Loading...
HomeMy WebLinkAboutContract 61865-CO261865-CO2 FORT WORTH, Project Name I 103969 Round 5 CD 9 Street Repair Program Client Project #(s) I 103969 & CO2445 Project City of Fort Worth Change Order Request ICity Sec # I 61865 Description Street Repair Program Near South Side Medical District Water and Sanitary Improvements Contractor) Woody Contractors Inc. Change Order #I 2 I Date 2/28/2025 City Project Mgr.I Gustavo A. Vallejo City Inspector Charles Hayes Dept. Unit 1: Water Unit 2: Sewer Unit 3: Paving Totals Contract Time (CD) Original Contract Amount $4,489,626.40 $1,227,857.80 $4,315,997.10 $10,033,481.30 450 Extras to Date 5 Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $4,489,626.40 $1,227,857.80 $4,315,997.10 $10,033,481.30 455 Amount of Proposed Change Order $25,424.80 10 $25,424.80 $0.00 $0.00 $0.00 Revised Contract Amount $10,058,906.10 465 $4,515,051.20 $1,227,857.80 $4,315,997.10 Original Funds Available for Change Order $501,673.86 $224,481.00 $61,393.00 $215,799.86 Remaining Funds Available for this CO $224,481.00 $61,393.00 $215,799.86 $501,673.86 Additional Funding (if necessary) CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.25% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST +25%) $12,541,851.63 JUSTIFICATION (REASONS) FOR CHANGE ORDER IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL: Furnish all labor and materials as specified in Change Order #2. Change Order #2 includes bid items for the replacement of 16 linear feet (LF) of existing 24" RCP storm drain,16 LF of existing 30" RCP storm drain, and the replacement of an existing storm drain junction box, all of which are located at the intersection of W. Magnolia Ave and S. Lake St. During installation of a proposed 30" waterline at this location, it was determined that above -mentioned stormwater assets in close proximity would need to be replaced for proper installation of the waterline. Time: Ten (10) calendar days (January 24, 2025 — February 3, 2025) have been approved and added to the contract time for the additional work. Cost: The City has compared the new bid items with current contract prices from other projects under construction at the time of the change order, and has determined that the contractor's proposed pricing is fair and reasonable. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the nerson responsible for the monitorine and administration of this contract. includine ensurine all performance and renortine requirements. Contractor's Company Name Contractor (Name) Contract Signature Date Woody Contractors, Inc. Troy Woody i ,w Mar 19, 2025 Inspector/Inspection Supervisor Date Project and Contract Compliance Manager Date 6s 10_1 -=- Mar31,2025 1'� Apr4,2025 Program Manager Date Senior Capital Project Officer Date Apr 18, 2025 .- Apr 21, 2025 Assistant Director (Dept) Date Director, Contracting Department (Dept) Date Patricia �. wads T Apr 23, 2025 A—Z Apr 24, 2025 Assistant City Attorney Date Assistant City Manager Date Apr 24, 2025 May 1, 2025 Council Action (if required) M&C Number I N/A ATTEST: acFFORr °a �90d a`6.Id A_ pro Ig P� Jannette Goodall, City Secretary dPaaIln6g4a'' M&C Date Approved I N/A OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORTWORTH City of Fort Worth V. Change Order Additions Project Name 1 103969 Round 5 CD 9 Street Repair Program City Sec # 1 61865 Client Project # 1 103969 & CO2445 I Contractor I Woody Contractors Inc. PM 1 Gustavo A. Vallejo Inspector I Charles Hayes Change Order Submittal # �J Date 1 2/28/2025 1 ADDITIONS ITEM DESCRIPTION DEPT City Unit Unit Cost Total 1 86 3341.0302 30" RCP, Class III Unit 1: Water 16.00000000 LF $275.00 $4,400.001 87 3341.0205 24" RCP, Class III Unit 1: Water 16.00000000 LF $212.00 $3,392.001 88 3349.0003 6'Storm Junction Box Unit 1: Water 1.00000000 EA $15,400.00 $15,400.001 89 0241.3401 Remove 4' Storm Junction Box Unit 1: Water 1.00000000 EA $1,300.00 $1,300.001 90 0241.3015 Remove 24" Storm Line Unit 1: Water 16.00000000 LF $20.00 $320.001 91 0241.3017 Remove 30" Storm Line Unit 1: Water 16.00000000 LF $20.00 $320.001 92 3301.0002 Post -CCTV Inspection Unit 1: Water 32.00000000 LF $9.15 $292.801 1 1 1 1 1 1 1 1 1 I I I I I 1 I I I I I 1 I 1 I 1 I I I I I 1 Unit 1:Water I I I I I I I 1 1 I 1 I I I I I I I I I I 1 I I I I I $25,424.801 Unit 2: Sewer $0.001 Unit 3: Paving $0.001 $0.001 Sub Total Additions $25,424.801 Change Order Additions Page 4 of 6 FORTWORTH City of Fort Worth Change Order Deletions Project Name 103969 Round 5 CD 9 Street Repair Program City Sec # 1 61865 Client Project # 1 103969 & CO2445 Contractor) Woody Contractors Inc. PMI Gustavo A. Vallejo Inspectorl Charles Hayes Change Order Submittal # 2 Date 1 2/28/2025 DELETIONS ITEM DESCRIPTION DEPT oty Unit ' Unit Cost Total Unit 1: Water $0.00 Unit 2: Sewer $0.00 Unit 3: Paving $0.00 $0.00 Sub Total Deletions $0.00 Change Order Deletions Page 5 of 6 M/SBE for this Change Order M/SBE Sub Type of Service Amount for this CO Total $0.00 Previous Change Orders Co # DATE AMOUNT 1 12/4/2024 $0.00 Total I $0.00 I 103969/CO2445-CNCO-Round 5 CD 9 Street Repair Program - Near Southside Med Dist. Final Audit Report 2025-03-31 Created: 2025-03-19 By: Andrea Munoz (Andrea. Mu noz@fortworthtexas.gov) Status: Signed Transaction ID: CBJCHBCAABAAeXUIPZThQH40SXV4CY1BKirdwt 8ruTf "103969/CO2445-CNCO-Round 5 CD 9 Street Repair Program - Near Southside Med Dist." History Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) 2025-03-19 - 11:01:07 PM GMT- IP address: 204.10.90.100 Document emailed to Filogonio Munoz (Filogonio.Munoz@fortworthtexas.gov) for filling 2025-03-19 - 11:05:30 PM GMT E.1. Document emailed to Troy Woody (twoody202O@aol.com) for signature 2025-03-19 - 11:05:30 PM GMT P-► Document emailed to Charles Hayes (charles.hayes@fortworthtexas.gov) for signature 2025-03-19 - 11:05:30 PM GMT Email viewed by Troy Woody (twoody202O@aol.com) 2025-03-19 - 11:24:17 PM GMT- IP address: 209.73.183.38 Document e-signed by Troy Woody (twoody202O@aol.com) Signature Date: 2025-03-19 - 11:25:24 PM GMT - Time Source: server- IP address: 50.84.77.98 Email viewed by Charles Hayes (charles.hayes@fortworthtexas.gov) 2025-03-19 - 11:43:02 PM GMT- IP address: 166.205.58.27 Email viewed by Filogonio Munoz (Filogonio.Munoz@fortworthtexas.gov) 2025-03-20 - 2:51:53 AM GMT- IP address: 204.10.90.100 tJp Form filled by Filogonio Munoz (Filogonio.Munoz@fortworthtexas.gov) Form filling Date: 2025-03-20 - 2:40:36 PM GMT - Time Source: server- IP address: 204.10.90.100 Email viewed by Charles Hayes (charles.hayes@fortworthtexas.gov) 2025-03-31 - 11:43:08 AM GMT- IP address: 99.103.200.141 FORTWORTH, I Pawere"Y Adobe Acrobat Sign Document e-signed by Charles Hayes (charles.hayes@fortworthtexas.gov) Signature Date: 2025-03-31 - 11:45:23 AM GMT - Time Source: server- IP address: 99.103.200.141 m Agreement completed. 