HomeMy WebLinkAboutContract 61324-CO3CSC No. 61324-CO3
FoRY T�x.
Project Name I Historic Southside Improvements
Client Project #(s)f 102932
Project Description)
Contractorl Woody Contractors Inc.
City Project Mgr.l Jose Orozoo
City of Fort Worth
Change Order Request
I City Sec # 1 61324
Water, Sanitary Sewer, Storm Drain and Street Paving Improvements
Change order #1 3 l Datel 4/25/2025
City Inspectorl Sergio Garcia
Dept.
Unit 1: Water
Unit 2: Sewer
Unit 3: Paving
Unit 4: Storm
Contract Time
Totals
(CD�
Original Contract Amount
$6,020,770.70
$2,077,370.40
54,958,218.25
$623,399.00
$13,679,758.35
50
Extras to Date
50.00
$168,165.40
$0.00
S0.00
5168,165.40
70
Credits to Date
Pending Change Orders (n M&C Process)
Contract Cost to Date
$6,020,770.70
S2,245,535.80
54,958,218.25
S623,399.00
513,847,923.75
520
Amount of Proposed Change Order
$14.432.00
$67``478.00
$0.00
$0.00
$81,910.00
30
Revised Contract Amount
$6,035,202.70
52,313,013.80
54,958,218.25
5623,399.00
513,929,833.75
550
Original Funds Available for Change Orders
5180,623.00
$62,321.00
5240,000.00
$35,000.00
5517,944.00
Remaining Funds Available for this CO
5180,623.00
50.00
$240,000.00
535,000.00
5455,623.00
Additional Funding (if necessary)
567,478.00
$67,478.00
CHANGE ORDERS to DATE
(INCLUDING THIS
ONE) AS % OF ORIGINAL CONTRACT I
1,83%
MAX ALLOWABLE
CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%J `
$17.099.697.94
TIFICATION (REASONS) FOR CHANGE ORDER 4111-
Change Order No. 3 will provide for the following:
'Replacementof a deteriorated segment of an existing 135 LF of 4-inch clay sanitary sewer lateral with a 8" PVC sewer line that was encountered during construction in E.
Maddox Street.
'Removal and replacement of 15"-24" storm drain conflicts that were encountered during installation of a new 30-inch water main on Vickery Blvd.
'Additional temporary HMAC paving to provide a decent driving surface during water and sewer main installation on Vickery Blvd. prior to conducting final pavement restoration.
'Removal and replacement of a concrete sidewalk and wheel chair ramp after the storm drain conflicts were completed.
'The deletion of pay item quantities that are no longer needed on the project.
Staff concurs with the contractors request for 30 additional calendar days for the change order.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes .�cco
rd and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order. The Pr jeProgram Manager signing below acknowledges that
he/she is the person responsible for the monitoring and administration of this contract, including a sng all perform ce an eporting requirements.
Contractors Company Na a r ff
Woodv Contractors, Inc. Troy Woody I 1 / l Jr— I -�
kwadallimuldion Superw Project and Contract compliance Manag
05/08/25 05/08/25
er — Wr Capital Project Officer gr Date
` 05/20/25 Mary, ,f 05/20/25
- partment (Dept) _Date
✓�aivicia L WadraiA 05/21/25 i�+y� �— 05/22/25
L F i1,s„ on �lY Manager
05/22/25 06/03/25
aq M&C Number N/A M&C Date Approved N/A
ATTEST: o! FORT QQQ
Janette Goodall, City Secretary
QQQ TEXASdo
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FoxT WORTH
*.
