HomeMy WebLinkAboutContract 6216CONTRACT FOR CONSTRUCTION OF FARMER'S BRANCH OUTFALL SEWER MAIN BETWEEN THE CITY OF WHITE SETTLEMENT, TEXAS AND THE CITY OF FORT WORTH, TEXAS !T Y 0SAC . "N�R'10A o�TARr THE STATE OF TEXAS ) OFFICIAL HURD "Ty SF'Pprorfy COUNTY OF TARRANT ) FT. THIS CONTRACT AND AGREEMENT made and entered into this 25th day of February , 19 69 , by and between the City of White Settlement, a municipal corporation located in Tarrant County, Texas, acting by and through its duly authorized Mayor, and the City of Fort Worth, a municipal corporation located in Tarrant County, Texas, acting by and through its duly authorized City Manager. W I T N E S S E T H: WHEREAS, the City of White Settlement has built and intends to build or cause to be built a sanitary sewerage system including interceptor or collector lines, mains, sub -mains, laterals, and other appurtenances for the purpose of collecting sewage and other acceptable wastes and transporting same away from the premises; and, WHEREAS, said City in the performance of a governmental function maintains and will maintain said lines and facilities as its sanitary sewerage system; and, WHEREAS, the City of Fort Worth has constructed or will construct sanitary sewerage facilities within the limits of its own municipality; and, WHEREAS, the City of Fort Worth desires to connect such sanitary sewerage facilities to those of the City of White Settlement at a point or points on the Farmer's Branch Collector Sewer Main of the City of White Settlement; and, WHEREAS, the City of White Settlement, for and in consideration of the covenants and agreements hereinafter contained, is willing to accept the sewage from the lines of the City of Fort Worth into its own sewer lines at a point or points of connection hereinafter described and to transport said sewage in the same manner that sewage from within the limits of the City of White Settlement is transported. NOW THEREFORE, KNOW ALL MEN BY THESE PRESENTS: That for and in consideration of the execution and performance of the mutual covenants herein set forth, the City of White Settlement and the City of Fort Worth do hereby covenant and agree as follows: -1- 1. SANITARY SEWERAGE SYSTEM CONSTRUCTION (a) The City of White Settlement, Texas, will construct the Farmer's Branch Outfall Sewer Main from its connection with the existing twenty-four (24") inch sewer main under Carswell Air Force Base to the west city limits of the City of White Settlement, as shown on Exhibit "A", with the western part of the line to consist of two eighteen (18") inch sewer mains unless detailed engineering data dictate alternate mutually agreeable main sizes approved as specified in Section I, subsection C, below. (b) It is agreed that the City of White Settlement will make application to the State Health Department for a grant under the terms of Public Law 660. All obligations and responsibilities of either party with the exception of payment of engineering fees hereto are expressly contingent upon the obtaining of such a grant by the City of White Settlement to assist in financing of said project same being a condition precedent to any such liability hereunder by either party. (c) The City of White Settlement will provide the necessary engi- neering plans and specifications. The City of Fort Worth will have the right to review these plans and specifications both during preparation and prior to contract award by the City of White Settlement. Final project plans and speci- fications will require the approval of both the City of Fort Worth and the City of White Settlement. (d) The total project cost of Farmer's Branch Outfall Sewer Main including its two branches, less any grant payments received, shall be shared by the parties hereto as follows: Preliminary cost participation computation using a minimum Fort Worth contributing area of. 2,565 acres yield the following cost participation: (i) Percent of total project cost to be paid by White Settlement -- not greater than -- 27.76% (ii) Percent of total project cost to be paid by Fort Worth -- not less than -- 72.24% The City of Fort Worth during its review of preliminary project engineering plans will review the sewer main design and may at that time enlarge their contributing area dependent upon the requirements of the City of Fort Worth. Final project cost participation shall be computed, using the final Fort Worth contributing area and in accordance with the procedure developed and followed to compute the preliminary project cost participation. This procedure is shown in Exhibit "B", attached and made a part of this contract and is based on the engineering report concerning the Farmer's Branch Outfall sewer main prepared by Carter and Burgess Engineers in May 1968. The total project cost shall include the costs of construction, rights of