HomeMy WebLinkAboutContract 62878-PM1FORT WORTH PROJECT MANUAL FOR THE CONSTRUCTION OF CSC No. 62878-PM1 WATER, SANITARY SEWER & STREET LIGHTING IMPROVEMENTS TO SERVE TAVOLO PARK COMMERCIAL LOTS 1-5, BLOCK 2 IPRC Record No. IPRC24-0030 City Project No. 105491 FED No. 30114-0200431-105491-EO7685 X File No. Mattie Parker Jesus "Jay" Chapa Mayor City Manager Christopher P. Harder, P.E. Director, Water Department Prepared for The City of Fort Worth DUNAWAY DUNAWAY ASSOCIATES, LLC 550 Bailey Avenue, Suite 400 Ft. Worth, TX 76107 Office: 817-335-1121 / Fax: 817-429-1370 TX REG. F-1114 DA Project# B001951.042 2025 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 414125 OF A v JAMES BRETT STEPHENS .............................. 113948/CENS ���ee�o /PNAL�ENm�m� 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 1 of 5 SECTION 00 00 10 TABLE OF CONTENTS DEVELOPER AWARDED PROJECTS Division 00 - General Conditions nno n t Last Revised nnv0 21 13 hwit,.ti Bidders Tnal- .ILvans to Bidders 03120/22020 03v�r20/2020 00 41 00 Pill Io m 04/0 T 00 42 43 nno Proposal Form Unit Price Bid Ben 05/22/2019 nn 102/2014 nno n�T waders Pr-eq ,,, ifieeAien' Prequalification Statement nn in 4 09/01/2015 0045 12 00 45 26 Contractor Compliance with Workers' Compensation Law 04/02/2014 noi�l8 0045 40 00 52 43 Minority Business Enterprise Goal Agreement 06/16/2016 00 61 25 nno�j Certificate of Insurance Per-f ,.m a -nee Bead 07/01/2011 0 n�z 0062 Paymefft Bond Maintenance Bond Gener-al Conditions 01,131Q012 ce 01/31/2012 i i ii T 00 62 19 00 7200 007300 0073 10 Suppioment., -y Conditions Standard City Conditions of the Construction Contract for Developer 0�in�11 01/10/2013 Awarded Projects Division 01- General Requirements Last Revised 01 1100 Summary of Work 12/20/2012 01 25 00 Substitution Procedures 08/30/2013 01 31 19 1T1n n32 Preconstruction Meeting Pr-eje,.t Meeting 08/30/2013 0� 0 2 i vrrry 01 32 33 Preconstruction Video V7T�T2P1T 08/30/2013 01 33 00 Submittals 08/30/2013 01 35 13 Special Project Procedures 08/30/2013 01 45 23 Testing and Inspection Services 03/20/2020 01 5000 Temporary Facilities and Controls 07/01/2011 01 5526 Street Use Permit and Modifications to Traffic Control 07/01/2011 0157 13 Storm Water Pollution Prevention Plan 07/01/2011 01 60 00 Product Requirements 03/20/2020 01 66 00 Product Storage and Handling Requirements 04/07/2014 01 70 00 Mobilization and Remobilization 04/07/2014 01 71 23 Construction Staking 04/07/2014 01 74 23 Cleaning 04/07/2014 01 77 19 Closeout Requirements 04/07/2014 01 78 23 Operation and Maintenance Data 04/07/2014 01 78 39 Project Record Documents 04/07/2014 CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPEC DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project Number: 105491 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 2 of 5 Technical Specifications which have been modified by the Engineer specifically for this Project; hard copies are included in the Project's Contract Documents NONE Technical Specifications listed below are included for this Project by reference and can be viewed/downloaded from the City's website at: httv:Hfortworthtexas.2ov/ti)w/contractors/ or httus:Hauus.fortworthtexas.gov/Proi ectResources/ Division 02 - Existing Conditions Last Revised 0241 13 Selective Site Demolition 12/20/2012 0241 14 Utility Removal/Abandonment 12/20/2012 Division 03 - Concrete 03 30 00 Cast -In -Place Concrete 12/20/2012 0334 13 Controlled Low Strength Material (CLSM) 12/20/2012 038000 Modi€ica-tio o DricVng Gonerete C,met es 12/�12 Division 26 - Electrical 260500 Common Work Results for Electrical 11/22,90B 7ti 05 1 n Demolition for Electrical Systems 12/20,9012 zv-vTry rcr�vrcmz 260533 R ee,. ays and Boxes for Eleetrieal Systems Q/201Q � 26-05-43 Undefg . x-.d Dusts .,..,a Raee,. ays for- 1~teov. a F/ystems n7/nv-n-01,tNll 260550 Ecmm1a��a�Iu tr. Dua Conduit 02/26,9 6 Division 31- Earthwork 31�o Sit`e^7!`� 17/'lzzr20190ia 31�o U1,.-z zz/.f:e,1 17.,.,.,,..,ti ni /7o 4z,-�8Q013 31�3 1 n 1 /0 4�13 3124 00 Erm-11 arrma-fts n1 /�014 31 25 00 /7' Erosion and Sediment Control 12/20/2012 313600 21�0 Ripr-ap 12/20,9012 Division 32 - Exterior Improvements 3201 17 � V1�P1�111�st Azr1.W.t%�l:4ng Repaii 17 /7rr 2019 z 3,3 1123 Flexible Base !`oufses- 12/20,9012 3,2 1129 Lime e Treated Base Ge,,,.ses 12/2042012 2'l�T Liquid Treated Sol St.,1.:1;..er 08/21,9015 27�o Asphalt It Paving 12/20,9012 32 1273 Asphalt Paving Crack Sealants 12/20,9012 CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPEC DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project Number: 105491 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 3 of 5 �'�o dcnv;lm, Dvivaways-and Ba uer Froo Ranipo 06/nova 2'l�3 Cone -ete C .l. and Cffit4er-s and Valley Gutte 1 n/nrvrv5riviv 32 �5 Gaiv- Add rCys _%lioin,� 1 13 !''L.ai >renees and Gates 12/20QOz 3291 19 Topsoil Placement and Finishing of Parkways 12/20/2012 32 92 13 Hydro -Mulching, Seeding, and Sodding 12/20/2012 27�3 Tr-ees and 9J1nu o 12/' z Division 33 - Utilities 33 01 30 Sewer and Manhole Testing 12/20/2012 33 0131 Closed Circuit Television (CCTV) Inspection 03/03/2016 2Z�o T✓--vrry 22�= Bypwa n ong of Existing Sewer- Systo joint Beading and Qee4ieal lseWie C,.,-.-osion Gontfol Tent Stations Q/'�iTL/- 0Q Q-avravzz 17/'rt 20190iz 33� 0�4 rz 3.3 04 3o 33 04 40 Magnesium Anode Cathodic Protection System To,,,,.,.,.ary Water Seryic Cleaning and Acceptance Testing of Water Mains 12r2-09-012 07/0T 02/06/2013 33 04 50 Cleaning of Sewer Mains 12/20/2012 3305 10 Utility Trench Excavation, Embedment, and Backfill 12/12/2016 3305 12 Water Line Lowering 12/20/2012 3305 13 Frame, Cover and Grade Rings — Cast Iron C 01/22/2016 /22,9016 �� 3305 13.10 T_/"C7�TT 33 05 14 Frame, and Grade Rings n-ai�r�Pe� inlets, ��es��te„ � �`1. AdjuW.mg s,inlets, Valve Boxes, and 0 icT ft .IL�`arrs to U-~-r-c'iCle 01 �� Q/20190Q 1ZT�1Z 3305 16 3305 17 330520 C,., erete Water Vaults Concrete Collars Auger- 2..:g 1 �� /'0iz 12/20/2012 12n/20901z } 33 05 22 T,mnel Liner Plate Steel Casing Pipe 12/20,9012 12/20/2012 1 �� /�tz 33 05 23 23 05 24 2Z�o Twmeling 1 TP�%l�l.�U..,,, of'C.,.-4e- Pipe i !''.,si g of T-ti ne 1 of Dlate TA.,r4er-s/T 06/lvvr19,9013 171 /7 33 05 30 Utility E)e tee Location of Existing Utilities z 12/20/2012 33 1105 Bolts, Nuts, and Gaskets 12/20/2012 33 11 10 Ductile Iron Pipe 12/20/2012 33 11 11 Ductile Iron Fittings 12/20/2012 33 11 12 Polyvinyl Chloride (PVC) Pressure Pipe 11/16/2018 P_ 11 13 GoneretePr essur Pipe, Bar- Wped;-Steel Cylinder Type 7/20190� 0 3_ 11 11 Buried Stect Pipo and 1'/�Q 33 1210 Water Services 1-inch to 2-inch T \IITa4e 02/14/2017 33 Q ii 33 1220 .fge f Metef:s Resilient Seated Gate Valve 12/20,9012 12/20/2012 CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPEC DOCUMENTS - DEVELOPER AWARDED PROJECTS City Project Number: 105491 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 4 of 5 33 1225 Connection to Existing Water Mains !'',.m1.;natie,. l.,o 02/06/2013 33 1230 33 1240 Aif V Assemblies f ,- Potable Water- - Systo Hydrants 12/20,L2012 01/03/2014 33 1250 2Z�0 �Fii7re y'r a4cr S�/W--.o Stations Standard Blow effValye Assembly , 2/'frrrzvriv1z 06494013 2Z�2 Gur-ed i Ulaee Pipe (CIPP4 C12/20,L2012 12/o�12 33 31 15 33 31 20 High Density Polyethylene (HDPE) Pipe fef Sa-mitafy Sewef Polyvinyl Chloride (PVC) Gravity Sanitary Sewer Pipe 12/204012 06/19/2013 �� Polyvinyl C l,.fide (PVC) Closed - r-eFile r-,.ayity-Sarxtar er , � /ten/�n, � Pipe 12 44 112 Sa-aitafy Sewer 0.-, :srr-rrrr = F' b 121�12 2Z�3 Sa-nitar-y SewerPips En=l gamew ,2/�20i2 33 31 50 Sanitary Sewer Service Connections and Service Line 04/26/2013 333170 3339 10 22�0 Combination Air- Valve fef Sa-ni4ar-y Sewer- Fefee Mains Cast -in -Place Concrete Manholes Precast Genefete M.,nhol iV20190i2 12/20/2012 Q/'lzzr201QN2 333930 33 3940 33 39 60 Fiber -glass Manholes Wastewater- n eeess Chamber- (Vi n C) Epoxy Liners for Sanitary Sewer Structures Q/rye-201QN2 , �i /'�i2 12/20/2012 , 11 23 41 2 High Density Polyethylene (HDPE) Pipe forSOarn. DruA. Deinf ,-ee.l Polyet le a (SRP ) Pipe 12/20,9 11/13,L2015 334.E 00 22 4601 CC„1� Slotted St-%vf. Dr`�!' 1 71 /7 z 07/0 ,z9011 33 4602 Tr4rz-A 1)"nkC..S 07/no 1�i 22�0 Cast i Place Manholes d Nzic`sio14 Be*e6 ., 12420,902 , 33 492e 33 4940 Gu r-b and Dr-e inlets ��:1�"0 14ea 1,, alls an xx7;�,,.,.,aI 2/'fzzr20,90iz 07,101 201 1 v-n-vn-svrr Division 34 34 41 1e - Transportation T-r-affie c;,.a 1s , o/,Tvrr T/20is 34 41 10 �01 34 ^�02 A Ott-� aee�,t n !`ef���treitner ��ne� Atta.^,1Pmisatt) Specification 1 Q48�0i5� 0 2 34 41 .03 1 SController- oftware Attachment C---Specification OiQoil 2 A�3 34 41 5 Removing ing T- fa fie Signals Reeta*gulx Rar/ d Fla hir4 Beaeon 1 7 /20, 2012 11 /7ri 22,901 3 34-41 16 Pedv�w'nv Hybrid Signal 11 /�2013 34 41 20 Roadway Illumination Assemblies 12/20/2012 3 n /1�01 AF*Sarial LED R ,.,, ,1,, ay Luminaires o 06 // 1V V 1 5, 201 5 34 4120.02 � Freeway LED n,,.,dw r ., .�axiiI:aiw, s 06/1 c ,90-c 34 4120.03 t; r r �Jll� �� �.�' �1a'ili�.' ice` 7� nu1 c901 5 ova�rcor� 34 4130 � 2�1�0 ��lU1i1111�U�'i� E�/lbiiC Single Mode Fiber llptie (-'.,ble 11 2�9013. , 02/'lvrrz6,9016 CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPEC DOCUMENTS - DEVELOPER AWARDED PROJECTS City Project Number: 105491 Revised March 20, 2020 00 00 00 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS Page 5 of 5 Appendix GR-01 60 00 Product Requirements END OF SECTION CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPEC DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project Number: 105491 Revised March 20, 2020 UNIT PRICE BID Bidlist Item No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information Description Specification Unit of Section No. Measure UNIT I: WATER JMPROVEMENTS 3305.0109 Trench Safety 33 05 10 LF 3305.0005 12" Waterline Lowering 3305 12 EA 3305.1003 20" Casing By Open Cut 33 05 22 LF 3311.0001 Duction Iron Water Fittings w/Restraint 33 11 11 TON 3311.0161 6" PVC Water Pipe 3311 12 LF 3311.0261 8" PVC Water Pipe 3311 12 LF 3311.0451 12" DIP Water 33 11 10 LF 3311.0461 12" PVC Water Pipe 33 11 12 LF 3312.2203 2" Water Service 33 12 10 EA 3312.2203 2" Irrigation Water Service 33 12 10 EA 3312.3002 6" Gate Valve 33 1220 EA 3312.3003 8" Gate Valve 33 1220 EA 3312.3005 12" Gate Valve 33 1220 EA 3312.0117 Connection to Existing 4"-12" Water Main 33 1225 EA 3312.0001 Fire Hydrant 33 1240 EA 00 42 43 DAP - BID PROPOSAL Page 1 47 Bidder's Application Bid Quantity 1320 $ 1 $ 20 $ 3.35 $ 98 $ 116 $ 90 $ 1016 $ 4 $ 4 $ 7 $ 2 $ 4 $ 2 $ 3 $ TOTA _ UNIT I: WATER IMPROVEMENTS Bidder's Proposal Unit Price I Bid Value 6.00 $ 7,920.00 8,500.00 $ 8,500.00 200.00 $ 4,000.00 7,000.00 $ 23,450.00 78.36 $ 7,679.28 65.48 $ 7,595.68 150.00 $ 13,500.00 102.39 $ 104,028.24 3,980.87 $ 15,923.48 3,980.97 $ 15,923.88 1,873.97 $ 13,117.79 2,568.53 $ 5,137.06 2,941.86 $ 11,767.44 5,000.00 $ 10,000.00 6,356.55 $ 19,069.65 $267,612.50 CITY OF PORT WORTH TAVOLO PARK COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPLCIFICA'TION DOCUMENTS - DEVELOPER AWARDED PROJLC'IS City Project 0 105491 Form Version Mav 22, 2019 UNIT PRICE BID Bidlist Item No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information Description Specification Unit of Section No. Measure UNIT II: SANITARY SEWER IMPROV MENTS 3301.0002 Post -CCTV Inspection 3301 31 LF 3301.0101 Manhole Vacuum Testing 3301 30 EA 3305.1003 20" Casing By Open Cut 33 05 22 LF 3305.0109 Trench Safety 33 05 10 LF 3305.0113 Trench Water Stops 33 05 15 EA 3331.3201 6" Sewer Service 3331 50 EA 3331.4115 8" Sewer Pipe 33 11 10,33 LF 3331.4116 8" Sewer Pipe, CSS Backfill 3311 10,33 LF 3331.4119 8" DIP Sewer Pipe 33 11 10 LF 3339.0001 Epoxy Manhole Liner 33 39 60 VF 3339.1001 4' Manhole 3339 10, 33 EA 3339.1003 4' Extra Depth Manhole 3339 10,33 VF 00 42 43 DAP - BID PROPOSAL Page 2 47 Bidder's Application Bidder's Proposal Bid Unit Price Bid Value Quantity 1209 $3.60 $4,352.40 6 $180.00 $1,080.00 27 $200.00 $5,400.00 1209 $2.50 $3,022.50 3 $600.00 $1,800.00 4 $2,500.00 $10,000.00 1142 $56.91 $64,991.22 40 $81.44 $3,257.60 27 $100.00 $2,700.00 83 $586.15 $48,650.45 7 $4,246.20 $29,723.40 41 $475.00 $19,475.00 TOTAL UNIT II: SANITARY SEWER IMPROVEMENTS CITY OF FOxr WORTH SI ANDARD CONSTRUCTION SPLCIFICAr10N DOCUMUN'TS - DEVELOPER AWARDED PROJLC'TS Form Version May 22, 2019 $194,452.57 TAVOLO PARK COMMLRCIAL LOTS 1-5, BLOCK 2 City Project 0 105491 00 42 43 DAP - BID PROPOSAL Page 5 of 7 SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM UNIT PRICE BID Bidder's Application Project Item Information Bidder's Proposal Bidlist Item Specification Description Unit of Bid Unit Price Bid Value No Section No. Measure Quantity UNIT V: STREET LIGHTING IMPROV MENTS 1 3441.1401 NO 4 Triplex OH insulated Elec Condr 3441 10 LF 1064 $7.00 $7,448.00 2 3441.3201 LED Lighting Fixture 34 41 20 EA 6 $750.00 $4,500.00 3 3441.3323 Furnish/Install 8' Wood Light Pole Arm 34 41 20 EA 6 $750.00 $4,500.00 4 3441.3338 Furnish/Install 30' Wood Light Pole 34 41 20 EA 2 $2,500.00 $5,000.00 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 TOTAL UNIT V: STREET LIGHTING IMPROVEMENTS $21,448.00 CITY OF FORT WORTH TAVOLO PARK COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS City Project # 105491 Form Version May 22, 2019 UNIT PRICE BID SECTION 00 42 43 Developer Awarded Projects - PROPOSAL FORM Project Item Information 004243 DAP - BID PROPOSAL Page 7 of 7 Bidder's Application Bidlist item Description I I Specification I Unit of Bid jl No. Section No. Measure Quantity Bid Summary UNIT I: WATER IMPROVEMENTS UNIT II: SANITARY SEWER IMPROVEMENTS UNIT III: DRAINAGE IMPROVEMENTS UNIT IV: PAVING IMPROVEMENTS UNIT V: STREET LIGHTING IMPROVEMENTS UNIT VI: TRAFFIC SIGNAL IMPROVEMENTS This Bid is submitted by the entity named below: BIDDER: SVB CONSTRUCTION CO., INC. 421 COMPTON AVE IRVING, TX 75061 Contractor agrees to complete WORK for FINAL ACCEPTANCE within CONTRACT commences to run as provided in the General Conditions. Total Construction Bid Bidder's Proposal Unit Price I Bid Value $267,612.50 $194,452.57 $21,448.00 $483,513.07 BY: BRIAN WOOD TITLE: VjICE PRESID NT DATE: 1 t I lhI Z7 J V working days after the date when the END OF SECTION CITY OF FORT WORTH TAVOLO PARK COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS - DEVELOPER AWARDED PROJECTS Cily Projecl N 105491 Fami Version May 22, 2019 0045 12 DAP PREQUALIFICATION STATEMENT Page 1 of 1 SECTION 00 45 12 DAP — PREQUALIFICATION STATEMENT Each Bidder is required to complete the information below by identifying the prequalified contractors and/or subcontractors whom they intend to utilize for the major work type(s) listed. In the "Major Work Tune" box Drovide the complete major work tvDe and actual description as _provided by the Water DeDartment for water and sewer and TPW for Davin2. Major Work Type Contractor/Subcontractor Company Name Prequalification Expiration Date Sanitary Sewer Collection SYB Construction Co., Inc. 1/31/2026 System, Development, 8-inch diameter and smaller Water Development 12 inch SYB Construction Co., Inc. 1/31/2026 diameter and smaller Street Light Improvements C&S Utility Contractors Inc. 1/31/2026 The undersigned hereby certifies that the contractors and/or subcontractors described in the table above are currently prequalified for the work types listed. BIDDER: SYB Construction Co., Inc. BY: Justin Castor 1017 S FM 157 Venus, TX 76084 (Signature) TITLE: Vice President of Estimating DATE: 3/21 /2025 C&S Utility Contractors Inc. BY: Blake Menapace 6705 Highway 287 Arlington, TX 76001 _ (Signature) TITLE: Operations Manager DATE: 03/21 /2025 I Nei ZI] OM x4011130 CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION PREQUALIFICATION STATEMENT — DEVELOPER AWARDED PROJECTS City Project #105491 Form Version September 1, 2015 2 3 4 5 6 7 8 9 10 11 12 13 14 IS 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 00 45 26 - 1 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Pale 1 of I SECTION 00 45 26 CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW Pursuant to Texas Labor Code Section 406.096(a), as amended, Contractor certifies that it provides worker's compensation insurance coverage for all of its employees employed an City Project No. 105018. Contractor further certifies that, pursuant to Texas Labor Code, Section 406.096(b), as amended, it will provide to City its subcontractor's certificates of compliance with worker's compensation coverage. CONTRACTOR: SYB Construction Co., Inc. Company 1017 S FM 157 Address Venus, TX 76084 City/State/Zip THE STATE OF TEXAS § COUNTY OFTARRANT § By. Justin Castor (Please Print) Signature: AA1. Title: Vice President of Estimating (Please Print) BEFORE ME, the undersigned authority, on this day personally appeared Justin Castor , known to me to be the person whose name is subscribed to the foregoing instrument, and acknowledged to me that he/she executed the same as the act and deed of SYB Construction Co., Inc. _ for the purposes and consideration therein expressed and in the capacity therein stated. GIVEN UNDER MY HAND AND SEAL OF OFFICE this 25 day of March , 2025. v GEANA BRANNQ MENotary Public, state of Texas Notary Public in and for the State of Texas Comm. Expires 03-07.2029 ,�qiin P Notary ID 129337163 END OF SECTION CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project #105491 Revised April 2.2014 00 52 43 - 1 Developer Awarded Project Agreement Pagel of 4 1 SECTION 00 52 433 2 AGREEMENT 3 4 THIS AGREEMENT, authorized on 3/19/25 is made by and between the Developer, 5 Pate Ranch Commercial, LP, authorized to do business in Texas ("Developer") , and SYB 6 Construction Co., Inc., authorized to do business in Texas, acting by and through its duly 7 authorized representative, ("Contractor"). 8 Developer and Contractor, in consideration of the mutual covenants hereinafter set forth, agree as 9 follows: 10 Article 1. WORK 11 Contractor shall complete all Work as specified or indicated in the Contract Documents for the 12 Project identified herein. 13 Article 2. PROJECT 14 The project for which the Work under the Contract Documents may be the whole or only a part is 15 generally described as follows: 16 TAVOLO PARK COMMERCIAL LOTS 1-5, BLOCK 2 17 City Proiect Number:105491 18 Article 3. CONTRACT TIME 19 3.1 Time is of the essence. 20 All time limits for Milestones, if any, and Final Acceptance as stated in the Contract 21 Documents are of the essence to this Contract. 22 3.2 Final Acceptance. 23 The Work will be complete for Final Acceptance within 21 working days after the date 24 when the Contract Time commences to run as provided in Paragraph 12.04 of the Standard 25 City Conditions of the Construction Contract for Developer Awarded Projects. 26 3.3 Liquidated damages 27 Contractor recognizes that time is of the essence of this Agreement and that Developer 28 will suffer financial loss if the Work is not completed within the times specified in 29 Paragraph 3.2 above, plus any extension thereof allowed in accordance with Article 10 of 30 the Standard City Conditions of the Construction Contract for Developer Awarded 31 Projects. The Contractor also recognizes the delays, expense and difficulties involved in 32 proving in a legal proceeding the actual loss suffered by the Developer if the Work is not 33 completed on time. Accordingly, instead of requiring any such proof, Contractor agrees 34 that as liquidated damages for delay (but not as a penalty), Contractor shall pay 35 Developer Two -Hundred Fiftv ($250.00) for each day that expires after the time specified 36 in Paragraph 3.2 for Final Acceptance until the City issues the Final Letter of 37 Acceptance. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised June 16, 2016 00 52 43 - 2 Developer Awarded Project Agreement Page 2 of 4 38 Article 4. CONTRACT PRICE 39 Developer agrees to pay Contractor for performance of the Work in accordance with the Contract 40 Documents an amount in current funds of Four -Hundred Eighty Three Thousand and Five- 41 Hundred Thirteen Dollars and Seven Cents ($483,513.07). 42 Article 5. CONTRACT DOCUMENTS 43 5.1 CONTENTS: 44 A. The Contract Documents which comprise the entire agreement between Developer and 45 Contractor concerning the Work consist of the following: 46 1. This Agreement. 47 2. Attachments to this Agreement: 48 a. Bid Form (As provided by Developer) 49 1) Proposal Form (DAP Version) 50 2) Prequalification Statement 51 3) State and Federal documents (project specific) 52 b. Insurance ACORD Form(s) 53 c. Payment Bond (DAP Version) 54 d. Performance Bond (DAP Version) 55 e. Maintenance Bond (DAP Version) 56 f. Power of Attorney for the Bonds 57 g. Worker's Compensation Affidavit 58 h. MBE and/or SBE Commitment Form (If required) 59 3. Standard City General Conditions of the Construction Contract for Developer 60 Awarded Projects. 61 4. Supplementary Conditions. 62 5. Specifications specifically made a part of the Contract Documents by attachment 63 or, if not attached, as incorporated by reference and described in the Table of 64 Contents of the Project's Contract Documents. 65 6. Drawings. 66 7. Addenda. 67 8. Documentation submitted by Contractor prior to Notice of Award. 68 9. The following which may be delivered or issued after the Effective Date of the 69 Agreement and, if issued, become an incorporated part of the Contract Documents: 70 a. Notice to Proceed. 71 b. Field Orders. 72 c. Change Orders. 73 d. Letter of Final Acceptance. 74 75 CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised June 16, 2016 00 52 43 - 3 Developer Awarded Project Agreement Page 3 of 4 76 Article 6. INDEMNIFICATION 77 1.2 Contractor covenants and agrees to indemnify, hold harmless and defend, at its own 78 expense, the city, its officers, servants and employees, from and against any and all 79 claims arising out of, or alleged to arise out of, the work and services to be 80 performed by the contractor, its officers, agents, employees, subcontractors, licenses 81 or invitees under this contract. This indemnification provision is specifically 82 intended to operate and be effective even if it is alleged or proven that all or some of 83 the damages being sought were caused, in whole or in part, by anv act, omission or 84 negligence of the citv. This indemnity provision is intended to include, without 85 limitation, indemnity for costs, expenses and legal fees incurred by the city in 86 defending against such claims and causes of actions. 87 88 6.2 Contractor covenants and agrees to indemnify and hold harmless, at its own expense, 89 the city, its officers, servants and employees, from and against any and all loss, damage 90 or destruction of property of the city, arising out of, or alleged to arise out of, the work 91 and services to be performed by the contractor, its officers, agents, employees, 92 subcontractors, licensees or invitees under this contract. This indemnification 93 provision is specifically intended to operate and be effective even if it is alleged or 94 proven that all or some of the damages being sought were caused, in whole or in part, 95 by anv act, omission or negligence of the citv. 96 97 Article 7. MISCELLANEOUS 98 7.1 Terms. 99 Terms used in this Agreement are defined in Article 1 of the Standard City Conditions of 100 the Construction Contract for Developer Awarded Projects. 101 7.2 Assignment of Contract. 102 This Agreement, including all of the Contract Documents may not be assigned by the 103 Contractor without the advanced express written consent of the Developer. 104 7.3 Successors and Assigns. 105 Developer and Contractor each binds itself, its partners, successors, assigns and legal 106 representatives to the other party hereto, in respect to all covenants, agreements and 107 obligations contained in the Contract Documents. 108 7.4 Severability. 109 Any provision or part of the Contract Documents held to be unconstitutional, void or 110 unenforceable by a court of competent jurisdiction shall be deemed stricken, and all ill remaining provisions shall continue to be valid and binding upon DEVELOPER and 112 CONTRACTOR. 113 7.5 Governing Law and Venue. 114 This Agreement, including all of the Contract Documents is performable in the State of 115 Texas. Venue shall be Tarrant County, Texas, or the United States District Court for the 116 Northern District of Texas, Fort Worth Division. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised June 16, 2016 005243 -4 DevcIOPer Awarded Project Agreement Page 4 o1'4 117 118 7.6 Authority to Sign. 119 Contractor shall attach evidence of authority to sign Agreement, if other than duly 120 authorized signatory of the Contractor. 121 122 IN WITNESS WHEREOF, Developer and Contractor have executed this Agreement in multiple 123 counterparts. I24 125 This Agreement is effective as of the last date signed by the Parties ("Effective Date"). 126 Contractor: Developer: SYB Construction Co., hic. Pate Ranch Commercial, LP a Texas limited partnership 127 By: Justin Castor (Sign re) ,I J�4;lA I° t (Printed Name) Title:Vice President of Estimatina Company Name: SYB Construction Co., Inc. Address: 1017 S FM 157 City/State/Zip: Venus, TX 76084 3/19/25 Date By: PRA Pate Ranch GP, LLC a Texas limited liability company its authorized Administrator LIM resident Company name: Address: Pate Ranch Commercial, LP 10210 N Central Ex wy, Suite 300 Dallas, Texas 75231 City/State/Zip: 3/19/25 Date CITY OF FORT WORTH TAVOLO PARK, CON04ERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project 4105491 Revised Jute 16, 2016 CNA Business Auto Policy Policy Endorsement WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US (WAIVER OF SUBROGATION) - AUTOMATIC WHEN REQUIRED BY WRITTEN CONTRACT OR AGREEMENT THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. The Transfer Of Rights Of Recovery Against Others To Us Condition does not apply to any person(s) or organization(s) for whom you are required to waive subrogation with respect to the coverage provided under this Coverage Form, but only to the extent that subrogation is waived: A. Under a written contact or agreement with such person(s) or organization(s); and B. Prior to the "accident" or the "loss." Form No: CA 04 43 11 20 Policy No: BUA 7092655505 Endorsement Effective Date: Endorsement Expiration Date: Policy Effective Date: 09/30/2024 Endorsement No: 3; Page: 1 of 1 Policy Page: 100 of 553 Underwriting Company: The Continental Insurance Company, 151 N Franklin St, Chicago, IL 60606 ° Copyright Insurance Services Office, Inc., 2019 CNA 1 It is understood and agreed that: Business Auto Policy Policy Endorsement If you have agreed under written contract to provide notice of cancellation to a party to whom the Agent of Record has issued a Certificate of Insurance, and if we cancel a policy term described on that Certificate of Insurance for any reason other than nonpayment of premium, then notice of cancellation will be provided to such Certificateholders at least 30 days in advance of the date cancellation is effective. If notice is mailed, then proof of mailing to the last known mailing address of the Certificate holder on file with the Agent of Record will be sufficient to prove notice. Any failure by us to notify such persons or organizations will not extend or invalidate such cancellation, or impose any liability or obligation upon us or the Agent of Record. All other terms and conditions of the policy remain unchanged This endorsement, which forms a part of and is for attachment to the policy issued by the designated Insurers, takes effect on the Policy Effective date of said policy at the hour stated in said policy, unless another effective date (the Endorsement Effective Date) is shown below, and expires concurrently with said policy. Form No: CNA68021 XX (02-2013) Endorsement Effective Date: Endorsement Expiration Date: Endorsement No: 13; Page: 1 of 1 Underwriting Company: The Continental Insurance Company, 151 N Franklin St, Chicago, IL 60606 Policy No: BUA 7092655505 Policy Effective Date: 09/30/2024 Policy Page: 122 of 553 ° Copyright CNA All Rights Reserved. CNA CNA PARAMOUNT Contractors' General Liability Extension Endorsement It is understood and agreed that this endorsement amends the COMMERCIAL GENERAL LIABILITY COVERAGE PART as follows. If any other endorsement attached to this policy amends any provision also amended by this endorsement, then that other endorsement controls with respect to such provision, and the changes made by this endorsement with respect to such provision do not apply. TABLE OF CONTENTS 1. Additional Insureds 2. Additional Insured - Primary And Non -Contributory To Additional Insured's Insurance 3. Bodily Injury— Expanded Definition 4. Broad Knowledge of Occurrence/ Notice of Occurrence 5. Broad Named Insured 6. Broadened Liability Coverage For Damage To Your Product And Your Work 7. Contractual Liability - Railroads 8. Electronic Data Liability 9. Estates, Legal Representatives and Spouses 10. Expected Or Intended Injury — Exception for Reasonable Force 11. General Aggregate Limits of Insurance — Per Project 12. In Rem Actions 13. Incidental Health Care Malpractice Coverage 14. Joint Ventures/Partnership/Limited Liability Companies 15. Legal Liability — Damage To Premises / Alienated Premises / Property In The Named Insured's Care, Custody or Control 16. Liquor Liability 17. Medical Payments 18. Non -owned Aircraft Coverage 19. Non -owned Watercraft 20. Personal And Advertising Injury — Discrimination or Humiliation 21. Personal And Advertising Injury - Contractual Liability 22. Property Damage - Elevators 23. Supplementary Payments 24. Unintentional Failure To Disclose Hazards 25. Waiver of Subrogation — Blanket 26. Wrap -Up Extension: OCIP CCIP, or Consolidated (Wrap -Up) Insurance Programs CNA74705XX (1-15) Policy No: 7092655522 Page 1 of 17 Endorsement No: 2 Nat'l Fire Ins Co of Hartford Effective Date: 09/30/2024 Insured Name: SYB CONSTRUCTION CO. INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA CNA PARAMOUNT Contractors' General Liability Extension Endorsement 1. ADDITIONAL INSUREDS a. WHO IS AN INSURED is amended to include as an Insured any person or organization described in paragraphs A. through H. below whom a Named Insured is required to add as an additional insured on this Coverage Part under a written contract or written agreement, provided such contract or agreement: (1) is currently in effect or becomes effective during the term of this Coverage Part; and (2) was executed prior to: (a) the bodily injury or property damage; or (b) the offense that caused the personal and advertising injury, for which such additional insured seeks coverage. b. However, subject always to the terms and conditions of this policy, including the limits of insurance, the Insurer will not provide such additional insured with: (1) a higher limit of insurance than required by such contract or agreement; or (2) coverage broader than required by such contract or agreement, and in no event broader than that described by the applicable paragraph A. through H. below. Any coverage granted by this endorsement shall apply only to the extent permissible by law. A. Controlling Interest Any person or organization with a controlling interest in a Named Insured, but only with respect to such person or organization's liability for bodily injury, property damage or personal and advertising injury arising out of: 1. such person or organization's financial control of a Named Insured; or 2. premises such person or organization owns, maintains or controls while a Named Insured leases or occupies such premises; provided that the coverage granted by this paragraph does not apply to structural alterations, new construction or demolition operations performed by, on behalf of, or for such additional insured. B. Co-owner of Insured Premises A co-owner of a premises co -owned by a Named Insured and covered under this insurance but only with respect to such co -owner's liability for bodily injury, property damage or personal and advertising injury as co-owner of such premises. C. Lessor of Equipment Any person or organization from whom a Named Insured leases equipment, but only with respect to liability for bodily injury, property damage or personal and advertising injury caused, in whole or in part, by the Named Insured's maintenance, operation or use of such equipment, provided that the occurrence giving rise to such bodily injury, property damage or the offense giving rise to such personal and advertising injury takes place prior to the termination of such lease. D. Lessor of Land Any person or organization from whom a Named Insured leases land but only with respect to liability for bodily injury, property damage or personal and advertising injury arising out of the ownership, maintenance or use of such land, provided that the occurrence giving rise to such bodily injury, property damage or the offense giving rise to such personal and advertising injury takes place prior to the termination of such lease. The CNA74705XX (1-15) Page 2 of 17 Nat'l Fire Ins Co of Hartford Insured Name: SYB CONSTRUCTION CO. INC. Policy No: 7092655522 Endorsement No: 2 Effective Date: 0 9/ 3 0/ 2 0 2 4 Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA CNA PARAMOUNT Contractors' General Liability Extension Endorsement coverage granted by this paragraph does not apply to structural alterations, new construction or demolition operations performed by, on behalf of, or for such additional insured. E. Lessor of Premises An owner or lessor of premises leased to the Named Insured, or such owner or lessor's real estate manager, but only with respect to liability for bodily injury, property damage or personal and advertising injury arising out of the ownership, maintenance or use of such part of the premises leased to the Named Insured, and provided that the occurrence giving rise to such bodily injury or property damage, or the offense giving rise to such personal and advertising injury, takes place prior to the termination of such lease. The coverage granted by this paragraph does not apply to structural alterations, new construction or demolition operations performed by, on behalf of, or for such additional insured. F. Mortgagee, Assignee or Receiver A mortgagee, assignee or receiver of premises but only with respect to such mortgagee, assignee or receiver's liability for bodily injury, property damage or personal and advertising injury arising out of the Named Insured's ownership, maintenance, or use of a premises by a Named Insured. The coverage granted by this paragraph does not apply to structural alterations, new construction or demolition operations performed by, on behalf of, or for such additional insured. G. State or Governmental Agency or Subdivision or Political Subdivisions — Permits A state or governmental agency or subdivision or political subdivision that has issued a permit or authorization but only with respect to such state or governmental agency or subdivision or political subdivision's liability for bodily injury, property damage or personal and advertising injury arising out of: 1. the following hazards in connection with premises a Named Insured owns, rents, or controls and to which this insurance applies: a. the existence, maintenance, repair, construction, erection, or removal of advertising signs, awnings, canopies, cellar entrances, coal holes, driveways, manholes, marquees, hoistaway openings, sidewalk vaults, street banners, or decorations and similar exposures; or b. the construction, erection, or removal of elevators; or c. the ownership, maintenance or use of any elevators covered by this insurance; or 2. the permitted or authorized operations performed by a Named Insured or on a Named Insured's behalf. The coverage granted by this paragraph does not apply to: a. Bodily injury, property damage or personal and advertising injury arising out of operations performed for the state or governmental agency or subdivision or political subdivision; or b. Bodily injury or property damage included within the products -completed operations hazard. With respect to this provision's requirement that additional insured status must be requested under a written contract or agreement, the Insurer will treat as a written contract any governmental permit that requires the Named Insured to add the governmental entity as an additional insured. H. Trade Show Event Lessor 1. With respect to a Named Insured's participation in a trade show event as an exhibitor, presenter or displayer, any person or organization whom the Named Insured is required to include as an additional insured, but only with respect to such person or organization's liability for bodily injury, property damage or personal and advertising injury caused by: CNA74705XX (1-15) Page 3 of 17 Nat'l Fire Ins Co of Hartford Insured Name: SYB CONSTRUCTION CO. INC. Policy No: 7092655522 Endorsement No: 2 Effective Date: 0 9/ 3 0/ 2 0 2 4 Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA CNA PARAMOUNT Contractors' General Liability Extension Endorsement a. the Named Insured's acts or omissions; or b. the acts or omissions of those acting on the Named Insured's behalf, in the performance of the Named Insured's ongoing operations at the trade show event premises during the trade show event. 2. The coverage granted by this paragraph does not apply to bodily injury or property damage included within the products -completed operations hazard. 2. ADDITIONAL INSURED - PRIMARY AND NON-CONTRIBUTORY TO ADDITIONAL INSURED's INSURANCE The Other Insurance Condition in the COMMERCIAL GENERAL LIABILITY CONDITIONS Section is amended to add the following paragraph: If the Named Insured has agreed in writing in a contract or agreement that this insurance is primary and non- contributory relative to an additional insured's own insurance, then this insurance is primary, and the Insurer will not seek contribution from that other insurance. For the purpose of this Provision 2., the additional insured's own insurance means insurance on which the additional insured is a named insured. Otherwise, and notwithstanding anything to the contrary elsewhere in this Condition, the insurance provided to such person or organization is excess of any other insurance available to such person or organization. 3. BODILY INJURY — EXPANDED DEFINITION Under DEFINITIONS, the definition of bodily injury is deleted and replaced by the following: Bodily injury means physical injury, sickness or disease sustained by a person, including death, humiliation, shock, mental anguish or mental injury sustained by that person at any time which results as a consequence of the physical injury, sickness or disease. 4. BROAD KNOWLEDGE OF OCCURRENCE/ NOTICE OF OCCURRENCE Under CONDITIONS, the condition entitled Duties in The Event of Occurrence, Offense, Claim or Suit is amended to add the following provisions: A. BROAD KNOWLEDGE OF OCCURRENCE The Named Insured must give the Insurer or the Insurer's authorized representative notice of an occurrence, offense or claim only when the occurrence, offense or claim is known to a natural person Named Insured, to a partner, executive officer, manager or member of a Named Insured, or an employee designated by any of the above to give such notice. B. NOTICE OF OCCURRENCE The Named Insured's rights under this Coverage Part will not be prejudiced if the Named Insured fails to give the Insurer notice of an occurrence, offense or claim and that failure is solely due to the Named Insured's reasonable belief that the bodily injury or property damage is not covered under this Coverage Part. However, the Named Insured shall give written notice of such occurrence, offense or claim to the Insurer as soon as the Named Insured is aware that this insurance may apply to such occurrence, offense or claim. 5. BROAD NAMED INSURED WHO IS AN INSURED is amended to delete its Paragraph 3. in its entirety and replace it with the following: 3. Pursuant to the limitations described in Paragraph 4. below, any organization in which a Named Insured has management control: a. on the effective date of this Coverage Part; or CNA74705XX (1-15) Page 4 of 17 Nat'l Fire Ins Co of Hartford Insured Name: SYB CONSTRUCTION CO. INC. Policy No: 7092655522 Endorsement No: 2 Effective Date: 0 9/ 3 0/ 2 0 2 4 Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA CNA PARAMOUNT Contractors' General Liability Extension Endorsement b. by reason of a Named Insured creating or acquiring the organization during the policy period, qualifies as a Named Insured, provided that there is no other similar liability insurance, whether primary, contributory, excess, contingent or otherwise, which provides coverage to such organization, or which would have provided coverage but for the exhaustion of its limit, and without regard to whether its coverage is broader or narrower than that provided by this insurance. But this BROAD NAMED INSURED provision does not apply to: (a) any partnership, limited liability company or joint venture; or (b) any organization for which coverage is excluded by another endorsement attached to this Coverage Part. For the purpose of this provision, management control means: A. owning interests representing more than 50% of the voting, appointment or designation power for the selection of a majority of the Board of Directors of a corporation; or B. having the right, pursuant to a written trust agreement, to protect, control the use of, encumber or transfer or sell property held by a trust. 4. With respect to organizations which qualify as Named Insureds by virtue of Paragraph 3. above, this insurance does not apply to: a. bodily injury or property damage that first occurred prior to the date of management control, or that first occurs after management control ceases; nor b. personal or advertising injury caused by an offense that first occurred prior to the date of management control or that first occurs after management control ceases. 5. The insurance provided by this Coverage Part applies to Named Insureds when trading under their own names or under such other trading names or doing -business -as names (dba) as any Named Insured should choose to employ. 6. BROADENED LIABILITY COVERAGE FOR DAMAGE TO YOUR PRODUCT AND YOUR WORK A. Under COVERAGES, Cov njury and Property Damage Liability, the paragraph entitled Exclusions is amended to delete exclusions k. and I. and replace them with the following: This insurance does not apply to: k. Damage to Your Product Property damage to your product arising out of it, or any part of it except when caused by or resulting from: (1) fire; (2) smoke; (3) collapse; or (4) explosion. I. Damage to Your Work Property damage to your work arising out of it, or any part of it and included in the products -completed operations hazard. This exclusion does not apply: (1) If the damaged work, or the work out of which the damage arises, was performed on the Named Insured's behalf by a subcontractor; or CNA74705XX (1 - 15) Policy No: 7092655522 Page 5 of 17 Endorsement No: 2 Nat'l Fire Ins Co of Hartford Effective Date: 09/30/2024 Insured Name: SYB CONSTRUCTION CO. INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA CNA PARAMOUNT Contractors' General Liability Extension Endorsement (2) If the cause of loss to the damaged work arises as a result of: (a) fire; (b) smoke; (c) collapse; or (d) explosion. B. The following paragraph is added to LIMITS OF INSURANCE: Subject to 5. above, $100,000 is the most the Insurer will pay under Coverage A for the sum of damages arising out of any one occurrence because of property damage to your product and your work that is caused by fire, smoke, collapse or explosion and is included within the product -completed operations hazard. This sublimit does not apply to property damage to your work if the damaged work, or the work out of which the damage arises, was performed on the Named Insured's behalf by a subcontractor. C. This Broadened Liability Coverage For Damage To Your Product And Your Work Provision does not apply if an endorsement of the same name is attached to this policy. 7. CONTRACTUAL LIABILITY — RAILROADS With respect to operations performed within 50 feet of railroad property, the definition of insured contract is replaced by the following: Insured Contract means: a. A contract for a lease of premises. However, that portion of the contract for a lease of premises that indemnifies any person or organization for damage by fire to premises while rented to a Named Insured or temporarily occupied by a Named Insured with permission of the owner is not an insured contract; b. A sidetrack agreement; c. Any easement or license agreement; d. An obligation, as required by ordinance, to indemnify a municipality, except in connection with work for a municipality; e. An elevator maintenance agreement; f. That part of any other contract or agreement pertaining to the Named Insured's business (including an indemnification of a municipality in connection with work performed for a municipality) under which the Named Insured assumes the tort liability of another party to pay for bodily injury or property damage to a third person or organization. Tort liability means a liability that would be imposed by law in the absence of any contract or agreement. Paragraph f. does not include that part of any contract or agreement: (1) That indemnifies an architect, engineer or surveyor for injury or damage arising out of: (a) Preparing, approving or failing to prepare or approve maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; or (b) Giving directions or instructions, or failing to give them, if that is the primary cause of the injury or damage; (2) Under which the Insured, if an architect, engineer or surveyor, assumes liability for an injury or damage arising out of the insured's rendering or failure to render professional services, including those listed in (1) above and supervisory, inspection, architectural or engineering activities. 8. ELECTRONIC DATA LIABILITY CNA74705XX (1-15) Policy No: 7092655522 Page 6 of 17 Endorsement No: 2 Nat'l Fire Ins Co of Hartford Effective Date: 09/30/2024 Insured Name: SYB CONSTRUCTION CO. INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA CNA PARAMOUNT Contractors' General Liability Extension Endorsement A. Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended to delete exclusion p. Electronic Data and replace it with the following: This insurance does not apply to: p. Access Or Disclosure Of Confidential Or Personal Information And Data -related Liability Damages arising out of (1) any access to or disclosure of any person's or organization's confidential or personal information, including patents, trade secrets, processing methods, customer lists, financial information, credit card information, health information or any other type of nonpublic information; or (2) the loss of, loss of use of, damage to, corruption of, inability to access, or inability to manipulate electronic data that does not result from physical injury to tangible property. However, unless Paragraph (1) above applies, this exclusion does not apply to damages because of bodily injury. This exclusion applies even if damages are claimed for notification costs, credit monitoring expenses, forensic expenses, public relation expenses or any other loss, cost or expense incurred by the Named Insured or others arising out of that which is described in Paragraph (1) or (2) above. B. The following paragraph is added to LIMITS OF INSURANCE: Subject to 5. above, $100,000 is the most the Insurer will pay under Coverage A for all damages arising out of any one occurrence because of property damage that results from physical injury to tangible property and arises out of electronic data. C. The following definition is added to DEFINITIONS: Electronic data means information, facts or programs stored as or on, created or used on, or transmitted to or from computer software (including systems and applications software), hard or floppy disks, CD-ROMS, tapes, drives, cells, data processing devices or any other media which are used with electronically controlled equipment. D. For the purpose of the coverage provided by this ELECTRONIC DATA LIABILITY Provision, the definition of property damage in DEFINITIONS is replaced by the following: Property damage means: a. Physical injury to tangible property, including all resulting loss of use of that property. All such loss of use shall be deemed to occur at the time of the physical injury that caused it; b. Loss of use of tangible property that is not physically injured. All such loss of use shall be deemed to occur at the time of the occurrence that caused it; or c. Loss of, loss of use of, damage to, corruption of, inability to access, or inability to properly manipulate electronic data, resulting from physical injury to tangible property. All such loss of electronic data shall be deemed to occur at the time of the occurrence that caused it. For the purposes of this insurance, electronic data is not tangible property. E. If Electronic Data Liability is provided at a higher limit by another endorsement attached to this policy, then the $100,000 limit provided by this ELECTRONIC DATA LIABILITY Provision is part of, and not in addition to, that higher limit. 