HomeMy WebLinkAboutContract 60937-FP2-FP2 FQRTWORTH�, City Secretary 60937 Contract No. Date Received 6/2/2025 6/5/2025 NOTICE OF PROJECT COMPLETION (Developer Projects) The Transportation and Public Works Department upon the recommendation of the Project Manager has accepted the following project as complete: Project Name: Madero Phase 5 City Project No.: 104856 Improvement Type(s): 0 Paving 0 Drainage 0 Street Lights ❑ Traffic Signals Original Contract Price: $3,783,826.66 Amount of Approved Change Order(s): $368.40 Revised Contract Amount: $3,784,195.06 Total Cost of Work Complete: $3,784,195.06 ��� Jay nel1�May16,20251037CDT) ��roject manager Title Conatser Construction TX L.P. Company Name ���� Project Inspector � Project Manager �� CFA Manager Lau��i�l�(^19-:in CDT? 05/16/2025 Date 05/16/2025 Date 06/02/2025 Date 06/02/2025 `��/02/2025 TPW Director C- ���� Asst. City Manager Date 06/03/2025 Date Page 1 of 2 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Notice of Project Completion Project Name: Madero Phase 5 City Project No.: 104856 City's Attachments Final Pay Estimate 0 Change Order(s): 0 Yes ❑ N/A Contractor's Attachments Affidavit of Bills Paid �-� Consent of Surety �� Statement of Contract Time Contract Time: 240 WD Days Charged: 243 WD Work Start Date: 3/25/2025 Work Complete Date: 3/24/2025 Completed number of Soil Lab Test: 1288 Completed number of Water Test: 33 Page 2 of 2 FORTWORTH CITY OF FORT WORTH FINAL PAYMENT REQUEST Contract Name MADERO, PHASE 5 Contract Limits Project Type DRAINAGE City Project Numbers 104856 DOE Number 4856 Estimate Number 1 Payment Number 1 For Period Ending 3/24/2025 WD City Secretary Contract Number Contract Date Project Manager NA Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH, TX 76119 Inspectors T. GARDNER / A. PAI'NE Contract Time 24�JD Days Charged to Date 243 Contract is 100.00 Complete Thursday, May 15, 2025 Page 1 of 6 City Project Numbers 104856 Contract Name MADERO, PHASI: 5 Contract Limits Project Type DRAINAGE Project Funding UNITIII: DRAINAGE IMPROVEMENTS (RES) Item Description of Items �stimated Unit No. Quanity 1 TRENCH SAFETY �047 LF 2 21" RCP, CLASS 831 LF 3 24" RCP, CLASS 851 LF 4 27" RCP, CLASS 495 LF 5 30" RCP, CLASS 384 LF 6 33" RCP, CLASS 924 LF 7 36'RCP, CLASS 550 LF 8 42" RCP, CLASS 510 LF 9 10' CURB INLET 26 EA 10 15' CURB INLET 2 EA 11 4' STORM JLTNCTION BOX 3 EA 12 5' STORM JLTNCTION BOX 4 EA 13 3'X3' BOX CULVERT 329 LF 14 LARGE STONE TYPE "A" DRY RIP RAP (12" 137 SY DEEP)(CO#2) 15 48" HP PIPE 173 LF 16 36" SLOPED END HEADWALL 1 EA 17 42" SLOPED END HEADWALL 1 EA 18 3' DROP INLET 1 EA 19 3'X3' 4:1 SW-0 WINGWALL 1 EA 20 3'X3' 4:1 SW-0 WINGWALL WITH 1.15' 1 EA EXTENDED CURB 21 INLET PROTECTION 29 EA Sub-Total of Previous Unit UNTT IV: PAVING IMPROVEMENTS (RES) Item Description of Items EsNmated Unit No. Quanity 1 HYDTATED LIME (32 LBS/SY) 512 TN 2 6" LIME TREATMENT 31994 SY 3 TOPSOIL 253 CY 4 BLOCK SOD PLACEMENT 1517 SY DOE Number 4856 Estimate Number 1 Payment Number 1 For Period Ending 3/24/2025 Unit Cost Estimated Total $2.00 $10,094.00 $75.00 $62,325.00 $85.00 $72,335.00 $90.00 $44,550.00 $110.00 $42,240.00 $125.00 $115,500.00 $150.00 $82,500.00 $205.00 $104,550.00 $3,800.00 $98,800.00 $4,800.00 $9,600.00 $6,000.00 $18,000.00 $7,000.00 $28,000.00 $270.00 $88,830.00 $145.00 $19,865.00 $215.00 $37,195.00 $5,000.00 $5,000.00 $6,000.00 $6,000.00 $4,500.00 $4,500.00 $6,500.00 $6,500.00 $7,500.00 $7,500.00 Completed Completed Quaniry Total 5047 $10,094.00 831 $62,325.00 851 $72,335.00 495 $44,550.00 384 $42,240.00 924 $I15,500.00 550 $82,500.00 510 $104,550.00 26 $98,800.00 2 $9,600.00 3 $18,000.00 4 $28,000.00 329 $88,830.00 137 $19,865.00 173 $37,195.00 1 $5,000.00 1 $6,000.00 1 $4,500.00 1 $6,500.00 1 $7,500.00 $I50.00 $4,350.00 29 $4,350.00 $868,234.00 $868,234.00 Unit Cost �stimated Completed Completed Total Quanity Total $245.00 $125,440.00 512 $125,440.00 $3.50 $111,979.00 31994 $111,979.00 $28.00 $7,084.00 253 $7,084.00 $8.00 $12,136.00 1517 $12,136.00 Thursday, May 15, 2025 Page 2 of 6 City Project Numbers 104856 Contract Name MADERO, PHASI: 5 Contract Limits Project Type PAVING Project Funding DOE Number 4856 Estimate Number 1 Payment Number 1 For Period Ending 3/24/2025 5 6" CONC PVMT 29881 SY $55.00 -,643,455.00 29881 1,643,455.00 6 5" CONC PVMT 17927 SF $4.80 $86,049.60 17927 $86,049.60 7 BARRIER FREE RAMP, TYPE P-1 24 EA $2,200.00 $52,800.00 24 $52,800.00 8 BARRIER FREE RAMP, TYPE R-1 12 EA $2,300.00 $27,600.00 12 $27,600.00 9 REMOVE BARRICADE & CONNECT TO 1 EA $500.00 $500.00 1 $500.00 EXISTING PAVEMENT 10 CONSTRUCT STD. PVMT HEADER 232 LF $30.00 $6,960.00 232 $6,960.00 11 ALL WAY STOP (RI-1) 13 EA $450.00 $5,850.00 13 $5,850.00 12 STREET NAME BLADE PAIR (53-1) 13 EA $350.00 $4,550.00 13 $4,5�0.00 13 ALL WAY PLAGUES ON EXISTING STOP SIGN 13 EA $500.00 $6,500.00 13 $6,500.00 (Rl-3P) 14 STREET SIGN POLE 13 EA $650.00 $8,450.00 13 $8,450.00 Sub-Total of Previous Unit $2,099,353.60 $2,099,353.60 UNTT V: STREET LIGIITING IMPROVEMENTS (RES) Item Description of Items Estimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 2" CONDT PVC SCH 80 (T) 3873 LF $I5.00 $58,095.00 3873 $58,095.00 2 LED LIGHTING FIXTURE (SOW) �0 EA $850.00 $42,500.00 �0 $42,�00.00 3 INSTALL TYPE 33B ARM 50 EA $500.00 $25,000.00 50 $25,000.00 4 RDWY IIIUM ASSEMBLY TY 8,11,D-25, AND D- 50 EA $3,000.00 $150,000.00 50 $150,000.00 30 5 RDWY IIIUM FOLJNDATION TY 1,2, AND 4 50 EA $1,200.00 $60,000.00 50 $60,000.00 Sub-Total of Previous Unit $335,595.00 $335,595.00 UNITIII: DRAINAGE IMPROVEMENTS (BRONCO TRAI Item Description of Items Estimated Unit No. Quanity 1 LARGE STONE TYPE "A" DRY RIP RAP (121" 27 SY DEEP) 2 10' CURB INLET 2 EA 3 5' STOR JUNCTION BOX 3 EA 4 4' DROP INLET 1 EA � 48" HP PIPE 718 LF 6 INLET PROTECTION 3 EA Unit Cost Estimated Total $145.00 $3,915.00 $3,800.00 $7,600.00 $7,000.00 $21,000.00 $6,500.00 $6,500.00 $215.00 $1�4,370.00 $150.00 $450.00 Completed Completed Quanity Total 27 $3,915.00 2 $7,600.00 3 $21,000.00 1 $6,500.00 718 $154,370.00 3 $450.00 Thursday, May 15, 2025 Page 3 of 6 City Project Numbers 104856 Contract Name MADERO, PHASI: 5 Contract Limits