way, engineering design, surveying and construction supervision and mis- cellaneous costs directly chargeable to the project. The City of Fort Worth covenants and agrees to pay fifty percent (50%) of its share of the estimated project cost of these main facilities to the City of White Settlement within fifteen (15) calendar days after the construction contract therefore has been awarded by the City Council of White Settlement and covenants and agrees to pay the remainder of its share of the total project cost within thirty (30) calendar days after the project has been completed, approved and accepted by the City Council of the City of White Settlement and the total project costs have been determined. The Farmer's Branch Outfall Sewer Main being within the City limits of the City of White Settlement shall be totally owned by the City of White Settlement subject however to the perpetual and irrevocable right in the City of Fort Worth to the use of not less than 100.00% (percent) of the total design capacity at the point(s) of connection of the Farmer's Branch Outfall Sewer Main to be con- structed in connection herewith, such connection or connections to be at the western city limits of the City of White Settlement. (e) Project inspection is to be the responsibility of the City of White Settlement. The City of Fort Worth is to have the right to conduct project inspections during construction to verify compliance with existing project plans and specifications, and to require correction of any variations from approved plans and specifications before payment is made to the con- tractor for any work found not to be in compliance with such plans and specifications. In this regard, final payment to the contractor shall not be made until the project is approved as complete by the Director of the Fort Worth Water Department, and such final payment shall be in an amount of not less than 10 percent of the project cost. (f) The City of White Settlement agrees to proceed with diligence with regard to construction of the Farmer's Branch Outfall Sewer Main so that the facility may be placed in operation# without undue delay. 2. MAINTENANCE OF SANITARY SEWERAGE SYSTEMS The City of White Settlement is to be responsible for normal opera- tion and maintenance of the Farmer's Branch Outfall Sewer Main within the City of White Settlement. The City of White Settlement will pay one hundred percent (100%) of normal maintenance. Major maintenance required by the Farmer's Branch Outfall Main is to be the responsibility of both the City of White Settlement and the City of Fort Worth with costs involved to be shared on the same basis as original project construction costs. Major maintenance is to be defined as that maintenance requiring the replacement of fifty (50') feet or more of sanitary sewer pipe because of actual or impending structural failure. The initiation of major maintenance will require the approval of both the City of Fort Worth and the City of White Settlement. 3. This contract is not intended to and shall not be construed as amending any existing contracts between the parties. All work performed hereunder shall be in compliance with applicable provisions of all Federal, State or local laws, statutes, charters and ordinances. -3- EXECUTED this the 25th day of February A.D., 19 69 CITY OF WHITE SETTLEMENT BY: W YNE f RT, MAYOR ATTEST: (Seal) J11144110 / cvwv TRANCES COLWELL, CITY SECRETARY APPROVED AS TO FORM AND LEGALITY: "O�; - zo y '/ HEMY E. KERPV, CITY ATTORNEY EXECUTED this the 17th day of February A.D., 19 69 ;ATTE2ST:1,eal) RT B MAN, CIT CRETARY APPROVED AS TO FORM AND LEGALITY: 10•ro4u4e/ S. G. JOHNDROE, JR., CITY ATTORNEY APPROVAL RECOMMENDED: W. R. HARDY, DIRECTOR, W WORTH WATER DEPL ENT CITY OF FO T WORTH L BY:2d�%!s I 1 11. D. McMAHAN -4- Q QI BIT "A_"�.".Q 00 w a - I l t},I r II i _ I .C,�� �• ,I A � �� ' � �i! li 1 1f �1�. Id. . 11 �% �� to CL '. `afR_- �:L__ W. W. L ✓ j r� ZY, Jill, �: . •r, Boa �� � { �____��— —_ ft L -� }!�_' { r JL' I i j �. w Its �1 r iV NIF; " �� I �_� , ill �-a - z- 1.t �`�_:.•-...a ! '� 'Y'N CA.♦ bi' N N (11 r{ N Gv Co P [, j F-1 N r,-) {-j. w.i 190 C<i N O Iri Cr66� � 11011 O r7 .ro M �rCpph tM1 �O Cpp"a uM"` fYJ a � cv •�{ N �{ � c�J° � N � • oil n 8 w, Hai m r^6 r * N t! r, M .J ua l�v N @ Cam^ (U O N O N N M A .0 L' . L 1 � Ol ul 4� .d f N ry h 0 Ci N A,�y 1 G:1 "• h:- i.`) F-{ s1\ ' fJ u\ Co �fl ,-{ .