HomeMy WebLinkAboutContract 60028-FP1FORTWORTH.
-FP1
City Secretary 60028
Contract No.
Date Received 5/5/2025
AT
NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: TDC Bonds Ranch
City Project No.: CPN 104234
Improvement Type(s): Water 0 Sewer ❑
Original Contract Price: $47,211.00
Amount of Approved Change Order(s): $0.00
Revised Contract Amount: $0.00
Total Cost of Work Complete: $47,211.00
Matthew 05/01 /2025
Matthew Tan kerslev (Mav 1. 202514:55 CDT
Contractor Date
Project Manager
Title
Richmond Builders, Inc.
Company Name
��'-7 05/01 /2025
Project Inspector
Date
#'�
05/04/2025
Project Manager
Date
05/05/2025
Kandice Merrick (Mav5. 202508:44 CDT)
CFA Manager
Date
de.?,L�
05/05/2025
Lauren Prieur (Mav 5. 2025 08:47 CDT)
TPW Director
Date
r-"C)�-0
05/09/2025
Asst. City Manager Date
OFFICIAL RECORD
CITY SECRETARY Page 1 of 2
FT. WORTH, TX
Notice of Project Completion
Project Name: TDC Bonds Ranch
City Project No.: 104234
City's Attachments
Final Pay Estimate ❑x
Change Order(s): ❑ Yes ❑x N/A
Pipe Report: ❑x Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time:180 WD Days Charged: 207 WD
Work Start Date: 4/1/2024 Work Complete Date: 12/26/2024
Completed number of Soil Lab Test: 92
Completed number of Water Test: 4
Page 2 of 2
FORT WORTH
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name BONDS RANCH
Contract Limits
Project Type WATER
City Project Numbers 104234
DOE Number 4234
Estimate Number 1 Payment Number 1
City Secretary Contract Number
Contract Date
For Period Ending 12/6/2024
WD
Project Manager NA
Contractor RICHMOND BUILDERS
3411 RICHMOND AVE., FIFTH FLOOR
HOUSTON, TX 77046
Inspectors A. DUARTE / E. TINNER
Contract Time 18"
Days Charged to Date 207
Contract is 100.00 Complete
Wednesday, April 23, 2025 Page 1 of 4
City Project Numbers 104234
Contract Name BONDS RANCH
Contract Limits
Project Type WATER
Project Funding
UN1T L• WATER IMPROVEMENTS
Item Description of Items
No.
1 DUCTILE IRON WATER FITTINGS W/
RESTRAINT
2 8" WATER PIPE
3 12" WATER PIPE
4 FIRE HYDRANT
5 CONNECTION TO EXISTING 4"-12" WATER
MAIN
6 2" WATER SERVICE, METER RECONNECTION
7 4" WATER METER AND VAULT
8 36" X 12" TAPPING SLEEVE & VALVE
9 CATHODIC PROTCTION TEST STATION
ADJUSTING
DOE Number 4234
Estimate Number I
Payment Number I
For Period Ending 12/6/2024
Estimated Unit Unit Cost Estimated Completed Completed
Quanity Total Quanity Total
0.28 TN $2,500.00 $700.00 0.28 $700.00
163 LF $98.00 $15,974.00 163 $15,974.00
14 LF $140.00 $1,960.00 14 $1,960.00
1 EA $5,100.00 $5,100.00 1 $5,100.00
1 EA $1,000.00 $1,000.00 1 $1,000.00
2 EA $3,200.00 $6,400.00 2 $6,400.00
2 EA $2,100.00 $4,200.00 2 $4,200.00
1 EA $7,000.00 $7,000.00 1 $7,000.00
1 EA $1,700.00 $1,700.00 1 $1,700.00
10 8" WATERLINE LOWERING WITH DI PIPE 1 EA $2,000.00 $2,000.00 1 $2,000.00
11 VALVE BOX ADJUSTMENT I EA $1,000.00 $1,000.00 1 $1,000.00
12 TRENCH SAFETY 177 LF $1.00 $177.00 177 $177.00
Sub -Total of Previous Unit $47,211.00 $47,211.00
--------------------------------------
Wednesday, April 23, 2025 Page 2 of 4
City Project Numbers 104234
Contract Name BONDS RANCH
Contract Limits
Project Type WATER
Project Funding
Contract Information Summary
Original Contract Amount
Change Orders
Total Contract Price
DOE Number 4234
Estimate Number 1
Payment Number 1
For Period Ending 12/6/2024
$47,211.00
$47,211.00
Total Cost of Work Completed $47,211.00
Less % Retained $0.00
Net Earned $47,211.00
Earned This Period $47,211.00
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$0.00
$0.00
$0.00
$0.00
$0.00
$47,211.00
Wednesday, April 23, 2025 Page 3 of 4
City Project Numbers 104234
Contract Name BONDS RANCH
Contract Limits
Project Type WATER
Project Funding
Project Manager NA