Project Type DRAINAGE Project Funding DOE Number 4856 Estimate Number 1 Payment Number 1 For Period Ending 1/1/2001 Sub-Total of Previous Unit $193,835.00 $193,835.00 UNTI' IV: PAVING IMPROVEMENTS (BRONCO "IRAIL) Item Description of Items �stimated Unit Unit Cost Estimated Completed Completed No. Quanity Total Quanity Total 1 HYDRATED LIME (42 LBS/SY) 68 TN $245.00 $16,660.00 68 $16,660.00 2 8" LIME TREATMENT 3239 SY $4.50 $14,575.50 3239 $14,575.50 3 TOPSOIL 98.47 CY $28.00 $2,757.16 98.47 $2,757.16 4 BLOCK SOD PLACEMENT 591 SY $8.00 $4,728.00 591 $4,728.00 5 5" CONC SIDEWALK (CO#2) 2622 SF $4.80 $12,585.60 2622 $12,585.60 6 6" CONC SIDEWALK 4174 SF $4.80 $20,035.20 4174 $20,035.20 7 BARRIER FRRE RAMP, TYPE P-1 (CO#2) 1 EA $2,200.00 $2,200.00 1 $2,200.00 8 7.5" CONC PVMT (CO#2) 2853 SY $72.00 $205,416.00 2853 $205,416.00 9 REMOVE BARRICADE & CONNECT TO 1 EA $500.00 $500.00 1 $500.00 EXISTING PAVEMENT 10 BARRIER FREE RAMP, TYPE M-2 (CO#2) 1 EA $2,400.00 $2,400.00 1 $2,400.00 11 5'X8' GALVANIZED STELL PLATE (CO#2) 1 EA $1,800.00 $1,800.00 1 $1,800.00 12 CURBED CONCRETE FLUME (CO#2) 76 SF $20.00 $1,520.00 76 $1,520.00 13 BOLLARD (CO#2) 1 EA $1,500.00 $1,500.00 1 $1,500.00 14 LARGE ARROW- SINGLE HEAD (Wl-6R) 1 EA $500.00 $500.00 1 $500.00 (CO#2) Sub-Total of Previous Unit $2R7,177.46 $2s7,177.46 Thursday, May 15, 2025 Page 4 of 6 City Project Numbers 104856 Contract Name MADERO, PHASI: 5 Contract Limits Project Type PAVING Project Funding DOE Number 4856 Estimate Number 1 Payment Number 1 For Period Ending 3/24/2025 Contract Information Summary Original Contract Amount $3,783,826.66 Change Orders Change Order Number 2 Change Order Number 2 ($3,190.00) $3,558.40 Total Contract Price $3,784,195.06 Total Cost of Work Completed $3,784,195.06 Less % Retained $0.00 Net Earned $3,784,195.06 Earned This Period $3,784,195.06 Retainage This Period $0.00 Less Liquidated Damages Days @ / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $0.00 $0.00 $0.00 $0.00 $0.00 $3,784,195.06 Thursday, May 15, 2025 Page 5 of 6 City Project Numbers 104856 Contract Name MADERO, PHASI: 5 Contract Limits Project Type PAVING DOE Number 4856 Estimate Number 1 Payment Number 1 For Period Ending 3/24/2025 Project Funding Project Manager NA Inspectors T. GARDNER / A. PAI'NE Contractor CONATSER CONSTRUCTION TxLP 5327 WICHITA ST FORT WORTH � TX 76119 City Secretary Contract Number Contract Date Contract Time 240 WD Days Charged to Date 243 WD Contract is 000000 Complete CITY OF FORT WORTH SUMMARY OF CHARGES Line Fund Account Center Amount Gross Retainage Net Funded Total Cost of Work Completed Less % Retained Net Earned Earned This Period $3,784,195.06 Retainage This Period $0.00 Less Liquidated Damages � Days @ $0.00 / Day LessPavement Deficiency Less Penalty Less Previous Payment Plus Material on Hand Less 15% Balance Due This Payment $3,784,195.06 $0.00 $3,784,195.06 $0.00 $0.00 $0.00 $0.00 $0.00 $3,784,195.06 Thursday, May 15, 2025 Page 6 of 6 W � � Z Z � N Q 0 U � O C Z � atf F W � � Z W 'a a � F Z Z � Q Q a � U � o a a � } F U Z � � � ^w wW � � � � F � � �� � � Q w� N a ¢� � � W � � � 0 = � p � � � � a Z c7 O 0 N � �> c� � X � lJ.