To the Mayor and Members of the City Council April 27 1999
Nxii Subject: TEA-21 CALL FOR PROJECTS
The North Central Texas Council of Governments (NCTCOG) has issued a "Call for
Projects" for the Transportation Equity Act for the 21st Century (TEA-21). The list of
projects must be submitted with candidate projects to NCTCOG by May.14". The TEA-21
bill is a major funding source for transportation projects that will be implemented between
Fiscal Years 2000 through 2006. The major funding programs consist of the Surface
Transportation Program — Metropolitan Mobility (STP-MM) and Congestion Mitigation and
Air Quality (CMAQ) Program.
Any submitted project that is subsequently approved for federal funding will require City
cost participation. It should be noted that state and federal funds have previously been
approved for East Rosedale Street for the sections from IH-35W to US287 and from
Bishop Street to Miller Avenue; however, there is currently no local funding match. Most
of the new projects may not be programmed prior to a new bond program.
We have previously submitted lists of projects by council districts. TPW staff has
discussed these projects with most council members and received comments as well as
additional projects to be considered. A list of all of the possible projects was prepared and
evaluated by staff in light of the total funding available in each category:
STP-MM = $51 million
CMAQ = $17.7 million
The attached list was presented to the Facilities and Infrastructure Committee on April 13,
for its review. These are the projects that we recommend for your consideration. Since
this is a new list of projects, this matter is being placed on the Pre-Council Agenda for
discussion and will be brought back the following week for your action.
If you have questions related to projects which were deleted, added or modified, or if you
would like to add a project, this can be discussed at the meeting. I would be glad to sit
down with you to discuss the proposed submission.
Bob Terrell
City Manager
ISSUED BY THE CITY MANAGER FORT WORTH,TEXAS
'
INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 8188
TEA-21 CALL FOR PROJECTS
CMAQ (CONGESTION MITIGATION AND AIR QUALITY)PROGRAM
F )ROJECT CITY COUNCIL PROJECT CONSTRUCTION COST ESTIMATE
# DISTRICT#
US377 and SH183 Intersection
Improvements: Provide additional turning $ 400,000-State/Federal
1 3 lanes t the US377 and SH 183 intersection. $ 200,000-City Participation
$ 600,000-Total Cost Estimate
Hulen Street from IH-30 to Old $ 1,500,000-State/Federal
2 3 Granbury Road: Roadway widening, $ 500,000 -City Participation(1)
signal improvements and ramp adjustments $ 2,000,000-Total Cost Estimate
to leverage additional funds for approved
CMAQ funds in the ISTEA bill. (1) Funding approved in CMAQ Program,
ISTEA bill.
Bryant Irvin Rd.(IH30—Vickery): $2,282,400-State/Federal
3 3&7 Widen to create four(4) lane divided road $ 570,600-City Participation
with left turn lanes at the major $2,853,000-Total Cost Estimate
intersections.
Green Oaks Bridge @ IH30: Reconstruct $ 2,000,000-State/Federal
4 3 &7 bridge to allow a left turn for traffic turning $ 500,000-City Participation
eastbound on IH30. Make necessary $2,500,000-Total Cost Estimate
improvements to frontage road at the
intersection of Green Oaks Boulevard.
IH30 Ramps for Oakland&Woodhaven: $ 550,000-State/Federal
5 4 Construct new on/off ramps for Oakland $- 50.000-City Participation
Blvd.&Woodhaven Blvd. Modify existing $ 600,000-Total Cost Estimate
ramp for Oakland Blvd.
East 1"St.@ Trinity River: Reconstruct $4,130,400-State/Federal
6 4 bridge to allow for six(6) lanes of traffic $ 1,032,600-City Participation
and future widening of East l't Street. $ 5,163,000-Total Cost Estimate
Hulen St.(Columbus Trail—Risinger $ 800,000—State/Federal
7 6 Rd.): Construct six(6) lane divided from $ 200,000—City Participation
Columbus Trail to north of Risinger Road, $ 1,000,000—Total Cost Estimate
remove temporary curb and replace with
concrete curb.
TEA-21 CALL FOR PROJECTS
CMAQ (CONGESTION MITIGATION AND AIR QUALITY) PROGRAM
ROJECT CITY COUNCIL PROJECT CONSTRUCTION COST ESTIMATE
# DISTRICT #
W.Everman Pky(Butterwick–IR35): $2,711,040- State/Federal
8 6 Construct six(6)lane divided roadway with $ 677-760- City Participation
turn lanes to complete a missing link $ 3,388,800-Total Cost Estimate
between W. terminus of Sycamore School
and IH35W.
IWO Ramps for University: Modify $ 480,000-State/Federal
9 7 existing westbound off ramp to provide for $ 120,000-City Participation
a two lane ramp. $ 600,000-Total Cost Estimate
Riverside Drive @ Trinity River: $ 1,296,000-State/Federal
10 8 Reconstruct bridge for six(6)lanes to $ 324,000-City Participation
comly with re-classification to a principal $ 1,620,000-Total Cost Estimate
arterial road.
Expand Traffic Signal System: Citywide $ 1,512,000- State/Federal
11 All Incident Management and Detection $ 378,000-City Participation
Project. $ 1,890,000-Total Cost Estimate
OF-
IH-30 Traffic Surveillance: Expand $ 800,000- State/Federal
12 All traffic monitoring system along the IH-30 $ 200,000-City Participation
corridor. $ 1,000,000-Total Cost Estimate
TOTAL CMAQ PROGRAM $23,214,800
-2-
.......... ................
