall
schedule and attend a project,site visit with the CITY Project Manager and
Construction personnel to walk the project. The ENGINEER shall summarize the
CITY)s comments from the field visit and submit this information to,the CITY in
writing.,
3.3. Utility Clearance
0 The ENGINEER will consult with the CITY's Transportation and Public Works
Department, Water Department, and other CITY departments, public utilities,
City of Fort'Worith,Texas
Attachment A
PMO Release Datei,07.213.2012
Page 3 of 1
private utilities, private utilities and government agencies to determine the
approximate location of above and underground utilities, and other facilities
(current and future) that have an impact or influence on the project. ENGINEER
will design CITY facilities to avoid or minimize conflicts with existing utilities, and
where known and possible consider potential future utilities in designs.
The ENGINEER shall upload individual DWF files for each plan, sheet of the
approved, preliminary plan set to the designated, project folder in B,uzzsaw for
forwarding to all utility companies which have facilities within the limits of the
project. The DWF files should be created directly from the CAD files as opposed
to P:DF files.
ASSUMPTIONS
0 All storm water ca:llculations and design shall, conform to the current CITY iS`WM
Criteria Manual for Site Development and Construction.
4 sets, of half size plans will be delivered,for the 60% design.,
1 sets of specifications will be delivered for the 60% design.
DW'F files created from design CAD drawings will be uploaded to the designated
project folder in Buzzsaw.
All submitted documents and checklists will be uploaded to the designated
project folder in Buzzsaw
The CITY's front end and technical specifications will be used. The ENGINEER
shall supplement the technical specifications if needed.
DWF sets, of full size drawings will be delivered for Utility Clearance.
• ENGINEER shall not proceed with Final Design activities without written approval
by the CITY of the Preliminary Design plans.
DELIVERABLES
A. Preliminary Design drawings and specifications
B. Preliminary 1SWIVI Checklist
C. Utility Clearance draw
Estimates of probable construction cost
TASK 4. FINAL DESIGN (90 PERCENT') AND FINAL CONSTRUCTION DOCUMENTS
(100 PERCENT).
Upon approval of the Preliminary plans, ENGINEER will prepare construction plans as
follows:
10 Final draft construction plans (90%) including iSWIVI Construction Plan and
specifications shall be submitted to CITY pier the approved Project Schedule.,
0 Final iSWM Checklist in accordance with the current iS`WM Critella Manual for Site
Development and Construction.
City of Fort Worth,Texas
Attachment A
PMO Release Date:07.23.20,12
Page 4 of 11
Following, a 90% construction, plan review meeting, with the CITY, the ENGINEER shall
submit Final Plans (1010%) to the CITY per the approved Project Schedule., Each plan
sheet shall be stamped, dated, and signed, by the ENGINEER registered in State of
Texas.
The ENGINEER sh all submit a final design estimate of probable construction cost with
both the 90% and 100% design packages. -rhis,estimate shall use ONLY standard CITY
bid items.
ASSUMPTIONS
0
2.sets of half size drawings and .....wv�l specifications will be delivered for,the
% Design package.
9 A D file for the 910% Design will be created from design CAD drawings and will be
uploaded to the project folder in Buizzsaw.
0 !15 sets of.13 Full and 2 half size drawings and 6 specifications will be
delivered for the 100% Design package.
0 A DWIF file for the 100 % Design,will be created from design CAD drawings and will, be
uploaded to the project folder in Buzzsaw.
01 ENGINEER to provide, estimated final sheet, list (cover/index, general notes, control point
location, easement layout, no. of plan/profiles, special detail skits, etc.)
DE,LIVERABLES
A. 90% construction plans and specifications.
B. Final 1SWM Checklist
C. 100% construction plans and specifications.
D. Detailed estimates of probable construction costs including summaries of bid items and
quantities using the CITY's standard bid items and format.
E. Original cover m,ylar for the signatures of authorized CITY officials.
4.2 Final Design Drawings
• Final Design Drawings shall be submitted as an Adobe Acrobat PIDF format
(verslion 6.,0 or higher)file and DWF format. There shall be one (1) F file
and one (1) C file (created from CAD application of drawing) for the TP,W
plan set and a separate P and DW'F file for the Water plan set., Each PDF and
D fide shall be created from the original CAD,drawing filess and shall contain
all associated sheets of the particular plan set. Singular PDF and DWF files, for
each sheet of A lan set I PF D,WF
-- ,w*111 not be aOpted. D and files shall c
conform to naming conventions as follows.-
1. TPW file, name example — "W-19!56— ""org4 .pdf' where "W-19,56" is the
assigned file number obtained from the CITY) ".org" designating the file is
of an original plan set, '14711 shall be the,total number of sheets in this file.
