HomeMy WebLinkAboutOrdinance 27559-03-2025Ordinance No. 27559-03-2025
AN ORDINANCE ADJUSTING ESTIMATED RECEIPTS AND
APPROPRIATIONS IN THE WATER & SEWER REV BONDS SERIES 2021
FUND, BY DECREASING ESTIMATED RECEIPTS AND APPROPRIATIONS IN
THE UNSPECIFIED -ALL FUNDS PROJECT (CITY PROJECT NO. UNSPEC) IN
THE AMOUNT OF $968,571.00 AND INCREASING ESTIMATED RECEIPTS
AND APPROPRIATIONS IN THE COMMUNITY FACILITIES AGREEMENT
BUCKET PROGRAMMABLE PROJECT (CITY PROJECT NO. P00001) BY THE
SAME AMOUNT FOR THE PURPOSE OF FUNDING THE COMMUNITY
FACILITES AGREEMENT-CFA LONGHORN ESTATES PHASE 2; PROVIDING
FOR A SEVERABILITY CLAUSE; MAKING THIS ORDINANCE CUMULATIVE
OF PRIOR ORDINANCES; REPEALING ALL ORDINANCES IN CONFLICT
HEREWITH; AND PROVIDING AN EFFECTIVE DATE.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF FORT WORTH, TEXAS:
SECTION 1.
That the budget of the City of Fort Worth for Fiscal Year 2024-2025, as enacted by Ordinance 27107-09-
2024, as amended, is hereby further amended to make the following adjustments to estimated receipts and
appropriations in the Water & Sewer Rev Bonds Series 2021 Fund, by decreasing estimated receipts and
appropriations in the Unspecified -All Funds project (City Project No. UNSPEC) in the amount of$968,571.00
and increasing estimated receipts and appropriations in the Community Facilities Agreement Bucket
programmable project (City Project No. P00001) by the same amount for the purpose of funding the
Community Facilities Agreement — CFA Longhorn Estates Phase 2 (City Project No 105598).
SECTION 2.
That should any portion, section or part of a section of this ordinance be declared invalid, inoperative or void
for any reason by a court of competent j urisdiction, such decision, opinion or j udgment shall in no way impair
the remaining portions, sections, or parts of sections of this ordinance, which said remaining provisions shall
be and remain in full force and effect.
SECTION 3.
That this ordinance shall be cumulative of Ordinance 27107-09-2024 and all other ordinances and
appropriations amending the same except in those instances where the provisions of this ordinance are in
direct conflict with such otherordinances and appropriations, in which instance said conflicting provisions of
said prior ordinances and appropriations are hereby expressly repealed.
SECTION 4.
This ordinance shall take effect upon adoption.
A. P PROVED AS TO FORM AND LEGALITY:
ra[ken (Apr 15.202515:37 CDT)
Assistant City Attorney
ADOPTED AND EFFECTIVE: March 25, 2025
CITY SECRETARY
Jannette S. Goodall
City Secretary
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE B1D
U H4.
DAP-ntn PROPOSAL
Pam t nt 4
Bidder's Application
r— -
Project Item Information
Bidder's Proposal
Bidllst Item
No.
