HomeMy WebLinkAboutContract 59482-FP4-FP4 FORT WORTH, City Secretary 59482 Contract No. Date Received 5/5/2025 AT NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Rocky Creek Crossing Ph City Project No.: 103936 Improvement Type(s): ❑ Paving ❑ Drainage Original Contract Price: Amount of Approved Change Order(s) Revised Contract Amount: Total Cost of Work Complete: L1&- Arturo Sanren (Anr 29. 202511.07 CDTl Contractor Superintendent Title Conatser Construction, TX LP Company Name Project Inspector Kral Taafat i P.E. KhA JCA- P.E. (Mav 4. 202522:52 CDT) Project Manager Kandice Merrick (Mav 5. 202508:48 CDTI CFA Manager de ..Z..,,_ Lauren Prieur (May 6, 2025 0925 CDT) TPW Director Asst. City Manager ❑x Street Lights $609,850.00 $14,938.00 $624,788.00 $624,788.00 04/29/2025 Date 05/02/2025 Date 05/04/2025 Date 05/05/2025 Date 05/06/2025 Date 05/06/2025 Date ❑ Traffic Signals OFFICIAL RECORD CITY SECRETARY Page 1 of 2 FT. WORTH, TX Notice of Project Completion Project Name: Rocky Creek Crossing Ph1 City Project No.: 103936 City's Attachments Final Pay Estimate ❑x Change Order(s): ❑x Yes O N/A Contractor's Attachments Affidavit of Bills Paid Consent of Surety Statement of Contract Time Contract Time 360 WD Days Charged: 244 WD Work Start Date: 8/21/2025 Work Complete Date: 3/20/2025 Completed number of Soil Lab Test: 1531 Completed number of Water Test: 31 Page 2 of 2 FORT WORT 11 CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name ROCKY CREEK CROSSING, LTD Contract Limits Project Type STREET LIGHTING City Project Numbers 103936 DOE Number 3936 Estimate Number 1 Payment Number 1 For Period Ending 3/20/2025 WD City Secretary Contract Number Contract Time 36WD Contract Date Days Charged to Date 244 Project Manager NA Contract is 100.00 Complete Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH, TX 76119 Inspectors G.DEYON / J.RUIZ Tuesday, April 29, 2025 Page 1 of 4 City Project Numbers 103936 DOE Number 3936 Contract Name ROCKY CREEK CROSSING, LTD Estimate Number I Contract Limits Payment Number I Project Type STREET LIGHTING For Period Ending 3/20/2025 Project Funding UNIT V: STREET LIGHTING IMPROVEMENTS Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 2" CONDT PVC SCH 80 (T) (CO#4) 6467 LF $14.00 $90,538.00 6467 $90,538.00 2 NO 6 INSULATED ELEC CONDR 16200 LF $4.50 $72,900.00 16200 $72,900.00 3 TYPE 11 STREET LIGHT FOUNDATION 83 EA $1,200.00 $99,600.00 83 $99,600.00 4 TYPE 11 STREET LIGHT PLOE 83 EA $3,000.00 $249,000.00 83 $249,000.00 5 TYPE 33B STREET LIGHT ARM 83 EA $500.00 $41,500.00 83 $41,500.00 6 TYPE R2 STREET LIGHT 76 EA $850.00 $64,600.00 76 $64,600.00 7 -------------------------------------- TYPE R4 STREET LIGHT 7 EA $950.00 $6,650.00 7 $6,650.00 Sub-Total of Previous Unit $624,788.00 $624,788.00 Tuesday, April 29, 2025 Page 2 of 4 City Project Numbers 103936 Contract Name ROCKY CREEK CROSSING, LTD Contract Limits Project Type STREET LIGHTING Project Funding Contract Information Summary Original Contract Amount