HomeMy WebLinkAboutContract 59244-FP2City Secretary -FP2
Contract No. 59244
FORT WORTHa
Date Received 5/7/2025
AT
NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: Palladium Oak Grove
City Project No.: 104281
Improvement Type(s): ❑ Paving ❑x Drainage ❑ Street Lights ❑ Traffic Signals
Original Contract Price: $293,195.00
Amount of Approved Change Order(s): $3,386.00
Revised Contract Amount: $296,581.00
Total Cost of Work Complete: $296,581.00
FA Cod, n.IPA.av 7.2 _ 14:05 CDT, May 7, 2025
Contractor Date
Project manager
Title
Wildstone Construction
Company Name
�`'�
Carlos GafCia (May 7, 202514:11 CDT)
May 7, 2025
Project Inspector
Date
UbsMageMohmWeeti,.E
May 7, 2025
Project Manager
Date
May 7, 2025
Kandice P.4errlck (Mav7. 202515:36 CDT)
CFA Manager
Date
"V ..7.
May 7, 2025
1 auien Prieur! N ay 7. 202515:43 CDT)
TPW Director
Date
May 7, 2025
Jesica McEachern lMav 7. 2025 19:15 CDT)
Asst. City Manager
Date
OFFICIAL RECORD
CITY SECRETARY Page 1 of 2
FT. WORTH, TX
Notice of Project Completion
Project Name: Palladium Oak Grove
City Project No.: 104281
City's Attachments
Final Pay Estimate x❑
Change Order(s): ❑x Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paido
Consent of Surety 0
Statement of Contract Time
Contract Time: 240 WD Days Charged: 233 WD
Work Start Date: 8/16/2023 Work Complete Date: 9/25/2024
Completed number of Soil Lab Test: 96
Completed number of Water Test: 18
Page 2of2
FoRTWORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name PALLADIUM OAK GROVE
Contract Limits
Project Type DRAINAGE
City Project Numbers 104281
DOE Number 4281
Estimate Number 1 Payment Number 1 For Period Ending 9/25/2024
WD
City Secretary Contract Number Contract Time 24U D
Contract Date Days Charged to Date 233
Project Manager NA Contract is 100.00 Complete
Contractor WILDSTONE CONSTRUCTION
P O BOX 164429
FORT WORTH, TX 76161
Inspectors G. DEYON / C. GARCIA
Friday, November 22, 2024 Page 1 of 4
City Project Numbers 104281 DOE Number 4281
Contract Name PALLADIUM OAK GROVE Estimate Number I
Contract Limits Payment Number 1
Project Type DRAINAGE For Period Ending 9/25/2024
Project Funding
UNIT III: DRAINAGE IMPROVEMENTS
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
1
60" RCP, CLASS III
71 LF
$435.00
$30,885.00
71
$30,885.00
2
66" RCP, CLASS III
250 LF
$533.00
$133,250.00
250
$133,250.00
3
T STORM JUNCTION BOX
1 EA
$15,000.00
$15,000.00
1
$15,000.00
4
LARGE STONE RIPRAP, DRY
449 SY
$150.00
$67,350.00
449
$67,350.00
5
60" SET, 1 PIPE
2 EA
$10,000.00
$20,000.00
2
$20,000.00
6
60" PARALLE HEADWALL, 1 PIPE
I EA
$10,000.00
$10,000.00
1
$10,000.00
7
66" FLARED HEADWALL, 1 PIPE
I EA
$10,000.00
$10,000.00
1
$10,000.00
8
POST - CCTV INSPECTION OF STORM DRAIN
I EA
$1,500.00
$1,500.00
1
$1,500.00
9
TRENCH SAFETY
321 LF
$10.00
$3,210.00
321
$3,210.00
10
W-BEAM END SECTION GUARD RAIL
2 EA
$1,000.00
$2,000.00
2
$2,000.00
11
LARGE STONE RIPRAP, GROUTED(CO#2)
25 SY
$135.44
$3,386.00
25
$3,386.00
Sub -Total of Previous Unit
$296,581.00
$296,581.00
Friday, November 22, 2024 Page 2 of 4
City Project Numbers 104281
Contract Name PALLADIUM OAK GROVE
Contract Limits
Project Type DRAINAGE
Project Funding
Contract Information Summary
Original Contract Amount
Change Orders
Change Order Number 2
Total Contract Price
DOE Number 4281
Estimate Number 1
Payment Number 1
For Period Ending 9/25/2024
$293,195.00
$3,386.00
$296,581.00
