Loading...
HomeMy WebLinkAboutContract 63389CSC No. 63389 ATMOS energy May 13, 2025 City of Fort Worth Attn: Jesica McEachern 200 Texas Street Fort Worth, TX 76102 Re: NASJRB 16" Water Line Install Dear Mrs. McEachern: It is Atmos Energy Corporation's (Atmos Energy) understanding that the City of Fort Worth,Texas is Engineering is proposing to install a 16" water line per plans provided by Kimley Horn, Inc. The project's utility crossings will cross Atmos Energy's 12", 10" and 4" steel distribution gas lines as shown in the attached drawings and included exhibits. Atmos Energy has determined that the construction of the proposed 16" water line will not present a significant conflict given a minimum clearance of 5 feet is achieved based on the given design criteria/information. Atmos Energy will not object to the construction of the proposed utility crossings project, provided that the following additional criteria are followed: • Please contact Texas 811 for line locates 72 hours prior to excavation. A representative with the Atmos Energy Damage Prevention team will then contact you to schedule an onsite meeting in advance of excavation activities within the vicinity of Atmos Energy facilities. Atmos Energy's facilities have been determined to currently be approximately 4' (feet) deep with respect to existing grade for the 4" steel gas distribution lines at the proposed water line crossings with a vertical clearance of 2' according to plans provided. No additional cover will be allowed to be removed. The minimum clearance of 5' will be maintained during the utility crossings of the gas line during construction. If sinking of construction equipment begins due to wet weather or compaction, then all work over the pipeline location will cease until it can be worked without sinkage to avoid damage to the pipelines and maintain depths of cover stated above. During construction and final finished depths of cover will not be less than existing cover of soil over the pipeline. An Atmos Energy Representative must be on site during any excavation over the pipeline. • Once Atmos' pipe is visually identified through the potholing referenced above, mechanized excavation may be utilized up to 3 feet of any direction of the circumference of the pipe. • Within 3 feet of any direction of the circumference of the pipe, any excavation must be done by vacuum excavation or hand digging. • Positive drainage must be maintained within Atmos Energy easement. If fill is required to produce positive drainage a request must be made for the amount of fill to place within the easement. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX 2 • At no time may cover be removed from the easement or right-of-way or over the pipeline other than what has already been approved without the prior written approval of Atmos Energy. • Atmos Energy's easement will be protected from washing and erosion during construction and/or repairs. • Equipment, materials, or excess dirt will not be stored on the easement or on top of the pipeline during construction without the prior written approval of Atmos Energy. • Notification to Atmos must be made prior to crossing our pipelines with construction equipment to allow time for load calculations to be performed. The curb weight and type of equipment will be required to perform calculations. Load isolation structures may be required at the requestor's expense. • Atmos Energy will not be responsible for damage to any allowed encroachments. • Atmos Energy reserves the right for future uses of this easement (if an easement exists), including but not limited to, ingress and egress, reconstructing, removing, relocating, maintaining, operating, etc., of any of its facilities. • Impact/conflict analysis was based on and is limited to any drawings and documents submitted to Atmos Energy, as referenced above. AND changes in scope of work contained in these drawings must be resubmitted for re -review and approval. Please: 1. Sign and fill out the information below which signifies that you agree to the terms of this letter. 