HomeMy WebLinkAboutContract 63066-CO1FORT WORTH® City of Fort Worth CSC No. 63066 C01 Change Order Request Project Name Road & Parking -Highland Hills Park Client Project #(s)1 104477 Project I City Sec # 1 63066 Description Demolishing current asphalt drive and parking lots and replacing with new asphalt Contractor H D Cook's Rock Solid Inc. Change Order#1 1 I Datel 6/10/2025 City Project Mgr.1 Blaise Grissom City Inspectorl Charles Hayes Dept. PARD Contract Time Totals (CD) Original Contract Amount $362,378.00 $362,378.00 180 Extras to Date Credits to Date Pending Change Orders (in M&C Process) Contract Cost to Date $362,378.00 $362,378.00 180 Amount of Proposed Change Order $9,500.00 $9,500.00 0 Revised Contract Amount $371,878.00 $371,878.00 180 Original Funds Available for Change Orders $0.00 Remaining Funds Available for this CO $0.00 Additional Funding (if necessary) $9,500.00 1 1 $9,500.00 CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 2.62% MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) $452,972.50 JUSTIFICATION (REASONS) FOR CHANGE ORDER During construction it was determined by City and project engineers that cem-lime should be used in lieu of cement to stabilize the sub -base layer of the new road and parking lot, due to soil test results showing a plasticity index above 15. This substitution, based on the soil conditions at the site, is allowable by City Standard Construction Specification, Section 32 1133. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. Contractor's Company Name Contractor Name Contract Si nature 111111W Date � ��� 06/11/2025 H D Cook's Rock Solid Inc. Charles Cook �na,e(E CooG;, u��1:.�:: i ns ector/Inspection Supervisor Date Project and Contract Compliance Manager Date Troy Gardner 06/11/2025 06/11/2025 Program Manager Date Senior Capital Project Officer Date 06/11/2025 S-& 0 06/11/2025 Assistant Director (Dept) Date Director, Qontracting Department Dept Date Joel McElhany 06/11/2025 6W 06/12/2025 Assistant City Attorney Date JAssistant City Manager Date 06/12/2025 1 ,a,,,1A ,,,,,, , ",,,. � 1 06/12/2025 M&C Number o Jannette Goodall, City Secretary Q�Fogrn,Qc a g�90p Ogg d0 aa�°ado 6ggga I M&C Date Approved OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX FORT WORTH v, Project Name I Road & Parking -Highland Hills Park Client Project # 1 104477 Contractorl H D Cook's Rock Solid Inc. I I tM HH-16 cem-Lime City of Fort Worth Change Order Additions City Sec # 63066 1 l PMJ Blaise Grissom I Inspectorl Charles Hayes l Change Order Submittal # 0 Date 1 6/10/2025 1 ADDITIONS UtSUKIF'I IUN ULVI Uty Unit Unit Lost total HAKU � .t)t)t)UUM IONS $4bb.UU' $34,3b1J.1J1J PQRD $34,350.00 Sub Total Additions $34,350.00 Change Order Additions Page 2 of 4 FORTWORTH Project Name I Road & Parking -Highland Hills Park Client Project # 1 104477 Contractorl H D Cook's Rock Solid Inc. I I tM UtJUK1Y 1 IUN KK-/ Dement City of Fort Worth Change Order Deletions City Sec # 1 63066 1 PMI Blaise Grissom Inspectorl Charles Hayes Change Order Submittal # 0 Date 1 6/10/2025 1 DELETIONS ULF I Uty unit unit cost I otal 1 NAKU 11.000UUUUU IUNJ �;Zu.UU �Z4,6!)V.UU1 PA RD $24,850.001 1 1 1 Sub Total Deletions $24,850.001 Change Order Deletions Page 3 of 4 M/SBE for this Change Order M/SBE Sub Type of Service Amount for this CO N/A Total $0.00 Previous Change Orders CO # DATE I AMOUNT Signature: TFoyGwvM- Email: troy.gardner@fortworthtexas.gov Signature: fj l Douglas Black (Jun 12, 202512:25 CDT) Email: Douglas.Black@fortworthtexas.gov Total Signature: �0. Email: joel.mcelhany@fortworthtexas.gov