Loading...
HomeMy WebLinkAboutContract 6803CITY SECRET RY WNTRACT 114a b3 , Mr. R. W. Crook, District Engineer District 2, Texas Highway Department P. 0. Box 6868 Fort Worth, Texas 76115 Attcn�ion: Mr. Bill Cason, Utility Section ThrouLh: City of Fort Worth Dear Sir: Plcase be advised that the City Councils of the City of Fort Worth, Texas, and the City of White Settlement, Texas, have reviewed a joint contract between the aforementioned authorities covering the construction of a major sanitary sewer outfall line. The contract is numbered "City of Fort Worth Contract No. 6216 (West Fork Collector, Unit 6)"and states, in part: "The City of Fort Worth, during its review of preliminary project engineering plans may extend the project to include areas beyond those contained in the original agreement, with the City of Fort Worth to pay the cost of such pro- ject additions." The respective City Councils have directed the appropriate signature autl-o_i„ies to execute this letter of agreement confirming the construction of two 18 inch sanitary sewer lines across right-of-way for proposed Interstate Loop 820 t_d within the corporate limits of the City of Fort Worth as part of the sanitary sewer project covered by Contract No. 6216 between the two cities. The necessary Utility Joint Use Agreement between the City of Fort Worth and the Texas Highway Department is also forwarded to allow the subject construction to be completed in accord with policies and regulations of the agencies concerned. Executed this the 20th day of April, 1971, for the City of White Settlement: ATT,,..,T . FRANCES COLWML, CITY SECRETARY By WAYNE AURT) MAYOR By Q_ AIM STIFF, CIT M ___ Executed this the day of April, 1971, for the City of Fort Worth: By ROGER LINE, CITY MANAGER ATT T : / V . APPROVED AS TO FORM AND LEGALITY: I , r511,41 S. G. JO ROE, JR.J CITY ATTORNEY APPROVAL RECOMMENDED: o Y, -CTOR, F WORTH WATER D ANT City of Fort Worth, Texas Mayor and Council Communication DATE REFERENCE SUBJECT:. Extension. of. West. Fork, Collector, PAGE NUMBER Unit 6. Across. Future. Interstate. Highway I 2 4/19%71 C-1962 „ I-820 for On.February..17, 1969, (M&C.C=1410), the City Council approved contract No.. 6216 with the City of White Settlement to construct the West Fork Collector Sewer, Unit 6, across the City of White Settlement to its.western boundary. The City of White Settlement and the City of Fort Worth agreed to participate in the construction costof this collector sewer on a percentage.basis.relating to the acregge served in each City. .Extension. of Project r Contract No. 6216 provided that the City. of Fort Worth, during .its.review of the Preliminary Engineering Plans, could extend the projectatitsexpense to include areas beyond those contained in the original agreement. During the project plan review in September, 1969, it wasdetermined.to.be in the City of Fort Worth's best interest to extend the project across proposed Interstate 820 at two locations for the following.reasons: 1) To obtain the benefitof lower unitprices which canbe anticipated on a project. of this size; 2). The costs for the more,stringen.t material and backfill requirements of the Highway Department havebeenavoidedby acquiring the.neces- sary easements prior to the Highway Department buying the right-of- way for I-820; and 3) Construction. of .the two required crossings, as,part of the. West Fork Collector, Unit 6 contract, makes..them.eligible for Federal Grant participation on the basis of 33 per cent of cons.truction.costs. Cost of Proposed Extensions Since no additional acreage within the.City limits of. White Settlement would be served by the proposed extensions,,the City of. White.Settlement will not participate intheir cost.. It is.estimated.that the..905 L.F. of 18-inch sewer crossings involved will.cost approximately $10.,000, if constructed in advance -of the Highway right-of-way acquisition... The same.installations would costapproximately.$20.,000.if installed after Highway right-of-way acquisition due to the morestringent requirements.imposedby. the. Highway.Department. After deducting the Federal Grant participationofapproximately.$3,300., the net cost to the City of Fort Worth will be approximately.$6,700 to construct these crossings under the .White.Settlement.contract,.as.opposed.to,approxi- mately $20,000 to accomplish the same.crossings at a later date. The City of White Settlement was authorized in late.1.969 to proceed with plans for the West Fork Collector., Unit 6., extension to include.the.Interstate.820 crossings.. The Federal Grant offer on.'this project subsequently,obtained.by the.City of White. Settlement was based.on .the.project.cost including the two Interstate crossings. DATE REFERENCE SUBJECT: Extension of West Fork Collector, PAGE NUMBER C-1962 Unit 6 Across Future Interstate Highway 2 of 2 4/19/71 T-R9n Highway Department Participation in. Cost After the easements forthetwo future. Interstate. crossings, had. been. secured by the_City of Fort Worth, the Texas State Highway Department acquired the property containing the easements for the right-of-way of Interstate 820. The Highway Department then requested the City of White Settlement to amend its contract documents to require the use of cast iron pipe for the Interstate 820 crossings and to include a more stringent backfill requirement on this portion of the collector sewer. The Texas Highway Department agreed to pay the additional cost resulting from these stricter construction and material requirements. A formal agreement providing for this cost participation by the Texas Highway Department in this installation is currently being negotiated with the City of White. Settlement. As part of this negotiation, the Texas Highway Department has requested a.specific agreement between the two cities providing for the City. of White Settlement to act as the contracting agent for the City of Fort Worth in the construction of the Interstate 820 crossings. The Highway Department has also requested the City. of Fort Worth to execute a standard "Utility Joint Use Agreement" permitting the Highway Department to construct Interstate Highway 820 across the easements obtained by the City of Fort Worth, Recommendation It is recommended that: The City Manager be authorized to execute an agreement between the City of White Settlement and the City of Fort Worth, confirming the constructionof the Interstate 820 crossings as part of the sanitary sewer construction projectcovered by Contract No. 6216.between the two cities, and ' 2. That the City Manager be authorized to execute the. standard "Utility Joint Use Agreement" enabling the. Texas Highway Department to enter upon the City of Fort Worth's easements for the purposes of construct- ing, operating and maintaining Interstate Highway 820 across the West Fork Collector, Unit 6 extension, west of the City of White Settlement. RNL:mm SUBMITTED BY: e4l,� CITY MANAGER DISPOSITION BY COUNCIL: ❑ APPROVED ❑ OTHER (DESCRIBE) PROCESSED BY CITY SECRETARY DATE