HomeMy WebLinkAboutOrdinance 21000-10-2013 ORDINANCE NO. 21000-10-201.3
AN ORDINANCE ESTABLISHING MAXIMUM PERMITTED RATES
AND CHARGES THAT ATMOS ENERGY CORPORATION, D/B/A
ATMOS ENERGY CORPORATION, MID-TEX DIVISION, MAY ASSESS
CUSTOMERS IN THE CITY OF FORT WORTH EFFECTIVE
NOVEMBER 1, 2013;. ADOPTING DECLARATIONS AND FINDINGS
RELATED TO RATES AND CHARGES ASSESSED TO CUSTOMERS IN
THE CITY OF FORT WORTH; DIRECTING ATMOS ENERGY
CORPORATION, D/B/A ATMOS ENERGY CORPORATION, MID-TEX
DIVISION, TO REIMBURSE RATE CASE EXPENSES; REPEALING
ANY PREVIOUSLY ADOPTED ORDINANCES IN CONFLICT
HEREWITH; PROVIDING FOR SEVERABILITY; PROVIDING A MOST
FAVORED NATION'S CLAUSE; ESTABLISHING AN EFFECTIVE
DATE; AND DIRECTING DELIVERY OF CERTIFIED COPIES
WHEREAS, the City of Fort Worth, Texas ("City") is a gas utility customer of Atmos
Energy Corporation, dIb/a Atmos Energy Corporation, Mid-Tex Division ("Atmos"), and a
regulatory authority with an interest in the rates and charges of Atmos; and
WHEREAS, on May 16, 2006 the City Council adopted Resolution No. 3348-0�5-2006
authorizing participation by the City of Fort Worth (the "City") in the Atmos Cities Steering
Committee (the "Steering Committee") for assistance in rate cases involving Atmos, including
the retention of consultants and outside legal counsel associated with such assistance; and
WHEREAS, on June 4, 2013, the City Council adopted Ordinance No. 20782-06-2013
approving an agreed rate review mechanism ("RRM") tariff filed by Atmos to provide a
mechanism for governing annual rate adjustment requests filed by Atmos through at least 2017
as an alternative to the Gas Reliability Infrastructure Program ("GRIP"); and
WHEREAS, the RRM tariff contemplates reimbursement of the Steering Committee
cities' reasonable expenses associated with RRM applications; and
WHEREAS, in accordance with the process outlined in the RRM tariff, on or about July
15, 2013, Atmos filed with the City an application to increase natural gas rates by an aggregate
amount of approximately $22.7 million system-wide(the 112013 RRM Filing"); and
Ordinance No.21000-10-2013 Page 1 of S
Atmos RRM Ordinance(2013)
WHEREAS, the Steering Committee, acting by and through its executive committee,
working in conjunction with its lawyers and consultants reviewed the 2013 RRM Filing and
concluded that the evidence provided by Atmos in support of its 2013 RRM Filing does not
justify the rate increase as proposed; and
WHEREAS, following review and analysis of Atmos's 2013 RRM Filing and supporting
evidence by the Steering Committee, its lawyers, and consultants and extensive negotiations with
Atmos, the Steering Committee's executive committee and Atmos reached a tentative agreement
to increase Atmos's revenue requirements by approximately $16.6 million system-wide; and
WHEREAS, the executive committee of the Steering Committee recommends that the
City Council approve the proposed settlement and revenue increase by adopting Atmos's rate
tariffs, which are attached hereto as Attachment "A" and hereby made a part of this Ordinance
for all purposes; and
WHEREAS, the negotiated resolution of the 2013 RRM Filing and the resulting rates
reflected in Attachment"A" are just, reasonable, and, as a whole, in the public interest.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE
CITY OF FORT WORTH, TEXAS:
Section 1.
FINDINGS.
That the City Council, pursuant to its exclusive original jurisdictional authority over the
rates, operations, and services of Atmos within the City and in the exercise of its sound
legislative discretion, makes the following findings of fact:
Ordinance No.2 1 000-1 0-20 1 3 Page 2 of 5
Atmos RRM Ordinance(2013)
1.1. The statements set forth in the Recitals above are true and correct and are hereby
incorporated as part of the findings herein.
