HomeMy WebLinkAboutIR 8005 00%,
I
INFORMAL REPORT TO CITY COUNCIL MEMBERS No.
("19
To the Mayor and Members of the City Council June 4, 1996
33
Subject:
1873
REPORT ON THE PARK SYSTEM
At the Pre-Council session on April 23, 1996, Councilmember Jim Lane expressed
concerns regarding the conditions of parks and the level of maintenance being
performed on parks. As a result, it was requested that staff provide a report on the
current condition of the park system.
Overall, the park system is in good condition and service levels are being provided in
accordance with budgeted levels. There are, however, some infrastructure issues
which, as a result of aging systems and reduced operating funds, are in a state of
decline. When systems reach a point of becoming hazardous or uneconomical to
repair, in accordance with departmental policy, they are removed from service.
Examples include removal of six (6) pieces of play equipment since 1993, and ballfield
lighting systems where two (2) were removed at Rosemont Park in February 1995.
This report will address the park infrastructure, maintenance service levels, operating
resource levels and efforts which have been undertaken to seek alternative and/or
additional funding during the last four (4) years.
1. Infrastructure
Primary facilities include playgrounds, lighting systems, parking lots and park
roads and general park amenities such as drinking fountains, fencing,
bleachers, etc.
A) Playgrounds - The system contains 129 playgrounds located throughout the
City. A playground generally contains one major structure and a number
of auxiliary pieces such as swings and merrywhirls. In addition, most%
playgrounds are located within a sand or pea gravel area intended to
absorb falls and facilitate drainage. In June 1995, the department
published an Issue Paper which concluded that 68 major play pieces and
84 surface areas require, or will require, replacement. The total estimated
cost for this work amounted to $3,305,940. _........" .................
B) Athletic field lighting -The system contains y letic
fields of which 13 are in a serious state of - Z e dlto li p les,
fixtures, wiring or control panel conditions. A oFJ.CfQ...,',,=d are
....................
ISSUED BY THE CITY MANAGER FORT WORTH,TEXAS
...............................-.111-1111 .................._'__.............
INFORMAL REPORT TO CITY COUNCIL MEMBERS No. sons
To the Mayor and Members of the City Council
Subject: June 4, 1996
1873 Page 2 of 6
REPORT ON TBE PARK SYSTEM
rated as critical with removal or disconnection of service projected in the
next 6 - 18 months. These include fields at Sycamore, Rockwood,
Hallmark and Lincoln parks. The total estimated cost for replacement of
these systems is $1,641,790.
Q Parking Lots and Roads - In the formulation of the 1993 Bond Program,
the Department identified $6,115,000 in needs to address deteriorated
parking and park roads and paving of unpaved lots. Priorities were
established in A, B and C categories. Due to the amount allocated to the
Park Department in the Bond Program, only the A category improvements
involving eight (8) sites were funded totaling $1 million.
In the B Category, nine (9) sites were recommended for replacement at an
estimated cost of $2,515,000 and in the C Category, fifteen (15) sites
were recommended at an estimated cost of$2,600,000.
D) General Amenities
The system contains 86 drinking fountains of which 73 are operational.
The remainder of the fountains (13) have been rendered inoperable due to
age, vandalism or major plumbing required for repair. The present
inventory of fountains has been reduced to this level through removal of
approximately 30 units over the past three (3)years. These removals were
fountains which did not meet existing plumbing codes or were
uneconomical to repair. Other park fixtures such as fences, ballfield
backstops, goals and furniture (tables, benches and bleachers) range in
condition and are repaired as needed utilizing available operating funds:
each year.
11. Maintenance Sfryice L&vels
Services include grounds maintenance (mowing and litter collection), athletic
fields maintenance (field lining and dragging), horticultural maintenance (bed
weeding and shrub pruning) and trades (electrical, plumbing, welding,
carpentry, painting and playground maintenance).
A), Mowing is done by both in-house personnel and by contract. Parks are
mowed,dn afourteen(14) day cycle and medians on a twenty-one (21)day
cycle, during,,the growing season. Exceptions include Central Business
District sites, mowed every seven (7) days, league play athletic fields
1QC11Cr% OV'rUC r4-rV &A A KI^f'-CM 'rMV AGE
INFORMAL REPORT TO CITY COUNCIL MEMBERS No.
