HomeMy WebLinkAboutIR 8301 INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 8301
0,�
1 C"4 }"..4 To the Mayor and Members of the City Council February 6, 2001
y Page 1 of 3
FYA
tall SUBJECT: IH35WIIH30 INTERCHANGE URBAN DESIGN REPORT
BACKGROUND
On January 16, 2001 staff presented an overview (IR8297) of the IH35W/IH30 Landscape Project being
constructed by the Texas Department of Transportation (TxDOT). The report included the project's
history, scope and construction budget; and outlined TxDOT's responsibilities for construction and the
City's proposed maintenance responsibilities. In order to ensure that appropriate and ongoing maintenance
occurs, it was recommended that an Interlocal Agreement be entered into with TxDOT authorizing the City
to maintain the landscape improvements. During the overview presentation, staff was asked to review the
projected cost for maintenance and potential involvement of TxDOT to maintain the improvements. This
report is in response to that request.
PROJECT SCOPE
All construction improvements within the right-of-ways will be funded by TxDOT as proposed in the
"Urban Design for the 11435W/IH30 Interchange Reconstruction" report commissioned by the City and
TxDOT in 1995. TxDOT has agreed to fund approximately $1,500,000 for landscape beautification of the
right-of-ways, which includes plant material and irrigation and a one-year irrigation and plant life
maintenance and warranty.
There will be approximately 3,342 trees, 88,032 square feet of bed/planting space for 7,336 shrubs, 45
acres of turf and more than 16 miles of irrigation pipe serving over 4,000 irrigation heads.
PROJECT HISTORY
The initial design of the IH35W/IH30 project did not include landscaping. In 1993 the City and TxDOT
agreed to mutually fund a design competition for the freeway interchange and Lancaster Blvd. The product
of this collaboration was the 1995 "Urban Design for the IH35W/IH30 Interchange Reconstruction" report.
The report was presented to the City Council on June 11, 1996 (IR 8008) and accepted by the City Council
on June 25, 1996 (Resolution 42184)
Although no contractual commitment was made for the City to maintain the landscape improvements, it was
understood that because TxDOT agreed to install the improvements, in exchange the City would maintain
them.
MAINTENANCE COSTS
The original level of maintenance proposed includes mowing on 7-day cycles and daily litter collection (via
contract) and daily irrigation system maintenance (via in-house staff). Based on these service levels the
FY2001-02 cost was projected at $281,000 and annual cost of $307,000. If the proposed service levels
were changed, estimated annualized costs could be adjusted as follows:
ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS
'
INFORMAL REPORT TO CITY COUNCIL MEMBERS NO. 8301
February 6, 2001
To the Mayor and Members of the City Council
Page 2 of 3
SUBJECT: IH35WIIH30 INTERCHANGE URBAN DESIGN REPORT
Contract irrigation system maintenance $ 70,000
(Note: This would include checking the 22 irrigation zones for leaks, breaks, missing heads, etc. Watering
levels would be verified to ensure plant materials receive proper amount of water. Adjustment would be
made to include time and duration of watering. Maintenance of the irrigation system would be required the
first three years only. Once plants are established, service would be eliminated.)
Water cost $ 28,800
Contract rnowing- of cycles*
14 day cycles 21 33,075
21 day cycles 16 32,400
Contract litter removal
Daily cycle 364 $ 212,940
7 day cycles 52 51,480
14 day cycles 26 46,800
21 day cycles 18 40,500
*Contract mowing cycles are calculated at listed frequency, March through September and then monthly
from October through February.
$171,700 to $3)52,240, Funds for replacement of lost plants,pesticides, etc. are not included.
Should the City Council elect to maintain these improvements, policy direction is needed on the service
levels desired. Since all services are proposed via contract, costs are subject to bidding.
TxDOT MAINTENANCE
I. Dallas Central Expressway
The City of Dallas contributed $5,000,000 to the Dallas Central Expressway Project for landscaping
and other amenities eg. bollards, lighting, etc. Although TxDOT is currently maintaining the
improvements, negotiations are underway that will result in the City of Dallas assuming
2. TxDOT Landscape Maintenance Guidelines
The guidelines included in the appendices of the Urban Design for the IH35W/IH')O report are4"1111
according to TxDOT, unfunded maintenance service levels. Generally TxDOT employs th,.
ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS
Using the highest and lowest service level costs, the total annual costs for maintenance would range from
INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 8301
February 2001
To the Mayor and Members of the City Council �'
vL
Page 3 of 3
n
EYF.
'°" SUBJECT. IH35W/1H30 INTERCHANGE URBAN DESIGN REPORT
guidelines as maintenance level expectations for local governmental entities to maintain landscape
improvements installed by TxDOT.
3. If TxDOT were expected to maintain the IH35W/TH30 improvements, the service level would
include only mowing of turf areas and litter collection on a 2-3 times per year basis.
LANDSCAPE DESIGN
Landscape planning for reduced maintenance of the landscape design includes hardwood trees, hardy
shrubs (pampas grass) and turf. Although more drought tolerant planting schemes are available, the current
plan is fairly low maintenance. Irrigation of the trees and shrubs is designed for establishment only (drip
irrigation) and scheduled for termination after 2-3 years. No irrigation of the 45 acres of turf is included.
The majority of the ongoing maintenance cost, after tree and shrub establishment, is for mowing and litter
collection.
RECOMMENDATION
In summary, TxDOT expected that since they amended the original IH35W/IH30 project scope to include
$1.5 million in landscaping, the City would maintain the improvements. This arrangement is consistent
with TxDOT policy across the state. Should the City choose not to maintain the improvements, TxDOT's
funded service level would be mowing and litter collection 2-3 times per year.
Should the City elect to maintain the improvements, service levels should be established by the City
Council. Once these levels are approved, staff will move forward on developing bid proposals to contract
the mowing, litter collection and irrigation system maintenance.
Unless the City Council directs otherwise, staff will bring forward a Mayor and Council Communication to
enter into an Interlocal Agreement with TxDOT for the maintenance of the landscape and irrigation
improvements on the IH35W/IH30 Reconstruction Project.
i
ob Terrell
City Manager
ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS