Project Name 2022 Bond Year 2 Contract 10 City Sec # I 61864
Client Project #(s)1 104243
Project Descriptioni Water, pavement and sidewalk improvements on N Houston Street, Lincoln Avenue and NW 15th Street
Contractor McClendon Construction Company, Inc Change Order #I 2 I Date 4/7/2025
City Project Mgr.1 Christian Cardona City Inspector) Kevin Jackson
Dept.
Unitl: Water
Unit 2: TPW
Unit 3: Storm
Contract Time
Water
Totals
(CD)
Original Contract Amount
$2,117,965.00
$5,004,703.25
$151,568.00
$7,274,236.25
400
Extras to Date
7
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
$2,117,965.00
$5,004,703.25
$151,568.00
$7,274,236.25
407
Amount of Proposed Change Order
$0.00
$0.00
$0.00
3
Revised Contract Amount
$2,117,965.00
$5,004,703.25
$151,568.00
$7,274,236.25
410
Original Funds Available for Change Orders
$105,898.00
$250,235.00
$20,000.00
$376,133.00
Remaining Funds Available for this CO
$105,898.00
$250,235.00
$20,000.00
$376,133.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 0.00%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $9,092,795.31
JUSTIFICATION (REASONS) FOR CHANGE ORDER
This change order will add bid items to relocate existing fire hydrants and install concrete boxes around new water meters. Due to the new pedestrian bulb -outs at the
intersections of N Houston Street/NW 24th Street and N Houston Street/Exchange Avenue, the new fire hydrants were installed at a temporary location to ensure the fire
department still had access to water supply until the pedestrian bulb -outs were constructed. Once the pedestrian bulb -outs were complete, the fire hydrants could be relocated
to their final location to meet the required horizontal distance from the back of the curb. Additionally, concrete boxes will need to be installed around new water meters located
in paved areas, per city standards.
City staff has reviewed the contractor's proposed pricing and determined it to be fair and reasonable based on comparison with similar work.
This change order also includes an additional 3 calendar days to allow for contractor remobilization required to complete the fire hydrant relocations.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in
full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below
acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and
reporting requirements.
Contractor's Comp a on rac or (Name) Date
McClendon Construction Company, Inc. Justin Blair a Apr 22, 2025
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
a wp13 pug on
Apr 17, 2025
(o
Apr 22, 2025
Program Manager
Date
Senior Capital Project Officer
Date
�11)� •=
Apr 23, 2025
Apr 23, 2025
Assistant Director (Dept)
Date
Director, Contracting Department (Dept)
Date
F77-
atrr'cia L. Wadrac!
Apr 24, 2025
Apr 25, 2025
ity Attorney
1 Qu
Date
Apr 29, 2025
Date
May 6, 2025
(if required)
M&C Number N/A M&C Date Approved N/A
ATTEST: poi FORT°dap
o pie 89.�PP-
Jannette Goodall, City Secretary
PP * o, oog*p
paaa4 TEXp5 ap
�booao�
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth
Change Order Additions
Project Name 2022 Bond Year 2 Contract 10
Client Project # 104243
Contractor McClendon Construction Company, Inc
I I EM UtSCKIP I ION
44 9999.UU11 Kelocate Existing hire Hydrant
45 9999.00121" Concrete Meter Box
City Sec # 61864
1
PMI Christian Cardona Inspectorl Kevin Jackson
Change Order Submittal # 0 Date 1 4/7/2025 1
ADDITIONS
DEPI
Unit1: Water
Unit1: Water
Oty Unit
2.000UUUUU EA
5.00000000 EA
Unit Cost I otal 1
$2,/51JAU $b,bUU.UU1
$125.00 $625.00�
Unit1: Water
$6,125.001
Unit 2: TPW
$0.001
Unit 3: Storm Water
$0.001
Sub Total Additions
$6,125.001
Change Order Additions Page 2 of 4
FORT WORTH City of Fort Worth
Change Order Deletions
Project Name 2022 Bond Year 2 Contract 10 City Sec # 61864
Client Project # 104243 1
Contractorl McClendon Construction Company, Inc I PMI Christian Cardona I Inspectorl Kevin Jackson l
Change Order Submittal # 0 Date 1 47/2025 1
DELETIONS
I I LM UESCKIP I ION DEP I Oty Unit Unit Cost I otal
40 9999.0002 Construction Allowance (Water) Unit1: Water 0.06125000 LS $100,000.00 $6,125.001
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
Unit1: Water $6,125.001
Unit 2: TPW $0.00 1
Unit 3: Storm Water $0.001
Sub Total Deletions $6,125.001
Change Order Deletions Page 3 of 4
MISBE for this Change Order
M/SBE Sub Type of Service Amount for this CO
Not Applicable Not Applicable Not Applicable
Total $0.00
Previous Change Orders
CO # DATE I AMOUNT
11 /20/2024 $0.00
Total I $0.00 I
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works Department
DOCUMENT TITLE: Change order #2 — 2022 Bond Year 2 — Contract 10
M&C:
Date:
To: Name
1. Sophia Flores
2. Justin Blair
CPN: 104243 CSO: 61864
Department Initials
TPW - initials
McClendon Construction n
- signature
DOC#:
Date Out
Apr 17, 2025
Apr 22, 2025
3.
Kevin Jackson
TPW - signature
Wr
Kge 1—k...
Apr 17, 2025
4.
Gary Devon
TPW - signature
Apr 23, 2025
5.
Christian Cardona
TPW - signature
Christian Cardona
Apr 22, 2025
6.
Gregory Robbins
TPW - signature
Apr 23, 2025
7.
Mary Hanna
TPW - signature
mfi//
Apr 23, 2025
8.
Patricia Wadsack
TPW - signature
PL W
Apr 24, 2025
9.
Lauren Prieur
TPW - signature
`vxfl—
Apr 25, 2025
10.
Doug Black
Legal - signature
o gBlack
Apr 29, 2025
11.
Jesica McEachern
CMO - signature
CM
May 6, 2025
12.
Jannette Goodall
CSO - signature
May 6, 2025
13.
TPW Contracts
DOCUMENTS FOR CITY MANAGER'S SIGNATURE:
All documents received from any
and all City Departments requesting City Manager's signature
for approval MUST BE ROUTED
TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip,
Jay will
review and take the next steps.
NEEDS TO BE NOTARIZED: DYES ®No
RUSH: ®YES ❑No SAME DAY: DYES [—]No NEXT DAY: ❑YES ®No
ROUTING TO CSO: ®YES ❑No
Action Required:
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return To: TPWContracts(&FortWorthTexas.gov at ext. 7233 for pick up when completed.
Thank you!