Loading...
HomeMy WebLinkAboutContract 61369-CO1CSC No. 61369-COl IPROJECT NAME: (CONTRACT: CFA # CITY PROJECT # CITY SECRETARY CONTRACT # FID # IX # FILE # INSPECTOR: PROJECT MANAGER: DEVELOPER -AWARDED -PROJECT CHANGE ORDER Long Horn Estates Phase 1 Water / Sewer / Drainage / Pavement/ Street lights CFA24-0041 105087 61369 30114-0200431-105087-EO7685 X-27933 W-3002 Michael Perkins Khal Jaafari WATER Developer Cost City Cost ORIGINAL CONTRACT $2,289,949.98 $1,249,149.69 EXTRAS TO DATE $0.00 $0.00 CREDITS TO DATE $0.00 $0.00 CONTRACT TO DATE $2,289,949.98 $1,249,149.69 AMOUNT OF PROP. CHANGE ORDER $0.00 $0.00 REVISED CONTRACT AMOUNT $2,289,949.98 $1,249,149.69 TOTAL REVISED CONTRACT AMOUNT PER UNIT $3,539,099.67 REVISED COST SHARE Dev. Cost: TOTAL REVISED CONTRACT CITY PARTICIPATION: YES Phone No: 682-715-7010 Phone No: 817-392-7872 CHANGE ORDER No: L CONTRACT UNIT SEWER DRAINAGE PAVING Developer Developer Cost City Cost Cost City Cost Developer Cost City Cost $2,739,064.00 $0.00 $4,384,347.00 $0.00 $5,323,325.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,739,064.00 $0.00 $4,384,347.00 $0.00 $5,323,325.70 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $2,739,064.00 $0.00 $4,384,347.00 $0.00 $5,323,325.70 $0.00 $2,739,064.00 $4,384,347.00 $5,323,325.70 $15,386,816.44 City Cost: '249, $16,635,966.13 STREET LIGHTS Developer Cost City Cost $605,993.06 $0.00 $0.00 $0.00 $0.00 $0.00 $605,993.06 $0.00 $44,136.70 $0.00 $650,129.76 $0.00 $650,129.76 149.69 I WORKING DAYS 275 275 0 275 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Revised: 12-17-2018 Page 1 You are directed to make the following changes in the contract documents: Street Lights CITY BID ITEM Developer PAY ITEM # # QUANTITY UNIT ITEM DESCRIPTION CFW Unit Price UNIT PRICE Cost City Cost TOTAL 1 2605-3015 1233.00 LF 2" Conduit PVC SCH 80 (T) $15.55 $19,173.15 $0.00 $19.173.15 If 2 3341-1410 3699.00 LF No 10 Insulated Elec Condr $1.45 $5,363.55 $0.00 $5,363.55 13* 2605-0111 2 Ea Furnish / Install Eelec Sery Pedestal $5,000.00 $10,000.00 $0.00 $10,000.00 14* 3441-1501 16 Ea Furnish /Install Ground Box Type B $600.00 $9,600.00 $0.00 $9,600.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 1 $0.00 $0.00 TOTAL Street Light IMPROVEMENTS $44,136.70 0.00 $44,136.70 Asterisk (*) indicates New Pay Item Revised: 12-17-2018 Page 2 RECOMMENDED: By: llyl fO Name: Michelle Lasa Title: Senior Project Manager, Pape -Dawson Engineers APPROVAL RECOMMENDED: CFW - Water Department sua ✓�,�,e Pf- By: WW Name: Suby Varughese MH Title: Engineering Manager RECOMMENDED: CFW - *Contract Compliance Manaqer Khal.Taafari PE. By. 1h111,1,11, v p z , .