Loading...
HomeMy WebLinkAboutContract 60830-FP160830-FP1 g:t;:�r��_ry 60830 ------ FORT WORTH® Date Received 5/29/2025 NOTICE OF PROJECT COMPLETION (Developer Projects) 6/4/2025 The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Northpointe Ph. 11 City Project No.: 104047 Improvement Type(s): � Paving � Drainage � Street Lights □Traffic Signals Original Contract Price: $2,243,671.00 Amount of Approved Change Order(s): $0.00 Revised Contract Amount: Total Cost of Work Complete: Arturo Sancen (May 23 2025 11:41 CDT) G.QntractQr �upenntendent Title Conatser Construction Company Name Qib-ijj'Jeers 'May 27, 202512:48 CDT) Project Inspector @bf<�· Ram Jiwari (May 29 2025 os:59 CDT} mManager CFA Manager Je--� lmrce0Priei1c'¥av29 2925J3'32CITT) TPW Director � Asst. City Manager $0.00 $2,243,671.00 05/23/2025 Date 05/27/2025 Date 05/29/2025 Date 5/29/2025 Date 05/29/2025 Date 05/30/2025 Date Page 1 of 2 Notice of Project Completion Project Name: Northpointe Ph. 11 City Project No.: 104047 City's Attachments Final Pay Estimate � Change Order(s): ❑ Yes 0 N/A Contractor's Attachments Affidavit of Bills Paid � Consent of Surety � Statement of Contract Time Contract Time 180 WD Days Charged:249 WD Work Start Date: 3/4/2024 Work Complete Date: 4/15/2024 Completed number of Soil Lab Test: 771 Completed number of Water Test: 26 Page 2 of 2 FORTWORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name NORTHPOINTE, PHASE 11 Contract Limits Project Type DRAIAGE City Project Numbers 104047 DOE Number 4047 Estimate Number � Payment Number � City Secretary Contract Number Contract Date For Period Ending 4/15/2024 WD Project Manager NA Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH , TX 76119 Inspectors D. WATSON / F. DIAZ Contract Time 18� Days Charged to Date 249 Contract is 100.00 Complete Friday, May 2, 2025 Page 1 of 5 City Project Numbers 104047 Contract Name NORTHPOINTE, PHASE 11 Contract Limits Project Type DRAIAGE Project Funding UNTI' III: DRAIAGE IMPROVEMENTS Item Description of Items Estimated Unit No. Quanity 1 10' CURB INLET 24 EA 2 15' CURB INLET 6 EA 3 4' STORM JUNCTION BOX 11 EA 4 5' STORM JLTNCTION BOX 4 EA 5 6' STORM JUNCTION BOX 3 EA 6 21" RCP, CLASS III 1219 LF 7 24" RCP, CLASS III 2033 LF 8 30" RCP, CLASS III 148 LF 9 36" RCP, CLASS III 30 LF 10 42" RCP, CLASS III 847 LF I 1 4X4 BOC CULVERT 494 LF 12 CONNECT TO EXISTING BOX CULVERT 1 EA 13 REMOVE HEADWALL AND CONNECT TO 1 EA EXISTING RCP 14 CONNECT TO EXISTING JUNCTION BOX 1 EA I S 4' DROP INLET 2 EA 16 13" LARGE STONE RIPRAP, DRY 130 SY 17 TXDOT SW-0 HEADWALL 1 EA 18 TXDOT SW-0 HEADWALL 1 EA 19 TRENCH SAFETY 4771 LF Sub-Total of Previous Unit UNTI' IV: PAVING IMPROVEMENTS Item Description of Items Estimated Unit No. Quanity 