1.2. Independent analysis by the Steering Committee's rate expert concluded that
Atmos's 2013 RRM Filing is unable to justify the increase as proposed.
1.3. Based on all information previously provided to and before the City Council, the
City Council hereby finds that the existing rates and the rates proposed by Atmos
in Its 2013 RRM Filing are unreasonable.
1.4. The tariffs attached hereto as Attachment "A," which will increase Atmos's
revenue requirement by $16.6 million system-wide, are just, reasonable, and in
the public interest and reflect a thorough review of Atmos's 2013 RRM filing and
supporting evidence and extensive negotiations with Atmos.
Section 2.
RATES AND CHARGES ORDERED.
That based on the findings of fact set forth in Section I of this Ordinance and all other
information before the City Council, Atmos is hereby authorized and ordered to implement the
tariffs attached hereto as Attachment "A."
Section 3.
REIMBURSEMENT OF RATE CASE EXPENSES.
That Atmos shall reimburse the reasonable ratemaking expenses of the City, as part of
the Steering Committee, in processing the 2013 RRM Filing.
Ordinance No.2 1 000-1 0-20 1 3 Page 3 of 5
Atmos RRM Ordinance(2013)
Section 4.
REPEAL OF ORDINANCES IN DIRECT CONFLICT.
That if any provisions or conditions of this Ordinance directly conflict with any
provisions or conditions of other Ordinances previously adopted by the City Council, the
conflicting provisions of such previously adopted Ordinances are hereby repealed.
Section 5.
COMPLIANCE WITH OPEN MEETINGS ACT REQUIREMENTS.
That the meeting in which this Ordinance was adopted was in all things conducted in
strict compliance with the Texas Open Meetings Act, as codified at Chapter 551, Texas
Government Code.
Section 6.
SEVERABILITY.
That if any portion, section or part of a section of this Ordinance is subsequently declared
invalid, inoperative or void for any reason by a court of competent jurisdiction, the remaining
portions, sections or parts of sections of this Ordinance shall be and remain in full force and
effect and shall not in any way be impaired or affected by such decision, opinion or judgment.
Section 7.
MOST FAVORED NATION'S CLAUSE.
That if the Steering Committee determines any rates, revenues, terms and conditions, or
benefits resulting from a Final Order or subsequent negotiated settlement approved in any
proceeding addressing the issues raised in Atmos' 2013 RRM filing would be more beneficial to
the Steering Committee cities than the terms of the attached tariffs, then the more favorable
Ordinance No.2 1 000-1 0-20 1 3 Page 4 of 5
Atmos R-RM Ordinance(2013)
rates, revenues, terms and conditions, or benefits shall additionally and automatically accrue to
the Steering Committee cities, including the City, without the need for City to take any ftli-ther
action. If this automatic adjustment occurs, Atmos shall promptly thereafter file with the City an
amended tariff documenting the adjustment to rates.
Section 8.
EFFECTIVE DATE.
That this Ordinance shall take effect and be in full force and effect from and after the date
of its adoption, with the tariffs attached hereto in Attachment "All to be effective for bills
rendered on and after November 1, 2013.
Section 9.
DELIVERY OF ORDINANCE
The City Secretary is hereby directed to deliver a certified copy of this Ordinance to
Atmos, care of Chris Felan, Manager of Rates and Regulatory Affairs, Atmos Energy
Corporation, 5420 LBJ Freeway, Suite 1862, Dallas, Texas 75240, and Geoffrey Gay, General
Counsel to the Steering Committee, at Lloyd Gosselink Rochelle & Townsend, P.C., P.O. Box
1725, Austin, Texas 78767-1725.
AND IT IS SO ORDAINED.
ADOPTED: October 15, 2013
APPROVED AS TO FORM AND LEGALITY:
By:
—— -----------
Denis C. Me y, Assistant City Attorney Mary J. ' ays, r, C4 Secretary
M&C: G-18039
Ordinance No.21000-10-2013 Page 5 of 5
Annos RRM Ordinance(2013)
Attachment A
Atmos Mid-Tex Tariffs
Effective November 1 , 2013
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE: R—RESIDENTIAL SALES
APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION EXCEPT THE CITY OF
DALLAS AND UNINCORPORATED AREAS
EFFECTIVE DATE: Bills Rendered on or after 11/01/2013
Application
Applicable to Residential Customers for all natural gas provided at one Point of Delivery and measured
through one meter.
