HomeMy WebLinkAboutContract 60983-A1CSC No. 60983-A1
AMENDMENT No . 1
TO CITY SECRETARY CONTRACT No. 60983
WHEREAS, the City of Fort Worth (CITY) and Shield Engineering Group,
PLLC, (ENGINEER) made and entered into City Secretary Contract No. 60983,
(the CONTRACT) which was authorized by M&C 23-1078 on the 12th day of
December, 2023 in the amount of $ 229,540.00; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
Sanitary Sewer Rehabilitation, Contract 130, CPN 105177; and
WHEREAS, it has become necessary to execute Amendment No. 1 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $47,403.00 (Water: $0.00; Sewer: $47,403.00)
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $276,943.00.
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: 12/08/2023
Page 1 of 2
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Sanitary Sewer Rehabilitation, Contract 130
CPN 105177
EXECUTED and EFFECTIVE as
designated Assistant City Manager.
APPROVED:
City of Fort Worth
op
Jesica McEachern
Assistant City Manager
DATE: 05/ 15/2025
ATTEST:
Jannette Goodall
City Secretary
APPROVAL RECOMMNDED:
Christopher Hader (May 8, 2025 12:45 CDT)
Christopher Harder, P.E.
Director, Water Department
Contract Compliance Manager:
of the date subscribed by the City's
poovonpn�
ap0� FOR��'aap
�o
ovo o=e°
aa�� �BZA5a4p
ENGINEER
Shield Engineering Group, PLLC
Jan Marie Alexan er, PE
COO
DATE: 5 1Z
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
0"(
L wrence Hax%i.lton, P.E.
Senior Professional Engineer
M&C No.#: N/A
APPROVED AS TO FORM AND LEGALITY:
M&C Date: N/A
Douglas Black (May 9, 2025 16:43 CDT)
Form 1295: N/A
Douglas W. Black
Sr. Assistant City Attorney
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: 12/08/2023
Page 2 of 2
Sanitary Sewer Rehabilitation, Contract 130
CPN 105177
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
SHIELD
ENGINEERING GROUP
February 3rd, 2024
Lawrence Hamilton, PE
Professional Engineer
City of Fort Worth
Water Department
RE: Amendment 1 to Provide Limited Professional Services
Dear Lawrence,
Shield Engineering Group, PLLC (The Firm) is pleased to submit the following as amended
services to the original contract below:
Original Contract: Sanitary Sewer Rehabilitation Contract 130
City Contract No: 105177
Shield Project No: 2023101.01
Amendment 1
• Relocation of Existing Sanitary Sewer, rerouting of existing SS services from the alley
to the street: $47,403
Relocate L-304 from the alley between E Terrell and E Humbolt Streets to the streets;
transfer of all private services from existing L-304 in the alley to the proposed lines in
the street. Upon construction of the proposed lines, the existing L-304 will be plugged,
grouted and abandoned in place. Realign waterline along Humbolt Street to allow for
the relocated L-304 main.
Amendment No. 1= $109,318
Less remaining Additional Services ($20,000)
Less remaininq easements ($41,915: retaininq $18,000 in easements for relocation TROEs)
Amendment No. 1 Total= $47,403
The following table summarizes the fee for this amendment by project phase:
Water Sewer Total
Original Contract $108,276 $121,264 $229,540
Total Amendment No.1 $0 $47,403 $47,403
Total $108,276 $168,667 $276,943
1600 W. 7th Street, Suite 400, Fort Worth, Texas 76102 1 817.810.0696
info@shield-engineering.com I www.SHIELDENGINEERINGGROUP.com
TBPE FIRM #F-1 1039 1 TBPLS FIRM #10193890
SHIELD
ENGINEERING GROUP
Please feel free to contact me with any questions or comments.
Sincerely,
Jean Marie Alexander, PE
COO
Shield Engineering Group, PLLC
1600 W. 7th Street, Suite 400, Fort Worth, Texas 76102 1 817.810.0696
info@shield-engineering.com I www.SHIELDENGINEERINGGROUP.com
TBPE FIRM #F-1 1039 1 TBPLS FIRM #10193890
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Water Department Survey Services for
Sanitary Sewer Rehabilitation Contract 130
City Project No. 105177
Task No.