�Y N M a l- i.4 C6 A d\ r=i rde �O � 1 I N N r=d a � R'i E-I 'T. • r•' V\ O - r-® N C O O M m M aOtN O �q z W 1 i i b O O O O ri �I N N c> pd O W EI ( 18 Coll N CI\I) C110, O -O-t '.0- C W (YNON O rJ ' O Ei 7 O �U 0 N u\ M E, P. Co N [-� N N N N N N N N N N N C 7 Cj r{ r^d N M M M M A, a mM N v n �o g allo o, b rI N M M h'1 t++� M If\ 92 r03 ,^ol COm Cam® dQl\ Q Ch N • 3 H c� r~ f[; �(7L lf\ tl\ �O V� rN•i N N N N �i N N N N O Y City of Fort Worth, Texas � a Mayor and Council Communication). �m DATE REFERENCE SUBJECT: Proposed Agreement - West Fork PAGE NUMBER Collector Sewer, Unit VI, Construction 1 °f 2 2/17/69 C-1410 Contract with City of White Settlement On October 27, 1961, the City Council approved a contract whereby the City of Fort Worth provides sanitary sewer service to the City of White Settlement (M&C WI-34). The collector sewer main which discharges into the City of Fort Worth system has become overloaded and it is necessary that it be replaced by the City of White Settlement. In order for the City of Fort Worth to provide sanitary sewer service to that portion of the City which is west of White Settlement, it will be necessary to extend the West Fork Collector Sewer, Unit VI, through the City of White Settlement. The 1969 Capital Improvement Program (CIP C-47) provides funds for the construction of the West Fork Collector Sewer, Unit VI, if arrange- ments can be made for the City of White Settlement to finance its share of the construction cost. An agreement has been prepared which provides for the construction of the West Fork Collector Sewer, Unit VI, with each city paying a proportionate share of the cost based on the size of the drainage area to be served. The proposed agreement has been approved by the City Council of White Settlement. A pre- liminary cost estimate of the project is $255,000. The proposed agreement contains the following major provisions: 1) The City of White Settlement will construct the Farmer's Branch Outfall Sewer Main (West Fork Collector Sewer, Unit VI) from a connection with the City of Fort Worth main located near the east boundary of White Settlement to the west city limits of White Settlement. 2) The City of White Settlement will make application to the State of Texas for a grant under terms of Public Law 660, to aid in the financing of the project. 3) The City of White Settlement will provide plans and specifications subject to the approval of the City of Fort Worth. 4) The preliminary cost participation provides for the City of White Settlement to pay not more than 27.76 per cent of the total project cost and the City of Fort Worth to pay not less than 72.24 per cent of the project cost. It is agreed that after preliminary engineer- ing plans have been prepared that the final project cost participa- tion shall be based on the final computation of the size of the Fort Worth contributing area. The City of Fort Worth agrees to pay 50 per cent of its share of the project cost within 15 days after the construction award has been made by the City Council of White Settlement and to pay the remainder of its share of the total project cost within 30 days after the project has been completed and accepted by the City Council of White Settlement. The sewer main which will be jointly financed by the two cities but constructed by the City of DATE REFERENCE SUBJECT: Proposed Agreement - West Fork PAGE NUMBER Collector Sewer, Unit VI, Construction 2 of 2 2/17/69 C-1410 Contract with City of White Settlement White Settlement will be owned by the City of White Settlement subject to the perpetual and irrevocable right of the City of Fort Worth to use not less than 100 per cent of the total design capacity at the points of connection at the western city limits of White Settlement. 5) The City of White. Settlement will provide project inspection but the City of Fort Worth has the right to conduct inspections during con- struction to determine compliance with approved plans and specifica- tions and to require correction of any deviations from the plans and specifications. Final payment to the contractor shall not be made until the project is approved as complete by the Director of the Fort Worth Water Department. 6) The City of White Settlement will be responsible for maintenance of the West Fork Collector Sewer, Unit VI(Farmer's Branch Collector) at its full expense except that the City of Fort Worth will participate in the cost of major maintenance. Major maintenance is defined as maintenance requiring the replacement of 50 feet or more of pipe be- cause of actual or impending structural failure. Such major mainte- nance will require the approval of both cities before the work is done. This project will make sanitary sewer service available to an area of the City not presently receiving this service and the joint participation with the City of White Settlement will result in savings on the project cost for the City of Fort Worth. Recommendation It is recommended that the City Manager be authorized to execute the proposed contract with the City of White Settlement to construct the West Fork Collector Sewer, Unit VI (Farmer's Branch Collector Sewer). HDM:ms Attach. SUBMITTED BY: yllow CITY MANAGER DISPOSITION BY COUNCIL: ❑ APPROVED ❑ OTHER (DESCRIBE) PROCESSED BY CITY SECRETARY DATE