HomeMy WebLinkAboutIR 8347 INFORMAL REPORT TO CITY COUNCIL MEMBERS No. -8347 To the Mayor and Members of the City Council August 14, 2001 Subject: COMPUTER AIDED DISPATCH PROJECT COSTS The purpose of this informal report is to inform the City Council of additional costs for the Computer Aided Dispatch (CAD) System project and to recommend a solution to finance these additional costs. Background The CAD Project was originally financed in March and June of 1999 through several M&Cs (C-17364 and G-12561). The budget set by these M&Cs covered the contract with Motorola, CAD workstations, the first-year lease of mobile data computers (MDC), and renovation of several City facilities to accommodate the new system, including the Primary (Bolt Street) and Alternate (Tunnel) Public .Safety Answering Points (PSAP). These items, indicated below, are currently projected to remain within budgeted limits. Motorola contract $12,858,717 CAD workstation leases for first year 150,000 MDC leases for first year 1,778,828 Facility renovation (Alternate and Primary PSAP) 320,000 Municipal Annex renovation 380,000 TOTAL. $15,487,545 Unbudgeted Items Since the original budget was set a number of needs have been identified that are critical to the implementation of the CAD Project. There are two general reasons why these needs were not included in the original CAD project budget, as follows. Reduction of the CAD project budget: before the budget was set, the estimated cost of the CAD project was $20-22 million. The City Council directed that the cost be brought down, The IT Solutions director complied with that Council direction and revised the project budget downward. Some of those budget revisions have proven to be sustainable cost reductions; others have not. As the details of the CAD project implementation have become clearer through experience, it is apparent that the consequences of some reductions were not 9; ISSUED BY THE CITY MANAGER FORT WORTH,TEXAS INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 8344 To the Mayor and Members of the City Council August 14, 2001 Page 2 of 8 Subject: COMPUTER AIDED DISPATCH PROJECT COSTS understood. It has become necessary to fund these needs in the CAD project in order to complete it. Evolution since CAD project inception: this project was first initiated in 1994; implementation has been underway since 1999. Technology and regulatory requirements have changed during this time, and taking advantage of new technology or complying with regulatory requirements has produced some of the needs outlined in this report. The additional cost for these unbudgeted items is estimated to be $2,778,558, summarized as follows. Alternate PSAP Implementation Radio consoles $1,430,000 Console equipment is required for a single dispatcher to monitor er multiple radio channels, which is common for Fire dispatching operations and is used in emergency situations by Police dispatchers. This was one of the items removed from the original CAD project budget. As the project has evolved, it has become evident that the Alternate PSAP should mirror the capabilities of the Primary PSAP to accommodate the several months that dispatchers will be using the Alternate PSAP while the Primary 'is being renovated. In the future, a mirrored Alternate site will ensure that the City can effectively dispatch public safety units if Bolt Street becomes non-operational or supplement dispatching capacity in the event of a disaster. Emergency power generator 200,000 With the design of the Alternate PSAP complete, it has been determined that the existing backup power generator is insufficient to power all of the equipment in the Alternate PSAP and the Emergency Operations Center. An additional generator is required to make the Alternate PSAP operational in the event of normal power loss. Call check recorders 108,000 Call check devices provide dispatchers with instant recall of any portion of an ongoing telephone or radio communication. These devices were not "present in the old Backup PSAP, but they are ISSUED BY THE CITY MANAGER FORT WORTH,TEXAS INFORMAL-REPORT TO CITY COUNCIL MEMBERS No. iq�4-7 To the Mayor and Members of the City Council August 14, 2001 Page 3 of 8 Subject: COMPUTER AIDED DISPATCH PROJECT COSTS necessary for the new Alternate PSAP to mirror the capabilities of the Primary site. Uninterruptible power supplies 72,000 When power fails, there is a brief period during which there is no power while the backup generators are started. The uninterruptible power supply provides power to electrical equipment during this critical period and allows operations to continue. This equipment should have been included in the original CAD project budget. It was likely left out to reduce the project's budget. External antenna array 50,000 Since the CAD project budget was initiated in 1999, FCC rules (FCC OET-65) have changed that prohibit installation of radio antennas above the ceiling, which is the current arrangement