Inspectors A. DUARTE / E. TINNER
Contractor RICHMOND BUILDERS
3411 RICHMOND AVE., FIFTH FLOOR
HOUSTON, TX 77046
DOE Number 4234
Estimate Number I
Payment Number I
For Period Ending 12/6/2024
City Secretary Contract Number
Contract Date
Contract Time 180 WD
Days Charged to Date 207 WD
Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed
$47,211.00
Less % Retained
$0.00
Net Earned
$47,211.00
Earned This Period $47,211.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 / Day
$0.00
LessPavement Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$0.00
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$47,211.00
Wednesday, April 23, 2025 Page 4 of 4
FORT WORTH
TRANSPORTATION AND PUBLIC WORKS
PIPE REPORT FOR:
PROJECT NAME: TDC Bonds Ranch
PROJECT NUMBER: 104234
DOE NUMBER: N/A
WATER
PIPE LAID SIZE TYPE OF PIPE LF
Yes 8" PVC
Yes 12" PVC
FIRE HYDRANTS: 1 VALVES (16" OR LARGER) N/A
PIPE ABANDONED SIZE TYPE OF PIPE LF
No
DENSITIES:
NEW SERVICES: 2" (2) Copper
4"(2) DIP
SEWER
PIPE LAID SIZE TYPE OF PIPE LF
PIPE ABANDONED SIZE TYPE OF PIPE LF
No
DENSITIES:
NEW SERVICES:
TRANSPORTATION AND PUBLIC WORKS
The City of Fort Worth • 1000 Throckmorton Street • Fort Worth, TX 76012-6311
(817) 392 - 7941 • Fax: (817) 392 - 7845
163
14
FORTWORTH.
TRANSPORTATION AND PUBLIC WORKS
April 22, 2025
Richmond Builders, Inc.
3411 Richmond Ave Fifth Floor
Houston TX, 77046
RE: Acceptance Letter
Project Name: Bonds Ranch
Project Type: Water, Paving, Storm Drain and Street lights
City Project No.: 104234
To Whom It May Concern:
On March 6, 2025 a final inspection was made on the subject project. There were punch list items
identified at that time. The punch list items were completed on April 22, 2025. The final inspection and
the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is
therefore accepted by the City. The warranty period will start on April 22, 2025, which is the date of the
punch list completion and will extend of two (2) years in accordance with the Contract Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 817-
392-2373.
Sincerely,
A`�
Sandip Adhikari, Project Manager
Cc: Eric Tinner, Inspector
Troy Gardner, Inspection Supervisor
Ariel Duarte, Senior Inspector
Andrew Goodman, Program Manager
Kimley Horn, Consultant
Richmond Builders Inc, Contractor
Inspire Homes Bonds Ranch LLC, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 8/20/19
NOTICE OF CONFIDENTIALITY RIGHTS: IF YOU ARE A NATURAL PERSON, YOU MAY REMOVE OR STRIKE
ANY OF THE FOLLOWING INFORMATION FROM THIS INSTRUMENT BEFORE IT IS FILED FOR RECORD IN
THE PUBLIC RECORDS: YOUR SOCIAL SECURITY NUMBER OR YOUR DRIVER'S LICENSE NUMBER.
UNCONDITIONAL BILLS PAID AFFIDAVIT
STATE OF—%_-P_�
COUNTY OF 4ik
The undersigned is a subcontractor who has furnished labor and/or material under a su.acontract agreement with
Bandera Utility , and hereinafter referred to as "Contractor" to a project known as: Inspire Homes Bonds
Ranch (referred to herein as the "Project"); and owned by: Inspire Homes Bonds Ranch LLC (referred to herein as
the "Owner"); and located between 1392 E Bonds Ranch Rd, Fort Worth: TX 76177, more particularly descripted
as follows:
For and in consideration of $ 0.00 , representing FULL AND FINAL payrnent. on the above -referenced
Project, Subcontractor hereby acknowledges complete satisfaction of, and forever waives and releases, any and
all claims of every kind against Owner, the Project, the property and Contractor, including, but not limited to, all
statutory or constitutional mechanic's liens and all contract liens that the undersigned may be entitled to in
connection with the furnishing of labor and/or material in connection with the work.