Type of Service
Where service of the type desired by Customer is not already available at the Point of Delivery, additional
charges and special contract arrangements between Company and Customer may be required prior to
service being furnished.
Monthly Rate
Customer's monthly bill will be calculated by adding the following Customer and Ccf charges to the
amounts due under the riders listed below:
Charge Amount
Customer Charge per Bill $ 17.70 per month
Rider CEE Surcharge $ 0.02 per month'
Total Customer Charge $ 17.72 per month
Commodity Charge—All Ccf $0.05831 per Ccf
Gas Cost Recovery: Plus an amount for gas costs and upstream transportation costs calculated
in accordance with Part(a) and Part(b), respectively, of Rider GCR.
Weather Normalization Adjustment: Plus or Minus an amount for weather normalization
calculated in accordance with Rider WNA.
Franchise Fee Adjustment: Plus an amount for franchise fees calculated in accordance with Rider
FF. Rider FF is only applicable to customers inside the corporate limits of any incorporated
municipality.
Tax Adjustment: Plus an amount for tax calculated in accordance with Rider TAX.
Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s).
Agreement
An Agreement for Gas Service may be required.
Notice
Service hereunder and the rates for services provided are subject to the orders of regulatory bodies
having jurisdiction and to the Company's Tariff for Gas Service.
1 Reference Rider CEE-Conservation And Energy Efficiency as approved In GUD 10170. Surcharge billing effective July 1,2013.
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE: C—COMMERCIAL SALES
APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION EXCEPT THE CITY OF
DALLAS AND UNINCORPORATED AREAS
EFFECTIVE DATE: Bills Rendered on or after 11101/2013
Application
Applicable to Commercial Cuohonx»m for all natural gas provided at one Point oYDelivery and naaaaunyd
through one meter and to Industrial Customers with an average annual usage of less than 30.000 Cnf.
Type of Service
Where service of the type desired by Customer is not already available at the Point of Delivery, additional
charges and special contract arrangements between Company and Customer may be required prior to
omn/inm being furnished.
Monthly Rate
Cuobomm/s monthly bill will be oa|cu|ob*d by adding the h/||ovving Customer and CcJ charges to the
amounts due under the riders listed below:
Charge Amount
Customer Charge per Bill $35.75 per month
Rider CEE Surcharge $ 0.10 per month'
Total Customer Charge $35.85 per month
Gas Cost Recovery: Plus an amount for gas costs and upstream transportation costs calculated
in accordance with Part(a)and Part(b). respectively, of Rider 8CR.
Weather Normalization Adjustment: Plus or Minus an amount for weather normalization
calculated in accordance with Rider VVNA.
Franchise Fee Adjustment Plus an amount fbr franchise fees calculated in accordance with Rider
FF. Rider FF is only applicable to customers inside the corporate limits of any incorporated
municipality.
Tax Adjustment: Plus an amount for tax calculated in accordance with Rider TAX.
Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s).
Agreement
An Agreement for Gas Service may be required.
Notice
Service hereunder and the nabnm for omn/ioeo provided are subject to the orders of regulatory bodies
having jurisdiction and tothe Company's Tariff for Gas Service.
1 Reference Rider CEE-Conservation And Energy Efficiency as approved In GUO 10170. Surcharge billing effective July 1`2n/y.
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE: I—INDUSTRIAL SALES
APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION EXCEPT THE CITY OF
DALLAS AND UNINCORPORATED AREAS
EFFECTIVE DATE: Bills Rendered on or after 11101/2013
Application
Applicable to Industrial Customers with a maximum daily usage(K0DU)of less than 3.600 MW1Bbu per day
for all natural gas provided atone Point ofDelivery and measured through one meter. Service for
Industrial Customers with an K8DU equal to or greater than 3.500 yNK88tu per day will be provided at
Company's sole option and will require special contract arrangements between Company and Customer.
Type of Service
Where service oy the type desired by Customer is not already available otthe Point ofDelivery, additional
charges and special contract arrangements between Company and Customer may be required prior to
service being furnished.