City of Fort Wofth,Texas
Attachment A
P Release Date:07.23.2012
Page 5 of I I
Example*. 1-0053.org3.pdf and K-0320.org,5.pdf
11. Water and Sewer file name example — "X-36667-"*org3�6.pdf" where "X-
35667" is the assigned file number obtained from the CSI,TY, ".org'y
designating the file is of an original plan set, "36" shall be the total number
of sheets, in this file.,
Example: X-12755..,.Orgl8.pdf'
Both PDF and DWF files,shall be uploaded to the project's Record Drawing folder
in Buzzs,aw.
In addition to the PDF and DWF files, the ENGINEER shall submit each plan sheet
as an 'Individual DEG file, with all reference files, integrated into the sheet., If the
plans, were prepared in D,GN format, they shall be converted to DWG, prior to
uploading,, The naming convention to be used for the DWG files shall be as
follows:
1. T files shall use the W number as for P F and DWF files, but shall
include the sheet number in the name—"W-1956.SHT01.dwg 11 1 (AW.
1956,,-S,HTO,2.dwg$1, etc.
11. Water and Sewer file names shall use the X number as for P and DWF
files, but shall include the sheet number in the name — "X-
12155.SHT01.dwg", "X-12755.SHT02.dwg", etc.
For information on the proper manner to submit files and to obtain a,file number for
the project, contact the Department of Transportation and Public Works Vault at
telephionel number(817) 392-8426. File numbers will not, be issued to a, project
unless the appropriate project numbers and fund codes have been assigned and
are inthe Department of Transportation and Pubilic'Works database.,
4.3 Record, Drawings
The ENGINEER shall prepare record drawings from information provided, by the
C,I,TY depicting any changes made to the Final Drawings during construction.
The following information shall be provided by the CITY:
• As-Built Survey
• Red,.-Lin,e Markups, from the Contractor
• Red-Line Markups from City Inspector
•
Copies of Approved Change Orders
• Approved Substitutions
City of Fort Worth,Texas
Attachment A
PMO Release Date:07.,23.2012
Page 6 of 11
The ENGINEER shall modify the Final, Drawings electronically and shall place a
stamp on the plans indicating,that they represent Record Drawings of the project
as constructed. The stamp shall be signed and dated by the ENGINEER and
shall be placed on each plan sheet, whether there are any revisions on the sheet
or not. Each sheet shall clearly indicate al,l changes which apply to that sheet by
clouding, and numbering, or other suitable means.
The following disclaimer shall be included with the Record, Drawing stamp*.
o These Record Drawings,were prepared using information provided by
others and represent the as constructed conditions to the extent that
documented changes were provided for recording. The ENGINEER
assumes, no liability for undocumented changes and certifies only that the
documented changes are accurately depicted on these drawings.
'The ENGINEER shall submit a set of'sealed Fin al Drawings, modified and
stamped as Record Drawings, on mylar for record storage. The ENGINEER may
keep copies of the information provided by the CITY'for their files, but gall Agin,
red-lined drawings shall, be retumed to the CITY with,the mylars.
Record Drawings shall also be submitted as an Adobe Acrobat PDF format
(versloon 6.0 or higher)file and DWF format. There shall be one (1) PDF file
and one (1) DWFfile for the TPW plan set and a separate PDF and DWF file for
the Water plan set. Each PDF and DWF file shall contain all associated sheets,
of the particular plan set., Saingular PDF and t files for each sheet of a
an set Mill, not be accepted. P,DF and DWF files shall conform to naming
conventions as follows:
11. TIP W file name example — "W-1956 org4,7.pdf' where "W-1 966" is the
assigned file number obtained from the CITY, "org" designating the file is
of an od,ginal plan set, "47:11 shall be the total number of sheets in this file.