9. ESTATES, LEGAL REPRESENTATIVES, AND SPOUSES The estates, heirs, legal representatives and spouses of any natural person Insured shall also be insured under this policy; provided, however, coverage is afforded to such estates, heirs, legal representatives, and spouses only for CNA74705XX (1 - 15) Page 7 of 17 Nat'l Fire Ins Co of Hartford Insured Name: SYB CONSTRUCTION CO. INC. Policy No: 7092655522 Endorsement No: 2 Effective Date: 0 9/ 3 0/ 2 0 2 4 Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA CNA PARAMOUNT Contractors' General Liability Extension Endorsement claims arising solely out of their capacity or status as such and, in the case of a spouse, where such claim seeks damages from marital community property, jointly held property or property transferred from such natural person Insured to such spouse. No coverage is provided for any act, error or omission of an estate, heir, legal representative, or spouse outside the scope of such person's capacity or status as such, provided however that the spouse of a natural person Named Insured and the spouses of members or partners of joint venture or partnership Named Insureds are Insureds with respect to such spouses' acts, errors or omissions in the conduct of the Named Insured's business. 10. EXPECTED OR INTENDED INJURY — EXCEPTION FOR REASONABLE FORCE Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended to delete the exclusion entitled Expected or Intended Injury and replace it with the following: This insurance does not apply to: Expected or Intended Injury Bodily injury or property damage expected or intended from the standpoint of the Insured. This exclusion does not apply to bodily injury or property damage resulting from the use of reasonable force to protect persons or property. 11. GENERAL AGGREGATE LIMITS OF INSURANCE - PER PROJECT A. For each construction project away from premises the Named Insured owns or rents, a separate Construction Project General Aggregate Limit, equal to the amount of the General Aggregate Limit shown in the Declarations, is the most the Insurer will pay for the sum of: 1. All damages under Coverage A, except damages because of bodily injury or property damage included in the products -completed operations hazard; and 2. All medical expenses under Coverage C, that arise from occurrences or accidents which can be attributed solely to ongoing operations at that construction project. Such payments shall not reduce the General Aggregate Limit shown in the Declarations, nor the Construction Project General Aggregate Limit of any other construction project. B. All: 1. Damages under Coverage B, regardless of the number of locations or construction projects involved; 2. Damages under Coverage A, caused by occurrences which cannot be attributed solely to ongoing operations at a single construction project, except damages because of bodily injury or property damage included in the products -completed operations hazard; and 3. Medical expenses under Coverage C caused by accidents which cannot be attributed solely to ongoing operations at a single construction project, will reduce the General Aggregate Limit shown in the Declarations. C. The limits shown in the Declarations for Each Occurrence, for Damage To Premises Rented To You and for Medical Expense continue to apply, but will be subject to either the Construction Project General Aggregate Limit or the General Aggregate Limit shown in the Declarations, depending on whether the occurrence can be attributed solely to ongoing operations at a particular construction project. D. When coverage for liability arising out of the products -completed operations hazard is provided, any payments for damages because of bodily injury or property damage included in the products -completed operations hazard will reduce the Products -Completed Operations Aggregate Limit shown in the Declarations, regardless of the number of projects involved. CNA74705XX (1 - 15) Page 8 of 17 Nat'l Fire Ins Co of Hartford Insured Name: SYB CONSTRUCTION CO. INC. Policy No: 7092655522 Endorsement No: 2 Effective Date: 0 9/ 3 0/ 2 0 2 4 Copyright CNA AII Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA CNA PARAMOUNT Contractors' General Liability Extension Endorsement E. If a single construction project away from premises owned by or rented to the Insured has been abandoned and then restarted, or if the authorized contracting parties deviate from plans, blueprints, designs, specifications or timetables, the project will still be deemed to be the same construction project. F. The provisions of LIMITS OF INSURANCE not otherwise modified by this endorsement shall continue to apply as stipulated. 12. IN REM ACTIONS A quasi in rem action against any vessel owned or operated by or for the Named Insured, or chartered by or for the Named Insured, will be treated in the same manner as though the action were in personam against the Named Insured. 13. INCIDENTAL HEALTH CARE MALPRACTICE COVERAGE Solely with respect to bodily injury that arises out of a health care incident: A. Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Insuring Agreement is amended to replace Paragraphs 1.b.(1) and 1.b.(2) with the following: b. This insurance applies to bodily injury provided that the professional health care services are incidental to the Named Insured's primary business purpose, and only if: (1) such bodily injury is caused by an occurrence that takes place in the coverage territory. (2) the bodily injury first occurs during the policy period. All bodily injury arising from an occurrence will be deemed to have occurred at the time of the first act, error, or omission that is part of the occurrence; and B. Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended to: i. add the following to the Employers Liability exclusion: This exclusion applies only if the bodily injury arising from a health care incident is covered by other liability insurance available to the Insured (or which would have been available but for exhaustion of its limits). ii. delete the exclusion entitled Contractual Liability and replace it with the following: This insurance does not apply to: Contractual Liability the Insured's actual or alleged liability under any oral or written contract or agreement, including but not limited to express warranties or guarantees. iii. add the following additional exclusions: This insurance does not apply to: Discrimination any actual or alleged discrimination, humiliation or harassment, including but not limited to claims based on an individual's race, creed, color, age, gender, national origin, religion, disability, marital status or sexual orientation. Dishonesty or Crime Any actual or alleged dishonest, criminal or malicious act, error or omission. Medicare/Medicaid Fraud CNA74705XX (1 - 15) Policy No: 7092655522 Page 9 of 17 Endorsement No: 2 Nat'l Fire Ins Co of Hartford Effective Date: 09/30/2024 Insured Name: SYB CONSTRUCTION CO. INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA CNA PARAMOUNT Contractors' General Liability Extension Endorsement any actual or alleged violation of law with respect to Medicare, Medicaid, Tricare or any similar federal, state or local governmental program. Services Excluded by Endorsement Any health care incident for which coverage is excluded by endorsement. C. DEFINITIONS is amended to: i. add the following definitions: Health care incident means an act, error or omission by the Named Insured's employees or volunteer workers in the rendering of: a. professional health care services on behalf of the Named Insured or b. Good Samaritan services rendered in an emergency and for which no payment is demanded or received. Professional health care services means any health care services or the related furnishing of food, beverages, medical supplies or appliances by the following providers in their capacity as such but solely to the extent they are duly licensed as required: a. Physician; b. Nurse; c. Nurse practitioner; d. Emergency medical technician; e. Paramedic; f. Dentist; g. Physical therapist; h. Psychologist; i. Speech therapist; j. Other allied health professional; or Professional health care services does not include any services rendered in connection with human clinical trials or product testing. ill. delete the definition of occurrence and replace it with the following: Occurrence means a health care incident. All acts, errors or omissions that are logically connected by any common fact, circumstance, situation, transaction, event, advice or decision will be considered to constitute a single occurrence; iii. amend the definition of Insured to: a. add the following: the Named Insured's employees are Insureds with respect to: (1) bodily injury to a co -employee while in the course of the co -employee's employment by the Named Insured or while performing duties related to the conduct of the Named Insured's business; and CNA74705XX (1-15) Policy No: 7092655522 Page 10 of 17 Endorsement No: 2 Nat'l Fire Ins Co of Hartford Effective Date: 09/30/2024 Insured Name: SYB CONSTRUCTION CO. INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA CNA PARAMOUNT Contractors' General Liability Extension Endorsement (2) bodily injury to a volunteer worker while performing duties related to the conduct of the Named Insured's business; when such bodily injury arises out of a health care incident. the Named Insured's volunteer workers are Insureds with respect to: (1) bodily injury to a co -volunteer worker while performing duties related to the conduct of the Named Insured's business; and (2) bodily injury to an employee while in the course of the employee's employment by the Named Insured or while performing duties related to the conduct of the Named Insured's business; when such bodily injury arises out of a health care incident. b. delete Subparagraphs (a), (b), (c) and (d) of Paragraph 2.a.(1) of WHO IS AN INSURED. D. The Other Insurance condition is amended to delete Paragraph b.(1) in its entirety and replace it with the following: Other Insurance b. Excess Insurance (1) To the extent this insurance applies, it is excess over any other insurance, self insurance or risk transfer instrument, whether primary, excess, contingent or on any other basis, except for insurance purchased specifically by the Named Insured to be excess of this coverage. 14. JOINT VENTURES / PARTNERSHIP / LIMITED LIABILITY COMPANIES WHO IS AN INSURED is amended to delete its last paragraph and replace it with the following: No person or organization is an Insured with respect to the conduct of any current or past partnership, joint venture or limited liability company that is not shown as a Named Insured in the Declarations, except that if the Named Insured was a joint venturer, partner, or member of a limited liability company and such joint venture, partnership or limited liability company terminated prior to or during the policy period, such Named Insured is an Insured with respect to its interest in such joint venture, partnership or limited liability company but only to the extent that: a. any offense giving rise to personal and advertising injury occurred prior to such termination date, and the personal and advertising injury arising out of such offense first occurred after such termination date; b. the bodily injury or property damage first occurred after such termination date; and c. there is no other valid and collectible insurance purchased specifically to insure the partnership, joint venture or limited liability company; and If the joint venture, partnership or limited liability company is or was insured under a consolidated (wrap-up) insurance program, then such insurance will always be considered valid and collectible for the purpose of paragraph c. above. But this provision will not serve to exclude bodily injury, property damage or personal and advertising injury that would otherwise be covered under the Contractors General Liability Extension Endorsement provision entitled WRAP-UP EXTENSION: OCIP, CCIP, OR CONSOLIDATED (WRAP-UP) INSURANCE PROGRAMS. Please see that provision for the definition of consolidated (wrap-up) insurance program. 15. LEGAL LIABILITY — DAMAGE TO PREMISES / ALIENATED PREMISES / PROPERTY IN THE NAMED INSURED's CARE, CUSTODY OR CONTROL A. Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended to delete exclusion j. Damage to Property in its entirety and replace it with the following: This insurance does not apply to: CNA74705XX (1 - 15) Policy No: 7092655522 Page 11 of 17 Endorsement No: 2 Nat'l Fire Ins Co of Hartford Effective Date: 09/30/2024 Insured Name: SYB CONSTRUCTION CO. INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA CNA PARAMOUNT Contractors' General Liability Extension Endorsement j. Damage to Property Property damage to: (1) Property the Named Insured owns, rents, or occupies, including any costs or expenses incurred by you, or any other person, organization or entity, for repair, replacement, enhancement, restoration or maintenance of such property for any reason, including prevention of injury to a person or damage to another's property; (2) Premises the Named Insured sells, gives away or abandons, if the property damage arises out of any part of those premises; (3) Property loaned to the Named Insured; (4) Personal property in the care, custody or control of the Insured; (5) That particular part of real property on which the Named Insured or any contractors or subcontractors working directly or indirectly on the Named Insured's behalf are performing operations, if the property damage arises out of those operations; or (6) That particular part of any property that must be restored, repaired or replaced because your work was incorrectly performed on it. Paragraphs (1), and (4) of this exclusion do not apply to property damage (other than damage by fire) to premises rented to the Named Insured or temporarily occupied by the Named Insured with the permission of the owner, nor to the contents of premises rented to the Named Insured for a period of 7 or fewer consecutive days. A separate limit of insurance applies to Damage To Premises Rented To You as described in LIMITS OF INSURANCE. Paragraph (2) of this exclusion does not apply if the premises are your work. Paragraphs (3), and (6) of this exclusion do not apply to liability assumed under a sidetrack agreement. Paragraph (6) of this exclusion does not apply to property damage included in the products -completed operations hazard. Paragraphs (3) and (4) of this exclusion do not apply to property damage to: i. tools, or equipment the Named Insured borrows from others, nor ii. other personal property of others in the Named Insured's care, custody or control while being used in the Named Insured's operations away from any Named Insured's premises. However, the coverage granted by this exception to Paragraphs (3) and (4) does not apply to: a. property at a job site awaiting or during such property's installation, fabrication, or erection; b. property that is mobile equipment leased by an Insured; c. property that is an auto, aircraft or watercraft; d. property in transit; or e. any portion of property damage for which the Insured has available other valid and collectible insurance, or would have such insurance but for exhaustion of its limits, or but for application of one of its exclusions. A separate limit of insurance and deductible apply to such property of others. See LIMITS OF INSURANCE as amended below. CNA74705XX (1 - 15) Policy No: 7092655522 Page 12 of 17 Endorsement No: 2 Nat'l Fire Ins Co of Hartford Effective Date: 09/30/2024 Insured Name: SYB CONSTRUCTION CO. INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA CNA PARAMOUNT Contractors' General Liability Extension Endorsement B. Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended to delete its last paragraph and replace it with the following: Exclusions c. through n. do not apply to damage by fire to premises while rented to a Named Insured or temporarily occupied by a Named Insured with permission of the owner, nor to damage to the contents of premises rented to a Named Insured for a period of 7 or fewer consecutive days. A separate limit of insurance applies to this coverage as described in LIMITS OF INSURANCE. C. The following paragraph is added to LIMITS OF INSURANCE: Subject to 5. above, $25,000 is the most the Insurer will pay under Coverage A for damages arising out of any one occurrence because of the sum of all property damage to borrowed tools or equipment, and to other personal property of others in the Named Insured's care, custody or control, while being used in the Named Insured's operations away from any Named Insured's premises. The Insurer's obligation to pay such property damage does not apply until the amount of such property damage exceeds $1,000. The Insurer has the right but not the duty to pay any portion of this $1,000 in order to effect settlement. If the Insurer exercises that right, the Named Insured will promptly reimburse the Insurer for any such amount. D. Paragraph 6., Damage To Premises Rented To You Limit, of LIMITS OF INSURANCE is deleted and replaced by the following: 6. Subject to Paragraph 5. above, (the Each Occurrence Limit), the Damage To Premises Rented To You Limit is the most the Insurer will pay under Coverage A for damages because of property damage to any one premises while rented to the Named Insured or temporarily occupied by the Named Insured with the permission of the owner, including contents of such premises rented to the Named Insured for a period of 7 or fewer consecutive days. The Damage To Premises Rented To You Limit is the greater of: a. $500,000; or b. The Damage To Premises Rented To You Limit shown in the Declarations. E. Paragraph 4.b.(1)(a)(ii) of the Other Insurance Condition is deleted and replaced by the following: (ii) That is property insurance for premises rented to the Named Insured, for premises temporarily occupied by the Named Insured with the permission of the owner; or for personal property of others in the Named Insured's care, custody or control; 16. LIQUOR LIABILITY Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended to delete the exclusion entitled Liquor Liability. This LIQUOR LIABILITY provision does not apply to any person or organization who otherwise qualifies as an additional insured on this Coverage Part. 17. MEDICAL PAYMENTS A. LIMITS OF INSURANCE is amended to delete Paragraph 7. (the Medical Expense Limit) and replace it with the following: 7. Subject to Paragraph 5. above (the Each Occurrence Limit), the Medical Expense Limit is the most the Insurer will pay under Coverage C — Medical Payments for all medical expenses because of bodily injury sustained by any one person. The Medical Expense Limit is the greater of: (1) $15,000 unless a different amount is shown here: $N,NNN,NNN,NNN; or (2) the amount shown in the Declarations for Medical Expense Limit. CNA74705XX (1 - 15) Page 13 of 17 Nat'l Fire Ins Co of Hartford Insured Name: SYB CONSTRUCTION CO. INC. Policy No: 7092655522 Endorsement No: 2 Effective Date: 09/30/2024 Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA CNA PARAMOUNT Contractors' General Liability Extension Endorsement B. Under COVERAGES, the Insuring Agreement of Coverage C — Medical Payments is amended to replace Paragraph 1.a.(3)(b) with the following: (b) The expenses are incurred and reported to the Insurer within three years of the date of the accident; and 18. NON -OWNED AIRCRAFT Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended as follows: The exclusion entitled Aircraft, Auto or Watercraft is amended to add the following: This exclusion does not apply to an aircraft not owned by any Named Insured, provided that: 1. the pilot in command holds a currently effective certificate issued by the duly constituted authority of the United States of America or Canada, designating that person as a commercial or airline transport pilot; 2. the aircraft is rented with a trained, paid crew to the Named Insured; and 3. the aircraft is not being used to carry persons or property for a charge. 19. NON -OWNED WATERCRAFT Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended to delete subparagraph (2) of the exclusion entitled Aircraft, Auto or Watercraft, and replace it with the following. This exclusion does not apply to: (2) a watercraft that is not owned by any Named Insured, provided the watercraft is: (a) less than 75 feet long; and (b) not being used to carry persons or property for a charge. 20. PERSONAL AND ADVERTISING INJURY —DISCRIMINATION OR HUMILIATION A. Under DEFINITIONS, the definition of personal and advertising injury is amended to add the following tort: Discrimination or humiliation that results in injury to the feelings or reputation of a natural person. B. Under COVERAGES, Coverage B — Personal and Advertising Injury Liability, the paragraph entitled Exclusions is amended to: 1. delete the Exclusion entitled Knowing Violation Of Rights Of Another and replace it with the following: This insurance does not apply to: Knowing Violation of Rights of Another Personal and advertising injury caused by or at the direction of the Insured with the knowledge that the act would violate the rights of another and would inflict personal and advertising injury. This exclusion shall not apply to discrimination or humiliation that results in injury to the feelings or reputation of a natural person, but only if such discrimination or humiliation is not done intentionally by or at the direction of: (a) the Named Insured; or (b) any executive officer, director, stockholder, partner, member or manager (if the Named Insured is a limited liability company) of the Named Insured. 2. add the following exclusions: CNA74705XX (1 - 15) Policy No: 7092655522 Page 14 of 17 Endorsement No: 2 Nat'l Fire Ins Co of Hartford Effective Date: 09/30/2024 Insured Name: SYB CONSTRUCTION CO. INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA CNA PARAMOUNT Contractors' General Liability Extension Endorsement This insurance does not apply to: Employment Related Discrimination Discrimination or humiliation directly or indirectly related to the employment, prospective employment, past employment or termination of employment of any person by any Insured. Premises Related Discrimination discrimination or humiliation arising out of the sale, rental, lease or sub -lease or prospective sale, rental, lease or sub -lease of any room, dwelling or premises by or at the direction of any Insured. Notwithstanding the above, there is no coverage for fines or penalties levied or imposed by a governmental entity because of discrimination. The coverage provided by this PERSONAL AND ADVERTISING INJURY —DISCRIMINATION OR HUMILIATION Provision does not apply to any person or organization whose status as an Insured derives solely from Provision 1. ADDITIONAL INSURED of this endorsement; or attachment of an additional insured endorsement to this Coverage Part. This PERSONAL AND ADVERTISING INJURY —DISCRIMINATION OR HUMILIATION Provision does not apply to any person or organization who otherwise qualifies as an additional insured on this Coverage Part. 21. PERSONAL AND ADVERTISING INJURY - CONTRACTUAL LIABILITY A. Under COVERAGES, Coverage B —Personal and Advertising Injury Liability, the paragraph entitled Exclusions is amended to delete the exclusion entitled Contractual Liability. B. Solely for the purpose of the coverage provided by this PERSONAL AND ADVERTISING INJURY - CONTRACTUAL LIABILITY provision, the following changes are made to the section entitled SUPPLEMENTARY PAYMENTS — COVERAGES A AND B: 1. Paragraph 2.d. is replaced by the following: d. The allegations in the suit and the information the Insurer knows about the offense alleged in such suit are such that no conflict appears to exist between the interests of the Insured and the interests of the indemnitee; 2. The first unnumbered paragraph beneath Paragraph 2.f.(2)(b) is deleted and replaced by the following: So long as the above conditions are met, attorneys fees incurred by the Insurer in the defense of that indemnitee, necessary litigation expenses incurred by the Insurer, and necessary litigation expenses incurred by the indemnitee at the Insurer's request will be paid as defense costs. Such payments will not be deemed to be damages for personal and advertising injury and will not reduce the limits of insurance. C. This PERSONAL AND ADVERTISING INJURY - CONTRACTUAL LIABILITY Provision does not apply if Coverage B —Personal and Advertising Injury Liability is excluded by another endorsement attached to this Coverage Part. This PERSONAL AND ADVERTISING INJURY - CONTRACTUAL LIABILITY Provision does not apply to any person or organization who otherwise qualifies as an additional insured on this Coverage Part. 22. PROPERTY DAMAGE —ELEVATORS A. Under COVERAGES, Coverage A — Bodily Injury and Property Damage Liability, the paragraph entitled Exclusions is amended such that the Damage to Your Product Exclusion and subparagraphs (3), (4) and (6) of the Damage to Property Exclusion do not apply to property damage that results from the use of elevators. CNA74705XX (1-15) Page 15 of 17 Nat'l Fire Ins Co of Hartford Insured Name: SYB CONSTRUCTION CO. INC. Policy No: 7092655522 Endorsement No: 2 Effective Date: 09/30/2024 Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA CNA PARAMOUNT Contractors' General Liability Extension Endorsement B. Solely for the purpose of the coverage provided by this PROPERTY DAMAGE — ELEVATORS Provision, the Other Insurance conditions is amended to add the following paragraph: This insurance is excess over any of the other insurance, whether primary, excess, contingent or on any other basis that is Property insurance covering property of others damaged from the use of elevators. 23. SUPPLEMENTARY PAYMENTS The section entitled SUPPLEMENTARY PAYMENTS — COVERAGES A AND B is amended as follows: A. Paragraph 1.b. is amended to delete the $250 limit shown for the cost of bail bonds and replace it with a $5,000. limit; and B. Paragraph 1.d. is amended to delete the limit of $250 shown for daily loss of earnings and replace it with a $1,000. limit. 24. UNINTENTIONAL FAILURE TO DISCLOSE HAZARDS If the Named Insured unintentionally fails to disclose all existing hazards at the inception date of the Named Insured's Coverage Part, the Insurer will not deny coverage under this Coverage Part because of such failure. 25. WAIVER OF SUBROGATION - BLANKET Under CONDITIONS, the condition entitled Transfer Of Rights Of Recovery Against Others To Us is amended to add the following: The Insurer waives any right of recovery the Insurer may have against any person or organization because of payments the Insurer makes for injury or damage arising out of: 1. the Named Insured's ongoing operations; or 2. your work included in the products -completed operations hazard. However, this waiver applies only when the Named Insured has agreed in writing to waive such rights of recovery in a written contract or written agreement, and only if such contract or agreement: 1. is in effect or becomes effective during the term of this Coverage Part; and 2. was executed prior to the bodily injury, property damage or personal and advertising injury giving rise to the claim. 26. WRAP-UP EXTENSION: OCIP, CCIP, OR CONSOLIDATED (WRAP-UP) INSURANCE PROGRAMS Note: The following provision does not apply to any public construction project in the state of Oklahoma, nor to any construction project in the state of Alaska, that is not permitted to be insured under a consolidated (wrap-up) insurance program by applicable state statute or regulation. If the endorsement EXCLUSION — CONSTRUCTION WRAP-UP is attached to this policy, or another exclusionary endorsement pertaining to Owner Controlled Insurance Programs (O.C.I.P.) or Contractor Controlled Insurance Programs (C.C.I.P.) is attached, then the following changes apply: A. The following wording is added to the above -referenced endorsement: With respect to a consolidated (wrap-up) insurance program project in which the Named Insured is or was involved, this exclusion does not apply to those sums the Named Insured become legally obligated to pay as damages because of: 1. Bodily injury, property damage, or personal or advertising injury that occurs during the Named Insured's ongoing operations at the project, or during such operations of anyone acting on the Named Insured's behalf; nor CNA74705XX (1-15) Page 16 of 17 Nat'l Fire Ins Co of Hartford Insured Name: SYB CONSTRUCTION CO. INC. Policy No: 7092655522 Endorsement No: 2 Effective Date: 0 9/ 3 0/ 2 0 2 4 Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA CNA PARAMOUNT Contractors' General Liability Extension Endorsement 2. Bodily injury or property damage included within the products -completed operations hazard that arises out of those portions of the project that are not residential structures. B. Condition 4.Other Insurance is amended to add the following subparagraph 4.b.(1)(c): This insurance is excess over: (c) Any of the other insurance whether primary, excess, contingent or any other basis that is insurance available to the Named Insured as a result of the Named Insured being a participant in a consolidated (wrap-up) insurance program, but only as respects the Named Insured's involvement in that consolidated (wrap-up) insurance program. C. DEFINITIONS is amended to add the following definitions: Consolidated (wrap-up) insurance program means a construction, erection or demolition project for which the prime contractor/project manager or owner of the construction project has secured general liability insurance covering some or all of the contractors or subcontractors involved in the project, such as an Owner Controlled Insurance Program (O.C.I.P.) or Contractor Controlled Insurance Program (C.C.I.P.). Residential structure means any structure where 30% or more of the square foot area is used or is intended to be used for human residency, including but not limited to: 1. single or multifamily housing, apartments, condominiums, townhouses, co-operatives or planned unit developments; and 2. the common areas and structures appurtenant to the structures in paragraph 1. (including pools, hot tubs, detached garages, guest houses or any similar structures). However, when there is no individual ownership of units, residential structure does not include military housing, college/university housing or dormitories, long term care facilities, hotels or motels. Residential structure also does not include hospitals or prisons. This WRAP-UP EXTENSION: OCIP, CCIP, OR CONSOLIDATED (WRAP-UP) INSURANCE PROGRAMS Provision does not apply to any person or organization who otherwise qualifies as an additional insured on this Coverage Part. All other terms and conditions of the Policy remain unchanged. This endorsement, which forms a part of and is for attachment to the Policy issued by the designated Insurers, takes effect on the effective date of said Policy at the hour stated in said Policy, unless another effective date is shown below, and expires concurrently with said Policy. CNA74705XX (1 - 15) Page 17 of 17 Nat'l Fire Ins Co of Hartford Insured Name: SYB CONSTRUCTION CO. INC. Policy No: 7092655522 Endorsement No: 2 Effective Date: 09/30/2024 Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA CNA PARAMOUNT Blanket Additional Insured - Owners, Lessees or Contractors - with Products -Completed Operations Coverage - Limited Liability Endorsement This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART It is understood and agreed as follows: I. The WHO IS AN INSURED section is amended to add as an Insured any person or organization whom the Named Insured is required by written contract to add as an additional insured on this Coverage Part; including any such person or organization, if any, specifically set forth on the Schedule attachment to this endorsement. However, such person or organization is an Insured only with respect to such person or organization's liability for: A. bodily injury, property damage, or personal and advertising injury to the extent caused by: 1. the Named Insured's acts or omissions; or 2. the acts or omissions of those acting on the Named Insured's behalf, in the performance of the Named Insured's ongoing operations specified in the written contract; or B. bodily injury or property damage to the extent caused by your work specified in the written contract and included in the products -completed operations hazard, and only if 1. the written contract requires the Named Insured to provide the additional insured such coverage; and 2. this coverage part provides such coverage. II. Subject always to the terms and conditions of this policy, including the limits of insurance, the Insurer will not provide such additional insured with: A. coverage broader than required by the written contract; or B. a higher limit of insurance than required by the written contract. III. The insurance granted by this endorsement to the additional insured does not apply to bodily injury, property damage, or personal and advertising injury arising out of: A. acts or omissions of the additional insured, or of anyone acting on the additional insured's behalf; or B. the rendering of, or the failure to render, any professional architectural, engineering, or surveying services, including: 1. the preparing, approving, or failing to prepare or approve maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; and 2. supervisory, inspection, architectural or engineering activities; or C. any premises or work for which the additional insured is specifically listed as an additional insured on another endorsement attached to this coverage part. IV. Notwithstanding anything to the contrary in the section entitled COMMERCIAL GENERAL LIABILITY CONDITIONS, the Condition entitled Other Insurance, this insurance is excess of all other insurance available to the additional insured whether on a primary, excess, contingent or any other basis. However, if this insurance is required by written contract to be primary and non-contributory, this insurance will be primary and non-contributory relative solely to insurance on which the additional insured is a named insured. V. Solely with respect to the insurance granted by this endorsement, the section entitled COMMERCIAL GENERAL LIABILITY CONDITIONS is amended as follows: CNA75081XX (1 - 15) Policy No: 7092655522 Page 1 of 2 Endorsement No: 5 Nat'l Fire Ins Co of Hartford Effective Date: 09/30/2024 Insured Name: SYB CONSTRUCTION CO. INC. Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA CNA PARAMOUNT Blanket Additional Insured - Owners, Lessees or Contractors - with Products -Completed Operations Coverage - Limited Liability Endorsement The Condition entitled Duties In The Event of Occurrence, Offense, Claim or Suit is amended with the addition of the following: Any additional insured pursuant to this endorsement will as soon as practicable: 1. give the Insurer written notice of any claim, or any occurrence or offense which may result in a claim; 2. except as provided in Paragraph IV. of this endorsement, agree to make available any other insurance the additional insured has for any loss covered under this coverage part; 3. send the Insurer copies of all legal papers received, and otherwise cooperate with the Insurer in the investigation, defense, or settlement of the claim; and 4. tender the defense and indemnity of any claim to any other insurer or self insurer whose policy or program applies to a loss that the Insurer covers under this coverage part. However, if the written contract requires this insurance to be primary and non-contributory, this paragraph 4 does not apply to insurance on which the additional insured is a named insured. The Insurer has no duty to defend or indemnify an additional insured under this endorsement until the Insurer receives written notice of a claim from the additional insured. VI. Solely with respect to the insurance granted by this endorsement, the section entitled DEFINITIONS is amended to add the following definition: Written contract means a written contract or written agreement that requires the Named Insured to make a person or organization an additional insured on this coverage part, provided the contract or agreement: A. is currently in effect or becomes effective during the term of this policy; and B. was executed prior to: 1. The bodily injury or property damage; or 2. The offense that caused the personal and advertising injury for which the additional insured seeks coverage. Any coverage granted by this endorsement shall apply solely to the extent permissible by law. All other terms and conditions of the Policy remain unchanged. This endorsement, which forms a part of and is for attachment to the Policy issued by the designated Insurers, takes effect on the effective date of said Policy at the hour stated in said Policy, unless another effective date is shown below, and expires concurrently with said Policy. CNA75081XX (1 - 15) Page 2 of 2 Nat'l Fire Ins Co of Hartford Insured Name: SYB CONSTRUCTION CO. INC. Policy No Endorsement No Effective Date 7092655522 09/30/2024 Copyright CNA All Rights Reserved. Includes copyrighted material of Insurance Services Office, Inc., with its permission. CNA CNA PARAMOUNT Changes - Notice of Cancellation or Material Restriction Endorsement This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART EMPLOYEE BENEFITS LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART OWNERS AND CONTRACTORS PROTECTIVE LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART RAILROAD PROTECTIVE LIABILITY COVERAGE PART STOP GAP LIABILITY COVERAGE PART TECHNOLOGY ERRORS AND OMISSIONS LIABILITY COVERAGE PART SPECIAL PROTECTIVE AND HIGHWAY LIABILITY POLICY — NEW YORK DEPARTMENT OF TRANSPORTATION SCHEDULE Number of days notice (other than for nonpayment of premium): 030 Number of days notice for nonpayment of premium: N/A Name of person or organization to whom notice will be sent: PER SCHEDULE ON FILE Address: PER SCHEDULE ON FILE PER SCHEDULE ON FILE XX 00000 If no entry appears above, the number of days notice for nonpayment of premium will be 10 days. It is understood and agreed that in the event of cancellation or any material restrictions in coverage during the policy period, the Insurer also agrees to mail prior written notice of cancellation or material restriction to the person or organization listed in the above Schedule. Such notice will be sent prior to such cancellation in the manner prescribed in the above Schedule. All other terms and conditions of the Policy remain unchanged. This endorsement, which forms a part of and is for attachment to the Policy issued by the designated Insurers, takes effect on the effective date of said Policy at the hour stated in said Policy, unless another effective date is shown below, and expires concurrently with said Policy. CNA74702XX (1-15) Page 1 of 1 Nat'l Fire Ins Insured Name: SYB Co of Hartford CONSTRUCTION CO INC. Copyright CNA Al Rights Reserved. Policy No: 7092655522 Endorsement No: 25 Effective Date: 0 9/ 3 0/ 2 0 2 4 POLICY NUMBER: 46 CPI KQ1745 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NON-CONTRIBUTORY This endorsement modifies insurance provided under the following: CONTRACTORS PROFESSIONAL AND PROTECTIVE INDEMNITY PLUS (CPPI+) SECTION V. - CONDITION Other Insurance Item 18 c. is deleted and replaced with the following: c. The coverage afforded under this Policy for an "additional insured" is primary and non- contributory to any other insurance available to such "additional insured" when required by written contract or written agreement between the "insured" and the "additional insured" executed prior to a "claim" or "pollution incident" involving such "additional insured". However, to the extent that the "additional insured" is named as an additional insured on another insurance policy that also provides primary and non- contributory coverage, we shall share with that other insurance as follows: 1. If all of the other insurance permits contribution by equal shares, we will follow this method also. Under this approach, each insurer contributes equal amounts until it has paid its applicable limit of insurance or none of the loss remains, whichever comes first. 2. If any of the other insurance does not permit contribution by equal shares, we will contribute by limits. Under this method, each insurer's share is based on the ratio of its applicable limit of insurance to the total applicable limits of insurance of all insurers. Form CL 28 36 01 16 Page 1 of 1 © 2016, The Hartford POLICY NUMBER: 46 CPI KQ1745 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF SUBROGATION This endorsement modifies insurance provided underthe following: CONTRACTORS PROFESSIONAL AND PROTECTIVE INDEMNITY PLUS (CPPI+) SECTION V - CONDITIONS, paragraph 11. Subrogation is deleted and replaced with the following: 11. Subrogation In the event of any payment under this Policy, an "insured" will execute and deliver all requested instruments and papers to us and take whatever other actions are reasonably necessary and requested by us to exercise our rights of subrogation. An "insured" will do nothing to waive or prejudice our rights of subrogation. We will have priority over an "insured" in allocation of any recovery, and any amounts recovered in excess of our total payment and our cost of recovery will be paid to the "insured"The Policy Aggregate Limit of Insurance will be reinstated by the amount recovered by us, less our cost of recovery. We waive our rights of subrogation under this Policy only to the extent such contract or written agreement executed by an "insured" prior to a "claim" "pollution incident", "professional incident", or "protective incident". All other terms and conditions remain unchanged. a waiver is required by written "protective indemnity claim", Form CL 28 24 10 15 Page 1 of 1 © 2016, The Hartford CNA Workers Compensation And Employers Liability Insurance Policy Endorsement TEXAS WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT This endorsement applies only to the insurance provided by the policy because Texas is shown in Item 3.A. of the Information Page. We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule, but this waiver applies only with respect to bodily injury arising out of the operations described in the Schedule where you are required by a written contract to obtain this waiver from us. This endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule. The premium for this endorsement is shown in the Schedule. Schedule 1. ❑ Specific Waiver Name of person or organization X❑ Blanket Waiver Any person or organization for whom the Named Insured has agreed by written contract to furnish this waiver. 2. Operations: All Texas Operations 3. Premium: The premium charge for this endorsement shall be 2% percent of the premium developed on payroll in connection with work performed for the above person(s) or organization(s) arising out of the operations described. 4. Advance Premium: Refer to Schedule of Operations All other terms and conditions of the policy remain unchanged. This endorsement, which forms a part of and is for attachment to the policy issued by the designated Insurers, takes effect on the Policy Effective Date of said policy at the hour stated in said policy, unless another effective date (the Endorsement Effective Date) is shown below, and expires concurrently with said policy unless another expiration date is shown below. Form No: WC 42 03 04 B (06-2014) Policy No: WC 7 92655536 Endorsement Effective Date: Endorsement Expiration Date: Policy Effective Date: 09/30/2024 Endorsement No: 8; Page: 1 of 1 Policy Page: 43 of 46 Underwriting Company: American Casualty Company of Reading, Pennsylvania, 151 N Franklin St, Chicago, IL 60606 ° Copyright 2014 National Council on Compensation Insurance, Inc. All Rights Reserved. CMA It is understood and agreed that: Workers Compensation And Employers Liability Insurance Policyholder Notice If you have agreed under written contract to provide notice of cancellation to a party to whom the Agent of Record has issued a Certificate of Insurance, and if we cancel a policy term described on that Certificate of Insurance for any reason other than nonpayment of premium, then notice of cancellation will be provided to such Certificate Holders at least 30 days in advance of the date cancellation is effective. If notice is mailed, then proof of mailing to the last known mailing address of the Certificate Holder on file with the Agent of Record will be sufficient to prove notice. Any failure by us to notify such persons or organizations will not extend or invalidate such cancellation, or impose any liability or obligation upon us or the Agent of Record. All other terms and conditions of the policy remain unchanged. This endorsement, which forms a part of and is for attachment to the policy issued by the designated Insurers, takes effect on the Policy Effective Date of said policy at the hour stated in said policy, unless another effective date (the Endorsement Effective Date) is shown below, and expires concurrently with said policy unless another expiration date is shown below. Form No: CC68021 A (02-2013) Policyholder Notice; Page: 1 of 1 Underwriting Company: American Casualty Company of Reading, Pennsylvania, 151 N Franklin St, Chicago, IL 60606 Policy No: WC 7 92655536 Policy Effective Date:09/30/2024 Policy Page: 4 of 46 ° Copyright CNA All Rights Reserved. Bond No. 1112594 / SYB Job No. 1242 0062 19- 1 MAINTENANCE BOND Page 1 of 3 1 SECTION 00 62 19 2 MAINTENANCE BOND 3 4 THE STATE OF TEXAS § 5 § KNOW ALL BY THESE PRESENTS: 6 COUNTY OF TARRANT § 7 8 That we SYB Construction Co., Inc., known as "Principal" herein and The Hanover 9 Insurance Company, a corporate surety (sureties, if more than one) duly authorized to do business 10 in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound 11 unto the Developer, Pate Ranch Commercial LP, authorized to do business in Texas 12 ("Developer") and the City of Fort Worth, a Texas municipal corporation ("City"), in the sum of 13 Four -Hundred Eighty Three Thousand and Five -Hundred Thirteen Dollars and Seven Cents 14 Dollars (S483,513.07), lawful money of the United States, to be paid in Fort Worth, Tarrant 15 County, Texas, for payment of which sum well and truly be made jointly unto the Developer and 16 the City as dual obligees and their successors, we bind ourselves, our heirs, executors, 17 administrators, successors and assigns, jointly and severally, firmly by these presents, 18 19 WHEREAS, Developer and City have entered into an Agreement for the construction of 20 community facilities in the City of Fort Worth by and through a Community Facilities 21 Agreement, CFA Number 24-0134; and 22 WHEREAS, the Principal has entered into a certain written contract with the Developer 23 awarded the 19 day of March , 20 25 , which Contract is 24 hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all 25 materials, equipment labor and other accessories as defined by law, in the prosecution of the 26 Work, including any Work resulting from a duly authorized Change Order (collectively herein, 27 the "Work") as provided for in said Contract and designated as TAVOLO PARK, LOTS 1-5, 28 BLOCK 2; and 29 30 WHEREAS, Principal binds itself to use such materials and to so construct the Work in 31 accordance with the plans, specifications and Contract Documents that the Work is and will 32 remain free from defects in materials or workmanship for and during the period of two (2) years 33 after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and 34 CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised January 31, 2012 006219-2 MAINTENANCE BOND Page 2 or3 I WHEREAS, Principal binds itself to repair or reconstruct the Work in whole or in part 2 upon receiving notice from the Developer and/or City of the need thereof at any time within the 3 Maintenance Period. 