— Name: Khal Jaafari Title: Professional Engineer Revised: 12-17-2018 Date: 05/13/2025 APPROVED: By: Name: Justin Bosworth Title: Assistant Secretary, D.R. Horton - Texas, Ltd. APPROVED: CFW - Assistant City Manager Bv: c' Date: 05/16/2025 Name: Jesica McEachern Title: Assistant City Manager of FORT hda ATTEST ago °aotl a�ao z°e 05/12/2025 Date: By. A ^aa °E�p56po Date: 05/16/2025 Name: Jannette S. Goodall Title: City Secretary M&C Number. 24-0224 M&C Date Approved: 3/19/2024 kc APPROVED: By: / Name: Richard Wolfe President, Independent Utility Construction, Title: Inc. APPROVED AS TO FORM AND LEGALITY: CFW - Assistant City Attorney Bv: G„ Date: 05/13/2025 Name: Richard McCracken Title: Sr Assistant City Attorney * Contract Compliance Manager (Project Manager): By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, and ensuring all performance and reporting requirements. ❑ There are NO City Funds associated with this Contract 2 There are City Funds associated with this Contract OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Page 3 FORTWORTH MATTIE PARKER MAYOR DAVID COOKE CITY MANAGER MICHAEL OWEN, P.E. CITY ENGINEER, TRANSPORTATION AND PUBLIC WORKS DEPARTMENT THE CITY OF FORT WORTH, TEXAS PLANS FOR THE CONSTRUCTION OF WATER, SEWER, PAVING, DRAINAGE & STREET LIGHT IMPROVEMENTS CHRISTOPHER P. HARDER, P.E. DIRECTOR, WATER DEPARTMENT IPRC RECORD NO. IPRC 23-0129 CITY PROJECT NO. 105087 FID NO. 30114-0200431-105087-EO7685 FILE NO. W-3002 LONGHORN ESTATES PHASE 1 X-27933 CURRENT CONSTRUCTION STANDARDS FOR DEVELOPMENTS 25 DATED: OCTDRER e. 2023 SHALL GOVERN ON THIS PROJECT u 0 U a LOTS 1-44,1 OX, BLOCK 1 - LOTS 1-22, BLOCK 2 - LOTS 1-22, BLOCK 3 - LOTS 1-23, BLOCK 4 - LOTS 1-29, BLOCK 5 -LOTS 1 X, BLOCK 6 LOTS 1-20, BLOCK 7 - LOTS 1-10, 1X, BLOCK 8 - LOTS 1-14, BLOCK 9 - LOTS 1-8,1 X, BLOCK 10 - LOTS 1-16,1 X, BLOCK 11 0 LOTS 1-8, 1X, BLOCK 15 - LOTS 1, BLOCK 16 -LOTS 1-24, BLOCK 17 - LOTS 1-5, BLOCK 18 ^ LOTS 1-18, 1X, BLOCK 19 LOTS 1-12, 1X, BLOCK 20 — LOTS 1-8,1X, BLOCK 21 — LOTS 1-16, BLOCK 22 — LOTS 1,2,11 -16, BLOCK 23 — LOTS 1, 1X, BLOCK 25 LOTS 18-24, BLOCK 26 - LOT 1 X, BLOCK 55 0 CITY OF PORT WORTH - - SHEET INDEX ON SHEET 2 w � I ij `sluu.exw------ —..---i_II I4 CROW EV I R r_f J SITE Nr I � 0 ............ L.r— I j i > _ I I N ARRAN COUNTY LOCATION MAP MAPSCO NO. 117E & 117J S2 COUNCIL DISTRICT 6 W H f4l.`•....%f+\1 •'�EOF iEy. ti. i JANUARY 2024 tEOR 14 ^—_ Jan 18,2024 .r._.,f. DEVELOPED BY: �, MCMELLE L ueA ; + DIRECTOR'S DESIGNEE FOR CONSTRUCTION DATE PREPARED BY: f 133Y39 °to C Z DR 6751 NORT FREEWAY FORT I+ t 4'i'I , lCka�GtG11 L APPROVAL za ., o�% PLAN APPRO FOR NORTH FREEWAY I LLF'" 01-10-2020 dw TX,PNGINE RSON Jan 17, 2024 FORT WORTH, BO WOR rJ ENGINEERS yyy��� { ¢ lz CONTACT: JUSTIN BOSWORTH „/ vxm - y i *xx.a xxaixTx exx.xo r,xu xeoix_Tiox ..00 CONTACT: MICHELLE L LASA, P.E. REVIEWED DATE PROJECT MANAGER O MLASA®PAPE-DAWSON.COM X-27933 ; a SHEETINDEX Sheet Description COVER SHEET SHEETINDEX DRAFT HORIZONTAL CONTROL PLAN (1) DRAFT HORIZONTAL CONTROL PLAN (2) COFW GENERAL NOTES(1) COFW GENERAL NOTES (2) GENERAL CONSTRUCTION NOTES (1) GENERAL CONSTRUCT ON NOTES (2) DEMOLITION PLAN OVERALL WATER LAYOUT (1) OVERALL WATER LAYOUT (2) WATER PLAN (1) WATER PLAN (2) WATER PLAN (3) WATER PLAN (4) WATER PLAN (5) WATER PLAN I. WATER PLAN (]) WATER PLAN (8) WATER PLAN (9) WATER PLAN (10) WATER LINE PLAN & PROFILE- 241N W-8 (1) WATER LINE PLAN & PROFILE- 241N W-8 (2) WATER LINE PLAN & PROFILE- 241N W-8 (3) WATER LINE PLAN & PROFILE- 241N W-13 (1) WATER LINE PLAN & PROFILE- 241N W-13 (2) WATER LINE PLAN & PROF LE 121NW- 15 (1) WATER LINE PLAN & PROFILE- 121N W-15 (2) WATER LINE PLAN & PROFILE- 721N W-75 (3) WATER LINE PLAN & PROFILE - 121N W-15 (4) OVERALL SANITARY SEWER LAYOUT (1) OVERALL SANITARY SEWER LAYOUT (2) SANITARY SEWER PLAN & PROFILE - SS-1 (1) SANITARY SEWER PLAN & PROFILE- SS-1 (2) SANITARY SEWER PLAN &PROFILE- SS-1 (3) SANITARY SEWER PLAN & PROFILE - SS-2 SANITARY SEWER PLAN & PROFILE - SS-2B (1) SANITARY SEWER PLAN & PROFILE - SS- 2B (2) & 3 SANITARY SEWER PLAN & PROFILE - SS-4 SANITARY SEWER PLAN & PROFILE -SS-5 SANITARY SEWER PLAN & PROFILE - SS-6 (1) SANITARY SEWER PLAN & PROFILE - SS-6 (2) SANITARY SEWER PLAN & PROFILE - SS-7 & 8 SANITARY SEWER PLAN & PROFILE - SS-9 (1) SANITARY SEWER PLAN & PROFILE - SS-9 (2) SANITARY SEWER PLAN & PROFILE - SS-9B SANITARY SEWER PLAN & PROFILE - SS-10 & 20 SANITARY SEWER PLAN & PROFILE - SS-11 SANITARY SEWER PLAN & PROFILE - SS-12 & 13 & 26 SANITARY SEWER PLAN & PROFILE - SS-14 & 15 SANITARY SEWER PLAN & PROFILE - SS-16 & 21 SANITARY SEWER PLAN & PROFILE - SS-18 &19 SANITARY SEWER PLAN & PROFILE - SS-22 & 24 SANITARY SEWER PLAN & PROFILE - SS-23 (1) SANITARY SEWER PLAN & PROFILE - SS-23 (2) SANITARY SEWER PLAN & PROFILE- SS-25 & Stubs 1 & 2 WATER DETAILS (1) WATER DETAILS (2) WATER DE TA ILLS (3) WATER DETAS (4) WATER DETAILS (5) WATER DETAILS (6) SANITARY SEWER DETAILS (1) SANITARY SEWER DETALS (2) SANITARY SEWER DETAILS (3) EROSION CONTROL PLAN EROSION CONTROL PLAN 12) EROSION CONTROL DETAILS Sheet No. SHEET INDEX Sheet Description COFW GENERAL NOTES (1) COFW GENERAL NOTES (2) GENERAL CONSTRUCTION NOTES (1) GENERAL CONSTRUCTION NOTES (2) GRADING PLAN (1) GRADING PLAN (2) GRADNG PLAN (3) GRADING PLAN (4) GRADNG PLAN (5) GRADING PLAN (6) GRADING PLAN (7) GRAD NO PLAN (8) GRADING PLAN (9) GRADING PLAN (10) GRADING PLAN (11) PLAN & PROFILE - W CLEBURNE-CROWLEY RD (1) PLAN & PROFILE - W CLEBURNE-CROWLEY RD (2) PLAN & PROFILE - S HULEN STREET (1) PLAN & PROFILE - S HULEN STREET (2) PLAN & PROFILE - S HULEN STREET (3) PLAN & PROFILE - LONGHORN TR (1) PLAN & PROFILE - LONGHORN TR (2) PLAN & PROFILE - LONGHORN TR (3) PLAN & PROFILE - STREET 2 PLAN & PROFILE - STREET 3 (1) PLAN & PROFILE -STREET 4 PLAN & PROFILE _STREET 5 (1) PLAN & PROFILE - STREET 5 (2) PLAN & PROFILE - STREET 6 (1) PLAN & PROFILE - STREET 6 (2) PLAN & PROFILE - STREET 7 (1) PLAN & PROFILE -STREET 7 (2) PLAN & PROFILE - STREET 8 PLAN & PROFILE - STREET 9 PLAN & PROFILE - STREET 10 PLAN & PROFILE - STREET 12 (1) PLAN & PROFILE - STREET 12 (2) PLAN & PROFILE _STREET 13 PLAN & PROFILE _STREET 14 PLAN & PROFILE - STREET 15 (1) PLAN & PROFILE - STREET 15 (2) PLAN & PROFILE - STREET 16 PLAN & PROFILE - STREET 17 PAVEMENT DETAILS (1) PAVEMENT DETAILS (2) PAVEMENT DETAILS (3) PAVEMENT DETAILS (4) PAVEMENT DETAILS (5) PAVEMENT DETAILS (6) DRAINAGE AREA MAP -EXISTING DRAINAGE AREA MAP -PROPOSED DRAINAGE AREA MAP - ULTIMATE HYDRAULIC CALCULATIONS (1) HYDRAULIC CALCULATONS (2) HYDRAULIC CALCULIATONS (4) HYDRAULIC CALCULATONS (3) STORM DRAIN PLAN & PROFILE- LINE SD-A(1) STORM DRAIN PLAN &PROFILE- LINE SD-A(2) STORM DRAIN PLAN & PROFILE- LINE SD-A(3), C8A & C99 STORM DRAIN PLAN & PROFILE - LINE SD-A3A, A313, A4A & A413 STORM DRAIN PLAN & PROFILE- LINE SD-A5A A A6A & A613 STORM DRAIN PLAN & PROFILE- LINE SD -ABA & A86 STORM DRAIN PLAN & PROFILE- LINE SD-B1(1) STORM DRAIN PLAN & PROFILE- LINE SD-81(2) STORM DRAIN PLAN & PROFILE- LNE SD-B1(3), B2A STORM DRAIN PLAN & PROFILI E- LNE SD-63 & B5 STORM DRAIN PLAN & PROFILE- LINE SD-C7 A(1) STORM DRAIN PLAN & PROFILE- LINE SD-C7 A(2) 8 D8 STORM DRAIN PLAN & PROFILE- LINE SD-C4A, C4B,C5A & C5B STORM DRAIN PLAN & PROF LE LINE SD-C10A, C10B & C11 STORM DRAIN PLAN & PROFILE - LINE SO DI A (1) STORM DRAIN PLAN & PROFILE- LINE SD-D1A (2) STORM DRAIN PLAN & PROFILE - LINE SD-D2A, D2B, D3A & D3B STORM DRAIN PLAN & PROFILE - LINE SD-F1 & D6 STORM DRAIN PLAN & PROFILE - LINE SD -El STORM DRAIN PLAN & PROFILE- LINE SD-OSA1, OSA3, & OSD2 STORM DRAIN PLAN & PROFILE- LNE SO-0S61 STORM DRAIN PLAN & PROFILE- LINE SD-OSD3, 4, 5, & 6 STORM DRAIN PROFILE LATERALS (1) STORM DRAIN PROFILE LATERALS (2) STORM DRAIN PROFILE LATERALS (3) STORM DRAIN PROFILE LATERALS (4) Sheet No. RENS NS DETENTION POND -A 151 xa DAs DEmnnox DETENTION POND -BC 152 i e7. coxi.srxeerucxrrxnruroxmewmn ..o NxEvil. DETENTION POND-D DETENTION POND-D (2) 153 154 STORM DRAIN DETAILS (1) 155 STORM DRAIN DETAILS (2) 156 STORM DRAIN DETAILS (3) STORM DRAIN DETAILS (4) 157 158 STORM DRAIN DETAILS (5) 159 ::I ............................:. STREET LIGHT PLAN (2) 16 STREET LIGHT PLAN (3) 162 Q STREET SIGNAGE PLAN (2) 164 PAVEMENT MARKING PLAN -S HULEN STREET 165 PAVEMENT MARKING PLAN -LONGHORN TRAIL 166 PAVEMENT MARKING PLAN- W CLEBURNE CROWLEY STREET LIGHT DETAILS (1) 167 168 STREET LIGHT DETAILS (2) 169 STREET SIGN DETAILS PAVEMENT MARKING DETAILS (1) 170 1 ]1 PAVEMENT MARKING DETAILS (2) 172 TRAFFIC CONTROL PLAN (TPWI 1]3 iSWM CONSTRUCTION PLAN (1) iSWM CONSTRUCTION PLAN (2) 174 175 iSWM CONSTRUCTION DETAILS 176 jf 1Pt�.0!,i�q�ld �„ Mic. 33B39u�JpA fs Itlt�'..,4C,lxi6�.".N." LL kA'AL�W iv2si� PAPE-DAWSON IM ENGINEERS LONGHORN ESTATES PHASE 1 INDEX SHEET aEcxm svx I D^.E xD.DaEd I CP�10508J I ten. rtZ/3R/R3 2 OF 176 I RENSIONS Y LJ�LJ�IL� 1 LEGEND ._.., � 1;1Z, Pac sr3T3xaMAll P,'Q oig - ■ © (—1 1� PP. � PaD�DsrD uE,ERED PEOEsra< � iaY ox�oR� axsTDRxER Pao PROP—D PILL eDx (EY DxcDR) UTILITY NOTE , ,'�P......... 1 Exec* Ioc — .HD a - -- —1— TME incNeiie L"" hli pE1ERY1Nf ��a11E aRE axY coxnicrs N ..... i carucDc Tiiiwi .1 a nx n n aR a y �.`...........t...; 11 K.'[NWa.•' bWAL T 11 Duos vaiaa —1- l—A­E'AT ar eacx P.'T xatrR r&Ph` (ein -.'. 6112/24 THE CITY OF FORT WORTH, TEXAS TRANSPORTATION AND PUBLIC WORKS DEPARTMENT PAPE-DAWSON rmj ENGINEERS LONGHORN ESTATES PHASE 1 STREET LIGHT PLAN (2) aEcrcED -1Da xD.Dac! I�P[t0508) Isxscr s/rY/Ea , �6F 17B � O SUM GONDRR RUNNa LLNWH O BEM IOM WXMNW cu SEE. � IM kOF IFNGTM T=(m CABLES IFn Rt Y WD T ] WO p r 1M T w 3 MN EN, R5 Y WO T 3 WO Y 10 T 3 W GAME OUANIMES (UP) RXHHWCU= 29M DONUUR WANTRES BF) YY BORE= 9803 WESTCLEBURNECROAlEY-LIGHTPOLEANDFWNM