HomeMy WebLinkAboutContract 56185-CO3CSC No. 56185-CO3
F_ 0R-F WoR HA City of Fort Worth
Change Order Request
Project Name:I Westside II to Westside II Pressure Plane Transfer Project City Sec No,: 1 56185
Project No.(s):l 56002 / 0600430 10700430 1 DOE No. I N/A I Cily Proj. No,:1 C01468
Project Descrlpllon:l Water system improvements on the west side of Fort Worth to allevate low pressure Issues. Thes improvements Include
multiple pressure reducing valves stationa to allow the transfer of portions of WS2 pressure plan to the W83 plane
Contractorl William J Schultz Inc, dba Circle C Construction Co. Change Order it 3 1 Date 4/16/2025
City Project Mgr.1 John Kasavich Cily Inspector: John Robinson
Phone Number:1 817-392-8480 I Phone Number 817.879-9818
Dept, Water Sewer Paving Totals Contract Time
(Calender days)
Original Contract Amount $7,613,927.25 $110,085.00 ' $7,724,012,25 540
Extras to Dale $0.00 $0.00 $0.00 330
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $7,613,927.25 $110,085.00 $7,724,012.25 870
Amount of Change Order-g75,417.50 ;13,200.00 j •$88,617.50 680
Revised Contract Amount $7,tv 8,509.75 $96,865.00 $7,635,394.76 1,560
Original Funds Available for Change Orders $228,418.00 $11,009.00 $239,427.00
Remaining Funds Available for this CO $228,418.00 I $11,009.00 $239,427,00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT -1.15%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) 1$9,655,016,31
JUSTIFICATION (REASONS) FOR CHANGE ORDRR
Change Order No. 3 primarilly provides compensation for the following increased and additional items that were
necessary on the project: 450 feet of 8-inch water main, 1-inch water service, permanent roadway repair,
grouting of a water main to be abandoned, street pavement marking, and time expended by the contractor to
i locate and identify several residential and business water meters within the project area. The change order
will also allow for the deletion of pay item quantities that are no longer needed on the project.
Staff concurs with the contractor's request for additional 680days on the project for the time it took to
coordinate with all property owners for private water main reroutes where necessary and time it took to
' reroute water services lines from the rear of lots to newley installed water mains on project streets, along with
property restoration.
Goniraotor's Conlpany,Name
Vh1;am J Schultz lna dba We C ConSM60n CO.
In polar
Director Water De )t
to fr 1
A istEt Ghy,Aftomoy
M&C Number I N/A
I
Contractor Name Contractor Signature
I Teri Skelly % S�
Date ProI Manager
4/18/' S" /L
Date Car truotion StIpervlsor.(,Water Dept)
T-.5 04/23/202� '
Date I Assistant 61iymanaget
)4/24/202d
Council Aclion.(If Required)
M&C Dale Approved NIA
Date
�y /,s•ZS
Date
Date
Date
05/12/2015
OFFICIAL RECORD
i CITY SECRETARY
FT. WORTH, TX
R'T Wo R-F](-I City of Fort Worth
Change Order Additions
Project Name I Weslside II to Weslside II Pressure Plane Transfer Project
I
City Sec No.:
1 56185
Project No.(s): i
I
DOE No.1 N/A (
City Pro). No.:
I C01468
Project Water system improvements on the west side of Fort Worth to allevate low
pressure Issues. Thes
Improvements Include
Description multiple pressure reducing valves stations to allow the transfer of portions of WS2 pressure plan to the W83 plane
Contractor I William J Schultz Inc, dba Circle C Construction Co,
i Change Order:
Date:1 411612025 i
City
Project Mgr, I John Kasavich i
City Inspector I John Robinson
i
ADDITIONS
I f EM
UE80HIP I ION
DEPT
Qtyy Unit
Unit Cost
I
Total
13
3311.0241 8" Water Pipe
Water
4ti0,00 LF
$65.00
$29,250.00
30
3312.3003 8" Gate Valve
Water
1.00 EA
$1,500.00
$1,500.00
31
6" Gate Valve
Water
1.00 EA
$1,200.00
$1,200.00
36
3312.0001 Fire Hydrant
Water
1,00 EA
$3,600.00
$3,500.00
39
3305.0103 Exploratory Excavation of Existing Utilities
Water
7.00 EA
1$1,000.00
$7,000.00
45
4"-12" Pressure Plu
Water
5.00 EA
1$1,000.00
$5,000.00
49
3312.0117 Connection to Existing 4"-12" Water Main
Water
1.00 EA
1$2,000.00
$2,000.00
54
3312,2001 1" Water Service Meter Reconnection
I Water
1 3.00 EA
1$500.00
$1,600.00
55
3312,20031" Water Service
(Water
1 3.00 EA
$1,200.00
$3,600.00
56
13312.20041" Private Water Service
I Water
1 800.00 LF
155.00
$44,000.00
58
0241.1001 Water Line Grouting
(Water
1 85.00 CY
$200.00
I$17,000.00
60
I3292.0100 Block Sod Placement
IWater
1 100.00 SF
$10.00
1$25.00
1$1,000.00
62
ITopsoil
IWater
I 10,001CY
1$250.00
71
ITraffic Control