� � � U Z H w U � w � � a � � � Q.' O Lal. F❑ Z J d U U U LL X LL O N � � N M N f� � � G C Z Z 0 0 aa Y mQ a Q � � Q !n � W U Q Z O� ~U U W W ' ap � � za y Q G r Q N � N � N � F� 2 O U y � $ $ � � � » � S o � � o Y1 J o� N tj N W o o e �^ � Y1 Yl YI N y € � N 1�f1 N N 1f> O U N N N b Pp N O � v M M M o w q Q � m � o � o o e � e o U � � o pi G m N � .m- `g w $ � os M m m o o y v O N N p N �g g o s z � St � � o � o U = V � v � � d o � m? o � m F U N eV �j N C� Oa W O~!� l+f Y1 ~ N U o m "' m � � � � � w w w N c�i $ $ $ � .i M N o 0 � V � � W � W � o 0 0 � o e d p�p O � � {Q a � � tt H N M ° < e `�& � - - - O N M N �s s s �� � � e � U �W r 3 0 0 0 o b o � o e •• `m a p � '�R " o S' � o � � U O U ~ � N � N N i � � w � v � Q W < 0 Z � G K Q f W O � t � U � Q = 7 y O ~ W U U U C U OWI a w a a o W n > � o o O a � y a H C �Z > > � O� v p�� � 0 Z � � � z w � ~ c� w z'o N o H O � U �U � � W W � � N N 0 v � 10 a C r 10 .y � a Q a a _ y W E � T a 3 m c N m c� 'v c Y N .� � y Q � _ �� �� �� � re _„ L Y � � c E . o� � V @ C C � R U a � � m m 3 N E � '� o ` �1 V ` m N L E � � o � V% U C m L W Y ' C O � .- n n N ,� �p W m l0 O � - � � �t � rn � � c T o � O 7 C O � m v m � y n�� 0 L m L�L •�p Cp m F U C C � Y Q �m N C N .0 N m N i° Y `m m p� V O O � j � � V L 'm o o E o a o N n U •� N R Q�1 m o >_ w `o ,� C O � N �r l0 N ��s > � `° o. � e�� m ` E 16 ��9 m�� m � � Cl �_� _aL m p U � N O � F C C m 10 ' m N C � to H V Q � w 0 � 0 w C9 2 a i U K O LL N Z � � Q W � � Z 0 z a F N O U � O � 0 W � 2 a U 2 LL � 0 0 � � J m 2 W a O � W � � '� n �' W W 2 a F- oY wm �_ O C7 � U N � w � m Z J 03 �, > � f" U ?w o= w �" J {,� O C Z� � Z � W Z � � W LL � �� � U '� O w z� N `� Cq I U m 0 J 0 � � U c f7 V c J ��m `m � c c . J m c � � C .� c rn � W Q (� J � c � _ U Q m � Z � 0 LA, W Y U � � Y � G1 E Z ui a W Z � ci m � Z 1- � w a Q � U W O � a ui 1- W � W � W � N O N 0 V O � �a a � O R 'i Y v Q 4 v � 10 � m ��r�������� TRANSPORTATION AND PUBLIC WORKS May 7, 2025 Conatser Construction TX,L.P. 5327 Wichita Street Fort Worth,TX 76119 RE: Acceptance Letter Project Name: Madero Phase 5 Project Type: Water, Sanitary Sewer, Drainage, Paving, and Street Lights City Project No.: 104856 To Whom It May Concern: On April 2, 2025 a final inspection was made on the subject project. There were punch list items identified at that time. The punch list items were completed on May 7, 2025. The final inspection and the corrected punch list items indicate that the work meets the City of Fort Worth specifications and is therefore accepted by the City. The warranty period will start on May 7, 2025, which is the date of the punch list completion and will extend of two (2) years in accordance with the Contract Documents. If you have any questions concerning this letter of acceptance, please feel free to contact me at 817- 392-2373. Sincerely, � Sandip Adhikari, Project Manager Cc: John Rogers, Inspector Troy Gardner, Inspection Supervisor Cody Horton, Senior Inspector Andrew Goodman, Program Manager UA