2025-03-31 - 11:45:23 AM GMT FORTWORTH, I Pawere"v Adobe Acrobat Sign 103969/CO2445-CNCO-Round 5 CD 9 Street Repair Program - Near Southside Med Dist. Interim Agreement Report 2025-04-21 Created: 2025-03-31 By: Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) Status: Out for Signature Transaction ID: CBJCHBCAABAAMYuhsezE3fedNLQVGDoQjnrC50SMxSvh Agreement History Agreement history is the list of the events that have impacted the status of the agreement prior to the final signature. A final audit report will be generated when the agreement is complete. "103969/CO2445-CNCO-Round 5 CD 9 Street Repair Program - Near Southside Med Dist." History Document created by Andrea Munoz (Andrea. Mu noz@fortworthtexas.gov) 2025-03-31 - 1:10:49 PM GMT- IP address: 204.10.90.100 Document emailed to Troy Gardner (troy.gardner@fortworthtexas.gov) for signature 2025-03-31 - 1:54:26 PM GMT Email viewed by Troy Gardner (troy.gardner@fortworthtexas.gov) 2025-03-31 - 1:54:53 PM GMT- IP address: 204.10.90.100 Document e-signed by Troy Gardner (troy.gardner@fortworthtexas.gov) Signature Date: 2025-03-31 - 1:57:42 PM GMT - Time Source: server- IP address: 204.10.91.100 Document emailed to Gustavo Vallejo (Gustavo.Vallejo@fortworthtexas.gov) for signature 2025-03-31 - 1:57:45 PM GMT Email viewed by Gustavo Vallejo (Gustavo.Vallejo@fortworthtexas.gov) 2025-04-04 - 1:26:24 PM GMT- IP address: 208.184.124.181 Document e-signed by Gustavo Vallejo (Gustavo.Vallejo@fortworthtexas.gov) Signature Date: 2025-04-04 - 1:27:12 PM GMT - Time Source: server- IP address: 208.184.124.181 Document emailed to Abolfazl Zakersalehi(abolfazl.zakersalehi@fortworthtexas.gov) for filling 2025-04-04 - 1:27:14 PM GMT FDRTWORTHs I P°`4'y Adobe Acrobat Sign Email viewed by Abolfazl Zakersalehi (abolfazl.zakersalehi@fortworthtexas.gov) 2025-04-12 - 5:45:50 PM GMT- IP address: 20.159.64.152 Email viewed by Abolfazl Zakersalehi (abolfazl.zakersalehi@fortworthtexas.gov) 2025-04-14 - 4:57:40 PM GMT- IP address: 20.159.64.138 Form filled by Abolfazl Zakersalehi (abolfazl.zakersalehi@fortworthtexas.gov) Form filling Date: 2025-04-14 - 6:19:38 PM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Gregory Robbins (Gregory.Robbins@fortworthtexas.gov) for signature 2025-04-14 - 6:19:40 PM GMT Email viewed by Gregory Robbins (Gregory.Robbins@fortworthtexas.gov) 2025-04-18 - 4:12:44 PM GMT- IP address: 20.159.64.152 Document e-signed by Gregory Robbins (Gregory.Robbins@fortworthtexas.gov) Signature Date: 2025-04-18 - 7:14:36 PM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Mary Hanna (Mary.Han na@fortworthtexas.gov) for signature 2025-04-18 - 7:14:39 PM GMT Email viewed by Mary Hanna (Mary.Hanna@fortworthtexas.gov) 2025-04-18 - 7:23:54 PM GMT- IP address: 166.205.58.29 FoRTWORTHs I P—m`l8y Adobe Acrobat Sign FORT WORTH. Routing and Transmittal Slip Transportation & Public Works. Department DOCUMENT TITLE' Round 5 CD 9 Street Repair Program — Near Southside Med Dist. M&C: 24-0555 CPN: 103969/CO2445 CSO: 61865 DOC#: Date: 12/10/2024 To: Name Department Initials Date Out 1. Filogonio Munoz TPW - initial Mar 20, 2025 2. Troy Woody Contractor -signature i,oYBdv Mar 19, 2025 3. Charles Hayes TPW - signature A&,Iaye, Mar31, 2025 4. Gustavo Vallejo TPW - signature -,74�- Apr 4, 2025 5. Abolfazl Zakersalehi Water - initial A' Apr 14, 2025 6. Greg Robbins TPW - signature Apr 18, 2025 7 Mary Hanna TPW - signature ��1' Apr 21, 2025 8 Patricia Wadsack TPW - signature pL Apr 23, 2025 9 Lauren Prieur TPW - signature ,'�� Apr 24, 2025 10. Doug Black Legal - signature D. WgB Apr 24, 2025 11. Jesica McEachern CMO - signature May 1, 2025 12. Jannette Goodall CSO - signatures May 1, 2025 13. TPW Contracts TPW DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review and take the next steps. NEEDS TO BE NOTARIZED: ❑YES ®No RUSH: ❑YES ®No SAME DAY: ❑YES ®No NEXT DAY: DYES ®No ROUTING TO CSO: ®YES ❑No Action Required:. ❑ As Requested ❑ For Your Information ® Signature/Routing and or Recording ❑ Comment ❑ File ❑ Attach Signature, Initial and Notary Tabs Return To: TPWContracts (&,FortWorthTexas. 2ov at ext. 7233 for pick up when completed. Thank you!