Total Cost of Work Completed $296,581.00
Less % Retained $0.00
Net Earned $296,581.00
Earned This Period $296,581.00
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$0.00
$0.00
$0.00
$0.00
$0.00
$296,581.00
Friday, November 22, 2024 Page 3 of 4
City Project Numbers 104281
Contract Name PALLADIUM OAK GROVE
Contract Limits
Project Type DRAINAGE
Project Funding
Project Manager NA
Inspectors G. DEYON / C. GARCIA
Contractor WILDSTONE CONSTRUCTION
P O BOX 164429
FORT WORTH, TX 76161
DOE Number 4281
Estimate Number 1
Payment Number 1
For Period Ending 9/25/2024
City Secretary Contract Number
Contract Date
Contract Time 240 WD
Days Charged to Date 233 WD
Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $296,581.00
Less % Retained $0.00
Net Earned $296,581.00
Earned This Period $296,581.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 / Day
$0.00
LessPavement Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$0.00
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$296,581.00
Friday, November 22, 2024 Page 4 of 4
DocuSign Envelope ID: D743BB06-A39C-478D-80C7-7F6D07E27A3C REVIEWED `
By Mosadage Mohammdeen at 10:19 am, Sep 12, 2023
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
PPROJECT NAME:
PALLADIUM OAK GROVE
I CHANGE
CONTRACT:
Water, Pavinq, Drainaqe and Street Liqhts
ORDER No:
ICFA #
CFA22-0086 CITY PARTICIPATION:(
N/A
CITY PROJECT #
104281
IPRC #
IPRC22-0146
IFID #
30114-0200431-104281-EO7685
IX -Number
X-27464
IFILE #
W-2862
INSPECTOR:
Eric Yarger Phone No:
PROJECT MANAGER:
VICTOR TORNERO, JR. P.E. Phone No:
817-392-7830
CONTRACT UNIT
WATER SEWER
PAVING
DRAINAGE
STREET LIGHTS
CONTRACT DAYS
Developer Developer
Developer
Developer
Cost City Cost Cost City Cost
Cost Citv Cost
Cost
City Cost
Developer Cost
City Cost
IORIGINAL CONTRACT
$175,915.00 $0.00 $67,381.00 $0.00
$227,625.00 $0.00
$293,195.00
$0.00
$157,266.00
$0.00
120
(EXTRAS TO DATE
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00
$0.00
$D.00
$ -
$0.00
CREDITS TO DATE
$0.00 $0.00 $0.00 $0.00
$0.00 $0.00
$0.00
$0.00
$0.00
$0.00
I
CONTRACT TO DATE
$175,915.00 $0.00 $67,381.00 $0.00
$227,625.00 $0.00
$293,195.00
$0.00
$157,266.00
$0.00 I
120
(AMOUNT OF PROP. CHANGE ORDER
$ - $ 2,050.00
1 $0.00
$0.00
$ -
REVISEDCONTRACTAMOUNT
$175,915.00 $0.00 $69,431.00 $0.00
$227,625.00 $0.00
$293,195.00
$0.00
$157,266.00
$0.00
120
TOTAL REVISED CONTRACT AMOUNT PER UNIT
$175,915.00 $69,431.00
$227,625.00
$293,195.00
$157,266.00
REVISED COST SHARE
Dev. Cost: $923,432.00
City Cost:
$0.00
TOTAL REVISED CONTRACT
$923,432.00
Revised: 10-12-2011 Page 1
DocuSign Envelope ID: D743BB06-A39C-478D-8OC7-7F6D07E27A3C
You are directed to make the following changes in the contract documents:
CITY BID ITEM
PAY ITEM #
# QUANTITY UNIT
ITEM DESCRIPTION
UNIT 1: Water Improvements
I
UNIT II: Sanitary Sewer Improvements Total
3201.0202
1 13' 15 SY
Asphalt Pvmt Repair Beyond Defined Width
0241.2101
14' 1 EA
I
4" Sewer Abandonment iuq
I I
UNIT II: Sanitary Sewer Improvements Total
UNIT III: Drainaqe Improvements
1
UNIT III: Drainage Improvements Total
UNIT V: Street Liqhtinq Improvements
UNIT V: Street Lightinq Improvements Total
I
TOTAL
Asterisk (`) indicates New Pay Item
REASONS FOR CHANGE ORDER
Added existing sewer service abandonment
REVIEWED
By Mosadage Mohammdeen at 10:19 am, Sep 12, 2023
UNIT PRICE
$ 90.00 $
$ 700.00 $
1$
NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER.