4 5 NOW THEREFORE, the condition of this obligation is such that if Principal shall 6 remedy any defective Work, for which timely notice was provided by Developer or City, to a 7 completion satisfactory to the City, then this obligation shall become null and void; otherwise to 8 remain in full force and effect. 9 10 PROVIDED, HOWEVER, if Principal shall fail so to repair or reconstruct any timely I 1 noticed defective Work, it is agreed that the Developer or City may cause any and all such 12 defective Work to be repaired and/or reconstructed with all associated costs thereof being borne 13 by the Principal and the Surety under this Maintenance Bond; and 14 15 PROVIDED FURTHER, that if any Iegal action be filed on this Bond, venue shall lie in 16 Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort 17 Worth Division; and 18 19 PROVIDED FURTHER, that this obligation shall be continuous in nature and 20 successive recoveries may be had hereon for successive breaches. 2l 22 23 CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS— DEVELOPER AWARDED PROJECTS City Project 9105491 Revised January 31, 2012 006219-3 MAINTENANCE BOND Page 3 of3 IN WITNESS WHEREOF, the Principal and the Surety have each SIGNED and SEALED this 2 inswument by duly authorized agents and officers on this the 19th day of March 3 , 20 25 . 4 5 6 7 8 9 10 11 T' 12 �r.-- 13 14 mcipal) Secretary 15 16 17 18 _ 19 r_ - 20 Witness as to Principa1 21 22 23 24 25 26 27 28 29 ATTEST: 3 31 32 (Surety)SElt>MXKY Kaden Tate, Witness 33 ro� 34 35 Witness as to Surety Alec steinfeldt, Witness 36 PRINCIPAL: SYB CONSTRUCTION CO. C. BY: Signature Brian Wood, Vice -President Name and Title Address: 1017 S FM 157 Venus, TX 76084 SURETY: The Hanover Insurance Company BY: �� J Signature Michelle Anne McMahon, Attorney -In -Fact Name and Title Address: 440 LINCOLN STREET WORCESTER, MA 01653 Telephone Number: (508) 853-7200 37 *Note: If signed by an officer of the Surety Company, there must be on file a certified extract 38 from the by-laws showing that this person has authority to sign such obligation. If 39 Surety's physical address is different from its mailing address, both must be provided. 40 41 The date of the bond shall not be prior to the date the Contract is awarded. 42 CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS City Projecl 9105491 Revised January 31, 2012 THE HANOVER INSURANCE COMPANY MASSACHUSETTS BAY INSURANCE COMPANY CITIZENS INSURANCE COMPANY OF AMERICA POWER OF ATTORNEY THIS Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. KNOW ALL PERSONS BY THESE PRESENTS: ThatTHE HANOVER INSURANCE COMPANY and MASSACHUSETTS BAY INSURANCE COMPANY, both being corporations organized and existing underthe taws of the State of New Hampshire, and CITIZENS INSURANCE COMPANY OF AMERICA, a corporation organized and existing under the laws of the State of Michigan, (hereinafter individually and collectively the "Company') does hereby constitute and appoint, Joshua Sanford, Jennifer Godere, Kathryn Pryor, Gentry Stewart, Michelle Anne McMahon, Jonathan Gleason, Nicholas Miller, Sarah Murtha, Doritza Mojica, Connor Woipert, and/or Richard Hackner Of Willis of Connecticut, LLC of Hartford, CT each individually, if there be more than one named, as its true and lawful attorney(s)-in-fact to sign, execute, seal, acknowledge and deliver for, and on its behalf, and as its act and deed any place within the United States, any and all surety bonds, recognizances, undertakings. or other surety obligations. The execution of such surety bonds, recognizances, undertakings or surety obligations, in pursuance of these presents, shall be as binding upon the Company as if they had been duly signed by the president and attested by the secretary of the Company, in their own proper persons. Provided however, that this power of attorney limits the acts of those named herein; and they have no authority to bind the Company except in the manner staled and to the extent of any limitation stated below: Any such obligations in the United States, not to exceed Twenty Million and Noll00 ($20,000,000) in any single instance That this power is made and executed pursuant to the authority of the following Resolutions passed by the Board of Directors of said Company, and said Resolutions remain in full force and effect: RESOLVED: That the President or any Vice President, in conjunction with any Vice President, be and they hereby are authorized and empowered to appoint Attorneys -in -fact of the Company, in its name and as it acts, to execute and acknowledge for and on its behalf as surety, any and all bonds, recognizances, contracts of indemnity, waivers of citation and all other writings obligatory in the nature thereof, with power to attach thereto the seal of the Company. Any such writings so executed by such Attorneys -in -fact shall be binding upon the Company as if they had been duly executed and acknowledged by the regularly elected officers of the Company in their own proper persons. RESOLVED: That any and all Powers of Attorney and Certified Copies of such Powers of Attorney and certification in respect thereto, granted and executed by the President or Vice President in conjunction with any Vice President of the Company, shall be binding on the Company to the same extent as if all signatures therein were manually affixed, even though one or more of any such signatures thereon may be facsimile. (Adopted October 7, 1981- The Hanover Insurance Company; Adopted April 14, 1982 -Massachusetts Bay Insurance Company; Adopted September 7, 2001 -Citizens Insurance Company of America and affirmed by each Company on March 24, 2014) IN WITNESS WHEREOF, THE HANOVER INSURANCE COMPANY, MASSACHUSETTS BAY INSURANCE COMPANY and CITIZENS INSURANCE COMPANY OF AMERICA have caused these presents to be sealed with their respective corporate seals, duly attested by two Vice Presidents, this 120' day of September, 2023 PND)G60-01 1 he Ilsnuyer InfYrinCe Cothpan) Massachumits Bay Insurnnce Company Citizens Insurance Cempanyyf Arlrcrics J H. KAckl, e STATE OF CONNECTICUT ) COUNTY OF HARTFORD ) ss. the alaaower Insurance Company R dalachuselts Bay In" rence Company Utilas Insurance Company of Amerira 1.00 A d-Aa-'4 J6--L lion M. Mendoza, Vice President On this 121 day of September 2023 before me came the above named Executive Vice President and Vice President of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America, to me personally known to be the individuals and officers described herein, and acknowledged that the seals affixed to the preceding instrument are the corporate seals of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America, respectively, and that the said corporate seals and their signatures as officers were duly affixed and sub�,-rlbPd to cam instrument by the authoritv_and dire-ction )f said Corporations. Wendy Latoumes J t i►Fdwy Poi Cl state of Connecticut es. OWU 11C WY Camfnissim Expires JWY 31, 2025 My cIfflAnomma si n ex fifes Jultr 3117 2425 I, the undersigned Vice President of The Hanover Insurance Company, Massachusetts Bay Insurance Company and Citizens Insurance Company of America, hereby certify that the above and foregoing is a full, true and correct copy of the Original Power of Attorney issued by said Companies, and do hereby further certify that the said Powers of Attorney are still in force and effect. GIVEN under my hand and the seals of said Companies, at Worcester, Massachusetts, this 19th day of _ March 2025 . Xchn as a fnwraece ompa c m Bay Ins any CERTIFIED COPY n ra cc A'r' Rowedder, Vice PreAdeal TEXAS POLICYHOLDER NOTICE IMPORTANT NOTICE You may call Hanover Insurance Company's telephone number listed below for information or to make a complaint: 800-446-8379 You may also write to Hanover Insurance Company at: 7557 Rambler Road Suite 550 Dallas, TX 75231 You may contact the Texas Department of Insurance to obtain information on companies, coverage's, rights or complaints at: Texas Department of Insurance PO Box 149104 Austin, TX 78714-1771 I-800-578-4677 Fax (512) 475-1771 Premium or Claims Disputes: Should you have a dispute concerning your premium or about a claim, you should contact your agent or the company first. If the dispute is not resolved, you may contact the Texas Department of Insurance. Attach This Notice to Your Policy: This notice is for information only and does not become a part or condition of the attached document. 474-0038(10-2005) STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 STANDARD CITY CONDITIONS OF THE CONSTRUCTION CONTRACT FOR DEVELOPER AWARDED PROJECTS TABLE OF CONTENTS Page Article 1 — Definitions and Terminology..........................................................................................................1 1.01 Defined Terms...............................................................................................................................1 1.02 Terminology..................................................................................................................................5 Article2 — Preliminary Matters......................................................................................................................... 6 2.01 Before Starting Construction........................................................................................................6 2.02 Preconstruction Conference.......................................................................................................... 6 2.03 Public Meeting.............................................................................................................................. 6 Article 3 — Contract Documents and Amending............................................................................................... 6 3.01 Reference Standards..................................................................................................................... 6 3.02 Amending and Supplementing Contract Documents.................................................................. 6 Article 4 — Bonds and Insurance....................................................................................................................... 7 4.01 Licensed Sureties and Insurers..................................................................................................... 7 4.02 Performance, Payment, and Maintenance Bonds........................................................................ 7 4.03 Certificates of Insurance............................................................................................................... 7 4.04 Contractor's Insurance.................................................................................................................. 9 4.05 Acceptance of Bonds and Insurance; Option to Replace...........................................................12 Article 5 — Contractor's Responsibilities........................................................................................................12 5.01 Supervision and Superintendent.................................................................................................12 5.02 Labor; Working Hours................................................................................................................13 5.03 Services, Materials, and Equipment...........................................................................................13 5.04 Project Schedule..........................................................................................................................14 5.05 Substitutes and "Or-Equals".......................................................................................................14 5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors).....................................16 5.07 Concerning Subcontractors, Suppliers, and Others...................................................................16 5.08 Wage Rates..................................................................................................................................18 5.09 Patent Fees and Royalties...........................................................................................................19 5.10 Laws and Regulations.................................................................................................................19 5.11 Use of Site and Other Areas.......................................................................................................19 5.12 Record Documents......................................................................................................................20 5.13 Safety and Protection..................................................................................................................21 5.14 Safety Representative.................................................................................................................21 5.15 Hazard Communication Programs............................................................................................. 22 5.16 Submittals....................................................................................................................................22 5.17 Contractor's General Warranty and Guarantee..........................................................................23 CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS —DEVELOPER AWARDED PROJECTS City Project #105491 Revised: January 10, 2013 5.18 Indemnification........................................................................................................................... 24 5.19 Delegation of Professional Design Services..............................................................................24 5.20 Right to Audit: ............................................................................................................................ 25 5.21 Nondiscrimination.......................................................................................................................25 Article6 - Other Work at the Site...................................................................................................................26 6.01 Related Work at Site................................................................................................................... 26 Article7 City's Responsibilities...................................................................................................................26 7.01 Inspections, Tests, and Approvals.............................................................................................. 26 7.02 Limitations on City's Responsibilities.......................................................................................26 7.03 Compliance with Safety Program...............................................................................................27 Article 8 - City's Observation Status During Construction...........................................................................27 8.01 City's Project Representative.....................................................................................................27 8.02 Authorized Variations in Work.................................................................................................. 27 8.03 Rejecting Defective Work..........................................................................................................27 8.04 Determinations for Work Performed..........................................................................................28 Article9 - Changes in the Work.....................................................................................................................28 9.01 Authorized Changes in the Work............................................................................................... 28 9.02 Notification to Surety..................................................................................................................28 Article 10 - Change of Contract Price; Change of Contract Time................................................................28 10.01 Change of Contract Price............................................................................................................28 10.02 Change of Contract Time............................................................................................................28 10.03 Delays..........................................................................................................................................28 Article 11- Tests and Inspections; Correction, Removal or Acceptance of Defective Work ...................... 29 11.01 Notice of Defects........................................................................................................................29 11.02 Access to Work........................................................................................................................... 29 11.03 Tests and Inspections.................................................................................................................. 29 11.04 Uncovering Work....................................................................................................................... 30 11.05 City May Stop the Work.............................................................................................................30 11.06 Correction or Removal of Defective Work................................................................................30 11.07 Correction Period........................................................................................................................ 30 11.08 City May Correct Defective Work............................................................................................. 31 Article12 - Completion.................................................................................................................................. 32 12.01 Contractor's Warranty of Title................................................................................................... 32 12.02 Partial Utilization........................................................................................................................ 32 12.03 Final Inspection...........................................................................................................................32 12.04 Final Acceptance.........................................................................................................................33 Article 13 - Suspension of Work .......................... 13.01 City May Suspend Work .................. Article 14 - Miscellaneous ..................... 14.01 Giving Notice ..................... CITY OF FORT WORTH STANDARD CITY CONDITIONS - DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 ................................................... 33 ................................................... 33 ............................................................ 34 ............................................................ 34 TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 City Project #105491 14.02 Computation of Times................................................................................................................ 34 14.03 Cumulative Remedies................................................................................................................. 34 14.04 Survival of Obligations...............................................................................................................35 14.05 Headings......................................................................................................................................35 CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 0073 10- 1 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 1 of 35 ARTICLE 1— DEFINITIONS AND TERNHNOLOGY 1.01 Defined Terms A. Wherever used in these General Conditions or in other Contract Documents, the terms listed below have the meanings indicated which are applicable to both the singular and plural thereof, and words denoting gender shall include the masculine, feminine and neuter. Said terms are generally capitalized or written in italics, but not always. When used in a context consistent with the definition of a listed -defined term, the term shall have a meaning as defined below whether capitalized or italicized or otherwise. In addition to terms specifically defined, terms with initial capital letters in the Contract Documents include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Agreement - The written instrument which is evidence of the agreement between Developer and Contractor covering the Work 2. Asbestos —Any material that contains more than one percent asbestos and is friable or is releasing asbestos fibers into the air above current action levels established by the United States Occupational Safety and Health Administration. 3. Business Day — A business day is defined as a day that the City conducts normal business, generally Monday through Friday, except for federal or state holidays observed by the City. 4. Buzzsaw — City's on-line, electronic document management and collaboration system. 5. Calendar Day — A day consisting of 24 hours measured from midnight to the next midnight. 6. City— The City of Fort Worth, Texas, a Texas home -rule municipal corporation, acting by, its governing body through its City Manager, his designee, or agents authorized pursuant to its duly authorized charter on his behalf. 7. Community Facilities Agreement (CFA) A Contract between the Developer and the City for the Construction of one or more following public facilities within the City public right-of- way or easement: Water, Sanitary Sewer, Street, Storm Drain, Street Light, and Street Signs. A CFA may include private facilities within the right-of-way dedicated as private right-of- way or easement on a recorded plat. 8. Contract —The entire and integrated written document incorporating the Contract Documents between the Developer, Contractor, and/or City concerning the Work. The Contract supersedes prior negotiations, representations, or agreements, whether written or oral. 9. Contract Documents —Those items that make up the contract and which must include the Agreement, and it's attachments such as standard construction specifications, standard City Conditions, other general conditions of the Developer, including: a. An Agreement CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 0073 10-2 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 2 of 35 b. Attachments to the Agreement i. Bid Form ii. Vendor Compliance with State Law Non -Resident Bidder iii. Prequalification Statement C. Current Prevailing Wage Rates Table (if required by City) d. Insurance Accord Form e. Payment Bond f. Performance Bond g. Maintenance Bond h. Power of Attorney for Bonds i. Workers Compensation Affidavit j. MWBE Commitment Form( If required by City) k. General Conditions 1. Supplementary Conditions M. The Standard City Conditions n. Specifications specifically made part of the Contract Documents by attachment, if not attached, as incorporated by reference and described in the Table of Contents of the Project's Contract Documents o. Drawings P. Documentation submitted by contractor prior to Notice of Award. q. The following which may be delivered or issued after the effective date if the Agreement and, if issued become an incorporated part of the Contract Documents i. Notice to Proceed ii. Field Orders iii. Change Orders iv. Letters of Final Acceptance r. Approved Submittals, other Contractor submittals, and the reports and drawings of subsurface and physical conditions are not Contract Documents. 10. Contractor —The individual or entity with whom Developer has entered into the Agreement. 11. Day or day — A day, unless otherwise defined, shall mean a Calendar Day. 12. Developer — An individual or entity that desires to make certain improvements within the City of Fort Worth 13. Drawings —That part of the Contract Documents prepared or approved by Engineer which graphically shows the scope, extent, and character of the Work to be performed by Contractor. Submittals are not Drawings as so defined. 14. Engineer —The licensed professional engineer or engineering firm registered in the State of Texas performing professional services for the Developer. 15. Final Acceptance — The written notice given by the City to the Developer and/or Contractor that the Work specified in the Contract Documents has been completed to the satisfaction of the City. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 0073 10- 3 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 3 of 35 16. Final Inspection — Inspection carried out by the City to verify that the Contractor has completed the Work, and each and every part or appurtenance thereof, fully, entirely, and in conformance with the Contract Documents. 17. General Requirements —A part of the Contract Documents between the Developer and a Contractor. 18. Laws and Regulations Any and all applicable laws, rules, regulations, ordinances, codes, and orders of any and all governmental bodies, agencies, authorities, and courts having jurisdiction. 19. Liens —Charges, security interests, or encumbrances upon Project funds, real property, or personal property. 20. Milestone —A principal event specified in the Contract Documents relating to an intermediate Contract Time prior to Final Acceptance of the Work. 21. Non -Participating Change Order —A document, which is prepared for and reviewed by the City, which is signed by Contractor, and Developer, and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 22. Participating Change Order —A document, which is prepared for and approved by the City, which is signed by Contractor, Developer, and City and authorizes an addition, deletion, or revision in the Work or an adjustment in the Contract Price or the Contract Time, issued on or after the Effective Date of the Agreement. 23. Plans — See definition of Drawings. 24. Project Schedule —A schedule, prepared and maintained by Contractor, in accordance with the General Requirements, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Time. 25. Project —The Work to be performed under the Contract Documents. 26. Project Representative —The authorized representative of the City who will be assigned to the Site. 27. Public Meeting — An announced meeting conducted by the Developer to facilitate public participation and to assist the public in gaining an informed view of the Project. 28. Regular Working Hours — Hours beginning at 7: 00 a.m. and ending at 6:00 p.m., Monday thru Friday (excluding legal holidays). 29. Samples Physical examples of materials, equipment, or workmanship that are representative of some portion of the Work and which establish the standards by which such portion of the Work will be judged. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 0073 10- 4 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 4 of 35 30. Schedule of Submittals —A schedule, prepared and maintained by Contractor, of required submittals and the time requirements to support scheduled performance of related construction activities. 31. Site —Lands or areas indicated in the Contract Documents as being furnished by City or Developer upon which the Work is to be performed, including rights -of -way, permits, and easements for access thereto, and such other lands furnished by City or Developer which are designated for the use of Contractor. 32. Specifications —That part of the Contract Documents consisting of written requirements for materials, equipment, systems, standards and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable thereto. Specifications may be specifically made a part of the Contract Documents by attachment or, if not attached, may be incorporated by reference as indicated in the Table of Contents (Division 00 00 00) of each Project. 33. Standard City Conditions — That part of the Contract Documents setting forth requirements of the City. 34. Subcontractor —An individual or entity having a direct contract with Contractor or with any other Subcontractor for the performance of a part of the Work at the Site. 35. Submittals All drawings, diagrams, illustrations, schedules, and other data or information which are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. 36. Superintendent — The representative of the Contractor who is available at all times and able to receive instructions from the City and/or Developer and to act for the Contractor. 37. Supplementary Conditions —That part of the Contract Documents which amends or supplements the General Conditions. 38. Supplier —A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with any Subcontractor to furnish materials or equipment to be incorporated in the Work by Contractor or Subcontractor. 39. Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to, those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 40. Weekend Working Hours — Hours beginning at 9: 00 a. in. and ending at 5: 00 p.m., Saturday, Sunday or legal holiday, as approved in advance by the City. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 0073 10- 5 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 5 of 35 41. Work —The entire construction or the various separately identifiable parts thereof required to be provided under the Contract Documents. Work includes and is the result of performing or providing all labor, services, and documentation necessary to produce such construction including any Participating Change Order, Non -Participating Change Order, or Field Order, and furnishing, installing, and incorporating all materials and equipment into such construction, all as required by the Contract Documents. 42. Working Day — A working day is defined as a day, not including Saturdays, Sundays, or legal holidays authorized by the City for contract purposes, in which weather or other conditions not under the control of the Contractor will permit the performance of the principal unit of work underway for a continuous period of not less than 7 hours between 7 a.m. and 6 p. m. 1.02 Terminology A. The words and terms discussed in Paragraph 1.02.13 through D are not defined but, when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. Defective: 1. The word "defective," when modifying the word "Work," refers to Work that is unsatisfactory, faulty, or deficient in that it: a. does not conform to the Contract Documents; or b. does not meet the requirements of any applicable inspection, reference standard, test, or approval referred to in the Contract Documents; or c. has been damaged prior to City's written acceptance. C. Furnish, Install, Perform, Provide: 1. The word "Furnish" or the word "Install" or the word "Perform" or the word "Provide" or the word "Supply," or any combination or similar directive or usage thereof, shall mean furnishing and incorporating in the Work including all necessary labor, materials, equipment, and everything necessary to perform the Work indicated, unless specifically limited in the context used. D. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with such recognized meaning. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 0073 10- 6 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 6 of 35 ARTICLE 2 — PRELIMINARY MATTERS 2.01 Before Starting Construction Baseline Schedules: Submit to City in accordance with the Contract Documents, and prior to starting the Work. New schedules will be submitted to City when Participating Change Orders or Non - Participating Change Orders occur. 2.02 Preconstruction Conference Before any Work at the Site is started, the Contractor shall attend a Preconstruction Conference as specified in the Contract Documents. 2.03 Public Meeting Contractor may not mobilize any equipment, materials or resources to the Site prior to Contractor attending the Public Meeting as scheduled by the City. ARTICLE 3 — CONTRACT DOCUMENTS AND AMENDING 3.01 Reference Standards A. Standards, Specifications, Codes, Laws, and Regulations 1. Reference to standards, specifications, manuals, or codes of any technical society, organization, or association, or to Laws or Regulations, whether such reference be specific or by implication, shall mean the standard, specification, manual, code, or Laws or Regulations in effect at the time of opening of Bids (or on the Effective Date of the Agreement if there were no Bids), except as may be otherwise specifically stated in the Contract Documents. 2. No provision or instruction shall be effective to assign to City, or any of its officers, directors, members, partners, employees, agents, consultants, or subcontractors, any duty or authority to supervise or direct the performance of the Work or any duty or authority to undertake responsibility inconsistent with the provisions of the Contract Documents. 3.02 Amending and Supplementing Contract Documents A. The Contract Documents may be amended to provide for additions, deletions, and revisions in the Work or to modify the terms and conditions thereof by a Participating Change Order or a Non -Participating Change Order. B. The requirements of the Contract Documents may be supplemented, and minor variations and deviations in the Work not involving a change in Contract Price or Contract Time, may be authorized, by one or more of the following ways: 1. A Field Order; CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 0073 10- 7 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 7 of 35 1. City's or Engineer's review of a Submittal (subject to the provisions of Paragraph 5.16.C); or 2. City's written interpretation or clarification. ARTICLE 4 — BONDS AND INSURANCE 4.01 Licensed Sureties and Insurers All bonds and insurance required by the Contract Documents to be purchased and maintained by Contractor shall be obtained from surety or insurance companies that are duly licensed or authorized in the State of Texas to issue bonds or insurance policies for the limits and coverage so required. Such surety and insurance companies shall also meet such additional requirements and qualifications as may be provided Section 4.04. 4.02 Performance, Payment, and Maintenance Bonds A. Contractor shall furnish performance and payment bonds in the name of Developer and City, in accordance with Texas Government Code Chapter 2253 or successor statute, each in an amount equal to the Contract Price as security for the faithful performance and payment of all of Contractor's obligations under the Contract Documents. B. Contractor shall furnish maintenance bonds in the name of Developer and City in an amount equal to the Contract Price as security to protect the City against any defects in any portion of the Work described in the Contract Documents. Maintenance bonds shall remain in effect for two (2) years after the date of Final Acceptance by the City. C. All bonds shall be in the form prescribed by the Contract Documents except as provided otherwise by Laws or Regulations, and shall be executed by such sureties as are named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. All bonds signed by an agent or attorney -in -fact must be accompanied by a sealed and dated power of attorney which shall show that it is effective on the date the agent or attorney -in -fact signed each bond. D. If the surety on any bond furnished by Contractor is declared bankrupt or becomes insolvent or its right to do business is terminated in the State of Texas or it ceases to meet the requirements of Paragraph 4.02.C, Contractor shall promptly notify City and shall, within 30 days after the event giving rise to such notification, provide another bond and surety, both of which shall comply with the requirements of Paragraphs 4.01 and 4.02.C. 4.03 Certificates of Insurance Contractor shall deliver to Developer and City, with copies to each additional insured and loss payee identified in these Standard City Conditions certificates of insurance (and other evidence of insurance requested by City or any other additional insured) which Contractor is required to purchase and maintain. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 0073 10- 8 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 8 of 35 1. The certificate of insurance shall document the City, an as "Additional Insured" on all liability policies. 2. The Contractor's general liability insurance shall include a, "per project" or "per location", endorsement, which shall be identified in the certificate of insurance provided to the City. 3. The certificate shall be signed by an agent authorized to bind coverage on behalf of the insured, be complete in its entirety, and show complete insurance carrier names as listed in the current A.M. Best Property & Casualty Guide 4. The insurers for all policies must be licensed and/or approved to do business in the State of Texas. Except for workers' compensation, all insurers must have a minimum rating of A-: VII in the current A. M. Best Key Rating Guide or have reasonably equivalent financial strength and solvency to the satisfaction of Risk Management. If the rating is below that required, written approval of City is required. 5. All applicable policies shall include a Waiver of Subrogation (Rights of Recovery) in favor of the City. In addition, the Contractor agrees to waive all rights of subrogation against the Engineer (if applicable), and each additional insured identified in these Standard City Conditions. Failure of the City to demand such certificates or other evidence of full compliance with the insurance requirements or failure of the City to identify a deficiency from evidence that is provided shall not be construed as a waiver of Contractor's obligation to maintain such lines of insurance coverage. 6. If insurance policies are not written for specified coverage limits, an Umbrella or Excess Liability insurance for any differences is required. Excess Liability shall follow form of the primary coverage. 7. Unless otherwise stated, all required insurance shall be written on the "occurrence basis". If coverage is underwritten on a claims -made basis, the retroactive date shall be coincident with or prior to the date of the effective date of the agreement and the certificate of insurance shall state that the coverage is claims -made and the retroactive date. The insurance coverage shall be maintained for the duration of the Contract and for three (3) years following Final Acceptance provided under the Contract Documents or for the warranty period, whichever is longer. An annual certificate of insurance submitted to the City shall evidence such insurance coverage. 8. Policies shall have no exclusions by endorsements, which, neither nullify or amend, the required lines of coverage, nor decrease the limits of said coverage unless such endorsements are approved in writing by the City. In the event a Contract has been bid or executed and the exclusions are determined to be unacceptable or the City desires additional insurance coverage, and the City desires the contractor/engineer to obtain such coverage, the contract price shall be adjusted by the cost of the premium for such additional coverage plus 10%. 9. Any self -insured retention (SIR), in excess of $25,000.00, affecting required insurance coverage shall be approved by the City in regards to asset value and stockholders' equity. In CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 0073 10-9 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 9 of 35 lieu of traditional insurance, alternative coverage maintained through insurance pools or risk retention groups, must also be approved by City. 10. Any deductible in excess of $5,000.00, for any policy that does not provide coverage on a first -dollar basis, must be acceptable to and approved by the City. 11. City, at its sole discretion, reserves the right to review the insurance requirements and to make reasonable adjustments to insurance coverage's and their limits when deemed necessary and prudent by the City based upon changes in statutory law, court decision or the claims history of the industry as well as of the contracting party to the City. The City shall be required to provide prior notice of 90 days, and the insurance adjustments shall be incorporated into the Work by Change Order. 12. City shall be entitled, upon written request and without expense, to receive copies of policies and endorsements thereto and may make any reasonable requests for deletion or revision or modifications of particular policy terms, conditions, limitations, or exclusions necessary to conform the policy and endorsements to the requirements of the Contract. Deletions, revisions, or modifications shall not be required where policy provisions are established by law or regulations binding upon either party or the underwriter on any such policies. 13. City shall not be responsible for the direct payment of insurance premium costs for Contractor's insurance. 4.04 Contractor's Insurance A. Workers Compensation and Employers' Liability. Contractor shall purchase and maintain such insurance coverage with limits consistent with statutory benefits outlined in the Texas Workers' Compensation Act (Texas Labor Code, Ch. 406, as amended), and minimum limits for Employers' Liability as is appropriate for the Work being performed and as will provide protection from claims set forth below which may arise out of or result from Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether it is to be performed by Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable: 1. claims under workers' compensation, disability benefits, and other similar employee benefit acts; 2. claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. 3. The limits of liability for the insurance shall provide the following coverages for not less than the following amounts or greater where required by Laws and Regulations a. Statutory limits b. Employer's liability CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 00 73 10- 10 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 10 of 35 1) $100,000 each accident/occurrence 2) $100,000 Disease - each employee 3) $500,000 Disease - policy limit B. Commercial General Liability. Coverage shall include but not be limited to covering liability (bodily injury or property damage) arising from: premises/operations, independent contractors, products/completed operations, personal injury, and liability under an insured contract. Insurance shall be provided on an occurrence basis, and as comprehensive as the current Insurance Services Office (ISO) policy. This insurance shall apply as primary insurance with respect to any other insurance or self-insurance programs afforded to the City. The Commercial General Liability policy, shall have no exclusions by endorsements that would alter of nullify premises/operations, products/completed operations, contractual, personal injury, or advertising injury, which are normally contained with the policy, unless the City approves such exclusions in writing. 1. For construction projects that present a substantial completed operation exposure, the City may require the contractor to maintain completed operations coverage for a minimum of no less than three (3) years following the completion of the project 2. Contractor's Liability Insurance under this Section which shall be on a per project basis covering the Contractor with minimum limits o£ a. $1,000,000 each occurrence b. $2,000,000 aggregate limit 3. The policy must have an endorsement (Amendment — Aggregate Limits of Insurance) making the General Aggregate Limits apply separately to each job site. 4. The Commercial General Liability Insurance policies shall provide "X", "C", and "U" coverage's. Verification of such coverage must be shown in the Remarks Article of the Certificate of Insurance. C. Automobile Liability. A commercial business auto policy shall provide coverage on "any auto", defined as autos owned, hired and non -owned and provide indemnity for claims for damages because bodily injury or death of any person and or property damage arising out of the work, maintenance or use of any motor vehicle by the Contractor, any Subcontractor or Supplier, or by anyone directly or indirectly employed by any of them to perform any of the Work, or by anyone for whose acts any of them may be liable. 1. Automobile Liability, Contractor's Liability Insurance under this Section, which shall be in an amount not less than the following amounts: a. Automobile Liability - a commercial business policy shall provide coverage on "Any Auto", defined as autos owned, hired and non -owned. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 00 73 10- 11 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 11 of 35 1) $1, 000, 000 each accident on a combined single limit basis. Split limits are acceptable if limits are at least: 2) $250,000 Bodily Injury per person 3) $500,000 Bodily Injury per accident / 4) $100,000 Property Damage D. Railroad Protective Liability. If any of the work or any warranty work is within the limits of railroad right-of-way, the Contractor shall comply with the following requirements: 1. The Contractor's construction activities will require its employees, agents, subcontractors, equipment, and material deliveries to cross railroad properties and tracks owned and operated by: None. Write the name of the railroad company. (If none, then write none) 2. The Contractor shall conduct its operations on railroad properties in such a manner as not to interfere with, hinder, or obstruct the railroad company in any manner whatsoever in the use or operation of its/their trains or other property. Such operations on railroad properties may require that Contractor to execute a "Right of Entry Agreement" with the particular railroad company or companies involved, and to this end the Contractor should satisfy itself as to the requirements of each railroad company and be prepared to execute the right -of -entry (if any) required by a railroad company. The requirements specified herein likewise relate to the Contractor's use of private and/or construction access roads crossing said railroad company's properties. 3. The Contractual Liability coverage required by Paragraph 5.04D of the General Conditions shall provide coverage for not less than the following amounts, issued by companies satisfactory to the City and to the Railroad Company for a term that continues for so long as the Contractor's operations and work cross, occupy, or touch railroad property: a. General Aggregate: None Enter limits provided by Railroad Company (If none, write none) b. Each Occurrence:: None Enter limits provided by Railroad Company (If none, write none) 4. With respect to the above outlined insurance requirements, the following shall govern: a. Where a single railroad company is involved, the Contractor shall provide one insurance policy in the name of the railroad company. However, if more than one grade separation or at -grade crossing is affected by the Project at entirely separate locations on the line or lines of the same railroad company, separate coverage may be required, each in the amount stated above. b. Where more than one railroad company is operating on the same right-of-way or where several railroad companies are involved and operated on their own separate rights -of - CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 00 73 10- 12 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 12 of 35 way, the Contractor may be required to provide separate insurance policies in the name of each railroad company. If, in addition to a grade separation or an at -grade crossing, other work or activity is proposed on a railroad company's right-of-way at a location entirely separate from the grade separation or at -grade crossing, insurance coverage for this work must be included in the policy covering the grade separation. d. If no grade separation is involved but other work is proposed on a railroad company's right-of-way, all such other work may be covered in a single policy for that railroad, even though the work may be at two or more separate locations. 