HomeMy WebLinkAboutContract 58683-CO7CSC No. 58683-CO7
Fc-PRT WORTH
City of Fort Worth
'V_
Change Order Request
Project Name:1 Village Creek WRF Digester
Mixing, Flare, Dome Improvements Phase 1
I City Sec No.: 1 58683
Project No.(s):I 56021/0700430/5740010/001780 I M&C: 1 22-1046
1 City Proj. No.: l 102652
Project Description: Digester mixing, flare, and dome improvements, new digester gas dryers, and
new hydrogen sulfide scrubbers. I
Contractor: Eagle Contracting, LLC
Change Order #
7 1 Date: 5127/2025
City Project Mgr.l Suzy Abbe
City Inspector:
Kevin Sidebottom
Phone Number:1 817-392-8209
Phone Number:
817-991-0629
Dept.
Sewer
Totals Contract Time
(Calendar days)
Original Contract Amount
$39,773,000.00
$39,773,000.00 1,095
Extras to Date
$1,414,391.00
$1,414,391.00 0226
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date
$41,187,391.00
$41,187,391.00 1,321
Amount of Proposed Change Order
�191.00
191.00 120
Revised Contract Amount
$41,187,582.00
$41, 87,582.00 1,441
Original Funds Available for Change Orders
$318,184.00
$318,184.00
Remaining Funds Available for this CO
$208,771.00
$208,771.00
Additional Funding (if necessary)
$191.00
$191.00 ,
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
3.56%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 15%) 1$49,716,250.00
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Change Order No. 7 provides for the following:
• Digester 1 and 2 Manway Hinges —The addition of hinges on the side manways to match side manways on the other digesters.
• Pump Rental and Set Up for Dewatering Operation — The contractor is dewatering Digester Nos. 1 and 2 to prepare for work inside the
digesters. Dewatering operations have been interrupted on multiple occasions due to the process impacts of returning the high ammonia
filtrate for treatment. To allow dewatering operations to continue without impacting the plant process, the contractor was allowed to pump
the filtrate directly to the dewatering facility. This change order provides for pump rental and set up costs.
• Credit for Digester Control Building No.1 Coating —The original contract included coating the ceiling of the Digester Control Building No. 1.
With the addition of new decking in Change Order No. 6, coating the ceiling was removed from the contractor's scope of work.
• Removal and Installation of Tar for Additional Depth in Digesters 1 and 2 Seals — The original contract included replacement of a 24-inch
deep annular seal. This change order provides for additional time and materials for an extra depth of 15 inches in the two digesters.
• Blind Flange Replacement — This change order provides for the replacement of two severely corroded steel blind flanges at the top of
Digesters No. 1 and 2.
• Digester 7 and 8 Annular Seal Corrections — Materials and labor for reinstallation of silicone sealant after removal to allow for
investigation of leaks, installation of SIKA Duoflex at the base plate that stopped the leaks, and changing the tar used in upcoming work to
improve seal performance, and staff agrees to the addition of 120 days of contract time.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment
in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
Contractor's company Name Contractor Name copt
-7 Date
Eagle Contracting, LLC I Mike Partridge I~ / Z'7r-4
G- , J_
Inspector
Kevin Sidebottorn
Director (Water Dept)
Chrlstooher harder
Senior Assistant City Attome
4.1�
Douglas Black (May 30, 202517:12 CDT)
M&C Number 7-- NA
Date
Project Ma
er
Date
5/27/2025
5/27/2025
Date
05/28/2025
Construction Supervisor (Water Dept .
OA, V R 4f"V
Date
5/27/25
Date
Assistarillpty Manager
Date
05/30/2025
06/03/2025
Council Action (If Required)
M&C Date Approved NA
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH
City of Fort Worth
'^
Change Order Additions
Project Name Village Creek WRF Digester Mixing,
Flare, Dome Improvements Phase 1
City Sec No.:
1 58683
Project No.(s): 5602110700430/5740010/001780
1 DOE No.1 22-104q
CityProj. No.:
1 102652
Project I Digester mixing, flare, and dome improvements, new digester gas dryers, and new hydrogen sulfide scrubbers.