Change Orders Change Order Number 4 Total Contract Price DOE Number 3936 Estimate Number I Payment Number I For Period Ending 3/20/2025 $609,850.00 $14,938.00 $624,788.00 Total Cost of Work Completed $624,788.00 Less % Retained $0.00 Net Earned $624,788.00 Earned This Period $624,788.00 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $624,788.00 Tuesday, April 29, 2025 Page 3 of 4 City Project Numbers 103936 Contract Name ROCKY CREEK CROSSING, LTD Contract Limits Project Type STREET LIGHTING Project Funding Project Manager NA Inspectors G.DEYON / J.RUIZ Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH, TX 76119 DOE Number 3936 Estimate Number I Payment Number I For Period Ending 3/20/2025 City Secretary Contract Number Contract Date Contract Time 360 WD Days Charged to Date 244 WD Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed $624,788.00 Less % Retained $0.00 Net Earned $624,788.00 Earned This Period $624,788.00 Retainage This Period $0.00 Less Liquidated Damages 0 Days @ $0.00 / Day $0.00 LessPavement Deficiency $0.00 Less Penalty $0.00 Less Previous Payment $0.00 Plus Material on Hand Less 15% $0.00 Balance Due This Payment $624,788.00 Tuesday, April 29, 2025 Page 4 of 4 DEVELOPER -AWARDED -PROJECT CHANGE ORDER PROJECT NAME: Rocky Creek Phase 1 CHANGE CONTRACT: Water, Sewer, Drainane, Paving and Street Lioht Improvements ORDER No: CFA # CITY PARTICIPATION:I NO CITY PROJECT # 103936 DOE # NA Al WATER PROJECT# 30114-0200431-103936-EO7685 SEWER PROJECT # 30114-0200431-103936-E07685 FILE # W-2835 RECEIVED INSPECTOR: James Ruiz Phone No: 817-205-1256 PROJECT MANAGER: Khal Jaafari Phone No: 817-392-7872 By Khal Jaafari at 3:59 pm, Aug 08, 2023 CONTRACT UNIT WATER SEWER PAVING I DRAINAGE STREET LIGHTS CONTRACT Developer I Developer DAYS Cost Cityco.t )Developer Cost City Cost Developer Cost�—Clty Cost Developer Cost City Cost (Cost CI Cost ORIGINAL CONTRACT $1,872,324.50 $2,051,578.50 $3,626,245.85 $3,159,702.00 I 320 EXTRAS TO DATE ' CREDITS TO DATE CONTRACT TO DATE $1,872,324.60 $0.00 $2,061,678.60 50.00 $3,626,246.85 $0.00 $3,169,702.00 $0.00 $0.00 90.00 320 AMOUNT OF PROP. CHANGE ORDER S 17,528.60 $ 1,900.00 REVISED CONTRA TAMOUNT $1,872,324.50 50.00 52,069,107.10 50.00 $3,526,245.86 $0.00 $3,161,602.00 SD.OD $O.DO f0.D0 320 TOTAL REVIS@D CONTRACT AMOUNT PER UNIT $1,872,324.50 $2,069,107.10 $3,526,245.85 $3,161,602.00 $0.00 REVISED COST SHARE Dev. Cost: $10,629,279.45 Clty Cost: $0.00 TOTAL REVISED CONTRACT $10,629,279.45 Revised: 7/28/2023 Page 1 RECEIVED Asterisk ("} indicates a new pay item number. By K%al Jaafarl at 4: 00 pm, Aug 08, 2023 You are directed to make the following changes in the contract documents: UNIT ll: SANITARY SEWER IMPROVEMENTS CITY BID ITEM PAY ITEM # # QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE TOTAL 4 3331.4115 -14176 LF 8" Sewer P�e i`SDR-26, ASTM D2241 69 $ {978,144.001 13- 3331.4115 14176 LF 8" Sewer Pipe i-sDR-26, ASTM D3034j 68.1 $ 965,385.60 7 3339.0001 51.4 VF EpoxjY' Manhole