Loading...
HomeMy WebLinkAboutContract 16672CITY SECRETARY CONTRACT No. AMENDMENT TO CITY SECRETARY CONTRACT NO. 16383 STATE OF TEXAS } } COUNTY OF TARRANT } WHEREAS, on May 2, 1988, the City of Fort Worth and White Settlement West/Teslin Master Joint Venture, made and entered into City secretary Contract No. 16383, which is a contract providing for the installation of certain improvements to the Live Oak Creek Waste Water Collection Facilities (Silver Creek); and WHEREAS, subsequent to the execution of said City Secretary Contract No. 16383, White Settlement West/Teslin Master Joint Venture requested a change in the location of the lift station for the subject Collection Facilities, thereby requiring changes to the gravity sewer system and the force main system; and WHEREAS, the parties to said City Secretary Contract No. 16383 desire to amend said contract to provide for such changes to the proposes system; NOW, THEREFORE, KNOW ALL MEN BY THESE PRESENTS: That the City of Fort Worth, a home -rule municipal corporation located in Tarrant County, Texas, acting herein by and through David A. Ivory, its duly authorized Senior Assistant City Manager, and White Settlement West/Teslin Master Joint Venture, consisting of White Settlement West Joint Venture and Teslin Investment Corporation, Inc., do hereby covenant and a icc as ioiiows; OFFICIAL RECORD CITY WRETARY FT. HER TEX, ; A8 SEr �! 105, 1. City Secretary Contract No. 16383, on file in the office of the City Secretary of the City of Fort Worth, is hereby amended by substituting in lieu of Pages 1-1 through 1-5 thereof, Pages 1-1 (Revised) through 1-5 (Revised), copies of which are attached hereto, incorporated herein, and made a part of City Secretary Contract No. 16383 for all purposes. 0 City Secretary Contract No. 16383 is hereby further amended by substituting in lieu of Appendix "A" thereof, an Appendix "A" (Revised), a copy of which is attached hereto, incorporated herein, and made a part of City Secretary Contract No. 16383 for all pur- poses. 3. City Secretary Contract No. 16383, is hereby further amended by substituting in lieu of Exhibit "A" thereof, an Exhibit "A" (Revised), a copy of which is attached hereto, incorporated herein, and made a part of City Secretary Contract No. 16383 for all pur- poses. ME All other provisions, covenants, recitals, terms and conditions of City Secretary Contract No. 16383, which are not expressly amended herein, shall remain in full force and effect. -2- IN WITNESS WHEREOF, the parties hereto have made and executed / this agreement this . fk-� day of �'t ("i , A.D., 1988, in Fort Worth, Tarrant County, Texas. ATTEST: 7 By: Ruth Howard City Secretary APPROVED AS TO FORM AND LEGALITY: By: ' William W. Wood Deputy City Attorney Date: �" 3 O � $ g Contract Authorization Date -3- CITY OF FORT WORTH F y , mW., r ��' M PA' David A. Ivory Senior Assistant City Manager DEVELOPER: White Settlement West/Teslin Master Joint Venture •Charles F. Stark, Vice President Redwood Properties, Inc. Managing Venturer, White Settlement West Joint Venture Arthur Tan Attorney -in -Fact for Teslin Investment Corporation, A Joint Venturer BY: (- ) ! 11,1'_ Vivencio Mari ano Attorney -in- act for Teslin Investment Corporation, a joint venturer LIVE OAK CREEK WATER AND/OR SANITARY SEWER FACILITIES A. The City agrees to install, by contract or otherwise, or to permit the Developer to let a contract for, in accordance with its accepted practices, ordinances,• regulations, and the provisions of the City Charter, and subject to the requirements of the City's Policies and Regulations for Installation of Community Facilities, all as current at the time of installation: WATER FACILITIES to serve the lots as shown on the attached Exhibit N/A, and SANITARY SEWER FACILITIES to serve the lots as shown on the attached Exhibit A , all in