NOTICE OF PROJECT COMPLETION
(Developer Projects)
The Transportation and Public Works Department upon the recommendation of the Project
Manager has accepted the following project as complete:
Project Name: Riverbend East Office Park Building 1 &2
City Project No.: 104721
Improvement Type(s): ❑ Paving 0 Drainage ❑ Street Lights ❑ Traffic Signals
Original Contract Price: $40,630.00
Amount of Approved Change Order(s): $6,406.00
Revised Contract Amount: $47,036.00
Total Cost of Work Complete: $47,036.00
�� � K�% 06/04/2025
Bivari�iner iJun 4. 20 SCDT1
Contractor Date
Vice President
Title
C-Con
Company Name
&b"*A. C%de4*
06/05/2025
Estevan Castillo (Jun 5. 202507:37 CDT)
Project Inspector
Date
lr , '&�
06/05/2025
Project Manager
Date
6�
06/05/2025
CFA Manager
Date
06/05/2025
Lauren Prieur (Jun 5, 202511:42 CDT)
TPW Director
Date
omm -'
06/05/2025
Asst. City Manager
Date
OFFICIAL RECORD
CITY SECRETARY Page 1 of 2
FT. WORTH, TX
Notice of Project Completion
Project Name: Riverbend East Office Park Building 1 &2
City Project No.: 104721
City's Attachments
Final Pay Estimate ❑x
Change Order(s): ❑x Yes ❑ N/A
Contractor's Attachments
Affidavit of Bills Paid
Consent of Surety
Statement of Contract Time
Contract Time: 45 WD
Days Charged: 83 WD
Work Start Date: 7/2/2024 Work Complete Date: 1/21/2025
Completed number of Soil Lab Test: 47
Completed number of Water Test: 2
Page 2 of 2
FORT WORT 11
CITY OF FORT WORTH
FINAL PAYMENT REQUEST
Contract Name RIVERBEND EAST OFFICE PARK BUILDINGS 1 & 2
Contract Limits
Project Type DRAINAGE
City Project Numbers 104721
DOE Number 4721
Estimate Number 1 Payment Number 1 For Period Ending 1/21/2025
WD
City Secretary Contract Number
Contract Date
Project Manager NA
Contractor C-CON SERVICES, INC.
2230 JOE FIELD RD
DALLAS , TX 75229
Inspectors M.GLOVER / KCASTILLO
Contract Time 4WD
Days Charged to Date 83
Contract is 100.00 Complete
Monday, June 9, 2025 Page 1 of 4
City Project Numbers 104721 DOE Number 4721
Contract Name RIVERBEND EAST OFFICE PARK BUILDINGS 1 & 2 Estimate Number I
Contract Limits Payment Number I
Project Type DRAINAGE For Period Ending 1/21/2025
Project Funding
UNIT III:DRAINAGE IMPROVEMENTS
Item
Description of Items
Estimated Unit
Unit Cost
Estimated
Completed
Completed
No.
Quanity
Total
Quanity
Total
1
10' RECESSED INLET
1 EA
$5,767.00
$5,767.00
1
$5,767.00
2
2 1 " RCP, CLASS III
73 LF
$113.00
$8,249.00
73
$8,249.00
3
4' STORM JUNCTION BOX
1 EA
$11,274.00
$11,274.00
1
$11,274.00
4
TRENCH SAFTEY (CO#2)
79 LF
$1.00
$79.00
79
$79.00
5
CONNECT TO EXISTING CURB INLET PER PIPE
4 EA
$3,410.00
$13,640.00
4
$13,640.00
PENETRATION DETAIL
6
REMOVE 10' RECESSED INLET
1 EA
$1,627.00
$1,627.00
1
$1,627.00
7
CONNECT TO PROPOSED 6' STORM JUNCTION
2 EA
$500.00
$1,000.00
2
1,000.00
BOX (CO#2)
8
6' STORM JUNCTION BOX (CO#2)
1 EA
$5,400.00
$5,400.00
1
$5,400.00
Sub -Total of Previous Unit
$47,036.00
$47,036.00
Monday, June 9, 2025 Page 2 of 4
City Project Numbers 104721
Contract Name RIVERBEND EAST OFFICE PARK BUILDINGS 1 & 2
Contract Limits
Project Type DRAINAGE
Project Funding
Contract Information Summary
Original Contract Amount
Change Orders
Change Order Number 2
Total Contract Price
DOE Number 4721
Estimate Number I
Payment Number I
For Period Ending 1/21/2025
$40,630.00
$6,406.00
$47,036.00
Total Cost of Work Completed $47,036.00
Less % Retained $0.00
Net Earned $47,036.00
Earned This Period $47,036.00
Retainage This Period $0.00
Less Liquidated Damages
Days @ / Day
LessPavement Deficiency
Less Penalty
Less Previous Payment
Plus Material on Hand Less 15%
Balance Due This Payment
$0.00
$0.00
$0.00
$0.00
$0.00
$47,036.00
Monday, June 9, 2025 Page 3 of 4
City Project Numbers 104721
Contract Name RIVERBEND EAST OFFICE PARK BUILDINGS 1 & 2
Contract Limits
Project Type DRAINAGE
Project Funding
Project Manager NA
Inspectors M.GLOVER / E.CASTILLO
Contractor C-CON SERVICES, INC.