ONS III OUANTRY —In 5 11 FOUNDATION TYPE ME ARM TYPE J3A ARM p11ANm 5 LUMTURE WANTRY 5 LUMNANE ME ATBOMMWLTRP31(MPNLPT AORFDSSRV IGROUND BOX QUANTITY 3 SEE FOUNDATION DESIGN TABLE ON STREET LUMNARE POLE DETAIL SHEET 1 SUMMAKYl7F C(1FIIIUI'TMABLES cONDUR cxxxwW RUN NO b.ERHBNIbII S M2EPM ffn IM IENGT TlExcx In CABLES (FT) HIS T 1M T 3 IB3 RB ! T 3 WO T R10 3 WO T A 3 M Rtt T ttT 3 SE .1 Y W 3 28 R14 Y SO 3 M R11 r A 3 T MR T 3 UH NEXGHBORHOOD� UC4if PIXEMD FWNDATDN9 FaIE WANnTr TO POLETYPE tt ME R2 LUMNARE M ME R4 LUMNARE B WNDATpV ME ME ARM In ms PAM WPNTIY TO m LUMNARE IXMNTTY TO LUMNME TYPE (N2) AM NOR MUOLT P231( NIP NIL AOFFD92SXP WMNAPE TYPEL(R1) ATEO PI01 MK MMm MR M. PT R W1 W/ 9EEFWNMIION TABIE IXi STREET LUMNARE PIXEOETPLSHEEf E S aF Y {58 9 LONGHORN ESTATES �INDU I ARM CABCES DDNDDIT H.HROU RUN NO 0�901EAOIOHI sMEnro IExGTHIFrI BDIE(M IENW N TRTNcxm oFs IFO P51 Y 19 T 3 2T P55 Y I 9 � T 3 5T LONGHORN ESTATES 5UM RUN NO OVERHEAD(OH) M10XMMW CU S.ON) LENGM(Fn SDREIM LENGTH TRENCX IT k0i G81E9 IFn R.r 9 T D RW r 9 T 3 2T RW T M T 3 1. RW r 131 T S W RM r b T 3 US RW T M T J W R1W Y 9 T 3 27 FRR Y W T 3 255 RIM r W 2 0 El. T 1. T 3 IOU RIM T 9 T T R1. Y 9 T 3 27 R1W Y 2W T 3 fW R1UT r 9 T ET NUM Y 1. T 3 IOU El. Y 5 T 5 ro �.eWEaMxmEs(LFI 91u XHHWCU= -1. T 3 1. :GONDUROUAIR ENDF) H= T 3 182 YBOPF- T 3 2 T 9 M \ T 3 WO -bUANTITIESOFTHEDAWFINRDETHE 14 LIGHT POLEAND FOUNDAT IOM6 POLE QUANTITY 28 I FOLETYPE 11 I FOUNDATpNTYPE TYPE1 3B ARM QUANTITY A I LUMINARE QUANTITY A LUMINARE TYPE AiBO P1D1 MNOLT R23K MPNLI /u' ,• , ...PT.AAARFD32560T C44/ M� A�DESI� 1�„Q STREET LUMINARE POLE OETNL SHEEP A NO ES: CONCRETE FOUNOATON FOR STREET LIGHT STRUCTURES ON THE OUTSIDE OF THE ROADWAY MUST BE 24" FROM FACE OF WORTH PRE -QUALIFIED LIGHTNG CONMACTOR. 3 CALL 517-999-7923 PRIOR TO ANY STREET LIGHT CONSTRUCTION INCLUDING CONDUITS 4. CONDUITS SHALL BE SCHEDULED 80 BURIED AT A TOP DEPTH OF 36'. 5. STREET LIGHT FOUNDATIONS SHALL BE INSTALLED 5' MINIMUM ALL WIRING/CABLES MUST EE COPPER UTILITY NOTE Tao QF J131 NOSED ­IURES THE 00—A—i coxru W,NTH, XI nx Tl n AP P {+{%4;,•N�ptE iAlcxeii' • hd% yg"`.......... t .. 133989 ' I f[x[SQ.• 1M T9WAl —A—H. AT Faces Eounox Daps .'OR roTA 3 (911) 392-1296 .11 WORTH — I. 392-U. 6112/24 THE CITY OF FORT WORTH, TEXAS TRANSPORTATION AND PUBLIC WORKS DEPARTMENT PAPE-DAWSON rgj ENGINEERS LONGHORN ESTATES PHASE STREET LIGHT PLAN (3) a1ECXW reJUA.F xo.oaFd ICP[10508T 1 1'6 s/13/tA Wd 1 Z OF 176