T
To the Mayor and Members of the City Council
X Subject: June 4, 1996
ion Page 3 of 6
REPORT ON THE PARK SYSTEM
mowed every seven(7) days during the playing season and naturalized sites
mowed four to six (4 - 6) times per year. The above mowing frequencies
were initiated in FY 1992-93 and public response has generally been
acceptable. The only times when complaints are received are when the time
between mowing is extended because of wet conditions, contractor non
performance, or equipment failure.
B) Litter collection occurs in parks twice weekly and is removed from
medians as necessary. Downtown sites and the Will Rogers Memorial
Center receive litter removal up to five (5) times per week. Public
reaction to these collection cycles has been acceptable, with some
complaints received about litter in the downtown area.
Q As part of a reorganization in 1994 the Department established optimum
service level guidelines for athletic fields which resulted in the
categorizing of fields into five (5) categories; Level 1 receiving intense
and frequent maintenance, Level 2 frequent, Level 3 twice monthly, Level
4 monthly and,Level 5 in accordance with the adjacent park. Due to
resource levels, all fields are actually maintained one level below the
desired level. Fields which contain irrigation systems are watered to
prevent cracking of the soil only. The Gateway and Rolling Hills
complexes are watered more frequently, however, they are only watered
half as much as they were prior to budget reductions implemented in the
FY 92-93 budget.
Public reaction to these service levels has been mixed. It is believed that,
the overuse of a limited number of fields combined with a lower service
level has contributed to the user concerns.
D) Horticulture maintenance is done by in-house personnel and includes shrub
trimming and bed weeding on an as needed basis at the Botanic Garden
and every six (6) weeks in other areas. In general, beds are located
adjacent to community centers, libraries, swimming pools, buildings at
the Will Rogers Memorial Center and downtown parks. Public reaction
to the service levels has been good at most locations. Exceptions include
the Will Rogers Memorial Center and downtownarica- where me
complaints have been received. OFFICIAL RECORD
CITY SECRFIARY
FL WORT110 T'EL
ISSUED BY THE CITY MANAGER FORT WORTH,TEXAS
rc
INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 8005
T
To the Mayor and Members of the city Council
X Subject: June 4, 1996
1873 Page 4 of 6
REPORT ON THE PARK SYSTEM
E) Trades services are primarily provided by in-house personnel with
electrical services augmented by private contract and the Transportation
and Public Works Department as needed. Since FY 1991-92 operating
dollars for supplies has increased from $64,000 to $91,000 which
represents a,42% increase. This demand in resources is reflective of an
aging infrastructure requiring more resources to maintain.
1) Electrical services are conducted on ballfield lights, swimming pools,
park security lights, group shelters and in support of various special
events. Due to aging systems, increased demands and previously
incurred resource reductions, service levels, are inadequate. Services
are conducted on a priority basis, with Priority I requests (safety
related) having first priority. During FY 1994-95 the Department met
its goal of 48 hour response time at a rate of only six percent (6%) for
Priority I requests. Public response has been.less than acceptable to
electrical services.
2) Plumbing services are conducted on swimming pools, irrigation
systems, drinking fountains and display fountains. Irrigation systems
and display fountains are maintained at an adequate level. However,
due to aging systems and vandalism, park drinking fountains have been
reduced from 126 to 86 during the last three (3) years. In general,
public reaction to these service losses has been acceptable. Changing
ordinances dealing with protection of drinking water system and waste
water disposal will continue to make these amenities more costly to
provide.
3) Playground maintenance services include a monthly inspection of each
of the 129 playgrounds in the system. Public reaction to maintenance
service levels of playgrounds has been generally acceptable. The only
exception is when playground structures are removed for safety reasons.
111. Operating Resources
Attached is a summary of General Fund Operating Budget resource reductions
which have been implemented since FY 1992-1993. The total reductions for
park maintenance during this period amounts to $1,381,240 and 41 authorized
positions.