Monthly Rate
Customers monthly bill will be calculated by adding the following Customer and YWMBtu charges tothe
amounts due under the riders listed below:
Charge Amount
Customer Charge per Meter $620.00 per month
Next 3,500 MMBtu $0.1879 per MMBtu
Gas Cost Recovery: Plus an amount for gas costs and upstream transportation costs calculated
io accordance with Part(a)and Part(b), respectively, of R|derGCR.
Franchise Fee Plus an amount for franchise fees calculated in accordance with Rider
FF, Rider FF is only applicable to customers inside the corporate limits of any incorporated
municipality.
Tax Adjustment: Plus an amount for tax calculated in accordance with Rider TAX.
Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s).
Curtailment OvwrpmHFee
Upon notification by Company of an event of curtailment or interruption of Customer's deliveries,
Customer will, for each N1K0Btu do||vamad in excess of the stated level of curtailment or Interruption, pay
Company 20096 of the midpoint price for the Katy point listed in Platta Gas Deily published for the
applicable Gas Day in the table entitled "Daily Price 8un/my.^
Replacement Index
In the event the "midpoint' or "common" prima for the Katy point listed in Platts Gas Deily in the table
entitled "Daily Price Survey" is no longer published, Company will calculate the applicable imbalance fees
utilizing a daily price index recognized as authoritative by the natural gas industry and most closely
approximating the applicable Index.
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE: I—INDUSTRIAL SALES
APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION EXCEPT THE CITY OF
DALLAS AND UNINCORPORATED AREAS
EFFECTIVE DATE: Bills Rendered on or after 11/01/2013
Agreement
An Agreement for Gas Service may be required.
Notice
Service hereunder and the rates for services provided are subject to the orders of regulatory bodies
having jurisdiction and to the Company's Tariff for Gas Service.
Special Conditions
In order to receive service under Rate I, Customer must have the type of meter required by Company.
Customer must pay Company all costs associated with the acquisition and installation of the meter.
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE: T—TRANSPORTATION
APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION EXCEPT THE CITY OF
DALLAS AND UNINCORPORATED AREAS
EFFECTIVE DATE: Bills Rendered on or after 11/01/2013
Application
App|icob|e, in the event that Company has entered into a Transportation AQraament, to u customer
directly connected to the Atmmm Energy Corp., Mid-Tex Division Distribution System (Customer) for the
transportation of all natural gas supplied by Customer or Customer's agent at one Point of Delivery for
use in Customer's facility.
Type ofService
Where service oythe h/pm desired by Customer io not already available at the Point oYDelivery, additional
charges and special contract arrangements between Company and Customer may be required prior to
smn/inm being furnished.
Monthly Rate
Customer's bill will be calculated by adding the following Customer and N1PWBtu charges hmthe amounts
and quantities due under the riders listed below:
Charge Amount
Customer Charge per Meter $620.00 per month
Next 3,500 MMBtu $0.1879 per MMBtu
All MMBtu over 5,000 MMBtu $0.0403 per MM Btu
Upstream Transportation Coot Recovery: Plus an amount for upstream transportation costs in
accordance with Part(b)nf Rider GCR.
Retention Adjustment: Plus a quantity of gas as calculated in accordance with Rider RA.
Franchise Fee Adjustment: Plus an amount for franchise fees calculated in accordance with Rider
FF. Rider FF is only applicable to customers inside the corporate limits of any incorporated
municipality.
Tax Adjustment: Plus an amount for tax calculated in accordance with Rider TAX.
Surcharges: Plus an amount for surcharges calculated in accordance with the applicable rider(s).
Imbalance Fees
All fees charged to Customer under this Rate Schedule will be charged based on the quantities
determined under the applicable Transportation Agreement and quantities will not be aggregated for any
Customer with multiple Transportation Agreements for the purposes of such fees.
Monthly Imbalance Fees
Customer shall pay Company the greater of(i)$0.10 per MMBlu, or(ii) 150% of the difference per KAKABtu
between the highest and lowest "midpoint" price for the Kob/ point |iobad in FYads Gem Daily in the table
entitled "Daily Price Survey" duhng such monVh, for the NYyN8tu of Customers monthly Cumulative
Imbalance,as defined in the applicable Transportation Agreement, at the end of each month that exceeds
1O96of Customer's receipt quantities for the month.