Engineering,lnc., Consultant Conatser Construction TX,L.P., Inc., Contractor Lennar homes of Texas Land and Construction,LTD, Developer File E-Mail: TPW_Acceptance@fortworthtexas.gov Rev. 8/20/19 At=�I�AV [T s�r�►�: or �-Fxns �UU�I�'Y ❑F TARRANT �3efore m�:, ��te undersigned auEhority. a Notary Public in thc sl�te and cnunty a#`oresaid, on this day persona�ly a�pc�rc�d 13rock E iv��ins, President af Corial�r Mana�eme�t Graup, lnc., gen�ral partncr of Conais�r Constr�ctinn 'i'){ LP, knvwn to me to be ��t`edi�le persan, whn being by mc d��y swarn, upan his aaih depascd aitd sait�: Th�E all �x:rsons, �ins�s, assaciations, cozpnrations ot nther vrgani�atians #�urnishing la�r artdlor materi�ls ha�+e 1ac�� p�id ia full; That �h� w�ge 5Ct1�e �st�3blished by #h� �i#y Counc3� in the City of �ort Worih, h� been paid in fulI; and Th�i lhere �'� no c�aims pe�tding far persana� irrlury andlor p�o�ercy damages; Qn Contract descrihed �.ti; NiADERD PH. 5 WATER, �ANI'i`ARY SEWER, I3RA]I�IAGE, PAVIn1G, 8c STREET I�1GHT IMPR�VEMEN"I'S cF�► �aJ # z�-o�si CYTY PRDJECT # 1fl4$5fi CITY �F F�R'I' V���L'�'� STATE QF TEXAS C�AIATSFR CONSTRLJC:TIQN T�, LP , Bruck Huggin Subscribed an� swvm 10 befnre me th�s 13`h day vf Februar�, ���.5. ��+�C �� i.'� � � KAiIiERfN� RO5E �'CX&5 NaT,ut+rn�eu�:t�r� a r[r.� ��C�I�i �ll�]�1C �� �a17Hlli ��lU'3i]f, ; �i i ���87833 so+pit�xr. �i-so-auzn CON5EN7 OF SURETY COMFANY 70 FiNAL PAYIhlIEN7 ConTams whh th� Am�rican Inetltute o1 Archhecti, AIA OveumeM �707 PROJECT: I�ame, addressl��ero Pnase 5 Fort Vr{orlh, TX TO �Owne�l Ba� No 0250725 ICiTY OF FORT IMDRTHAND LENNPA HOM£5 OF —I ARCHITECT'S PROJECT N0: cFnNo.27-0isi TEXASL4kOAP7000N570.UC710N,L70 CON7RqC7 FOR: 1707 Me�cetplaC9 BIW . Surte 1tl0 Vraler, $arWary $¢yi¢r. �rainage. Parng. & SIIee� LfgM Improre�mnLe lo� Madero Phase 5 �"""� � ��3 J CONTRACT DATE: COiVTRACTOR: CONATSER CONSTRUCTION 7X. L P In accordence with the provisions otthe Contract 6etwcen the Owner snd the CansreUar as indicated ebov�, the �twslmul Kma and aAG�en of Su�sly ComyenYl BERKLEY INSURANCE COMPANY 475 5leamboa�Hoad Greenwich CT 06936 , SUR�TI( COMPANY on bood oC IMro iro.� �+.m..�e.de�w or ten��eeto�l CONATSER CONSTRUCTIONI'X.LP 5327 Wichita St FortWotth 77c 76st9-s635 .CONTRACTOR. herehy approves of tlie final payment to she Contractor, and a�ees thei final payment to the Cantractar shell oot relieve the Surety Company of any of iu obligsiions to m..•3u.rt �..�..w.ad.�+a aMr.a C17Y OF F�RT WORTH AND LENNAR HOMES OF TEXAS LAND AN� CONSTRUC710N. LT6. 17C7 MBrkelpldce Blvd , Smt6 104 Irving TX 75�n"3 � �wN�S� es set fotth in the said Surety Company's bond. [N WI'CNE55, WN'E[i�OF, the Surery Company has hueunto set iu hand lhis �ztn day of Feeruary, 2ozs BERKLEY INSl1RANCE COMPANY Surery Company Adest: � �c�4 73 j �� / (Seal): �" � Signaturc of Authorized Representative Roh i Mnr I Attome -in-Fac[ ?itle NOTE: TI�s form a �o be wetl a� e carroanlan Exumnm to AIA OOCIIMENT 6796. CONf9ACTOfl'S AfFI�AVR OF PAYMENi 0� DfBTS PNQ CL41M5, cwn�n eauw+ ONE PAGf owNeR ❑ ARCHITECT ❑ CONTRACTOA ❑ SURETY ❑ OTHEA