5. No work or activities on a railroad company's property to be performed by the Contractor shall be commenced until the Contractor has furnished the City with an original policy or policies of the insurance for each railroad company named, as required above. All such insurance must be approved by the City and each affected Railroad Company prior to the Contractor's beginning work. 6. The insurance specified above must be carried until all Work to be performed on the railroad right-of-way has been completed and the grade crossing, if any, is no longer used by the Contractor. In addition, insurance must be carried during all maintenance and/or repair work performed in the railroad right-of-way. Such insurance must name the railroad company as the insured, together with any tenant or lessee of the railroad company operating over tracks involved in the Project. E. Notification of Policy Cancellation: Contractor shall immediately notify City upon cancellation or other loss of insurance coverage. Contractor shall stop work until replacement insurance has been procured. There shall be no time credit for days not worked pursuant to this section. 4.05 Acceptance of Bonds and Insurance; Option to Replace If City has any objection to the coverage afforded by or other provisions of the bonds or insurance required to be purchased and maintained by the Contractor in accordance with Article 5 on the basis of non-conformance with the Contract Documents, the Developer and City shall so notify the Contractor in writing within 10 Business Days after receipt of the certificates (or other evidence requested). Contractor shall provide to the City such additional information in respect of insurance provided as the Developer or City may reasonably request. If Contractor does not purchase or maintain all of the bonds and insurance required by the Contract Documents, the Developer or City shall notify the Contractor in writing of such failure prior to the start of the Work, or of such failure to maintain prior to any change in the required coverage. ARTICLE 5 — CONTRACTOR'S RESPONSIBILITIES 5.01 Supervision and Superintendent A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting such attention thereto and applying such skills and expertise as may be necessary to perform the CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 00 73 10- 13 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 13 of 35 Work in accordance with the Contract Documents. Contractor shall be solely responsible for the means, methods, techniques, sequences, and procedures of construction. B. At all times during the progress of the Work, Contractor shall assign a competent, English- speaking, Superintendent who shall not be replaced without written notice to City. The Superintendent will be Contractor's representative at the Site and shall have authority to act on behalf of Contractor. All communication given to or received from the Superintendent shall be binding on Contractor. C. Contractor shall notify the City 24 hours prior to moving areas during the sequence of construction. 5.02 Labor; Working Hours A. Contractor shall provide competent, suitably qualified personnel to perform construction as required by the Contract Documents. Contractor shall at all times maintain good discipline and order at the Site. B. Except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all Work at the Site shall be performed during Regular Working Hours. Contractor will not permit the performance of Work beyond Regular Working Hours or for Weekend Working Hours without City's written consent (which will not be unreasonably withheld). Written request (by letter or electronic communication) to perform Work: for beyond Regular Working Hours request must be made by noon at least two (2) Business Days prior 2. for Weekend Working Hours request must be made by noon of the preceding Thursday 3. for legal holidays request must be made by noon two Business Days prior to the legal holiday. 5.03 Services, Materials, and Equipment A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume full responsibility for all services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the performance, Contractor required testing, start-up, and completion of the Work. B. All materials and equipment incorporated into the Work shall be as specified or, if not specified, shall be of good quality and new, except as otherwise provided in the Contract Documents. All special warranties and guarantees required by the Specifications shall expressly run to the benefit of City. If required by City, Contractor shall furnish satisfactory evidence (including reports of required tests) as to the source, kind, and quality of materials and equipment. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 00 73 10- 14 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 14 of 35 C. All materials and equipment to be incorporated into the Work shall be stored, applied, installed, connected, erected, protected, used, cleaned, and conditioned in accordance with instructions of the applicable Supplier, except as otherwise may be provided in the Contract Documents. 5.04 Project Schedule A. Contractor shall adhere to the Project Schedule established in accordance with Paragraph 2.01 and the General Requirements as it may be adjusted from time to time as provided below. 1. Contractor shall submit to City for acceptance (to the extent indicated in Paragraph 2.01 and the General Requirements) proposed adjustments in the Project Schedule. 2. Proposed adjustments in the Project Schedule that will change the Contract Time shall be submitted in accordance with the requirements of Article 9. Adjustments in Contract Time for projects with City participation shall be made by participating change orders. 5.05 Substitutes and "Or -Equals " A. Whenever an item of material or equipment is specified or described in the Contract Documents by using the name of a proprietary item or the name of a particular Supplier, the specification or description is intended to establish the type, function, appearance, and quality required. Unless the specification or description contains or is followed by words reading that no like, equivalent, or "or -equal" item or no substitution is permitted, other items of material or equipment of other Suppliers may be submitted to City for review under the circumstances described below. 1. "Or -Equal" Items: If in City's sole discretion an item of material or equipment proposed by Contractor is functionally equal to that named and sufficiently similar so that no change in related Work will be required, it may be considered by City as an "or -equal" item, in which case review and approval of the proposed item may, in City's sole discretion, be accomplished without compliance with some or all of the requirements for approval of proposed substitute items. For the purposes of this Paragraph 5.05.A.1, a proposed item of material or equipment will be considered functionally equal to an item so named if: a. City determines that: 1) it is at least equal in materials of construction, quality, durability, appearance, strength, and design characteristics; 2) it will reliably perform at least equally well the function and achieve the results imposed by the design concept of the completed Project as a functioning whole; and 3) it has a proven record of performance and availability of responsive service; and b. Contractor certifies that, if approved and incorporated into the Work: 1) there will be no increase in cost to the City or increase in Contract Time; and CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 00 73 10- 15 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 15 of 35 2) it will conform substantially to the detailed requirements of the item named in the Contract Documents. 2. Substitute Items: a. If in City's sole discretion an item of material or equipment proposed by Contractor does not qualify as an "or -equal" item under Paragraph 5.05.A.1, it may be submitted as a proposed substitute item. b. Contractor shall submit sufficient information as provided below to allow City to determine if the item of material or equipment proposed is essentially equivalent to that named and an acceptable substitute therefor. Requests for review of proposed substitute items of material or equipment will not be accepted by City from anyone other than Contractor. c. Contractor shall make written application to City for review of a proposed substitute item of material or equipment that Contractor seeks to furnish or use. The application shall comply with Section 0125 00 and: 1) shall certify that the proposed substitute item will: i. perform adequately the functions and achieve the results called for by the general design; ii. be similar in substance to that specified; iii. be suited to the same use as that specified; and 2) will state: i. the extent, if any, to which the use of the proposed substitute item will prejudice Contractor's achievement of final completion on time; ii. whether use of the proposed substitute item in the Work will require a change in any of the Contract Documents (or in the provisions of any other direct contract with City for other work on the Project) to adapt the design to the proposed substitute item; iii. whether incorporation or use of the proposed substitute item in connection with the Work is subject to payment of any license fee or royalty; and 3) will identify: i. all variations of the proposed substitute item from that specified; ii. available engineering, sales, maintenance, repair, and replacement services; and CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 00 73 10- 16 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 16 of 35 4) shall contain an itemized estimate of all costs or credits that will result directly or indirectly from use of such substitute item, including costs of redesign and Damage Claims of other contractors affected by any resulting change. B. Substitute Construction Methods or Procedures: If a specific means, method, technique, sequence, or procedure of construction is expressly required by the Contract Documents, Contractor may furnish or utilize a substitute means, method, technique, sequence, or procedure of construction approved by City. Contractor shall submit sufficient information to allow City, in City's sole discretion, to determine that the substitute proposed is equivalent to that expressly called for by the Contract Documents. Contractor shall make written application to City for review in the same manner as those provided in Paragraph 5.05.A.2. C. City's Evaluation: City will be allowed a reasonable time within which to evaluate each proposal or submittal made pursuant to Paragraphs 5.05.A and 5.05.13. City may require Contractor to furnish additional data about the proposed substitute. City will be the sole judge of acceptability. No "or -equal" or substitute will be ordered, installed or utilized until City's review is complete, which will be evidenced by a Change Order in the case of a substitute and an accepted Submittal for an "or -equal." City will advise Contractor in writing of its determination. D. Special Guarantee: City may require Contractor to furnish at Contractor's expense a special performance guarantee, warranty, or other surety with respect to any substitute. Contractor shall indemnify and hold harmless City and anyone directly or indirectly employed by them from and against any and all claims, damages, losses and expenses (including attorneys fees) arising out of the use of substituted materials or equipment. E. City's Cost Reimbursement: City will record City's costs in evaluating a substitute proposed or submitted by Contractor pursuant to Paragraphs 5.05.A.2 and 5.05.B. Whether or not City approves a substitute so proposed or submitted by Contractor, Contractor may be required to reimburse City for evaluating each such proposed substitute. Contractor may also be required to reimburse City for the charges for making changes in the Contract Documents. F. Contractor's Expense: Contractor shall provide all data in support of any proposed substitute or "or -equal" at Contractor's expense. G. Substitute Reimbursement: Costs (savings or charges) attributable to acceptance of a substitute shall be incorporated to the Contract by Participating Change Order. 5.06 Pre -Qualification of Bidders (Prime Contractors and Subcontractors) A. The Contractor and any subcontractors are required to be prequalified for the work types requiring pre -qualification 5.07 Concerning Subcontractors, Suppliers, and Others A. Minority and Women Owned Business Enterprise Compliance: CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 00 73 10- 17 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 17 of 35 ❑ Required for this Contract. (Check this box if there is any City Participation) ® Not Required for this Contract. It is City policy to ensure the full and equitable participation by Minority and Women Business Enterprises (MWBE) in the procurement of goods and services on a contractual basis. If the Contract Documents provide for a MWBE goal, Contractor is required to comply with the intent of the City's MWBE Ordinance (as amended) by the following: 1. Contractor shall, upon request by City, provide complete and accurate information regarding actual work performed by a MWBE on the Contract and payment therefor. 2. Contractor will not make additions, deletions, or substitutions of accepted MWBE without written consent of the City. Any unjustified change or deletion shall be a material breach of Contract and may result in debarment in accordance with the procedures outlined in the Ordinance. 3. Contractor shall, upon request by City, allow an audit and/or examination of any books, records, or files in the possession of the Contractor that will substantiate the actual work performed by an MWBE. Material misrepresentation of any nature will be grounds for termination of the Contract. Any such misrepresentation may be grounds for disqualification of Contractor to bid on future contracts with the City for a period of not less than three years. B. Contractor shall be fully responsible to City for all acts and omissions of the Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work just as Contractor is responsible for Contractor's own acts and omissions. Nothing in the Contract Documents: 1. shall create for the benefit of any such Subcontractor, Supplier, or other individual or entity any contractual relationship between City and any such Subcontractor, Supplier or other individual or entity; nor 2. shall create any obligation on the part of City to pay or to see to the payment of any moneys due any such Subcontractor, Supplier, or other individual or entity except as may otherwise be required by Laws and Regulations. C. Contractor shall be solely responsible for scheduling and coordinating the Work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing any of the Work under a direct or indirect contract with Contractor. D. All Subcontractors, Suppliers, and such other individuals or entities performing or furnishing any of the Work shall communicate with City through Contractor. E. All Work performed for Contractor by a Subcontractor or Supplier will be pursuant to an appropriate agreement between Contractor and the Subcontractor or Supplier which specifically binds the Subcontractor or Supplier to the applicable terms and conditions of these Contract CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 00 73 10- 18 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 18 of 35 Documents, Contractor shall provide City contract numbers and reference numbers to the Subcontractors and/or Suppliers. 5.08 Wage Rates ❑ Required for this Contract. ® Not Required for this Contract. A. Duty to pay Prevailing Wage Rates. The Contractor shall comply with all requirements of Chapter 2258, Texas Government Code (as amended), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these Contract Documents. B. Penalty for Violation. A Contractor or any Subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents. This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause. On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a Contractor or Subcontractor, the City shall make an initial determination, before the 31 st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the Contractor or Subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the Contractor or Subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the Contractor or Subcontractor and any affected worker does not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to Paragraph C above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 11th day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The Contractor and each Subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 00 73 10- 19 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 19 of 35 occupation of each worker employed by the Contractor in the construction of the Work provided for in this Contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of Paragraph 6.23, Right to Audit, shall pertain to this inspection. F. Progress Payments. With each progress payment or payroll period, whichever is less, the Contractor shall submit an affidavit stating that the Contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The Contractor shall post prevailing wage rates in a conspicuous place at all times. H. Subcontractor Compliance. The Contractor shall include in its subcontracts and/or shall otherwise require all of its Subcontractors to comply with Paragraphs A through G above. 5.09 Patent Fees and Royalties A. To the fullest extent permitted by Laws and Regulations, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to any infringement of patent rights or copyrights incident to the use in the performance of the Work or resulting from the incorporation in the Work of any invention, design, process, product, or device not specified in the Contract Documents. 5.10 Laws and Regulations A. Contractor shall give all notices required by and shall comply with all Laws and Regulations applicable to the performance of the Work. Except where otherwise expressly required by applicable Laws and Regulations, the City shall not be responsible for monitoring Contractor's compliance with any Laws or Regulations. B. If Contractor performs any Work knowing or having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such Work. However, it shall not be Contractor's responsibility to make certain that the Specifications and Drawings are in accordance with Laws and Regulations, but this shall not relieve Contractor of Contractor's obligations under Paragraph 3.01. 5.11 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Contractor shall confine construction equipment, the storage of materials and equipment, and the operations of workers to the Site and other areas permitted by Laws and Regulations, and shall not unreasonably encumber the Site and other areas with construction equipment or CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 00 73 10- 20 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 20 of 35 other materials or equipment. Contractor shall assume full responsibility for any damage to any such land or area, or to the owner or occupant thereof, or of any adjacent land or areas resulting from the performance of the Work. 2. At any time when, in the judgment of the City, the Contractor has obstructed or closed or is carrying on operations in a portion of a street, right-of-way, or easement greater than is necessary for proper execution of the Work, the City may require the Contractor to finish the section on which operations are in progress before work is commenced on any additional area of the Site. 3. Should any Damage Claim be made by any such owner or occupant because of the performance of the Work, Contractor shall promptly attempt to resolve the Damage Claim. 4. Pursuant to Paragraph 5.18, Contractor shall indemnify and hold harmless City, from and against all claims, costs, losses, and damages arising out of or relating to any claim or action, legal or equitable, brought by any such owner or occupant against City. B. Removal of Debris During Performance of the Work: During the progress of the Work Contractor shall keep the Site and other areas free from accumulations of waste materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish, and other debris shall conform to applicable Laws and Regulations. C. Site Maintenance Cleaning: 24 hours after written notice is given to the Contractor that the clean-up on the job site is proceeding in a manner unsatisfactory to the City or Developer, if the Contractor fails to correct the unsatisfactory procedure, the City may take such direct action as the City deems appropriate to correct the clean-up deficiencies cited to the Contractor in the written notice (by letter or electronic communication), and shall be entitled to recover its cost in doing so. The City may withhold Final Acceptance until clean-up is complete and cost are recovered. D. Final Site Cleaning: Prior to Final Acceptance of the Work Contractor shall clean the Site and the Work and make it ready for utilization by City or adjacent property owner. At the completion of the Work Contractor shall remove from the Site all tools, appliances, construction equipment and machinery, and surplus materials and shall restore to original condition or better all property disturbed by the Work. E. Loading Structures: Contractor shall not load nor permit any part of any structure to be loaded in any manner that will endanger the structure, nor shall Contractor subject any part of the Work or adjacent property to stresses or pressures that will endanger it. 5.12 Record Documents A. Contractor shall maintain in a safe place at the Site or in a place designated by the Contractor and approved by the City, one (1) record copy of all Drawings, Specifications, Addenda, Change Orders, Field Orders, and written interpretations and clarifications in good order and annotated to show changes made during construction. These record documents together with all approved CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 00 73 10- 21 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 21 of 35 Samples and a counterpart of all accepted Submittals will be available to City for reference. Upon completion of the Work, these record documents, any operation and maintenance manuals, and Submittals will be delivered to City prior to Final Inspection. Contractor shall include accurate locations for buried and imbedded items. 5.13 Safety and Protection A. Contractor shall be solely responsible for initiating, maintaining and supervising all safety precautions and programs in connection with the Work. Such responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. Contractor shall take all necessary precautions for the safety of, and shall provide the necessary protection to prevent damage, injury or loss to: 1. all persons on the Site or who may be affected by the Work; 2. all the Work and materials and equipment to be incorporated therein, whether in storage on or off the Site; and 3. other property at the Site or adjacent thereto, including trees, shrubs, lawns, walks, pavements, roadways, structures, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. B. Contractor shall comply with all applicable Laws and Regulations relating to the safety of persons or property, or to the protection of persons or property from damage, injury, or loss; and shall erect and maintain all necessary safeguards for such safety and protection. Contractor shall notify owners of adjacent property and of Underground Facilities and other utility owners when prosecution of the Work may affect them, and shall cooperate with them in the protection, removal, relocation, and replacement of their property. C. Contractor shall comply with the applicable requirements of City's safety programs, if any. D. Contractor shall inform City of the specific requirements of Contractor's safety program, if any, with which City's employees and representatives must comply while at the Site. E. All damage, injury, or loss to any property referred to in Paragraph 5.13.A.2 or 5.13.A.3 caused, directly or indirectly, in whole or in part, by Contractor, any Subcontractor, Supplier, or any other individual or entity directly or indirectly employed by any of them to perform any of the Work, or anyone for whose acts any of them may be liable, shall be remedied by Contractor. F. Contractor's duties and responsibilities for safety and for protection of the Work shall continue until such time as all the Work is completed and City has accepted the Work. 5.14 Safety Representative Contractor shall inform City in writing of Contractor's designated safety representative at the Site. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 00 73 10- 22 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 22 of 35 5.15 Hazard Communication Programs Contractor shall be responsible for coordinating any exchange of material safety data sheets or other hazard communication information required to be made available to or exchanged between or among employers in accordance with Laws or Regulations. 5.16 Submittals A. Contractor shall submit required Submittals to City for review and acceptance. Each submittal will be identified as required by City. 1. Submit number of copies specified in the General Requirements. 2. Data shown on the Submittals will be complete with respect to quantities, dimensions, specified performance and design criteria, materials, and similar data to show City the services, materials, and equipment Contractor proposes to provide and to enable City to review the information for the limited purposes required by Paragraph 5.16.C. 3. Submittals submitted as herein provided by Contractor and reviewed by City for conformance with the design concept shall be executed in conformity with the Contract Documents unless otherwise required by City. 4. When Submittals are submitted for the purpose of showing the installation in greater detail, their review shall not excuse Contractor from requirements shown on the Drawings and Specifications. 5. For -Information -Only submittals upon which the City is not expected to conduct review or take responsive action may be so identified in the Contract Documents. 6. Submit required number of Samples specified in the Specifications. 7. Clearly identify each Sample as to material, Supplier, pertinent data such as catalog numbers, the use for which intended and other data as City may require to enable City to review the submittal for the limited purposes required by Paragraph 5.16.C. B. Where a Submittal is required by the Contract Documents or the Schedule of Submittals, any related Work performed prior to City's review and acceptance of the pertinent submittal will be at the sole expense and responsibility of Contractor. C. City's Review: 1. City will provide timely review of required Submittals in accordance with the Schedule of Submittals acceptable to City. City's review and acceptance will be only to determine if the items covered by the submittals will, after installation or incorporation in the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 00 73 10- 23 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 23 of 35 2. City's review and acceptance will not extend to means, methods, techniques, sequences, or procedures of construction (except where a particular means, method, technique, sequence, or procedure of construction is specifically and expressly called for by the Contract Documents) or to safety precautions or programs incident thereto. The review and acceptance of a separate item as such will not indicate approval of the assembly in which the item functions. 3. City's review and acceptance shall not relieve Contractor from responsibility for any variation from the requirements of the Contract Documents unless Contractor has complied with the requirements of Section 01 33 00 and City has given written acceptance of each such variation by specific written notation thereof incorporated in or accompanying the Submittal. City's review and acceptance shall not relieve Contractor from responsibility for complying with the requirements of the Contract Documents. 5.17 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to City that all Work will be in accordance with the Contract Documents and will not be defective. City and its officers, directors, members, partners, employees, agents, consultants, and subcontractors shall be entitled to rely on representation of Contractor's warranty and guarantee. B. Contractor's warranty and guarantee hereunder excludes defects or damage caused by: 1. abuse, modification, or improper maintenance or operation by persons other than Contractor, Subcontractors, Suppliers, or any other individual or entity for whom Contractor is responsible; or 2. normal wear and tear under normal usage. C. Contractor's obligation to perform and complete the Work in accordance with the Contract Documents shall be absolute. None of the following will constitute an acceptance of Work that is not in accordance with the Contract Documents or a release of Contractor's obligation to perform the Work in accordance with the Contract Documents: 1. observations by City; 2. recommendation or payment by City or Developer of any progress or final payment; 3. the issuance of a certificate of Final Acceptance by City or any payment related thereto by City; 4. use or occupancy of the Work or any part thereof by City; 5. any review and acceptance of a Submittal by City; 6. any inspection, test, or approval by others; or CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 00 73 10- 24 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 24 of 35 7. any correction of defective Work by City. D. The Contractor shall remedy any defects or damages in the Work and pay for any damage to other work or property resulting therefrom which shall appear within a period of two (2) years from the date of Final Acceptance of the Work unless a longer period is specified and shall furnish a good and sufficient maintenance bond, complying with the requirements of Article 4.02.13. The City will give notice of observed defects with reasonable promptness. 5.18 Indemnification A. Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licenses or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. This indemnity provision is intended to include, without limitation, indemnity for costs, expenses and legal fees incurred by the City in defending against such claims and causes of actions. B. Contractor covenants and agrees to indemnify and hold harmless, at its own expense, the City, its officers, servants and employees, from and against any and all loss, damage or destruction of property of the City, arising out of, or alleged to arise out of, the work and services to be performed by the Contractor, its officers, agents, employees, subcontractors, licensees or invitees under this Contract. THIS INDEMNIFICATION PROVISION IS SPECIFICALLY INTENDED TO OPERATE AND BE EFFECTIVE EVEN IF IT IS ALLEGED OR PROVEN THAT ALL OR SOME OF THE DAMAGES BEING SOUGHT WERE CAUSED, IN WHOLE OR IN PART, BY ANY ACT, OMISSION OR NEGLIGENCE OF THE CITY. 5.19 Delegation of Professional Design Services A. Contractor will not be required to provide professional design services unless such services are specifically required by the Contract Documents for a portion of the Work or unless such services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences and procedures. B. If professional design services or certifications by a design professional related to systems, materials or equipment are specifically required of Contractor by the Contract Documents, City will specify all performance and design criteria that such services must satisfy. Contractor shall cause such services or certifications to be provided by a properly licensed professional, whose signature and seal shall appear on all drawings, calculations, specifications, certifications, and Submittals prepared by such professional. Submittals related to the Work designed or certified by such professional, if prepared by others, shall bear such professional's written approval when submitted to City. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 00 73 10- 25 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 25 of 35 C. City shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications or approvals performed by such design professionals, provided City has specified to Contractor performance and design criteria that such services must satisfy. D. Pursuant to this Paragraph 5.19, City's review and acceptance of design calculations and design drawings will be only for the limited purpose of checking for conformance with performance and design criteria given and the design concept expressed in the Contract Documents. City's review and acceptance of Submittals (except design calculations and design drawings) will be only for the purpose stated in Paragraph 5.16.C. 5.20 Right to Audit: A. The City reserves the right to audit all projects utilizing City funds B. The Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of the Contractor involving transactions relating to this Contract. Contractor agrees that the City shall have access during Regular Working Hours to all necessary Contractor facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Contractor reasonable advance notice of intended audits. C. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under this Contract, have access to and the right to examine and photocopy any directly pertinent books, documents, papers, and records of such Subcontractor, involving transactions to the subcontract, and further, that City shall have access during Regular Working Hours to all Subcontractor facilities, and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this Paragraph. The City shall give Subcontractor reasonable advance notice of intended audits. D. Contractor and Subcontractor agree to photocopy such documents as may be requested by the City. The City agrees to reimburse Contractor for the cost of the copies as follows at the rate published in the Texas Administrative Code in effect as of the time copying is performed. 5.21 Nondiscrimination A. The City is responsible for operating Public Transportation Programs and implementing transit - related projects, which are funded in part with Federal financial assistance awarded by the U.S. Department of Transportation and the Federal Transit Administration (FTA), without discriminating against any person in the United States on the basis of race, color, or national origin. B. Title VI, Civil Rights Act of 1964 as amended: Contractor shall comply with the requirements of the Act and the Regulations as further defined in the Supplementary Conditions for any project receiving Federal assistance. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 00 73 10- 26 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 26 of 35 ARTICLE 6 — OTHER WORK AT THE SITE 6.01 Related Work at Site A. City may perform other work related to the Project at the Site with City's employees, or other City contractors, or through other direct contracts therefor, or have other work performed by utility owners. If such other work is not noted in the Contract Documents, then written notice thereof will be given to Contractor prior to starting any such other work; and B. Contractor shall afford each other contractor who is a parry to such a direct contract, each utility owner, and City, if City is performing other work with City's employees or other City contractors, proper and safe access to the Site, provide a reasonable opportunity for the introduction and storage of materials and equipment and the execution of such other work, and properly coordinate the Work with theirs. Contractor shall do all cutting, fitting, and patching of the Work that may be required to properly connect or otherwise make its several parts come together and properly integrate with such other work. Contractor shall not endanger any work of others by cutting, excavating, or otherwise altering such work; provided, however, that Contractor may cut or alter others' work with the written consent of City and the others whose work will be affected. C. If the proper execution or results of any part of Contractor's Work depends upon work performed by others under this Article 7, Contractor shall inspect such other work and promptly report to City in writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the proper execution and results of Contractor's Work. Contractor's failure to so report will constitute an acceptance of such other work as fit and proper for integration with Contractor's Work except for latent defects in the work provided by others. ARTICLE 7 — CITY'S RESPONSIBILITIES 7.01 Inspections, Tests, and Approvals City's responsibility with respect to certain inspections, tests, and approvals is set forth in Paragraph 11.03. 7.02 Limitations on City's Responsibilities A. The City shall not supervise, direct, or have control or authority over, nor be responsible for, Contractor's means, methods, techniques, sequences, or procedures of construction, or the safety precautions and programs incident thereto, or for any failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. City will not be responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. B. City will notify the Contractor of applicable safety plans pursuant to Paragraph 5.13. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 00 73 10- 27 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 27 of 35 7.03 Compliance with Safety Program While at the Site, City's employees and representatives shall comply with the specific applicable requirements of Contractor's safety programs of which City has been informed pursuant to Paragraph 5.13. ARTICLE 8 — CITY'S OBSERVATION STATUS DURING CONSTRUCTION 8.01 City's Project Representative City will provide one or more Project Representative(s) during the construction period. The duties and responsibilities and the limitations of authority of City's representative during construction are set forth in the Contract Documents. A. City's Project Representative will make visits to the Site at intervals appropriate to the various stages of construction as City deems necessary in order to observe the progress that has been made and the quality of the various aspects of Contractor's executed Work. Based on information obtained during such visits and observations, City's Project Representative will determine, in general, if the Work is proceeding in accordance with the Contract Documents. City's Project Representative will not be required to make exhaustive or continuous inspections on the Site to check the quality or quantity of the Work. City's Project Representative's efforts will be directed toward providing City a greater degree of confidence that the completed Work will conform generally to the Contract Documents. B. City's Project Representative's visits and observations are subject to all the limitations on authority and responsibility in the Contract Documents. 8.02 Authorized Variations in Work City's Project Representative may authorize minor variations in the Work from the requirements of the Contract Documents which do not involve an adjustment in the Contract Price or the Contract Time and are compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. These may be accomplished by a Field Order and will be binding on City Developer, and also on Contractor, who shall perform the Work involved promptly. 8.03 Rejecting Defective Work City will have authority to reject Work which City's Project Representative believes to be defective, or will not produce a completed Project that conforms to the Contract Documents or that will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. City will have authority to conduct special inspection or testing of the Work as provided in Article 11, whether or not the Work is fabricated, installed, or completed. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 00 73 10- 28 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 28 of 35 8.04 Determinations for Work Performed Contractor will determine the actual quantities and classifications of Work performed. City's Project Representative will review with Contractor the preliminary determinations on such matters before rendering a written recommendation. City's written decision will be final (except as modified to reflect changed factual conditions or more accurate data). ARTICLE 9 — CHANGES IN THE WORK 9.01 Authorized Changes in the Work A. Without invalidating the Contract and without notice to any surety, City may, at any time or from time to time, order Extra Work. Upon notice of such Extra Work, Contractor shall promptly proceed with the Work involved which will be performed under the applicable conditions of the Contract Documents (except as otherwise specifically provided). Extra Work shall be memorialized by a Participating Change Order which may or may not precede an order of Extra work. B. For minor changes of Work not requiring changes to Contract Time or Contract Price on a project with City participation, a Field Order may be issued by the City. 9.02 Notification to Surety If the provisions of any bond require notice to be given to a surety of any change affecting the general scope of the Work or the provisions of the Contract Documents (including, but not limited to, Contract Price or Contract Time), the giving of any such notice will be Contractor's responsibility. The amount of each applicable bond will be adjusted by the Contractor to reflect the effect of any such change. ARTICLE 10 — CHANGE OF CONTRACT PRICE; CHANGE OF CONTRACT TIME 10.01 Change of Contract Price A. The Contract Price may only be changed by a Participating Change Order for projects with City participation. 10.02 Change of Contract Time A. The Contract Time may only be changed by a Participating Change Order for projects with City participation. 10.03 Delays A. If Contractor is delayed, City shall not be liable to Contractor for any claims, costs, losses, or damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) sustained by Contractor on or in connection with any other project or anticipated project. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 00 73 10- 29 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 29 of 35 ARTICLE 11— TESTS AND INSPECTIONS; CORRECTION, REMOVAL OR ACCEPTANCE OF DEFECTIVE WORK 11.01 Notice of Defects Notice of all defective Work of which City has actual knowledge will be given to Contractor. Defective Work may be rejected, corrected, or accepted as provided in this Article 13. 11.02 Access to Work City, independent testing laboratories, and governmental agencies with jurisdictional interests will have access to the Site and the Work at reasonable times for their observation, inspection, and testing. Contractor shall provide them proper and safe conditions for such access and advise them of Contractor's safety procedures and programs so that they may comply therewith as applicable. 11.03 Tests and Inspections A. Contractor shall give City timely notice of readiness of the Work for all required inspections, tests, or approvals and shall cooperate with inspection and testing personnel to facilitate required inspections or tests. B. If Contract Documents, Laws or Regulations of any public body having jurisdiction require any of the Work (or part thereof) to be inspected, tested, or approved, Contractor shall assume full responsibility for arranging and obtaining such independent inspections, tests, retests or approvals, pay all costs in connection therewith, and furnish City the required certificates of inspection or approval; excepting, however, those fees specifically identified in the Supplementary Conditions or any Texas Department of Licensure and Regulation (TDLR) inspections, which shall be paid as described in the Supplementary Conditions. C. Contractor shall be responsible for arranging and obtaining and shall pay all costs in connection with any inspections, tests, re -tests, or approvals required for City's acceptance of materials or equipment to be incorporated in the Work; or acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work. Such inspections, tests, re -tests, or approvals shall be performed by organizations approved by City. D. City may arrange for the services of an independent testing laboratory ("Testing Lab") to perform any inspections or tests ("Testing") for any part of the Work, as determined solely by City. 1. City will coordinate such Testing to the extent possible, with Contractor; 2. Should any Testing under this Section 11.03 D result in a "fail", "did not pass" or other similar negative result, the Contractor shall be responsible for paying for any and all retests. Contractor's cancellation without cause of City initiated Testing shall be deemed a negative result and require a retest. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 00 73 10- 30 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 30 of 35 3. Any amounts owed for any retest under this Section 11.03 D shall be paid directly to the Testing Lab by Contractor. Developer/Contractor. City will forward all invoices for retests to 4. If Contractor fails to pay the Testing Lab, City will not issue a letter of Final Acceptance until the Testing Lab is Paid E. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by Contractor without written concurrence of City, Contractor shall, if requested by City, uncover such Work for observation. 11.04 Uncovering Work A. If any Work is covered contrary to the Contract Documents or specific instructions by the City, it must, if requested by City, be uncovered for City's observation and replaced at Contractor's expense. 11.05 City May Stop the Work If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable materials or equipment, or fails to perform the Work in such a way that the completed Work will conform to the Contract Documents, City may order Contractor to stop the Work, or any portion thereof, until the cause for such order has been eliminated; however, this right of City to stop the Work shall not give rise to any duty on the part of City to exercise this right for the benefit of Contractor, any Subcontractor, any Supplier, any other individual or entity, or any surety for, or employee or agent of any of them. 11.06 Correction or Removal of Defective Work A. Promptly after receipt of written notice, Contractor shall correct all defective Work pursuant to an acceptable schedule, whether or not fabricated, installed, or completed, or, if the Work has been rejected by City, remove it from the Project and replace it with Work that is not defective. Contractor shall pay all claims, costs, additional testing, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or arbitration or other dispute resolution costs) arising out of or relating to such correction or removal (including but not limited to all costs of repair or replacement of work of others). Failure to require the removal of any defective Work shall not constitute acceptance of such Work. B. When correcting defective Work under the terms of this Paragraph 11.06 or Paragraph 11.07, Contractor shall take no action that would void or otherwise impair City's special warranty and guarantee, if any, on said Work. 11.07 Correction Period A. If within two (2) years after the date of Final Acceptance (or such longer period of time as may be prescribed by the terms of any applicable special guarantee required by the Contract CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 00 73 10- 31 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 31 of 35 Documents), any Work is found to be defective, or if the repair of any damages to the land or areas made available for Contractor's use by City or permitted by Laws and Regulations as contemplated in Paragraph 5.10.A is found to be defective, Contractor shall promptly, without cost to City and in accordance with City's written instructions: 1. repair such defective land or areas; or 2. correct such defective Work; or 3. if the defective Work has been rejected by City, remove it from the Project and replace it with Work that is not defective, and 4. satisfactorily correct or repair or remove and replace any damage to other Work, to the work of others or other land or areas resulting therefrom. B. If Contractor does not promptly comply with the terms of City's written instructions, or in an emergency where delay would cause serious risk of loss or damage, City may have the defective Work corrected or repaired or may have the rejected Work removed and replaced. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) arising out of or relating to such correction or repair or such removal and replacement (including but not limited to all costs of repair or replacement of work of others) will be paid by Contractor. C. Where defective Work (and damage to other Work resulting therefrom) has been corrected or removed and replaced under this Paragraph 11.07, the correction period hereunder with respect to such Work may be required to be extended for an additional period of one year after the end of the initial correction period. City shall provide 30 days written notice to Contractor and Developer should such additional warranty coverage be required. Contractor's obligations under this Paragraph 11.07 are in addition to any other obligation or warranty. The provisions of this Paragraph 11.07 shall not be construed as a substitute for, or a waiver of, the provisions of any applicable statute of limitation or repose. 11.08 City May Correct Defective Work A. If Contractor fails within a reasonable time after written notice from City to correct defective Work, or to remove and replace rejected Work as required by City in accordance with Paragraph 11.06.A, or if Contractor fails to perform the Work in accordance with the Contract Documents, or if Contractor fails to comply with any other provision of the Contract Documents, City may, after seven (7) days written notice to Contractor and the Developer, correct, or remedy any such deficiency. B. In exercising the rights and remedies under this Paragraph 11.09, City shall proceed expeditiously. In connection with such corrective or remedial action, City may exclude Contractor from all or part of the Site, take possession of all or part of the Work and suspend Contractor's services related thereto, and incorporate in the Work all materials and equipment incorporated in the Work, stored at the Site or for which City has paid Contractor but which are CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 00 73 10- 32 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 32 of 35 stored elsewhere. Contractor shall allow City, City's representatives, agents, consultants, employees, and City's other contractors, access to the Site to enable City to exercise the rights and remedies under this Paragraph. C. All claims, costs, losses, and damages (including but not limited to all fees and charges of engineers, architects, attorneys, and other professionals and all court or other dispute resolution costs) incurred or sustained by City in exercising the rights and remedies under this Paragraph 13.09 will be charged against Contractor, and a Change Order will be issued incorporating the necessary revisions in the Contract Documents with respect to the Work; and City shall be entitled to an appropriate decrease in the Contract Price. D. Contractor shall not be allowed an extension of the Contract Time because of any delay in the performance of the Work attributable to the exercise of City's rights and remedies under this Paragraph 11.09. ARTICLE 12 — COMPLETION 12.01 Contractor's Warranty of Title Contractor warrants and guarantees that title to all Work, materials, and equipment covered by any Application for Payment will pass to City no later than the time of Final Acceptance and shall be free and clear of all Liens. 12.02 Partial Utilization A. Prior to Final Acceptance of all the Work, City may use or occupy any substantially completed part of the Work which has specifically been identified in the Contract Documents, or which City, determines constitutes a separately functioning and usable part of the Work that can be used by City for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. City at any time may notify Contractor in writing to permit City to use or occupy any such part of the Work which City determines to be ready for its intended use, subject to the following conditions: 1. Contractor at any time may notify City in writing that Contractor considers any such part of the Work ready for its intended use. 2. Within a reasonable time after notification as enumerated in Paragraph 14.05.A.1, City and Contractor shall make an inspection of that part of the Work to determine its status of completion. If City does not consider that part of the Work to be substantially complete, City will notify Contractor in writing giving the reasons therefor. 3. Partial Utilization will not constitute Final Acceptance by City. 12.03 Final Inspection A. Upon written notice from Contractor that the entire Work is complete in accordance with the Contract Documents: CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 00 73 10- 33 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 33 of 35 1. within 10 days, City will schedule a Final Inspection with Contractor. 2. City will notify Contractor in writing of all particulars in which this inspection reveals that the Work is incomplete or defective. Contractor shall immediately take such measures as are necessary to complete such Work or remedy such deficiencies. 12.04 Final Acceptance A. Upon completion by Contractor to City's satisfaction, of any additional Work identified in the Final Inspection, City will issue to Contractor a letter of Final Acceptance upon the satisfaction of the following: 1. All documentation called for in the Contract Documents, including but not limited to the evidence of insurance required by Paragraph 5.03; 2. consent of the surety, if any, to Final Acceptance; 3. a list of all pending or released Damage Claims against City that Contractor believes are unsettled; and 4. affidavits of payments and complete and legally effective releases or waivers (satisfactory to City) of all Lien rights arising out of or Liens filed in connection with the Work. 5. after all Damage Claims have been resolved: a. directly by the Contractor or; b. Contractor provides evidence that the Damage Claim has been reported to Contractor's insurance provider for resolution. 6. Issuing Final Acceptance by the City shall not relieve the Contractor of any guarantees or other requirements of the Contract Documents which specifically continue thereafter. ARTICLE 13 — SUSPENSION OF WORK 13.01 City May Suspend Work A. At any time and without cause, City may suspend the Work or any portion thereof by written notice to Contractor and which may fix the date on which Work will be resumed. Contractor shall resume the Work on the date so fixed. During temporary suspension of the Work covered by these Contract Documents, for any reason, the City will stop contract time on City participation projects. B. Should the Contractor not be able to complete a portion of the Project due to causes beyond the control of and without the fault or negligence of the Contractor, and should it be determined by mutual consent of the Contractor and City that a solution to allow construction to proceed is not CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 00 73 10- 34 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 34 of 35 available within a reasonable period of time, Contractor may request an extension in Contract Time, directly attributable to any such suspension. C. If it should become necessary to suspend the Work for an indefinite period, the Contractor shall store all materials in such a manner that they will not obstruct or impede the public unnecessarily nor become damaged in any way, and he shall take every precaution to prevent damage or deterioration of the work performed; he shall provide suitable drainage about the work, and erect temporary structures where necessary. ARTICLE 14 — MISCELLANEOUS 14.01 Giving Notice A. Whenever any provision of the Contract Documents requires the giving of written notice, it will be deemed to have been validly given i£ 1. delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended; or 2. delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the notice. B. Business address changes must be promptly made in writing to the other party. C. Whenever the Contract Documents specifies giving notice by electronic means such electronic notice shall be deemed sufficient upon confirmation of receipt by the receiving party. 14.02 Computation of Times When any period of time is referred to in the Contract Documents by days, it will be computed to exclude the first and include the last day of such period. If the last day of any such period falls on a Saturday or Sunday or on a day made a legal holiday the next Working Day shall become the last day of the period. 14.03 Cumulative Remedies The duties and obligations imposed by these General Conditions and the rights and remedies available hereunder to the parties hereto are in addition to, and are not to be construed in any way as a limitation of, any rights and remedies available to any or all of them which are otherwise imposed or available by Laws or Regulations, by special warranty or guarantee, or by other provisions of the Contract Documents. The provisions of this Paragraph will be as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 00 73 10- 35 Standard City Conditions Of The Construction Contract For Developer Awarded Projects Page 35 of 35 14.04 Survival of Obligations All representations, indemnifications, warranties, and guarantees made in, required by, or given in accordance with the Contract Documents, as well as all continuing obligations indicated in the Contract Documents, will survive final payment, completion, and acceptance of the Work or termination or completion of the Contract or termination of the services of Contractor. 14.05 Headings Article and paragraph headings are inserted for convenience only and do not constitute parts of these General Conditions. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CITY CONDITIONS — DEVELOPER AWARDED PROJECTS Revised: January 10, 2013 City Project #105491 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 01 11 00 SUMMARY OF WORK 011100-1 DAP SUMMARY OF WORK Pagel of 3 5 A. Section Includes: 6 1. Summary of Work to be performed in accordance with the Contract Documents 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 - Bidding Requirements, Contract Forms, and Conditions of the Contract 11 2. Division 1 - General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 A. Work Covered by Contract Documents 1. Work is to include furnishing all labor, materials, and equipment, and performing all Work necessary for this construction project as detailed in the Drawings and Specifications. B. Subsidiary Work 1. Any and all Work specifically governed by documentary requirements for the project, such as conditions imposed by the Drawings or Contract Documents in which no specific item for bid has been provided for in the Proposal and the item is not a typical unit bid item included on the standard bid item list, then the item shall be considered as a subsidiary item of Work, the cost of which shall be included in the price bid in the Proposal for various bid items. C. Use of Premises 1. Coordinate uses of premises under direction of the City. 2. Assume full responsibility for protection and safekeeping of materials and equipment stored on the Site. 3. Use and occupy only portions of the public streets and alleys, or other public places or other rights -of -way as provided for in the ordinances of the City, as shown in the Contract Documents, or as may be specifically authorized in writing by the City. a. A reasonable amount of tools, materials, and equipment for construction purposes may be stored in such space, but no more than is necessary to avoid delay in the construction operations. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects City Project #105491 Revised December 20, 2012 011100-2 DAP SUMMARY OF WORK Page 2 of 3 I b. Excavated and waste materials shall be stored in such a way as not to interfere 2 with the use of spaces that may be designated to be left free and unobstructed 3 and so as not to inconvenience occupants of adjacent property. 4 c. If the street is occupied by railroad tracks, the Work shall be carried on in such 5 manner as not to interfere with the operation of the railroad. 6 1) All Work shall be in accordance with railroad requirements set forth in 7 Division 0 as well as the railroad permit. 8 D. Work within Easements 9 1. Do not enter upon private property for any purpose without having previously 10 obtained permission from the owner of such property. 11 2. Do not store equipment or material on private property unless and until the 12 specified approval of the property owner has been secured in writing by the 13 Contractor and a copy furnished to the City. 14 3. Unless specifically provided otherwise, clear all rights -of -way or easements of 15 obstructions which must be removed to make possible proper prosecution of the 16 Work as a part of the project construction operations. 17 4. Preserve and use every precaution to prevent damage to, all trees, shrubbery, plants, 18 lawns, fences, culverts, curbing, and all other types of structures or improvements, 19 to all water, sewer, and gas lines, to all conduits, overhead pole lines, or 20 appurtenances thereof, including the construction of temporary fences and to all 21 other public or private property adjacent to the Work. 22 5. Notify the proper representatives of the owners or occupants of the public or private 23 lands of interest in lands which might be affected by the Work. 24 a. Such notice shall be made at least 48 hours in advance of the beginning of the 25 Work. 26 b. Notices shall be applicable to both public and private utility companies and any 27 corporation, company, individual, or other, either as owners or occupants, 28 whose land or interest in land might be affected by the Work. 29 c. Be responsible for all damage or injury to property of any character resulting 30 from any act, omission, neglect, or misconduct in the manner or method or 31 execution of the Work, or at any time due to defective work, material, or 32 equipment. 33 6. Fence 34 a. Restore all fences encountered and removed during construction of the Project 35 to the original or a better than original condition. 36 b. Erect temporary fencing in place of the fencing removed whenever the Work is 37 not in progress and when the site is vacated overnight, and/or at all times to 38 provide site security. 39 c. The cost for all fence work within easements, including removal, temporary 40 closures and replacement, shall be subsidiary to the various items bid in the 41 project proposal, unless a bid item is specifically provided in the proposal. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects City Project #105491 Revised December 20, 2012 011100-3 DAP SUMMARY OF WORK Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 12 13 II�IIIII.��1111130 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — Developer Awarded Projects City Project #105491 Revised December 20, 2012 012500-1 DAP SUBSTITUTION PROCEDURES Pagel of 4 1 SECTION 0125 00 2 SUBSTITUTION PROCEDURES 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedure for requesting the approval of substitution of a product that is not 7 equivalent to a product which is specified by descriptive or performance criteria or 8 defined by reference to 1 or more of the following: 9 a. Name of manufacturer 10 b. Name of vendor 11 c. Trade name 12 d. Catalog number 13 2. Substitutions are not "or -equals". 14 B. Deviations from this City of Fort Worth Standard Specification 15 1. None. 16 C. Related Specification Sections include, but are not necessarily limited to: 17 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 18 2. Division 1— General Requirements 19 1.2 PRICE AND PAYMENT PROCEDURES 20 A. Measurement and Payment 21 1. Work associated with this Item is considered subsidiary to the various items bid. No 22 separate payment will be allowed for this Item. 23 1.3 REFERENCES [NOT USED] 24 1.4 ADMINISTRATIVE REQUIREMENTS 25 A. Request for Substitution - General 26 1. Within 30 days after award of Contract (unless noted otherwise), the City will 27 consider formal requests from Contractor for substitution of products in place of 28 those specified. 29 2. Certain types of equipment and kinds of material are described in Specifications by 30 means of references to names of manufacturers and vendors, trade names, or catalog 31 numbers. 32 a. When this method of specifying is used, it is not intended to exclude from 33 consideration other products bearing other manufacturer's or vendor's names, 34 trade names, or catalog numbers, provided said products are "or -equals," as 35 determined by City. 36 3. Other types of equipment and kinds of material may be acceptable substitutions 37 under the following conditions: 38 a. Or -equals are unavailable due to strike, discontinued production of products 39 meeting specified requirements, or other factors beyond control of Contractor; 40 or, CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised August 30, 2013 012500-2 DAP SUBSTITUTION PROCEDURES Page 2 of 4 1 b. Contractor proposes a cost and/or time reduction incentive to the City. 2 1.5 SUBMITTALS 3 A. See Request for Substitution Form (attached) 4 B. Procedure for Requesting Substitution 5 1. Substitution shall be considered only: 6 a. After award of Contract 7 b. Under the conditions stated herein 8 2. Submit 3 copies of each written request for substitution, including: 9 a. Documentation 10 1) Complete data substantiating compliance of proposed substitution with 11 Contract Documents 12 2) Data relating to changes in construction schedule, when a reduction is 13 proposed 14 3) Data relating to changes in cost 15 b. For products 16 1) Product identification 17 a) Manufacturer's name 18 b) Telephone number and representative contact name 19 c) Specification Section or Drawing reference of originally specified 20 product, including discrete name or tag number assigned to original 21 product in the Contract Documents 22 2) Manufacturer's literature clearly marked to show compliance of proposed 23 product with Contract Documents 24 3) Itemized comparison of original and proposed product addressing product 25 characteristics including, but not necessarily limited to: 26 a) Size 27 b) Composition or materials of construction 28 c) Weight 29 d) Electrical or mechanical requirements 30 4) Product experience 31 a) Location of past projects utilizing product 32 b) Name and telephone number of persons associated with referenced 33 projects knowledgeable concerning proposed product 34 c) Available field data and reports associated with proposed product 35 5) Samples 36 a) Provide at request of City. 37 b) Samples become the property of the City. 38 c. For construction methods: 39 1) Detailed description of proposed method 40 2) Illustration drawings 41 C. Approval or Rejection 42 1. Written approval or rejection of substitution given by the City 43 2. City reserves the right to require proposed product to comply with color and pattern 44 of specified product if necessary to secure design intent. 45 3. In the event the substitution is approved, if a reduction in cost or time results, it will 46 be documented by Change Order. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised August 30, 2013 012500-3 DAP SUBSTITUTION PROCEDURES Page 3 of 4 1 4. Substitution will be rejected if- 2 a. Submittal is not through the Contractor with his stamp of approval 3 b. Request is not made in accordance with this Specification Section 4 c. In the Developer's opinion, acceptance will require substantial revision of the 5 original design 6 d. In the City's or Developer's opinion, substitution will not perform adequately 7 the function consistent with the design intent 8 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 9 1.7 CLOSEOUT SUBMITTALS [NOT USED] 10 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 11 1.9 QUALITY ASSURANCE 12 A. In making request for substitution or in using an approved product, the Contractor 13 represents that the Contractor: 14 1. Has investigated proposed product, and has determined that it is adequate or 15 superior in all respects to that specified, and that it will perform function for which it 16 is intended 17 2. Will provide same guarantee for substitute item as for product specified 18 3. Will coordinate installation of accepted substitution into Work, to include building 19 modifications if necessary, making such changes as may be required for Work to be 20 complete in all respects 21 4. Waives all claims for additional costs related to substitution which subsequently 22 arise 23 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 24 1.11 FIELD [SITE] CONDITIONS [NOT USED] 25 1.12 WARRANTY [NOT USED] 26 PART 2 - PRODUCTS [NOT USED] 27 PART 3 - EXECUTION [NOT USED] 28 END OF SECTION 29 Revision Log DATE NAME SUMMARY OF CHANGE 30 CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised August 30, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 012500-4 DAP SUBSTITUTION PROCEDURES Page 4 of 4 EXHIBIT A REQUEST FOR SUBSTITUTION FORM: TO: PROJECT: DATE: We hereby submit for your consideration the following product instead of the specified item for the above project: SECTION PARAGRAPH SPECIFIED ITEM Proposed Substitution: Reason for Substitution: Include complete information on changes to Drawings and/or Specifications which proposed substitution will require for its proper installation. Fill in Blanks Below: A. Will the undersigned contractor pay for changes to the building design, including engineering and detailing costs caused by the requested substitution? B. What effect does substitution have on other trades? C. Differences between proposed substitution and specified item? D. Differences in product cost or product delivery time? E. Manufacturer's guarantees of the proposed and specified items are: Equal Better (explain on attachment) The undersigned states that the function, appearance and quality are equivalent or superior to the specified item. Submitted By: For Use by City Signature as noted Firm Address Date Telephone For Use by City: Approved City Recommended Recommended Not recommended _Received late By Date Remarks Date Rejected CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised August 30, 2013 0131 19- 1 DAP PRECONSTRUCTION MEETING Pagel of 3 1 SECTION 013119 2 PRECONSTRUCTION MEETING 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Provisions for the preconstruction meeting to be held prior to the start of Work to 7 clarify construction contract administration procedures 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. No construction schedule required unless requested by the City. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1— General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Work associated with this Item is considered subsidiary to the various items bid. 16 No separate payment will be allowed for this Item. 17 1.3 REFERENCES [NOT USED] 18 1.4 ADMINISTRATIVE REQUIREMENTS 19 A. Coordination 20 1. Attend preconstruction meeting. 21 2. Representatives of Contractor, subcontractors and suppliers attending meetings 22 shall be qualified and authorized to act on behalf of the entity each represents. 23 3. Meeting administered by City may be tape recorded. 24 a. If recorded, tapes will be used to prepare minutes and retained by City for 25 future reference. 26 B. Preconstruction Meeting 27 1. A preconstruction meeting will be held within 14 days after the delivery of the 28 distribution package to the City. 29 a. The meeting will be scheduled and administered by the City. 30 2. The Project Representative will preside at the meeting, prepare the notes of the 31 meeting and distribute copies of same to all participants who so request by fully 32 completing the attendance form to be circulated at the beginning of the meeting. 33 3. Attendance shall include: 34 a. Developer and Consultant 35 b. Contractor's project manager 36 c. Contractor's superintendent 37 d. Any subcontractor or supplier representatives whom the Contractor may desire 38 to invite or the City may request CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised August 30, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 01 31 19 - 2 DAP PRECONSTRUCTION MEETING Page 2 of 3 e. Other City representatives f. Others as appropriate 4. Preliminary Agenda may include: a. Introduction of Project Personnel b. General Description of Project c. Status of right-of-way, utility clearances, easements or other pertinent permits d. Contractor's work plan and schedule e. Contract Time f. Notice to Proceed g. Construction Staking h. Progress Payments i. Extra Work and Change Order Procedures j. Field Orders k. Disposal Site Letter for Waste Material 1. Insurance Renewals m. Payroll Certification n. Material Certifications and Quality Control Testing o. Public Safety and Convenience p. Documentation of Pre -Construction Conditions q. Weekend Work Notification r. Legal Holidays s. Trench Safety Plans t. Confined Space Entry Standards u. Coordination with the City's representative for operations of existing water systems v. Storm Water Pollution Prevention Plan w. Coordination with other Contractors x. Early Warning System y. Contractor Evaluation z. Special Conditions applicable to the project aa. Damages Claims bb. Submittal Procedures cc. Substitution Procedures dd. Correspondence Routing ee. Record Drawings ff. Temporary construction facilities gg. MBE/SBE procedures hh. Final Acceptance ii. Final Payment J. Questions or Comments CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised August 30, 2013 0131 19 - 3 DAP PRECONSTRUCTION MEETING Page 3 of 3 1 1.5 SUBMITTALS [NOT USED] 2 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE [NOT USED] 6 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.11 FIELD [SITE] CONDITIONS [NOT USED] 8 1.12 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 12 13 II�IIIII.��11 I [17e1 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised August 30, 2013 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 0132 33 PRECONSTRUCTION VIDEO 01 32 33 - 1 DAP PRECONSTRUCTION VIDEO Pagel of 2 5 A. Section Includes: 6 1. Administrative and procedural requirements for: 7 a. Preconstruction Videos 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. Though not mandatory, it is highly recommended on infill developer projects. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1— General Requirements 13 1.2 PRICE AND PAYMENT PROCEDURES 14 A. Measurement and Payment 15 1. Work associated with this Item is considered subsidiary to the various items bid. 16 No separate payment will be allowed for this Item. 17 1.3 REFERENCES [NOT USED] 18 1.4 ADMINISTRATIVE REQUIREMENTS 19 A. Preconstruction Video 20 1. Produce a preconstruction video of the site/alignment, including all areas in the 21 vicinity of and to be affected by construction. 22 a. Provide digital copy of video upon request by the City. 23 2. Retain a copy of the preconstruction video until the end of the maintenance surety 24 period. 25 1.5 SUBMITTALS [NOT USED] 26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE [NOT USED] 30 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 31 1.11 FIELD [SITE] CONDITIONS [NOT USED] 32 1.12 WARRANTY [NOT USED] 33 PART 2 - PRODUCTS [NOT USED] CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised August 30, 2013 01 32 33 - 2 DAP PRECONSTRUCTION VIDEO Page 2 of 2 PART 3 - EXECUTION [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised August 30, 2013 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 0133 00 DAP SUBMITTALS 013300-1 DAP SUBMITTALS Pagel of 8 5 A. Section Includes: 6 1. General methods and requirements of submissions applicable to the following 7 Work -related submittals: 8 a. Shop Drawings 9 b. Product Data (including Standard Product List submittals) 10 c. Samples 11 d. Mock Ups 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include, but are not necessarily limited to: 15 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 16 2. Division 1— General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS 23 A. Coordination 24 1. Notify the City in writing, at the time of submittal, of any deviations in the 25 submittals from the requirements of the Contract Documents. 26 2. Coordination of Submittal Times 27 a. Prepare, prioritize and transmit each submittal sufficiently in advance of 28 performing the related Work or other applicable activities, or within the time 29 specified in the individual Work Sections, of the Specifications. 30 b. Contractor is responsible such that the installation will not be delayed by 31 processing times including, but not limited to: 32 a) Disapproval and resubmittal (if required) 33 b) Coordination with other submittals 34 c) Testing 35 d) Purchasing 36 e) Fabrication 37 f) Delivery 38 g) Similar sequenced activities 39 c. No extension of time will be authorized because of the Contractor's failure to 40 transmit submittals sufficiently in advance of the Work. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised August 30, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 013300-2 DAP SUBMITTALS Page 2 of 8 d. Make submittals promptly in accordance with approved schedule, and in such sequence as to cause no delay in the Work or in the work of any other contractor. B. Submittal Numbering 1. When submitting shop drawings or samples, utilize a 9-character submittal cross- reference identification numbering system in the following manner: a. Use the first 6 digits of the applicable Specification Section Number. b. For the next 2 digits number use numbers 01-99 to sequentially number each initial separate item or drawing submitted under each specific Section number. c. Last use a letter, A-Z, indicating the resubmission of the same drawing (i.e. A=2nd submission, B=3rd submission, C=4th submission, etc.). A typical submittal number would be as follows: 03 30 00-08-B 1) 03 30 00 is the Specification Section for Concrete 2) 08 is the eighth initial submittal under this Specification Section 3) B is the third submission (second resubmission) of that particular shop drawing C. Contractor Certification 1. Review shop drawings, product data and samples, including those by subcontractors, prior to submission to determine and verify the following: a. Field measurements b. Field construction criteria c. Catalog numbers and similar data d. Conformance with the Contract Documents 2. Provide each shop drawing, sample and product data submitted by the Contractor with a Certification Statement affixed including: a. The Contractor's Company name b. Signature of submittal reviewer c. Certification Statement 1) `By this submittal, I hereby represent that I have determined and verified field measurements, field construction criteria, materials, dimensions, catalog numbers and similar data and I have checked and coordinated each item with other applicable approved shop drawings." D. Submittal Format 1. Fold shop drawings larger than 8 1/2 inches x 11 inches to 8 %2 inches x 1 Iinches. 2. Bind shop drawings and product data sheets together. 3. Order a. Cover Sheet 1) Description of Packet 2) Contractor Certification b. List of items / Table of Contents c. Product Data /Shop Drawings/Samples /Calculations E. Submittal Content 1. The date of submission and the dates of any previous submissions CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised August 30, 2013 013300-3 DAP SUBMITTALS Page 3 of 8 1 2. The Project title and number 2 3. Contractor identification 3 4. The names of- 4 a. Contractor 5 b. Supplier 6 c. Manufacturer 7 5. Identification of the product, with the Specification Section number, page and 8 paragraph(s) 9 6. Field dimensions, clearly identified as such 10 7. Relation to adjacent or critical features of the Work or materials 11 8. Applicable standards, such as ASTM or Federal Specification numbers 12 9. Identification by highlighting of deviations from Contract Documents 13 10. Identification by highlighting of revisions on resubmittals 14 11. An 8-inch x 3-inch blank space for Contractor and City stamps 15 F. Shop Drawings 16 1. As specified in individual Work Sections includes, but is not necessarily limited to: 17 a. Custom -prepared data such as fabrication and erection/installation (working) 18 drawings 19 b. Scheduled information 20 c. Setting diagrams 21 d. Actual shopwork manufacturing instructions 22 e. Custom templates 23 f. Special wiring diagrams 24 g. Coordination drawings 25 h. Individual system or equipment inspection and test reports including: 26 1) Performance curves and certifications 27 i. As applicable to the Work 28 2. Details 29 a. Relation of the various parts to the main members and lines of the structure 30 b. Where correct fabrication of the Work depends upon field measurements 31 1) Provide such measurements and note on the drawings prior to submitting 32 for approval. 33 G. Product Data 34 1. For submittals of product data for products included on the City's Standard Product 35 List, clearly identify each item selected for use on the Project. 36 2. For submittals of product data for products not included on the City's Standard 37 Product List, submittal data may include, but is not necessarily limited to: 38 a. Standard prepared data for manufactured products (sometimes referred to as 39 catalog data) 40 1) Such as the manufacturer's product specification and installation 41 instructions 42 2) Availability of colors and patterns 43 3) Manufacturer's printed statements of compliances and applicability 44 4) Roughing -in diagrams and templates 45 5) Catalog cuts 46 6) Product photographs CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised August 30, 2013 01 33 00 - 4 DAP SUBMITTALS Page 4 of 8 1 7) Standard wiring diagrams 2 8) Printed performance curves and operational -range diagrams 3 9) Production or quality control inspection and test reports and certifications 4 10) Mill reports 5 11) Product operating and maintenance instructions and recommended 6 spare -parts listing and printed product warranties 7 12) As applicable to the Work 8 H. Samples 9 1. As specified in individual Sections, include, but are not necessarily limited to: 10 a. Physical examples of the Work such as: 11 1) Sections of manufactured or fabricated Work 12 2) Small cuts or containers of materials 13 3) Complete units of repetitively used products color/texture/pattern swatches 14 and range sets 15 4) Specimens for coordination of visual effect 16 5) Graphic symbols and units of Work to be used by the City for independent 17 inspection and testing, as applicable to the Work 18 I. Do not start Work requiring a shop drawing, sample or product data nor any material to 19 be fabricated or installed prior to the approval or qualified approval of such item. 20 1. Fabrication performed, materials purchased or on -site construction accomplished 21 which does not conform to approved shop drawings and data is at the Contractor's 22 risk. 23 2. The City will not be liable for any expense or delay due to corrections or remedies 24 required to accomplish conformity. 25 3. Complete project Work, materials, fabrication, and installations in conformance 26 with approved shop drawings, applicable samples, and product data. 27 J. Submittal Distribution 28 1. Electronic Distribution 29 a. Confirm development of Project directory for electronic submittals to be 30 uploaded to City's Buzzsaw site, or another external FTP site approved by the 31 City. 32 b. Shop Drawings 33 1) Upload submittal to designated project directory and notify appropriate 34 City representatives via email of submittal posting. 35 2) Hard Copies 36 a) 3 copies for all submittals 37 b) If Contractor requires more than 1 hard copy of Shop Drawings 38 returned, Contractor shall submit more than the number of copies listed 39 above. 40 c. Product Data 41 1) Upload submittal to designated project directory and notify appropriate 42 City representatives via email of submittal posting. 43 2) Hard Copies 44 a) 3 copies for all submittals 45 d. Samples 46 1) Distributed to the Project Representative 47 2. Hard Copy Distribution (if required in lieu of electronic distribution) CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised August 30, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 013300-5 DAP SUBMITTALS Page 5 of 8 a. Shop Drawings 1) Distributed to the City 2) Copies a) 8 copies for mechanical submittals b) 7 copies for all other submittals c) If Contractor requires more than 3 copies of Shop Drawings returned, Contractor shall submit more than the number of copies listed above. b. Product Data 1) Distributed to the City 2) Copies a) 4 copies c. Samples 1) Distributed to the Project Representative 2) Copies a) Submit the number stated in the respective Specification Sections. 3. Distribute reproductions of approved shop drawings and copies of approved product data and samples, where required, to the job site file and elsewhere as directed by the City. a. Provide number of copies as directed by the City but not exceeding the number previously specified. K. Submittal Review 1. The review of shop drawings, data and samples will be for general conformance with the design concept and Contract Documents. This is not to be construed as: a. Permitting any departure from the Contract requirements b. Relieving the Contractor of responsibility for any errors, including details, dimensions, and materials c. Approving departures from details furnished by the City, except as otherwise provided herein 2. The review and approval of shop drawings, samples or product data by the City does not relieve the Contractor from his/her responsibility with regard to the fulfillment of the terms of the Contract. a. All risks of error and omission are assumed by the Contractor, and the City will have no responsibility therefore. 3. The Contractor remains responsible for details and accuracy, for coordinating the Work with all other associated work and trades, for selecting fabrication processes, for techniques of assembly and for performing Work in a safe manner. 4. If the shop drawings, data or samples as submitted describe variations and show a departure from the Contract requirements which City finds to be in the interest of the City and to be so minor as not to involve a change in Contract Price or time for performance, the City may return the reviewed drawings without noting an exception. 5. Submittals will be returned to the Contractor under 1 of the following codes: a. Code 1 1) "NO EXCEPTIONS TAKEN" is assigned when there are no notations or comments on the submittal. a) When returned under this code the Contractor may release the equipment and/or material for manufacture. b. Code 2 CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised August 30, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 013300-6 DAP SUBMITTALS Page 6 of 8 1) "EXCEPTIONS NOTED". This code is assigned when a confirmation of the notations and comments IS NOT required by the Contractor. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. c. Code 3 1) "EXCEPTIONS NOTED/RESUBMIT". This combination of codes is assigned when notations and comments are extensive enough to require a resubmittal of the package. a) The Contractor may release the equipment or material for manufacture; however, all notations and comments must be incorporated into the final product. b) This resubmittal is to address all comments, omissions and non -conforming items that were noted. c) Resubmittal is to be received by the City within 15 Calendar Days of the date of the City's transmittal requiring the resubmittal. d. Code 4 1) "NOT APPROVED" is assigned when the submittal does not meet the intent of the Contract Documents. a) The Contractor must resubmit the entire package revised to bring the submittal into conformance. b) It may be necessary to resubmit using a different manufacturer/vendor to meet the Contract Documents. 6. Resubmittals a. Handled in the same manner as first submittals 1) Corrections other than requested by the City 2) Marked with revision triangle or other similar method a) At Contractor's risk if not marked b. Submittals for each item will be reviewed no more than twice at the City's expense. 1) All subsequent reviews will be performed at times convenient to the City and at the Contractor's expense, based on the City's or City Representative's then prevailing rates. 2) Provide Contractor reimbursement to the City within 30 Calendar Days for all such fees invoiced by the City. c. The need for more than 1 resubmission or any other delay in obtaining City's review of submittals, will not entitle the Contractor to an extension of Contract Time. 7. Partial Submittals a. City reserves the right to not review submittals deemed partial, at the City's discretion. b. Submittals deemed by the City to be not complete will be returned to the Contractor, and will be considered "Not Approved" until resubmitted. c. The City may at its option provide a list or mark the submittal directing the Contractor to the areas that are incomplete. 8. If the Contractor considers any correction indicated on the shop drawings to constitute a change to the Contract Documents, then written notice must be provided thereof to the Developer at least 7 Calendar Days prior to release for manufacture. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised August 30, 2013 013300-7 DAP SUBMITTALS Page 7 of 8 1 9. When the shop drawings have been completed to the satisfaction of the City, the 2 Contractor may carry out the construction in accordance therewith and no further 3 changes therein except upon written instructions from the City. 4 10. Each submittal, appropriately coded, will be returned within 30 Calendar Days 5 following receipt of submittal by the City. 6 L. Mock ups 7 1. Mock Up units as specified in individual Sections, include, but are not necessarily 8 limited to, complete units of the standard of acceptance for that type of Work to be 9 used on the Project. Remove at the completion of the Work or when directed. 10 M. Qualifications 11 1. If specifically required in other Sections of these Specifications, submit a P.E. 12 Certification for each item required. 13 N. Request for Information (RFI) 14 1. Contractor Request for additional information 15 a. Clarification or interpretation of the contract documents 16 b. When the Contractor believes there is a conflict between Contract Documents 17 c. When the Contractor believes there is a conflict between the Drawings and 18 Specifications 19 1) Identify the conflict and request clarification 20 2. Sufficient information shall be attached to permit a written response without further 21 information. 22 23 24 25 26 1.5 SUBMITTALS [NOT USED] 27 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 28 1.7 CLOSEOUT SUBMITTALS [NOT USED] 29 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 30 1.9 QUALITY ASSURANCE [NOT USED] 31 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 32 1.11 FIELD [SITE] CONDITIONS [NOT USED] 33 1.12 WARRANTY [NOT USED] CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised August 30, 2013 013300-8 DAP SUBMITTALS Page 8 of 8 1 PART 2 - PRODUCTS [NOT USED] 2 PART 3 - EXECUTION [NOT USED] 3 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 12/20/2012 D. Johnson 1.4.K.8. Working Days modified to Calendar Days CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised August 30, 2013 0135 13- 1 DAP SPECIAL PROJECT PROCEDURES Pagel of 7 1 SECTION 0135 13 2 SPECIAL PROJECT PROCEDURES 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. The procedures for special project circumstances that includes, but is not limited to: 7 a. Coordination with the Texas Department of Transportation 8 b. Work near High Voltage Lines 9 c. Confined Space Entry Program 10 d. Air Pollution Watch Days 11 e. Use of Explosives, Drop Weight, Etc. 12 f. Water Department Notification 13 g. Public Notification Prior to Beginning Construction 14 h. Coordination with United States Army Corps of Engineers 15 i. Coordination within Railroad permits areas 16 j. Dust Control 17 k. Employee Parking 18 B. Deviations from this City of Fort Worth Standard Specification 19 1. None. 20 C. Related Specification Sections include, but are not necessarily limited to: 21 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 22 2. Division 1— General Requirements 23 3. Section 33 12 25 — Connection to Existing Water Mains 24 25 1.2 REFERENCES 26 A. Reference Standards 27 1. Reference standards cited in this Specification refer to the current reference 28 standard published at the time of the latest revision date logged at the end of this 29 Specification, unless a date is specifically cited. 30 2. Health and Safety Code, Title 9. Safety, Subtitle A. Public Safety, Chapter 752. 31 High Voltage Overhead Lines. 32 3. North Central Texas Council of Governments (NCTCOG) — Clean Construction 33 Specification 34 1.3 ADMINISTRATIVE REQUIREMENTS 35 A. Coordination with the Texas Department of Transportation 36 1. When work in the right-of-way which is under the jurisdiction of the Texas 37 Department of Transportation (TxDOT): 38 a. Notify the Texas Department of Transportation prior to commencing any work 39 therein in accordance with the provisions of the permit CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised August, 30, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 013513-2 DAP SPECIAL PROJECT PROCEDURES Page 2 of 7 b. All work performed in the TxDOT right-of-way shall be performed in compliance with and subject to approval from the Texas Department of Transportation B. Work near High Voltage Lines 1. Regulatory Requirements a. All Work near High Voltage Lines (more than 600 volts measured between conductors or between a conductor and the ground) shall be in accordance with Health and Safety Code, Title 9, Subtitle A, Chapter 752. 2. Warning sign a. Provide sign of sufficient size meeting all OSHA requirements. 3. Equipment operating within 10 feet of high voltage lines will require the following safety features a. Insulating cage -type of guard about the boom or arm b. Insulator links on the lift hook connections for back hoes or dippers c. Equipment must meet the safety requirements as set forth by OSHA and the safety requirements of the owner of the high voltage lines 4. Work within 6 feet of high voltage electric lines a. Notification shall be given to: 1) The power company (example: ONCOR) a) Maintain an accurate log of all such calls to power company and record action taken in each case. b. Coordination with power company 1) After notification coordinate with the power company to: a) Erect temporary mechanical barriers, de -energize the lines, or raise or lower the lines c. No personnel may work within 6 feet of a high voltage line before the above requirements have been met. C. Confined Space Entry Program 1. Provide and follow approved Confined Space Entry Program in accordance with OSHA requirements. 2. Confined Spaces include: a. Manholes b. All other confined spaces in accordance with OSHA's Permit Required for Confined Spaces D. Use of Explosives, Drop Weight, Etc. 1. When Contract Documents permit on the project the following will apply: a. Public Notification 1) Submit notice to City and proof of adequate insurance coverage, 24 hours prior to commencing. 2) Minimum 24 hour public notification in accordance with Section 01 31 13 E. Water Department Coordination 1. During the construction of this project, it will be necessary to deactivate, for a period of time, existing lines. The Contractor shall be required to coordinate with the Water Department to determine the best times for deactivating and activating those lines. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised August, 30, 2013 013513-3 DAP SPECIAL PROJECT PROCEDURES Page 3 of 7 1 2. Coordinate any event that will require connecting to or the operation of an existing 2 City water line system with the City's representative. 