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RATE SCHEDULE: T—TRANSPORTATION
APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION EXCEPT THE CITY OF
DALLAS AND UNINCORPORATED AREAS
EFFECTIVE DATE: Bills Rendered on or after 11/01/2013
Curtailment Overpull Fee
Upon notification by Company of an event of curtailment or interruption of Customer's deliveries,
Customer will, for each MMBtu delivered in excess of the stated level of curtailment or interruption, pay
Company 200% of the midpoint price for the Katy point listed in Platts Gas Daily published for the
applicable Gas Day in the table entitled "Daily Price Survey."
Replacement Index
In the event the "midpoint" or "common" price for the Katy point listed in Platts Gas Daily in the table
entitled "Daily Price Survey" is no longer published, Company will calculate the applicable imbalance fees
utilizing a daily price index recognized as authoritative by the natural gas industry and most closely
approximating the applicable index.
Agreement
A transportation agreement is required.
Notice
Service hereunder and the rates for services provided are subject to the orders of regulatory bodies
having jurisdiction and to the Company's Tariff for Gas Service.
Special Conditions
In order to receive service under Rate T, customer must have the type of meter required by Company.
Customer must pay Company all costs associated with the acquisition and installation of the meter.
MID-TEX DIVISION
ATMOS ENERGY CORPORATION
RIDER: WNA—WEATHER NORMALIZATION ADJUSTMENT
APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION EXCEPT THE CITY OF
DALLAS AND UNINCORPORATED AREAS
EFFECTIVE DATE: Bills Rendered on or after 11/01/2013
Provisions for Adiustment
The Commodity ha per Cof (1OD cubic feet) for gas service set forth in any Raba Schedules utilized
by the cities of the Mid-Tex Division service area for determining normalized winter period revenues shall
be adjusted by on amount hereinafter dmmohbed, which amount is referred to as the 'Weather
Normalization AdustrnmnL° The Weather Normalization Adjustment oh$|| apply to all temperature
sensitive residential and commercial bills based on meters read during the revenue months of November
through April. The five regional weather stations are Abilene, Austin, Dallas,Waco, and Wichita Falls.
Computation of Weather Normalization Adjustment
The Weather Normalization Adjustment Factor shall be computed to the nearest one-hundredth cent
per Cnyby the following formula:
(HGFi x (NDD`AOD) )
VVNAFi = R|
(BLi + (HGF| x ADD) )
Where
( = any particular Rate Schedule Vr billing classification within any such
particular Rate Schedule that contains more than one billing classification
VVNAFi Weather Normalization Adjustment Factor for the ithrate schedule or
classification expressed in cents per Cof
R| = Commodity Charge rate of temperature sensitive sales for the ith schedule or
classification.
HSF| = heat sensitive factor for the ith schedule or classification divided bythe
average bill count in that class
ND0 = billing cycle normal heating degree days calculated omthe simple ten-year
average of actual heating degree days.
ADD = billing cycle actual heating degree days.
B|i = base load sales for the ith schedule or classification divided Uy the average
bill count|n that class
TheVVeatherNormg|izabonAduobmanthorNhejMhoustonerinithrabosohedu|eiocnmpuhadao:
VVN44= VVNAF/ x gv
VVhana qo is the relevant sales quantity for the jth customer in ith rate schedule.
MID-TEX DIVISION
ATMOSGN2RGY CORPORATION
RIDER: WNA—WEATHER NORMALIZATION ADJUSTMENT
APPLICABLE TO: ALL CUSTOMERS IN THE MID-TEX DIVISION EXCEPT THE CITY OF
DALLAS AND UNINCORPORATED AREAS
EFFECTIVE DATE: Bills Rendered on or after 11101/2013
Base Use/Heat Use Factors
Residential Commercial
Base use Heat use Base use Heat use
Weather Station Ccf Ccf0H0D {�cf Ccf/HDD
Abilene 9.97 0.1318 96.50 0.5659
Austin 11.05 0.1202 188.59 0.7185
Dallas 13.13 0.1832 171.84 0.8797
Waco 9.78 0.1202 117.80 0.5774
Wichita 10.99 0.1287 107.70 0.5041
Falls
Weather Normalization Adiustment(WNA) Report
On or before June 1 of each year, the company posts on its webaita at otnosenergy.00nVmtx'wna. In
Excel format, o Weather Normalization Adjustment (WVA) Report to show how the company calculated
its\NNAm factor during the preceding winter season. Additionally, or before June 1 of each year, the
company fi|om one hard copy and a Excel version of the kVNA Report with the Railroad Commission of
Texgs'Gao Services Division, addressed ho the Director of that Division.
