HomeMy WebLinkAboutContract 59323-CO359323-0O3
City of Fort Worth
Change Order Request
Project Namel 102980 - 2022 Bond Yr 1- Contract 6
Client Project #(s)l 102980
Project
City Sec # I 59323
Description) Combined Street Paving Improvements, Water and Sanitary Sewer Main Replacements for 2022 Bond Year 1 - Contract 6
Contractorl Stabile and Winn, Inc. I Change Order #I 3 1 Datel 4/16/2025
City Project Mgr.I Gustavo A. Vallejo City Inspectorl Ariel Duarte
Dept.
Unit 1: Water
Unit 2: Sewer
Unit 3: Paving
Contract Time
Totals
(CD)
Original Contract Amount
$3,207,420.25
$1,103,711.00
$3,690,507.84
$8,001,639.09
450
Extras to Date
$20,040.00
$20,022.00
$40,062.00
88
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
$3,227,460.25
$1,123,733.00
$3,690,507.84 1
$8,041,701.09
538
Amount of Proposed Change Order
$0.00
$0.00
$0.00
$0.00
13
Revised Contract Amount
$3,227,460.25
$1,123,733.00
$3,690,507.84
$8,041,701.09
551
Original Funds Available for Change Orders
$160,371.00
$77,260.00
$184,525.16
$422,156.16
Remaining Funds Available for this CO
$140,331.00
$57,238.00
$184,525.16
$382,094.16
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 0.50%
MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $10,002,048.86
JUSTIFICATION (REASONS) FOR CHANGE ORDER ad
IN ACCORDANCE WITH THIS CHANGE ORDER REQUEST, THE CONTRACTOR SHALL: Furnish all labor and material as per the proposed Change Order #3.
This change order includes additional pay items for the removal of the existing coating on the manhole located at the intersection of Belzise Terrace and E Richmond Ave (Sta
23+25.16). It also covers the isolation and flushing of the fire line at 2000 E Richmond Ave to facilitate the reconnection of the building's fire line to the main water line. This
change order also includes the removal and replacement of the retaining wall on Belzise and Harvey due to TDLR inspection.
The pricing for the Water and Sewer additional pay items was consistent with rates from other recently bid projects and was approved by the water project manager.
Staff supports the Contractor's request for an additional 13 calendar days to allow for the contractor to complete the additional work.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges
that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting
requirements.
Contractor
Contract Signature
Stabile and Winn, Inc.
Jerry Henderson
, -r
Apr 18, 2025
Project and Contract Compliance Manager
Al-k ,7kuPM y
Apr 19, 2025
1
Apr 19 22025
Date
Senior Capital Project Officer
Date
Apr 21, 2025
MN!"`
Apr 21, 2025
Assistant Director Dept
Date
Director, Contracting Department Dept
Date
Patricia 1. wadsack
Apr 23, 2025
Apr 24, 2025
Assistant City Attorney
Date
JAssistant City Manager
QLiBt
Apr 24, 2025
May 2, 2025
Council Action (if required)
M&C Number I NA
a oo,,, od
ATTEST: P �o ' 00�
o
pd
e �� 0�'-0d
OVo 0o
=d—
Jannette Goodall, City Secretary �0 * PP
as
C�TEXA`�o4p
nnaaaoo
M&C Date Approved I NA
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH
City of Fort Worth
..W.'
Change Order Additions
Project Name 1 102980 - 2022 Bond Yr 1- Contract 6
I City Sec # 1 59323
Client Project# 1 102980
1
Contractorl Stabile and Winn, Inc.