RECOMMENDED: APPROVED: APPROVED:
[i°&Hsi Ofi� )Mgineer) Eel7ERWigned by: on�jVV igned by:
y.y: I b i G�ln�t.
E9542BC98F6C440._ A39FBBBCCA854EE... 853E47886AD2410...
Name: Jonathan Hake - Cross Enqineerinq Name: Scott Johnson - Palladium East Berry, Ltd. Name: John Kolb - Wildstone Construction
Title: Vice President Title: Senior Vice President Title: President
TOTAL
1,350.OD
700.00
2.050.00
Revised: 10-12-2011 Page 2
i
vtl
640 EX. 12" SS LINE s4, ... PUBLIC SS NORTH ...
§Y3 -
635 w3+ 65, 655 -r€ p_ 655
CAUTIONII
Eel,ting UUIU- In Aroo. Contractor 10° n � Z�. 3e
,hall determine loeatlon and elevatlon
If all utllltT,, prior to e.n.- 11*1 ✓3
Cono-otor vhml Inform Engt .er of 630 630 650 650
only aonmets prmr to con.tructlon. -
L i
Neck 625 / I 1 625 645 +a=
645
E.i.ting UtIllu.. Shawn Per m-Built
owm.Dnt.. ConNotor toFlald "leyLacatlan nd Depth f All Ulllidea Prior5
toC -tloo antl Notify Engln..r ofanYDhcrepancloe.620 620 640�. 640
Natc
All Improwmenty Up-SV.am of Mete, O - • ---
Are Privet. and By 6ep-to Contract
/ J
Tempormary S—ob May Be Roqul,d to - I Dc 11W) r-la v
, t No Colt— No. S—I 615 615 635 w-. 635
Inthas.oupt.d.
610 610 630 t er rr 630
0+00 1+00
REVIEWED
6rAf.,tlw gf.m,Ind..n.rrr:sD.n, ap rg, apn J
=O _
0 40 00
GRAPHIC SCALE 1"
1'=40'
WATER & SANITARY SEWER NOTES
1. All atedoI, Ind natruction Mall be In ....do,,, Mth th. City of
Fort Warty Standard Sp7.111. tlpn. antl Conatrvetlon Stondordy. and
Standard Spaclflo,t5an. far Public Work. C... huatlon prepared by North
Central Tana. Council of —non, nt• (Lot..t ftaN.lon). antl to th.
reguiauono of The T...a —onI..lon on EnNronmentIt Ouollty.
2. EeLHng utllltl., a e hown .oh—teally and are for too eontmet-
guidance only. The loc.uon antl/or .lewtlon of -I.Ung u[ilitie, a ahown
whth... pion, . e based o cord. of Nv a utility cempenlea, and,
ere .... IN., m .nb taken In In. R.1d.OeThI contractor mu.t call
to vpproprlat. utlllty c..PonY at least 72 In —prior to any ...-U.o
to r.q-t e..ct field Iocatl.n of uVilti...
3. The eo tractor ,hall I, r pon.lble for prot.ctlnq all ealvtlnq
Mprowments In the .-I, on,
of thi. preJ.at The controctor la
-ponelble for epos, of d.mago to.1y .a'U" Improvement. durinq
o nVuctlon. Rep.i, ,hall b. equal to r better on candill- prior to
mnaNucuon.
4. All sewer (In,. shall be PVC SDR-26
5. All monhoi. Hm god. must match golbn.d grvde In p.wd a
o No, I., c netructed in Wool ... pe vreva must haw a final rlm gradeai.
Inches (6-) above final grvde.
6. All w or plpo shall ba DR-14, Cl- 2D0 PVC water pipe, conforming
to AWWA 400 vtvndard.. e.cept MI. Lln..
y. Contractor oh.11 b. r..p... ible for mointotning -non ,fety
requlr.m.nty In a w d,n,I with the Ivte,t .tandard. of MGM- I, any
.Nor agency h.Nog juAatlletlon for vaeawtlon no l,nching crocedurev
Contractor shall proWtla and Implement v trench aaf.ty plan omDlNng Ith
O.S H.A
8. Flre eprlokIl, IIn. hall be eI.d and Inotolled by a state licensed
controctor. FlrLlne ahown for reference only.
pvnehr .t...ge. R,. Prate tloln brooms areofw Rm M,maand ConVolcvl
yyytem, u.e..