Specification Section No unit of Bid Unit Pnr Bid Value
Measure Quanirty
I: WATER IMPROVEMENTS
UNIT
1
3305.0109 Trench Safety
33 05 10
LF
11.820
$1.00
$11,820.DO
2
3305.1003 20" Casing By Open Cut
33 05 22
LF
50
$197.00
$9,850.00
3
3311.0001 Ductile Iron Water Fittings wlRestraint
3311 11
TON
17.40
$13,717.00
$238,675.00
4
3311.0241 8" Water Pipe
33 11 10. 33 11 12
LF
7.860
$45.00
$353,700.00
5
3311.0254 8" DIP Water, CLSM Ball
3311 10
LF
280
$113.00
$31,640.00
6
3311.0641 24" Water Pipe
33 11 10, 33 11 12. 33 11 13, 33 11 14
LF
3,640
$157.00
$571,480.00
7 13311.0642
24" Water Pipe, CSS Backfill
33 11 10, 33 11 12. 33 11 13, 33 11 14
1 LF
40
$336.00
$13,440.04
8
13312.DDOI Fire Hydrant
33 12 40
EA
12
$8,652,00
$103,824.00
9
13312.01D8 Connection to Existing 24" Water Main
33 12 25
EA
1
1 $13,421.00
$13,421.00
10
13312.0117 Connection to Existing 4"-12" Water Main
33 12 25
EA
5
$5,923.00
$29,615.00
11
13312.1004 4" Combination Air Valve Assembly for Water
33 12 60
1 EA
1 21
$39,632.001
$79,264.00-
12
3312.2003 1" Water Service
33 12 10
EA
106
$1,461.00
$154,866.00
13
3312.2103 1 112" Water Service (Irrigation)
33 12 10
EA
2
$3,032.00
$6,064.00
14
3312.2203 2" Water Service
33 12 10
FA
1
$3,229.00
$3,229.00
15
3312.3003 8" Gate Valve
33 12 20
EA
36
$2,503.00
$76,090.00
16
3312.3008 24" Gate Valve wl Vaull
33 12 20
FA
4
$50,950.00
$203,800.00
17
3312.6003 6" Blow Off Valve
33 12 60
EA
1
$28,966.00
$28,955.00
18
13471.0001 Traffic Control
3471 13
1 MO
1 2
$5,50G.001
$11,000.00
TOTAL UNIT is WATER IMPROVEMENTS
$1.939,733.80
CITY OF FORT WORTH
STANDARD CONSTRUCTION 5PIXIFICATION DOC:UNFNTS - DWELOPFR AW ARDFJ2 PROJECTS
I— Vessoon May 22, 2014
Cagy oroo 42 43 Ihd Proposal —DAP {,ulll I.
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
udfiti.
DAP -BID PRoposAL
Puge 2 cf4
Bidder's Application
PrajeA Item Information
BiddeA Proposal
BidlatItem
No.
Description Specification Section No.
Unit of
Measure
Bid
Quantity
Unit Prict
F BidVatue
UNIT II: SANITARY SEWER IMPROVEMENTS
1
3301.0002 Post -CCTV Inspection
33 01 31
LF
6,348
$2.00
$12,696.00
2
3301.0101 Manhole Vacuum Testing
33 01 30
EA
31
$138.00
$4,278.00
3
3305.0109 Trench Safety
33 05 10
LF
6.348
$1.00
$6,348.00
4
3305.0202 Imported EmbedmentlBackrill, CSS
33 05 10
CY
11
$216.00
$2,376.00
5
3305.1003 20" Casing By Open Cut
33 05 22
LF
62
$241.00
$14,942.00
fi
3331.3101 4" Sewer Service
33 31 50
EA
105
$1.884.00
$197.820.00
7
3331.3106 4" DIP Sewer Servlce
33 31 50
EA
1
$9.073.00
$9.073.00
8
3331Al15 8" Sewer Pipe
33 11 10. 33 31 12,333120
LF
3,046
$58.00
$176.668.00
9
3331.4116 8" Sewer Pipe, CSS Backilill
33 11 10.33 3112.33 31 20
LF
92
$93.00
$8,556.00
10
3331.4120 8" DIP Sewer Pipe, CSS Bacldill
3311 10
LF
67
$1143,00
$9,581.00
11
3331.4201 10" Sewer Pipe
33 11 10.33 3112.33 3120
LF
149
$79.00
$11.771.00
12
333IA202 10" Sewer Pipe, CSS Backfill
33 11 10.33 31 12.333120
LF
20
$126.00
$2.520.00
13
13331IA2013 12" Sewer Pipe
33 11 10. 33 31 12. 33 3120
LF
2,803
$76.00
$213.028.00
14
3331.4209 12" Sewer Pipe, CSS Sackrid
33 11 10. 33 31 12,333120
LF
120
$169.00
$20,280.00
15
3331.4213 12" DIP Sewer, CSS Backrill
3311 10
LF
51
$248.00
$12.648.00
16
3339,0001 Epoxy Manhole Liner
33 39 60
VF
33
$418.00
$13,794.00
17
3339.1001 V Manhole
33 39 10. 33 39 20
EA
31
$4.374.00
$135,594.00
18
3339.1002 4' Drop Manhole
33 3910. 33 39 20
EA
1
$6.789.00
$6,789.00
19
3339.1003 Extra Depth Manhole
33 39 10.33 39 20
VF
126
$359.00
$45.234.00
TOTAL UNIT II: SANITARY SEWER
IMPROVEMENTS1
$903.996.00
CtrYOFFORT WORTH
STANDARD CONSTRUCTION SPECMCA710N DOCl IENTS - DEVELOPER AWARDED PROJECTS
Fm Vmirm May22.200 Copy or004243 Bid Rap-l_DAPQW0 xhx
SECTION 00 42 43
Developer Awarded Projects - PROPOSAL FORM
UNIT PRICE BID
ifnfities
DAP -13ID PROPOSAL
Page 3.f4
Bidder's Application
Project Item information
Bidders Proposal
B idbst Item
Na.