accordance with plans and specifications to be prepared by the Engineering Division of the Water Department, or by private engineers employed by the Developer and approved by the Water Department. B. The City agrees to install, at Developer's expense, at the time all other water mains in this addition are installed, a service line for each lot as shown on the attached Exhibit N/A• The estimated cost of these service lines is $ none The City agrees to record the location of each said service line in respect to the corner of the lot served, and to repair said records in its possession. C. The construction cost of the water facilities herein concerned, exclusive of service lines and engineering is estimated to be Dollars ($ none ). D. The City agrees to install, at Developer's expense, at the time all other sanitary sewer mains in this addition are installed, a service line for each lot as shown on the attached Exhibit A The estimated cost of these service lines is $ none The City agrees to record the location of each said service line in respect to the corner of the lot served, and to retain said records in its possession. E. The construction cost of the sanitary sewer facilities to be installed hereunder, exclusive of service lines and engineering, is estimated to be one million two hundred seven tl llars ($1,271,200.----- one thousand two hundred F. Prior to the award of the construction contract by the City, or the commencing of any work by the City or its contractors, if the Developer does not award his own contract, the -Developer agrees to pay to the City: (1) (a) One hundred percent (100%) of the cost of all water and sanitary sewer facilities within the development, exclusive of engineering and service costs, through the 8-inch size, including the costs of larger sized facilities adjusted to 8-inch size costs; and (b) One hundred percent (100%) of the cost of all approach water main facilities outside the limits of the development through the 16-inch size, including the costs of larger sized facilities adjusted to 16-inch size costs, less ten percent (10%) of the calculated front foot charges for lots contained in the development served by such approach water main facilities; and 1-1 (Revised) LIVE OAK CREEK SEWER (c) One hundred percent (100%) of the cost of all approach, sanitary sewer facilities outside the limits of the development through the 24=inch size, including the costs of larger sized facilities adjusted to 24-inch size costs, less ten percent (10%) of the calculated front foot charges for lots contained in the development serviced by such approach sanitary sewer facilities. (2) An additional ten percent (10%) of the total of the Developer's cost of these water and sanitary sewer facilities, exclusive of cost of service lines, for design engineering, if such engineering is performed by the City. This charge will be waived if private engineers employed by the Developer and approved by the Water Department perform the design engineering. (3) One hundred percent (100%) of the cost of all service lines, estimated under 1-B and 1-D above, in accordance with the provisions of the current Fort Worth City Code. G. The distribution of estimated construction cost between the City and the Developer, as per paragraph 1-F above, for all water and sanitary sewer facilities to be constructed hereunder is estimated as follows: (1) Water Facilities: (a) Mains: Within Development Approach (b) Services ( None ) Sub -Totals, Water (2) Sanitary Sewer Facilities: Estimated Developer Estimated Total Cost City Cost Cost --0-- --0-- --0-- --0-- --0-- --0-- --0-- --0-- --0-- ( a) Mains: Within Development --0-- --0-- --0-- Approach * $780,900 $490,300 $1,271,200 (b) Services ( None ) --0-- --0-- --0-- Sub-Totals, Sewers $780,900 $490,300 $1,271,200 Grand Totals $780,900 $490,300 $1,271,200 1-2(Revised) COST