2230 JOE FIELD RD
DALLAS , TX 75229
DOE Number 4721
Estimate Number I
Payment Number I
For Period Ending 1/21/2025
City Secretary Contract Number
Contract Date
Contract Time 45 WD
Days Charged to Date 83 WD
Contract is .000000 Complete
CITY OF FORT WORTH
SUMMARY OF CHARGES
Line Fund Account Center Amount Gross Retainage Net
Funded
Total Cost of Work Completed $47,036.00
Less % Retained $0.00
Net Earned $47,036.00
Earned This Period $47,036.00
Retainage This Period $0.00
Less Liquidated Damages
0 Days @ $0.00 / Day
$0.00
LessPavement Deficiency
$0.00
Less Penalty
$0.00
Less Previous Payment
$0.00
Plus Material on Hand Less 15%
$0.00
Balance Due This Payment
$47,036.00
Monday, June 9, 2025 Page 4 of 4
DEVELOPER-AWARDED-PROXOT QHANGE ORDER
PROJECT NAME:
Riverbend East. Office, Park - Rltiidina 1 R 2
CHANGE
CONTRACT:
Water. Sewer and S_ torm train Imn_rn_VPmpnts
ORDER No:
ICFA#
23-0016
CITY PARTICIPATION: NO
CITY PROJECT #
104721
1
IFID #
301140-0200431-104721-E0_768_5_
(FILE #
SD-0685. X-27691
INSPECTOR:
Travis Strang Phone No:
682-328-6310
REVIEWED
PROJECT MANAGER:
Debbie J. VVIllhelm, PE Phone No:
817-392-2481
By Debbie J. Willhelm at 9:57 am, Oct 11, 2023
CONTRACT UNIT
WATER SEWER
PAVING
DRAINAGE STREET LIGHTS
CONTRACT
Developer Developer
Developer Developer
Developer -- -
DAYS
Cost City Cost Cost City Cost
Cast GUY Cat Cost City Cost Cost Oily oust
ORIGINAL CONTRACT
S67.64400 $0.00 $31,084.00 $e.00
$0.00 $9.00
$40,630.00 $0.00 $0.00 $0.00
45
EXTRAS TO DATE
CREDITS TO DATE
CONTRACT TO DATE
$57,644.00
S0 00 S31,08400 SHOO
_ 0 $0.00 4
50 A
��
11111110.
$40,630.00 $0.00 0
45
AMOUNT OF PROP. CHANGE ORDER
$3,163 00
�' $3.183 00
REVISED CONTRACT AMOUNT
$60,807.00
S0.00 $'34,247.00 $0,00
50.00 50.00
$40,630.00 $0.00 0
45
TOTAL REVISED CONTRACT AMOUNT
PER UNIT
$60,807 0_0_ $14,247.00
$_0.00
$40.630.0
$$0.00
REMISED COST SHARE
Dev. Cost: $135,684.00
TOTAL REVISED CONTRACT
$136,684.00
Revised: 10-12-2011
Page 1
You are directed to make the following changes in the contract documents
UNIT I - Water
CITY BID ITEM
PAY ITEM #
#
QUANTITY
NEW
241.1512
1
UNIT II - Sewer
NEW
241,2001
1
NEW
241.2101
1
REASONS FOR CHANGE ORDER
UNIT
RIPTION
EA SALVAgE EXISTING 1" WATER M cAND ABANDON 1" WATER SERVICE
SUBTOTAL
CY I SANITARY SEWER LINE GROUTING
EA l�4" SEWER ABANDONMENT PLUG
UBTOTAL
TOTAL
UNIT PRICE
$3,163.00
$1,581.50
$1,581.50
Salvage existing 1' water meter, abandon 1' water service, abandon existing 4'sewer service by cut and install 4' abandonment plug for services
no longer needed for the property. Changes correspond to Plan Revision 01 sheets C3.1 and C4.0 of the construction plans.
NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER,
RECOMMENDED:
GM
By:
Name.- Jason Weaver, PE
Title: Protect Enqineer
APPROVED:
LCG2i Riverbend, LLCp D
BYY�� J ✓�
Name: Sean Wood
Title: Authorized Signatory
APPROVED:
C-Con Services,
By:
Name: Earl Cotton
Title: President
TOTAL
$3 163.00
$3,163.00
$1,581.50
$1,581.50
S3,163.00
$6,326.00
Revised: 1 D-12-2011 Page 2
PROJECT NAME:
CONTRACT:
CFA #
CITY PROJECT #
FID #
FILE #
INSPECTOR:
PROJECT MANAGER
ORIGINAL CONTRACT
EXTRAS TO DATE
CREDITS TO DATE
CONTRACT TO DATE
AMOUNT OF PROP. CHANGE ORDER
REVISED CONTRACT AMOUNT
TOTAL REVISED CONTRACT AMOUNT
PER UNIT
REVISED COST SHARE
TOTAL REVISED CONTRACT
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
Riverbend East Office Park - Building 1 & 2
Water, Sewer, and Storm Drain Improvements
23-0016 CITY PARTICIPATION
104721
301140-0200431-104721-E07685
SD-0685, X-27691
Estevan Castillo Phone No:
Debbie J. Willhelm, PE Phone No:
HE
CHANGE
ORDER No:
2
682-263-4793 REVIEWED
817-392-2481 By Debbie J. Willhelm at 9:21 am, Dec 11, 2024
CONTRACT UNIT
WATER
SEWER
PAVING
DRAINAGE STREET LIGHTS
CONTRACT
Developer
Developer
Developer
Developer Developer
DAYS
Cost
City Cost
Cost City Cost
Cost City Cost
Cost City Cost Cost
City Cost
$57,644.00
$0.00
$31,084.00 $0.00
$0.00 $0.00
$40,630.00 $0.00 $0.00
$0.00
45
$3,163.00
$3,163.00
■
$60,807.00
' $0.00
$34,247.00 $0.00
$0.00 $0.00
$40,630.00 $0.00 $0.00
$0.00
45
'
$6,406.00
$60,807.00
$0.00
$34,247.00 $0.00
$0.00 $0.00
$47,036.00 _ $0.00 $0.00
$0.00
45
$60,807.00
$34,247.00
$0.00
$47,036.00
$0.00
Dev. Cost:
$142,090.00
City Cost:
�0.00
$142,090.00
Revised: 10-12-2011 Page 1
Docusign Envelope ID: 45ED6732-30AA-4A42-9D66-B96C50101A5D
You are directed to make the following changes in the contract documents
Unit III - Drainage
Bid Item #4 I 3305.0109 I 6 I LF I TRENCH SAFETY I $1.00 $6.00
NEW 9999.0002 2 EA CONNECT TO PROPOSED 6' STORM JUNCTION BOX $500.00 $1,000.00
NEW 3349.0003 1 EA 6' STORM JUNCTION BOX $5,400.00 $5,400.00
TOTAL $6,406.00
REASONS FOR CHANGE ORDER Scope change to include storm drain scope for Building 3 development. Changes correspond to Plan Revision 3 as shown on new sheets C7.4, C8.1, C8.4,
C9.3, & C9.4 of the construction plans.
NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER.
RECOMMENDED:
G c I
Na: Jason Weaver, PE
Title: Project Engineer
APPROVED:
LCG2i Rwer en, LLC
gy �DocuSil
EBF79E69A000498...
Name: Sean Wood
Title: Authorized Signatory
APPROVED:
C-Con Service Inc.