FIRE LINE NOTE
1. All underground gry Ilne and r—to M. piping shall be o o,T—no
of Cleey 200/DR 14 or better. Embedment shall b. No. 4 cru.h.d
.tone. Dopt, of Buryl- m 1-on If 48 inche. from grade to the
top of the pips All ,d.,g,.U,d ill, Ilne. beglo at the point of
action to the circulatlnq public/privet. water main and
terminate at - top of me spigot place 1 ft obow N. nolnhed
floor and no — than 5 tt Inside Na W(ding.
HT"
STO IF
— 1.tX.11 y.ln CALL BEFORE YOU DIG
—,•. r I,�P�..d x.mmmo wv �
WSS STUDY NO. WSL-2022-1895 Qj Added Abandnnmant of Ea SS S—I
N � I l,mc Dn¢.: Rcn,ienc D.re �.
0+75 0+00 >ns/:.Ira 1 ba/u,nnz, R CC ENGINE&SING
CITY BENCHMARK: SITE BENCHMARK: IR RVII/211"^ 2 C1\OVV CONSULZ•ANIS F.4
Ieaoo _ a v*V v one., . MI��PpP wn.r ee.
a•u,P�f. ... .� •-cp .arm m�r..a�,a I4 lvua/2nr n y5wv sIn„ nkt;,,w..r z4n]Smg
o.a enaa�wu .i�.••. p�i.nn'• b t I5 12/nt /'ll_ 'P=�eum'0'.• Tm,P£Pom N. FSWS 9l]0 : ��
D w e]pDa n en,N {/�^ •^• polM I4 nl/I-/�u21 n CheeNnl RP 6alc , LL'...�4
w. - .oulnwrt mmw u. weJ.cl pmP+Iy.• bD•+.-6g0.]I I T n2/n2 /"02M1 C.LL(..L I C_LC1. IHI 1"�40' V:1".a' •"•��@/Ol/t�
Ile..nbu'. be
(®1-1TL houn pdor to digging)
SANITARY SEWER I I'l,,
PI AN & PROFILE CS
PALLADIUM OAK GROVE
PALLADIUM OAK GROVE, LTD.
CITY OF FORT WORTH, TEXAS
U
REVIEWED
By Mosadage Mohammdeen at 11:12 am, Dec 11, 2023
DEVELOPER-AINARDED-PROJECT CHANGE ORDER /
PROJECT NAME:
PALLADIUM OAK GROVE
CHANGE
CONTRACT:
Water, Paving, Drainage and Street Lights
ORDER No:
CFA #
CFA22-0086
CITY PARTICIPATION:
N/A
CITY PROJECT #
104281
IPRC #
IPRC22-0146
2
FID #
30114-0200431-104281-E07685
X-Number
X-27464
FILE #
W-2862
INSPECTOR:
Eric Yarger
Phone No:
PROJECT MANAGER:
VICTOR TORNERO,
JR. P.E. Phone No: 817-392-7830
CONTRACT UNIT
WATER
SEWER PAVING
DRAINAGE
STREET LIGHTS
CONTRACT DAYS
Developer
Developer Developer
Developer
Cost City Cost
Cost Clty Cost Cost City C
Cost
Clay C
Developer Cost CIt1r Cost
ORIGINAL CONTRACT
$175,915.00 $0.00
$67,881.00 .1 $0.00 $227,625.00 $0.00 °
$293,195.00
$0.00
$157,266.00 $0.00
120
EXTRAS TO DATE
$0.00 $0.00
$2,050.00 $0.00 $0.00 $0.00 .
$0.00
$0.