BREAKDOWN LIVE OAK CREEK WASTEWATER FACILITIES (SILVER RIDGE APPROACH SEWER) (Note) *Cost Breakdown between City and Developer Developer's Cost Live Oak Creek Intercepter Sewer $453,300 (9,275 L.F. of 10" thru 24") Live Oak Creek Lift Station $185,000 Silver Creek Rd/Verna Trail Rd [11 14-inch Force $142,600 18 11/21" Gravity Line Connection [21 to White Settlement Sewer Line none City Total none $453,300 none $185,000 $140,150 $282,750 $350,150 $350,150 TOTAL $780,900 $490,300 $1,271,200 [11 City to pay 100% of Cost of Force Main from intersection of Silver Creek Road and Verna Trail to Connection with Gravity Line to White Settlement Sewer Line. [21 City to pay 100% of Cost. 1-3 (Revised) LIVE OACK CREEK SEWER H. The above charges do not .include any "per connection" charges for con- nection to existing or proposed sanitary sewer mains constructed or to be constructed under the provisions of the "APPROACH MAIN OPTION" as described in Sub -Paragraph (3), IV-7 of. the Policies and Regulations for "INSTALLATION OF COMMUNITY FACILITIES" adopted January 1, 1972. These additional charges are as followst Not applicable to this Contract _ XXXXX - — Applicable to this Contract in the amount of by Ordinance No. dated When water facilities are installed by contract, installation of water services will be included as part of the contract. Installation of meter boxes on those services may be done by the City, after comple- tion of construction of all relative curb and gutter work on the water facilities project site, at a cost of $70/$135 per contract -installed service, such meter box installation charge to be due and payable prior to issuance of a Work Order on the water facilities installation contract. The above charges do not apply if the Developer elects to include meter box installation as part of the contract. However, meter boxes must conform to City standards. I. Within a reasonable time after completion of the above referenced facilities to be constructed by the City or by contract awarded by the City or by the Developer, the City and Developer agree to an adjust- ment of, the Developer's payment as set out in 1-F and 1-G hereinabove, so as to conform said payment to actual construction costs and actual service costs under the provisions of the current Fort Worth City Code, (said adjustment to be calculated as payment in 2-F and/or 1-C above), but based on actual quantities as reflected in the .final esti- mate paid to the Contractor by the City or by the Developer, and/or in the event any portion of the facilities are installed by City forces, on the actual records of cost, kept by the City as a part of its cus- tomary procedures. In the event the difference in the deposit and the actual costs exceeds $25, Developer agrees to pay to the City any underpayment which said adjustment might indicate as being clue, and the City agrees to pay to Developer any overpayment. J. Work hereunder shall be completed within two (2) years from date hereof, and it is understood that any obligation on the part of the City to make any refunds with respect to water and/or sanitary sewer facilities shall cease upon the expiration of two (2) years from date hereof, except for refunds due from "per connection charges" on sani- tary sewers and from "front foot charges" on water mains, both of which refunds may continue to be made for a period of ten (10) years after the date hereof., as elsewhere provided herein. In the event water and/or sanitary sewer facilities work is not completed with the two (2) year period, City may, at its election, complete such work at Developer's expense. 