By:
Name: Earl Cotton
Title: President
Revised: 10-12-2011 Page 2
Docusign Envelope ID: 1249F6F1-55DE-4DE5-8683-7F63697DDC89
DEVELOPER -AWARDED -PROJECT CHANGE ORDER
PROJECT NAME: Riverbend East Office Park - Buildinq 1 & 2 CHANGE
CONTRACT: Water, Sewer, and Storm Drain Improvements ORDER No:
CFA# 23-0016 CITY PARTICIPATION: NO
CITY PROJECT # 104721 3
FID # 301140-0200431-104721-E07685
FILE # SD-0685, X-27691
INSPECTOR: Estevan Castillo Phone No: 682-263-4793
PROJECT MANAGER: Debbie J. Willhelm, PE Phone No: 817-392-2481
CONTRACT UNIT
WATER
SEWER
PAVING
Developer
Developer
Developer
Cost City Cost
Cost City Cost
Cost City Cost
ORIGINAL CONTRACT $57,644.00 $0.00
$31,084.00 $0.90
$0.00 50.i;0
EXTRAS TO DATE $3,163.00
$3,163.00
CREDITS TO DATE
CONTRACT TO DATE $60,807.00 $0.00
$34,247.00 $0.00
$0.90 50.ml
AMOUNT OF PROP. CHANGE ORDER $3,968.00
REVISED CONTRACT AMOUNT $64,776.00 $0.09
$34,247.00 $0.00
$0.00 $0.00
TOTAL REVISED CONTRACT AMOUNT
PER UNIT $64,775.00
$34.247.00
$0.00
REVISED COST SHARE Dev. Cost:
$146,068.00
City Cost:
TOTAL. REVISED CONTRACT
$146,058.00
REVIEWED J
lBy Andrew Goodman at 1:18 pm, Apr 08, 2025 J
DRAINAGE
STREET LIGHTS
Developer
Developer
Cost
City Cost
Cost
City Cost
S40,630.00
$0.00
$0.00
$0.00
$6.406.00
$47,036.00
$0.00
$0.00
$0.00
$47,036.00
$0.00
$0.00
S9.G0
$47,030,00
$0.00
$0.00
I
CONTRACT
DAYS
45
45
45
r•
1
Revised: 10-12-2011 Page 1
Docusign Envelope ID: 1249F6F1-55DE-4DE5-8683-7F63697DDC89
You are directed to make the following changes in the contract documents
UNIT( -WATER
NEW 1 3312.2003 1 1 l EA
TOTAL
REASONS FOR CHANGE ORDER
1" IRRIGATION SERVICE
REVIEWED J
lBy Andrew Goodman at 1:18 pm, Apr 08, 2025 J
$3,968.D0 1 $3,968.00
Re -install an irrigation service 8 meter for the median of Flagstone that was directed to be killed by the City of Fort Worth Water Department,
that was actually in use by the adjacent property owner.
NO CITY FUNDS INVOLVED IN THIS CONTRACT. DEVELOPER IS RESPONSIBLE FOR 100% OF THE CHANGE ORDER COST AND NO
REIMBURSEMENT FROM THE CITY WILL BE SOUGHT BY THE DEVELOPER.
RECOMMENDED:
APPROVED:
APPROVED:
GMc' i
l CG2i Riverbend, LLC
C-Con Services
0«.50.e ey./}
E NCWADc 90
Name: Jason Weaver, FE
Name: Sean Wood
Name: Earl Cotton
Title: Protect Engineer
Title: Authorized Signatory
Title: President
$3,968.00
Revised: 10-12-2011 Page 2
FORTWORTH.
do
TRANSPORTATION AND PUBLIC WORKS
January 31, 2025
C-CON Services. INC.
118 Hillsdale Drive
Lewisville, TX 75057
RE: Acceptance Letter
Project Name: Riverbend East Office Park- Building 1&2
Project Type: Developer
City Project No.: 104721
To Whom It May Concern:
On January 31, 2025 a final inspection was made on the subject project. There were no punch list items
identified at that time. The final inspection indicates that the work meets the City of Fort Worth
specifications and is therefore accepted by the City. The warranty period will start on May 8, 2024,
which is the date of the final inspection and will extend of two (2) years in accordance with the Contract
Documents.