1 6" CONC PVMT 16255 SY 2 6" LIME TREATMENT 17265 SY 3 HYDRATED LIME @ 30#/SY 259 TN 4 5' CONC SIDEWALK 1192 LF 5 6" CONC SIDEWALK 388 LF 6 BARRIER FREE RAMP, TYPE R-1 14 EA DOE Number 4047 Estimate Number 0 Payment Number � For Period Ending 4/15/2024 Unit Cost Estimated Completed Completed Total Quanity Total $3,800.00 $91,200.00 24 $91,200.00 $4,800.00 $28,800.00 6 $28,800.00 $6,000.00 $66,000.00 11 $66,000.00 $7,000.00 $28,000.00 4 $28,000.00 $8,000.00 $24,000.00 3 $24,000.00 $75.00 $91,425.00 1219 $91,425.00 $85.00 $172,805.00 2033 $172,805.00 $110.00 $16,280.00 148 $16,280.00 $150.00 $4,500.00 30 $4,500.00 $205.00 �173,635.00 847 $173,635.00 $325.00 �160,550.00 494 $160,550.00 $2,500.00 $2,500.00 1 $2,500.00 $3,500.00 $3,500.00 1 $3,500.00 $2,500.00 $2,500.00 1 $2,500.00 $7,000.00 $14,000.00 2 $14,000.00 $125.00 $16,250.00 130 $16,250.00 $7,500.00 $7,500.00 1 $7,500.00 $7,000.00 $7,000.00 1 $7,000.00 $2.00 $9,542.00 4771 $9,542.00 $919,987.00 $919,987.00 Unit Cost Estimated Completed Completed Total Quanity Total $56.00 �910,280.00 16255 $910,280.00 $4.00 $69,060.00 17265 $69,060.00 $235.00 $60,865.00 259 $60,865.00 $22.50 $26,820.00 1192 $26,820.00 $27.00 $10,476.00 388 $10,476.00 $2,000.00 $28,000.00 14 $28,000.00 Friday, May 2, 2025 Page 2 of 5 City Project Numbers 104047 Contract Name NORTHPOINTE, PHASE 11 Contract Limits Project Type PAVING Project Funding 7 BARRIER FREE RAMP, TYPE P-1 12 EA 8 FURNISH/INSTALL ALUM SIGN GROUND 17 EA MOUNT CITY STD. 9 INSTALL STREET NAME BLEADES 8 EA 10 INSTALL STOP SIGN 9 EA ll REMOVE BARRICADES & CONNECT TO 2 EA 12 SAWCUT AND REMOVE EXISTING CURB AND 240 LF GUTER 13 CONNECT TO EXISTING PVMT W/ 240 LF LONGITUDINAL BUTT JOING Sub-Total of Previous Unit DOE Number 4047 Estimate Number 1 Payment Number 1 For Period Ending 4/15/2024 $2,200.00 $26,400.00 12 $26,400.00 $650.00 $I1,050.00 17 $11,050.00 $350.00 $2,800.00 $450.00 $4,050.00 $500.00 $1,000.00 $30.00 $7,200.00 8 $2,800.00 9 $4,050.00 2 $1,000.00 240 $7,200.00 $20.00 $4,800.00 240 $4,800.00 $1,162,801.00 $1,162,801.00 UNTI' V: S1'REET LIGHTING IMPROVEMENTS Item Estimated Estimated Completed Completed Description of Items Unit Unit Cost No. Quanity Total Quanity Total 1 RDWY IIIUM TY 11 POLE 24 EA $3,000.00 $72,000.00 24 $72,000.00 2 RDWY IINM FOLTNDATION TY 1,2, AND 4 24 EA $1,200.00 $28,800.00 24 $28,800.00 3 NO 6 INSULATED ELEC CONDR, ALUM. #6 1557 LF $4.00 $6,228.00 1557 $6,228.00 XHHW 4 INSTALL TYPE 33A ARM 24 EA $500.00 $12,000.00 24 $12,000.00 5 ATBO-20BLEDE70-MVOLT-R2-3K-MP-NL-P7 19 EA $750.00 $14,250.00 19 $14,250.00 LUMINAIRE 6 2" CONDT PVC SCH 80, OPEN CUT 1557 LF $15.00 $23,355.00 1557 $23,355.00 7 TYPE R4 LUMINAIRE 5 EA $850.00 $4,250.00 5 $4,250.00 Sub-Total of Previous Unit �16o,gs3.00 �16o,sg3.00 Friday, May 2, 2025 Page 3 of 5 City Project Numbers 104047 Contract Name NORTHPOINTE, PHASE 11 Contract Limits Project Type STREET LIGHTING Project Funding Contract Information Summary Original Contract Amoant Change Orders DOE Number 4047 Estimate Number 1 Payment Number 1 For Period Ending 4/15/2024 $2,243,671.00 Total Contract Price $2,243,671.00 Total Cost of Work Completed g2,243,671.00 Less % Retained $0.00 Net Earned $2>243,671.00 Earned This Period $2,243,671.00 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $2,243,671.00 Friday, May 2, 2025 Page 4 of 5 City Project Numbers 104047 Contract Name NORTHPOINTE, PHASE 11 Contract Limits Project Type STREET LIGHTING DOE Number 4047 Estimate Number 1 Payment Number 1 For Period Ending 4/15/2024 Project Funding Project Manager NA Inspectors D. wATSON / F. DIAZ Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH , TX 76119 City Secretary Contract Number Contract Date Contract Time 180 WD Days Charged to Date 249 WD Contract is .000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed Less % Retained Net Earned Earned This Period $2,243,671.00 Retainage This Period $0.00 Less Liquidated Damages � Days @ $0.00 / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $2,243,671.00 $0.00 $2,243,671.00 $0.00 S0.00 $0.00 $0.00 $0.00 $2,243,671.00 Friday, May 2, 2025 Page 5 of 5 FORT VVORTH� TRANSPORTATION AND PUBLIC WORKS April 17, 2025 Conatser Construction 5327 Wichita Street Fort Worth, TX 76119 RE: Acceptance Letter Project Name: Northpointe Ph. 11 Project Type: Water, Sewer City Project No.: 104047 To Whom It May Concern: On April 22, 2025 a final inspection was made on the subject project. There were no punch list items identified at that time. The final inspection indicates that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on April 22, 2025, which is the date of the final inspection and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-2237. Sincerely, iE'�m %uc�o Ram Tiwari (May 29, 2025 OS:59 CDT) Ram Tiwari, Project Manager Cc: Dennis Rodgers, Inspector Donald Watson, Inspection Supervisor Oscar Aguillon, Senior Inspector Victor Tornero, Program Manager Kimley Horn, Consultant Conatser Construction, TX, LP, Contractor Lennar Homes, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 08/20/19 �����t���avr�r �Fr��i`� �� �r��:�c�►� co��r��r�r c�i, �������r��r }3efore rne, ih� undersigncd �utharity, a Nc�i�ury Pub�ic iri t�te state and county afaresa.id, on �hi� d�}� persortally �p��red E3rc�ck �uggins, Fr�sid�nt of Conatscr �la�agcznenl Cirou�, �nc,. �enerai ��rtnc�r ot{ C�nat��cr Cp�•�uct�crn T}�_, LF, known t� m� #€� ?