HomeMy WebLinkAboutContract 61692-CO2CSC No. 61692-0O2
FORT WORTH® City of Fort Worth
Change Order Request
Project Name 8 Playground Replacement I City Sec # I 61692
Client Project #(s)l 103940, 104941,103942,103943, 103944, 103945,103946,103947
Project Description Replace 8 playgrounds to include: inclusive play equipment, picnic tables, benches and cookers.
Contractor Northstar Construction Change Order #I 2 1 Datel 4/15/2025 I
City Project Mgr.1 Patrick Vicknair City Inspectorl Cody Horton
Dept.
Original Contract Amount
Extras to Date
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
Amount of Proposed Change Order
Revised Contract Amount
Original Funds Available for Change Orders
Remaining Funds Available for this CO
Additional Funding (if necessary)
PARD
$2,174,833.00
$39,108.50
$2,213,941.50
$58,507.50
$2,272,449.00
$108,741.65
$69,633.15
Contract Time
Totals (CD`
$2,174,833.00 260
$39,108.50 0
$2,213,941.50 260
$58,507.50 25
$2,272,449.00 285
$108,741.65
$69,633.15
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT IMAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) 1 $2,718,541.25
Provide ADA parking spaces, sidewalks, S.S. cooker and zero gravity swing to comply with ADA. Additional drainage, earthwork, grading, sidewalks and sod.
Adjustment to original base bid quantities compared to as -built record drawing quantities.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements.
MlV Contractor's Company Name9E Irontractor Name Contract Si nature
�ko ffo��U�ti
Northstar Construction Inc. Luke Heimlich ... 05/01 /2025
Inspector/Inspection Supervisor
Date
Project and Contract Compliance Manager
Date
05/02/2025
05/02/2025
Program Manager
Date
Senior Capital Project Officer
Date
✓j-a.� E y
05/06/2025
05/06/2025
nt Director (Dept)
Date
Director, Contracting Department Dept
Date
k42 -�� '
05/06/2025
4v
05/12/2025
Assistant City Attorney
Date
Assistant City Manager
Date
�a
05/14/2025
05/15/2025
ATTEST: *tea
Jannette Goodall, City Secretary
AcC
Q.o4vvupL
aA � fORt��dd0
9 0
p e d
dank nEan SQ4.o;
ction if r
M&C Number I I M&C Date Approved
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORTWORTH
City of Fort Worth
"_`
Change Order Additions
Project Name F18 Playground Replacement
City Sec # 1 61692
Client Project # 1 103940, 104941, 103942, 103943, 103944, 103945, 103946, 103947
Contractorl Northstar Construction
PMI Patrick
Vicknair I
Inspector)
Cody Horton
I
Change Order Submittal # 0
Date 1 4/15/2025 1
ADDITIONS
IIEM
UESCRIPIIUN
UEpI
Uty
Unit
Unit Gost
total 1
Glenwood park
1
1
Mobilization, bond, surveying
PARD
1.000OO000
LS
$3,500.00
$3,buu.UU1
2
Demo and remove exisitng concrete paving
PARD
4,383.0000000U
SF
$3.50
$15,340.501
3
Demo and remove existing concrete curb and gutter
PARD
50.00OOOOOU
LF
$10.0U
$500.001
4
Demo and remove unsafe park amenities
PARD
5.0000000U
EA
$200.00
$1,000.001
5
Unclassified excavation
PARD
80.00OOOOOU
CY
$70.OU
$5,600.001
6
New 5" concrete sidewalks
PARD
1,865.000OOOOU
SF
$11.50
$21,447.501
7
New 7" concrete ADA parking with ramp
PARD
945.00OOOOOU
SF
$13.5U
$12,757.501
8
New ADA pavement marking and sign
PARD
1.000OOOOU
LS
$3,115.00
$3,115.001
9
New concrete bradga crossin over tr butary creek
PARD
1.00OOOOOU
EA
$3,100.O0
$3,100.001
10
New concrete resfroom pads
PARD
1.000OOOOU
EA
$4,700.00
$4,700.001
11
New ADA S.S. cooker and zero gravity swing
PARD
1.000OOOOU
EA
$3,610.00
$3,610.001
1
Lost Spurs Park
1
12
New 4" concrete sidewalk
PARD
105.000OOOO1J
SF
$10.00
k1,050.001
13
Additional Sod
PARD
26.00OOOOOU
SF
$9.00
234.001
Arcadia Park
1
1
14
Additional concrete sidewalk
PARD
25.000OOOOU
SF
$10.00
$250.001
Jennings May St Louis
I
15
Additional concrete sidewalk
PARD
21.00OOOOOU
SF
$10.00
$210.001
1
Kristi Jean Burbach Park
1
16
Additional Sod
PARD
22.000OOOOU
SF
$9.00
$198.001
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
PARD
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
1
I
$76,612.501
1
Sub
Total Additions
1
1
$76,612.501
Change Order Additions
Page 2 of 4
FORT WORTH
City of Fort Worth
Change Order Deletions
Project Name 1 8 Playground Replacement
City Sec # 1 61692
Client Project 9 1 103940, 104941, 103942, 103943, 103944,
103945, 103946, 103947
1
Contractorl Northstar Construction
PMI Patrick
Vicknair I
Inspectorl Cody Horton
Change Order Submittal # 0
Date 1 4/23/2025 1
DELETIONS
IIEM
UESURIPI IUN
UEPI
Uty
Unit Unit lost
total 1
Arcadia I rail Park
1
21
Site Underdrain Non-pertorated Pipe)
PARD
-3.00000000
LF $37.OU
- 111.001
23
Concrete Playg ound Border
PARD
-2.000000OU
LF $42.00-
-'84.001
Ellis Park
1
1
23
Wood Fiber Playground Surfacing
PARD
-1.00000000
SF $3.0(A
-$3.001
23
Site Underdrain4on-perforated Pipe)
PARD
-10.00000000
LF $37.0(1
-$370.001
25
Concrete Playg ound Border
PARD
-1.00000000
LF $4
42.001
26
Block Sod
PARD
-623.000000OU
SF $9.0(.
-$5,607.001
Glenwood Park
1
1
20
Site Underdrain (Non -perforated Pipe)
PARD
-45.000000OU
LF $37.OU
-$1,665.001
23
Block Sod
PARD
-192.000000OU
SF $9.0U
-$1,728.001
Jennings May St -Louis Park
1
1
21
Wood Fiber Playground Surfacing
PARD
-529.000000OU
SF $3.0U
-$1,587.001
25
Concrete Playground Border
PARD
-16.00000000
LF $42.OU
672.001
Kristi Jean Burbach Park
1
1
9
Concrete Sidewalk
PARD
-5.00000000
SF $9.0U
-$45.001
23
Concrete Playground Border
PARD
-5.00000000
LF $42.OU
-$210.001
Lost Spurs Park
1
1
23
Concrete Playground Border
PARD
-8.00000000
LF $42.OU
-$336.001
Marine Creek Linear Park North)
1
1
9
Biodegradeable Erosion Co trol F bdc
PARD
-3,795.0000000U
SF $1.0U
-$3,795.001
24
Site Underdrain (Non -perforated Pipe)
PARD
-50.00000000
LF $37.OU
-$1,850.001
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
PARD
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
-$18,105.001I
I
Sub Total Deletions
I
I
-$18,105.001
Change Order Deletions Page 3 of 4
M/SBE for this Change Order
M/SBE Sub Type of Service T Amount for this CO
Total $0.00
Previous Change Orders
co # DATE I AMOUNT
Total I $0.00 1
Signature:
Email: Douglas.Black@fortworthtexas.gov