Example: W-0053Prg3.pdf and K-0320—org5.pdf
111. Water and Sewer file name example — '1X-36667_,org36.pdV where "X-
3666709 is the assigned file number obtained from the CITY, " or g"
designating the file is of an original plan set, '136" shall be the total number
of sheets, in this file.
Example-, X-12755—Org18.pdf
Both PDF and DW'F filles, shall be uploaded to the project's Record Drawing folder
in Buzzsaw.,
For information on the proper,manner to submit files and to obtain a file number for
the project, contact the Depa,rtment of T'ranspoftation and Public Works Vag ult at
telephone number, (817) 392-8426. File numbers will not be issued to a project
0#' of Fort Worth,Texas
Attachment A
PMO Release Date:07.23,2012
Page 7 ot 1,
unless the appropriate project numbers and fund codes, have been assigned and
are in the Department of Transportation and Public Works databa .
TASK 7. ROW/EASEMENT SERVICES.
ENGINEER will support and perform activities related to ROW and land as outlined below,
per scoping direction and guidance from the CITY's Project Manager.
7.1:1 Right-of-Way Research
The ENGINEER shall determine rights-of-way, easements, needs for construction
of the project. Required temporary and permanent easements will be identified
based on available information and recommendations will be made for approval
by the CITY.
7.2. Right-of-Way/Easement Preparation and Submittal.
* The ENGINEER shall prepare documents to be used to obtain right-lof-way and
permanent and/or temporary easements required to construct the improvements.
* The documentation shall be provided in conformance with the checklists and
templates available on the CITY's Su saw site.
7.3. Temporary Right of Entry Preparation and Submiftal
Prior to construction, the ENGINEER shall prepare, mail and obtain Temporary
Right of'Entries from landowners. It is assumed that letters will only be required
for land owners adjacent to temporary construction easements or who are
directly affected by the project and no easement i's required to enter their
property.
The,documentation shall be provided in conformance with the checklists and
templates available on the CITY's Bu saw site.
ASSUMPTIONS
Right-of-Way research includes review of property/right-of-way records based on
current internet based Tarrant Appraisal District (,TAD) information available at
the start of the project and available on-ground property information: (i.e. iron
rods,, fences, stakes, etc.). It does not include effort for chain, of title research,
parent track, research, additional research for easements not included in the
TAD, right-of-way takings, easement,vacations, and abandonments, right-of-way
vacations, and street closures:.
DELIVERABLES
A. Easement exhibits and meets and bounds provided on CITY forms.
B. Temporary Right of Entry Letters
TASK 80 SURVEY
ENGINEER will provide survey support, as follows.
8.1. Design, Survey
City of Fort Worth,Texas,
Attachment A
PMO Release Date:07,23.2012
Page 8 of l,1
• ENGINEER will perform field surveys to collect horizontal and vertical elevations
and other information needed by ENGINEER in design and preparation of plans
for the project. Information gathered during the survey shall, include topographic
data, elevations,of all sanitary and adjacent storm sewers, rim/invert elevations,,
location of buried utilities, structures,, trees (measure caliper, identify overall
canopy, and have qualified arborist identify species of'trees), and other features
relevant to the final plan sheets. Existing drainage at intersections will be verified
by field surveys. Spot elevations,will be shown on intersection layouts with cross
slope to fit intersecting grade lines.
• The minimum survey information to be provided on the plans shall include the
following:
- A Project Control Sheet, showing ALL Control Points, used or set while
gathering data. Generally on a scale of not less than o:
- The following information about each Control Point;
a. Identified (Existing. CITY Monument#8901, PIK Nall, 5/8" Iron Rod)
b. x, Y and Z Coordinates, in an identified coordinate system, and a
referred bearing base. Z coordinate on CITY Datum only.
c,., Descriptive Location (Ex. Set in the centedine of the inlet in the South
curb line of North Side Drive at the East end of radius at the Southeast
corner of North Side Drive and North Ma�in, Street).
Coordinates on al P.C.'s,
P.T.11 s, PJ.'s, Manholes,, Valves, etc., in the
- :l
same coordinate system, as the Control.
- No less than two horizontals bench marks, per line or location.
- Bearings given on all, proposed centerlines, or baselines.
- Station equations relating utilities to paving, when appropriate.
8.2. Temporary Right of Entry Preparation and Submittal
Prior to entering property, the ENGINEER shall prepare, mail and obtain
Temporary Right of Entry from landowners.