I PM I Gustavo A. Vallejo I
Inspectorl Ariel Duarte
I
Change Order Submittal # 0
Date 1 4/16/2025 1
ADDITIONS
I I EM
UESCKIP I ION
UEP I Uty
Unit Unit Cost
t otal 1
bb
9999.0002 Isolate &Flush Existing Fire Line
Unit 1: Water 1.00000000
Lb $3,b00.00
$3,bUU.UU1
46
9999.0002 Removal Existing Raven Coating
Unit 2: Sewer 1.00000000
LS $5,750.00
$5,750.001
9
0241.0100 Remove Sidewalk
Unit 3: Paving 273.10000000
SF $3.00
$819.3U1
23
3123.0105 Borrow by Delivery
Unit 3: Paving 22.00000000
CY $22.00
$484.001
30
3213.0301 4" Conc Sidewalk
Unit 3: Paving 25.00000000
SF $12.00
$30U.0U1
32
3213.0321 Conic Sidewalk, Adtacent to Het Wall
Unit 3: Paving 248.1000000U
SF $14.00
$3,413.4U1
46
3232.0100 Conic Ret Wall Adjacent to Sidewalk
Unit 3: Paving 75.10000000
SF $115.00
$8,638.5U1
62
0241.0600 Remove Wall <4'
Unit 3: Paving 42.20000000
LF $12.00
$WIJAUI
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Unit 1: Water
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
$3,500.001
I
Unit 2:Sewer
$5,750.001
Unit 3:Paving
$14,219.601
I
$0.001
Sub Total Additions
$23,469.601
Change Order Additions Page 4 of 6
FORTWORTH City of Fort Worth
Change Order Deletions
Project Name 1 102980 - 2022 Bond Yr 1- Contract 6 I City Sec # 1 59323 1
Client Project # 1 102980 1
Contractorl Stabile and Winn, Inc. PMI Gustavo A. Vallejo I Inspedorl Ariel Duarte l
Change Order Submittal # Date 1 4/16/2025 1
DELETIONS
llLM
ULSUKIPI IUN
ULPI
Uty
Unit Unit Cost
total 1
52
9999.u0U1 water Construction Allowance
Unit l: Water
0.03500uou
LS $luu,uuu.UU
$3,5uu.U01
44
9999.0001 Sewer Construction Allowance
Unit 2: Sewer
0.08214290
LS $70,000.OU
$5,750.001
60
9999.0010 Paving Construction Allowance
Unit 3: Paving
0.1421960U
LS $100,000.OU
$14,219.601
1
1
1
1
1
1
1
1
1
1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
Unit 1:Water
1
1
1
1
1
1
1
1
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1
3,500.001
Unit 2: Sewer
t5,750.001
Unit 3: Paving
$14,219.601
$0.00
Sub Total Deletions
$23,469.6u
Change Order Deletions Page 5 of 6
M/SBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
NA NA $0.00
Total $0.00
Previous Change Orders
co # DATE I AMOUNT
4/22/2024
8/5/2024
$40,062.00
$0.00
Total I $40,062.00
FORT WORTHO
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE • 2022 Bond Year 1 Contract 6 - Change Order #3
M&C: CPN: 102980 CSO: 59323 DOC#:
Date: 4/16/2025
To:
Name
Department
Initials
Date Out
L
Filogonio Munoz
TPW - initial
Apr 18, 2025
2.
Jerry Henderson
Contractor - signature
Apr 18, 2025
3.
Ariel Duarte
TPW - signatures
Apr 19, 2025
4.
Gustavo Vallejo
TPW - signatures
Apr 19, 2025
5.
Greg Robbins
TPW - signatures
Apr 21, 2025
6.
Mary Hanna
TPW - signature
'I/
Apr 21, 2025
7.
Patricia Wadsack
TPW - signature
PLW
Apr 23, 2025
8.
Lauren Prieur
TPW - signature
a ,
Apr 24, 2025
9.
Doug Black
Legal - signature
Doug
Apr 24, 2025
10.
Jesica McEachern
CMO - signature
C�*
May 2, 2025
11.
Jannette Goodall
CSO - signature
J-4-
May 2, 2025
12.
TPW Contracts
TPW
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments
requesting City Manager's
signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval
first. Once the ACM has signed the routing slip, Jay will review
and take the next steps.
NEEDS TO BE NOTARIZED: DYES ®No
RUSH: ❑YES ®No SAME DAY: DYES ®No NEXT DAY: DYES ®No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContracts (ibFortWorthTexas.�zov at ext. 7233 for pick up when completed.
Thank you!