If you have any questions concerning this letter of acceptance, please feel free to contact me at 682-
263-4793.
Sincerely,
Andrew Goodman, Project Manager
Cc: Estevan Castillo, Inspector
Mike Glover, Inspection Supervisor
Daniel Roy, Senior Inspector
Andrew Goodman, Program Manager
GM civil, Consultant
C-CON Services, Inc. , Contractor
LGG2i Riverbend, LLC, Developer
File
E-Mail: TPW_Acceptance@fortworthtexas.gov
Rev. 08/20/19
ALL BILLS PAID AFFIDAVIT
STATE OF TEXAS $
COUNTY OFDENTON $
The undersigned hereby certifies that payment has been made in full or all obligations have otherwise been
satisfied for all materials and equipment furnished, for all work, labor and services performed by C-Con
Services. Inc., and any subcontractors and suppliers under the Agreement ("Agreement") dated:3/17/23
between
Leone Capital Group ("owner")
pertaining to the construction of the
Riverbend East, Bld2s 1, 2 & 3 ("project")
for which the Owner or the Owner's property might in any way be held responsible or encumbered.
By:
Name: Bry�
Title: Project Manager
SUBSCRIBED and SWORN to before me on this the day of �L.l n , 2025.
(SEAL)
Notary Public in and for the State of Texas m}y= My Notary ID # 8388979
Expires July 27, 2026
Printed �NameA7hy Sewell
CONSENT OF OWNER ❑
SURETY COMPANY ARCHITECT ❑
TO FINAL PAYMENT CONTRACTOR ❑
SURETY ❑
AIA DOCUMENT G707 OTHER
Bond No. SUR0075479
PROJECT: Riverbend East Office Park - Building 1 & 2 City of Project #104721, Ft. Worth TX
(name, address)
TO (Owner) [ City of Fort Worth
200 Texas Street
Fort Worth, TX 76102
CONTRACTOR: C-Con Services, Inc.
118 Hillside Drive
Lewisville, TX 75057
ARCHITECT'S PROJECT NO:
CONTRACT FOR:
CONTRACT DATE: March 21, 2023
In accordance with the provisions of the Contract between the Owner and the Contractor as indicated above, the
(here insert name and address of Surety Company)
Argonaut Insurance Company
P.O. Box , SURETY COMPANY,
San Antonio,io, T TX 78246
on bond of (here insert name and address of Contractor)
C-Con Services, Inc.
118 Hillside Drive
Lewisville, TX 75057 , CONTRACTOR,
hereby approves of the final payment to the Contractors, and agrees that final payment to the Contractor shall not relieve
the Surety Company of any of its obligations to (here insert name and address of owner)
City of Fort Worth
200 Texas Street
Fort Worth, TX 76102 ,OWNER,
as set forth in the said Surety Company's bond.
IN WITNESS WHEREOF,
the Surety Company has hereunto set its hand this 30th day of April 2Q25
Argonaut Insurance Company
Surety Company
Signature of Authorized Representative ! -
Attcst: -
(Seal): Debra Lee Moon Attornev-In-1 -4
1,10C -
NOTE: This form is to be used as a companion document to AIA DOCUMENT G706, CONTRACTOR'S AFFIDAVIT OF PAYMENT OF DEBTS AND CLAIMS,
Current Edition
AlA DOCUMENT G707 • CONSENT OF SURETY COMPANY TO FINAL PAYMENT • APRIL 1970 EDITION • AIAO ONE PAGE
O 1970 • THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 New York Ave., NW, WASHINGTON, D.C. 20006
Argonaut Insurance Company
Deliveries Only: 225 W. Washington, 24th Floor
Chicago, IL 60606
United States Postal Service: P.O. Box 469011, San Antonio, TX 78246
POWER OF ATTORNEY
KNOW ALL MEN BY THESE PRESENTS: That the Argonaut Insurance Company, a Corporation duly organized and existing under the laws of the State
of Illinois and having its principal office in the County of Cook, Illinois does hereby nominate, constitute and appoint:
Trov Russell Kev. Dcbra Lee Moon. Andrea Rose Crawford- Sandra Lee Roncv. Colin E. Conly. Allvson W. Dean Emily Allison Mikeska. Thomas
Douelas Moore, Monica Rubv Veazev. John R. Ward
Their true and lawful agcnt(s) and attomey(s)-in-fact, each in their separate capacity if more than one is named above, io.make, execute, seal and deliver for
and on its behalfas surety, and as its act and deed any and all bonds, contracts, agreements of indemnity and othertindertakings in suretyship provided,
however, that the penal sum of any one such instrument executed hereunder shall not exceed the sum of. .