Project Name I Historic Southside improvements
Client Pmjaot N I 102932
Coatmctarl Woody Contractors Inc,
City of Fort Worth
Change Order Additions
Clry Sec 0 61324
1
PMI JoseOrozcc I Inspectorl Sergio Garcia
Change Order Suhmittal # F-T7 Date I 412W2025
ADDITIONS
I1.5M
))
unit
Unit Cost
E$44I,euu.00+
epair (2" RrdA(; on 6- Flexible Ease CflJnit 1: Water
32U1.U400 Temporary Asphalt N Y ng Repair
1,3�t�WUUUtlo
LF
1.59
3213.03U1 4"Ooncreledkiewaix
unitT Water
935.000000
SF
$12,158,0u
1.34
i33U1.0002 PostCClVlnspecVCO
Un1111water
105A0OULiDW
LF
A013
'945,00
t-85
33UIJU014 FM CC IV inspection
UnRVWater
WS.00g00ooa
LF
$9.00
940.UU
1-86
3341.0205 24" RCP, Class lit
Unit 1: Water
16.0000000U
LF
$285.00
'bou'W I
1-87
0241.301 Remove is Storm Line
unit it water
105CWumu
LF
LF
$10,K
89U.Uu'
336 uu1
1-0U241.3U13
Kam Its Stone Une
Unit 1: Water
itiAllUWU6jj
$21.OcI
1.89
9999,0017 15" RCP, Class III
Unit 1: Water
105.00000211
LF
$210.O( i
$2£050.00+
1.90
0241.3401 Remove 4' Stone Junction Sox
ITnit 1: Water
1,00000000
EA
$1.300.dC
{9y300,W
1-91
3349,UU01 4' Storm Junction Box
Unit 1: Wafer
1.0000000 j
EA
$6,500,OC1
b616 U•U f
1-92
32DI.U400 I emporary Aspnail FavnRM g Repair (Z" AC on Ii" 1-10A 1e base CC Unit 1: Water
121AD000 1
LF
$68,10C
$tl,2'L6.UU
-$27,00.001
24
3331,41156"Nvt:Sewer Pipe PVCSUN 26
unit 2:Sewer
135.000000U01
LF
$200.0U-
2 7
5331:3101 4" Sewer i e6MO
Unit 2� Sewer
4.00WGWO)
EA
$2,3iU0,0t.1
$11,2W.0U
2.9
33311.101.11 4' Mannola
Unn 2 Sewer
2.900013 U
EA
$8,500.0[
$17,000.OU1
2211
331iw.1W34'IxlraoupmNianncia
urn 2:Sewer
1,0000OOW
VF
4250.01
j$260.110'
2-14
3301.0002 rest GGIVlospechon
Unit 2:Sewer
125.00000UW
LF
f9.X
CULP,
1,125.UU1
2-15
3301.0014 Final CCTV inspection
Unit 2: Sewer
125.00000006
LF
1,126.00{
2.15
3301.UO15 Final Manc�ialnspoctlon
Unit2-ewer
2.00000000
EA
$1,000,00
O.00I
2.11
3w.U101 Mannole vacuum I esing
Unit 2: Sewer
2,00000000
EA
250,OV
$60U,00�
2.20
0241.2001 Sanitary Line Groutirgi
Unit2�ewer
2A000000U
Cy
25.00
485U,UUI
2-21
0241.22uI Remove 4' Sewer Manhole
Unit 2: Sewer
1.0000001.10
EA
$6U0.00
$buu,UU
2.22
0241.210141 Sewer Abandonment Plug
Unit 2; Sewer
1.00MOUi
EA
$300,W
$300.00
2-26
0241.01OU Remove Sidewalk
Unit 2: Sewer
48.000000UU1
SF
$3,0U
$i44.001
2a6
J11U.U1U812-18°ireeRamovai
unit Z:Sewer
1.0000UUUOI
EA
$1,1U0,00
$1,1DOM
2-42
3201,04UU I emporary Aspran Paving Repair (2" HMAU on b" Flexible
base Cc7Unll 2c Sewer
750,0000000 jt(
LF
$39,00
$29,250,00
25'2
133u5.U1u9 IrenonJdre
UhI12:Sewer
12PS.00oa0000[f1�
12.00U000O�J
LF
41.06
$125A I
-
2-66
3395.0103 Exploratory 4cavallon of Exis9ng Ulilities
I m 2, Sewer
EA
$1,700.00--
9400.00
2-66
0241MOO Remove ADA Ramp
Unit 2: Sewer
1.0000000�J1bj
EA
$300,00
300-OU1
2.67
3213,u3U1 4" (:Onerets SMMIK
Unit 2: Sewer
48,30WOM
SF
$13.00
y}7,000A
SA-UU!'