Task Description
Ra[e
Principal
$305
Program
Manager
$285
Prot'
Enalneer
$215
Ell
$170
Lid -lb-
CADD
$135
RPLS
$255
SIT
$150
Survey Survey Atlminis
Teeh Crew rat lve
$120 $200 $100
Total Labor Cost
Subconitant Er)
Subconsulsutant
MI Non-MWBE
n
Rse eproduction
Total
Expense
Task Sub Total
%Complete
Remaining
3.0
3.1
3.2
3.3
3.4
3.5
3.6
3.7
38
4.0
4.1
4.1
4.2
4.3
4.4
Preliminary Design (60 Percent)
Preliminary Design Dmvnngs(assumes 2,2001F) ind ref plan, CCTV review for L-304
reroutes Also includes multiple exhibits for L-304 review
Construclability Review ind site visits for realignment (foundations, etc)
Public Meeting
Utility Clearance
Traffic Control Plan updated per phase/per changes
Lot Entrance Exhibits
Water design realignment (Humboll St)
Estimate
Final Design
SWPPP (') (Assumed a SWPPP book will be provided by the contractor)
Prepare ISWM Construction Plan
Final Draft (90%) Construction Plans
Final (100%) Planshnclude LOE for M-22 water realignment)
Construction Estimates (90% and 100%)
0
0
4
4
6
2
3
1
55
39
8
1
1
6
28
8
11
7
264
105
17
5
106
20
11
1 74
34
31
9
44
28
12
2
2
1 5
5
0
0
0
1 0
0
1 0
0 0
1 0 1 0
$ 63,785
$ 1,075
$
$
$ 1,075
$ 64,860
$ 31,155
$ 215
$ 215
$ 215
$ 215
$ 215
$ 215
$ 31,370
$ 4,610
$ 215
$ 4,825
$
$
$
$
$
$
$ 2,685
$ 215
$ 2,900
$ 18,020
$
$ 18,020
$ 3,885
$ 215
$ 4,100
$ 3,430
$ 215
$ 3,645
$ 20,555
$ 645 $ $
$ 645
$ 21,200
$
$ 215
$ 215
$ 215
$
$
$
$
$
$ 8,745
$ 215
$ 8,960
$ 8,490
$ 215
$ 8,705
$ 3,320
$ 215
$ 3,535
7.0
7.1
7.2
7.3
IROW/Easement Services
�gh I-of-Wa Research
FY�pJ�t-of-WajY'/Easement Prgp and Submital 1600 each -Assumes 0)
Tim poren/h'ighl o(Entn/ 6bmittal(Assum� 0)
0
0
0
0
0
0
0
0
0
0
$
$
§
$
$
$
0
$ -
$ -
$
$ -
$
$ -
$
$
$
8.0
8.1
81
8.1
9.0
10.0
Survey
Finished Floors
/�.ddltlonal Road Survey
g,cWrds detail and coordination
Ri -of-Way/Easement Pree and Submittal (left)(.)
Atltli[ional City Directed Services Left(-)
0
0
0
0
0
26
0
95
111
0
$ 40,140
$ 860.00
$
$
$
860
$ 41,000
$ -
E -
2
5
19
4
15
76
8
27
76
$ 2,590
$ 8,385
$ 860,00
$
$ 2,590
$ -
$ 8,385
$ 29,165
$ (59,915)
$ 860
$ 30,025
$
$ (59,915)
§ 20,000
§
§ 20,000
Totals 0
10
81
338
49
26
0
95
111
0
44,5I
2,530
$
S
2,580
47,145
Foolage /o Footage Design Fee Water
Water 0°°JJ $ - Footsq@f %J $� LFJ
Sewer 220 l 100% $ 47,403 1 1 Contract (iJ 0/' $ - 22'Q
Total 2200I 100%I $ 47,403 1 1 TOTAL OI 0- I $ - 2200
City of Fort Worth, Texas
Attachment B - Level of Effort Supplement
PMO Official Release Date: 8.09.2012
Frolea summary
Sanitary Sewer Total Coss %Complete IRemamlnq Budgets Total Hours 710
%J /I Total Labor $ 44,565
100� $ 47.403 $ 47,403 0'). $ 47.403 Total ExgftPse $ 2.580
100 °I $ 47,403 $ 47,403 0°0l $ 47,403 MBE/SBE Subconsultant $ 2,580
Non-MBE/SBE Subconsultant $ -
10% Sub Markup $ 258
MBE/SBE Panic'rtion 5.4%
Total ProjecE Cosf $ 47,403