ISSUED BY THE CITY MANAGER FORT WORTH,TEXAS
INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 8W5
C'00-TEp�
To the Mayor and Members of the City Council
June 4, 1996
Subject:
1873 Page 5 of 6
REPORT ON THE PARK SYSTEM
IV. Alternative Funding Efforts
During the past four (4) years the Department has sought and solicited a variety
of funding opportunities to address both infrastructure and maintenance service
level needs.
During the annual budget process, Decision Packages have been proposed to
address playgrounds and playground maintenance, electrical and plumbing
systems and maintenance, athletic field maintenance, and supplies, i.e.,
fertilizer, plants and water. Due to other priorities and limited resources, none
of the proposals have been funded. In addition, funding requests for
infrastructure replacements for playgrounds, swimming pools, ballfield lights
and parking lots have been submitted during the Community Development
Block Grant budget process and as part of a comprehensive listing of projects
to be considered for funding from the Capital Projects Reserve Fund.
For the Year XXII Community Development Block Grant Fund budget funding
has been appropriated to replace five (5) playgrounds, one (1) ballfield lighting
system (Rosemont Park) and repairs to the floor at Sycamore-Swimming Pool.
In addition, funds for additional (not replacement) security lights have been
appropriated; however, no operating funds to maintain these new lights have
been allocated.
V. Summary
Overall, current maintenance resource allocations are appropriate to meet
established service levels for parklands and facilities maintenance. Exceptions
included electrical and plumbing services where aging systems require a higher..
and more frequent level of service; athletic fields services where overuse places
a greater burden on existing facilities; and grounds maintenance services where
public concern in some areas exists and inflation factors place a greater demand
on existing funds for contractual services.
The aging infrastructure has and will continue to result in deterioration of our
playgrounds, lighting systems (particularly at athletic fields) and parking lots
and park roads.
fi"RD" '
CIV SEC llf:"I'ARYI
FT. Nllakfilf
ISSUED BY THE CITY MANAGER FORT WORTH,TEXAS
INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 8W5
To the Mayor and Members of the City Council
r�X
Subject: June 4, 1996
fan Page 6 of 6
REPORT ON THE PARK SYSTEM
V1. Conclusion
To address areas of concern, the Department will continue its policy of
accepting additions to the system only when appropriate level operation and
maintenance funds are allocated and remove systems when they are deemed
hazardous or uneconomical to repair. Finally, resources to address deficiencies
in service levels and deteriorated infrastructure systems will continue to be
pursued from all potential funding sources.
ob Terrell
-'City Manager
Attachment
100 1 ICM OV11rum f%1"rV Am^KI A 1410T WnPT14 TPY A Q
SUMMARY OF GENERAL FUND OPERATING BUDGET-RESOURCE REDUCTIONS
SINCE 1992-93
DESCRIPTION A.P. AMOUNT ADJUSTMENT
1. MAINTENANCE
Grounds Maintenance-Districts (9) ($ 177,450) Contracted out
Grounds Maintenance-Lake Worth (5) ($ 112,230) Contracted out
Reduce Mowing Cycle --- ($ 71,319) 7&14 to 14&21 day cycle
Reduction of Seasonal Maint.Activities (3) ($ 158,089) Reduction in service
Elimination of irrigation --- ($ 162,370) Reduction in service
Decrease in Agricultural/Botanical
Supplies --- ($ 16,812) Reduction in service
Delete Botanic Garden Annual (3) ($ 101,151) Reduction in service
Color&Turf Care partial funding thru
garden support groups
Deletion of color plantings citywide ($ 19,315) Reduction in service
Change to Seasonal Extra Help (6) $ 62,524) Change in service
Increase in funds for Water/Wastewater --- $ 10,000 Adopt A Park Program
2. TRADES
Elimination of skilled trades positions (9) ($ 350,000) Reduction in service
and supplies
Addition of funds to convert --- $ 20,453 Change in service
bond construction crew to
general fund
Elimination of Equipment Operator 11 (1) 40,804) Reduction in service
& Truck
3. FORESTRY
Elimination of Street Tree (4) ($ 103,549) Reduction in service
Maintenance Crew
Elimination of Park Supervisor
in Landscape Production (1) ($ 36,080) Reduction in service
TOTAL (41) ($1,381,240)
OHICIAI
CITY SECRE"ARY
T11, TEX.
Ors,, t
...............