000,UU I
2-08
3213.05xx Sarner i-ree Ramp, Type U-1
Unit 2: Sewer
1,0090000f}
EA
11,BUu.OUr
2-69
321'S.0W1 darner Fro& Ramp, I peR-1
Unit 2: Sowor
2.00000UW
EA
$3,9UU.Ul
2-70
3349.5u06 Remove and replace Inlet top, 10.
unit 2: sour
1.4UMB
EA
$8,000A1
$B,WU,UOi
520.001
2-71
3441R110 Remove and Kelnetall Sign Panal and Post
Unit 2: Sewer
1000W00��J
EA
4620.01
2-72
9999.U015 MoNlizallon
Unitz:Sewer
1.0000000Uf
L5
$6,000.01
Ccux1
2-73
9999.0016 Remove Steps and Install Liner on Ex. Mai
unit 2: Sewer
I
,
15.Oo0000iU
I
I
VF
$92fi.0(
-
,875.VOI
1
i
1
I
I
1
i
1
1
j
I
1
1
Un010Na1or $105,722.001
i Unit 2:Sewer $140,096.00
Unit 3: Paving $0.04
Unit4:Storm $0.0I
SUh Total Additions $245,820.001
Change order Additions Page 3 of 5
n i Worm'
City of Fort Worth
Change Order Deletions
Prgieci Name I Hislodo Southelde Improvements
` CHy Sec# 1 61324 1
Client Project # 1 102932
f
Contactorl Woody Contractors Mo.
I PMI Jose01
I
Inspectorl SO4.C'rcia
Change Order Suhmitlal# ®
Date 412512026
DELETIONS
IIhM
UFUCRIPIIUN
J&I
U1y
Unit Unit Gust
total
1.20
3305.1008 48- Casing By Open Cut
Unit 1! Water
16.0000000
EA 910.00
13,660.001
1-49
1.61
3201.012$ 6' Wipe Asphalt Pvmt Repair, Arterial
3204,02d2 Asphalt Pvmt Repair Beyond Vetoed Width.
Unit 1; Water --
Arteial Unit 1: Water
390.00000000
300.00000000
LF 110.11U
22 001
2.1
3331,110261-611 Pipe Enlargement
IUnit 2;Sewer —
270.k00000PQ
SY 115,8t)
LF 125.p'0
3a,lAU,uU I
S,IbU.0
uol
2.2
3331,1201 Service Reinstatement, Pipe Enlargement
1Unh 2; Sewer
2100000000
EA $1,950,00
6,9m,ud1
2-39
3201.0123 6' Wide Asphalt Avmt Repair, Arterial
Unit 2; Sewer
160.00W000U
LF $$110.0QQ
1 r,t;uu ou
2.41
3201.0202 Asphalt NMI: Repair Beyond Defined Width.
Arterial Unit 2: Sewer
- 1
I
I
150.000U0000
SY $115,S11
_
7 1,3 r0.uu 1
f
l
1
I
I
I I
I
1 I
I I
I I
I I
Unit Y. Water
I
I
I
I
I
1
f
I
I
I
91,290.001
Unit 2l Sewer
72,620.001
Unit 3: Paving
$0.001
Unit 4: Storm
$0.001
Sub TotalDoletlene
$163,91C.001
Change Order Deletions Page 4 of 5
MISBE for this Change Order
.MIN t... YP punt=for•tl i��GO `
Nla
Total f;
Previous Change Orders
A E
D `[. r
91912024 $0.00
2/7/2025 $168,165.40
Y;
Total : y.;k
102932-CNCO-Historic Southside
Improvements Change Order 3
Interim Agreement Report
Created: 2025-05-07
By: Andrea Munoz (Andrea. Munoz@fortworthtexas.gov)
Status: Out for Signature
Transaction ID: CBJCHBCAABAADBwCL75xwbm4MTYBgNBKPcwS_FeIVOiL
Agreement History
2025-05-13
Agreement history is the list of the events that have impacted the status of the agreement prior to the final signature. A final audit report will
be generated when the agreement is complete.