1197,116,000.00
This Power of Atoomey is granted and is signed and sealed under and by the authority of the following Resolution adopted by the Board of Directors of
Argonaut Insurance Company:
"RESOLVED, That the President, Senior Vice President, Vice President, Assistant Vice President, Secretary, Treasurer and each of them hereby is
authorized to execute powers of attomey, and such authority can be executed by use of facsimile signature, which may be attested or acknowledged by any
officer or attorney, of the Company, qualifying the attorney or attorneys named in the given power ofattorney, to execute in behalf of, and acknowledge as
the act and deed of the Argonaut Insurance Company, all bond undertakings and contracts of suretyship, and to affix the corporate seal thereto."
IN WITNESS WHEREOF, Argonaut Insurance Company has caused its official`seal to be hereunto affixed and these presents to be signed by its duly
authorized officer on the 19th day of November, 2021. Argonaut Insurance Company
.............. g
/J = 'SEAL --
by:
STATE OF TEXAS �t1NO•�s' Gary E. Grose
•'' ,President
COUNTY OF HARRIS SS:
1-
On this 19th day of November, 2021��A.D;, before me, a Notary Public of the State of Texas, in and for the County of Harris, duly commissioned and
.,-../
qualified, came THE ABOVE OFFICER OF THE COMPANY, to me personally known to be the individual and officer described in, and who executed the
preceding instrument, and he acknowledged the execution of same, and being by me duly sworn, deposed and said that he is the officer of the said Company
aforesaid, and that the seal'afiized to`'L preceding instrument is the Corporate Seal of said Company, and the said Corporate Seal and his signature as
officer were duly affixeJ and subscribed to the said instrument by the authority and direction of the said corporation, and that Resolution adopted by the
Board of Directot's of said'Company, referred to in the preceding instrument is now in force,
IN TESTIIv`IOTY WHEREOF, I have hereunto set my hand, and affixed my Official Seal at the County of Harris, the day and year first above written.
�� KATI-ELEEN M MEEKS
�'� NOTARY PUBLIC
STATE OF TEXAS
�. o. RJ MY COMM. EXP. 07/t 5125
NOTARY ID 557g02-8 (Notary Public)
1, the undersigned Officer of the Argonaut Insurance Company, Illinois Corporation, do hereby certify that the original POWER OF ATTORNEY aftwhjeh, - -- _
the foregoing is a full, true and correct copy is still in full force and effect and has not been revoked. '
IN WITNESS WHEREOF, I have hereunto set my hand, and affixed the Seal ofsaid Company, on the 30th day of April
i
URA
NO
1948
MOyk' Austin W. King Secretary
IF YOU HAVE QUESTIONS ON AUTHENTICITY OF THIS DOCUMENT CALL (833) 820 - 9137.
IMPORTANT NOTICE
To obtain information or make a complaint:
You may call Argonaut Insurance Company and its affiliates by
telephone for information or to make a complaint:
ARGONAUT INSURANCE COMPANY
Please send all notices of claim on this bond to:
Argo Surety Claims
(413) 773-6359
Deliveries Only: 225 W. Washington, 24th Floor, Chicago, IL 60606
United States Postal Service: P.O. Box 469011, San Antonio, TX 78246
You may contact the Texas Department of Insurance to obtain
information on companies, coverages, rights or complaints at:
(512) 490-1007
You may write the Texas Department of Insurance:
P. O. Box 149104
Austin, TX 78714-9104
Fax: (512) 475-1771
Web: httu://www.tdi.state.tx.us
E-mail: ConsumerProtectionCatdi.state.tx.us
PREMIUM OR CLAIM DISPUTES:
Should you have a dispute concerning your premium or about a claim
you should contact your agent or Argo Surety first. If the dispute is
not resolved, you may contact the Texas Department of Insurance.
ATTACH THIS NOTICE TO YOUR BOND:
This notice is for information only and does not become a part or
condition of the attached document and is given to comply with Texas
legal and regulatory requirements.