$ $0.00 j
CREDITS TO DATE
$0.00 $0.00
$0.00 $0.00 $0.00 $0.00
$0.00
$
$0.00 $0.00 i
�
CONTRACT TO DATE
$175,915.00 $0.00
$69,431.00 $0.00 $227,625.00 $0.00
$293,195.00
$0.00
$157,266.00 $0.00
120
AMOUNT OF PROP. CHANGE ORDER
REVISED CONTRACT AMOUNT
$
$175,915.00 $0.00
$ $0.00
$69,431.00 $0 $227,625.00 $0.011
$ 3,386.00
$296,581.00
$0.00
$
$157,266.00 $0.00
120
TOTAL REVISED CONTRACT AMOUNT PER UNIT
$175,915.00
$69,431.00 $227,625.00
$296,581.00
$157,266.00
REVISED COST SHARE
Dev. Cost:
$926,818.00 City Cost:
$0.00
TOTAL REVISED CONTRACT
$926,818.00
Revised: 10-12-2011 Page 1
You are directed to make the follo=nq chances in the contract documents:
CITY BID ITEM
PAY ITEM # # QUANTITY U VIT
`UNIT I: Water Improvements
(UNIT II: Sanitary Sewer Improvements Total
UNIT ll: Sanitary Sewer Improvements Total
UNIT III: Drainage jrnpr, vpinenis
313T0103 11" 25 SY Large Stone Riprap, Groutec
III: Drainaip+ proyements Total
IUN�T
LNT V: Stree4 LigUtlnq Improvements
UNIT V: Street Liahtina Improvements Total
TOTAL
Asterisk (') indicates New Pay Item
REASONS FOR CHANGE ORDER Added grouted rip rap
NO CITY FUNDS INVOLVED IN THIS CONT " CT. DEVELOPER IS I
REIMBURSEMENT FROM THE CITY WILL SOUGHT BY THE DE'
;.Jathan
ENDE APPROVED:
ng gineer) (Developer)
me Hake -Cros En Bering Nam Scott J sident I/ Title: Seniglr Vice
REVIEWED
By Mosadage Mohammdeen at 11:13 am, Dec 11, 2023
ITEM DESCRIPTION UNIT PRICE TOTAL
S 135.44 $
BLE FOR 100% OF THE CHANGE ORDER COST AND NO
APPROVED:
(Corwacw
By,
East Berry, Ltd. Name; .ahn KOIIWjkWwe Constriction
Title: Rrasid!&i
3,386.00
3,386.00
Revised: 10-12-2011 Page 2
PROJECT NAME:
CONTRACT:
CFA #
CITY PROJECT #
IPRC #
FID #
X-Number
FILE #
INSPECTOR:
PROJECT MANAGER:
ORIGINAL CONTRACT
EXTRAS TO DATE
CREDITS TO DATE
CONTRACT TO DATE
AMOUNT OF PROP. CHANGE ORDER
REVISED CONTRACT AMOUNT
TOTAL REVISED CONTRACT AMOUNT PER UNIT
REVISED COST SHARE
TOTAL REVISED CONTRACT
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
PALLADIUM OAK GROVE
Water, Paving, Drainage and Street Lights
CFA22-0086 CITY PARTICIPATION: N/A
104281
IPRC22-0146
30114-0200431-104281-EO7685
X-27464
W-2862
Carlos Garcia Phone No: 817-925-4381
Mosadage Mohammdeen Phone No: 817-392-2443
REVIEWED
By Mosadage Mohammdeen at 10:07 am, Mar 11, 2024
10
CHANGE
ORDER No:
3
CONTRACT UNIT
WATER SEWER PAVING DRAINAGE
Developer Developer Developer Developer
Cost City Cost Cost City Cost Cost City Cost Cost City Cost
$175,915.00 $0.00 $67,381.00 $0.00 $227,625.00 E0.00 $293,195.00 $0.00
$0.00 $0.00 $2,050.00 $0.00 t $0.00 ' $0.00 $3,386.00 $0.00'
$0.00 $0.00 $0.00 $0.00 $0.00 $o.0o $0.00 $0.00'
$175,915.00 $69,431.00 $227,625.00 $296,581.00
$ $ $ 4,689.44
$175,915.00 $0.00 $69,431.00 $0.00 $232,314.44 $0.00 $296,581.00 $0.00
$175,915.00 $69,431.00 $232,314.44 $296,581.00
Dev. Cost: $931,507.44 City Cost:
$931,507.44
STREET
LIGHTS
CONTRACT DAYS
Developer Cost
City Cost
$157,266.00
' $0.00
120
$
$0.00
$0.00
$0.00
$157,266.00
120
$157,266.00
120
$157,266.00
Revised: 10-12-2011 Page 1
REVIEWED
By Mosadage Mohammdeen at 10:07 am, Mar 11, 2024
You are directed to make the tollowing changes in the contract documents:
CITY BID ITEM
PAY ITEM #
# QUANTITY
UNIT
ITEM DESCRIPTION
UNIT PRICE
UNIT IV: Paving Improvements
10* 2
SF
0241.0100 Remove Sidewalk
$
465.00 $
2 2
SF
3213.0301 4" Conc Sidewalk
$
79,72 $
11* 60
LF
0241.1300 Remove Conc CurbBGutter
$
24.00 $
6 60
LF
3216.0101 6" Conc Curb and Gutter
$
36.00 $
UNIT IV: Paving Improvements Total
I I I
I
$
TOTAL
$
Asterisk (*) indicates New Pay Item
REASONS FOR CHANGE ORDER
Added curb and sidewalk removal
and replacement
NO CITY FUNDS INVOLVED IN THIS CONT CT. DEVELOPER I RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL E SOUGHT BY THE VELOPER.