The documentation shall be provided in conformance with the checklists and
templates available on the CITY's Buzzsaw site.
83. COORDINATION WITH CITY INSPECTOR CONTRACTOR: ENGINEER's
surveyor is expected to work with the CITY inspector and contractor to provide any
special requests contractor may have providing the scope of work described above is
not exceeded.
• INCIDENTAL PRE-CONSTRUCTION STAKING: Right-of-way flagging, back of
,curb location, driveways, walks and retaining walls as requested by the CITY
Inspector, curb radii is already covered by earlier contract with Hillwood.
• SPECIAL CONDt"riONS:
a., The CITY Inspector assigned to the project shall oversee all construction
staking activity and shall be responsible for all field coordination. All
City of Fort Worth,Texas
Attachment A
PMO Release Date:107.23.2012
Page 9 of 11
documentation including field notes, cut and/or fill notes, grades,, "as staked
information etc., shall, be provided to the CITY inspector and shall be sealed
and signed: by a surveyor licensed in the State of Texas.
b. The ENGINEER's Surveyor shall attend the pre-construction conference.
c. -rlhe ENGINEER11 s Surveyor shall meet with CITY Inspector and Contractor to
coordinate surveying schedule and needs, prior to beginning work.
d., The ENGINEER's Surveyor shall stake each utility separately, and at different
times with, if applicable, sanitary sewer first, water second, storm drain third
and roadway construction fourth and shall provide enough construction staking
information so that the projects can be constructed as designed.
e. A member of ENGINEER's firm familiar with project shall be available at all
times,to immediately respond to questions from the field.,
ASSUMPTIONS
0 Assume survey work is already covered by Developers contract with Engineer for
North Riverside Dn*ve, except the additional survey work for the roundabout.
DELIVERABLES
A. Copies of Field survey data and notes signed and sealed by a, licensed surveyor.
B. Drawing of the project layout with dimensions and coordinate list.
C. SUE plan drawings sealed, by a professional engineer registered in the State of
Texas.
ADDITIONAL, SERVICES NOT INCLUDED IN THE EXISTING SCOPE OF' BERM CES
Additional Services not incluided in the.existiong Sc f Services — CITY and
ENGINEER agree that the following services are beyond the Scope of Services
described in the tasks above. However, ENGINEER can provide these services, if
needed, upon the CI 's written request,,. Any additional amounts paid to the
ENGINEER as a result of any, material change to the Scope of the Project shall be
agreed upon in writing by both parties before the services are performed. These
additional services include the following:
Negotiation of easements or property acquisition.
Services related to development of the CI 's project financing and/or budget,.
Services related to disputes over pre qualification, bid protests, bids rejection
and re bidding of the contract for construction.
Construction, management and inspection services
Performance of materials testing, or specialty testing services.
• Services necessary due to the default of the Contractor,.
Services, related to damages caused by fire, flood, earthquake or other acts of
God.
Services related to warranty claims, enforcement, and inspection after final
completion.
Services to support, prepare, document, bring, defend, or assist in litigation
undertaken or defended by the CITY.
City,of Fort Worth,Texas
Attachment A
PMO Release Date.07.23,2012
Page 10 of 11
..............................
• Performance of miscellaneous and supple�mental services related to the project
as requested by the CITY.
City of Fort Worth,texas
Attachment A
PMO Release Date,07,23.2012
Page 11 of 11
ATTACHMENT B
COMPENSATION
Design Services for
North Riverside Drive/Shiver Road Roundabout
City Pr "'ect No., #02006
01
Lump Sum Project
1. Compensation
A. The ENGINEER shall be compensated a total lump sum fee of 9,960.0 as
summarized in Exhibit 81-1 —Engineer Invoice and Section IV—Summary of Total
Project Fees. -rhe total lump, sum fee shall be considered full compensation for
the services, described in Attachment Al including all' labor materials, supplies,
and equipment necessary to deliver the services.
B. The ENGINEER shall be paid monthly payments as described in Section If -
Method of Payment.
ll. Method of Payment
A. Partial payment shall be made to the ENGINEER monthly upon City's approval of'
an invoice prepared, and submitted by the ENGINEER in the format and including
content as presented in Exhibit B-1, Progress Reports as required in item 111. of
this Attachment Bi, and Schedule as required, in Attachment D to this Agreement.