1-4 (Revised) LIVE OAK CREEK SEWER it is further agreed and understood that any add.ttiontal. pityn, t required of Developer is ,to cover only such additional work and/ or materials as may be made necessary by conditions encountered during, construction, and shall not include any change in scope of the project. RE CO ND,D: Richard W. Sawey, 1) rec- r Water Department / Date: 1-5 (Revised) APPENDIX "A", (Revised) COST ESTIMATE SUMMARY PROJECT LIVE OAK CREEK WASTEWATER COLLECTION FACILITIES (SILVER RIDGE) PERFORMANCE CONTRACT SECTION DEVELOPER CITY TOTAL GUARANTY Section I Water $ -0- Sewer 780,900 I. Interior Streets Construction N/A Design Eng. ^_ Eng.&Admin. 2. Storm Drains Construction N/A Design Eng. Eng.&Admin. _ 3. Border Streets'(Assessment Paving) Construction Streets N/A Storm Drains Design Eng. Assessment:,Admin. Eng.&Admin. Section III Street.Lignts N/A $ -0- 490,300 N/A N/A N/A -----Wi Street Name Sign N/A N/A TOTAL 780,900 490,300 * Developer shall deposit 100% of approved bid. $ -0- 1,271,200 N/A N/A N/A N/A N/A -�/-A — N/A - N/A N/A 1,271,200 AU I'JJV�' 1 1t P ` •� \ ' '�j fit 11I9i.•ti;l it �'� I �r - Lij U , roses .• 0 Z 'I17 •/ ` .. ; . %f ; —Zoo 'r. �� - - rn - i 1� - •\(•�•,i • 3 2 r `'1i J-j F- r L/ 1 1 U� _ > N1SF1ON/UND 7 Q . •. ' I ; u ' .. �. W (n \ v \� .\ u^,^ it--r�/' 650 LIJ \L _ =''}•. of t l W �= U - -__=,,,, .•,, v Wi � >O v< i ��Q 0 ID C') L L (D )M4 ._._ LIJ co ( �\ \��• \ a Q W .�. �. �_`' , ■ it �.'` , olio 1^ (n � u ^ W oc • UUU CIO '. t O V (/i /� C ■ ■ ■ a� �` 1 lye W • •I;W.• 1- W . / C r,w w ( Z wco _of '/r. •-..� i JLd v . II: II• -Its=._ tom. CO) O LLJ f --> QLJ7 --------- I ------------3N173d1d ck� Ld 1\ �r ` q �, I /✓� III ( \GD O1 '�\\\ '!� I` •_ \U . �• .. aa� a � _- -a: 11 1'' O, _ olm r 1 r e�Jt� of Fort Worth, `-" Jeri Mayor and Council Communication DATE REFERENCE SUBJECT: AMENDMENT TO CITY SECRETARY PAGE NUMBER CONTRACT NO. 16383 - LIVE OAK CREEK lof 2 8/ 16 /88 C- 11134 WASTE WATER COLLECTION FACILITIES (SILVER RIDGE) Recommendation It is recommended that: 1) The following bond fund transfer be approved: From To Amount Reason 56-014007-00 56-014901-00 $230,000 To return funds to Live Oak Creek Unspecified appropriate account Collector in accordance with amended. Community Facilities Agree- ment which reduces City participation. 2) The City Manager be authorized to execute an amendment to the Community Facilities Agreement No. 16383 to relocate the Lift Station. Discussion On April 5, 1988 (M&C C-10897), the City Council approved the installation of community facilities for Live Oak Creek Waste Water Collection Facilities (Silver Ridge). On May 2, 1988, City Secretary Contract No. 16383 was executed by the City Manager. Under that contract, provisions were made for the installation of a wastewater collection facility in accordance with the development policy in effect at that time. Subsequent to the execution of the subject agreement, the developer, ^White Settlement West/Teslin Master Joint Venture, requested a change in the location of the Lift Station. With concurrence of the Water Department, changes were made to the gravity sewer system and force main system, resulting in a substantial cost reduction ($232,700) to the City. The estimated cost for the Lift Station will be amended as follows and subject to the actual bid price. Project Cost and Financing Developer City Total Sanitary Sewers $927,850* $723,000* $1,650,850* 780,900 490,300 ( 1,271,200 DATE REFERENCE SUBJECT: AMENDMENT TO CITY SEC, ARY PAGE NUMBER 8/16/88 1 C-11134 CONTRACT NO. 16383 - LIVE OAK CREEK 2 , 2 (SILVER RIDGE) Total $927,850* $723,000* $1,650,850* 780,900 490,300 ( 1,271,200 * Previous estimated cost ( ) Amended estimated cost After completion of Recommendation No. 1, funds will be returned to Water CIP Fund 56, Project Number 014901-00, Unspecified. DAI:m SUBMITTED FOR THE CITY MANAGER'S DISPOSITION BY COUNCIL: PROCESSED BY OFFICE BY: David Ivory ❑ APPROVED ORIGINATING ❑ OTHER (DESCRIBE) DEPARTMENT HEAD: ,J o e B i l l a r d i CITY SECRETARY FOR ADDITIONAL INFORMATION J. T uome 81 78 CONTACT: .Y DATE