HomeMy WebLinkAboutIR 8013 INFORMAL REPORT TO CITY LOUNCIL MEMBERS No. 8013
eTo the Mayor and Members of the City Council July 9, 1996
1K t �§R. Page 1 of 3
Subject:
ENVIRONMENTAL RESOURCE COLLECTION CENTER
The City of Fort Worth is required, by the Environmental Protection Agency (EPA), under the
forthcoming National Pollutant Discharge Elimination System (NPDES) Stormwater Permit to
establish a permanent program for the collection of household hazardous materials (waste).
This program must be readily available to all residents and be publicized and promoted. in
addition, as the public's familiarity with the past single day collection events increases,
citizen demand for an exp'a:nded service with greater accessibility has grown. More and
more residents are requesting flexibility when they drop off their materials.
A collection facility will allow Fort Worth to accomplish the ultimate goal of providing
expanded service to prevent household chemicals from entering surface and ground water
through municipal waste streams (i.e., landfill), sanitary sewer system, and storm sewers.
Also, a collection facility will assist in the preservation of valuable landfill space and help
curtail illegal dumping. An additional goal of the program is to continue creating public
awareness about proper disposal of household wastes. it is therefore, the intent of the
Environmental Management Department to expand its Environmental Resource Center Office
at the Southeast Service Center to accommodate the collection facility.
FACILITY LOCATION
One of the critical factors to the success of the facility is its location. The anticipated location
for the facility is the Southeast Service Center. This location is ideal for a number of reasons:
• The facility will be on City property, thus eliminating the costs associated with purchasing
property;
• The facility would be distant from residential areas, but close enough to provide
convenient access to populous areas;
• This location provides ample space to accommodate heavy facility usage without
impeding traffic on major thoroughfares; and
• The site is readily accessible from a number of highways serving Fort Worth.
SPACE REQUIREMENTS
It is estimated that the size needed for the facility will be approximately 10,000 sq. ft. This
size was derived as follows:
1. Total area needed for materials storage 6200 sq. ftqFICIAL HCOAD
2. Office space, meeting/educational room 1000 sq. ftcrff SIMARY
3. RestroonVdecontarriination/locker area 900 sq. ft
4. Equipment storage 700 sq.lftrT. Wom, Im
5. Open bay (drive through area for resident material drop-off) 1200 SQ. R.
TOTAL 10,000 sq. ft.
ISSUED BY THE CITY MANAGER FORT WORTH,TEXAS
`
INFORMAL REPORT TO CITY o.,JUNCIL MEMBERS No. 8013
To the Mayor and Members of the City Council July9, 1996
Page 2 of 3
rr
Subject: ENVIRONMENTAL RESOURCE COLLECTION CENTER
ESTIMATED COST
The existing building at the Southeast Service Center has a square footage of approximately
9,300 sq. ft., and has drive through bays needed to provide ease of material loading and
unloading. Additionally, the building has some office facilities. This building could easily
be modified to meet the rjeeds of the Program. The estimated cost for pursuing this,
including equipment, is approximately $739,000.
This was determined as follows:
1. Modification/upgrade of existing facility' $ 300,000
2. Equipping facility once modified $ 400,000
3. Miscellaneous changes/additions $ 39,000
TIMEFRAME
The timeframe estimate for implementation of the above is to modify the existing building
and put it into operation by July 1997.
FUNDING
It is intended that funding for construction of the facility and start-up costs will come from
the Environmental Protection Fee. The design and construction oversight costs are funded
by a grant from the North Central Texas Council of Governments (NCTCOG) in the
OPERATION
The collection facility will serve not only as a place to collect unwanted household wastes
such as pesticides and herbicides, but also as a consolidation point for recyclable items
such as automotive products (used motor oil, antifreeze, oil filters, brake fluid, batteries),
paint, pool chemicals, aerosol cans, pharmaceutical products, etc. As a consolidation
point, the facility acts as a one stop collection site for recyclers of such materials, thereby
making it more convenient and cost effective for citizens to recycle these materials.
Materials that will not be accepted include materials from businesses, explosives,
ammunition, radioactive materials, and biologically active substances.
This includes estimate for landscaping,electrical and plumbing upgrades as needed,additio Jug*JW"l
fire suppression,construction of additional space for storage needs. CRY ZKTAKV
ISSUED BY THE CITY MANAGER- FORT WORTH, TEXAS
INFORMAL REPORT TO CITY L,,jUNCIL MEMBERS No. 8013
pRTEpFQ
To the Mayor and Members of the City Council July 9, 1996
Page 3 of 3
o
TEXAS Subject: ENVIRONMENTAL RESOURCE COLLECTION CENTER
rats
All collected materials will be segregated and stored in areas that are equipped with
secondary containment and proper ventilation. The facility will be equipped with a fire
suppression system and will be designed in accordance with stringent regulatory
requirements (Environmental Protection Agency,- Texas Natural Resource Conservation
Commission, Occupational Safety and Health Administration). All collected materials will
be either recycled, reused, or disposed of within a 3-month time period from the date of
collection.
If you have any questions regarding this issue, please contact Dr. Edward Sierra at 871-
8085.
Bob Terrell
City Manager
OFFICIAL RECORD
MY SECRETARY
MY
Ft WORTH, TIM
ISSUED BY THE CITY MANAGER FORT WORTH,TEXAS
INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 8014
To the Mayor and Members of the City Council July 9, 1996
Page I of 2
0e. Subject:
ton REPORT ON THE PARK SYSTEM/MOST CRITICAL NEEDS
At the Pre-Council meeting on June 11, 1996, Parks and Community Services Department(PACSD) staff
presented a report on the condition of the existing park infrastructure system. The report detailed current
playgrounds, ballfield lighting and parking lot conditions in addition to increasing maintenance demands
for these systems. In response, the City Council directed that staff provide a report addressing the most
critical needs, both now and in the near term, available funding and the gap in funding needed to address
these needs.
As a result of the PACSD's Strategic Plan developed in 1992, Park staff and the Parks and Community
Services Advisory Board (PACSAB) have developed a priority system to address infrastructure issues in
a systematic manner. Playground conditions are given the highest priority with ballfield lighting systems
second and parking and park roads third. Within each of these categories are subcategories which places
replacement of lost services first, impending loss of services and/or possible safety hazard, i.e. play
equipment over hardened earth, second and high use facilities third. Based upon these priorities, the
following lists of needs have been established. Estimated costs associated with each need are included.
1. Loss of Service
2 Playgrounds $ 77,800
1 Ballfield Lighting System $ 135,040
Sub Total $ 212,840
2. Pending Loss of Service/Possible Safety Hazard
21 Playgrounds $ 496,740
4 Ballfield Lighting Systems $ 517,520
Sub Total $ 1,014,260
3. High Use Facilities
11 Playgrounds $ 570,470
6 Ballfield Lighting Systems $ 751,850
9 Parking Lots and Roads $ 2,525,000
Sub Total $ 3,847,320
Total $ Mm-,
1 ,
cffy %ROW AAY
FT, WORTHO TM