Loading...
HomeMy WebLinkAboutContract 60983-A1CSC No. 60983-A1 AMENDMENT No . 1 TO CITY SECRETARY CONTRACT No. 60983 WHEREAS, the City of Fort Worth (CITY) and Shield Engineering Group, PLLC, (ENGINEER) made and entered into City Secretary Contract No. 60983, (the CONTRACT) which was authorized by M&C 23-1078 on the 12th day of December, 2023 in the amount of $ 229,540.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Sanitary Sewer Rehabilitation, Contract 130, CPN 105177; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $47,403.00 (Water: $0.00; Sewer: $47,403.00) 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $276,943.00. 3. All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: 12/08/2023 Page 1 of 2 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Sanitary Sewer Rehabilitation, Contract 130 CPN 105177 EXECUTED and EFFECTIVE as designated Assistant City Manager. APPROVED: City of Fort Worth op Jesica McEachern Assistant City Manager DATE: 05/ 15/2025 ATTEST: Jannette Goodall City Secretary APPROVAL RECOMMNDED: Christopher Hader (May 8, 2025 12:45 CDT) Christopher Harder, P.E. Director, Water Department Contract Compliance Manager: of the date subscribed by the City's poovonpn� ap0� FOR��'aap �o ovo o=e° aa�� �BZA5a4p ENGINEER Shield Engineering Group, PLLC Jan Marie Alexan er, PE COO DATE: 5 1Z By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. 0"( L wrence Hax%i.lton, P.E. Senior Professional Engineer M&C No.#: N/A APPROVED AS TO FORM AND LEGALITY: M&C Date: N/A Douglas Black (May 9, 2025 16:43 CDT) Form 1295: N/A Douglas W. Black Sr. Assistant City Attorney City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: 12/08/2023 Page 2 of 2 Sanitary Sewer Rehabilitation, Contract 130 CPN 105177 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX SHIELD ENGINEERING GROUP February 3rd, 2024 Lawrence Hamilton, PE Professional Engineer City of Fort Worth Water Department RE: Amendment 1 to Provide Limited Professional Services Dear Lawrence, Shield Engineering Group, PLLC (The Firm) is pleased to submit the following as amended services to the original contract below: Original Contract: Sanitary Sewer Rehabilitation Contract 130 City Contract No: 105177 Shield Project No: 2023101.01 Amendment 1 • Relocation of Existing Sanitary Sewer, rerouting of existing SS services from the alley to the street: $47,403 Relocate L-304 from the alley between E Terrell and E Humbolt Streets to the streets; transfer of all private services from existing L-304 in the alley to the proposed lines in the street. Upon construction of the proposed lines, the existing L-304 will be plugged, grouted and abandoned in place. Realign waterline along Humbolt Street to allow for the relocated L-304 main. Amendment No. 1= $109,318 Less remaining Additional Services ($20,000) Less remaininq easements ($41,915: retaininq $18,000 in easements for relocation TROEs) Amendment No. 1 Total= $47,403 The following table summarizes the fee for this amendment by project phase: Water Sewer Total Original Contract $108,276 $121,264 $229,540 Total Amendment No.1 $0 $47,403 $47,403 Total $108,276 $168,667 $276,943 1600 W. 7th Street, Suite 400, Fort Worth, Texas 76102 1 817.810.0696 info@shield-engineering.com I www.SHIELDENGINEERINGGROUP.com TBPE FIRM #F-1 1039 1 TBPLS FIRM #10193890 