Description
Contractor Eagle Contracting, LLC
Change Order: 07
Date: 1 5/27/2025
City Project Mgr. Suzy Abbe
City Inspector
I Kevin Sidebottom
ADDITIONS
HEM tM UtSf:KIN I IUN
DEPT
Qty Unit
'Unit Cost
Total
50 Digester 1 and 2 Manway Hinges
Sewer
1.00 LS
$5,205.00
$5,205.00
51 Monthly Pump Rental for Dewatering Operation
Sewer
5.00 EA
$2,379.53
$11,897.65
52 Pump Set Up for Dewatering Operation
Sewer
3.00 EA
$848.45
$2,545.35
53 Removal and Installation of Tar for Additional Depth
in Digesters 1 and 2 SeASewer
1.00 LS
$81,674.00
$81,674.00
54 Digester 1 and 2 Blind Flange Replacement
Sewer
1.00 LS
$18,372.00
$18,372.00
55 Digester 7 and 8 Annual Seal Corrections
Sewer
1.00 LS
$89,343.00
$89,343.00
24 Credit for Digester Control Building No. 1 Coating
Sewer
1.00 LS
-$2,206.00
-$2,206.00
Sewer $206,831.00
Additions Sub Total $206,831.00
Page 1 of 1
FC, RT' Wo RT H City of Fort Worth
Change Order Deletions
Project Name Village Creek WRF Digester Mixing, Flare, Dome Improvements Phase 1 City Sec No.: 58683
Project No.(s): 5602110700430/5740010/001780 1 DOE No. 1 22-10� City Proj, No.: 102652
Project Description I Digester mixing, flare, and dome improvements, new digester gas dryers, and new hydrogen sulfide scrubbers.
Contractor Eagle Contracting, LLC Change Order: F7 ] Date 5/27/2025
City Project Mgr. Suzy Abbe City Inspector: I Kevin Sidebottom
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
A11-5 Digester 7 and 8 Framing Repairs Sewer 2.87 TN $72,000.00 $206,640.00
1.72E-01
Sewer $206,640.00
Page 1 of 1 (Deletions Sub Total $206,640.00
MNVBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
co # DATE AMOUNT
Total $0.00
Page 1 of 1
5/27/2025
CPN 102652
Digester Mixing, Flare, Dome Improvements Phase 1
Change Order 7 Notes
Change Order No. 7 provides for the following:
CMR-40 Digester 1 and 2 Manway Hinges — Side manways were added in Change Order No. 6 to
facilitate maintenance access in Digester Nos. 1 and 2. This change order provides for hinges on
the manways to match side access on the other digesters.
• CM 21 Monthly Pump Rental and Set Up for Dewatering Operation —The contractor is
dewatering Digester Nos. 1 and 2 to prepare for rehabilitation work and installation of the new
mixing systems. Filtrate high in ammonia from the dewatering operation is sent to the plant
drain where it is pumped to X. Dewatering operations have been interrupted on multiple
occasions due to the process impacts of high ammonia being returned to the head of the plant.
To allow the dewatering operations to continue and not delay the project further, the
contractor was allowed to pump the filtrate to the DS1 well, sending the filtrate directly to the
dewatering facility. This change order provides for the pump rental and for set up of the pump
and filtrate piping to the IDS well to continue dewatering now and for upcoming sets of
digesters.
• CMR 43 Credit for Digester Control Building No. 1 Coating — Change Order No. 6 included new
metal decking for Digester Control Building No. 1. The original contract included coating the
ceiling of the Digester Control Building No. 1. With the addition of new decking in Change Order
No. 6, coating the ceiling was removed from the contractor's scope of work. This change order
includes a credit for that work.
CMR 44 Removal and Installation of Tar for Additional Depth in Digesters 1 and 2 Seals —The
original contract included removal and replacement of a 24-inch deep annular seal. The annual
seals in Digesters No. 1 and 2 are deeper than 24 inches. This change order provides for
additional time and materials for a total additional depth of 15 inches in the two digesters. The
high cost is primarily associated with the labor-intensive process of chipping out the existing tar
in a one to two-inch wide seal 24 inches down.
• CMR 45 Bling Flange Replacement —This change order provides for the replacement of two 10-
foot dimeter steel blind flanges at the top of Digesters No. 1 and 2 that are severely corroded.
The blind flange on Digester No. 1 has holes that have broken through. The blind flange at
Digester No. 2 is severely pitted.
• Digester 7 and 8 Annular Seal Corrections — The contractor submitted a delay claim for
$501,170.00 and 190 days of contract time to capture costs of corrective actions and delays
associated with Digester Nos. 7 and 8 seal leaks. The City believes the corrective actions and
delays to be associated with poor installation of the seal, but has agreed to compensate the
contractor with $89,343.00 to cover materials and labor for reinstallation of the silicone sealant
at the top of the seal, installation of SIKA Duoflex at the base plate that successfully stopped the
leaks, and changing the tar used in the seals of upcoming digesters from Type IV to Type II (a
more viscous and elastic material) as well as 120 days of contract time.
Labor hours and material quantities and costs proposed in each CMR were reviewed in detail
and adjustments made as needed prior to approval. Approved CMR's are saved in E-builder.
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Suzanne Abbe
Name of Employee
Senior Engineer, Capital Project Delivery