TEA-21 CALL FOR PROJECTS
STP-MM(METROPOLITAN MOBILITY) PROGRAM
T CITY COUNCIL PROJECT CONSTRUCTION COST
DISTRICT# ESTIMATE
Meacham Boulevard from IH35W to North $ 1,900,000-State/Federal
2 Main Street(Phase 2): Reconstruction and $ 2,600,000-City Participation(1)
widening of Meacham Boulevard to a four-lane $4,500,000-Total Cost Estimate
divided boulevard from IH35W to North Main
Street. (1) Funding approved in 1998 Bond
Program
Dirks Rd.(Old Granbury—Bryant Irvin): $ 1,234,400-State/Federal
2 3 &6 Construct six(6)lane roadway with turn lanes $ 308,600-City Participation
and connection to proposed Southwest Park-way $ 1,5 3,000-Total Cost Estimate
(Developer Project)
BN SF RR @ Dirks Rd.: Reconstruct bridge to $4,000,000-State/Federal
3 3 &6 accommodate the upgrade of Dirks/Alta Mesa to $ 1,000,000-City Participation
a six(6)lane divided boulevard. $ 5,000,000-Total Cost Estimate
Hulen St.@ Proposed Southwest Parkway: $ 8,955,200 State/Federal
4 3 &9 Reconstruct bridge to accommodate the $2,238,800 City Participation
construction of Southwest Parkway Bridge over $11,194,000-Total Cost Estimate
Hulen,Union Pacific RR,and the Trinity River.
Old Denton Road from Summerrields $ 3,200,000- State/Federal
5 4 Boulevard to Park Glen Boulevard: Widen $ 800,000-City Participation(1)
and reconstruct existing pavement. $4,000,000-Total Cost Estimate
N.Beach St.(Basswood—Thompson): $ 2,436,800-State/Federal
6 4 Construct North bound three(3)lanes and turn $ 796,784 -City Participation(1)
lanes. $3,046,000-Total Cost Estimate
(1) Funds collected through
Community Facilities Agreements
(CFA's)
Park Glen Blvd.from Old Denton Rd.to Ray $ 5,600,000- State/Federal
7 4 White Rd.: Construct four(4)lane divided road $ 1,400,000-City Participation(1)
with turn lanes east of Old Denton Road to Ray $7,000,000-Total Cost Estimate
White Road. Add additional two(2) lanes to
Park Glen Blvd. from IH35W to Old Denton
Road.
Meadowbrook Drive from Sandy Drive to $ 1,600,000—State/Federal
8 4 Cooks Lane: Reconstruct existing pavement. $ 400,000—City Participation
$ 2,000,000—Total Cost Estimate
TEA-21 CALL FOR PROJECTS
STP-MM(METROPOLITAN MOBILITY)PROGRAM
PROJECT CITY COUNCIL PROJECT CONSTRUCTION COST
# DISTRICT# ESTIMATE
Randol Mill Road from IH820 to Precinct Line $ 2,000,000—State/Federal
9 4 Road: Widen and reconstruct existing pavement. $ 500,000—City Participation
$2,500,000—Total Cost Estimate
East Rosedale St.from US287 to Bishop and $ 3,200,000—State/Federal
10 5 &8 from Miller Ave. to IH820: Reconstruction of $ 800,000—City Participation
existing pavement. This project will fund the $4,000,000—Total Cost Estimate
remaining gaps of the rosedale Street corridor
from forest park Boulevard to IH820.
Henderson(Pennsylvania—W.Rosedale): $ 1,210,400- State/Federal
11 8&9 Reconstruct to four(4)lane divided roadway with $ 302,600-City Participation
turn lanes. Convert existing one-way street to a $ 1,513,000-Total Cost Estimate
two-way street.
Union Pacific RR @ Henderson St.: $ 1,512,000—State/Federal
12 8&9 Reconstruct underpass to lower elevation and $ 378,000—City Participation
allow greater vertical clearance. Remove $ 1,890,000—Total Cost Estimate
unnecessary bridge section that currently serves
an abandoned railroad spur line.
010�1
F�'
IH30 Connectors: Tie-in with lowering of $ 1,360,000—State/Federal
13 8&9 Main,Jennings, and Henderson St. and the $ 340,000—City Participation
extension of the Hemphill-Lamar-Taylor $ 1,7000,000—Total Cost Estimate
connection.
Hemphill-Lamar-Taylor Connection: $4,555,200-State/Federal
14 9 Construction of a new six(6)lane divided $ 1,138,800-City Participation
boulevard between Vickery and Lancaster. $ 5,694,000-Total Cost Estimate
TOTAL STP-MM PROGRAM $55,580,00
-2-
TEA-21 CALL FOR PROJECTS
ENHANCEMENT PROGRAMS
JPROJECT CITY COUNCIL PROJECT CONSTRUCTION COST
# DISTRICT# ESTIMATE
North Main Street from Trinity River to N.E. $ 1,500,000—State/Federal
1 2 28`b Street: Roadway and beautification $ 1,560,000—City Participation(1)
improvements to North Main Street to leverage $ 3.060000—Total Cost Estimate
additional funds for approved funds in the 1998
Bond Program. (1) Funds approved in 1998 Bond
Program
Lancaster Ave.(11135—Henderson St.): $4,800,000 -State/Federal
2 8 &9 Reconstruct six(6)lane divided to reduce the $ 1,200,000- City Participation
median and allow for greater parkway width. $6,000,000 -Total Cost Estimate
Berry Street from University Drive to Evans $ 1,500,000 State/Federal
3 8&9 Avenue: Roadway and beautification $1 500,000-City Participation
improvements to Berry Street to leverage $ 3,000,000 -Total Cost Estimate
additional funds for approved funds inn the 1.998
Bond Program
TOTAL ENHANCEMENT PROGRAM $12,060,000