Liner 455 $ 23,387.00 8 3339.1001 -69 EA d' Manhole 4500 $ 310,500.0M 8 3339.1001 69 EA 4' Manhole 4600 $ )17,400.00 TOTAL $ 17,528.60 UNIT III: DRAINAGE IMPROVEMENTS CITY BID ITEM PAY ITEM # # QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE TOTAL 14 3349.0001 -4 EA 4' Storm Junction Box 6000 $ i24,000.00i 14 3349.0001 4 EA 4' Storm Junction Box 6100 $ 24,400,06 15 3349.0002 A EA 5' Storm Junction Box 7000 $ (28,000.00) 15 3349.0002 4 EA 5' Stonn Junction Box 7100 $ 28,400,00 16 3349,0003 -3 EA 6' Storm Junction Box 8000 $ ,24,000.001 16 3349.0003 3 EA 6' Storm Junction Box 8100 $ 24,300.06 18 3349.0102 -8 EA 4' Manhole Riser 4500 $ (36,000.01)1 18 3349.0102 8 EA 4' Manhole Riser 4600 $ 36,800,00 TOTAL I $ 1,900.00 REASONS FOR CHANGE ORDER Change 8" sanitary sewer from ASTM D2241 to ASTM D3034 Add epoxy finer at seven sanitary manholes per revision 1 on plans Add $100 to unit cost for sanitary manholes and storm junction boxes for composite grade rings NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER. RECOMMENDED: LJA ENineering, Inc. By. Name: Ronald Salamie, PE Title: Senior Project Emaineer APPROVED: Rocky Cree g Ltd. By: J�A Name: Max Miller Tide: Director APPROVED: ConatserCo c(ion TX L.P. By: Name: J}BN! �'` `! Title: /�/ a&,06f I — Revised: 7/28/2023 Page 2 DEVELOPER -AWARDED -PROJECT CHANGE ORDER PROJECT NAME: Rocky Creek Phase 1 CONTRACT: Water, Sewer, Drainage, Paving and Street Light Improvements CFA # CITY PARTICIPATIONd NO CITY PROJECT # 103936 CITY SECRETARY CONTRACT # NA FID # 30114-0200431-103936-EO7685 X # 30114-0200431-103936-EO7685 FILE # W-2835 INSPECTOR: James Ruiz Phone No: 817-205-1256 PROJECT MANAGER: Khal Jaafari Phone No: 817-392-7872 CHANGE ORDER No: A2 RECEIVED By Khal Jaafari at 5:20 pm, Aug 29, 2024 CONTRACT UNIT WATER SEWER DRAINAGE PAVING STREETLIGHTS CONTRACT Developer F DAYS Cost City Cost Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost ORIGINAL CONTRACT $1,872,324.50 $0,00 $2,051,578,50 $0.00 $3,159,702.00 $0.00 $3,526,245.85 $0.00 $0.00 320 EXTRAS TO DATE $0.00 $ 17,528.60 $0.00 $1,900.00 $0.00 $0.00 $0.00 CREDITS TO DATE CONTRACT TO DATE $1,872,324.50 $0.00 $2,069,107.10 $0.00 $3,161,602.00 $0.00 $3,526,245.85 $0.00 $0.00 320 AMOUNT OF PROP. CHANGE ORDER ($120,214.00) $0.00 ($2,431.20) $0.00 $0.00 $0.00 $9,154.05 $0.00 $0.00 REVISED CONTRACT AMOUNT $1,752,110.50 $0.00 $2,066,675.90 $0.00 $3,161,602.00 $0.00 $3,535,399.90 $0.00 $0.00 320 TOTAL REVISED CONTRACT AMOUNT PER UNIT $1,752,110.50 $2,066,675.90 $3,161,602.00 $3,535,399.90 I $0.00 REVISED COST SHARE Dev. Cost: $10,515,788.30 iCity Cost: TOTAL REVISED CONTRACT $10,515,788.30 08/29/2024 Page 1 You are directed to make the following changes in the contract documents: UNIT I: WATER IMPROVEMENTS CITY BID ITEM PAY ITEM # # QUANTITY UNIT ITEM DESCRIPTION CFW Unit Price UNIT PRICE Developer Cost City Cost TOTAL I 1 3311.1041 -57 LF 6" P.V.C. Water pipe 52 ($2,964.00) ($2,964.00) I 5 3312.3002 -1 FA 6" Gate Valve 1000 ($1,000.00) ($1,000.00) I 18 9999.0004 -2 EA 1.5" Backflow Preventer 500 ($1,000.00) ($1,000.00) 21 9999.0007 -1 EA 2" Backflow Preventer 750 ($750.00) ($750.00) 23 9999.0009 -2 FA 4" Backflow Preventer 20,500.00 ($41,000.00) ($41,000.00) 24 9999.0010 -3 FA 6" Backflow Preventer 24,500.00 ($73,500.00) ($73,500.00) TOTAL UNIT I: WATER IMPROVEMENTS 120 214.00 $0.00 ($120,214.00) I UNIT II: SANITARY SEWER IMPROVEMENTS CITY BID ITEM PAY ITEM # # QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE Developer Cost City Cost TOTAL 5 3331.4116 -1188 LF 8" Sewer Pipe (SDR-26, ASTM D2241 w/ CSS) 78 ($92,664.00 5 3331.4116 1188 LF 8" Sewer Pipe ( DR-26, ASTM D3034 w/ CSS) 77.1 $91.594.80 $91,594.80 I 13 3331.4115 -20 LF 8" Sewer Pipe (SDR-26, ASTM D3034) 68.1 ($1,362.00) ($1,362.00) TOTAL UNIT II: SANITARY SEWER IMPROVEMENTS ($2,431.20) 0 ($2,431.20) U 4IT IV: PAVING IMPROVEMENTS CITY BID ITEM PAY ITEM # # QUANTITY UNIT ITEM DESCRIPTION UNIT PRICE Developer Cost City Cost TOTAL 1 3113.0101 72 SY 6" Concrete Pavement 48 $3,456.00 $3.456.00 2 3211.0501 74 SY 6" Lime Treatment (30#/SY) 3.5 $259.00 $259.00 4 3211.04 1.11 TON Hydrated Lime (30#/SY) 255 $283.05 $283.05 6 3213.0302 -632 SF 5' Concrete Sidewalk 4.5 ($2,844.00) ($2,844.00) 9 3213.0506 4 EA Barrier Free Ramp, Type P-1 2000 $8,000.00 $8,000.00 TOTAL UNIT IV: PAVING IMPROVEMENTS $9,154.05 0 $9,154.05 I Asterisk (*) indicates New Pay Item I I RECEIVED By Khal Jaafari at 5:20 pm, Aug 29, 2024 08/29/2024 Page 2 REASONS FOR CHANGE ORDER Revise drainage area map and calculations to accommodate anticipated drainage for the Amenity Center (no cost impact). Remove backflow preventers from non-residential lots, as these are to be constructed with the developments on these lots. Remove fire service to amenity center lot. RECOMMENDED: LJJA Engineering, Inc. By: Fv w rc✓ g6vCe, •c Name: Ronald Salamie, PE Title: Senior Project Engineer APPROVAL RECOMMENDED: CFW - Water Department By: Name: NA Title: RECOMMENDED: CFW - `Contract Compliance Manager By: Name: NA Title: M&C Number: N / A M&C Date Approved: APPROVED: Rocky Creek Crossing Ltd. By: Ptoild h(Aug r2AOaxi n15'-xBCMDT) ith Name: Patrirk (man-Rmith Title: Virg. PrP.sident APPROVED: CFW - Assistant City Manager By: Name: NA Title: APPROVED: Conatser Construction TX, L.P. Brack X�wa rar By; 77 Name: Rrork HI IP JnS Title: President APPROVED AS TO FORM AND LEGALITY: CFW - Assistant City Attorney By: Name: NA Title: ATTEST ' Contract Compliance Manager (Project Manager): By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, include NA ensuring all performance and reporting requirements. Jannette S. Goodall City Secretary ❑� There are NO City Funds associated with this Contract ❑There are City Funds associated with this Contract RECEIVED By Khal Jaafari at 5:20 pm, Aug 29, 2024 08/29/2024 Page 3 DEVELOPER -AWARDED -PROJECT CHANGE ORDER PROJECT NAME: Rocky Creek Phase 1 CHANGE ICONTRACT: Water, Sewer, Drainage, Paving and Street Light Improvements ORDER No: ICFA# I CITY PARTICIPATION:( NO (CITY PROJECT# 103936 (CITY SECRETARY CONTRACT# NA A3 FID # 30114-0200431-103936-EO7685 X # 30114-0200431-103936-EO7685 FILE # W-2835 INSPECTOR: James Ruiz Phone No: 817-205-1256 RECEIVED PROJECT MANAGER: Khal Jaafari Phone No: 817-392-7872 By Khal Jaafari at 5:41 pm, Aug 29, 2024 / CONTRACT UNIT WATER SEWER DRAINAGE PAVING STREETLIGHTS CONTRACT DAYS Developer Cost City Cost Developer Cost City Cost Developer Cost yiTost Developer Cost City Cost Developer Cost City Cost IORIGINAL CONTRACT $1,872,324.50 $0.00 $2,051,578.50 $0.00 $3,159,702.00 $0.00 $3,526,245.85 $0.00 $0.00 320 (EXTRAS TO DATE ($120,214.00) $0.00 t $ 15,097.40 F $0.00 $1,900.00 $0.00 ` $ 9,154.05 { $0.00 $0.00 (CREDITS TO DATE ICONTRACT TODATE $1,752,110.50 $0.00 $2,066,675.90 $0.00 $3,161,602.00 $0.00 $3,535,399.90 $0.00 $0.00 $0.00 320 (AMOUNT OF PROP. CHANGE ORDER $6,000.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 IREVISED CONTRACT AMOUNT $1,758,110.50 $0.00 $2,066,675.90 $0.00 $3,161,602.00 $0.00 $3,535,399.90 $0.00 $0.00 $0.00 320 TOTAL REVISED CONTRACT AMOUNT PER UNIT $1,758,110.60 $2,066,675.90 $3,161,602.00 $3,535,399.90 $0.00 REVISED COST SHARE Dev. Cost: $10,521,788.30 City Cost: $0.00 TOTAL REVISED CONTRACT $10,521,788.30 You are directed to make the following changes in the contract documents: UNIT I: WATER IMPROVEMENTS CITY BID ITEM PAY ITEM # # QUANTITY UNIT ITEr D SC IPTION CFW Unit Price UNIT PRICE Developer Cost City Cost TOTAL 15 9999.0001 4 EA 1" Irrigaionervice 1500 $6,000.00 $6,000.00 $0.00 $0.00 TOTAL UNIT I: WATER IMPROVEMENTS $6,000.00 0.00 $6,000.( 08/19/2024 Page 1 REASONS FOR CHANGE ORDER Add Irrigation Services for Open Spaces RECOMMENDED: L,JJA Engineering, Inc. By: Name: Ronald Salamie, PE Title: Senior Project Engineer APPROVAL RECOMMENDED: CFW - Water Department By: Name: NA Title: RECOMMENDED: CFW- `Contract Compliance Manager By: Name: NA Title: M&C Number: N / A M&C Date Approved: RECEIVED By Khal Jaafari at 5:42 pm, Aug 29, 2024 APPROVED: Rocky Creek Crossing Ltd. PafrCck Carrinr�-Snu!% Name: Patrick Carriqan-Smith Title: Virg PrPsidf nt APPROVED: CFW- Assistant City Manager By: Name: NA Title: APPROVED: Conatser Construction TX, L.P. SI-oclr IIORaN'Nd Name: Brock Huaains Title: PrARldpnt APPROVED AS TO FORM AND LEGALITY: CFW - Assistant City Attorney By: Name: NA Title: ATTEST ` Contract Compliance Manager (Project Manager): By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, include NA ensuring all performance and reporting requirements. Jannette S. Goodall City Secretary There are NO City Funds associated with this Contract ❑There are City Funds associated with this Contract 08/19/2024 Page 2 DEVELOPER -AWARDED -PROJECT CHANGE ORDER PROJECT NAME: Rocky Creek Phase 1 CHANGE CONTRACT: Water, Sewer, Drainage, Paving and Street Light Improvements ORDER No: CFA # CITY PARTICIPATIONd NO CITY PROJECT# 103936 CITY SECRETARY CONTRACT # NA A4 FID # 30114-0200431-103936-EO7685 X # 30114-0200431-103936-EO7685 