2. Return this signed scanned document to Corn elio.Wiebe4-atmosenerpy.com prior to your construction. For further assistance please call Corney Wiebe at 682-201-0337. Sincerely, Saul Balcazar Engineering Manager Atmos Energy Corporation 901 Altamesa Blvd. Fort Worth, TX 76134 Date: 0 6/ b SM Oa. Signature: 00*� Name: Jesica McEachern company: CitV of Fort Worth Title: Assistant City Manager Date: 06/04/2025 4 Attachments: . TJ'ti`A�w.+w��MR'• �dt�"'�'Mb Y/.�V f.IwFaN•Y4 M4r .�. i I I �t jam- , � p{� 9 9 { 4 q MA +NE iTAY+dO i l � I� � EE SHE :1 18 g At 9 � tl 'p 4:-� mill NO X4 iom 0. 11 5 i i 91 r=rrS■R�1 qu ILI it ■■ f■■ as us a Y ■i _!■ ■■■i� ■ ■ on ■��■ 1182 in i■ IF Try■ ■ i■r ��i ■■! ■ ■ ■■ m ■mna■ !o lions ■■ r� ■�_ ei■ '! SECSEE :: all all t, on # 3 W p 3 I F I 1 ro 0 �� � F,91 O S � T mAll� %OATCHURE STA 7+00 SEE SHEET 17 rn y I Ay■ � i �A � i 1• i i M I {+ 1 l q I 1 • i )1 iti'me m m 61 133M 33S oo+r 1 r1 S M11HOO" 011Atll ^4 � T Tjghxl p R Y A 1jill 10 W. Y • Jim fF4Y4}1 i � a�q�lj $��� dal R75� 14 a.: yJdi� iiggy g } i 8 § a fpjA , R� 7 nn # f�1 MATCHLIM STACA-CK) SE f SI I E E 7 26 ! i i711f.F �1 1 I •� 'gill! # e4daliki piq �,4,A 11l f���5��4110, a6p1AP fi AP XA i� �• �A dfj�a} ypyay yr`p ��y■ tl C�7! L�3 Z9 ����Y�Z �� 7 • Lvi — MATCHLINE $TA 76400 SEE SHEET 21 l� 1 f, • jf 4 t f { ��l y � F !!13 r•1 � aI��Y� I I C + ' TV �� � �� + �•�� j � LL 133}�,�' �yyr 14MT 5 1� '11 Neil W111 N IT i� `�. � = t p � � � '* � � Rif• �9 ��q �i Ili ll rn C. P —Fvoii S C q A 9 A K) w � mv...•n�.•.�e.rr.r+rvry+r,roxrr.sra ire . rw w. wv.n. r. F+�w r.r• 6i-33HS3ES r O0.48v is RiNlh )A + a a 8 a s ai0"s #S � 1r Figgig Air/ AP10 jil 'FRO flggp g p P 65 �t I YV%Akoo" PWI—m—.b" Nu4*l BM MISCUE r ■� l■ LJEe�:"� �E ■■ 19 ■. i ■ isMR a ! ■ R■R �!■[ ! �■■ MMINOR i F } ■■■■■■_■� �i 'a's manR■i i L ■ R ■ � Hot ■■#■ Nm#r■ 'I ■■■ MEN ■■ �i■i■ i■ E isilai�ii� ! ■ E N)bkl r Bien;LpsIt %10 rT A � � 'm z g w � > r, n �` 8 ►.IATCHLNE STA I10KO SEE SHEET 32 d a x•� �x4 sage f MAICHEINES17C WtOO SEE SHEET 34 r m.+�rn.,r...r��rr�.�.�v���•�rrV w � rr n sn r,yar� eww � n�. HE xe 8 • E!f!0 � a t� town ■ND 00 �� �• OAK1*1 _ I a �■ ■ loon !M ■M !!Er in ! ■■ ■ ! oil So n� ron Y .n if .! all NO gig a op 11,191 1 o �! 0 7 c J MATCHU E STA 117 KO SEE Vim n 1 1 1 A 5����� •yy I ! . A 1 - p sssiii y ��K. � 5 I a Ajl rn q t rs S + I s � jli \. nAs Y 1 Q MA 1 d � - Lnpcpc jj cHur� s A 123r58 SEE SHEET 35 .'f1al�/Y+t�.+.++.+�+-.1•�t.�avirvr�•fi�trlit..V �. v1.Yt.�N Vf4w .yr 11 r �� ■■ ■C� i �C ■CCCCC C: " 'CC C C:■' C'C ■■� ■ mCC C :■a .::: 1� ■CC . Hil m ■1B■ Boom gas Mt1E loE m!■ ■■ ■ ■o■ mom m! !:. /C CHo ■■ ■Ci CSao H too i ■im ■wr i ■■■ ■■ � i ■■■■ Iit MEN on l rB'ta■iC RCNsms ■i ■� III ■g■ ■■■ EWE ■' ■■■ ■■ C ■■EmSm ` Nmm mom � mat BI■■ ■mat 6.C" ■■■ �� ' . �iC : C t m Log t� MATC1M,NE STA 123#00 SEE SIIEET34 arw+ IR as r� t „ ;I .. i��4 4, I± V� i i , 0._` 1 8131{ III, : t G� 4.j�■ 'f F; ��. a .- .Rip a � �r R loth fal Jyi „=3aa Jyi.. Zia 9 �� Letter of No Objection PROJECT NAME: NASJRB WATER AND SANITARY SEWER MAIN IMPROVEMENTS PART 3 ADDITIONAL ROUTING SIGNATURES CITY OF FORT WORTH CONTRACT COMPLIANCE MANAGER: By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all perfor7nance and reporting requirements. By: �04` /�� Preeti KC, P.E. Sr. Project Manager Email: Preeti.KC@foihvorthtexas.gov APPROVAL RECOMMENDED: By: Christopher HAder (May 27, 202515:00 CDT) Christopher Harder, P.E., Director, Water Department Email: Christopher.Harder@fortwortlitexas.gov CONTRACT AUTHORIZATION M&C: NIA Date Approved: NIA APPROV W FORM AND LEGALITY: By: Douglas Black (,Say 27, 2025 17:29 CDT) Douglas W. Black Senior Assistant City Attorney Email: Douglas.Black@fortwortlitexas.gov FORM 1295: NIA ATTEST 'A.�ST{O }QCITY MANAGER SIGNATURE: a � � Fonr�9aA o By: �`o ,.Id PVS ejzd Jannette Goodall pd o00 *d City Secretary a°°n aEoA544 Email: Jannette.Goodall@forttvorthtexas.gov OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX