Loading...
HomeMy WebLinkAboutContract 61921-A1CSC No. 61921-A1 AMENDMENT No . 1 TO CITY SECRETARY CONTRACT No. 61921 WHEREAS, the City of Fort Worth (CITY) and Compliance Partners, Inc., (CONSULTANT) made and entered into City Secretary Contract No. 61921, (the CONTRACT) which was administratively authorized on the 26th day of August, 2024 in the amount of $46,000; and WHEREAS, the CONTRACT involves consulting and professional services for the following project: Air Permit Consulting and Management Services for the Village Creek Water Reclamation Facility (VCWRF) ; and WHEREAS, it has become necessary to execute Amendment No. 1 to the CONTRACT to include an increased scope of work and revised fee. NOW THEREFORE, CITY and CONSULTANT, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional consulting services specified in proposal attached hereto and incorporated herein. The cost to City for the additional services to be performed by CONSULTANT totals $2,000.00. (See Attachment "A") 2. Article II of the CONTRACT is amended to provide for an increase an the fee to be paid to CONSULTANT for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $48,000.00. See Attachment A and Attachment B. 3. OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. City of Fort Worth, Texas VCWRF Air Permit Management Prof Services Agreement Amendment Template Revision Date: 12/08/2023 Page 1 of 3 EXECUTED and EFFECTIVE as of the date subscribed by the City's designated Assistant City Manager. APPROVED: City of Fort Worth 00*� Jesica McEachern Assistant City Manager DATE: 06/18/2025 a F Four°�°a ATTEST: o�° v `" aan� rezp5 a� �44464� Jannette Goodall City Secretary APPROVAL RECOMMENDED: Christopher Ha der (Jun 6, 202514:45 CDT) Chris Harder, P.E. Director, Water Department Contract Compliance Manager: CONSULTANT Compliance Partners, Inc. J. C. Wyatt,�:� President DATE: �- / �- / )- S- By signing, I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. .73tUIOW, ,L_. Aidtd,& Steve Nutter Water Systems Superintendent APPROVED AS TO FORM AND LEGALITY: Douglas Black (Jun 9, 2025 15:40 CDT) Douglas W. Black Sr. Assistant City Attorney City of Fort Worth, Texas Prof Services Agreement Amendment Template Revision Date: 12/08/2023 Page 2 of 3 M&C No.#: N/A M&C Date: OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX VCWRF Air Permit Management City of Fort Worth, Texas VCWRF Air Permit Management Prof Services Agreement Amendment. Template Revieion Date: 12/08/2023 Page 3 of 3 ATTACHMENT A SCOPE OF SERVICE Compliance Partners, Inc. 402 E Avenue G • Midlothian, Texas 76065 • 972-723-9509. 800-779-3063 • Fax 972-723-0964 SCOPE OF SEIRVHCCES April 1, 2025 Mr. Steven Nutter City of Fort Worth 4500 Wilma Lane Arlington, Texas 76012 Re: 2025 Professional Services Scope of Work and Cost Estimate Dear Steven: This document is submitted to provide a scope of work and project cost estimate to the proposed professional services contract for 2025. The following services requested by the City shall be provided on a time and materials basis at our standard rates, not to exceed $48,000.00. Task 1: Prepare Emissions Inventory for Fiscal Year 2025 (Due March 31, 2026 for calendar year 2025). Task 1 will include the following: a) Gather the required operating hours for combustion sources. b) Review emission factors for combustion sources. c) Collection of all data necessary to complete the EIQ submittal forms. d) Obtain 2025 plant throughput and influent water analysis for Water 9 modeling. e) Revise form structure, complete and update Emission Inventory forms. f) Submittal of FY 2025 Emission Inventory Questionnaire to the appropriate TCEQ office. g) Preparation and submittal of fee basis summary form to TCEQ in timely fashion. h) Revise EIQ structure to reflect addition of the heat recovery boiler. Cost for Task 1: $8,000.00 Task 2: Title V Deviation Report / Annual Compliance Certification Task 2 will include preparation of the 2025 annual Compliance Certification and semi-annual Deviation Reports as required by the conditions of the plant FOP (Federal Operating Permit). Work involved is expected to include the following: a) Complete review of plant operations to verify compliance with plant FOP for each reporting period. b) Complete Deviation reports in required format for submission to City of Ft. Worth in a timely manner. c) Complete Annual Compliance Certification in required format and in a timely manner for submission to City of Ft. Worth. Cost for Task 2: Task 3: Two Semi -Annual Stack Sampling Events {Two Turbines} $1,500.00 Task 3 will involve the activities necessary to complete two semi-annual stack sampling events for turbines GT-1 and GT-2 in accordance with Special Condition #11 of NSR Permit #7553, as amended. Ref: 251269 Cost for Task 3: $19,400.00 Task 4: Annual Boiler Monitoring Complete annual boiler monitoring as required by permit. Cost for Task4: $7,100.00 Task 5: Biosolids Management Facility Provide regulatory support for transferring the ownership and operation of the Biosolids Management facility to the City of Fort Worth. Prepare transfer of ownership form for submittal and prepare a federal applicability determination for the need to merge the NSR permits and / or include the biosolids permit in the Village Creek Title V FOP. Prepare :NSR documentation to merge NSR permits and include the merged permits in the Title V FOP or add the biosolids NSR permit to the Title V FOP. Cost for Task 5 Task 6 General Compliance $7,000.00 Task 6 will include general compliance support and assistance, such as assisting plant staff in understanding regulations and reporting requirements for chemical spill/emission events. Cost for Task 6 Excluded Items: $5,000.00 The following items have been identified as work or assistance that is not included in the scope of work described above: • Day-to-day monitoring, reporting and record keeping. • Sampling and laboratory analysis costs, except for those specifically included. • All SARA and TSCA regulatory requirements • All local, state, and federal fees. Should the City of Ft. Worth request assistance with any other items not included in the Task 1 through 6 of this Scope of Work, Compliance Partners, Inc. will provide an estimate of the work and request authorization from the Village Creek plant management prior to performing such services. We appreciate your continued confidence and look forward to working with you on this project. Sincerely yours, J. C. Wyatt President Ref: 251269 ATTACHMENT B RATE SCHEDULE: ATTACHMENT B SCHEDULE OF RATES EFFECTIVE 1-1-24 SERVICES HOURLY RATES Principal $ 160.00 (Sr. Engineer / Project Manager/Cert. Ind. Hygienist) Engineer / Professional Technical Services $ 100.00 Technical Services / Industrial Hygienist $ 95.00 Technical Services / General $ 70.00 Field Supervisor $ 70.00 HAZMAT Technician II $ 60.00 (40 hr. HAZWOPER Trained) HAZMAT Technician I $ 50.00 (24 hr. HAZWOPER Trained) CAD Technician $ 65.00 Clerical/Word Processing $ 55.00 Materials and expenses shall be billed at cost plus 20% Ref: 251269 3