3 a. Coordination shall be in accordance with Section 33 12 25. 4 b. If needed, obtain a hydrant water meter from the Water Department for use 5 during the life of named project. 6 c. In the event that a water valve on an existing live system be turned off and on 7 to accommodate the construction of the project is required, coordinate this 8 activity through the appropriate City representative. 9 1) Do not operate water line valves of existing water system. 10 a) Failure to comply will render the Contractor in violation of Texas Penal 11 Code Title 7, Chapter 28.03 (Criminal Mischief) and the Contractor 12 will be prosecuted to the full extent of the law. 13 b) In addition, the Contractor will assume all liabilities and 14 responsibilities as a result of these actions. 15 F. Public Notification Prior to Beginning Construction 16 1. Prior to beginning construction on any block in the project, on a block by block 17 basis, prepare and deliver a notice or flyer of the pending construction to the front 18 door of each residence or business that will be impacted by construction. The notice 19 shall be prepared as follows: 20 a. Post notice or flyer 7 days prior to beginning any construction activity on each 21 block in the project area. 22 1) Prepare flyer on the Contractor's letterhead and include the following 23 information: 24 a) Name of Project 25 b) City Project No (CPN) 26 c) Scope of Project (i.e. type of construction activity) 27 d) Actual construction duration within the block 28 e) Name of the contractor's foreman and phone number 29 f) Name of the City's inspector and phone number 30 g) City's after-hours phone number 31 2) A sample of the `pre -construction notification' flyer is attached as Exhibit 32 A. 33 3) Submit schedule showing the construction start and finish time for each 34 block of the project to the inspector. 35 4) Deliver flyer to the City Inspector for review prior to distribution. 36 b. No construction will be allowed to begin on any block until the flyer is 37 delivered to all residents of the block. 38 G. Public Notification of Temporary Water Service Interruption during Construction 39 1. In the event it becomes necessary to temporarily shut down water service to 40 residents or businesses during construction, prepare and deliver a notice or flyer of 41 the pending interruption to the front door of each affected resident. 42 2. Prepared notice as follows: 43 a. The notification or flyer shall be posted 24 hours prior to the temporary 44 interruption. 45 b. Prepare flyer on the contractor's letterhead and include the following 46 information: 47 1) Name of the project 48 2) City Project Number CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised August, 30, 2013 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 01 35 13 - 4 DAP SPECIAL PROJECT PROCEDURES Page 4 of 7 3) Date of the interruption of service 4) Period the interruption will take place 5) Name of the contractor's foreman and phone number 6) Name of the City's inspector and phone number c. A sample of the temporary water service interruption notification is attached as Exhibit B. d. Deliver a copy of the temporary interruption notification to the City inspector for review prior to being distributed. e. No interruption of water service can occur until the flyer has been delivered to all affected residents and businesses. f. Electronic versions of the sample flyers can be obtained from the Project Construction Inspector. H. Coordination with United States Army Corps of Engineers (USACE) 1. At locations in the Project where construction activities occur in areas where USACE permits are required, meet all requirements set forth in each designated permit. I. Coordination within Railroad Permit Areas 1. At locations in the project where construction activities occur in areas where railroad permits are required, meet all requirements set forth in each designated railroad permit. This includes, but is not limited to, provisions for: a. Flagmen b. Inspectors c. Safety training d. Additional insurance e. Insurance certificates f. Other employees required to protect the right-of-way and property of the Railroad Company from damage arising out of and/or from the construction of the project. Proper utility clearance procedures shall be used in accordance with the permit guidelines. 2. Obtain any supplemental information needed to comply with the railroad's requirements. J. Dust Control 1. Use acceptable measures to control dust at the Site. a. If water is used to control dust, capture and properly dispose of waste water. b. If wet saw cutting is performed, capture and properly dispose of slurry. K. Employee Parking 1. Provide parking for employees at locations approved by the City. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised August, 30, 2013 013513-5 DAP SPECIAL PROJECT PROCEDURES Page 5 of 7 1 1.4 SUBMITTALS [NOT USED] 2 1.5 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 3 1.6 CLOSEOUT SUBMITTALS [NOT USED] 4 1.7 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.8 QUALITY ASSURANCE [NOT USED] 6 1.9 DELIVERY, STORAGE, AND HANDLING [NOT USED] 7 1.10 FIELD [SITE] CONDITIONS [NOT USED] 8 1.11 WARRANTY [NOT USED] 9 PART 2 - PRODUCTS [NOT USED] 10 PART 3 - EXECUTION [NOT USED] 12 13 M 11130 Revision Log DATE NAME SUMMARY OF CHANGE 1.3.B — Added requirement of compliance with Health and Safety Code, Title 9. 8/31/2012 D. Johnson Safety, Subtitle A. Public Safety, Chapter 752. High Voltage Overhead Lines. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised August, 30, 2013 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 013513-6 DAP SPECIAL PROJECT PROCEDURES Page 6 of 7 EXHIBIT A (To be printed on Contractor's Letterhead) Date: CPN No.: Project Name: Mapsco Location: Limits of Construction: THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE CITY OF FORT WORTH, OUR COMPANY WILL WORK ON UTILITY LINES ON OR AROUND YOUR PROPERTY. CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS FROM THE DATE OF THIS NOTICE. IF YOU HAVE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY OR ANY OTHER ISSUE, PLEASE CALL: Mr. <CONTRACTOR'S SUPERINTENDENT> AT <TELEPHONE NO.> OR Mr. <CITY INSPECTOR> AT < TELEPHONE NO.> AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL (817) 392 8306 PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised August, 30, 2013 013513-7 DAP SPECIAL PROJECT PROCEDURES Page 7 of 7 1 EXHIBIT B 2 FORT WORTH Date: DoIK no. xxax Project Haase: NOTICE OF TEMPORARY WATER SERVICE INTERRUPTION DUE TO UTILITY IMPROVEMENTS IN YOUR NEIGHBORHOOD, YOUR WATER SERVICE WILL BE INTERRUPTED ON BETWEEN THE HOURS OF AND IF YOU HAVE QUESTIONS ABOUT THIS SHUT -OUT, PLEASE CALL: MR. AT (CONTRACTORS SUPERINTENDENT) (TELEPHONE NUMBER) OR MR. AT (CITY INSPECTOR) (TELEPHONE NUMBER) THIS INCONVENIENCE WILL BE AS SHORT AS POSSIBLE. THANK YOU, 3 - - 4 CONTRACTOR CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised August, 30, 2013 014523-1 DAP TESTING AND INSPECTION SERVICES Pagel of 2 1 SECTION 0145 23 2 TESTING AND INSPECTION SERVICES 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Testing and inspection services procedures and coordination 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1— General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 a. Contractor is responsible for performing, coordinating, and payment of all 17 Quality Control testing. 18 b. City is responsible for performing and payment for first set of Quality 19 Assurance testing. 20 1) If the first Quality Assurance test performed by the City fails, the 21 Contractor is responsible for payment of subsequent Quality Assurance 22 testing until a passing test occurs. 23 a) Final acceptance will not be issued by City until all required payments 24 for testing by Contractor have been paid in full. 25 1.3 REFERENCES [NOT USED] 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 A. Testing 28 1. Complete testing in accordance with the Contract Documents. 29 2. Coordination 30 a. When testing is required to be performed by the City, notify City, sufficiently 31 in advance, when testing is needed. 32 b. When testing is required to be completed by the Contractor, notify City, 33 sufficiently in advance, that testing will be performed. 34 3. Distribution of Testing Reports 35 a. Electronic Distribution 36 1) Confirm development of Project directory for electronic submittals to be 37 uploaded to City's Buzzsaw site, or another form of distribution approved 38 by the City. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised August 30, 2013 014523-2 DAP TESTING AND INSPECTION SERVICES Page 2 of 2 1 2) Upload test reports to designated project directory and notify appropriate 2 City representatives via email of submittal posting. 3 3) Hard Copies 4 a) 1 copy for all submittals submitted to the Project Representative 5 b. Hard Copy Distribution (if required in lieu of electronic distribution) 6 1) Tests performed by City 7 a) Distribute 1 hard copy to the Contractor 8 2) Tests performed by the Contractor 9 a) Distribute 3 hard copies to City's Project Representative 10 4. Provide City's Project Representative with trip tickets for each delivered load of 11 Concrete or Lime material including the following information: 12 a. Name of pit 13 b. Date of delivery 14 c. Material delivered 15 B. Inspection 16 1. Inspection or lack of inspection does not relieve the Contractor from obligation to 17 perform work in accordance with the Contract Documents. 18 1.5 SUBMITTALS [NOT USED] 19 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 20 1.7 CLOSEOUT SUBMITTALS [NOT USED] 21 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 22 1.9 QUALITY ASSURANCE [NOT USED] 23 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 24 1.11 FIELD [SITE] CONDITIONS [NOT USED] 25 1.12 WARRANTY [NOT USED] 26 PART 2 - PRODUCTS [NOT USED] 27 PART 3 - EXECUTION [NOT USED] 28 END OF SECTION 29 30 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised August 30, 2013 01 50 00 - 1 DAP TEMPORARY FACILITIES AND CONTROLS Pagel of 4 1 SECTION 0150 00 2 TEMPORARY FACILITIES AND CONTROLS 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Provide temporary facilities and controls needed for the Work including, but not 7 necessarily limited to: 8 a. Temporary utilities 9 b. Sanitary facilities 10 c. Storage Sheds and Buildings 11 d. Dust control 12 e. Temporary fencing of the construction site 13 B. Deviations from this City of Fort Worth Standard Specification 14 1. None. 15 C. Related Specification Sections include, but are not necessarily limited to: 16 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 17 2. Division 1— General Requirements 18 1.2 PRICE AND PAYMENT PROCEDURES 19 A. Measurement and Payment 20 1. Work associated with this Item is considered subsidiary to the various Items bid. 21 No separate payment will be allowed for this Item. 22 1.3 REFERENCES [NOT USED] 23 1.4 ADMINISTRATIVE REQUIREMENTS 24 A. Temporary Utilities 25 1. Obtaining Temporary Service 26 a. Make arrangements with utility service companies for temporary services. 27 b. Abide by rules and regulations of utility service companies or authorities 28 having jurisdiction. 29 c. Be responsible for utility service costs until Work is approved for Final 30 Acceptance. 31 1) Included are fuel, power, light, heat and other utility services necessary for 32 execution, completion, testing and initial operation of Work. 33 2. Water 34 a. Contractor to provide water required for and in connection with Work to be 35 performed and for specified tests of piping, equipment, devices or other use as 36 required for the completion of the Work. 37 b. Provide and maintain adequate supply of potable water for domestic 38 consumption by Contractor personnel and City's Project Representatives. 39 c. Coordination 40 1) Contact City 1 week before water for construction is desired CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised JULY 1, 2011 015000-2 DAP TEMPORARY FACILITIES AND CONTROLS Page 2 of 4 I d. Contractor Payment for Construction Water 2 1) Obtain construction water meter from City for payment as billed by City's 3 established rates. 4 3. Electricity and Lighting 5 a. Provide and pay for electric powered service as required for Work, including 6 testing of Work. 7 1) Provide power for lighting, operation of equipment, or other use. 8 b. Electric power service includes temporary power service or generator to 9 maintain operations during scheduled shutdown. 10 4. Telephone 11 a. Provide emergency telephone service at Site for use by Contractor personnel 12 and others performing work or furnishing services at Site. 13 5. Temporary Heat and Ventilation 14 a. Provide temporary heat as necessary for protection or completion of Work. 15 b. Provide temporary heat and ventilation to assure safe working conditions. 16 B. Sanitary Facilities 17 1. Provide and maintain sanitary facilities for persons on Site. 18 a. Comply with regulations of State and local departments of health. 19 2. Enforce use of sanitary facilities by construction personnel at job site. 20 a. Enclose and anchor sanitary facilities. 21 b. No discharge will be allowed from these facilities. 22 c. Collect and store sewage and waste so as not to cause nuisance or health 23 problem. 24 d. Haul sewage and waste off -site at no less than weekly intervals and properly 25 dispose in accordance with applicable regulation. 26 3. Locate facilities near Work Site and keep clean and maintained throughout Project. 27 4. Remove facilities at completion of Project 28 C. Storage Sheds and Buildings 29 1. Provide adequately ventilated, watertight, weatherproof storage facilities with floor 30 above ground level for materials and equipment susceptible to weather damage. 31 2. Storage of materials not susceptible to weather damage may be on blocks off 32 ground. 33 3. Store materials in a neat and orderly manner. 34 a. Place materials and equipment to permit easy access for identification, 35 inspection and inventory. 36 4. Equip building with lockable doors and lighting, and provide electrical service for 37 equipment space heaters and heating or ventilation as necessary to provide storage 38 environments acceptable to specified manufacturers. 39 5. Fill and grade site for temporary structures to provide drainage away from 40 temporary and existing buildings. 41 6. Remove building from site prior to Final Acceptance. 42 D. Temporary Fencing 43 1. Provide and maintain for the duration or construction when required in contract 44 documents 45 E. Dust Control CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised JULY 1, 2011 015000-3 DAP TEMPORARY FACILITIES AND CONTROLS Page 3 of 4 1 1. Contractor is responsible for maintaining dust control through the duration of the 2 project. 3 a. Contractor remains on -call at all times 4 b. Must respond in a timely manner 5 F. Temporary Protection of Construction 6 1. Contractor or subcontractors are responsible for protecting Work from damage due 7 to weather. 8 1.5 SUBMITTALS [NOT USED] 9 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 10 1.7 CLOSEOUT SUBMITTALS [NOT USED] 11 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 12 1.9 QUALITY ASSURANCE [NOT USED] 13 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 14 1.11 FIELD [SITE] CONDITIONS [NOT USED] 15 1.12 WARRANTY [NOT USED] 16 PART 2 - PRODUCTS [NOT USED] 17 PART 3 - EXECUTION [NOT USED] 18 3.1 INSTALLERS [NOT USED] 19 3.2 EXAMINATION [NOT USED] 20 3.3 PREPARATION [NOT USED] 21 3.4 INSTALLATION 22 A. Temporary Facilities 23 1. Maintain all temporary facilities for duration of construction activities as needed. 24 3.5 [REPAIR] / [RESTORATION] 25 3.6 RE -INSTALLATION 26 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 27 3.8 SYSTEM STARTUP [NOT USED] 28 3.9 ADJUSTING [NOT USED] 29 3.10 CLEANING [NOT USED] 30 3.11 CLOSEOUT ACTIVITIES 31 A. Temporary Facilities CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised JULY 1, 2011 01 50 00 - 4 DAP TEMPORARY FACILITIES AND CONTROLS Page 4 of 4 1 1. Remove all temporary facilities and restore area after completion of the Work, to a 2 condition equal to or better than prior to start of Work. 3 3.12 PROTECTION [NOT USED] 4 3.13 MAINTENANCE [NOT USED] 5 3.14 ATTACHMENTS [NOT USED] 6 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised JULY 1, 2011 01 55 26 - 1 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Pagel of 3 1 SECTION 0155 26 2 STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Administrative procedures for: 7 a. Street Use Permit 8 b. Modification of approved traffic control 9 c. Removal of Street Signs 10 B. Deviations from this City of Fort Worth Standard Specification 11 1. None. 12 C. Related Specification Sections include, but are not necessarily limited to: 13 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 14 2. Division 1— General Requirements 15 3. Section 34 71 13 — Traffic Control 16 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 1. Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payment will be allowed for this Item. 20 1.3 REFERENCES 21 A. Reference Standards 22 1. Reference standards cited in this specification refer to the current reference standard 23 published at the time of the latest revision date logged at the end of this 24 specification, unless a date is specifically cited. 25 2. Texas Manual on Uniform Traffic Control Devices (TMUTCD). 26 1.4 ADMINISTRATIVE REQUIREMENTS 27 A. Traffic Control 28 1. General 29 a. When traffic control plans are included in the Drawings, provide Traffic 30 Control in accordance with Drawings and Section 34 71 13. 31 b. When traffic control plans are not included in the Drawings, prepare traffic 32 control plans in accordance with Section 34 71 13 and submit to City for 33 review. 34 1) Allow minimum 10 working days for review of proposed Traffic Control. 35 B. Street Use Permit 36 1. Prior to installation of Traffic Control, a City Street Use Permit is required. 37 a. To obtain Street Use Permit, submit Traffic Control Plans to City 38 Transportation and Public Works Department. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised July 1, 2011 015526-2 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 2 of 3 1 1) Allow a minimum of 5 working days for permit review. 2 2) Contractor's responsibility to coordinate review of Traffic Control plans for 3 Street Use Permit, such that construction is not delayed. 4 C. Modification to Approved Traffic Control 5 1. Prior to installation traffic control: 6 a. Submit revised traffic control plans to City Department Transportation and 7 Public Works Department. 8 1) Revise Traffic Control plans in accordance with Section 34 71 13. 9 2) Allow minimum 5 working days for review of revised Traffic Control. 10 3) It is the Contractor's responsibility to coordinate review of Traffic Control 11 plans for Street Use Permit, such that construction is not delayed. 12 D. Removal of Street Sign 13 1. If it is determined that a street sign must be removed for construction, then contact 14 City Transportation and Public Works Department, Signs and Markings Division to 15 remove the sign. 16 E. Temporary Signage 17 1. In the case of regulatory signs, replace permanent sign with temporary sign meeting 18 requirements of the latest edition of the Texas Manual on Uniform Traffic Control 19 Devices (MUTCD). 20 2. Install temporary sign before the removal of permanent sign. 21 3. When construction is complete, to the extent that the permanent sign can be 22 reinstalled, contact the City Transportation and Public Works Department, Signs 23 and Markings Division, to reinstall the permanent sign. 24 F. Traffic Control Standards 25 1. Traffic Control Standards can be found on the City's Buzzsaw website. 26 1.5 SUBMITTALS [NOT USED] 27 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 28 1.7 CLOSEOUT SUBMITTALS [NOT USED] 29 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 30 1.9 QUALITY ASSURANCE [NOT USED] 31 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 32 1.11 FIELD [SITE] CONDITIONS [NOT USED] 33 1.12 WARRANTY [NOT USED] 34 PART 2 - PRODUCTS [NOT USED] 35 PART 3 - EXECUTION [NOT USED] 36 END OF SECTION CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised July 1, 2011 015526-3 DAP STREET USE PERMIT AND MODIFICATIONS TO TRAFFIC CONTROL Page 3 of 3 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised July 1, 2011 0157 13- 1 DAP STORM WATER POLLUTION PREVENTION Pagel of 3 1 PART 1 - SECTION 0157 13 2 STORM WATER POLLUTION PREVENTION 3 PART2- GENERAL 4 2.1 SUMMARY 5 A. Section Includes: 6 1. Procedures for Storm Water Pollution Prevention Plans 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the 11 Contract 12 2. Division 1— General Requirements 13 3. Section 3125 00 — Erosion and Sediment Control 14 2.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Construction Activities resulting in less than 1 acre of disturbance 17 a. Work associated with this Item is considered subsidiary to the various Items 18 bid. No separate payment will be allowed for this Item. 19 2. Construction Activities resulting in greater than 1 acre of disturbance 20 a. Measurement and Payment shall be in accordance with Section 3125 00. 21 2.3 REFERENCES 22 A. Abbreviations and Acronyms 23 1. Notice of Intent: NOI 24 2. Notice of Termination: NOT 25 3. Storm Water Pollution Prevention Plan: SWPPP 26 4. Texas Commission on Environmental Quality: TCEQ 27 5. Notice of Change: NOC 28 A. Reference Standards 29 1. Reference standards cited in this Specification refer to the current reference 30 standard published at the time of the latest revision date logged at the end of this 31 Specification, unless a date is specifically cited. 32 2. Integrated Storm Management (iSWM) Technical Manual for Construction 33 Controls 34 2.4 ADMINISTRATIVE REQUIREMENTS 35 A. General CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised July 1, 2011 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 01 57 13 - 2 DAP STORM WATER POLLUTION PREVENTION Page 2 of 3 1. Contractor is responsible for resolution and payment of any fines issued associated with compliance to Stormwater Pollution Prevention Plan. B. Construction Activities resulting in: 1. Less than 1 acre of disturbance a. Provide erosion and sediment control in accordance with Section 3125 00 and Drawings. 2. 1 to less than 5 acres of disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) TCEQ Small Construction Site Notice Required under general permit TXR150000 a) Sign and post at job site b) Prior to Preconstruction Meeting, send 1 copy to City Department of Transportation and Public Works, Environmental Division, (817) 392- 6088. 2) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 3. 5 acres or more of Disturbance a. Texas Pollutant Discharge Elimination System (TPDES) General Construction Permit is required b. Complete SWPPP in accordance with TCEQ requirements 1) Prepare a TCEQ NOI form and submit to TCEQ along with required fee a) Sign and post at job site b) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 2) TCEQ Notice of Change required if making changes or updates to NOI 3) Provide erosion and sediment control in accordance with: a) Section 3125 00 b) The Drawings c) TXR150000 General Permit d) SWPPP e) TCEQ requirements 4) Once the project has been completed and all the closeout requirements of TCEQ have been met a TCEQ Notice of Termination can be submitted. a) Send copy to City Department of Transportation and Public Works, Environmental Division, (817) 392-6088. 42 2.5 SUBMITTALS 43 A. SWPPP 44 1. Submit in accordance with Section 0133 00, except as stated herein. 45 a. Prior to the Preconstruction Meeting, submit a draft copy of SWPPP to the City 46 as follows: 47 1) 1 copy to the City Project Manager CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised July 1, 2011 0157 13 - 3 DAP STORM WATER POLLUTION PREVENTION Page 3 of 3 1 a) City Project Manager will forward to the City Department of 2 Transportation and Public Works, Environmental Division for review 3 B. Modified SWPPP 4 1. If the SWPPP is revised during construction, resubmit modified SWPPP to the City 5 in accordance with Section 0133 00. 6 2.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 7 2.7 CLOSEOUT SUBMITTALS [NOT USED] 8 2.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 9 2.9 QUALITY ASSURANCE [NOT USED] 10 2.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 11 2.11 FIELD [SITE] CONDITIONS [NOT USED] 12 2.12 WARRANTY [NOT USED] 13 PART 3 - PRODUCTS [NOT USED] 14 PART 4 - EXECUTION [NOT USED] 15 END OF SECTION 16 17 Revision Log DATE NAME SUMMARY OF CHANGE CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised July 1, 2011 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 0160 00 PRODUCT REQUIREMENTS 01 60 00 - 1 DAP PRODUCT REQUIREMENTS Pagel of 2 5 A. Section Includes: 6 1. References for Product Requirements and City Standard Products List 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1— General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES [NOT USED] 13 1.3 REFERENCES [NOT USED] 14 1.4 ADMINISTRATIVE REQUIREMENTS 15 A. A list of City approved products for use is located on Buzzsaw as follows: 16 1. Resources\02 - Construction Documents\Standard Products List 17 B. Only products specifically included on City's Standard Product List in these Contract 18 Documents shall be allowed for use on the Project. 19 1. Any subsequently approved products will only be allowed for use upon specific 20 approval by the City. 21 C. Any specific product requirements in the Contract Documents supersede similar 22 products included on the City's Standard Product List. 23 1. The City reserves the right to not allow products to be used for certain projects even 24 though the product is listed on the City's Standard Product List. 25 D. Although a specific product is included on City's Standard Product List, not all 26 products from that manufacturer are approved for use, including but not limited to, that 27 manufacturer's standard product. 28 E. See Section 0133 00 for submittal requirements of Product Data included on City's 29 Standard Product List. 30 1.5 SUBMITTALS [NOT USED] 31 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 32 1.7 CLOSEOUT SUBMITTALS [NOT USED] 33 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 34 1.9 QUALITY ASSURANCE [NOT USED] CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised April 7, 2014 016000-2 DAP PRODUCT REQUIREMENTS Page 2 of 2 1 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 2 1.11 FIELD [SITE] CONDITIONS [NOT USED] 3 1.12 WARRANTY [NOT USED] 4 PART 2 - PRODUCTS [NOT USED] 5 PART 3 - EXECUTION [NOT USED] 6 END OF SECTION 7 Revision Log DATE NAME SUMMARY OF CHANGE 10/12/12 D. Johnson Modified Location of City's Standard Product List 4/7/2014 M.Domenech Revised for DAP application 8 CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised April 7, 2014 01 66 00 - 1 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Pagel of 4 I SECTION 0166 00 2 PRODUCT STORAGE AND HANDLING REQUIREMENTS 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Scheduling of product delivery 7 2. Packaging of products for delivery 8 3. Protection of products against damage from: 9 a. Handling 10 b. Exposure to elements or harsh environments 11 B. Deviations from this City of Fort Worth Standard Specification 12 1. None. 13 C. Related Specification Sections include, but are not necessarily limited to: 14 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 15 2. Division 1— General Requirements 16 1.2 PRICE AND PAYMENT PROCEDURES 17 A. Measurement and Payment 18 1. Work associated with this Item is considered subsidiary to the various Items bid. 19 No separate payment will be allowed for this Item. 20 1.3 REFERENCES [NOT USED] 21 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 22 1.5 SUBMITTALS [NOT USED] 23 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 24 1.7 CLOSEOUT SUBMITTALS [NOT USED] 25 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 26 1.9 QUALITY ASSURANCE [NOT USED] 27 1.10 DELIVERY AND HANDLING 28 A. Delivery Requirements 29 1. Schedule delivery of products or equipment as required to allow timely installation 30 and to avoid prolonged storage. 31 2. Provide appropriate personnel and equipment to receive deliveries. 32 3. Delivery trucks will not be permitted to wait extended periods of time on the Site 33 for personnel or equipment to receive the delivery. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised April 7, 2014 016600-2 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 2 of 4 1 4. Deliver products or equipment in manufacturer's original unbroken cartons or other 2 containers designed and constructed to protect the contents from physical or 3 environmental damage. 4 5. Clearly and fully mark and identify as to manufacturer, item and installation 5 location. 6 6. Provide manufacturer's instructions for storage and handling. 7 B. Handling Requirements 8 1. Handle products or equipment in accordance with these Contract Documents and 9 manufacturer's recommendations and instructions. 10 C. Storage Requirements 11 1. Store materials in accordance with manufacturer's recommendations and 12 requirements of these Specifications. 13 2. Make necessary provisions for safe storage of materials and equipment. 14 a. Place loose soil materials and materials to be incorporated into Work to prevent 15 damage to any part of Work or existing facilities and to maintain free access at 16 all times to all parts of Work and to utility service company installations in 17 vicinity of Work. 18 3. Keep materials and equipment neatly and compactly stored in locations that will 19 cause minimum inconvenience to other contractors, public travel, adjoining owners, 20 tenants and occupants. 21 a. Arrange storage to provide easy access for inspection. 22 4. Restrict storage to areas available on construction site for storage of material and 23 equipment as shown on Drawings, or approved by City's Project Representative. 24 5. Provide off -site storage and protection when on -site storage is not adequate. 25 a. Provide addresses of and access to off -site storage locations for inspection by 26 City's Project Representative. 27 6. Do not use lawns, grass plots or other private property for storage purposes without 28 written permission of owner or other person in possession or control of premises. 29 7. Store in manufacturers' unopened containers. 30 8. Neatly, safely and compactly stack materials delivered and stored along line of 31 Work to avoid inconvenience and damage to property owners and general public 32 and maintain at least 3 feet from fire hydrant. 33 9. Keep public and private driveways and street crossings open. 34 10. Repair or replace damaged lawns, sidewalks, streets or other improvements to 35 satisfaction of City's Project Representative. 36 a. Total length which materials may be distributed along route of construction at 37 one time is 1,000 linear feet, unless otherwise approved in writing by City's 38 Project Representative. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised April 7, 2014 016600-3 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 3 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2 - PRODUCTS [NOT USED] 4 PART 3 - EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATION [NOT USED] 7 3.3 PREPARATION [NOT USED] 8 3.4 ERECTION [NOT USED] 9 3.5 REPAIR / RESTORATION [NOT USED] 10 3.6 RE -INSTALLATION [NOT USED] 11 3.7 FIELD [OR] SITE QUALITY CONTROL 12 A. Tests and Inspections 13 1. Inspect all products or equipment delivered to the site prior to unloading. 14 B. Non -Conforming Work 15 1. Reject all products or equipment that are damaged, used or in any other way 16 unsatisfactory for use on the project. 17 3.8 SYSTEM STARTUP [NOT USED] 18 3.9 ADJUSTING [NOT USED] 19 3.10 CLEANING [NOT USED] 20 3.11 CLOSEOUT ACTIVITIES [NOT USED] 21 3.12 PROTECTION 22 A. Protect all products or equipment in accordance with manufacturer's written directions. 23 B. Store products or equipment in location to avoid physical damage to items while in 24 storage. 25 C. Protect equipment from exposure to elements and keep thoroughly dry if required by 26 the manufacturer. 27 3.13 MAINTENANCE [NOT USED] 28 3.14 ATTACHMENTS [NOT USED] 29 END OF SECTION 30 CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised April 7, 2014 01 66 00 - 4 DAP PRODUCT STORAGE AND HANDLING REQUIREMENTS Page 4 of 4 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised April 7, 2014 01 70 00 - 1 DAP MOBILIZATION AND REMOBILIZATION Pagel of 4 1 SECTION 0170 00 2 MOBILIZATION AND REMOBILIZATION 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 1. Mobilization and Demobilization a. Mobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies to the Site 2) Establishment of necessary general facilities for the Contractor's operation at the Site 3) Premiums paid for performance and payment bonds 4) Transportation of Contractor's personnel, equipment, and operating supplies to another location within the designated Site 5) Relocation of necessary general facilities for the Contractor's operation from 1 location to another location on the Site. b. Demobilization 1) Transportation of Contractor's personnel, equipment, and operating supplies away from the Site including disassembly 2) Site Clean-up 3) Removal of all buildings and/or other facilities assembled at the Site for this Contract c. Mobilization and Demobilization do not include activities for specific items of work that are for which payment is provided elsewhere in the contract. 2. Remobilization a. Remobilization for Suspension of Work specifically required in the Contract Documents or as required by City includes: 1) Demobilization a) Transportation of Contractor's personnel, equipment, and operating supplies from the Site including disassembly or temporarily securing equipment, supplies, and other facilities as designated by the Contract Documents necessary to suspend the Work. b) Site Clean-up as designated in the Contract Documents 2) Remobilization a) Transportation of Contractor's personnel, equipment, and operating supplies to the Site necessary to resume the Work. b) Establishment of necessary general facilities for the Contractor's operation at the Site necessary to resume the Work. 3) No Payments will be made for: a) Mobilization and Demobilization from one location to another on the Site in the normal progress of performing the Work. b) Stand-by or idle time c) Lost profits 3. Mobilizations and Demobilization for Miscellaneous Projects CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised April 7, 2014 017000-2 DAP MOBILIZATION AND REMOBILIZATION Page 2 of 4 1 a. Mobilization and Demobilization 2 1) Mobilization shall consist of the activities and cost on a Work Order basis 3 necessary for: 4 a) Transportation of Contractor's personnel, equipment, and operating 5 supplies to the Site for the issued Work Order. 6 b) Establishment of necessary general facilities for the Contractor's 7 operation at the Site for the issued Work Order 8 2) Demobilization shall consist of the activities and cost necessary for: 9 a) Transportation of Contractor's personnel, equipment, and operating 10 supplies from the Site including disassembly for each issued Work 11 Order 12 b) Site Clean-up for each issued Work Order 13 c) Removal of all buildings or other facilities assembled at the Site for 14 each Work Oder 15 b. Mobilization and Demobilization do not include activities for specific items of 16 work for which payment is provided elsewhere in the contract. 17 4. Emergency Mobilizations and Demobilization for Miscellaneous Projects 18 a. A Mobilization for Miscellaneous Projects when directed by the City and the 19 mobilization occurs within 24 hours of the issuance of the Work Order. 20 B. Deviations from this City of Fort Worth Standard Specification 21 1. None. 22 C. Related Specification Sections include, but are not necessarily limited to: 23 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 24 2. Division 1— General Requirements 25 1.2 PRICE AND PAYMENT PROCEDURES 26 A. Measurement and Payment 27 1. Mobilization and Demobilization 28 a. Measure 29 1) This Item is considered subsidiary to the various Items bid. 30 b. Payment 31 1) The work performed and materials furnished in accordance with this Item 32 are subsidiary to the various Items bid and no other compensation will be 33 allowed. 34 2. Remobilization for suspension of Work as specifically required in the Contract 35 Documents 36 a. Measurement 37 1) Measurement for this Item shall be per each remobilization performed. 38 b. Payment 39 1) The work performed and materials furnished in accordance with this Item 40 and measured as provided under "Measurement" will be paid for at the unit 41 price per each "Specified Remobilization" in accordance with Contract 42 Documents. 43 c. The price shall include: 44 1) Demobilization as described in Section 1.1.A.2.a.1) 45 2) Remobilization as described in Section 1.1.A.2.a.2) CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised April 7, 2014 017000-3 DAP MOBILIZATION AND REMOBILIZATION Page 3 of 4 1 d. No payments will be made for standby, idle time, or lost profits associated this 2 Item. 3 3. Remobilization for suspension of Work as required by City 4 a. Measurement and Payment 5 1) This shall be submitted as a Contract Claim in accordance with Article 10 6 of Section 00 72 00. 7 2) No payments will be made for standby, idle time, or lost profits associated 8 with this Item. 9 4. Mobilizations and Demobilizations for Miscellaneous Projects 10 a. Measurement 11 1) Measurement for this Item shall be for each Mobilization and 12 Demobilization required by the Contract Documents 13 b. Payment 14 1) The Work performed and materials furnished in accordance with this Item 15 and measured as provided under "Measurement" will be paid for at the unit 16 price per each "Work Order Mobilization" in accordance with Contract 17 Documents. Demobilization shall be considered subsidiary to mobilization 18 and shall not be paid for separately. 19 c. The price shall include: 20 1) Mobilization as described in Section 1.1.A.3.a.1) 21 2) Demobilization as described in Section 1.1.A.3.a.2) 22 d. No payments will be made for standby, idle time, or lost profits associated this 23 Item. 24 5. Emergency Mobilizations and Demobilizations for Miscellaneous Projects 25 a. Measurement 26 1) Measurement for this Item shall be for each Mobilization and 27 Demobilization required by the Contract Documents 28 b. Payment 29 1) The Work performed and materials furnished in accordance with this Item 30 and measured as provided under "Measurement" will be paid for at the unit 31 price per each "Work Order Emergency Mobilization" in accordance with 32 Contract Documents. Demobilization shall be considered subsidiary to 33 mobilization and shall not be paid for separately. 34 c. The price shall include 35 1) Mobilization as described in Section 1.1.A.4.a) 36 2) Demobilization as described in Section 1.1.A.3.a.2) 37 d. No payments will be made for standby, idle time, or lost profits associated this 38 Item. 39 1.3 REFERENCES [NOT USED] 40 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 41 1.5 SUBMITTALS [NOT USED] 42 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 43 1.7 CLOSEOUT SUBMITTALS [NOT USED] 44 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised April 7, 2014 01 70 00 - 4 DAP MOBILIZATION AND REMOBILIZATION Page 4 of 4 1 1.9 QUALITY ASSURANCE [NOT USED] 2 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 3 1.11 FIELD [SITE] CONDITIONS [NOT USED] 4 1.12 WARRANTY [NOT USED] 5 PART 2 - PRODUCTS [NOT USED] 6 PART 3 - EXECUTION [NOT USED] 7 END OF SECTION 8 9 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised April 7, 2014 017123-1 DAP CONSTRUCTION STAKING AND SURVEY Page 1 of 4 1 SECTION 01 71 23 2 CONSTRUCTION STAKING AND SURVEY 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Requirements for construction staking and construction survey 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1— General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Construction Staking 15 a. Measurement 16 1) This Item is considered subsidiary to the various Items bid. 17 b. Payment 18 1) The work performed and the materials furnished in accordance with this 19 Item are subsidiary to the various Items bid and no other compensation will 20 be allowed. 21 2. Construction Survey 22 a. Measurement 23 1) This Item is considered subsidiary to the various Items bid. 24 b. Payment 25 1) The work performed and the materials furnished in accordance with this 26 Item are subsidiary to the various Items bid and no other compensation will 27 be allowed. 28 1.3 REFERENCES [NOT USED] 29 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 30 1.5 SUBMITTALS 31 A. Submittals, if required, shall be in accordance with Section 0133 00. 32 B. All submittals shall be approved by the City prior to delivery. 33 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS 34 A. Certificates 35 1. Provide certificate certifying that elevations and locations of improvements are in 36 conformance or non-conformance with requirements of the Contract Documents. 37 a. Certificate must be sealed by a registered professional land surveyor in the 38 State of Texas. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised April 7, 2014 017123-2 DAP CONSTRUCTION STAKING AND SURVEY Page 2 of 4 B. Field Quality Control Submittals 2 1. Documentation verifying accuracy of field engineering work. 3 1.7 CLOSEOUT SUBMITTALS [NOT USED] 4 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 5 1.9 QUALITY ASSURANCE 6 A. Construction Staking 7 1. Construction staking will be performed by the City. 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 2. Coordination a. Contact City's Project Representative at least 2 weeks in advance for scheduling of Construction Staking. b. It is the Contractor's responsibility to coordinate staking such that construction activities are not delayed or negatively impacted. 3. General a. Contractor is responsible for preserving and maintaining stakes furnished by City. b. If in the opinion of the City, a sufficient number of stakes or markings have been lost, destroyed or disturbed, by Contractor's neglect, such that the contracted Work cannot take place, then the Contractor will be required to pay the City for new staking with a 25 percent markup. The cost for staking will be deducted from the payment due to the Contractor for the Project. B. Construction Survey 1. Construction Survey will be performed by the City. 2. Coordination a. Contractor to verify that control data established in the design survey remains intact. b. Coordinate with the City prior to field investigation to determine which horizontal and vertical control data will be required for construction survey. c. It is the Contractor's responsibility to coordinate Construction Survey such that construction activities are not delayed or negatively impacted. d. Notify City if any control data needs to be restored or replaced due to damage caused during construction operations. 1) City shall perform replacements and/or restorations. 3. General a. Construction survey will be performed in order to maintain complete and accurate logs of control and survey work as it progresses for Project Records. b. The Contractor will need to ensure coordination is maintained with the City to perform construction survey to obtain construction features, including but not limited to the following: 1) All Utility Lines a) Rim and flowline elevations and coordinates for each manhole or junction structure 2) Water Lines a) Top of pipe elevations and coordinates for waterlines at the following locations: (1) Every 250 linear feet CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised April 7, 2014 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 017123-3 DAP CONSTRUCTION STAKING AND SURVEY Page 3 of 4 (2) Horizontal and vertical points of inflection, curvature, etc. (All Fittings) (3) Cathodic protection test stations (4) Sampling stations (5) Meter boxes/vaults (All sizes) (6) Fire lines (7) Fire hydrants (8) Gate valves (9) Plugs, stubouts, dead-end lines (10) Air Release valves (Manhole rim and vent pipe) (11) Blow off valves (Manhole rim and valve lid) (12) Pressure plane valves (13) Cleaning wyes (14) Casing pipe (each end) b) Storm Sewer (1) Top of pipe elevations and coordinates at the following locations: (a) Every 250 linear feet (b) Horizontal and vertical points of inflection, curvature, etc. c) Sanitary Sewer (1) Top of pipe elevations and coordinates for sanitary sewer lines at the following locations: (a) Every 250 linear feet (b) Horizontal and vertical points of inflection, curvature, etc. (c) Cleanouts c. Construction survey will be performed in order to maintain complete and accurate logs of control and survey work associated with meeting or exceeding the line and grade required by these Specifications. d. The Contractor will need to ensure coordination is maintained with the City to perform construction survey and to verify control data, including but not limited to the following: 1) Established benchmarks and control points provided for the Contractor's use are accurate 2) Benchmarks were used to furnish and maintain all reference lines and grades for tunneling 3) Lines and grades were used to establish the location of the pipe 4) Submit to the City copies of field notes used to establish all lines and grades and allow the City to check guidance system setup prior to beginning each tunneling drive. 5) Provide access for the City to verify the guidance system and the line and grade of the carrier pipe on a daily basis. 6) The Contractor remains fully responsible for the accuracy of the work and the correction of it, as required. 7) Monitor line and grade continuously during construction. 8) Record deviation with respect to design line and grade once at each pipe joint and submit daily records to City. 9) If the installation does not meet the specified tolerances, immediately notify the City and correct the installation in accordance with the Contract Documents. 49 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised April 7, 2014 01 71 23 - 4 DAP CONSTRUCTION STAKING AND SURVEY Page 4 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2 - PRODUCTS [NOT USED] 4 PART 3 - EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATION [NOT USED] 7 3.3 PREPARATION [NOT USED] 8 3.4 APPLICATION 9 3.5 REPAIR / RESTORATION [NOT USED] 10 3.6 RE -INSTALLATION [NOT USED] 11 3.7 FIELD [OR] SITE QUALITY CONTROL 12 A. It is the Contractor's responsibility to maintain all stakes and control data placed by the 13 City in accordance with this Specification. 14 B. Do not change or relocate stakes or control data without approval from the City. 15 3.8 SYSTEM STARTUP [NOT USED] 16 3.9 ADJUSTING [NOT USED] 17 3.10 CLEANING [NOT USED] 18 3.11 CLOSEOUT ACTIVITIES [NOT USED] 19 3.12 PROTECTION [NOT USED] 20 3.13 MAINTENANCE [NOT USED] 21 3.14 ATTACHMENTS [NOT USED] 22 END OF SECTION 23 Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application 24 CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised April 7, 2014 017423-1 DAP CLEANING Pagel of 4 1 SECTION 0174 23 2 CLEANING 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Intermediate and final cleaning for Work not including special cleaning of closed 7 systems specified elsewhere 8 B. Deviations from this City of Fort Worth Standard Specification 9 1. None. 10 C. Related Specification Sections include, but are not necessarily limited to: 11 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 12 2. Division 1— General Requirements 13 3. Section 32 92 13 — Hydro -Mulching, Seeding and Sodding 14 1.2 PRICE AND PAYMENT PROCEDURES 15 A. Measurement and Payment 16 1. Work associated with this Item is considered subsidiary to the various Items bid. 17 No separate payment will be allowed for this Item. 18 1.3 REFERENCES [NOT USED] 19 1.4 ADMINISTRATIVE REQUIREMENTS 20 A. Scheduling 21 1. Schedule cleaning operations so that dust and other contaminants disturbed by 22 cleaning process will not fall on newly painted surfaces. 23 2. Schedule final cleaning upon completion of Work and immediately prior to final 24 inspection. 