in the Alternate PSAP. It is necessary to relocate the radio antennas to the roof of the Public Safety and Courts building. Fixed Mobile Radios 49,500 Fixed mobile radios are used as backup equipment in case the radio consoles fail. The number of positions in the new Alternate PSAP is greater than in the old Backup site, so an additional 11 radios are needed. Additional equipment enclosures 40,000 With the additional equipment being installed to give the Alternate PSAP the same capabilities as the Primary PSAP, modifications to the furniture are needed to install the additional equipment. Headset jacks 13,000 The design of the Alternate PSAP assumes that call takers and dispatchers will use headsets for both radio and telephone communication. The small physical size of the Alternate site further underscores the need for headset operation since it will be noisy. It was assumed in budgetary planning that the headset jacks would be included in the cost of the console furniture. This was not the case, and so separate funding is sought for this item. ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS INFORMAL REPORT TO CITY COUNCIL MEMBERS No. R347 To the Mayor and Members of the City Council August 14, 2001 Page 4 of 8 Subject: COMPUTER AIDED DISPATCH PROJECT COSTS Cellular coverage 10,000 Cellular telephones will not work in the tunnel without a system to boost the cellular signal. This has been installed in the Emergency Operations Center and needs to be extended to the Alternate PSAP. This need was known when the original CAD project budget was established but was not included. Various communication equipment 20,445 This includes TV monitors, wall clocks, wireless headset jacks, relocation of a call logger unit from the Primary PSAP to the Alternate PSAP, accommodation of a visually impaired call taker, and connections in the Alternate PSAP to receive security alarm notifications from systems in City facilities, Most of these items are improvements to enhance the Alternate PSAP that were. not known when the original budget was established. Sub-total $1,992,945 Primary PSAP Renovation Structured cabling $68,350 The new CAD system runs on the City network, which requires the Primary PSAP building on Bolt Street to be wired for connection to the City network. This was a known requirement when the original CAD budget was established. The omission of this item from the original budget is part of a larger trend of omitting all IT Solutions charges. Floor cable trays 20,000 The sheer volume of cabling in the Primary PSAP requires a system to organize it so it can be effectively maintained in case of a problem. This is also a known, IT-related item that was omitted from the original budget. Sub-total $88,350 CAD System Implementation Gartner Group consulting contract $175,000 The Warner Group, since acquired by Gartner Group, has been a consultant to the City on the CAD project since 1995. The firm provided very valuable assistance in conducting the original needs assessment and assisting staff with creating the request for proposals, ISSUED BY THE CITY MANAGER FORT WORTH,TEXAS INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 8347 �.pTEq� To the Mayor and Members of the City Council August 14, 2001 � Page 5 of 8 Subject: COMPUTER AIDED DISPATCH PROJECT COSTS subsequent review of vendor proposals and supporting the contract negotiations with Motorola. Retaining the Gartner Group to assist with the CAD implementation will provide staff with more valuable advice as the project continues to progress. This item was not part of the original CAD budget. Motorola contract change order- Fire MDC units 17,280 After the original budget was established, the Fire Department determined that a different mobile data computer than was originally specified in the contract would better satisfy their requirements. The Fire Department reduced its complement of mobile data computers to cover the increased purchase price of the units, but the cost of installing the units has also increased. These funds cover the additional installation casts. Motorola contract change order- consoles 15,000 After the original budget was established, it was determined that the console furniture would need to be changed because the specified furniture was not of sufficient size to accommodate the equipment to be installed. These funds should cover the additional costs to change to another type of console furniture that can handle the size requirements. Motorola contract change order- Medstar interface unknown When the CAD project budget was established, it was anticipated that Medstar would use the City's CAD system as it had in the past. Since Medstar has recently implemented a separate system, it must interface with the City's new CAD system. Staff is currently working with Motorola to set requirements for this task and determine a price. It is anticipated that additional funding will be needed to build the interface. Sub-total $207,280 IT Solutions Charges IT Solutions has been involved in the CAD project from the beginning. Since October 1998, the department has charged for its services. The CAD project has utilized IT services to support the mobile data computer system installation, an interface from the new CAD system ISSUED BY THE CITY MANAGER FORT WORTH,TEXAS INFORMAL REPORT TO CITY-COUNCIL MEMBERS No. 8347 To the Mayor and Members of the City Council August 14, 2001 Subject: Page 6 of 8 COMPUTER AIDED DISPATCH PROJECT COSTS to the City's geographic information system, and the replacement of the current CAD system. The charges below include both the current fiscal year to date and a projection for the remainder of the CAD project. The projection does not include any charges for Phase III of the project, which is the automated field reporting system for the Police Department. IT Solutions charges were known when the original budget was established. That they were not included in the original budget was a decision on the part of the IT Solutions Director at that time. Either they were not included to reduce the overall budget for the project, or they were omitted by mistake. Given the operational model of the IT Solutions Department as an internal service fund, these charges should have been included in the original CAD budget. Technical and consultant charges-Police $299,011 Technical and consultant charges-Fire 190,972 Sub-total $489,983 Reprogramming existing funds already associated with the CAD project can largely fund the $2,778,558 total cost of these needs. Funding the Additional Costs Several sources of funding are available to fund the additional costs of the CAD project. They are detailed as follows. CAD Project Interest Revenue: the cash balance of the CAD project has been earning interest since the project budget was established in 1999. The total amount accumulated through the end of June 2001 is $1,152,896. It is projected that this interest revenue accumulation will increase to approximately $1,230,396 by the time all payment milestones are made for this portion of the project. This revenue is available to fund a significant portion of the unfunded needs. Tiburon CAD Software Budget: the current year Crime Control and pftj, Prevention District (CCPD) budget has $800,000 appropriated during V'r FY2001 and $800,000 planned for FY2002 for the purpose of paying ISSUED BY THE CITY MANAGER FORT WORTH, TEXAS ............... INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 8347 T AR Cffi !!1*10 To z To the Mayor and Members of the City Council August 14, 2001 rats Subject: Page 7 of 8 COMPUTER AIDED DISPATCH PROJECT COSTS maintenance for the CAD system software. Following continued dialogue with the vendor regarding project timelines and available warranties, these funds will not be necessary for this purpose until 2003. Of this $1.6 million, $218,154 is expected to be reprogrammed to fund an early recruit officer training class, leaving up to $1,381,846 for allocation to this project. These funds combined with the available interest from the project will fund all but $88,816 of the identified need. CCPD Board and Council approval is necessary to reprogram the Tiburon software maintenance funds. Recommendation It is recommended that the interest revenue and reprogrammed Tiburon maintenance funds be used to fund $2,612,242 of the $2,778,558 in unfunded needs for the CAD project. The remaining $166,316 will be absorbed in the Fire Department's General Fund budget during FY 2002. The CCPD budget adjustment process will be followed to obtain Board and Council approval to reprogram the CCPD Tiburon software funds. Outlook for Completion of CAD Project Currently, the CAD project specifies customizing an existing version of the Tiburon CAD software (version 6.33) to meet the requirements of the Police and Fire Departments. Assuming this scenario continues and the unfunded needs specified in this report are funded, completion of Phase II of the CAD project is expected to occur between January and March 2002. However, the latest version of the Tiburon CAD software (version 7.0) has been reviewed and discussions are underway about installing it instead of Version 6.33 with customizations. Adopting version 7.0 will allow for the use of industry standard data management software and significantly reduce the future support cost of ownership of the CAD system. The implementation of Version 7.0 is not expected to have an impact on the first quarter 2002 completion date. Staff is currently reviewing this scenario and will recommend a course of action by the end of August 2001. ISSUED BY THE CITY MANAGER FORT WORTH,TEXAS INFORMAL REPORT TO CITY COUNCIL MEMBERS No. 8347 To the Mayor and Members of the City Council August 14, 2001 Page 8 of 8 x Subject: COMPUTER AIDED DISPATCH PROJECT COSTS Further information will be provided upon request. Gary W. Jackson City Manager J ISSUED BY THE CITY MANAGER FORT WORTH,TEXAS