FILE # W-2835 ` INSPECTOR: James Ruiz Phone No: 817-205-1256 RECEIVED PROJECT MANAGER: Khal Jaafarl Phone No: 817-392-7872 By Khal Jaafari at 5:45 pm, Aug 29, 2024 ` CONTRACT UNIT WATER SEWER DRAINAGE PAVING STREETLIGHTS CONTRACT DAYS Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost Developer Cost City Cost Developer Cost_ City Cost ORIGINAL CONTRACT $0.00 $0.00 $0.00 $0.00 $609,850.00 $0.00 40 EXTRAS TO DATE $0.00 $0.00 $0.00 $0.00 $0.00 CREDITS TO DATE CONTRACT TO DATE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $609,850.00 $0.00 40 AMOUNT OF PROP. CHANGE ORDER $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $14,938.00 _ $0.00 0 REVISED CONTRACT AMOUNT $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $624,788.00 $0.00 40 TOTAL REVISED CONTRACT AMOUNT PER UNIT $0.00 $0.00 $0.00 $0.00 $624,788.00 REVISED COST SHARE Dev. Cost: TOTAL REVISED CONTRACT You are directed to make the following changes in the contract documents: CITY BID ITEM PAY ITEM # # QUANTITY 1 2605.3015 1067 Asterisk (*) indicates New Pay Item REASONS FOR CHANGE ORDER Street Light Conduit Relocation $624,788.00 City Cost: $624,788.00 $0.00 UNIT V: STREET LIGHTING IMPROVEMENTS UNIT ITEM DESCRIPTION UNIT PRICE Developer Cost City Cost TOTAL EA 2" CONDT PVC SCH 80(T) I 14 $14,938.00 I $14,938.00 TOTAL UNIT IV: PAVING IMPROVEMENTS $14,938.00 0 $14,938.00 08/29/2024 Page 1 RECOMMENDED: LJJA Engineering, Inc. By: {v^a �o Name: Ronald Salamie. PE Title: Senior Project Enqineer APPROVAL RECOMMENDED CFW - Water Department By: Name: NA Title: RECOMMENDED: CFW - 'Contract Compliance Manager By: Name: NA Title: M&C Number: N / A M&C Dale Approved: 08129/2024 APPROVED: Rocky Creek Crossing Ltd. ; trick By: Name: Patrirk (' ;rrinan_.qmith Title: APPROVED: CFW - Assistant City Manager By: Name: NA Title: APPROVED: Conatser Construction TX, L.P By: Name: Rrnr•k W Title: PrP.SiC[ellt APPROVED AS TO FORM AND LEGALITY: CFW - Assistant City Attorney By: Name: NA Title: ATTEST ' Contract Compliance Manager (Project Manager): By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, include NA ensuring all performance and reporting requirements. Jannette S. Goodall City Secretary There are NO City Funds associated with this Contract ❑There are City Funds associated with this Contract N 0 N , Page 2 FORTWORTH. M, TRANSPORTATION AND PUBLIC WORKS April 15, 2025 Conatser Construction TX , L.P. 5327 Wichita St Fort Worth, TX 76119 RE: Acceptance Letter Project Name: Rocky Creek Crossing Ph 1 Project Type: Water, Sewer, Drainage, Paving & Lights City Project No.: 103936 To Whom It May Concern: On August 12, 2024 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on March 20, 2025. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on March 20, 2025, which is the date of the punch list completion and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-7872. Sincerely, Kral Taafari P.E. KhaI Jaaf- P.E. (May 4, 2025 22:52 CDT) Khal Jaafari, Project Manager Cc: Toliver Lipka, Inspector Gary Deyon, Inspection Supervisor Edward Davila, Senior Inspector Victor Tornero, Program Manager LJA Engineering, Consultant Conatser Construction TX L.P. , Contractor Rocky Creek Crossing LTD, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 8/20/19 AFFIDAVE STATE OF TEXAS COUNTY OF TARRANT Before me, the undersig,ncd authority, a Votary Public in the state and county aforesaid, on this day personally appeared /Brock I Iuggins. President of Conatscr Managerncnt Group, Inc., general partner of Cser Construction "TX{. LP, known to me to he a credible pvcrson, who bcitrg by me duly sworn, upon his oath deposed and said: That all persons, firms, associations, corporations or ether organizations fumishing labor and/or materials have been paid in full, That the wage scalc established by the City Council in the City of Fort Worth, has been paid in full. and rThat there arc no clHims pending for personal injury and/or property damages: On Contract described as: ROCKY CREEK CROSSING PH. 1 WATER, SANITARY SEWER, DRAINAGE, PAVING, & STREET LIGHT IMPROVEMENTS CFA PRJ #. CITY PROJECT #:103936 CITY OF FORT WORTH STATE OF TEXAS C'ONATSFR CONSTRUCTION TIC. LP i Brock Huggi Subscribed and sworn to before me this 24r" day of July. 2024. Notary Public in Tarrant County, Texas CONSENT Of OWNER Q SURETY COMPANY ARCHITECT Q CONTRACTOR Q TO FINAL PAYMENT SURETY ❑ Conlarms *kh thm Arrr•riran Institute of OTHER An**Wfr, AfA 0ocum*nt G707 PROJECT, (name, addrCSSIRDnky Creek Crafting Phase I Water, Sanitary Sewer. Orainage, & Paving Improvements TO IOwner) Fort Worth Tat Bond No 0251922 IRS WORTH CROSSING. LT❑ a CITY OF FORT —] ARCHITECT'S PROJECT NO.- CONTRACT FOR: 73141 b W4X*,e3t Freeway Wafer, Sanitary Sever, ❑larnagtt. & Paving Imprwermnos for Rocky Crook Crams,ngPhaie 1 Lauslnn rx 77040 _J CONTRACT DATE: CONTRACTOR: CONATSER CONSTRUCTION Tx, L P In ... , . -with the provisions of the Contract betwecn the Owner and titc Co►Itracior as indicated above, the ante kam rremre &V e".er ul 9014'r Compeng3 BERKLEY MH JRANCH COMPANY 475 Steamboat Road Greenwrcn CT 08830 SURETY COMPANY On bOnd of *ws irnerr vanes end eddresa nr Contripmo?t CONATSER CCNSTRUCTEOJH TX. L P. 5327 Wchrta St Fort Worth Tit 76119-6035 , CONTRACTOR, hereby appmm of the final payment to the Contractor, and agrccs that final payment to the Contractor shall not roII.CV'c the Surety Compeny of any of its obligations to Lrlerr rneerr nrme snd ■ddru■ ar OvK+erl ROCKY CREEK CROSSING, LTD & CITY OF FORT WORTH 1314 t Northwest F me"y Houston Tx 17040 r OWNER, as set forth in the said Surety Company's bond. IN WITNESS, SS, WHEPLEOFr the Surety Company has hereunto sct its hand this Attc*t: 23rd day of JUly, 2024 BERKLEY_INSURANCE COMPANY Surety ComP"Y l Signatur6 of AtithaHzed Retprese]ntativo sapninie H rr Title Anomey-on•Fa t rUM 11i No it a Ia wd -do ■ cumparron dcxummot ro AIA DOCOftlYT 0705. co+vTRACToa�s AFFgOOLrrT Of PAYMENt of arers Ante CthueS. OJIM010 won ONE PAGE