City of Fort Worth, Texas
Mayor and Council Communication
/., i/,e c',.%9f G.i ///1<.,.: dLIO /,n,///., •.6ic///[, ..I:/af@/L/uG ... ,L/ O%allr/..:2//(✓A /,Rlll1U///✓// /l/./O DOS.Il! ....IGA.✓! .INRPa.a/klG6d,MGE
COUNCIL ACTION: Approved As Amended on 10/15/2013 - Ordinance Na, 21000-10-2013
//lG(,(Iti%GlUH1(////I llllfi
I If /1/7Q I lf/// 1/A/,iIvAPAIG .;44A/f,..�l2lRttlllllllM1l I-IR"D,f@
DATE: Tuesday, October 15, 2013 REFERENCE NO.: G-18039
LOG NAME: 12ADOPTION OF ATMOS 2013 RRM
SUBJECT:
Adopt Ordinance Establishing Maximum Permitted Rates and Charges that Atmos Energy Corporation
d/b/a Atmos Energy Corporation, Mid-Tex Division, may Assess Customers in the City of Fort Worth
Effective November 1, 2013 (ALL COUNCIL DISTRICTS)
RECOMMENDATION:
It is recommended that the City Council adopt the attached ordinance establishing maximum permitted
rates and charges that Atmos Energy Corporation d/b/a Atmos Energy Corporation, Mid-Tex Division, may
assess customers in the City of Fort Worth, effective November 1, 2013, pursuant to a negotiated
settlement and resolution of Atmos' proposed rate increase under its 2013 Rate Review Mechanism filing.
DISCUSSION:
Under the Gas Utilities Regulatory Act, the City of Fort Worth has original rate regulatory authority over
utilities providing retail natural gas to customers in the City. In accordance with that authority, on June 4,
2013 the City Council adopted Ordinance No. 20782-06-2013 (M&C G-17912) approving an agreed Rate
Review Mechanism (RRM) Tariff filed by Atmos Energy Corporation d/b/a Atmos Energy Corporation, Mid-
Tex Division (Atmos).
The RRM was negotiated and agreed to by Atmos and cities that Atmos serves in order to provide a
mechanism to govern annual rate adjustments and to provide an alternative to the mechanism established
by state law. The annual review under the RRM provides a way for Atmos to recover its capital
expenditures in an expeditious manner but also provides participating cities, as regulatory authorities, the
ability to review Atmos' filings, both with regard to individual expenditures and on a global basis that takes
into account overall service costs and returns.
On July 15, 2013, Atmos filed an application to increase natural gas rates under the new RRM tariff. In its
RRM filing, Atmos sought a $22.7 million rate increase system-wide based on an alleged test-year cost of
service revenue deficiency of$25.7 million. Working with and through the Atmos Cities Steering
Committee (ACSC), in which the City has been a participating stakeholder since 2006 (Resolution No.
3348-05-06; M&C G-15202), the City analyzed the schedules and evidence offered by Atmos in support of
its requested rate increase and determined that the evidence did not support the full amount of the
proposed increase.
After several lengthy discussions, the ACSC negotiating committee and Atmos reached a tentative
settlement that would authorize an increase of$16.6 million in Atmos' total revenues system-wide with the
additional revenues coming from increases in the commodity (consumption) rate.
Of the total $16.6 million increase, $1.29 million or 7.8 percent is attributable to and will be paid by Fort
Worth customers, with approximately $1.03 million being paid by residential customers and $0.26 million
being paid by commercial customers. The tariffs attached to the ordinance maintain the current base
Logname: 12ADOPTION OF ATMOS 2013 RRM Pagel of 3
monthly residential customer charge at $17.70 for residential customers and impose a slight increase in
the base commercial customer charge - raising it from $34.72 to $35.75.