B. The estimated current, physical percent complete as required on the invoice shall
be calculated from the progress schedule as required in Attachment D to this
Standard Agreement and according to the current version of the City of Fort
Wofth's Schedule Guidance Document.
C. The cumulative sum of such monthly partial fee payments shall not exceed, the
total current project budget including all approved Amendments.
D. Each invoice shall be,verified as to its accuracy and compliance with the terms of
this Agreement by an officer of the ENGINEER.
111111. Progress Reports
A. The ENGINEER shall prepare and submit to the designated representative of the
Transportation and Public Works, Department, Patrick Buckley monthly progress
reports and schedules,in the format required by the City.
City of Fort'Worth,Texas
A,ftachment 8
PMO Official Release Date:8.09.2012
Page I of 3
B-1
ATTACHMENT B
COMPENSATION
IV. Summary of Total Per' a Fees
Firm Primary Reis pons iIrty Fee Amount
Prime Consultant
Peloton Laid Solutons,LLLP Civil Engineering Design 49,960 10
Proposed M �EISB ►u �-C nsult n,ts
Non-M /SBE Consultants
MON
TA ,9610. %
Project Number& Name Total Fee MBEISBE Fee M E S S
City M E/S E Goal = %, Consultant Committed Goal
City of Fort Worth,T
Attachment B
PMO Official,Release Diate:8.09,201,2
Page 2 of 3
2
tai to
lot "o' Owq
l r4 v*4 r4 m-4 ri r1
IL
gr
ri
rn
LIM f"
al al 0 r"l I'
roll �4
� I i
�I
LAI
z R Lon 2
r4 x4
0 CL CID P4 00
011f in Ln, in 0 LA two t 4 kA Ln Ln
Im ON ii Hl V.r
emu-
f
raw 00
0
X,
m
0
two„
W
0'
�4A tu, mi 1A
w .- CL M
0 j W 00 a
r
0 0 0 E
ie c
ATTACHMENT ASCV9
CHANGES AND AMENDMENTS TO STANDARD AGR,EEM'ENT
D�esig,n Services for
North Riverside are Shiver Road Roundabout
City Project No. 02006
1. There i*s no anticipated MWBE requitement for the contracted services.
City of Fort Wofth,Texas
Attachment C
PMO Release Date'.05,19,20110
Page I of I
Consulting Contract Schedule Specifications FoRT' WORTH
City of Fort Woith Capital Improvement Program
Attachment D-Fro iect Sichedule
s PRO IEui requi re's a, I zer << I >> schedule as defined herein and in the Cih s Schedule
Guidance Document.
D1. CONSULTING SERVICES SCHEDULE DEVELOPMENT,-,' The CONSULTANT all
sh
prepare schedules for consulting services that meet the requirements described in this
specitication,, showing by Critical Path Method (CPM) the planned sequence and timing of
the Work associated with the Agreement. All submittals shall be submitted 'in PDF format,
and schedule files shall also be submitted in native file format (i.e. file formats associated
with the scheduling so are). The approved scheduling software systems for creating the
schedule files, are:
- Primavera(Version 6.1 or later or,approved by CITY)
- Pru' navera Contractor(Version 6.1 or later or approved by CITY)
- Microsoft Project (Version,2,003/20107 or later or approved by CITY)(Pl-"!ASING CKJ-0
D2. BASELINE CONSULTING SERVICES SCHEDULE: Following notice-to-proceed, the
CONSULTANT shall develop, submit and review the draft detailed baseline consulting
services schedule with the CITY to demonstrate the CONSULTANT's understanding of the
Agreement requirements and approach for performing the work. The CONSULTANT will
prepare the f* al detailed baseline consulting serVices schedule,based on CITY comments, if
any, and submit to the CM no later than the,submittal of the first project invoice.
The followm* g guidelines shall be adhered to 'in preparing the baseline schedule, and as
described '*in further detail in the CITY's Schedule Guidance Document.
a. The scope, shall be subdivided by work breakdown structure (WBS) representing the
tasks, subtasks, and activities,associated with delivering the work.
b. The schedule shall accurately describe the major work activities, key n-iilestones,and
dependencies/relationships as appropriate to the work.