"102932-CNCO-Historic Southside Improvements Change Order
3" History
Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov)
2025-05-07 - 11:53:14 PM GMT- IP address: 204.10.90.100
Document emailed to Filogonio Munoz (Filogonio.Munoz@fortworthtexas.gov) for filling
2025-05-08 - 0:03:45 AM GMT
Document emailed to Sergio Garcia Pedroza (sergio.garciapedroza@fortworthtexas.gov) for signature
2025-05-08 - 0:03:46 AM GMT
Email viewed by Filogonio Munoz (Filogonio.Munoz@fortworthtexas.gov)
2025-05-08 - 0:03:51 AM GMT- IP address: 20.159.64.138
Email viewed by Sergio Garcia Pedroza (sergio.garciapedroza@fortworthtexas.gov)
2025-05-08 - 0:03:52 AM GMT- IP address: 52.244.179.71
=i
IcDocument e-signed by Sergio Garcia Pedroza (sergio.garciapedroza@fortworthtexas.gov)
Signature Date: 2025-05-08 - 12:30:15 PM GMT - Time Source: server- IP address: 158.41.142.150
&p Form filled by Filogonio Munoz (Filogonio.Munoz@fortworthtexas.gov)
Form filling Date: 2025-05-08 - 1:04:20 PM GMT - Time Source: server- IP address: 204.10.90.100
Document emailed to Donald Watson (Donald.Watson@fortworthtexas.gov) for signature
2025-05-08 - 1:04:22 PM GMT
FORT WORTHS 1 Powered'y
Adobe
Acrobat Sign
�-. Document emailed to Jose Orozco Qose.orozco@fortworthtexas.gov) for signature
2025-05-08 - 1:04:22 PM GMT
f) Email viewed by Donald Watson (Donald.Watson@fortworthtexas.gov)
2025-05-08 - 1:04:31 PM GMT- IP address: 20.159.64.138
f) Email viewed by Jose Orozco Oose.orozco@fortworthtexas.gov)
2025-05-08 - 1:04:32 PM GMT- IP address: 20.159.64.138
&0 Document e-signed by Jose Orozco Oose.orozco@fortworthtexas.gov)
Signature Date: 2025-05-08 - 1:39:55 PM GMT - Time Source: server- IP address: 208.184.124.181
FORT WORTHS 1 Powered'y
Adobe
Acrobat Sign
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Historic Southside Improvements Change
Order 3
M&C: CPN: 102932 CSO: 61324
Date:
To: Name Department Initials
1. Filogonio Munoz TPW 'm
2. Troy Woody twoodv2020naol.com
3.
Sergio Garcia
4.
Don Watson
5.
Jose Orozco
6.
Greg Robbins
7
Mary Hanna
8
Patricia Wadsack
9
Lauren Prieur
10.
Doug Black
11.
Jesica McEachern
12.
Jannette Goodall
Vendor
TPW
TPW
TPW
TPW
TPW
TPW
TPW
Legal
CMO
CSO
/10
TW
�lLL
DW
TD
FAO
7
N �//
Do�eia: eiack
CM
DOC#:
Date Out
05/08/25
05/14/25
05/08/25
05/19/25
05/08/25
05/20/25
05/20/25
05/21/25
05/22/25
05/22/25
06/03/25
CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW Contract,
ALSO List: - Bus Sppt: Filogonio Munoz; Prg Mgr Greg Robbins; Sr CPO —Mary Hanna
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all City
Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE
ACM for approval first. Once the ACM has signed the routing slip, Jay will review and take the next steps.
NEEDS TO BE NOTARIZED: [-]YES ®No
RUSH: DYES ®No SAME DAY: DYES [—]No NEXT DAY: [—]YES [—]No
ROUTING TO CSO: ®YES ❑No
Action Required: ❑ Attach Signature, Initial and Notary Tabs
❑ As Requested
❑ For Your Information
® Signature/Routing and or Recording
❑ Comment
❑ File
Return To: Please notify TPWContractsn,fortworthtexas.gov for pickup when complete. Call ext. 7233 or ext. 8363
with questions. Thank you!