25 1.5 SUBMITTALS [NOT USED] 26 1.6 ACTION SUBMITTALS/INFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE [NOT USED] 30 1.10 STORAGE, AND HANDLING 31 A. Storage and Handling Requirements 32 1. Store cleaning products and cleaning wastes in containers specifically designed for 33 those materials. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised April 7, 2014 01 74 23 - 2 DAP CLEANING Page 2 of 4 1 1.11 FIELD [SITE] CONDITIONS [NOT USED] 2 1.12 WARRANTY [NOT USED] 3 PART 2 - PRODUCTS 4 2.1 OWNER -FURNISHED [OR] OWNER-SUPPLIEDPRODUCTS [NOT USED] 5 2.2 MATERIALS 6 A. Cleaning Agents 7 1. Compatible with surface being cleaned 8 2. New and uncontaminated 9 3. For manufactured surfaces 10 a. Material recommended by manufacturer 11 2.3 ACCESSORIES [NOT USED] 12 2.4 SOURCE QUALITY CONTROL [NOT USED] 13 PART 3 - EXECUTION 14 3.1 INSTALLERS [NOT USED] 15 3.2 EXAMINATION [NOT USED] 16 3.3 PREPARATION [NOT USED] 17 3.4 APPLICATION [NOT USED] 18 3.5 REPAIR / RESTORATION [NOT USED] 19 3.6 RE -INSTALLATION [NOT USED] 20 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 21 3.8 SYSTEM STARTUP [NOT USED] 22 3.9 ADJUSTING [NOT USED] 23 3.10 CLEANING 24 A. General 25 1. Prevent accumulation of wastes that create hazardous conditions. 26 2. Conduct cleaning and disposal operations to comply with laws and safety orders of 27 governing authorities. 28 3. Do not dispose of volatile wastes such as mineral spirits, oil or paint thinner in 29 storm or sanitary drains or sewers. 30 4. Dispose of degradable debris at an approved solid waste disposal site. 31 5. Dispose of nondegradable debris at an approved solid waste disposal site or in an 32 alternate manner approved by City and regulatory agencies. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised April 7, 2014 01 74 23 - 3 DAP CLEANING Page 3 of 4 1 6. Handle materials in a controlled manner with as few handlings as possible. 2 7. Thoroughly clean, sweep, wash and polish all Work and equipment associated with 3 this project. 4 8. Remove all signs of temporary construction and activities incidental to construction 5 of required permanent Work. 6 9. If project is not cleaned to the satisfaction of the City, the City reserves the right to 7 have the cleaning completed at the expense of the Contractor. 8 10. Do not burn on -site. 9 B. Intermediate Cleaning during Construction 10 1. Keep Work areas clean so as not to hinder health, safety or convenience of 11 personnel in existing facility operations. 12 2. At maximum weekly intervals, dispose of waste materials, debris and rubbish. 13 3. Confine construction debris daily in strategically located container(s): 14 a. Cover to prevent blowing by wind 15 b. Store debris away from construction or operational activities 16 c. Haul from site at a minimum of once per week 17 4. Vacuum clean interior areas when ready to receive finish painting. 18 a. Continue vacuum cleaning on an as -needed basis, until Final Acceptance. 19 5. Prior to storm events, thoroughly clean site of all loose or unsecured items, which 20 may become airborne or transported by flowing water during the storm. 21 C. Exterior (Site or Right of Way) Final Cleaning 22 1. Remove trash and debris containers from site. 23 a. Re -seed areas disturbed by location of trash and debris containers in accordance 24 with Section 32 92 13. 25 2. Sweep roadway to remove all rocks, pieces of asphalt, concrete or any other object 26 that may hinder or disrupt the flow of traffic along the roadway. 27 3. Clean any interior areas including, but not limited to, vaults, manholes, structures, 28 junction boxes and inlets. 29 4. If no longer required for maintenance of erosion facilities, and upon approval by 30 City, remove erosion control from site. 31 5. Clean signs, lights, signals, etc. 32 3.11 CLOSEOUT ACTIVITIES [NOT USED] 33 3.12 PROTECTION [NOT USED] 34 3.13 MAINTENANCE [NOT USED] 35 3.14 ATTACHMENTS [NOT USED] 36 37 38 39 40 CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised April 7, 2014 01 74 23 - 4 DAP CLEANING Page 4 of 4 END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP application CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised April 7, 2014 1 2 3 PART1- GENERAL 4 1.1 SUMMARY SECTION 01 7719 CLOSEOUT REQUIREMENTS 017719-1 DAP CLOSEOUT REQUIREMENTS Pagel of 3 5 A. Section Includes: 6 1. The procedure for closing out a contract 7 B. Deviations from this City of Fort Worth Standard Specification 8 1. None. 9 C. Related Specification Sections include, but are not necessarily limited to: 10 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 11 2. Division 1— General Requirements 12 1.2 PRICE AND PAYMENT PROCEDURES 13 A. Measurement and Payment 14 1. Work associated with this Item is considered subsidiary to the various Items bid. 15 No separate payment will be allowed for this Item. 16 1.3 REFERENCES [NOT USED] 17 1.4 ADMINISTRATIVE REQUIREMENTS 18 A. Guarantees, Bonds and Affidavits 19 1. No application for final payment will be accepted until all guarantees, bonds, 20 certificates, licenses and affidavits required for Work or equipment as specified are 21 satisfactorily filed with the City. 22 B. Release of Liens or Claims 23 1. No application for final payment will be accepted until satisfactory evidence of 24 release of liens has been submitted to the City. 25 1.5 SUBMITTALS 26 A. Submit all required documentation to City's Project Representative. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised April 7, 2014 017719-2 DAP CLOSEOUT REQUIREMENTS Page 2 of 3 1.6 INFORMATIONAL SUBMITTALS [NOT USED] 2 1.7 CLOSEOUT SUBMITTALS [NOT USED] 3 PART 2 - PRODUCTS [NOT USED] 4 PART 3 - EXECUTION 5 3.1 INSTALLERS [NOT USED] 6 3.2 EXAMINATION [NOT USED] 7 3.3 PREPARATION [NOT USED] 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 3.4 CLOSEOUT PROCEDURE A. Prior to requesting Final Inspection, submit: 1. Project Record Documents in accordance with Section 0178 39 2. Operation and Maintenance Data, if required, in accordance with Section 0178 23 B. Prior to requesting Final Inspection, perform final cleaning in accordance with Section 01 74 23. C. Final Inspection 1. After final cleaning, provide notice to the City Project Representative that the Work is completed. a. The City will make an initial Final Inspection with the Contractor present. b. Upon completion of this inspection, the City will notify the Contractor, in writing within 10 business days, of any particulars in which this inspection reveals that the Work is defective or incomplete. 2. Upon receiving written notice from the City, immediately undertake the Work required to remedy deficiencies and complete the Work to the satisfaction of the City. 3. Upon completion of Work associated with the items listed in the City's written notice, inform the City, that the required Work has been completed. Upon receipt of this notice, the City, in the presence of the Contractor, will make a subsequent Final Inspection of the project. 4. Provide all special accessories required to place each item of equipment in full operation. These special accessory items include, but are not limited to: a. Specified spare parts b. Adequate oil and grease as required for the first lubrication of the equipment c. Initial fill up of all chemical tanks and fuel tanks d. Light bulbs e. Fuses £ Vault keys g. Handwheels h. Other expendable items as required for initial start-up and operation of all equipment 39 D. Notice of Project Completion CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised April 7, 2014 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 017719-3 DAP CLOSEOUT REQUIREMENTS Page 3 of 3 1. Once the City Project Representative finds the Work subsequent to Final Inspection to be satisfactory, the City will issue a Notice of Project Completion (Green Sheet). E. Supporting Documentation 1. Coordinate with the City Project Representative to complete the following additional forms: a. Final Payment Request b. Statement of Contract Time c. Affidavit of Payment and Release of Liens d. Consent of Surety to Final Payment e. Pipe Report (if required) f. Contractor's Evaluation of City g. Performance Evaluation of Contractor F. Letter of Final Acceptance 1. Upon review and acceptance of Notice of Project Completion and Supporting Documentation, in accordance with General Conditions, City will issue Letter of Final Acceptance and release the Final Payment Request for payment. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] DATE NAME 4/7/2014 M.Domenech END OF SECTION Revision Log SUMMARY OF CHANGE Revised for DAP application CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised April 7, 2014 017823-1 DAP OPERATION AND MAINTENANCE DATA Pagel of 5 1 SECTION 0178 23 2 OPERATION AND MAINTENANCE DATA 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Product data and related information appropriate for City's maintenance and 7 operation of products furnished under Contract 8 2. Such products may include, but are not limited to: 9 a. Traffic Controllers 10 b. Irrigation Controllers (to be operated by the City) 11 c. Butterfly Valves 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include, but are not necessarily limited to: 15 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 16 2. Division 1— General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various Items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS 23 A. Schedule 24 1. Submit manuals in final form to the City within 30 calendar days of product 25 shipment to the project site. 26 1.5 SUBMITTALS 27 A. Submittals shall be in accordance with Section 01 33 00. All submittals shall be 28 approved by the City prior to delivery. 29 1.6 INFORMATIONAL SUBMITTALS 30 A. Submittal Form 31 1. Prepare data in form of an instructional manual for use by City personnel. 32 2. Format 33 a. Size: 8 % inches x 11 inches 34 b. Paper 35 1) 40 pound minimum, white, for typed pages 36 2) Holes reinforced with plastic, cloth or metal 37 c. Text: Manufacturer's printed data, or neatly typewritten CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised April 7, 2014 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 01 78 23 - 2 DAP OPERATION AND MAINTENANCE DATA Page 2 of 5 d. Drawings 1) Provide reinforced punched binder tab, bind in with text 2) Reduce larger drawings and fold to size of text pages. e. Provide fly -leaf for each separate product, or each piece of operating equipment. 1) Provide typed description of product, and major component parts of equipment. 2) Provide indexed tabs. f. Cover 1) Identify each volume with typed or printed title "OPERATING AND MAINTENANCE INSTRUCTIONS". 2) List: a) Title of Project b) Identity of separate structure as applicable c) Identity of general subject matter covered in the manual 3. Binders a. Commercial quality 3-ring binders with durable and cleanable plastic covers b. When multiple binders are used, correlate the data into related consistent groupings. 4. If available, provide an electronic form of the O&M Manual. B. Manual Content 1. Neatly typewritten table of contents for each volume, arranged in systematic order a. Contractor, name of responsible principal, address and telephone number b. A list of each product required to be included, indexed to content of the volume c. List, with each product: 1) The name, address and telephone number of the subcontractor or installer 2) A list of each product required to be included, indexed to content of the volume 3) Identify area of responsibility of each 4) Local source of supply for parts and replacement d. Identify each product by product name and other identifying symbols as set forth in Contract Documents. 2. Product Data a. Include only those sheets which are pertinent to the specific product. b. Annotate each sheet to: 1) Clearly identify specific product or part installed 2) Clearly identify data applicable to installation 3) Delete references to inapplicable information 3. Drawings a. Supplement product data with drawings as necessary to clearly illustrate: 1) Relations of component parts of equipment and systems 2) Control and flow diagrams b. Coordinate drawings with information in Project Record Documents to assure correct illustration of completed installation. c. Do not use Project Record Drawings as maintenance drawings. 4. Written text, as required to supplement product data for the particular installation: a. Organize in consistent format under separate headings for different procedures. b. Provide logical sequence of instructions of each procedure. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised April 7, 2014 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 01 78 23 - 3 DAP OPERATION AND MAINTENANCE DATA Page 3 of 5 5. Copy of each warranty, bond and service contract issued a. Provide information sheet for City personnel giving: 1) Proper procedures in event of failure 2) Instances which might affect validity of warranties or bonds C. Manual for Materials and Finishes 1. Submit 5 copies of complete manual in final form. 2. Content, for architectural products, applied materials and finishes: a. Manufacturer's data, giving full information on products 1) Catalog number, size, composition 2) Color and texture designations 3) Information required for reordering special manufactured products b. Instructions for care and maintenance 1) Manufacturer's recommendation for types of cleaning agents and methods 2) Cautions against cleaning agents and methods which are detrimental to product 3) Recommended schedule for cleaning and maintenance 3. Content, for moisture protection and weather exposure products: a. Manufacturer's data, giving full information on products 1) Applicable standards 2) Chemical composition 3) Details of installation b. Instructions for inspection, maintenance and repair D. Manual for Equipment and Systems 1. Submit 5 copies of complete manual in final form. 2. Content, for each unit of equipment and system, as appropriate: a. Description of unit and component parts 1) Function, normal operating characteristics and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Operating procedures 1) Start-up, break-in, routine and normal operating instructions 2) Regulation, control, stopping, shut -down and emergency instructions 3) Summer and winter operating instructions 4) Special operating instructions c. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Alignment, adjusting and checking d. Servicing and lubrication schedule 1) List of lubricants required e. Manufacturer's printed operating and maintenance instructions f. Description of sequence of operation by control manufacturer 1) Predicted life of parts subject to wear 2) Items recommended to be stocked as spare parts g. As installed control diagrams by controls manufacturer h. Each contractor's coordination drawings 1) As installed color coded piping diagrams CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised April 7, 2014 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 01 78 23 - 4 DAP OPERATION AND MAINTENANCE DATA Page 4 of 5 i. Charts of valve tag numbers, with location and function of each valve j. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage k. Other data as required under pertinent Sections of Specifications 3. Content, for each electric and electronic system, as appropriate: a. Description of system and component parts 1) Function, normal operating characteristics, and limiting conditions 2) Performance curves, engineering data and tests 3) Complete nomenclature and commercial number of replaceable parts b. Circuit directories of panelboards 1) Electrical service 2) Controls 3) Communications c. As installed color coded wiring diagrams d. Operating procedures 1) Routine and normal operating instructions 2) Sequences required 3) Special operating instructions e. Maintenance procedures 1) Routine operations 2) Guide to "trouble shooting" 3) Disassembly, repair and reassembly 4) Adjustment and checking f. Manufacturer's printed operating and maintenance instructions g. List of original manufacturer's spare parts, manufacturer's current prices, and recommended quantities to be maintained in storage h. Other data as required under pertinent Sections of Specifications 4. Prepare and include additional data when the need for such data becomes apparent during instruction of City's personnel. 30 1.7 CLOSEOUT SUBMITTALS [NOT USED] 31 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 32 1.9 QUALITY ASSURANCE 33 A. Provide operation and maintenance data by personnel with the following criteria: 34 1. Trained and experienced in maintenance and operation of described products 35 2. Skilled as technical writer to the extent required to communicate essential data 36 3. Skilled as draftsman competent to prepare required drawings CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised April 7, 2014 017823-5 DAP OPERATION AND MAINTENANCE DATA Page 5 of 5 1 1.10 DELIVERY, STORAGE, AND HANDLING [NOT USED] 2 1.11 FIELD [SITE] CONDITIONS [NOT USED] 3 1.12 WARRANTY [NOT USED] 4 PART 2 - PRODUCTS [NOT USED] 5 PART 3 - EXECUTION [NOT USED] 6 END OF SECTION 7 Revision Log DATE NAME SUMMARY OF CHANGE 8/31/2012 D. Johnson 1.5.A.1 — title of section removed 4/7/2014 M.Domenech Revised for DAP Application 8 CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised April 7, 2014 01 78 39 - 1 DAP PROJECT RECORD DOCUMENTS Pagel of 4 1 SECTION 0178 39 2 PROJECT RECORD DOCUMENTS 3 PART1- GENERAL 4 1.1 SUMMARY 5 A. Section Includes: 6 1. Work associated with the documenting the project and recording changes to project 7 documents, including: 8 a. Record Drawings 9 b. Water Meter Service Reports 10 c. Sanitary Sewer Service Reports 11 d. Large Water Meter Reports 12 B. Deviations from this City of Fort Worth Standard Specification 13 1. None. 14 C. Related Specification Sections include, but are not necessarily limited to: 15 1. Division 0 — Bidding Requirements, Contract Forms and Conditions of the Contract 16 2. Division 1— General Requirements 17 1.2 PRICE AND PAYMENT PROCEDURES 18 A. Measurement and Payment 19 1. Work associated with this Item is considered subsidiary to the various Items bid. 20 No separate payment will be allowed for this Item. 21 1.3 REFERENCES [NOT USED] 22 1.4 ADMINISTRATIVE REQUIREMENTS [NOT USED] 23 1.5 SUBMITTALS 24 A. Prior to submitting a request for Final Inspection, deliver Project Record Documents to 25 City's Project Representative. 26 1.6 ACTION SUBMITTALSANFORMATIONAL SUBMITTALS [NOT USED] 27 1.7 CLOSEOUT SUBMITTALS [NOT USED] 28 1.8 MAINTENANCE MATERIAL SUBMITTALS [NOT USED] 29 1.9 QUALITY ASSURANCE 30 A. Accuracy of Records 31 1. Thoroughly coordinate changes within the Record Documents, making adequate 32 and proper entries on each page of Specifications and each sheet of Drawings and 33 other Documents where such entry is required to show the change properly. 34 2. Accuracy of records shall be such that future search for items shown in the Contract 35 Documents may rely reasonably on information obtained from the approved Project 36 Record Documents. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised April 7, 2014 017839-2 DAP PROJECT RECORD DOCUMENTS Page 2 of 4 1 3. To facilitate accuracy of records, make entries within 24 hours after receipt of 2 information that the change has occurred. 3 4. Provide factual information regarding all aspects of the Work, both concealed and 4 visible, to enable future modification of the Work to proceed without lengthy and 5 expensive site measurement, investigation and examination. 6 1.10 STORAGE AND HANDLING 7 A. Storage and Handling Requirements 8 1. Maintain the job set of Record Documents completely protected from deterioration 9 and from loss and damage until completion of the Work and transfer of all recorded 10 data to the final Project Record Documents. 11 2. In the event of loss of recorded data, use means necessary to again secure the data 12 to the City's approval. 13 a. In such case, provide replacements to the standards originally required by the 14 Contract Documents. 15 1.11 FIELD [SITE] CONDITIONS [NOT USED] 16 1.12 WARRANTY [NOT USED] 17 PART 2 - PRODUCTS 18 2.1 OWNER -FURNISHED [OR] OWNER -SUPPLIED PRODUCTS [NOT USED] 19 2.2 RECORD DOCUMENTS 20 A. Job set 21 1. Promptly following receipt of the Notice to Proceed, secure from the City, at no 22 charge to the Contractor, 1 complete set of all Documents comprising the Contract. 23 B. Final Record Documents 24 1. At a time nearing the completion of the Work and prior to Final Inspection, provide 25 the City 1 complete set of all Final Record Drawings in the Contract. 26 2.3 ACCESSORIES [NOT USED] 27 2.4 SOURCE QUALITY CONTROL [NOT USED] 28 PART 3 - EXECUTION 29 3.1 INSTALLERS [NOT USED] 30 3.2 EXAMINATION [NOT USED] 31 3.3 PREPARATION [NOT USED] 32 3.4 MAINTENANCE DOCUMENTS 33 A. Maintenance of Job Set 34 1. Immediately upon receipt of the job set, identify each of the Documents with the 35 title, "RECORD DOCUMENTS - JOB SET". CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised April 7, 2014 017839-3 DAP PROJECT RECORD DOCUMENTS Page 3 of 4 1 2. Preservation 2 a. Considering the Contract completion time, the probable number of occasions 3 upon which the job set must be taken out for new entries and for examination, 4 and the conditions under which these activities will be performed, devise a 5 suitable method for protecting the job set. 6 b. Do not use the job set for any purpose except entry of new data and for review 7 by the City, until start of transfer of data to final Project Record Documents. 8 c. Maintain the job set at the site of work. 9 3. Coordination with Construction Survey 10 a. At a minimum clearly mark any deviations from Contract Documents 11 associated with installation of the infrastructure. 12 4. Making entries on Drawings 13 a. Record any deviations from Contract Documents. 14 b. Use an erasable colored pencil (not ink or indelible pencil), clearly describe the 15 change by graphic line and note as required. 16 c. Date all entries. 17 d. Call attention to the entry by a "cloud" drawn around the area or areas affected. 18 e. In the event of overlapping changes, use different colors for the overlapping 19 changes. 20 5. Conversion of schematic layouts 21 a. In some cases on the Drawings, arrangements of conduits, circuits, piping, 22 ducts, and similar items, are shown schematically and are not intended to 23 portray precise physical layout. 24 1) Final physical arrangement is determined by the Contractor, subject to the 25 City's approval. 26 2) However, design of future modifications of the facility may require 27 accurate information as to the final physical layout of items which are 28 shown only schematically on the Drawings. 29 b. Show on the job set of Record Drawings, by dimension accurate to within 1 30 inch, the centerline of each run of items. 31 1) Final physical arrangement is determined by the Contractor, subject to the 32 City's approval. 33 2) Show, by symbol or note, the vertical location of the Item ("under slab", "in 34 ceiling plenum", "exposed", and the like). 35 3) Make all identification sufficiently descriptive that it may be related 36 reliably to the Specifications. 37 c. The City may waive the requirements for conversion of schematic layouts 38 where, in the City's judgment, conversion serves no useful purpose. However, 39 do not rely upon waivers being issued except as specifically issued in writing 40 by the City. 41 B. Final Project Record Documents 42 1. Transfer of data to Drawings 43 a. Carefully transfer change data shown on the job set of Record Drawings to the 44 corresponding final documents, coordinating the changes as required. 45 b. Clearly indicate at each affected detail and other Drawing a full description of 46 changes made during construction, and the actual location of items. 47 c. Call attention to each entry by drawing a "cloud" around the area or areas 48 affected. CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised April 7, 2014 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 01 78 39 - 4 DAP PROJECT RECORD DOCUMENTS Page 4 of 4 d. Make changes neatly, consistently and with the proper media to assure longevity and clear reproduction. 2. Transfer of data to other Documents a. If the Documents, other than Drawings, have been kept clean during progress of the Work, and if entries thereon have been orderly to the approval of the City, the job set of those Documents, other than Drawings, will be accepted as final Record Documents. b. If any such Document is not so approved by the City, secure a new copy of that Document from the City at the City's usual charge for reproduction and handling, and carefully transfer the change data to the new copy to the approval of the City. 3.5 REPAIR / RESTORATION [NOT USED] 3.6 RE -INSTALLATION [NOT USED] 3.7 FIELD [OR] SITE QUALITY CONTROL [NOT USED] 3.8 SYSTEM STARTUP [NOT USED] 3.9 ADJUSTING [NOT USED] 3.10 CLEANING [NOT USED] 3.11 CLOSEOUT ACTIVITIES [NOT USED] 3.12 PROTECTION [NOT USED] 3.13 MAINTENANCE [NOT USED] 3.14 ATTACHMENTS [NOT USED] END OF SECTION Revision Log DATE NAME SUMMARY OF CHANGE 4/7/2014 M.Domenech Revised for DAP Application CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS — DEVELOPER AWARDED PROJECTS City Project #105491 Revised April 7, 2014 APPENDIX GR-01 60 00 Product Requirements CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number: 105491 Revised July 1, 2011 CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number: 105491 Revised July 1, 2011 GC-4.01 Availability of Lands THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number: 105491 Revised July 1, 2011 GC-4.02 Subsurface and Physical Conditions THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number: 105491 Revised July 1, 2011 GC-4.04 Underground Facilities THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number: 105491 Revised July 1, 2011 GC-4.06 Hazardous Environmental Condition at Site THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number: 105491 Revised July 1, 2011 GC-6.06.1) Minority and Women Owned Business Enterprise Compliance THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number: 105491 Revised July 1, 2011 GC-6.07 Wage Rates THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number: 105491 Revised July 1, 2011 GC-6.09 Permits and Utilities THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number: 105491 Revised July 1, 2011 GC-6.24 Nondiscrimination THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number: 105491 Revised July 1, 2011 GR-01 60 00 Product Requirements THIS PAGE LEFT INTENTIONALLY BLANK CITY OF FORT WORTH TAVOLO PARK, COMMERCIAL LOTS 1-5, BLOCK 2 STANDARD CONSTRUCTION SPECIFICATION DOCUMENTS City Project Number: 105491 Revised July 1, 2011 FORT WORTH. (Approval I I 07/23/97 I 04/26/00 I 04/26/00 I 1/26/99 I 5/13/05 I 1/26199 I 08/30/06 I 08/24/18 08/24/18 I 10/31/06 I 7/25/03 I 01/31/06 I 11/02/10 I 07/19/11 08/10/11 I 10/14/13 I 06/O1117 12/05/23 I 09/16/19 10/07/21 I 03/04/28/00 00/01 I 09/23/96 I 12/05/23 I 05/08/18 09/03/24 I 06/09/10 I 09/06/19 I 10/07/21 I 10/07/21 I 10/07/21 03/07/23 I 03/07/23 04/28/07 iWi47i4! I 14/23/01 I I 4/20/01 I 5/12/03 I 08/30/06 I Spec No. lClasssification CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Manufacturer I Model No. Water & Sewer - Manholes & Bases/Commments 33-39-10 (Rev 2/3/16) 3305 13 Urethane Hydrophilic Waterstop Asahi Kogyo K.K. Adeka Ultra -Seal P-201 33 05 13 Offset Joint for 4' Diam. MH Hanson Concrete Products Drawing No. 35-0048-001 33 05 13 Profile Gasket for 4' Diam. MH. Press -Seal Gasket Corp. 250-4G Gasket 33 05 13 HDPE Manhole Adjustment Rings Ladtech, Inc HDPE Adjustment Ring 33 05 13 Manhole External Wrap Canusa - CPS WrapidSeal Manhole Encapsulation System Water & Sewer - Manholes & Bases/Fiberelass 33-39-13 (1/8/13) 33 39 13 Fiberglass Manhole Fluid Containment, Inc. 33 39 13 Fiberglass Manhole L.F. Manufacturing Water & Sewer - Manholes & Bases/Frames & Covers/Rectangular 33-05-13 (Rev 2/3/16) 33 05 13 IManhole Frames and Covers I Western Iron Works, Bass & Hays Foundry ( Water & Sewer - Manholes & Bases/Frames & Covers/Standard (Round) 33-05-13 (Rev 2/3/16) 33 05 13 Manhole Frames and Covers Western Iron Works, Bass & Hays Foundry 33 05 13 Manhole Frames and Covers McKinley Iron Works Inc. 33 05 13 Manhole Frames and Covers Neenah Foundry, 33 05 13 Manhole Frames and Covers Neenah Foundry, 33 05 13 Manhole Frames and Covers Sigma Corporation 33 05 13 Manhole Frames and Covers Sigma Corporation 33 05 13 Manhole Frames and Covers Pont-A-Mousson 33 05 13 Manhole Frames and Covers Neenah Casting 33 05 13 Manhole Frame: and Covers (Hinged) Powerseal 33 05 13 Manhole Frames and Covers Saint-Gobain Pipelines (Pamrex/rexus) 33 05 13 30" Dia. MH Ring and Cover East Jordan Iron Works 33 05 13 30" Dia. MH Ring and Cover Sigma Corporation 33 05 13 30" Dia. MH Ring and Cover Star Pipe Products 33 05 13 30" Dia. MH Ring and Cover Accucast 33 05 13 30" Dia. MH Ring and Cover (Hinged & Lockable) East Jordan Iron Works 3405 13 30" Dia. MH Ring and Cover (Lockable) CI SIP Industries 3405 13 30" Dia. MH Ring and Cover (Hinged & Lockable) CI SIP Industries 33 05 13 30" Dia. MH Ring and Cover Composite Access Products, L.P. 3405 13 30" Dia. MH Ring and Cover Trumbull Manufacturing Flowtite National Spec ASTM 132240/13412/13792 ASTM C-443/C-361 ASTM 3753 30024 A 24 AM R-1272 ASTM A48 & AASHTO M306 NF 1274 ASTM A48 & AASHTO M306 MH-144N MH-143N GTS-STD Hinged Ductile Iron Manhole RE32-R8FS V1432-2 and V1483 Designs MH1651FWN & MH16502 MR32FTWSS-DC 220700 Heavy Duty with Gasket Ring 30" ERGO XL Assembly with Cam Lock/MPIC/T-Gasket 2280 (32") 4267WT - Hinged (32") CAP-ONE-30-FTW, Composite, w/ Lock w/o Hmg 32"(30") Frame and Cover Water & Sewer - Manholes & Bases/Frames & Covers/Water Tight & Pressure Tight 33-05-13 Bev 2/3/16) 33 05 13 Manhole Frames and Covers Pont-A-Mousson Pamtlgbt 33 05 13 Manhole Frames and Covers Neenah Casting 3305 13 Manhole Frames and Covers Western Iron Works,Bass & Hays Foundry 300-24P 3305 13 Manhole Frames and Covers McKinley Iron Works Inc. WPA24AM 33 05 13 Manhole Frames and Covers Accucast RC-2100 33 05 13 Manhole Frames and Covers (SIP)Scrampore Industries Private Ltd. 300-24-23.75 Ring and Cover Water & Sewer - Manholes & Bases/Precast Concrete ( tev 1/8/13) 33 39 10 Manhole, Precast Concrete Hydro Conduit Com 33 39 10 Manhole, Precast Concrete Wall Concrete Pipe Co. Inc. 33 39 10 Manhole, Precast Concrete Concrete Product Inc. 33 39 10 Manhole, Precast Concrete The Turner Company 33 39 10 Manhole, Precast Concrete The Turner Company 33 39 10 Manhole, Precast Concrete 33 39 10 Manhole, Precast (Reinforced Polymer)Concrete 33 3920 Manhole, Precast Concrete 32 39 20 Manhole, Precast Concrete 33 3920 Manhole, Precast (Reinforced Polymer) Concrete 33 39 20 Manhole, Precast (Hybrid) Polymer & PVC 33 39 20 Manhole, Precast Concrete 33 3920 Manhole, Precast (Reinforced Polymer) Concrete Manhole, Precast (Reinforced Polymer) Concrete Sewer -(WACI Wastewater Access Chamber 33 39 40 33 3920 I Wastewater Access Chamber Oldcastle Precast Inc. US Composite Pipe Forterra Pipe and Precast Fortera Pipe and Precast Armorock Geneva Pipe and Precast (Predl Systems) AmeriTex Pipe and Products, LLC P3 Polymers, RockHardscp Amitech USA Ouickstream Solutions, Inc. Water & Sewer - Manholes & Bases/Rehab Svstems/Cementitious E1-14 Manhole Rehab Systems Ouadex E I - 1 4 Manhole Rehab Systems Standard Cement Materials, Inc. E1-14 Manhole Rehab Systems AP/M Permaform EI-14 Manhole Rehab System Strong Company EI-14 Manhole Rehab System (Liner) Triplex Lining System General Concrete Repair FlexKrete Technologies SPL Item 449 48" I.D. Manhole w/ 32" Cone 72" I.D. Manhole w/ 32" Cone 48", 60" I.D. Manhole w/ 32" Cone Maritime, 32" Opening and Hat top, (No Transition Cones) Reinforced Polymer Concrete 60" & 72" I.D. Manhole w/32" Cone 48" I.D. Manhole w/32" Cone 48" & 60" I.D. Manhole w/32" Cone 48" & 60" I.D. Manhole w/32" Cone 48" & 60" I.D. Manhole w/32" Cone 48" & 60" I.D. Manhole w/32" Cone Meyer Polycrete Pipe Type 8 Maintenace Shaft (Poopit) Relincr ]VISE Strong Seal MS2A Rehab System MH repair product to stop infiltration Vinyl Polyester Repair Product ASTM A536 AASHTO M306-04 AASHTO M105 & ASTM A536 ASTM A 48 ASTM A 48 ASTM A 48 ASTM A 48 ASTM C 478 ASTM C-443 ASTM C 478 ASTM C 478 ASTM C 478 ASTM C 478 ASTM C-76 ASTM C-76 ASTM C-77 ASTM C-478; ASTM C-923; ASTM C-443 ASTM D5813 Updated: 11-6-24 Size SS MH Traffic and Non -traffic area Non -traffic area Non -traffic area 24"x40" WD 24" Dia. 24" Dia. 24" Dia. 30" Dia. 24" dia. 24" dia. 24" Dia, 30" Dia. 30" Dia. 30" Dia 30" Dia 30" Dia 30" Dia 30" Dia. 30" Dia. 30" Dia. 30" Dia. 24" Dia. 24" Dia. 24" Dia. 24" Dia. 24" Dia. 24" Dia. 48" 48" 48" w/32" cone I 72" I 48", 60" I 48" to 84" I.D. 48" to 72" I 60" & 72" I 48" I 48" & 60" I 48" & 60" Non Traffic Areas I I I I I For use when Std. MH cannot be installed due to depth I I I I I I I Misc. Use I I * From Original Standard Products List CITY OF FORT WORTH FORT WORTH. WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 11-6-24 (Approval Spec No. IClasssification I Manufacturer Model No. National Spec Size Water & Sewer - Manholes & Bases/Rehab Svstems/NonCementitious I 05/20/96 E1-14 Manhole Rehab Systems Smavrou, Spray Wall Polyurethane Coating ASTM D639/13790 I I 12/14/01 Coating for Corrosion protection(Exterior) ERTECH Series 20230 and 2100 (Asphatic Emulsion) Structures Only I I01/31/06 Coatings for Corrosion Protection Chesterton Are 791, S1HB, Sl, S2 Acid Resistance Test Sewer Applications I I8/28/2006 Coatings for Corrosion Protection Warren Environmental S-301 and M-301 Sewer Applications I 33 11 16, 33 39 11, RR&C Dampproofing Non-Fibered Spray For Exterior Coating of Concrete 03/19/18 333920 Coating for Corrosion protection(Exterior) Sherwin Williams Grade (Asphatic Emulsion) Structures Only I Water & Sewer - Manhole Inserts - Field Onerations Use Only (Rev 2/3/16) I I * 33 05 13 Manhole Insert Knutson Enterprises Made to Order - Plastic ASTM D 1248 For 24" dia. I I * 33 05 13 Manhole Insert South Western Packaging Made to Order - Plastic ASTM D 1248 For 24" dia. I I 33 05 13 Manhole Insert Noflow-Inflow Made to Order - Plastic ASTM D 1248 For 24" dia. I I 09/23/96 33 05 13 Manhole Insert Southwestern Packing & Seals, Inc. LifeSaver - Stainless Steel For 24" dia. I I 09/23/96 33 05 13 Manhole Insert Southwestern Packing & Seals, Inc. TetherLok - Stainless Steel For 24" dia I I Water & Sewer - Pine Casine Spacers 33-05-24 (07/01/13) I 11/04/02 Steel Band Casing Spacers Advanced Products and Systems, Inc. Carbon Steel Spacers, Model SI 02/02/93 Stainless Steel Casing Spacer Advanced Products and Systems, Inc. Stainless Steel Spacer, Model SSI 04/22/87 Casing Spacers Cascade Waterworks Manufacturing Casing Spacers 09/14/10 Stainless Steel Casing Spacer Pipeline Seal and Insulator Stainless Steel Casing Spacer Up to 48" 09/14/10 Coated Steel Casin Spacers Pipeline Seal and Insulator Coated Steel Casing Spacers Up to 48" 05/10/11 Stainless Steel Casing Spacer Powerseal 4810 Powerchock Up to 48" .311111. Casing Spacers BWM SS-12 Casing Spacer(Stainless Steel) FB-12 Casing Spacer (Coated Carbon Steel) .311-18 Casing Spacers BWM for Non_pressure Pipe and Grouted Casing 03/29/22 33 M 13 Casing Spacers CCI Pipeline Systems CSC12, CSS12 Per Manufacturers Requirements (Sewer 09/03/24 33 M 13 Casing Spacers Ravi (Completely HDPE) Applications Only) 8^ _ 12" (Sewer Only) I Water & Sewer - Pines/Ductile Iron 33-11-10(1/8/13) I I * 33 11 10 Ductile It. Pipe Griffin Pipe Products, Co. Super Bell-Tite Ductile Iron Pressure Pipe, AW WA C150, C151 I 3" thrn 24" 08/24/18 33 11 10 Ductile Iron Ape American Ductile Iron Pipe Co. American Futile Ape (Bell Spigot) AW WA C150, C151 4" thinin 30" 08/24/18 33 11 10 Ductile Iron Pipe American Ductile Iron Pipe Co. American Flex Ring (Restrained Joint) AW WA C150, C151 4" thou 30" * 33 11 10 Ductile Iron Pipe U.S. Pipe and Foundry Co. AW WA C150, C151 * 33 11 10 Ductile Iron Pipe McWane Cast Iron Pipe Co. AW WA C150, C151 I Water & Sewer - Utility Line Marker (08/24/2018) I I Sewer - Coatin�_,s/Enoxv 33-39-60 (01/08/13) I I 02/25/02 Epoxy Lining System Sauereisen, Inc S—Gard 21ORS LA County #210-1.33 I I 12/14/01 Epoxy Lining System Ertech Technical Coatings Ertech 2030 and 2100 Senes I I 04/14/05 Interior Ductile Iron Ape Coating Induron Protecto 401 ASTM B-117 Ductile Iron Ape Only I I01/31/06 Coatings for Corrosion Protection Chesterton Arc 791, S1HB, S1, S2 Acid Resistance Test Sewer Applications I I8/28/2006 I Coatings for Corrosron Protection Warren Environmental S-301 and M-301 Sewer Applications I I I Sewer - Coatings/Polvurethane I I I Sewer - Combination Air Valves I I 05/25/18 I 33-31-70 1 Air Release Valve A. -I. USA, Inc. D025LTP02(Composite Body) 2" I I I Sewer - Pioes/Concrete I * E1-04 Cone. Pipe, Reinforced Wall Concrete Pipe Co. Inc. ASTM C 76 I * EI-04 Conc. Pipe, Reinforced Hydro Conduit Corporation Class III T&G, SPL Item #77 ASTM C 76 I * EI-04 Conc. Pipe, Reinforced Hanson Concrete Products SPI. item #95 499 Rip.ASTM C 76 I * EI-04 Conc. Pipe, Reinforced Concrete Pipe & Products Co. Inc. ASTM C 76 I I Sewer - Pine Enlar¢ment Svstem (Method)33-31-23 (01/18/13) PIM System PIM Corporation Polyethylene ELM Corp., Piscam Way, N.J. Approved Previously I McConnell Systems McLat Construction Polyethylene Houston, Texas Approved Previously I I TRS Systems Trenchless Replacement System Polyethylene Calgary, Canada Approved Previously I I Sewer - Pioe/Fibemlass Reinforced/ 33-31-13(1/8/13) I 7/21/97 3331 13 Cent. Cast Fiberglass (FRP) Bob. Pipe USA, Inc. Bolus Pipe (Non -Pressure) ASTM D3262/D3754 I I 03/22/10 3331 13 Fiberglass Pipe (FRP) Amemn Bondstrand RPMP Pipe ASTM 133262/133754 I I 04/09/21 3331 13 Glass -Aber Reinforced Polymer Pipe (FRP) Thompson Pipe Group Thompson Pipe (Flowtite) ASTM D3262/D3754 I ASTM D3262, ASTM D3681, 03/07/23 3331 13 Fiberglass Pipe (FRP) Future Pipe Industries Fiberstrong FRP ASTM D4161, AW WA M45 ASTM D3262, ASTM D3517, 09/03/24 I 3331 13 Fiberglass Pipe (FRP) Supedit Boma Sanayi A.S. Superlrt PRE ASTM 3754, AW WA C950 I * From Original Standard Products List 2 CITY OF FORT WORTH FORT WORTH. WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 11-6-24 IApprovall Spec No. [Classsification I Manufacturer I Model No. I National Spec I Size Sewer - Pioe/Polvmer Pioe 4/14/05 Polymer Modified Concrete Pipe Amitech USA Meyer Polycrete Pipe AS— C33, A276, -11 8" to 102", Class V 06/09/10 E I-9 Reinforced Polymer Concrete Pipe US Composite Pipe Reinforced Polymer Concrete Pipe ASTM C-76 Sewer - Piues/HDPE 33-31-23(1/8/13) * hdsity polyethylene pipe Phillips Driscwpipe, Inc. Gpticore Ductile Polyethylene Pipe ASTM D 1248 8" * gh-densd polyethylene pipe �'Ih�gh-d-msitv Plexco Inc. ASTM D 1248 8" * gh-density polyethylene pipe Polly Pipe, Inc. ASTM D 1248 8" polyethylene pipe CSR Hydro CondurUPipelrne Systems McConnell Pipe Enlargement ASTM D 1248 Sewer - PiDes/PVC (Pressure Sewer) 33-11-12 (4/1/131 12/02/11 33-11-12 DR-14 PVC Pressure Pipe Pipette, Jctstream PVC Pressure Pipe AW WA C900 4" thru 12" 10/22/14 33-11-12 DR-14 PVC Pressure Pipe Royal Building Products Royal Seal PVC Pressure Pipe AW WA C900 4" thru 12" Sewer - PiDes/PVC* 33-31-20 (7/1/13) * 33-31-20 PVC Sewer Pipe 1-M Manufacturing Co., Inc. (1M Eagle) SDR-26 (PSI 15) ASTM D 3034 4" - 15" 12/23/97* 33-31-20 PVC Sewer Pipe Diamond Plastics Corporation SDR-26 (PSI 15) ASTM D 3034 4" thru 15" * 33-31-20 PVC Sewer Pipe Lamson Vylon Pipe SDR-26 (PSI 15) ASTM D 3034 4" thru 15" 12/05/23 33-31-20 PVC Sewer Pipe Vinyltech PVC Pipe SDR-26 (PSI 15) ASTM D3034 4" thru 15" 12/05/23 33-31-20 PVC Sewer Pipe Vinyltech PVC Pipe Gra rty Sewer PS 115 ASTM F 679 18" * 33-31-20 PVC Sewer Pipe 1-M Manufacturing Co, Inc. (1M Eagle) PS 115 ASTM F 679 18" - 28" 05/06/05 33-31-20 PVC Solid Wall Pipe Diamond Plastics Corporation PS 115 ASTM F-679 18" to 48" 04/27/06 33-31-20 PVC Sewer Fittings Harco SDR-26 (PS 115) Gasket Fittings ASTM D-3034, D-1784, etc 4" - 11" * 33-31-20 PVC Sewer Fittings Plastic Trends, Inc.(Westlak) Gasketed PVC Sewer Main Finings ASTM D 3034 3/19/2018 33 31 20 PVC Sewer Pipe Pipette Jet Stream SDR 26 (PS 115) ASTM F679 18"- 24" 3/19/2018 33 31 20 PVC Sewer Pipe Pipette Jet Stream SDR 26 ASTM D3034 4"- 15" 3/29/2019 33 3120 Gasketed Fittings (PVC) GPK Products, Inc. SDR 26 ASTM D3034 4"- 15" 10/21/2020 33 3120 PVC Sewer Pipe NAPCO(Westlak) SDR 26 ASTM D3034 4" - 15" 10/22/2020 33 3120 PVC Sewer Pipe Sanderson Pipe Corp. SDR 26 ASTM D3034 4"- 15" 10/21/2020 33 3120 PVC Sewer Pipe NAPCO(Westlak) SDR 26 PS 115 ASTM F-679 18"-36" * From Original Standard Products List FORT WORTH. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST (Approval Spec No. Classsification Manufacturer Model No. National Spec Water - Ammr enances 33-12-10 (07/01/13) 09/03/24 33-12-10 Double Strap Saddle Ford Meter Box Co, Inc. 202B 01/18/18 33-12-10 Double Strap Saddle Ronnie 202NS Nylon Coated AW WA C800 08/28/02 Double Strap Saddle Smith Blau 4317 Nylon Coated Double Strap Saddle 07/23/12 33-12-10 Double Strap Service Saddle Mueller Company DR2S Double (SS) Strap DI Saddle AW WA C800 03/07/23 33-12-10 Double Strap Service Saddle Powerseal 3450AS, Incl. Corp. Stop, Dbl Strap, Stainless NSF ANSI 372 10/27/97 Curb Stops -Ball Meter Valves McDonald 610UM,6100MT & 610MT 1./27/87 Curb Stops -Ball Meter Valves McDonald 4603B, 4604B, 6100M, 610OTM and 6101M FB600-7NL, FB1600-7-NL, FV23-777-W-NL, 111101. 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co, Inc. 122-77NL AW WA C800 FB600-6-NL, FB1600-6-NL, FV23-666-W- 5/25/2018 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co, Inc. NL, L22-66NL AW WA C800 FB600-4-NL, FB1600-4-NL, B11-444-WR- 1/25/2018 33-12-10 Curb Stops -Ball Meter Valves Ford Meter Box Co, Inc. NL, B22444-WR-NL, L28-44NL AW WA C800 B-25000N, B-24277N-3, B-20200N-3, H- AW WA C800, ANSF 61, 1/21/018 33-12-10 Club Stops -Ball Meter Valves Mueller Co, Ltd. 15000N, , H-1552N, H142276N ANSI/NSF 372 B-2500011b, B-20200N-3, B-24277N-3,H- AW WA C800, ANSF 61, 5/25/2018 33-12-10 Cub Stops -Ball Meter Valves Mueller Co, Ltd. 15000N, H-14276N, H-15525N ANSI/NSF 372 B-2500011b, B-20200N-3,H-15000N, H- AW WA C800, ANSF 61, 1/25/2018 33-12-10 Curb Stops -Ball Meter Valves Mueller Co, Ltd. 1553ON ANSI/NSF 372 01/26/00 Coated Tapping Saddle with Double SS Straps JCM Industries, Inc. #406 Double Band SS Saddle 0/5/21/12 33-12-25 Tapping Sleeve (Coated Steep JCM Industries, Inc. 412 Tapping Sleeve ESS AW WA C-223 03/29/22 33-12-25 Tapping Sleeve (Coated or Stainless Steep JCM Industries, Inc. 415 Tapping Sleeve AW WA C-223 05/10/11 Tapping Sleeve (Stainless Steep Powerseal 3490AS (Flange) & 3490MJ 02/29/12 33-12-25 Tapping Sleeve (Coated Steep Romac FTS 420 AW WA C-223 02/29/12 33-12-25 Tapping Sleeve (Stainless Steep Romac SST Stainless Steel AW WA C-223 02/29/12 33-12-25 Tapping Sleeve (Stainless Steep Romac SST III Stainless Steel AW WA C-223 05/10/11 Joint Repair Clamp Powerseal 3232 Bell Joint Repair Clamp Plastic Meter Box w/Composite Lid DFW Plastics Inc. DFW37C-12-1EPAF FTW Plastic Meter Box w/Composite Lid DFW Plastics Inc. DFW39C-12-1EPAF FTW 08/30/06 Plastic Meter Box w/Composite Lid DFW Plastics Inc. DFW65C-14-]EPAF FTW Concrete Meter Box Bass & Hays CMB37-B12 1118 LID-9 Concrete Meter Box Bass & Hays CMB-18-Dual 1416 LID-9 Concrete Meter Box Bass & Hays CMB65-B65 1527 LID-9 Water - Bolts. Nuts. and Gaskets 33-11-05 (01/08/13) None � Water - Combination Air Release 33-31-70 (01/08/13) * E1-11 Combination Air Release Valve * E1-I I Combination Air Release Valve * EI-11 Combination Air Release Valve Water - Dry Barrel Fire Hvdrants 33-12-40 (01/15/14) 10/01/87 E-1-12 Dry Barrel Fire Hydrant 03/31/88 E-1-12 Dry Barrel Fire Hydrant 09/30/87 E-1-12 Dry Barrel Fire Hydrant 01/12/93 E-1-12 Dry Barrel Fire Hydrant 08/24/88 E-1-12 Dry Barrel Fire Hydrant E-1-12 Dry Barrel Fire Hydrant 09/24/87 E-1-12 Dry Barrel Fire Hydrant 10/14/87 E-1-12 Dry Barrel Fire Hydrant 01/15/88 E1-12 Dry Barrel Fire Hydrant 10/09/87 E-1-12 Dry Barrel Fire Hydrant 09/16/87 E-1-12 Dry Barrel Fire Hydrant 08/12/16 33-12-40 Dry Barrel Fire Hydrant Water - Meters 02/05/93 E101-5 Detector Check Meter 08/05/04 Magnetic Drive Vertical Turbine GA Industries, Inc. Empire Air and Vacuum Valve, Model 935 ASTM A 126 Class B, ASTM A Multiplex Manufacnning Co. Crispin Air and Vacuum Valves, Model No. Valve and Primer Corp. APCO #143C, #145C and #147C Updated: 11-6-24 Size 1"-2" SVC, up to 16" Pipe 1"1" SVC, up to 24" Pipe 1"-2" SVC, up to 24" Pipe 1"-2" SVC, up to 24" Pipe 3/4" and 1" 1'/:" and 2" 2" 1-1/2" 1" 2" 1" 1"-2" Taps on up to 12" Up to 30" w/12" Out Concrete Pipe Only 4%8" and 16" U p to 42" w/24" Out Up to 24" w/12" Out Up to 30" w/12" Out 4" to 30" Class "A V&2" 1/2" 1"&2" 1" 2" & 3" American -Darling Valve Drawing Nos. 90-18608, 94-18560 AWWA C-502 American Darling Valve Shop Drawing No. 94-18791 AW WA C-502 Clow Corporation Shop Drawing No. D-19895 AW WA C-502 American AVK Company Model 2700 AW WA C-502 Clow Corporation Drawings D20435, D20436, B20506 AW WA C-502 ITT Kennedy Valve Shop Drawing No. D-80783FW AW WA C-502 M&H Valve Company Shop Drawing No. 13476 AW WA C-502 Shop Drawings No. 6461 Mueller Company A423 Centmron AW WA C-502 Shop Drawing FH-12 Mueller Company A-423 Super Centurion 200 AW WA C-502 U.S. Pipe & Foundry Shop Drawing No. 960250 AW WA C-502 American Flow Control (AFC) Waterous Pacer WB67 AW WA C-502 EJ (East Jordan Iron Works) WaterMaster 5CD250 Ames Company Model 1000 Detector Check Valve AW WA C550 4" - 10" Hersey Magnetic Drive Vertical AW WA C701, Class 1 3/4" - 6" * From Original Standard Products List 4 FORT WORTH. CITY OF FORT WORTH WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 11-6-24 IApprovall Spec No. IClasssification I Manufacturer Model No. National Spec Size Water - Pines/PVC (Pressure Water) 33-31-70 (01/08/13) AWWA C900, AWWA C605, 1.113 33-11-12 PVC Pressure Pipe Vinyltech PVC Pipe DR14 ASTM D1784 4"-16" AWWA C900, AWWA C605, 1.513 33-11-12 PVC Pressure Pipe Vinyltech PVC Pipe DR18 ASTM D1784 16"-18" AWWA C900, AWWA C605, 09/03/24 33-11-12 PVC Pressure Pipe Northern Pipe Products DR14 ASTM D1784 4"-16" AWWA C900, AWWA C605, 0.314 33-11-12 PVC Pressure Pipe Northern Pipe Products DR18 ASTM D1784 16"-18" 3/19/2018 33 11 12 PVC Pressure Pipe Pipelife Jet Stream DR14 AWWA C900 4"-12" 3/19/2018 33 11 12 PVC Pressure Pipe Pipelife Jet Stream DR18 AWWA C900 16"-24" 5/25/2018 3311 12 PVC Pressure Pipe Diamond Plastics Corporation DR 14 AWWA C900 4"-12" 5/25/2018 3311 12 PVC Pressure Pipe Diamond Plastics Corporation DR 18 AWWA C900 16"-24" AWWA C900-16 UL 1285 12/6/2018 3311 12 PVC Pressure Pipe J-M Manufacturing Co., Inc d/h/a JM Eagle DR 14 ANSIMSF 61 4"-28" FM 1612 AWWA C900-16 UL 1285 12/6/2018 33 11 12 PVC Pressure Pipe J-M Manufacturing Co., Inc d/h/a JM Eagle DR 18 ANSIMSF 61 16"-24" FM 1612 9/6/2019 3311 12 PVC Pressure Pipe Underground Solutions Inc. DR14 Fusible PVC AWWA C900 4" - 8" 9/6/2019 331112 PVC Pressure Pipe NAPCO(Westlake) DR18 AWWA C900 16"-24" 9/6/2019 331112 PVC Pressure Pipe NAPCO(Westlake) DR14 AWWA C900 4%12" 9/6/2019 3311 12 PVC Pressure Pipe Sanderson Pipe Corp. DR14 AWWA C900 4"- 12" Water - PinesNalves & Fittinas/Ductile Iron Fittings 33-11-11 (01/08/13) 07/23/92 EI-07 Ductile Iron Fittings 'tar Pope Produces, Inc. Mechanical Joint Fittings AWWA C153 & C110 * E1-07 Ductile Iron Fittings Griffin Pipe Products, Co. Mechanical Joint Fittiil� AWWA C 110 * E1-07 Ductile Iron Fittings McWane/Tyler Pipe/ Union Utilities Division Mechanical Joint Fittings, SSB ass 350 AW WA C 153, C 110, C l l l 08/11/98 E1-07 Ductile Iron Fittings Sigma, Co. Mechanical Joint Fittings, SSB Class 351 AWWA C 153, C 110, C 112 02/26/14 E1-07 MJ Fittings Accucast Class 350 C-153 MJ Fittings AW WA C153 4"-12" 05/14/98 EI-07 Ductile Iron Joint Restraints Ford Meter Box Co./Uni-Flange Uni-Flange Series 1400 AW WA Cl l l/C153 4" to 36" 05/14/98 E1-24 PVC Joint Restraints Ford Meter Box Co.fUni-Flange Uni-Flange Series 1500 Circle -Lock AW WA Cl l l/C153 4" to 24" 11/09/04 E1-07 Ductile Iron Joint Restraints One Bolt, be. One Bolt Restrained Joint Fitting AW WA C111/CI16/C153 4" to 12" 02/29/12 33-11-11 Ductile Iron Pipe Mechanical Joint Restraint EBAA Iron, Inc. Megalug Series 1100 (for DI Pipe) AW WA Cl l l/C116/C153 4" to 42" 02/29/12 33-11-11 PVC Pipe Mechanical Joint Restraint EBAA Iron, Inc. Megalug Series 2000(for PVC Pipe) AWWACIII/C116/CI53 4" to 24" 08/05/04 EI-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLC4 - SLCIO AWWA Cl I VC153 4" to 10" 03/06/19 33-I1-I1 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One-Lok SLCS4 - SLCS12 AWWA Cl I1/C153 4" to 12" 08/05/04 EI-07 Mechanical Joint Retainer Glands(PVC) Sigma, Co. Sigma One -Lk SLCE AWWA Cl I1/C153 12" to 24" 08/10/98 E1-07 MJ Fittings(DIP) Sigma, Co. Sigma One-Lok SLDE AWWA C153 4" - 24" 10/12/10 E1-24 Interior Restrained Joint System S & B Techncial Products Bulldog System ( Diamond Lok 21 & JM ASTM F-1624 4" to 12" 08/16/06 EI-07 Mechanical Joint Fittings SIP Industries(Serampore) Mechanical Joint Fittings AWWA C153 4" to 24" 11/07/16 33-I1-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc. PVC Stargrip Series 4000 ASTM A536 AW WA CIII 11/07/16 33-I1-11 Mechanical Joint Retainer Glands Star Pipe Products, Inc. DIP Stargrip Series 3000 ASTM A536 AW WA CIII EZ Grip Joint Restraint (EZD) Black For DIP 03/19/18 33-I1-11 Mechanical Joint Retainer Glands SIP Industries(Serampore) ASTM A536 AW WA CIII 3"-48" EZ Grip Joint Restraint (EZD) Red for C900 .11-18 3341-11 Mechanical Joint Retainer Glands SIP Industnes(Serampore) DR14 PVC Pipe ASTM A536 AW WA CI I I 4"-12" EZ Grip Joint Restraint (EZD) Red for C900 03/19/18 3341-11 Mechanical Joint Retainer Glands SIP Industnes(Serampore) DR18 PVC Pipe ASTM A536 AW WA C111 16"-24" * From Original Standard Products List 5 CITY OF FORT WORTH FORT WORTH. WATER DEPARTMENT STANDARD PRODUCT LIST Updated: 11-6-24 Approval Spec No. �Classsification Manufacturer Water Pinea & Fittings/Resilient Seated Gate 33-12-20 (05/13/151 Model No. National Spec Size - alves Resilient Wedged Gate Valve w/no Gears alve* American Flow Control Series 2500 Drawing # 94-20247 16" I 12/13/02 Resilient Wedge Gate Valve American Flow Control Series 2530 and Series 2536 AW WA C515 30" and 36" I 08/31/99 Resilient Wedge Gate Valve American Flow Control Series2520 & 2524 (SD 94-20255) AW WA C515 20" and 24" I 05/18/99 Resilient Wedge Gate Valve American Flow Control Series 2516 (SD 94-20247) AW WA C515 16" 10/24/00 E1-26 Resilient Wedge Gate Valve American Flow Control Series 2500 (Ductile Iron) AW WA C515 4" to 12" I 08/05/04 Resilient Wedge Gate Valve American Flow Control 42" and 48" AFC 2500 AW WA C515 42" and 48" I 05/23/91 EI-26 Resilient Wedge Gate Valve American AVK Company American AVK Resilient Seaded GV AW WA C509 4" to 12" I 01/24/02 EI-26 Resilient Wedge Gate Valve American AVK Company 20" and smaller I * E1-26 Resilient Seated Gate Valve Kennedy 4" - 12" I E1-26 Resilient Seated Gate Valve M&H 4" - 12" I * E1-26 Resilient Seated Gate Valve Mueller Co. 4" - 12" I 11/08/99 Resilient Wedge Gate Valve Mueller Co. Series A2361 (SD 6647) AW WA C515 16" I 01/23/03 Resilient Wedge Gate Valve Mueller Co. Series A2360 for 18"-24" (SD 6709) AW WA C515 24" and smaller I 05/13/05 Resilient Wedge Gate Valve Mueller Co. Mueller 30" & 36", C-515 AW WA C515 30" and 36" I 01/31/06 Resilient Wedge Gate Valve Mueller Co. Mueller 42" & 48", C-515 AW WA C515 42" and 48" 01/28/88 E1-26 Resilient Wedge Gate Valve Clow Valve Co. AW WA C509 4" - 12" I 10/04/94 Resilient Wedge Gate Valve Clow Valve Co. 16" RS GV (SD D-20995) AW WA C515 16" I 11/08/99 EI-26 Resilient Wedge Gate Valve Clow Valve Co. Clow RW Valve (SD D-21652) AW WA C515 24" and smaller I 11/29/04 Resilient Wedge Gate Valve Clow Valve Co. Clow 30" & 36" C-515 AW WA C515 30" and 36" (Note 3) 11/30/12 Resilient We�f Gate Valve Clow Valve Co. Clow Valve Model 2638 AWWA C515 24"to 48" me 3) 05/08/91 EI-26 Resilient Sea Gate Valve Stockham Valves & Fittings AW WA C 509, ANSI 420 -stem, 4" - ��n I E1-26 Resilient Seated Gate Valve U.S. Pipe and Foundry Co. Metrosea1250, requirements SPL #74 3" to 16" 11126116 33-12-20 Resilient Seated Gate Valve EJ (East Jordan Iron Works) El I'l—Master Gate Vat- & Boxes 08/24/18 Matco Gate Valve Matco-Norca 225 MR AW WA/ANSI C115/An21.15 4" to 16" I Water - PinesNalve9 & Fittings/Rubber Seated Butterfly Valve 33-12-21 (07/10/14). I I * E1-30 Rubber Seated Butterfly Valve Henry Pratt Co. AW WA C-504 24" I * E1-30 Rubber Seated Butterfly Valve Mueller Co. AW WA C-504 24"and smaller I 1/11/99 E1-30 Rubber Seated Butterfly Valve Dezmik Valves Co. AW WA C-504 24" and larger I 06/12/03 E1-30 Valmatic American Butterfly Valve Valmatic Valve and Manufacturing Com Valmatic American Butterfly Valve. AW WA C-504 Up to 84" diameter I 04/06/07 E1-30 Rubber Seated Butterfly Valve M&H Valve M&H Style 4500 & 1450 AW WA C-504 24" to 48" I 03/19/18 33 1221 Rubber Seated Butterfly Valve G. A. Industries (Golden Anderson) AW WA C504 Butterfly Valve AW WA C-504 30"-54" I 09/03/24 I 33 1221 Rubber Seated Butterfly Valve American AVK Company AW WA C504 Butterfly Valve Class 250B AW WA C-504 24" - 48" I Water - Polved vlene Encasement 33-11-10 (01/08/13) I 05/12/05 EI-13 Polyethylene Encasment Fl-.1 Packaging Fulton Enterprises AW WA C105 8 mil LLD I 05/12/05 E1-13 Polyethylene Encasment Mountain States Plastics (MSP) and AEP Ind. Standard Hardware AW WA C105 8 mil LLD I 05/12/05 EI-13 Polyethylene Encasment AEP Industries Bullstrong by Cowtown Bolt & Gasket AW WA C105 8 mil LLD I 09/06/19 33-I1-11 Polyethylene Encasment Northtown Products Inc. PE Encasement for DIP AW WA C105 8 mil LLD I Water - Samulfntr- Station I 03/07/23 33 12 50 lWatcr Sampling Station Kupf le Foundry Company Eclipse, Number 88 , 12-inch Depth ofBury As shown m s ec 33 12 50 09l02F24 3342-50 w.