SHIELD ENGINEERING GROUP Please feel free to contact me with any questions or comments. Sincerely, Jean Marie Alexander, PE COO Shield Engineering Group, PLLC 1600 W. 7th Street, Suite 400, Fort Worth, Texas 76102 1 817.810.0696 info@shield-engineering.com I www.SHIELDENGINEERINGGROUP.com TBPE FIRM #F-1 1039 1 TBPLS FIRM #10193890 Level of Effort Spreadsheet TASK/HOUR BREAKDOWN Water Department Survey Services for Sanitary Sewer Rehabilitation Contract 130 City Project No. 105177 Task No. Task Description Ra[e Principal $305 Program Manager $285 Prot' Enalneer $215 Ell $170 Lid -lb- CADD $135 RPLS $255 SIT $150 Survey Survey Atlminis Teeh Crew rat lve $120 $200 $100 Total Labor Cost Subconitant Er) Subconsulsutant MI Non-MWBE n Rse eproduction Total Expense Task Sub Total %Complete Remaining 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 38 4.0 4.1 4.1 4.2 4.3 4.4 Preliminary Design (60 Percent) Preliminary Design Dmvnngs(assumes 2,2001F) ind ref plan, CCTV review for L-304 reroutes Also includes multiple exhibits for L-304 review Construclability Review ind site visits for realignment (foundations, etc) Public Meeting Utility Clearance Traffic Control Plan updated per phase/per changes Lot Entrance Exhibits Water design realignment (Humboll St) Estimate Final Design SWPPP (') (Assumed a SWPPP book will be provided by the contractor) Prepare ISWM Construction Plan Final Draft (90%) Construction Plans Final (100%) Planshnclude LOE for M-22 water realignment) Construction Estimates (90% and 100%) 0 0 4 4 6 2 3 1 55 39 8 1 1 6 28 8 11 7 264 105 17 5 106 20 11 1 74 34 31 9 44 28 12 2 2 1 5 5 0 0 0 1 0 0 1 0 0 0 1 0 1 0 $ 63,785 $ 1,075 $ $ $ 1,075 $ 64,860 $ 31,155 $ 215 $ 215 $ 215 $ 215 $ 215 $ 215 $ 31,370 $ 4,610 $ 215 $ 4,825 $ $ $ $ $ $ $ 2,685 $ 215 $ 2,900 $ 18,020 $ $ 18,020 $ 3,885 $ 215 $ 4,100 $ 3,430 $ 215 $ 3,645 $ 20,555 $ 645 $ $ $ 645 $ 21,200 $ $ 215 $ 215 $ 215 $ $ $ $ $ $ 8,745 $ 215 $ 8,960 $ 8,490 $ 215 $ 8,705 $ 3,320 $ 215 $ 3,535 7.0 7.1 7.2 7.3 IROW/Easement Services �gh I-of-Wa Research FY�pJ�t-of-WajY'/Easement Prgp and Submital 1600 each -Assumes 0) Tim poren/h'ighl o(Entn/ 6bmittal(Assum� 0) 0 0 0 0 0 0 0 0 0 0 $ $ § $ $ $ 0 $ - $ - $ $ - $ $ - $ $ $ 8.0 8.1 81 8.1 9.0 10.0 Survey Finished Floors /�.ddltlonal Road Survey g,cWrds detail and coordination Ri -of-Way/Easement Pree and Submittal (left)(.) Atltli[ional City Directed Services Left(-) 0 0 0 0 0 26 0 95 111 0 $ 40,140 $ 860.00 $ $ $ 860 $ 41,000 $ - E - 2 5 19 4 15 76 8 27 76 $ 2,590 $ 8,385 $ 860,00 $ $ 2,590 $ - $ 8,385 $ 29,165 $ (59,915) $ 860 $ 30,025 $ $ (59,915) § 20,000 § § 20,000 Totals 0 10 81 338 49 26 0 95 111 0 44,5I 2,530 $ S 2,580 47,145 Foolage /o Footage Design Fee Water Water 0°°JJ $ - Footsq@f %J $� LFJ Sewer 220 l 100% $ 47,403 1 1 Contract (iJ 0/' $ - 22'Q Total 2200I 100%I $ 47,403 1 1 TOTAL OI 0- I $ - 2200 City of Fort Worth, Texas Attachment B - Level of Effort Supplement PMO Official Release Date: 8.09.2012 Frolea summary Sanitary Sewer Total Coss %Complete IRemamlnq Budgets Total Hours 710 %J /I Total Labor $ 44,565 100� $ 47.403 $ 47,403 0'). $ 47.403 Total ExgftPse $ 2.580 100 °I $ 47,403 $ 47,403 0°0l $ 47,403 MBE/SBE Subconsultant $ 2,580 Non-MBE/SBE Subconsultant $ - 10% Sub Markup $ 258 MBE/SBE Panic'rtion 5.4% Total ProjecE Cosf $ 47,403 1 of