Description
Specification Section No '
Unit of
Measure
Bid
Quantity
UnaPnce
Bid Value
UNIT III'
DRAINAGE IMPROVEMENTS
1
0241.4201 Remove 4' Drop Inlet
3341 10
EA
1
$1,403.00
$1,403.00
2
0241.3019 Remove 38" Storm Litre
0241 14
LF
70
$42.00
$2,940.00
3
0241.4202 Remove 5' Drop Inlet
3341 10
EA
2
$1,403.00
$2,806.00
4
0241.4401 Remove HeadwaiVSET
0241 14
EA
1
$1.403.00
$1,403.00
5
3137.0103 Large Stone Riprap, grouted
31 3700
SY
2,222
$182.00
$404.404.00
6
3137.0105 Medium Stone Riprap, grouted
31 3700
SY
183
$165,00
$30,195.00
7
13305.0109 Trench Safety
3305 10
LF
5.741
$1.00
$5.741.00
B
3341.0201 21" RCP, Class Ili
33 41 10
LF
429
$78.00
$33,462 00
9
3341.0205 24" RCP, Class III
3341 10
LF
477
$87.00
$41,499.00
10
3341.0208 2T' RCP, Class III
33 41 10
1 LF
1 487
$102.001
$49,674.00
11
13341.0302 30" RCP. Class III
3341 10
1 LF
1 1546
$10&001
$166.966.00
12
3341.0304 30" RCP Class V
33 41 1f)
LF
630
13
3341.0309 36" RCP, Class III
3341 10
LF
544
$136.00
$73,984.00.
14
3341.0402 42" RCP, Class III
3341 10
LF
268
$198,00
$53,064.00,
15
3341.0409 48" RCP, Class III
33 41 10
LF
614
$229.00
$140,606.001
16
3341.1201 5x3 Box Culvert
13341.1304 6x5 Box Culvert
.3341 10
3341 10
LF
220
$288.00
$63,360.001
17
1 LF
1 5261
$446.001
$234,596,0C
18
3349.0001 4' Storm Junction Box
33 49 10
EA
13
$7,881,00
$102.453.00
19
3349.0002 5' Storm Junction Box 33 49 10
EA
5
$9,641,00
$48,205,00
20
3349.0004 T Storm Junction Box 33 49 10
EA
1
$20,941,00
$20,941.00
21
3340.5001 10' Curb Intel
33 49 20
EA
23
$9,473.00
$217,879.00
22
3349.5002 15' Curb Inlet
33 49 20
EA
5
$12,716,00
$63,590.00
23
3349.5003 20' Curb Inlet
33 49 20
33 49 20
EA
3
$14,91_3,00
$44,739.00
$36.904.00
24
I3349.7001 4' Drov klkt
1 EA
1 41
$9,226.001
25
9999,0001 15" RCP, Class V
3341 10
LF
73
$208.00
$15,184.00
26
9999,0002 18" RCP, Class V
3341 10
LF
65
$216.00
$14,040.00
27
9999,0003 SETP-CD Headwall (15" RCP, 1 pipe)
99 99 99
EA
2
$4,038.00
$8,076.00
28
9999,0004 SETP-CD Headwall (18" RCP, 1 pipe)
99 99 99
EA
2
$4,643.00
$9,286.06
29
9999.0005 SETP-CD Headwall (24" RCP, 1 pipe)
99 99 99
EA
1
$5,056.00
$5,056.00
30
9999.0007 SETP-CD Headwall (30" RCP, 1 pipe)
99 99 99
EA
2
$5,496.00
$10,992.00
31
199910006 SETP-CD Headwall (48" RCP, 1 pipe)
99 99 99
EA
1
$10,25300
$10,253.00
32
9999.0009 SETS -CD Headwall (S'x3' RCB, 4 pipe)
99 99 99
EA
2
$36,691.00
$73,382.00
33
9999.0010 SETB-CD Headwall (6'x5' RCB, 1 pipe)
999999
EA
1
$17,941.00
$17,941.00
34
9999.0011 Filter Fabric
99 99 99
SY
2,405
$10.00
$24,050,00
35
9999.0012 6" Concrete SpilWvay
99 99 99
SY
552
$116.00
$64,032,00,
36 1
9999.0013 8'Dmp Inlet
99 99 99
EA
1
TOTAL UNIT III: DRAINAGE IMPROVEMENTS
CITY OF FORT WORTH
S"FANI]WW CONSTRUMaN SPECIFICATION DOCUMEM"S- DEVELOPER AWARDED PROJECTS
F- V-ion May 22,2019 Copy o£OG 42 43FIId Prop-1_DAP4m11),xbx
SECTION 00 42 43
Developer Amrded Projects- PROPOSAL FORM
UNIT PRICE BID
Utilities
DAP - Bm F,ROPOSAL
Ngz4 Cf4
Bidder's Application
Project Item Information
Bidder's Proposal
Bidlistoftem
Description
Specification Section No.