Under the proposed rates, the average residential customer in Atmos system is expected to experience an
increase of $0.74 (or 1.75 percent) per month. However, because the average residential consumption in
Fort Worth is slightly less than in the system overall, the average Fort Worth residential customer is
expected to experience an increase of $0.70 per month.
ACSC recommends that its members find that the proposed rates are just, reasonable and in the public
interest and that its members approved the rate tariffs reflected in the attached ordinance.
Residential Present "Recommended
Customer Charge 17.70 17.70
..............
',Rider CEE Surcharge 0.02*
17.72
Total Customer Charge
.......... ...........
All Mt4 Ccf 0.0417 0.05831
:Commercial
;Customer Charge 34.72 1$ 35.75
Rider CEE Surcharge 0.10* L.
,Total Customer Charge 35.85
All Mef tcf 0.0659 0.06893
'Industrial
..........
"Customer Charge 600.00 620.00
First 1,500 MMBtu 0.2473 0.2565
'Next 3,500 MMBtu 0.1812
0.1879
11 over percent,000 MMBtu ;$ 0.0403
:A 0.0389
:Transportation
.................
icustomer Charge 600.00 i$ 620.00
First 111,5010 MMBtu 0.2473 0.2565
;Next 3,11500 MMBtu- 0.1812 0.1879
0.0403
All over 5,000 MMBtu $ 0.0389
*Reference Rider CEE - Conservation and Energy Efficiency as approved in GUD 10170. Surcharge
billing effective July 1, 2013.
Upon adoption of the attached ordinance, the rate schedule set forth in Attachment A of the ordinance will
take effect with bills rendered beginning November 1, 2013.
FISCAL INFORMATION CERTIFICATION:
The Financial Management Services Director certifies that this action will have no material effect on City
Funds.
FUND CENTERS:
TO Fund/Account/Centers FROM Fund/Account/Centers
CERTIFICATIONS:
Submitted for City Manager's Office by: Charles W. Daniels (6199)
Logname: 12ADOPTION OF ATMOS 2013 RRM Page 2 of 3
Originating Department Head: Sarah Fullenwider (7623)
Additional Information Contact: Bridgette Garrett (8518)
ATTACHMENTS
1. 2013 RRM Ordinance 10.2 and Attachment A.pdf (Public)
2. G-18039 Chart Revision.pd (Public)
Logname: 12ADOPTION OF ATMOS 2013 RRM Page 3 of 3
FORTWORTH
Memorandum
Tuesday, October 15, 2013
TO: Mary Kayser,
City Secretary
From: Bridgette Garrett, Utility Administrator
Law Department
Subject: Revisions to M&C G- 18039 Atmos Rate Ordinance
The chart in M&C G-18039 contains an error. In two places the chart refers to "Mcf" when it should refer to
"Ccf". The Language to amend and approve M&C G-18039 (Atmos Rate Ordinance) is—
Move to approve M&C G-18039 with the following amendment: that the two references in the chart to "Mcf"
be changed to "Ccf".
Below is a revised chart.
Residential Present Recommended
Customer Charge $17.70 $17.70
Rider CEE Surcharge $0.02*
Total Customer Charge $17.72
All Ccf $0.0417 $0.05831
Commercial
Customer Charge $34-72 $35.75
Rider CEE Surcharge $0.10*
Total Customer Charge $35.85
All Ccf $0.0659 $0.06893
............................
Industrial
Customer Charge $600.00 $ 20.00
First 1,500 MMBtu $0.2473 $0.2565
Next 3,500 MMBtu $0.1812 $0.1879
All over%,000 MMBtu $0.0389 $0.0403
Transportation
Customer Charge $600.00 $620.00
First 1,500 MMBtu $0.2473 $0.2565
Next 3,500 MMBtu $0.1812 $0.1879
All over 5,000 MMBtu $0.0389 $0.0403
*Reference Rider CEE—Conservation and Energy Efficiency as approved in GUD 10170.Surcharge billing effective July 1,2013,