�e a cr�ciib�e �ersa�, wlta �in� hy` m� duly sworn, uEx�r� his oath depa�d and said: "1'ftat �11 per�t�r��, tirms, assacialion�, c�rpara#ions �r olher orgar�i;c��inns �w�i�hi�g lt�bc,r ancilt�r m��c�E�ls h�v� b�ccn paid i:� full; Th��t �hc� w:��,e scaPe �stabli�hcd by th� (:i�y Cauncit in tl�c Ci�}r ot' Fnrt WE�rth, l� hecn paid in full: and 'fhat thcr� arc n� �l;airn� pending for personal injury endlor gn�ge�ty d�rn�g�s; Dn C.'untraee describcc� as: Nt)RTHPC7ll�ITE P�-I. �1 V�JATE�, SA�(ITf�RY tiF?ViIE?R, l)RA�tVAC;�:F PAVii�f(;, & S'1'R��'�' �,i�f�'I' il4iPR(IY�:ME?�!'1'S CF�A Yf�j � �3-{f13€1 CITi{ ['ROf L�T # 1Q�0�#7 CITY O�' �U�T V�C}�7'f� 5'i'A'�'� C��' '�'��AS G�}NATSFR �',[)�fS'I'RU�:7"EUN "I�}L* 1.�' R E3rn�:k Fiuggi 5uhscr�k�d and swr�rn tt� beit�re me this 29�' day o1�April, 2{}25. ��� �� .��� F�arf�F��rNF R(}S� +�nT.arrweue�artzeo++�e+�! �U� ��i��iC 4R T{ifT�l[�� �.�llf1��, ���C`��� . ,: it�a t3i�87l3] �ir `� [oN11.#11/. iy•]O•70�a � C�II�SENT Q� SU�E�TY C�MPANY �o �r��� ���nn�n�� �o�larm� wit1, eh. Am.rir..n �na�la,e� o! A�cl�lt.at�. AiA Dv�nt o7U7 �RQ.IE�T: Inarria, acidrssa}�ort�o�te. �ase �� �ar: V4�ortn. r� TO �Qwrrerl Bpn� N� Q�5�221 ICi'TY �F fDRT �1J�7H J4�VD L�HNAFi WC3FdE5 OF � Af�G}iITECT`S PRQ.�EC7 IVQ. CFA F�. 23-6�30 TF�(A.� lA?�i011fdpCONS1R�T�OM. LYI� C��YE���T FQA: 1T07 INqarlc�f �`k]ICR �14d.. SurE4 i�p Vtifalef, San�iary S�ver, Rr�n P�w�!g.$ S�ael LiD�9 Irnp��em��s f� NOttC�pG�+1tC�11a� 1 f � rx r�c�s3 J CONTRA�T DATE: C�1N�RACT��: C�lA7SER COHSTR�3C3iO�i T7C, L.P i d aeca�tdan�x �it3� thr �rrovisiotx� 4f t�e Cant�act betwcen thc �wecr ar�d ti�c Cfln�actor � i�ics#cd abova, the �+.�. �+H+e +V+�. �+d .der.aa ar su..ey raa�v.�r� 9FFiiCi.EY 1Sw!$�1i3.4N�� �QIiAPAAi'f �75 Steamba�s R�ad ��eenr+nch CY n6e3� . SURETY CONIPANY on bcrnd of s�+ +�+e +�.�..r+�.e�w. of c�v.�s�� �Q��47��R �pNSTRUGT3DM Ti[. L.P 5327 W+�hda �t �ortVtilarttr TX 7Bi�9�D35 . C�NTRACT�R, hereby appiv�+�s of thc ftnal payment tn t�e Car�traet�r. and 9grec� 4hat fin81 ��+m�r�i Eo the Cc�n�Clor 9h�ll nof roti�ve the Sur�cy C�pNny a�` �ny o� its vbligations �o u+«. ��.T..►.e �ea�.4. � o�.t �lTY �F F�RT WL�EtTH A[+!O L6t�INAR iiOME5 OF �'�AS LAN� ANi7 Ct]NS�RUCTI(}N, LTD i T�T A+�a�k� Pl�oe Bjvd . Surte � QO Imr►� T�( T5Q63 �s sei forth io ihe smid 5wre#y Com�ar:y's bond. IIV 1�TN�5S, W�RE�F, tha 9urety Ct�mp�arxy �as i��reurito set i� hand tfis� 28tn day uf Apr�1, 2�25 � ������ �x��r �r�su�ar�c� co���an� s� ea�p�� � -� ����: � �, �.t.�_ �a--���..� ����: ����� �+�k.�' �j�•�— �1�T'ldLkli'C 4f 1�Ux�iO#4ZEd �C�I`C3C17i��iVO F�db�l FADi31�8 A##Dt11B4���-�� T4tle � NaTE: 7'trs lnr�n � o0 0� w�d a� oeaa�w+[ws �acwn.�n tio Au ODCVIUEM4 Gi4�. COfrTfl,tCT411'6 AFRIQI�I+I� � �AYlVl�iT OF DE�TS Al+f� CtAY�15, Currrin� E�1on O1NN�R � ����i���r cor,���ac�-�� 0 su��r�r I� QTH�R �HE PAC�E