unit of
Measure
B,
Quantity
I ity
Unit Price
Bid Value
Bid Summary
UNIT I: WATER IMPROVEMENTS $1,939,733.80
UNIT II: SANITARY SEWER IMPROVEMENTS $903.996.00
UNIT III: DRAINAGE IMPROVEMENTS '
This Bid is submitted by the entity named below:
BIDDER- BY.
W,ighl Construction Co, Inc.
60o W. Wall St.
Grapevine, Texas 76051 TITLE:
DATE:
Contractoraerees to complete WORK for FINAL ACCEPTANCE within
CONTRACr commences to run as provided in the General Candhians.
END OF SECTION
CITY OF FORT WORTH
STANDARD CONSTRIICRON SPECBTCATION DOCLM04CS - DEVELOPER AWARDED PROJECTS
Farm V=i0uMay2? 2014
Total Conslruction
I S VTOT-1 working days after the date when the
Copy of004243 Bid Mposal DAP(ffl1
CCY
my�
2120/2025
Longhorn Phase
2
24"
FORTWORTH
-
�C'jRICY rl�770�E JSEF M DAI, APR
EN 71 -� , 7� F1 ',"Z qY 4 RES7FAE,) FHO;FS;IC:KAL 140
0 LITI-
P",E .E -I. M�ll NID REaPDNILFI
Water Line
WATER
N
FC� THE ACCURACY G9 �Al,-- DATA
FORT WORTH GL0019-07 - Project Budget Summary
«Back F2unTime: 02/20/2025 10:34 AM
Extort Detail Data Expand All Collapse All
105598 CFA-Longhorn Estates Phase 2'
Total Revenue:
0.00
Total Expenditure : $0.00 0.00
Project 105598
«Back FSCM 92 Production
Page 1 of 1
City of Fort Worth, Texas
Mayor and Council Communication
DATE; 03/25/25 M&C FILE NUMBER: M&C 25-0270
LOG NAME: 60LONGHORN ESTATES PHASE 2 WATER IMPROVEMENTS
SUBJECT
(CD 6) Authorize Execution of a Community Facilities Agreement with D.R. Horton - Texas, LTD., with City Participation in an Amount Up to
$842,235.24 for Oversizing an 8-Inch Water Main to 24-Inches for Anticipated Future Growth in South Fort Worth, and Adopt Appropriation
Ordinance to Effect a Portion of Water's Contribution to the Fiscal Years 2025-2029 Capital Improvement Program
RECOMMENDATION:
It is recommended that the City Council. -
Authorize the execution of a Community Facilities Agreement with D.R. Horton -Texas, LTD., with City participation in an amount up to
$842,235,24, for oversizing an 8-inch water main to 24-inches for anticipated future growth located in south Fort Worth; and
Adopt the attached appropriation ordinance adjusting estimated receipts and appropriations in the Water & Sewer Rev Bonds Series
2021 Fund by decreasing estimated receipts and appropriations in the Unspecified -All Funds project (City Project No. UNSPEC) in th
amount of $968,571.00 and increasing estimated receipts and appropriations in the Community Facilities Agreement Bucket p'rogran
project (City Project No. P00001) by the same amount for the purpose of funding the Community Facilities Agreement— CFA Longhon
Estates Phase 2 (City Project No.105598) and to effect a portion of Water's contribution to the Fiscal Years 2025-2029 Capital
Improvements Program.