IWater
I 3.001EA
1$4,600.00
1$13,500.00
77
(Permanent Road repairs for 1" Service Connection
IWater
I 500.001LF
1$40.00
1$20,000.00
78
13216.010 6" Conc Curb and Gutter
IWater
I 30.00ILF
1$45.00
1$1,350.00
79
13213.030 6" Conc Sidewalk
IWater
1 120.0018F
1$15,00
1$1,800.00
93
ICSS Bacfill for 1" Service Public and Private
IWater
I 200.001CY
1$150.00
1$30,000.00
96
Ilrrigation Repairs
IWater
1 1.00 LS
1$1,500.00
1$1,500.00
109
13217.01016' SOL Pvmt Markings HAS (W)
IWater
I 8189.0001LF
1$4.50
1$36,860.50
110
1 217.0102 6" SDL Pvmt Markings HAS (Y)
IWater
I 9146.00011-F
$4.60
1$41,157.00
111
13217.0103 W BRK Pvmt Markings HAS (W)
IWater
I 340,0001LF
1 4.50
1$1,530.00
112
IDemobilization and Remobilization
IWater
I 2.00ILF
1$3,500.00
1$7,000.00
114
1 Street Use Permit
IWater
I 2,001EA
1$100.00
$200.00
115
ITrafficControlDetails
IWater
I 2,001EA
1$2,500.00
1$5,000.00
116
11 " Meter Abandonment
IWater
I 3.001EA
1$750.00
1$2,250.00
117
Permanent Road repairs for 1" Reroute on Private Properly
IWater
I 300.00ILF
1$40.00
1$12,000.00
118
Extra Width In Parking Lot Due to Poor Existing Conditions
1Waler
I 200.001SY
1$65.00
1$13,000.00
119
16" Pressure Plug
IWater
I 1.001EA
1$4,500.00
1$4,500.00
120
16" PVC for water connection
1Waler
I 15.001LF
1$200.00
1$3,000.00
121
Water Service
IWater
I 1.001LS
1$15,000.00
1$15,000.00
lAddillonalTemporary
Compensallon for lime expenaea localmg and Icemoying residential and
IWater
I 5.00IEA
I$8,500.00
I$42,500.00
122
business water meters within the project area
123
13305,0109 Trench Safety
IWater
I 1.001LS
1$5,500.00
1$5,500.00
124
1Concrete Encasement Removal
[Water
I 1.001LS
1$3,500.00
1$3,500.00
125
Inlet Modification
IWater
I 1.001SF
1$35.00
1$35.00
126
18" Wateer Line Lowering
Water
1 1.0011-8
1$8,000.00
1$8,000.00
127
IAs-Buills Survey
1
1
'Water
I
I
I 1.001LS
I I
I 1
I$2,000.00
I
I
1$2,000,00
I
1
1
I
I I
Water
I
I
1$387,972.50
Sewer
1
Paving
1
Page 2 of 4
Additions Sub Total
1$387,972.50
F'owr wORTH
City of Fort Worth
Change Order Deletions
Project Name Wesiside II to Westside II Pressure Plane Transfer Project
City Sec No,: 56185
Project No,(s):
I DOE No.
I N/A
City Proj. No.: I C01468
Project Description I Water system Improvements on the west side of Fort Worth to alleviate low pressure Issues, Thes Improvements
Include multiple pressure reducing valves staliona to allow the transfer of portions of W52 pressure plan to the WS3
Contractor I William J Schultz Inc. dba Circle
C Construction Co. I Change Order: F-3-1
Date 4/16/2025
City
Project Mgr. John Kasavich
City Inspector
I John Robinson
DELETIONS
ITEM
DESCRIPTION
DEPT
Qty Unit
Unit Cost Total
7
0241,2001 Sanitary Sewer Grouting
Sewer
66.00 CY
$200.00 $13,200.00
8
3311.045212" DIP Water, CSS Back(ill
Water
206.00 LF
$135.00 $27,810.00
14
3311.0252 8" DIP Water, CSS Backfill
Water
506.00 LF
$115.00 $58,190.00
25
9999.0001 16" Direct Bury Gate Valve
Water
1.00 EA
$12,600.00 $12,500.00
56
3312.20041" Private Water Service
Water
1,100.00 LF
$55.00 $60,500.00
60
3292.0100 Block Sod Placement
Water
12,000.00 SY
$10.00 $120,000,00.
61
13292.0400 Seeding & Hydromulch
Water
2,800.00 SY
1 $6,00 $14,000.00
62
ITopsoll
lWater I
850.001CY
1 $25.00 $21,260.00
73
13123.0101 Unclassified Excavation by Plan
lWaler I
635.001CY
1 $25.00 $16,875.00
78
13216.0101 6" Cone Curb and Gutter
lWater
225,0011-F
1 $45,001$10,125.00
79
13213.0303 Cone Sidewalk
lWater
3,000.001SF
1 $15.00 $45,000.00
85
13212.0302 2" Asphalt Pvmt Type D
IWaler I
40.001CY
1 $200.00 $8,000.00
88
13217.00014" SDL Pvmt Marking HAS (W)
lWater I
8189.001LF
1 $4.00 $32,756.00
89
13217.0002 4" SDL Pvmt Marking HAS (Y)
( Water I
9146,001 LF
1 $4.001$36,584.00
90
13217.00034" BRK Pvmt Marking HAS (W)
lWater I
200.00I1-F
I
1 $4.001$800.00
I
Water
I
$463,390.00
Sewer
1$13,200.00
Paving
Page 3 of 4
Deletions
Sub Total 1$476,590.00
MIWBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total 1 $0.00
Previous Change Orders
CO# DATE AMOUNT
Total
Page 4 of 4
$0.00
4/16/2025
Westside II to Westside II Pressure Plane Transfer
CSC No. 56185
CPN C1468
Change Order 3 Notes
Staff has reviewed the requested prices and days and considers them to be fair and
reasonable.
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
12
Signature
John R. Kasavich
Name of Employee
Engineering Manager
Title
44p o r'r
�oFOR.
d A° 0�-i°v
ATTEST:
°ono o=°c
C`� /� Qd�IlTEXASod�
1() bRnuaba
Jannette Goodall
City Secretary
OFFICIAL RECORD
CITY SECRETARY