HomeMy WebLinkAboutContract 61082-CO2CSC No. 61082-0O2
Fox.
Project Namel E. Northside Dr Bridge
Client Project #(s)l 102097
Project
City of Fort Worth
Change Order Request
I City Sec # I 61082
Descrition) This project includes the bridge removal and replacement of East Northside Drive eastbound and westbound bridge decks over Samuels Avenue
p
Contractorl IBCTX, LLC
City Project Mgr.I Gustavo A. Vallejo
Change Order #1 2 1
City Inspectorl
Date 4/17/2025
Curtis Hollingsworth
Dept.
Unit 1: Paving
Contract Time
Totals
(CDJ
Original Contract Amount
$3,714,298.00
$3,714,298.00
300
Extras to Date
5
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
$3,714,298.00
$3,714,298.00
305
Amount of Proposed Change Order
$0.00 $0.00
0
Revised Contract Amount
$3,714,298.00
$3,714,298.00
305
Original Funds Available for Change Orders
$185,715.00
$185,715.00
Remaining Funds Available for this CO
$185,715.00
$185,715.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
0.007
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 15%)
$4,642,872.50
.OIL
JUSTIFICATION (REASONS) FOR CHANGE ORDER d1l,
ANEW
IN ACCORDANCE WITH THIS CHANGE ORDER, THE CONTRACTOR SHALL: Furnish all labor and materials as specified in Change Order #2
Change Order #2 includes bid items for the remobilization to build retaining walls on Samuels Ave, which are necessary to prevent erosion from stormwater runoff from the
abutment. This retaining wall was not included in the original project scope.
Time: no additional time to the contract for the additional work.
Cost: The City has compared the new bid items with current contract prices from other projects under construction at the time of the change order, and has determined that the
contractor's proposed pricing is fair and reasonable.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges
that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting
requirements.
IBCTX, LLC
IIIIIIIIIIIIIIIIIIIIIIIIIIIII�ontractor (Name
Alex Hammes
a0 ""
Date
Apr 21, 2025
pectorllnspection Supervisor
Date
Pro ect and Contract Compliance Manager
nnw=,.wssuuaon ' mcon
Apr 21, 2025
Apr21,2025
Date
Senior Capital Project Officer
Date
Apr 23, 2025
MpJ—,�T
Apr 23, 2025
Date
Apr24,2025
ment (Dept)
Date
Apr25,2025
ssistant City Attorney
Date
Assistant City Manager
B�
Apr 29, 2025
ouncil Action
May 6, 2025
4g44UVn�n M&C Number I NA
d fORT G
ATTEST: &.......
���9Ad
Xw...'
Jannette Goodall, City Secretary
Pa
dQp nEX o5�gv
M&C Date Approved I NA I
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Fox_ r V-
Project Name I E. Northside Dr Bridge
Client Project # 1 102097
Contractorl IBCTX, LLC
City of Fort Worth
Change Order Additions
HEM UESCKIP I IUN
65 9999.0002 Specified Remobilization
21 3291.0100 Topsoil
23 3292.0100 Block Sod Placement
46 TxDOT 423-6008 Retaining Wall (Cast-In-Place)(W/sidewalk)
City Sec # I
61082
PMl Gustavo A. Vallejo
I
1
Inspectorl Curtis Hollingsworth l
Change Order Submittal #
0
Date 1 4/17/2025
ADDITIONS
DEP I Uty
J
Unit Unit Cost
I otal 1
Unit 1: Paving
1.OL1
LS $8,190.00
$8,190.001
Unit 1: Paving
5.2L 1
CY $500.00
$2,600.001
Unit 1: Paving
44.0E i
SY $50.00
$2,200.001
Unit 1: Paving
28.OL1
SF $120.00
$3,360.001
I
1
I
1
I
1
I
1
I
1
I
I
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
Unit 1: Saving
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
$16,350.001
1
1
1
$0.001
I
Sub Total Additions
$16,350.001
Change Order Additions Page 4 of 6
FOR_ rH City of Fort Worth
Change Order Deletions
Project Name I E. Northside Dr Bridge City Sec # 1 61062
Client Project# 1 102097 1
Contractorl IBCTX, LLC I PMI Gustavo A. Vallejo I Inspectorl Curtis Hollingswodh I
Change Order Submittal # 0 Date 1 4/17/2025 1
DELETIONS
IIFM Dt5GKIF'I ION JEPI ldTy unit unit cost total 1
tit 9999.uuul bridge construction Allowance unit l: Paving O. Wbuuuu Lb $1UU,uuu.uu y1b,35u.1J1Jl
1
1
1
1
1
1
1
1
1
1
I
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Unit 1: raving $16,350.001
1
1
I $0.001
Sub Total Deletions $16,350.001
Change Order Deletions Page 5 of 6
M/SBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
N/A N/A N/A
Total $0.00
Previous Change Orders
CO # DATE I AMOUNT
8/29/2024 $0.00
Total 1 $0.00 I
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: E. Northside Dr Bridge Replacement at Samuels Ave — Change
Order #2
M&C:
24-0039 CPN:
102097
CSO: 61082
DOC#:
Date:
1
To:
Name
Department
Initials
Date Out
I
Alex Hammes
IBCTX
74AH
Apr 21, 2025
(AHammes(&,IBCTX.com)
AH
2.
Gustavo A. Vallejo
TPW-PM
GVGV
Apr 21, 2025
3.
Greg Robbins
TPW-PrgM
G1 6)(F
Apr 23, 2025
4.
Mary Hanna
TPW Sr CPO
NW
Apr 23, 2025
5.
Patricia Wadsack
TPW AD
PLW
Apr 24, 2025
Lauren Prieur
TPW Director
x0e6.
--Pri-
Apr 25, 2025
7
Doug Black
Legal
0
Apr 29, 2025
8
Jesica McEachern
CMO
Douglas Black
(:)Pk
May 6, 2025
9
TPW Contracts
TPW
10.
CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW Contracts
ALSO List: Bus Sppt: Filownio Munoz ; PrgMgr: GreH Robbins ; Sr CPO: Mary Hanna
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑YES ®No
RUSH: ❑YES ®No SAME DAY: ❑YES ®No NEXT DAY: ❑YES ®No
ROUTING TO CSO: ®YES ❑No
Action Required: ❑ Attach Signature, Initial and Notary Tabs
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
Return To: Please notify TPWContractsna,fortworthtexas.Liov for pickup when complete. Call ext. 7233 or ext.
8363 with questions. Thank you!
CONSTRUCTION CONTRA CTROUTING & TRANSMITTAL SLIP Eff 01-13-2024, mdhm