DISCUSSION:
D.R. Horton - Texas, LTD. (Developer) is constructing the Longhorn Estates development project located west of South Hulen Street and nortH of
Longhorn Trail. The Water Department is requesting to oversize approximately 3,678 linear feet of an 8-inch water main to a 24-inch water maln for
anticipated future growth in the area. The construction cost for the 24-inch water main is estimated to be allocated at 11.1 % for the ❑erveloper�and
40146. II
88.9% for the City. The Longhorn Estates Phase 2 project is assigned City Project No. 105598 and Accela System Record IPRC2
In accordance with Chapter 212, Subchapter C of the Texas Local Government Code, the City's participation in the contract is exempt from
competitive bidding requirements because the contract is for oversizing public improvements being constructed by the Developer. The Developer
will execute a performance bond to cover the total project cost, including all of the City's cost participation, and the City's cost participation will be
determined in accordance with the City's Community Facilities Agreement (CFA) unit price ordinance.
The City's cost participation to be paid to the Developer for oversizing of the water main is estimated to be an amount up to $842,235.24 as
shown in the table below. An additional $126,335.29 in contingency funds will cover the City's portion of any change orders.
The following table shows the cost sharing breakdown for the project between all parties:
A. Construction
Developer
Cost
City Cost
Total Cost
1. Water
$1,097,498.56
$842,235.24
$1,939,733.80
Contingency
$0.00
$126,335.29
$126,335.29
2. Sewer
$903,996.00
$0.00
$903,996.00
3. Paving
$2,153,231.90
$0.00
$2,153,231.90
4. Drainage
$2,092,478.00
$0.00
$2,092,478.00
5. Street Lights
$464,409.28
$0.00
$464,409.28
Construction Fees:
I
B. Construction Inspection Fee
$80,325.00
$0.00
$80,325.00
C. Admin Material Testing Fee
$24,804.00
$0.00
$24,804.00
D. Water Testing Lab Fee
$2,868.75
$0.00
$2,868.75
Total Project Cost
$6,819,611.491
$968,570.53
$7,788,182.02
*Numbers will be rounded up for accounting purposes.
The reimbursement of the City participation is not a lump -sum amount and may be less than the stated amount depending upon the actual
quantities and unit prices from the Notice of Final Completion package, commonly referred to as the Green Sheet package.
It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year (FY), instead of within the annual budget ordinance,
as projects commence, additional funding needs are identified, and to comply with bond covenants. The actions in this Mayor & Council
Communication (M&C) will appropriate funds in support of the Water Department's portion of the City of Fort Worth's Fiscal Years 2025-2029
Capital Improvements Program, as follows:
Capital
Revised
Fund
Project
FY2025 CIP
Authority
Budget
FY2025
Name
Name
Appropriations
Adjustment
Bud et
g
56019
105598-
-W&S
CFA
Rev
LonghLonghorn$0.00
This M&C
$968,571.00
$968,571.00
Bonds
Estates
eries S
Seri
Phase 2
Funding is available in the Unspecified -All Funds projectwithin the Water & Sewer Rev Bonds Series 2021 Fund for the purpose of funding
CFA- Longhorn Estates Phase 2 project.
Funding for the Community Facility Agreement (CFA) -- Longhorn Estates Phase 2 project is as depicted in the table below:
Existing 11
Additional
Project
Fund
lAppropriations
Appropriations
Total*
W&S Rev Bonds
$0.00
$968,671.00
$968,571.00
Series 2021 - 56019
_
Project Total
$0.00
$968,571.00
$6681571.00
*Numbers rounded for presentation purposes.
BUSINESS EQUITY- A goal is not required under Business Equity Ordinance 25165-10-2021 when City spending participation on Commu
Facilities Agreements is less than $1,000,000.00 dollars.
This project is located in COUNCIL DISTRICT 6.
FISCAL INFORMATION 1 CERTIFICATION:
The Director of Finance certifies that funds are currently available in the Unspecified - All Funds project within the W&S Rev Bonds Series 2021
Fund and upon approval of the above recommendations and adoption of the attached appropriation ordinance, funds will be available in W&S Rev
Bands Series 2021 Fund for the CFA-Longhorn Estates Phase 2 project to support the approval of the above recommendations and execution of
the agreement. Prior to an expenditure being incurred, the Water Department has the responsibility of verifying the availability of funds. 1
Submitted for City Manager's Office by: Jesica McEachem 5804
Originating Business Unit Head:, Chris Harder 5020
Additional Information Contact: Suby Varughese 8009
Melissa Harris 8428