RE MEN APPROVED: I APPROVED:
( nsultin ngineer) (Develo (Contractor)
By: By: _ By: // ta-'Z 0001aZ/LQi2.
nathan Hake - Cro hearing Name: ott Jo on - dlalladium East Berry, Ltd. Name: Brandi Prather - FB Potter Concrete, LLC
tie: Vice President Title: Senior Vice spent Title: CFO
TOTAL
930.00
159.44
1,440.00
2,160.00
4,689.44
4,689.44
Revised: 10-12-2011 Page 2
PROJECT NAME:
I CONTRACT:
ICFA #
CITY PROJECT #
IIPRC #
IFID #
IX -Number
FILE #
INSPECTOR:
PROJECT MANAGER:
(ORIGINAL CONTRACT
EXTRAS TO DATE
(CREDITS TO DATE
ICONTRACT TO DATE
(AMOUNT OF PROP. CHANGE ORDER
(REVISED CONTRACT AMOUNT
TOTAL REVISED CONTRACT AMOUNT PER UNIT
REVISED COST SHARE
TOTAL REVISED CONTRACT
REVIEWED
By Mosadage Mohammdeen at 11:34 am, Jul 09, 2024
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
PALLADIUM OAK GROVE I CHANGE
Water, Pavinq, Drainaqe and Street Liqhts ORDER No:
CFA22-0086 CITY PARTICIPATION: N/A
104281
IPRC22-0146 4
30114-0200431-104281-EO7685
X-27464
W-2862
Carlos Garcia Phone No: 817-925-4381
Mosadage Mohammdeen Phone No: 817-392-2443
WATER I SEWER
Developer beveloper
Cost I City Cost Cost City Cost
$175,915.00 I $0.00 I $67,381.00 $0.00
$0.00 I $0.00 I $2,050.00 $0.00
$0.00 $0.00 I $0.00 $0.00
$175,915.00 $0.00 I $69,431.00 $0.00
$ I I $
$175,915.00 I $0.00 I $69,431.00
$175,915.00 I $69,431.00
Dev. Cost: $946,315.44
CONTRACT UNIT
PAVING
I DRAINAGE
STREET LIGHTS
beveloper
eveloper
(Cost I
(Developer
Cost
City Cost
City Cost
Cost
City Cost
$227,625.00
$0.00
$293,195.00 I
$0.00
$157,266.00
$0.00
$4,689.44
$0.00
I $3,386.00 I
$0.00
$
$0.00
$0.00
$0.00
I $0.00 I
$0.00
$0.00
$0.00
$232,314.44
$0.00
I $296,581.00 I
$0.00
$157,266.00
$0.00
$ 14,808.00
I I
$
$247,122.44
$0.00
$296,581.00 I
$0.00
$157,266.00
$247,122.44
$296,581.00
$157,266.00
City Cost:
$0.00
$946,315.44
CONTRACT DAYS
120
120
120
Revised: 10-12-2011 Page 1
You are directed to make the following changes in the contract documents:
CITY BID ITEM
PAY ITEM # #
QUANTITY
UNIT
UNIT IV: Paving Improvements
7
688
SF
12*
77
SY
13*
1
LS
UNIT IV: Paving Improvements Total
Asterisk (*) indicates New Pay Item
REASONS FOR CHANGE ORDER
Added asphalt removal and replacement
REVIEWED
By Mosadage Mohammdeen at 11:34 am, Jul 09, 2024
ITEM DESCRIPTION
0241.0402 Remove Asphalt Drive
3201.0202 Asphalt Pvmt Repair Beyond Defined Width
Mobilization
TOTAL
UNIT PRICE
$ 3.00 $
$ 72.00 $
$ 7,200.00 $
$
TOTAL
NO CITY FUNDS INVOLVED IN THIS CONT CT. DEVELOPER IS RESPONSIBLE FOR 100 % OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL E SOUGHT BY THE DEVELOPER.
