Loading...
HomeMy WebLinkAboutContract 59701-A1CSC No. 59701-A1 AMENDMENT No . 1 TO CITY SECRETARY CONTRACT No. 59701 WHEREAS, the City of Fort Worth (CITY) and Westwood Professional Services Inc., (ENGINEER) made and entered into City Secretary Contract No. 59701, (the CONTRACT) which was authorized by M&C 23-0502 on the 13th day of June, 2023 in the amount of $ 577,105.00; and WHEREAS, the CONTRACT involves engineering services for the following project: Water and Sanitary Sewer Replacements Contract 2021, WSM-F, CPN 104668; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in proposal attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $14,760.00 (Water: $9,358; Sewer: $5,402). 2. Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $591, 865. 00. OFFICIAL RECORD CITY SECRETARY 3. FT. WORTH, TX All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. City of Fort Worth, Texas W/SS Replacement Contract 2021, WMS-F Prof Services Agreement Amendment Template CPN. 104668 Revision Date: 12/08/2023 Page 1 of 2 EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth �1 Jesica McEachern Assistant City Manager DATE: 06/04/2025 onnIln ATTEST: aaFFORr�°a 0 � w 0.4 }� pV i=o aannzo aaap Jannette Goodall City Secretary APPROVAL RECOMMENDED: chris-fOphelr Harder Christopher Harc(er (Jun 2, 2025 14:57 CDT) Christopher Harder, P.E. Director, Water Department Contract Compliance Manager: ENGINEER Westwood Professional Services Inc. Brian D. O'Neill, PE, CFM Director DATE: May 7, 2025 By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Z:)O4LCLqe;�6Z ); Dena Johnson, P.E. Project Manager APPROVED AS TO FORM AND LEGALITY: )q� Douglas Black (Jun 4, 2025 14:31 CDT) Douglas W. Black Sr. Assistant City Attorney City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: 12/08/2023 Page 2 of 2 M&C No.#: N/A M&C Date: N/A Form 1295: N/A OFFICIAL RECORD W/SS Replacement Contract 2021, WMS-F CPN. 104668 CITY SECRETARY FT. WORTH, TX Westwood April 21, 2024 CPN 104668 Tony Sholola, PE Water Department City of Fort Worth 311 1 Ot" Street Fort Worth, Texas 76102 Re: Amendment No. 1: Water and Sanitary Sewer Replacements Contract 2021, WSM-F; City Project No. 104668 City Secretary Contract No. 59701 Dear Tony, Westwood has been requested to provide additional design services for the above -mentioned project. Westwood is requesting additional funding in the amount of $14,760.00, be added to this project for each of the phases below: - Task Number 1, "Project Management"- $5,060 - Task Number 4, "Final Design"- $8,390 - Task Number 5, "Bid Phase"- $1,310 Original Contract Amount: $577,705 (Water: $386,857; Sewer: $190,248) Amendment No. 1 Amount: $14.760 (Water: $9.358, Sewer: $5.402) Revised Contract Amount: $591,865 (Water: $396,215; Sewer: $195,650) The above budget reallocation is requested for additional coordination with Pape-Dawson's storm design along El Campo Avenue and Ashland Avenue, in order to update the current construction plans for WSM-F and to combine the 2 projects into one bid package. We look forward to continuing work with the City of Fort Worth. Please contact us if there are any questions. Sincerely, Ryley Paroulek, PE Project Manager Westwood 817-412-7155 RCP 104668: WSM-F Amendment 1 4060 Bryant Irvin Road • Fort Worth, TX 76109-41 13 • 817.412.7155 • pkce.com EXHIBIT B Level of Effort Spreadsheet- Amendment 1 TASKMOUR BREAKDOWN Design Services for Water and Sanitary Sewer Replacements Contract 2021, WSM-F City Project No. 104668 Task Description Task No. Principal Project Mana er Labor (hours) Project En ineer EIT CADD I Administrative Total Labor Cost Ex Subconsultant E Non-MWBE ense Travel Reproduction Total Expense Cost Task Sub Total Rate $275 11.0 Project Management 0 1.1 Amendment 1 $230 $210 $165 $150 $100 22 0 5,060 0 0 0 0 $0 $5,060 22 $5,060 $0 $5,060 4.0 4.1 Final Design Amendment 1i 0 10 14 10 10 0 $8,390 $0 $0 $0 $0 $0 $8,390 101 14 10 10 $8,3901 1 $0 $8,390 5.0 Bid Phase 5.1 Amendment 1 1 Totals 0 1,3101 0 0 0 0 $0 $1,310 0 1 33 2 16 4 14 10 0 $1,310 $0 $0 $0 $0 $0 $1,310 $14,760 $0 $14,760 Water Line Footage 15,0271 63.4% 1 Sewer Line Footage 8,6671 36.6% 23,6941 100.0 % (ATotal Fee $14,760 later Fee (63.4 % of C) Sewer Fee (36.6 % of C) $9,- 1 $5,402.00 City of Fort Worth, Texas Attachment B - Level of Effort Supplement Typical Water and Sewer Replacement FWWTR Official Release Date: 8.09.2012 Project Summary Total Hours 73 Total Labor $14,760 Total Expense $0 MBE/SBE Subconsultant $0 Non-MBE/SBE Subconsultant $0 5% Sub Markup $0 MBE/SBE Participation 0.0000%' Total Project Cost $14,760.00