IN CONSIDERATION FOR PAYMENTS MADE, THE UNDERSIGNED AFFIANT AGREES TO INDEMNIFY AND HOLD
HARMLESS RICHMOND BUILDERS, INC. FOR ANY LOSS OR EXPENSE THAT MAY RESULT FROM FALSE OR INCORRECT
INFORMATION CONTAINED IN THIS AFFIDAVIT.
Subcontractor further represents and warrants that it has not assigned and will not assign any claim for payment,
any right to perfect a lien claim, or any contractual, statutory or constitutional lien against the Project in
connection with the above -described work.
Subcontractor further warrants and represents that all bills, claims, or liabilities against it or the Project arising
out of labor and/or material provided by or through Subcontractor to the Project, or purchased by Subcontractor
for use on the Project have been paid and satisfied except as noted on the attached schedule of unpaid
subcontractors and suppliers. Subcontractor further warrants and represents that any unpaid subcontractors and
suppliers will be paid and satisfied directly out of funds paid in reliance on this affidavit.
Subcontractor further represents and warrants that funds paid in reliance on this affidavit in the amount shown
above are sufficient for payment of any outstanding bills, claims, or liabilities incurred by Subcontractor in
connection with labor and/or material provided to the Project.
All of the provisions of this release shall bind the undersigned Subcontractor and the Subcontractor's legal
representatives, successors and assigns and shall inure to the benefit of the Owner, and the Owner's heirs, legal
representatives, successors and assigns.
Affidavit(BillsPaid - Sub) Page 1
The person signing this document represents that they are duly authorized to do so on behalf of the undersigned
Subcontractor.
EXECUTED this day of MC 1Ck*- 202ji.
By: ►'Y��,rr��e�
Name: liar v,P t1P L Tm r �-
Title: Co -It r-oAVe-r
SUBSCRIBED, SWORN TO AND ACKNOWLEDGED BEFORE ME by the said on this the day offt!Ckr, 202!5_to
certify which witness my hand and official seal of office.
Notary Public, State of Texas
SHERRI L. SHORT
�$0' "� �: Notary Public, State of Texas
Comm. Explrea 09-22-2028
Notary ID 133978902
Affidavit (Bills Paid - Sub) Page 2
SCHEDULE OF UNPAID SUBCONTRACTORS AND SUPPLIERS
Subcontractor certifies that all bills, claims, or liabilities against it or the Project arising out of labor and/or material
provided by or through Subcontractor to the Project, or purchased by Subcontractor for use on the Project have
been paid and satisfied except as follows (include name address and phone number and the amount owed through
the date noted above):
Affidavit (Bills Paid - Sub) Page 3
CONSENT OF SURETY
TO FINAL PAYMENT
ALA Document G707
Bond No. 4467379
TO 0'%VNER-
(Name arrdadd rm—j
Inspire Homes Bonds Ranch, LLC (Developer)
City of Fort Worth
PROJECT.
(M me and adl -V
COINER
ARCHITECT
CGINTitACMR
SURETY
QTHFR
ARMTECT'S PROJECT N0.:
CONTRACT' FOR: General Construction
CONTRACT DATED:
Maintenance Bond for Bonds Ranch Lot 1 Block 1 Single Family Homes Project
In accordance with the provisions of the Contract between the Owner and d-e Contractor as Indic awd above, the
fJttsert rxunr Attd artditsx ofS}orery}
SureTec Insurance Company
2103 CityWest Boulevard, Suite 1300
Houston , TX 77042
SUI{R'I"Y,
on bond of
(lnw+t namt, and addrnaa[(Contmetur)
Richmond Builders, Inc.
, COMMCT'Olt,
hereby approves of the final payment to the Contractor, and agrees that final payment to the Contractor shall not relieve the Surety of
any of its obligations to
(Eswel namearrd a*ft";s of Owner)
Inspire Homes Bonds Ranch, LLC (Developer)
City of Fort Worth
as set forth in said Surety's load.
, OWNER,
IN VA NESS WHEREOF, the.%=y lus hereunto set its hand on this date: May 1, 2025
ff+ziari (et kviling The urarrtb jU1MVd by &e o wirurk ehveanrl i wn;
Attest:
(seal). Kim Stanley, Secretary
`,�,,,nmiwrxrnx nn
tiu t�,6 � � ,•cspv;
���xxnumr mm�j°"
SureTec Insurance Company
(Sum"I.)
By:
(Swiatur r of aulbadmI MpmSemerd w)
Scott D. Chapman Attorney -in -Fact
Ofs1w itanwe oral Pith)
G707--1994