C. The schedule should include appropriate meetings, review periods, critical decision
p m ts, including third party utility dependencies revi
ewing agencies.
D3., PROGRESS CONSULTING SERVICES SCHEDULE: The CONSULTANT shall prepare
and submit monthly to the CITY for approval the updated schedule in accordance with D1
and, D2 and the CITY's Schedule Guidance Document clusive. As the Work progresses,
the CONSULTANT shall enter into the schedule and record, actual progress as described *in
the CITY's Schedule Guidance Document.,
The updated schedule subMI'ttal shall also include a concise schedule, narrative that
highlights the following, if appropriate and applicable:
• Cbanges in the critical path,
• Expected schedule changes,
• Potential delays,
• Opportunities to expedite, the schedule,
• Coordination issues the CITY should be aware of or can assist with,,
City of Fort Worth,Texas
Attaichment D
PMO Release Date:02.15,20111
Page 1 of 2
7x
Other schedule-related issues, that the CONSULTANT wishes to communicate to the
CITY"
D4. PERFORMANCE, AND CONSULTING SERVICES SCHEDULE If the work
accomplished falls bead that scheduled due to factors within the CONS 'LTANT's
control, the CONSULTANT' shall take such action as necessary to improve the progress of
the Work.. In addition, the CITY may re ufe the CONSULTANT to submit a reprised
schedule demonstrating the prop sed plan to make up the delay in schedule progress and
to ensure completion of the Work within the,allotted Agreement time.
D5. SCHEDULE TARS SPECIAL INS U IONS.
Tb,e requirements for the schedule are determined based ors the mature and needs of the
project. The schedule fer for this projects stated at the top of this document.
CONSULTANT shall, submit each schedule relying on the CITYs current Schedule
Guidance Document.
D6. SCHEDULE SUBMITTAL AND PAYMENT:
As stated 'in 11I. . 1 . of the Agreement, CONSULTANT shah provide the information
required by Attachment, . CONS LTA T's monthly invoices Will not be accepted and
processed for payment without monthly schedule updates that are submitted in, the t me
and manner required by Attachment D and the C 's current Schedule GU dance
Document.
City of Fort Worth,Texas
Attachment D
PMO Release Date:02..15.201
Page 2 of 2
o
z
0 e
e
vt
0
QD
cm
CL
N CL
CL
� I
.w,
1
WIC
w 4�
( ,.."
" LO
CO
I Li
1Yy
M9•
Nnlvs;nWwl MW�fr+ONwa:�;uu�.w�uwwwW wWN�nm VwwWMrrTr+�Wly{r�Wrv�dV�p VN+w�I,JV;�.w1WWVwwWA bxf�lmaum.!�www 0."N!/h�.v,4�M�'IMwnua'rewwarNA�Sy�xw.M;;&.R uua'tiawkuf�wv nYNYJam�w.:'.uvluaP NdFi�W.rwtroti mm uv""wwwd Ax4M kroH �1pV;FM.rrnrnvw;o�""o�Y�ufiWryywuxe w�.mmA�µpµ
I
It-- Iq
INZ
col co 0) ce) col, cle) 0 0 0
0 � LO � U)
cq�•" "•°
K13
0 CD --
U- U
LL
m m m M (o I Ca (9 m (0
*0 70 "Gµ
ca
CL
id7!
C
t1! U) --
". �.5 m* 0 0 tD
� 75
,�..
E 0 0 0 >
b
4-d cn
cn
(0 10 0 w w 0 0 T)
o°.
V-
0)
..
I
0 V—
r m
ATTACHMENT "E"I
�ww
m
U
-A GT'.'»n_...,�,....,.�.,.. �.�„w a „„,� «w^" �•• ..�•r"
17 _M_
0 w
III
I
J
"
.... �
� .
I
I
I
..� ......._�W
CT .ARI
...........
1<7
.............
L,
.,
Q "
Al
uj
LU
Z�"
r
.d
I
0 800'
w,
' 9944 ,. �., '.�..�.�1 ..�...-•. -�
PHIL SCALE
E L T 0 N N O R T H
�aU M�•
FII I I ' r
�..._ .. ......
. AND S �. TI NS
57'6,1 KROGER DR.STE,1851 KELLER m TX 76244 J 817-W-3350
P
i