�.P - - This product removed Water - Automatic Flusher HG6-A-IN-2-BRN-LPRR(Portable) 10/21/20 Automated Flushing System Mueller Hydrogaard Mueller HG2-A-IN--2-PVGOl B-LPLG(Permanent) 04/09/21 Automated Flushing System Foundry Company Eclipse #9800wc 04/09/21 I Automated Flushing System Kupferle Foundry Company Eclipse #9700 (Portable) I The Fort Worth Water Department's Standard Products List has been developed to minimize the submittal review ofproducts which meet the Fort Worth Water Department's Standard Specifications during utility constmchon projects. When Technical Specifications for specific products, are included as part of the Construction Contract Documents, the requirements of the Technical Specification will override the Fort Worth Water Department's Standard Specifications and the Fort Worth Water Department's Standard Products List and approval ofthe specific products will be based on the requirements of the Technical Specification whether or not the specific product meets the Fort Worth Water Department's Standard Specifications or is on the Fort Worth Water —Yellow Highlight indicates recent changes * From Original Standard Products List 6 FORT WORTH® CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 2/4/2025 Coocrete Class A Sidewalk ADA Ramps. Driveways, Carb/Gutter. Median Pavement) 9/92022 0330 0 M. D.[ A—mm Concrete Company 30CAF029 3000 pet Concrete for Sidewalks & ADA Ramps 3-5" Slump; 36% Ar 6/24/2024 03 30 00 Mu Desigp Big Town Concrete `302050-1 '3000 psi Concrete for Curbs and Sidewalks 31" Slump, 3-6% Air 9/92022 03 30 00 Ma D.m Bumco Texas 30U101AG 3000 psi Concrete Mix for Flalwork 3-5" Slump; 36%An 4/12024 033000 Mu D'Ou, Bumco Texas 30U500BG i000Mi Conaete Mu for Sid—.&0 31"Slump, 3-6% Air 9192022 03 30 00 Mix Design Carder Concrete FWCC502001 3000 M, for Sidewalks, Dnveways, Ramps, Curb & Gi ua, Flalwork 3-5" Sfmp; 36%A. 9/92022 03 30 00 Mu Design Card. Coocrete FWCC502021 '3500 psi concrete for Sidewalks, Driveways, Ramps, Curb & Guner 3-5" Sfmp, 3-6% Ai, 9/92022 03 30 00 Mix Design Chisholm Titl Redr Ma C13020AE 3000 Mr Coocrete for Dnveways, Curb & Gutter 3-5" Slump; 4.5-7.5%Air 9/92022 03 3000 Mix Desist City Concrete Company 30HA20R 3000 psi Concrete Mu for Blocking, Sidewalks, Fl.Mmk, Pads 3-5" Slump, 36 %Air 9/9/2022 03 3000 Mix Design Cow Town RM, Ma 253-W 3000 psi Concrete Mur Sidewalks, ADA Ramps, Dnveways, Curb & Gutter, Safety End Treatment, Nov-TxDOT Retammg Walls 3-5" Shimp; 3-6% Air 9/9/2022 03 3000 Mix Desist Cow Town Redi Mu '250 3000 psi Concrete Mu for Sidewalks, Driveways, ADA Ramps 3-5" Slump; 3-6% Air 9/9/2022 03 3000 Mix Design Cow Town Red, Ma 350 3000 psi Concrete Ma for Sidewalks, Driveways, ADA Ramps 3-5" Sfmp; 3-6% An 1/29/2024 03 30 00 Mi. Design Eshada Ready Mu R3050AEWR 5.00 Sacks / 3,000 psi Concrete for Sidewalks, Ramps, £lets, and Manholes 3-5" Slump; 36%Air 9/92022 03 30 00 M. Dmm GCH Co— Se GCH4000 4000 psr Concrete for for Sidewalks, Ramps, Headwalls, £lets, and Storm Dim Stuu mres 3-5" Slump; 36 % Air 9/9/2022 03 3000 Mu Desimr Holchn - SOR, hi, -1261 3000 psi Concrete Mu for Sidewalks 3-5" Slump; 36 % Air 9/23/2024 03 3000 Mix Dmm Hofm, - SOR, fc 5177 3000 psr Concrete M. for Sidewalk., Cmbs and Gutters 3-1 Slump; 3-6% Av 9/92022 03 30 00 Mi. Design Hole. - SOR, fe. "5409 4000 psi Concrete Mu for Sidewalks, £lets _ 3-5" Slump; 3-6% Air 4/'/2023 03 30 00 Mix Dmum Liquid Smne C301D 3,000 psi Conaete for Sidewalks, Approaches, and Dnveways _ 3-5" Slump; 3-6% Air 9/92022 03 30 00 Mm D.rgn Martin Marietta R2136214 3,000 psi Coverete for Sidewalks & Ramps 3-5" Slump; 36 % Air 9/92022 03 30 00 Ma Design Martin Mariena R2136014 3,000 psi Concrete f. Sidewalks & Ramps 3-5" Slump; 3-6% Air _ 4/12023 03 30 00 Mu Design Mau. Marietta R2136N14 45 00 sacks / 3,000 psi concrete for Sidewalks 3-5" Slump, 3-6 Air 112023 03 30 00 Ma Design Mart. Manetta R2136R20 3,000 Mr Concrete for Sidewalks and Ramps 3-5" Sfmp; 36% An 6/12023 033000 3 30 00 M1. Design Martin Marietta R2136N20 i,000 mi Concrete for Sidewalks and Ramps 3-5" Sfmp, 3-6 Air 112/2022 03300 0 Ma Design Mart. Manetta R2141K24 4,000 Mr Conaete for Ju ctron Boxes, Sidewalks and Ramps 3-5" Sfmp; 3-6 An 4/72023 03 30 00 Mu Design Maum Marietta R2136K14 i,000 psi concrete for sidewalks and ramps 3-5" Sfmp, 3-6 Ai, 9/92022 03 30 00 Ma Desm Mmt. Manetta R2131314 3,000 psi Concrete for Srdewalks & Ramps 3-5" Sfmp; 36% Air 9/92022 033000 Ma Demgp Martm Marietta R2132214 '3,000 psi CoveretefrSidewalks&Ramos 3-5"Sfmp; 36%Air 9/9/2022 033009 Ma Design Mart. Mum. D9490SC 3,000 psi Conaete for Sidewalks & Ramps 3-5" Sfmp; 4.5-7.1- Av 10/4/2023 03 30 00 Ma Desimi NBR Ready Ma CLS A-ti Y -5.00 Sacks / 3,000 psi Coucreta fur Sidewalks & Ru,nps, and Cmb & Gutter 3-5" Slump; 36%Air l014/2023 03 30 00 Mix Design NBR Ready Ma CLS A -NY 5 00 Sacks / 3,000 psr Concrete for Sidewalks & Ramps, and Curb & Guner 3-5" Sfmp; 3-6% Air 7/]02023 033000 Ma Desfg Osbum 30A5OMR �SK/3,000 psi Concete for Sidewalks 3-5"Stu mp; 36 l/18/2023 03 30 00 Ma De Our Rapid Red, Ma RRM5020A 3000 psr Concrete for Curb, Gutter, Dnveways, Sulewalk R—M 3-5" Slump; 3-6% Air 1/24/2023 03 30 00 Ma Design Rapid Redi Mix RRM5525A 3600 psi Concrete for Sidewalks, Approach., ADA Ramps 3-5" Slump; 3-6% Air 9/92022 03 30 00 Ma Design Redr-Mur IOL11504 b 00 Sacks / 4,000 psr Concrete Mur for Sidewalks, Curb & Guner, Sewer Mauho1e, £lets, & Junction Boxes 3-5" Slump; 3-6% Air 10242024 03 30 00 Mix D.rgp SRM Coverete �30850 3000 per Concrete fr Sidewalks & ADA Ramps _ 3-5" SO—; 3-6% Alit 10242024 03 3000 Ma Design SRM Cgncrete 30350 3000 psi Conaete for Sidewalks &ADA Ramps 3-5" Slump; 35 % Air 10/182024 03 3000 Ufa Desigri �RM Concrete '30050 3000 mi Conerele for Sidewalks, Ramps, £lets, Junction Boxes, Thmst Blocks, Curb and Giulia, Driveways, Bamer Ramp _ 3-5" Slump; 3-6% Ail 9/92022 03 30 00 Ma Design Tarrant Cgncrete FW5025A 3000 psr Concrete M. f Curb &Guner, Driveways, Sidewalks, ADA Ramps 3-5" Slump; 3-6% Ai, 9/Z022 037000 Ma D.Our -T—um Concete CP5020A 3000 psi Concrete Ma fr Club and Gutta 3-5" Sfmp; 3-6% Air 10/102022 03 30 00 M. Design Taint Concrete TCFW5020A 3000 psi Concrete f Sidewalks 3-5" Sfmp; 36%An 9/92022 03 30 00 Ma Design _I'apant Concrete F W5525A2 3600 psi Concrete Ma for Sidewalks, Drive Approaches, ADA Ramp, Cuff and Gum, 3-5" Slump, 3-6% Air 9/9/2022 03 30 00 Ma Design Tmm Ready Ma 3020AE 3000 psi Concrete for Sidewalks 3-5" Sfmp; 36%An 9/92022 03 30 00 Ma Design -Tui Grit Redi Ma 0250.230 3W psi Concrete Ma for Flatwork Curb & Gun., Driveways, Sidewalks, ADA Ramps 3-5" Slump, 36%Ah 9/92022 033000 Ma De �ff,,JJ�� Grit Redi Ma 0250.2301 3000 psi Concrete Ma for Curb & Gutter, Dmeways, Sidewalks, ADA Ramps 3-5" Sfmp, 36%Air Tarr CB ao1ets, Msnbolea, Junction ♦Tme Boxes, Encasement. Blocking. Collars. Liahtoole Foundations) 9/9/2022 03 30 00 Ma Design A—... Concrete Company 40CNF065 4000 psi Concrete fur Manholes & Utility Sum—3-5" Sfmp; 0'%Av 9/9/2022 03 30 00 Ma Design Bumco Texas 40U500BG 4000 psi Concrete Ma for Storm Dmi, Stmctme , Driveways, Screen Walls, Collars 3-5" Slump, 36%Air 9/9/1022 03 30 00 M. De gn Town Red, Ma 255-2 3000 Ni Concrete Ma for Inlets, Thmst B1.1mu, Concrete Encasement mp; 36%A 3-5" Slump; 9/9/2022 03 30 00 _ Ma Design _Cow Cow Town Redi Ma `355 i000 psi Concrete Ma for h,lets, Throat Blockfg, Concrete Encasement 3-5" Slump, 3-6% Air 9/9/2022 03 30 00 Mix Design Cow Towv Red, Ma 255 3500 psr Coocrete Ma for Flatwork, I.- Thmst Bl k.g Concrete Encasement 3-5" Sfmp; 36%A. 9/9/2022 03 3000 Mix Desimr Cow Town Redi Ma '270 -5000 psi Concrete Ma for Cast -iv -Place Box Culverts 3-5" Ski— 36%Ah 9/9/2022 03 3000 Mix Design Cow Town Rerh Ma 370 5000 psi Concrete Mur for Cast -.-Place Box Culverts 3-5" Sfmp; 3-6% Air 9/92022 03 3000 Mix Design Cow Town Redi Ma `353 �3000 psi Concrete Ma for Sidewalks, ADA Ramps, Diu,— Curb & Gutt., Safety End Tmatimid , Non-TxDOT Remini g Walls 3-5" Slump, 3-6% Air 9/9/2022 03 3000 Ma Design Cow Town Red, M. 211 3600 Ni Concrete ma for Valley Gutters, L,glumle Foundations 3-5" Sfmp; 3-6% Air 9/9/2022 03 3000 Ma Design Cow T.—Redi Ma '357 '3600 psi CrMa for Valley Gutters, LigJ,tpole Foundations 3-5" Slump; 36 %Alit 9/9/2022 03 3000 Ma Design - Holum SOR, Inc. 1701 4000 M, Concrete Ma for Storm Drum Stru tt , Sanitary Sewer MaMoles, Junction Box 3-5" Sfmp; 3-6% Air 9/9/2022 03 3000 Ma Desimr Holchu - SOR, fc. ­551 '3000 psi Concrete Ma for Blocking 3-5" Slump; 3-6% Air 9/9/2022 03 3000 Ma Design Holcmr - SOR, fc 5409 4000 psr Concrete M,for Sidewalks, £lets 3-5" Slump; 3-6% Air 4/27/2023 03 3000 Ma Design Liquid Stone C361DNFA 3,600 psi Coverete for Retaining wa14 driveway, lmmmr box apron, approach 3-5" Slump; 3-6% Air 9/9/2022 03 3000 Mix Design Mart. Mancha R2141230 4,000 M, Conaete for Mm holes, £lets & Headwalls, Valve Pads 3-5" Slump; 3-6% Air 8/42023 03 30 00 Mi. Design Martf Marietta R2141R24 '5.53 Sacks / 4,000 psi Concrete for Junction Box, Hox Culvert, Sidewalks and Ramos. 3-5" Slump; 3-6% Air 11202023 03 30 00 Ma Design Martin Marietta R2146R33 b.OI Sacks / 4,000 psi Concrete Mur for COP Sewer Manholes 3-5" Slump; 3-6% Air 11202023 033001 Mi, Design Martin Mariena R2146K33 6.01 Sacks / 4,000 psr Concrete Mu for COPSewer Manholes. 3-5" Slump; 3-6% Ail 9/92022 03 30 00 Ma Design Martm Mariena R2142233 3,600 psi Conaete for Manholes, £lets & Headwalls 3-5" Slump; 4 5-7 5 %An 9/92022 033000 Ma Design Martin Marietta R2136224 i,600 psi Concrete for Curb £lets 3-5" Shunp, 3-6% Air 91M022 03 30 00 Ma Demgu Man. Manetta R2141233 3,600 per Concrete for Storm Snucmr., luk., Blockfg & Encasement 3-5" Sfmp; 36%Air 9/92022 03 30 00 Ma Design Maum Marietta R2146038 4,500 psi Concrete for £lets, Storm Drain SWctur. 3-5" Sfmp, 3-6% Air 10242024 03 30 00 Mix Demeo Mort. Mancha R2146K34 4000 per Concrete for flea, Manhol., Headwalls, Thmst Blocks, Collate 3-5" Sfmp; 36%Air 9/12/2023 03 3000 Ma Design NBR Ready Ma CLS PI-yY 6.00 Sacks / 4,000 psi Concrete for Collars, Manhol., Box Culverts 3-5" Sfmp, 36%Air 9/92022 03 30 00 Mix Design NBR Ready M. TX C-yY 3000 psi Concrete Ma for Curb £lets 3-5" Sfmp; 3-6% An 9/92022 03 30 00 Mi. Design NBR Ready Ma -fK C-NY '3000 psi Coumete Mm for Cmb £lets 3-5" Slump, 36 %Air 1/182023 03 30 00 Mix Design Raprd Rerh M. RRM5320A 3000 psr Concrete for Bl.&.g 3-5" Sfmp; 3-6% A. 1/18/2023 03 3000 Ma D.m Rapid Redi M. RRM6020ASS 4000 N, Concrete for Strom Dim Sttucmres 3-5" Sfmp; 36%An FORT WORTH® CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 2/4/2025 10242024 03 30 00 Mix Des i ISRM Concrete 10/ 4/ 0 4 03 30 00 M. Deetgt C n to 9/16/2024 0 30 00 Mi. D* SRM C vc ate 9/9/2022033000 Mix D—m JIISRM Tarrant Concrete 10/102022 033000 Mix DesJJffff�� Tarrant Concrete ss C walls. ♦Mine Ik Culverfa Dn16d DrHled SI� (fs Shafts) 9/92022 03 30 00 Ma Design Bum.. Texas 621/2023 033000 Mi. D* Cow Town Redi Mu 10/30/2024 03 30 00 Ma Design Esheda Ready Mix 12/52022 03 30 00 Mu Des0 Holcim - SOR, fc. 9/92022 03 30 00 Mu D—m Holcim - SOR, fc. 4/72023 03 30 00 Mu Desk md Stone b/27/2023 03 30 00 Mu Dessgn Maztm Manetta 6212021 03 30 00 Mu Des�IP Mart. Marietta 8/22/2024 03 30 00 Ma Design NBR Ready Mu 8/22/2024 033000 Ma Destm NBR Ready Mu Other AppHcafions 9/92022 033000 Mi. Desim Carder Concrete 9/92022 03 30 00 Ma D—m CityConcrete Company 9/92022 03 3000 Mi. 13`0 Cow Town Redi Mi. 9/9/2022 03 3000 Mix Design Cow T.: Redi Ma 9/9/2022 03 30 00 Mu 13`0 Cow Town Redi Mi. 1/9/2024 03 30 00 Ma Design Estrada Ready Ma 9/92022 033000 Mu es D GCH Concrete Services 9/92022 03 30 00 Ma Design H.Ic - SOR, fur. 4/12023 033000 Mis 13`0 Martf Marietta 8/30/2023 033000 Ma Design Mm. Mmu, 9/92022 033000 Mix D* Martin Marietta 9.022 033000 Mix Desgn SRM Concrete 9/9/2022 03 3000 Mi. D-0 SRMC were 4/12024 033000 Ma Design SRMConaete 9/9/2022 033000 M. 13s: P avfel Tummt Concrete 624/2024 32 1s3 1 Mix Dcs, Bll'��Town Concrete 6/24/2024 32 13 13 Ma Design Bi .Town ConcreAe 9/9/2022 321313 Mi. D* Carder Concrete 9/92022 321313 Mrs Desim Csrder Concrete 9/92022 321313 Mi. Des i City Concrete Compny 9/92022 33 l3 13 Mix Design Cow Tovm Rerli MM 11/142022 321313 Mu D* Cow T.—Redi Mi. 9/9/2022 32 l3 13 Mix Design C w Town 11 6 Ma 9/92022 32 l3 13 Mix D* Cow Town Redi Mi. 2/6/ 0 4 32 L313 Mix Design Estrada Re dy M. 8/42023 321313 Mix D* Martf Marietta l 12/2022 321313 Mix Design Mm. Mmumm l0/42023 3213 13 Ma D* NBR Ready�Mi, l0/4/2023 321313 Mix Design NBR ReadyM4, 321313 Ma es D SRM Coverers 10/242024 0242024 321313 Mix Design SRM Concrete 9/16/2021 321313 a MDesp SRM Coverers 111 2024 32 133 Ma Design SRM Concrete 9/92022 32 13 13 Ma Deslm Tarrant Co .... I, 9/9/2022 32 13 13 Mu Dessgu Tme Gnt Redi Mu 9/92022 p332,, 13 13 Ma Des D Pfced Tme Gut Redi M. Etas 9/92022 32 13 1� and vine) Mix Dca,p American Couerm, Com- 5/22023 32 13 13 Ma Design Big D Concrete 9/92022 32 13 13 Ma D* Bll'T�Town Concrete 9/92022 32 13 13 Ma Design Bigrown Co ... 10 9/92022 32 l3 13 Ma D* Bumco Texas 9/9/2022 321313 Ma Design Carder Concrete 9/92022 321313 Ma D* City Concrete Comppny 9/9/2022 32 l3 13 Mix Design C w Tr—Rerh MM�� 9/92022 32 l313 Ma D* Cow T.—Redi Ma l29/2024 321313 Mix Design Estrada Ready Mue 9/9/2022 32 l3 13 Ma D* GCH C vc ate Semcers l0/4/2024 321313 Ma Design H.IcmSOR, fc 9/9/2022 321313 Ma De10 Holcim--SOR,fc. ,1"022 321313 Mi. Desim Mum. Muria's �11350 4000 psi Concrete for flats, Manholes, Headwalls, Thmst Blocks, Collars 3-5" Sfmp, 36% Air 40850 4000ysi Concrete for Inlets, Manholes, Headwalls, Thmst Blocks, Collars 3-5" Slump; 36% Air F5050 350 W5320A 3006 1 Concrete M. fornBI.s.kmg �d Collars 3-5°Skurp;3h%Ar TCFW6025A2 4000psr Concre mrManholes 3-5"Sfmp;36%An 36U500BG 3600 psi Concrete Mu for Lmbfirm and Traffic Sims] Foundations (DrW d Shafts) 5 5-15" Sfmp; 36%An 360-DS 3600 wi Concrete for Drilled ShaO/Lightfg and Traffic Simal Foundation (Drilled Shafts) 5.5-7.5" Sfmp, 3fi% Air R36575AEWR 3600 psi Concrete for Dulled Shafl/Lighum and Traffic Simal Fumduum, (Drilled Shafts) 5 5-7 5" Skimp;3-6% An 1822 3600 mi Concrete for (Drilled Shafls)/Li6 mg and Traffic Simal Foundations 5.5-7.5" Sfmp, 0-3 % Air 1859 4000 psi Concrete for (Drilled Shafts)/Liubmw and Truth. Sims] Foundations 5 5-7 5" Skimp; 3-6% An C361DHR 3.600 psi Concrete for (DrM d Shaft)/Lighti u and Traffic Simal Foundations 5.5-7.5" Sfmp, 3fi% Air U2146N41 6 44s.ks / 3.600 psr Concrete for (DdU d Shaftsl / Lujium and Traffic Simal Fumdatmns 5-7" Sfmp; 36% AQ U2146K45 6.65 sacks /3.600 psi Concrete for (Drilled Shafts) / Li6 mg and Trafic Simal Foundations 5-7" Slmmp, 3fi%Air 135K2524 3500 psi Concrete fm (Drilled Shaft) Lishtpole Foundmmns 5 5" Sfmp; 341 Air 135K0524 3500 psi Concretefor(Drilled Shaft) LiAmule Foundatons 55"Sfmp;36%Air FWCC602001 4000 psi Concrete for Storm Drum SWcmres, Manholes, Headwalls, Retaining Walls, Valley Gutters, Drive Approaches 3-5" Sfmp, 3fi% Air 40LA2011 4000 psi Concrete Mu for Storm Dmf Su-mres 3-5" Sfmp; 36% An 260-2 3600 psi Concrete Mix for Box Culverts, Headwalls 3-5" Sfmp, 3fi%Air 360-1 3600 pei Concrete Mrs fr Box Culverts, Headwalls, Wmgwalls 3-5" Sfmp; 36% Air 260-1 3600 psi Concrete Mu for Headwalls 3-5" Sfmp, 3fi%Air R3655AEWR 5 50 Sacks / 3,600 psr Concrete for Headwalls, Wmgwalls, and Culverts 3-5" Sfmp; 36% An GCH4000 4000ysi Concrete for for Sidewalks, Ramps, Headwalls, (lets, and Storm Dmin Stmr[ 3-5" Sfmp, 3fi%Ah 1851 450(I pm Concrete for Storm Dram Structures, Hand Placed Pavmg 3-5" Slump; 3-6% Air 310LBP 3,600 R@i Concrete fr Retaini�� W'fl 3-5" Slump; I %Air P,2141R30 5 85 3 / 4,000 pei C vcrete It Box Culverts & Headwalls 3-5" Slump; 3-6% Air R2146035 4,000 psi Concrete for Mmholes, flats & Headwalls, Valve Pads 3-5" Slump; 36%Air 40050 4,000 Ni Concrete for Headwalls, Remmmg Wall, Collars 3-5" Slump; 3fi . An 35022 3,600 p.4i Covcr�tgf CJundLon Hox, Rmimim, Walls 3-5"Slump; 3fi%Air 45050 4500 psYi Concrete F r Storm Structures 3-5" Slump; 3fi%An FW6020A2 4000 psi Concrete Mi. for Storm Dram Structures 3-5" Slump; 3fi%Air 360060-1 362060-1 3600 4 Concrete for Machfe Placed Pavir� 3600 Ni Concrete for Machmce Placed Pavmg ".. Sfmp, 36%Air 1-3" Sfmp; 36'Air FWCC552091 3600 pi fur Machine Placed Pavfg 1 Y Shunp, 3fi%Air FWCC602091 4000 N, for Machme Paced Pavfg 1-3" Sfmp; 36%n A 36LA2011 3600 psi Concrete Mix for Machfe Placed Pavfg 1-3" Sfmp, 3fi%Air 257-M 3600 psi Concrete M. for Machme Placed Pavmg 1-3" Sfmp; 3- . An 357-M 3600 psi Concrete Mi. for Machfe Placed Pavfg 1-3" Slump, 3d%Air 260-M 4000 P.Concrete Mu for Machme Placed Pavmg 1-3" Slump;36 % An 360-M 4000 psi Concrete MixfrMachfe Placed Pavir� 1-3"Slump; 36-Ah TD3655AEWR 5 50 Sacks / 3,600 psr Concrete for Machme Plac� Pavmg 1-3" Slump; 36 % Air Q2141R21 5.69 sacks / 4,000 i Concrete for Machfe Placed Paving 1-Y Slump; 3fi % Air Q2141K30 4,000 psi Concree %r Machme Placed Pavmg 1-3"Slump; 3fi%An TX C SF-YY 5.50 Sacks / 3,600psi Concrete for Machine Placed Pavfg 1-Y Slump; 3fi % Air TX C SF -NY 5 50 Sacks / 3,60(I pm Concrete for Machme Placed Pavmg 1-3" Slump; 3-6% An 40068 4000ysr Concrete for Machine Placed Pavfg 1-3" Slump; 3fi % Air 40825 4006 pm Concrete for Machme Placed Pavmg 1-3" Slump; 35 % An 40025 4000ggsi Concrete for Machine Placed Pavfg 1-3" Slump; 3fi % Air 35023 360Qpm Conmem for Machme Paced Pavfg 1-Y Slump; 36 % An FW5520AMP 3600 psr Concrete for Machme Placed Paving 1-Y Slump; 3fi % Air 0255 2301 3600 Ni Concrete Ma for Machme Placed Pavmg 1-3" Sfmp; 3.56.5 % AQ 0260 2302 4000 psi Concrete Mu for M.N.e Paced Pavmg 1-3" Sfmp; 3.56.5%An 45CAF076 4500 p`� Concrete for Hand Placed Pavfg 3-5" Sfmp, 36%Air CM14520AE 4500 Ni Concrete fm Hand Placed Pavmg 3-5" Sfmp; 36% An 452065-1 Z0041, andJ�lacedgavfg 3-5" Sfmp, 3fi%Air 450065-1 0 N, haul placedm, ing 3-5" Sfmp; 3h% An 45U500BG 4500 p,51 Concrete Ma for Hand Placed Pavfg, Storm Structures 3-5" Sfmp, 36%Air FWCC602021 4500 N, concrete for Hand Pfced Pavmg 3-5" Sfmp; 36% An 45NA20H 4500 psi Concrete Ma for Hmd Placed Pavfg 3-5" Slump, 36%Ah 265 4500 psr Concrete M. for Hand Placed Pavmg 3-5" Slump;36 % An 365 4500 psi Concrete Ma for Hmd Placed Pavu� 3-5" Slump; 36 - Ah R4560AEWR/ 600 Sacks l4,500 psr Concrete for Hand Pla� Pavmg 3-5" Slump; 46.Av GCH4500 4500psi Concrete Hmd Placed Pavfg 3-5" Slump; 3-6% Air 55" 450Q psr Concrete Hand Placed Pavmg 3-5" Slump; 3fi % An 1851 4500 psi Concrete for Storm Drain Sm"mres, Hand Placed Paves° 3-5" Slump; 36 % Air R2146N35 6.11 sacks / 4,500 psi ... erm, fr Hmd Place Pavmg, flats, Manholes, Hmdw fls 3-5" Slump, 36%Air FORT WORTH® CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 2/4/2025 8/42023 32 13 13 M. Deco Marlin Marietta R2146R36 6.17 / 4,500 psi Concrete for Hand Placed Paving M" Slum", 36%Air 11/2/2022 32 13 13 Mix De lai Mert. M_.R2146N36 4,500 psr Comets for Hand Placed Paving 3-5" Sfmp; 36%Air 112/2022 32 13 13 Mu Des' Marlin Marietta R2146K36 4,500 Concrete for Hand Placed Pav' 7r 3-5" Shunp, 36% Air 1121 3 32 13 13 Mix Desk Marlin Manetta R2146K37 6 22 sack / 4500 psi Concrete for Hand Placed Paving 3-5" Sfinp; 36% Air 12222023 32 13 13 Mu Deso Martin M.ie. R2146R44 6.60 Sacks / 4,500 psi Concrete Mix for Hand Placed Paving 3-5" Slump, 36%Air 1222/2 32 l3 13 Mix Design Martin Manetta R2146K44 6 60 Sacks / 4,500 psi Concrete Mix for Hand Placed Paving 3-5" Stamp; 3— I1/152022 32 l3 13 Mu Desr Martin Marietta R2146P36 4,500 psi Concrete for Hand Placed Paving 3-5" Slump, 36% Air I ]/152022 321313 Mix Desiga Martin Manetta R2146K36 4,500 par Concrete for Hand Placed Paving 3-5"Sfmp; 3-' 9/92022 32 l3 13 Mia Desor Martin Marietta R2147241 4,500 psi Concrete for Hand Placed Paving 3-5" Slump; 4.5-7.5%Air 9/92022 32 l313 Mix Desieo Martin Manetta R2146236 4,500 per Concrete for Hand Placed Paving 3-5"Sfmp; 3-6 An 9/92022 32 l3 13 Mu Des, Martin Marietta R2146036 4,500 psi Concrete for Hand Placed Paving, inlets 3-5" Slump; 36 %Air 9/92022 321313 Mix Dmiai Martin Maneva R2146242 4,500 psi Comets for Hand Placed Paving 3-5"Sfmp; 3-6 9/9/2022 32 13 13 Mu Desor Martin Marietta R2146042 4,500 psi Concrete for Hand Placed Pavi 3-5" Slump; 36 % Air 10/4/2023 32 13 13 Mix Design NBR Ready Mix CLS P2-YY 65 Sacks / 4,500 psi Concrete for Hand Paced Paving 3-5" Slump; 36 % An 10/42023 32 13 13 Mu Des r NBR Ready Mi, CLS P2-NY 6.50 Sacks / 4,500 psi Concrte for Hand Placed Paving 3-5" Slump; 36 %Air 7/10/2023 321313 Mix Design Osbum 45A60MR 65K/4,500 psi Concrete for Hand Placed Paving 3-5"Slump; 36%An 1242023 32 13 13 Mi, Design Rapid Redi Mm RRM6320AHP 4500 psi Concrete for Hand Placed Paving 3-5" Slump; 36 % Ali 1/132023 32 13 13 Mix Design SRM Cancre[e 45023 4500 psi Can —le for Hand Placed Paving 3-5" Slump; 3-6% An 9/92022 32" 13 Mic Design SRM Concrete 45000 4500 psi Concrete for Hand Placed Paving 3-5" Slump; 36 % Au 10/24/2024 32 13 13 M. Destga SRM Concrete 45350 4500 psi Concrete for Hand Placed Paving 3-5" Sfmp; 36%An 10242024 32 13 13 Mu Deao SRM Concrete 45850 4500 psi Concrete for Hand Placed Paving 3-5" Shun", 36% Ai, 10/18/2 24 32 13 13 Mix De ,ai SRM Cpv=I, 45050 4500 Mi Concrete far Hand Placed Paving 3-5" Sfmp; 36% Air 9/92022 32 l3 13 Mu Des*r Tartan[ Concrete FW6020AHP 4500 psi Concrete Mix for Hand Placed Pavfg 3-5" Sfmp, 36%Air 9/92022 32 l3 13 Mix Design Tarrant C—le FW60AHP 4500 psi Concrete M. for Hand Placed Paving 3-5" Sfmp; 3b% An 9/92022 321313 Mu Des�r Tartant Concrete TCFW6020AHP 4500 psi Concrete Mix for Hand Placed Pavfg 3-5"Sfmp, 36%Ak 9/92022 32 l3 13 Mix Design Titan Ready M. TRC4520 4500 psi Concrete for Hand Placed Paving 3-5" Sfmp; 36 % An 9/92022 32 13 13 Mu Desp T. Grit Redi Mu 0260.2301 4500 psi Concrete Mu for Hand Placed Pavia � 3-5" Slump; 36%Air 9/92022 32 l3 13 Mix Design Tm Gnt Redr Mix 02fi5 2301 4500 Mi Cali—tv M. for Valley Gutters, Has Placed Paving 3-5" Sfmp; 3.56.5%An 9/92022 32 13 13 Mu Des�fr Tme Grit Redi Mu 270.230 5000 "si Concrete for Hand Placed Paving 3-5" Slump; 3-6% Av l0/92024 y32 13 13 Class BEE Mu Design h Early Strength Paving) �ix Wildcatter 4520AI 4500 "si Concrete for Hand Placed Pavfg 3-5" Slump; 36 %Air 9/9/2022 32 13 13 Design Big D Concrete 14500AE 4500 psi Concrete for High Early Strength Paving 3-5" Sfmp; 36%Av 9/92022 32 13 13 Mu Des Bumco Texas 55U720AG 4000 psConcrete Mu for High Early Strngf Paving 3-5" Shun", 36% Air 9/92022 32 l3 13 Mix Design Cow Town Red, M. 370-INC 4500 Nii Concrete for HES Paving 3-5" Sfmp; 36'An 9/92022 32 l3 13 Mu Des r Cow Town Redi Mu 375-NC 5000 psi Concrete for HES Pavfg 3-5" Sfmp, 36%Air 9/92022 32 l3 13 Mix Design Cow Towv Redi Mix 370-NC 4500 psi Covcrete for HES Paving 3-5" Sfmp; 3-6 An 1/18/2023 32 13 13 Mu Deso Cow Tovm Redi Mu 380-NC 4500 psi Concrete for HES Pavia 3-5" Sfmp, 36%Ab 1/29/2.4 32 l3 13 Mix Desiga Eetmda Ready M. 4575AESC 7 50 Sacks / 4,500 Mi (3,000 pei �a.3-d y) Concrete for HES Paving 3-5" Sfmp; 3-6% An 9/92022 32 13 13 Mu Desr Holcim- SOR, fc. 2125 5000 Ri Concrete for HES Paving 3-5" Slump, 36% Av 1/242023 321313 Mix Design liquid Stone C451DHR-A 4500psr Concrete for HES Paving 3-5"Sfmp;3b%Av 4/72023 32 l3 13 Mu Desor Martin Marietta R2161K70 6,000 psi (3,000 pa' fy; 24 h..) for HES Paving 3-5" Slump; 36 % Ah 2/10/2023 32 13 13 Mix Design SRM Concete 50310 5,000 pei Concrete or ES P-.g 3-5" Sfmp; 3-6 An 9/9/2022 32 l3 13 Mu Desp SRM Concrete .326 4,500 (3,000 A 3days) Mi Concrete fr HES Pavfg 3-5" Sfmp; 36 % Air 9/92022 32 l3 13 Mix Desiga Tarrant Concrete FW6520AMR 4500 (3000 pei (d 3-d ys) Mi HES Paving 3-5" Sfmp; 36 % An 9/92022 32 13 13 M.De� Tarrant Concete FW7520AMR 4500 (3000 par Cur 3-days) psi Covicete HES Paving 3-5" Sfmp; 3-6% An h.ss S Bridge Slabs,p Slabs of Direct Traffic Culverts, Approach Slabs) 9/92022 32 l3 13 Mu Des�fr Cow Town Redi Mu 260 4000 psi Concrete Mu for Bri e Slabs, Box Culverts, Headwalls 3-5" Slump; 36 % Air 9/9/2 2 32 l3 13 Mix Design Cow Town Redi Mix 360 4000 psi Concrete Mix for Bp ge Slabs, Bax Culvv—, Headwalpls�s 3-5" Sfmp; 36%An 9/92022 32 l3 13 Mu Hes r Cow Town Re di Mu 365-STX 4000 p�iC .4 diTopIK,, 1� -TXDOT Class S-No Fly Ash fr Concrete 3-5" SW 3{bi°� 1/29/2024 321313 Mix Design Estrada Ready M. R4060AEWR 600 000 psr for Bn�dge el and r,,pwT Slh,' p 5/32023 32 l3 13 Mu Des r Martin Marietta M7842344 4,000, Concrete for Bridge Deck 3-5" Sfmp, 4.5-7.5%Ak 4/12023 32 l3 13 Mix Design Mart. Manetta R2146P33 6 01 sacks / 4,000 per cp._,e for BMge Deck 3-5" Sfmp; 36% An 4/15/2024 32 13 13 Mu Des�r NBR Ready Mix TX S-NY 5.50 Sacks / 4000"si Concrete Mu for Class S Slab Paving -No Fly Ash 3-5" Slump, 36%Air 4/152024 32 13 13 Mix Design NBR Ready Mix TX S-YY 4 50 Sacks / 4000per Covciete Mix for Cla, S Slab Paving 3-5" Sfmp; 36%Air 5/52023 3``2 13 13 ix De y� SRM Concrete D100008553CB 4,000 pin Concrete Cor Bdndge Approach 31ab, Deck Slab 3-5" Sfmp: 3-6% An l:onerete Base .eh Renan 4/9/2 000 al far T­c u 9/92022 03 34 16 2 �ontro Mix Dcsler IBpmCp Texas I08Y450BA 800 psiZ'oncrete Mix fo Base for Trench Repa�v 5�7WSbhnv", 36%Air led L Slrensi Mnhrial 9/9/2022 0334 13 Mix Design Bumco Texas IIY690BF 100 psr Concrete Mu for Flowable Fill Flowable; 8.5-11 5 % Av 9/92022 033413 Mu Des Carder Concrete FWCC359101 50-110 psi Flowable Fill-CLSM 3-5"Slam11��, 8-12%Air 9/9/2022 033413 M. Destgn Carder Covcrete FWFF237501 50-I50 N, Flowable Fill -CLSM Flowable; S.S-115%Av 9/92022 033413 Mi. Dew City Concrete Comrany I1-350-FF 50-150 i Concretefa Flowable FiIILLSM Flowable, 8-12%Air 9/92022 03 34 13 Mix Design Cow Town Redi X Mix# 9 70 psi ewable Fi11-CLSM 7-9" Sfmp; 8-11%An 10/4/2023 03 34 13 M& Des fr NBR Ready Mix FTW FLAW FILL 150 pi concrete for —able 7-10" SI 8 18-12%Av 9/92022 033413 Mnu Design Tmant Concrete FWFF150CLSM 50- o Mi Flowable Fill -CLSM Flowable, 2%Air �'); 4/1/2023 31 3700 I313700 i Design Mart. Manetta IM.. R2141030 IR2146033 4000 psr Concrete for R,pmp 3-5" Sfmp; 36% Air 4/1/2023 IMMaix Design Manetta 4,000 psr Concrete for R,ptap 3-5"Sfmp: 36 A�;;l1half P. 9/9/2022 3112 ]6 Mix Design Austin Asphalt FTSBI17965 Fr5B 117965 PG64-22 Type B Fine Base 9/92022 321216 Mu Des r Austin Asphalt FT1B139965 FTB739965 PG64-22T13''1��B Fine Base 9/92022 321216 Mix Design Anst. Asphalt FT1B117.2 Fr B 1172 PG64-22 TypeB Fine Base 5/l2024 32 12 16 Mu Desor Reynolds Asphalt 340-DG-B P 340-DG-B PG64-22 Ty1( B Base Course 9/9/2 2 32 l2 ]fi Mix Design Reynolds Asphalt 1112B 1112E PG64-22 Type B F.e Base 9/92022 32 12 16 Mu Des r Reynolds Asphalt 1612B 1612E PG64-22 Ty}41�� B Fine Base 12/52022 33121fi Mix De'n" Sunmourit Pavng 3076BV6422 3076BV6422 PG6222 Type B P}J.)ee Base n[ Paving 341ZBIRAP6 �22ERG Base OS 9/92022 32 12 Ifi Mix Desigr TXBTT 37'2Hl 02PG64-22 Type B Pine Baue 9/92022 32 l2 16 Mu Desr TXBTT 44-211305-17 44-211305-17 PG64-22 Type B Fine Base .1022 32 12 16 Mu Design TXBTT 211305 (1757) 211305 (1757) PG64-22 Type B Fine Base FORT WORTH® CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 2/4/2025 Asphall(CovlJJinued) ITXBIT I44 2MAC-SP-D 64- PG70-22 Type D Fine Surface 4 /2024 3 70-22XR MAC--18 344 MACSP-D 70-22XR SAC A-R Tvce D Fine Surface etecteble Warn�iDesign 7 Surface 9/9/2022 321320 DWS-Pavers Hall Bnck(Wmslov Salem,NC) Tactile Pavers 9/9/2022 321320 DWS-Pavers estem Brick C.(Houston, TX) Detectable Wamig Pavers9/9/2022 321320 DWS-Compoite P'o AmorTde 9/9/2022 321320 DWS-Composite DA Solutovs(Wilormuton, MA) Heritage Brick CB Composite Payer 4/7/2023 321320 DWS-Pavers DASolutions(Wdmiugton, MA) Detectable Wammg Pavers Silicone Joint Sealant 9/9/2022 32 13 73 Joint Sealant Dow 890SL 89oSL -Cold Applied Single Component, Sihwne Joint Sealant AST, D1191 Tr e. le rut �9/92022 32 13 73 Joint Sealant Pecomo 300SL 300SL -Cold Applied, Single Component, Sihwne Joint Swlant ASTM D5893 �9/9/2022 32 13 73 Joit Sealant Crafty RoadSaver Sihwne RoodS_ Silicone -Cold Applied, Single Component, Silicone Joint Sealant ASTM D5893 Utility Trench Embedment Savd 9/9/2022 33 OS 10 Embcdmcn[ Sand ra Utility Embedmem Sand ASTM C33 9/92022 33 05 10 Embedment Sand rouch Matenals Utility Embedment Savd ASTM C33 9/9/2022 3305 10 Embedmcnt Sand [I—Ceekl,lateril� andLDinMvers Utility Embedment Savd ASTM C33 9/9/2022 33 OS 10 EmbedmentSavd andLDvtMoversUtilty Embedmmt Savd ASTM C339/92022330510 Embdment Sand m Top Mmtm Maneva Utility Embedment Savd ASTM C33 Storm Sewer - Manholes & Bases/Frames & CoverVSfandard�ound) 33-05-13 9/28'ol li 33 OS 13 MaMole Frame, and Covers AaoCast (Go, Steel Company, LTI)) hHIRC #220605 -MHRC #220605 (Si. -- '24" Diu.) ASTM A48 AASHTO M306 9282018 i3 OS 13 Manhole Cover Neenah Foundry NF-1274-T91 NF-1274-T91 (Size - 32" Dia) ASTM A48 AASHTO M306 9/28/2018 33 05 13 Manhole Frames and Covers Neenah Foundry NP-1743-LM (Hioged) NF-1743-LM (Higed) (Sue - 32" Dia) ASTM A48 AASHTO M306 9282018 i3 OS 13 Manhole Frame Neenah Foondry NF-1930-30 NF-1930-30 (Size-32.25" Dia) ASTM A48 AASHTO M306 9/28/2018 33 05 13 Manhole Frames and Covers Neenah Foundry R-1]43-HV R-1743-HV (Sue - 32" Dia) ASTM A48 AASHTO M306 4/32019 i3 OS 13 Manhole Formes and Covers "SIP idustries -2279ST '2279ST (Size - 24" Dia) ASTM A48 AASHTO M306 4/3/2019 33 05 13 Manhole Frames and Covers SIP idustri" 2280ST 22SOST (Sue - 32" Dia) ASTM A48 AASHTO M306 10/8/2020 i3 OS 13 Manhole Frames and Covers EJ ( Formally East Jordan ho r Works) 01033 M/A E11033 Z2/A (Size - 32.25" Diu.) ASTM A536 AASHTO M306 3/8/2024 33 05 13 Curb filet Covers SIP idii-e— 2296T 2296T (Suz-'"'24" Dia) ASTM A48 AASHTO M306 _ 6/18/2024 `33 05 13 Curb filet Covers 'SIP idii.-- '22795T1,i `2279STN (Sae -24" Dia) ASTM A48 AASHTO M306 •*Note:Aff— develop —rand— insml/anon manhole lidsslat/medthe minimum 304-k opening regm emenras spedfied in Gly S,-if d-330513. Any amaHer opening sizes will only beallowedfar exiutugmanholes rharrequire replacemenrframes and rovers. Storm Sewer -Intel &Structures 33-05-13 10/82020 33 49 20 Cuib Iol- F.-- FRT-10x3-005-PRECAST•* (Srze -10' X 31 ASTM C913 10/8/2020 33 49 20 Curb filets Fonertia FRT-10x3-006-PRECAST'* (Sbe - ]0' X 31 ASTM C913 10/82020 i3 49 20 Curb Inlcts Fonema FRT-IOx4.5-007-PRECAST" (Si. - ]0' X 4.51 AS C913 10/8/2020 33 49 20 Curb filets Fonema FRT-10x4 5420-PRECAST'" (Si. -10' X 4.51 ASTM C913 10/8/2020 i33920 Manholc Fonema FRT-0X4-009-PRECAST-TOP (Size-4'X4) ASTM C913 10/8/2020 333920 Manhole Fprterzm FRT-0X4-009-PRECAST-BASE(Sm.-4'X41 ASTM C913 10/8/2020 -333920 Manhole Fort— ERT-5X5-010-PRECAST-TOP(Srze-5'X 51 ASTM C913 10/8/2020 333920 Manhole Forterrm FRT-5X54t0-PRECAST-BASE(Sm.-5'X 51 ASTM C913 10/8/2020 -333920 Manhole Fort FRT-6X6-011-PRECAST-TOP(Srze-6'X 61 ASTM C913 10/8/2020 333920 Manhole I-- FRT-6X6-0t]-PRECAST-BASE(Srze-6'X 61 AS C913 3/19/2021 i3 49 20 Curb Inlets Thompson Pipe Group i'PG-l0X3-005-PRECAST INLET" (Size -10' X 31 ASTM 615 3/19/2021 33 49 20 Curb filet Thompson Ptpe Group 7PG-15X3-0OS-PRECAST INLHT'n (Sue -15' X 31 ASTM 6l5 3/19/2�34920 Curb Inlets Thompson Pipe Group TPG-20X3-005-PRECAST INLET" (Size-20'X 71 AS 615 3/19/2021 33 3920 Manhole Thompson Pipe Group TPG4X4409-PRECAST TOP (Sue-4' X 41 ASTM 6l5 3/19/2�33920 M ffile Thompson Pipe Group TPG-0X4-009-PRECAST BASE (Si.-4'X4) ASTM 6l5 3/19/2021 333920 Manhole Thompson Pipe Group TPG-0X4-012-PRECAST4-FT RISER( Sue-4'X41 AS 6t5 3/19/2021 333920 Mmffi le Thompson Ape Group TPG-5X5-010-PRECAST TOP (Size-5'X51 ASTM 615 3/19/2021 333920 Manhole Thompson Ape Group TPG-5X5-010-PRECAST BASE (Size-5'X51 AS 615 3/19/2021 333 220 Manhole Thompson Pipe Group TPG-5X5-012-PRECASTS-FT RISER (Size-5'X 51 AS 615 3/192021 333920 Manhole Thompson Ape Group TPG-6X6-011-PRECAST TOP (Sue-6'X 61 AS 615 3/192�33920 Manhole Thompson Pipe Group TPG-6X6-0ll-PRECAST BASE (Size-b'X 61 AS 615 3/19,021 333920 Manhole Thompson Ape Group TPG-6X6-012-PRECAST 6-17 RISER (Size-6'X6) AS 615 3/192021 ' 33920 Manhole Thompson Pipe Group TPG-7X7-0Il-PRECAST TOP (Size-7'X71 AS 615 3/19/2021 333920 Manhole Thompson Pipe Group TPG-7X7-041-PRECAST BASE(Sue-TX71 ASTM 615 3/192021 —33 39 20 Manhole Thompson Pipe Group TPG-7X7A72-PRECAST 4-FT RISER (Size - 7' X 71 ASTM 615 3/19/2021 33 39 20 Manhole Thompson Pipe Group TPG-BX84 t-PRECAST TOP (Sue - 8' X 81 AS 615 3/19/2�3 39 20 Manhole Thompson Pipe Group TPG-8X8-01 l-PRECAST BASE (Size - 8' X 8) AS 615 3/192021 333920 Manhole Thump —Ape Group TPG-SX8-012-PRECASTS-FP RISER (Suz-S'X81 AS 615 3/19/2�34920 Drop Inlet Thompson Pipe Group TPG-0X44H8-PRECAST INLET (Size-4'X41 AS 615 3/19/2021 33 49 20 Drop filet Thompson Ape Group TPG-5X5-0O8-PRECAST INLET (Srze-5' X 51 ASTM 615 3/19/2�34920 Drop Inlet Thompson Pipe Group TPG-6X6-008-PRECASTINL l(Size-6'X61 ASTM 615 8282023 334910 Manhole Old—fle Precast4'x 4' Stacked Mavhole(Sue-4'X41 ASTM C478 8/28/2�3491 0 Manhole 01& He Precast 5' x 8' Storm Junction Box (Size - 5' X 81 AS C478 8282023 33 49 10 Manhole Old—fle Precast 4' x 4' Smtm Iunaton Box (Sue - 4' X 41 AS C478 8/28/2�3 49 10 Manhole Oldcaede Precast 5' x 5' Storm Junction Box (Size - 5' X 5) AS C478 8/28/2023 33 49 10 Manhole Oldcasdo Precast 6' x 6' Smtm Iuvcho. Box (Sue - 6' X 61 AS C478 8/28/2�3 49 ]0 Manhole 01& tle Precast 8' x 8' Storm Junction Box Base (Size - 8' X 81 AS C478 8/28/2023 33 49 10 Manhole Old—fle Precast 5' x 8' Storm Junction Box Base (Sue - 5' X 81 AS C478 8/28/2�3 49 10 Manhole Rinker Materials Reivforoed 48" Diameter Spread Footing Manhole (Size -T X 41 AS C433 8.,023 333920 Curb 1110 k 3'Rtser Thompson Pipe Group filet Riser (Sue-3 FT) AS C913-16 8/2S/2023 33 39 20 Corb Inlet 15 k 3' Riser Thompson Pipe (Jroup filet Riser (Size-3 FT) AS C913-16 8282023 333920 CmblWet20'x3'Rwer Thompson Pipe Group Inlet R—(Sue-3 FT) ASTM C913-16 1/12/2024 334920 Drop Inlet AmenTex Pipe&Products Drop 11(4'X 41 ASTM C913 1/122024 3349 20 Drop filet AmenTex Pipe &Produces Drop filet (5' X 5) ASTM C913 1/19/2024 '33 49 20 Manhole Auu,,,Z Pipe&Priul-t Precast4i,4'Storm Junction Box ASTM C913 1/19/2024 33 49 20 Manhole AmenTex Pipe &Products Precast 5'x5' Storm IuvGmv Box ASTM C913 1/192024 i3 49 20 Manhole AmeriT_ Pipe &Products �5' Precast Tan,ltion MH IT MH on the top of 5' JB) ASTM C913 1/19/2024 334 20 Manhole Amt,t. Pipe &Products Precast 6'x6' Storm Iunamn Box ASTM C913 '331/19/2024 3 49 20 Manhole Arruffex Pipe &Products 6' Precast Tansilion MH (T MH on the Iop of 6' JB) ASTM C913 1/19/2024 334 20 Manhole Am'TePipe &Product Precast 8'x8' smtm Iunamn Box ASTM C913 1/19/2024 '33 49 20 Manhole Amedrex Pipe &Products 8' Precast Tansitiov MH (T MH on the too of 8' JB) ASTM C913 1/19/2024 334 20 Manhole AmenTex Pipe &Product, I— C Storm Dori Manhole on Box W MH on the too ofRCB) ASTM C913 7/162024 i3 49 20 Cmb Wets A o—Tex Ape &Prodo,, I Ox3 Precast" (Sue 10' x 31 AST, C913 7/16/2024 33 49 20 Cmb Wets AmenTex Pipe &Prodaare 15x3 Precast" (Sue 15' x 31 AST, C913 . Note: Prerasr inlas are appovedfor the.nage 1poM- ofthe s.iacmre (basin).1y. Stage Jlpom'on offhe s-rorrore are required ro be cast in -place. No—po'ons w this regairemenrsbal( be allowed. FORT WORTH® CITY OF FORT WORTH TRANSPORTATION/PUBLIC WORKS DEPARTMENT STANDARD PRODUCTS LIST AS OF 2/4/2025 Storm Sewer - Pipes & Boxes 3345-13 3341 13 So. Dmm Pipes Advanced Dre—ee System,, I. (ADS) ADS HP Storm Polw lene (PP) Pipe (Size -12" -60") ASTM F2881 & A HTO M330 33 41 10 Storm Dmm Prpes Rmke, Matenals Reinforced Cm,rele Prpe Tongpe and Groove Jomt Prpe (Sze- 21" or larger) ASTM C76, C655 3341 ]0 Culvert Box Rinker Materials Reinf..ed Concrete Box C.1—(S.-Various) ASTM C789, C850 334110 Storm Dram Prpes Ame,iT- Pipe &.Product. Reinforced Concete hN Tongue and Groove Jr., Pipe' (Size -15" or larger) ASTM C76, C506 344111 Calvert Box Ame,iTez P11'ppe&Products t Reinfrced Concrete Box Calven(size-Vsrio..)) ASTM C1433,C1577 35 41 10 Storm Dram Prpes The Tome, Remfomed C.— Prpe Tongue and Groove Jomt Prpe" (Size -15" or larger) ASTM C76, C506 334110 Calvert Box The Tome, Co Reinforced Concrete Box Clslven (size- Vanous) ASTM C1433,C1577 334110 Storm Dram Prpes Thompson Pipe Group Reinforced Concrete Prpe Tongue and Groove Jomt Prpe' (Se. Vanous) ASTM C76, C506 334111 Culvert Box Oldcutle Reinf..ed Concrete Box C.I— ASTM C1433,C1577 334110 Smrm Dram Npes Oldcastle Reinforced Concrete Pipe Tongue and Groove Joint Pipe` (Si. Vauous) ASTM C76, C506 Revision Removed Argos, fgmm, Redi-Mix, Charley. DW (1-29-2025) CFW Lighting Approved Products List CFW Product Name Manufacturer I Manufacturer Product Name & Description Residential -Standard MRT2470AB-Type 11, 36" or 60" Rise 2/Bolt 8' Arm, Makers Sales and Marketing, LLC Galvanized MRT2470AB-Type 11, 36" or 60" Rise 2/Bolt 8' Arm, Type 11 Pole Makers Sales and Marketing, LLC Black D601373(page 1 of 6)-Shoe Base Pole Type 11, Valmont Industries, Inc Galvanized Makers Sales and Marketing, LLC Type 33B, 36" Rise Simplex 8' Arm, Galvanized Makers Sales and Marketing, LLC Type 33B, 36" Rise Simplex 8' Arm, Black Type 33B Arm Valmont Industries, Inc D1301373(page 4 of 6)-Single Arm Type 33B, Galvanized American Electric Lighting, ATBO-P101-Mvolt-R2-3K- Acuity Brands Lighting, Inc. M P-N L-P7-AO-RFD325607 American Electric Lighting, ATBO-P101-Mvolt-R4-3K- Acuity Brands Lighting, Inc. M P-N L-P7-AO-RFD325606 Residential Luminaire American Electric Lighting, ATBO-P101-Mvolt-R2-3K-BK- Acuity Brands Lighting, Inc. MP-NL-P7-AO-RFD325609 American Electric Lighting, ATBO-P101-Mvolt-R4-3K-BK- Acuity Brands Lighting, Inc. M P-N L-P7-AO-RFD325608 McFarland Cascade CREOSOTE 30/35 FOOT TIMBER POLE Timber Pole Bayou Forest Products 30-35' .80 CCA Green Timber Pole Makers Sales and Marketing, LLC Wood Pole Arm, 36" Rise Simplex 8' Arm, Galvanized Wood Pole Arm Makers Sales and Marketing, LLC Wood Pole Arm, 36" Rise Simplex 8' Arm, Black Valmont Industries, Inc D1301373(page 6 of 6)-Wood Pole Arm, Galvanized Arterial -Standard MRT33.585AB-Type 18, 36" or 60" Rise 2/Bolt 8' Arm, Makers Sales and Marketing, LLC Galvanized MRT33.585AB-Type 18, 36" or 60" Rise 2/Bolt 8' Arm, Type 18 Pole Makers Sales and Marketing, LLC Black DB01373(page 2 of 6)-Shoe Base Pole Type 18, Valmont Industries, Inc Galvanized Makers Sales and Marketing, LLC Type 33A, 60" Rise Simplex 8' Arm, Galvanized Makers Sales and Marketing, LLC Type 33A, 60" Rise Simplex 8' Arm, Black Type 33A Arm Valmont Industries, Inc D1301373(page 3 of 6)-Single Arm Type 33A, Galvanized American Electric Lighting, ATBO-P303-Mvolt-R2-3K- Acuity Brands Lighting, Inc. M P-N L-P7-AO-RFD322792 American Electric Lighting, ATBO-P303-Mvolt-R4-3K- Acuity Brands Lighting, Inc. M P-N L-P7-AO-RFD322794 Arterial Luminaire American Electric Lighting, ATBO-P303-Mvolt-R2-3K-BK- Acuity Brands Lighting, Inc. M P-N L-P7-AO-RFD322793 Acuity Brands Lighting, Inc. American Electric Lighting, ATBO-P303-Mvolt-R4-3K-BK- M P-N L-P7-AO-RFD322795 McFarland Cascade CREOSOTE 35/40 FOOT TIMBER POLE Timber Pole Bayou Forest Products 30-35' .80 CCA Green Timber Pole Makers Sales and Marketing, LLC Wood Pole Arm, 60" Rise Simplex 8' Arm, Galvanized Wood Pole Arm Makers Sales and Marketing, LLC Wood Pole Arm, 60" Rise Simplex 8' Arm, Black Valmont Industries, Inc DB01373(page 5 of 6)-Wood Pole Arm, Galvanized Decorative -Pedestrian Holophane, CLA 10.6(OAL)FT J20P07BK-MOD, AB-31-4 Washington 10' Pole Acuity Brands Lighting, Inc. RFD110736 Holophane, CLA14FT J20DMODC03BK RFD325026, AB- Washington 14' Pole Acuity Brands Lighting, Inc. 16-4 SPEC RFD325026 Holophane, WFCL3 P40 30K MVOLT FC3 NF BK AO PR7 Washington Luminaire Acuity Brands Lighting, Inc. FRGL RFD338699 Washington Globe Holophane, AWDE3 P40 30K MVOLT MS AL3 BK PR7 Luminaire Acuity Brands Lighting, Inc. AO RFD-315548 Oleander Type A Pole Acuity Brands Lighting, Inc. Holophane, PDA 12S5L20POBBK-MOD Oleander Type B Pole Acuity Brands Lighting, Inc. Holophane, PDA20S5L20P08BK-MOD Oleander Type B Arm Acuity Brands Lighting, Inc. Holophane, OHC 151N 2A TN BK Holophane, AUCL2 P40 30K AS BK L3 N P7 AO Oleander Luminaire Acuity Brands Lighting, Inc. RFD338741 Berry 12' Pole Acuity Brands Lighting, Inc. Holophane, RSA 12 50 G12 SC BK AB-26-4 RFD326400 Berry 20' Pole Acuity Brands Lighting, Inc. Holophane, PD20S5J20P11BK RFD338816 Berry Arm Acuity Brands Lighting, Inc. Holophane, VLC 271N 1A TN QSM BK Holophane, GPLF3 P40 30K MVOLT ASY QSM BK PR7 Berry Luminaire Acuity Brands Lighting, Inc. AO SH Banner Arms Acuity Brands Lighting, Inc. Holophane, BA-241N-2A-CO-S4J-BL-075P-BK System Rigid Nonmetallic Schedule 80 Conduit, Meets UL 651 Cantex Inc. specifi cations and NEMA TC2, Rated for 90°C Cable, Sunlight Resistant, 10' Lengths and 20' lengths Rigid Nonmetallic Schedule 80 Electric Conduit, Meets UL 651 specifications, RUS listed, NEMA TC-2 and Heritage Plastics NEMA TC-3, Rated for 90°C Cable, Sunlight & Weather Conduit Resistant PVC Rigid Schedule 80 Conduit, Conforms to UL 651 Atkore-Heritage Plastics and NEMA TC 2, Sunlight Resistant, Listed for 90°C conductors or cable Schedule 80 PVC Rigid Nonmetallic Conduit, Extra Prime Conduit, Inc Heavy Wall EPC-80, Sunlight resistant, Rated for use with 90°C conductors, Meets UL651 Splice Kit With Connector NSi Industries, LLC Gel Stub Splice Kit with Connector, Easy -Splice, ESSLK Series Copper Wire/Conductor Southwire Encore Wire Encore Wire Service Wire Co Advanced Digital Cable Inc Aluminum Wire -Triplex Priority Wire & Cable, Inc Fuse & Fuse Holder Edison Edison Cooper EATON EATON Connector Thomas & Betts Metered Pedestal 120-240V Electrol Systems, Inc WE Manufacturing & Controls Metered Pedestal 240- Electrol Systems, Inc 480V WE Manufacturing & Controls Ground Box Kearneys Photocell Shorting Caps MacLean Highline Oldcastle Type XHHW-2 copper conductor, 600V TYPE XHHW-2 / RW90, copper conductor, Superslick Elite, 600V/1000V THHN / MTW / THWN-2 Copper conductor, 600V Servicepro-X XHHW-2, 600/1,000 Volt Copper, CT Rated XHHW-2 Low Smoke Halogen Free, Cross -linked Polyethylene Insulated 14 AWG-750 MCM, 600 Volts, 90°C Dry and wet Triplex Overhead Aluminum Conductor General Purpose, Midget Class MEN Fuses, Voltage Rating: MEN - 250 VAC, Ampere Rating: 0.5 - 30 Amps, Interrupting Rating: 10,000 RMS Amps @ 125V Modular Ferrule Fuse Blocks for Midget Class and CC Fuses In -line fuse holders for Single -Pole 13/32" x 1 1/2" Fuses HEB-AA Bussmann Series, HEB breakaway and non -breakaway in -line fuse holders for UL 13/32" x 1- 1/2"supplemental fuses Bussmann Series, FNM 13/32" x 1-1/2" 250Vac time - delay supplemental fuses Wire Joints for Copper Conductor, Cat No: 54615, 54620, 54625-TB, 54635, 54640, 54630 TY A (120/240) 100(NS)AL(E)PS(U) TY A 120/240 100(NS)AL(E)PS(U) TY A (240/480) 100(NS)AL(E)PS(U) TY A 240/480 100(NS)AL(E)PS(U) Polymer Concrete, PHA132412X0002: TIER 22 (X) 22, 500l bs Polymer Concrete, H-SERIES UNIT, H1730-24 TIER-22 - TXDOT 2x 1/2" CAPTIVE BOLT - 2x BRASS FLOATING NUT Polymer Concrete, H-SERIES UNIT, H1324-24 TIER-15 - Oldcastle TXDOT 2x 1/2" CAPTIVE BOLT- 2x BRASS FLOATING NUT NSi Industries, LLC Split Bolt Connectors, Copper Split Bolts 2 Wire, N Series Dark To Light, DLL Elite, Electronic Locking, Type Acuity Brands Lighting, Inc. Photocontrol, DLL-127 or DLL-480 Acuity Brands Lighting, Inc. Dark To Light, Part # DSHORT SBK U Interim Products Residential Luminaire ITRASTAR INC. PRA-STR25-31K-120-3-GIR-SCIL RA-STR10A-3K-120-3-GR-SCL Arterial Luminaire TRASTAR INC.