REC MEND APPROVED: APPROVED:
(C sulting g1 ) (Developer) (Contractor)
By: By: 9&
zze� 7.9.2024By 07/09/2024
nathan Hake - Cros E neerinq Name: Scott Jo nson - Palladium East Berry, Ltd. Name: Jordan Lannuier - Treymore Construction
Vice President Title: Senior Vice President Title: SPM
2,064.00
5,544.00
7,200.00
14.808.00
14,808.00
Revised: 10-12-2011 Page 2
FORTWORTH.
M,
TRANSPORTATION AND PUBLIC WORKS
November 18, 2024
Wildstone Construction
12850 Highway 287
Fort Worth, Texas 76052
RE: Acceptance Letter
Project Name: Palladuim Oak Grove
Project Type: Water, Sewer, Drainage
City Project No.: 104281
To Whom It May Concern:
On October 1, 2024 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on November 18, 2024. The final
inspection and the corrected punch list items indicate that the work meets the City of Fort Worth
specifications and is therefore accepted by the City. The warranty period will start on November 18,
2024, which is the date of the punch list completion and will extend of two (2) years in accordance with
the Contract Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
925-4381.
Sincerely,
Mosadage mohawo(een' P. E
Mohammdeen Mosadage, Project Manager
Cc: Carlos Garcia, Inspector
Gary Deyon, Inspection Supervisor
Lorrie Pitts, Senior Inspector
Mohammdeen, Mosadage , Program Manager
Cross Engineeing Consultants, Consultant
Wildstone Contruction, Contractor
Palladium Oak Grove, LTD., Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 8/20/19
ALL BILLS PAID AFFIDAVIT
State of Texas
County of Dallas
BEFORE ME, the undersigned authority, on this day personally appeared John Kolb, known to me to be a
credible person and officer of Wildstone Construction LLC and who, being duly sworn, upon his oath
declares and acknowledges as follows:
1. I am a duly authorized agent of Wildstone Construction LLC, which has authorized me to make
this affidavit, and all of the recitations herein are true and correct.
2. Pursuant to Private Development Contract No. 828.106 between Treymore Construction LLC and
Wildstone Construction LLC for Palladium Oak Grove, Wildstone Construction LLC has
supplied materials and performed labor in connection with the construction of improvements on
real property contracted by Treymore Construction LLC in the Fort Worth,
3. Wildstone Construction LLC has actual knowledge that all bills owed by Treymore Construction
LLC to Wildstone Construction LLC for materials supplied or labor perfonned in connection
with the improvements have been fully paid and satisfied.
4. Wildstone Construction LLC has actual knowledge that all bills owed by Wildstone Construction
LLC to others for materials supplied or labor performed in connection with the improvements
have been fully paid and satisfied.
5. Wildstone Construction LLC has actual knowledge that there are no claims or liens for materials
supplied or labor performed in connection with the Private Development Contract.
6. Wildstone Construction LLC further warrants that should any claim or lien be filed for material
supplied or labor performed in connection with the Private Development Contract, Wildstone
Construction LLC will immediately furnish a bond pursuant to Texas Property Code Sections
53.236 through 53.238 for release of each the claim or lien, obtain settlement of any claim or lien,
and furnish the City of Dallas written full release. Wildstone Construction LLC agrees to fully
indemnify and hold harmless the City of Dallas from any and all costs that may occur by reason
of such claims or liens.
EXECUTED this _3rd_ day of _December—, 2024`
By
NAME:_Jo
TITLE: Presi
STATE OF TEXAS
COUNTY OF TARRANT
LLC
This instrument was acknowledged before me on
December 3.2024 by
John Kolb President of
Wildstone Construction a
LLC corporation, on behalf of
raiid1corporation.,
�•"""+., AtMNDA LEIGH PATREDIS
U
?�,� `•, �NotarY Public. State o� Texas&YP
lam,•.L C:Omm_ Expires 05 Q8 2027
ARUB
Notary ID 134346448
No Consent of Surety on our maintenance bond.
-Wildstone Construction LLC, Cody Lange PM