Loading...
HomeMy WebLinkAboutContract 43082-A1 CITY SECRETARY AMENDMENT CONTRACT NO, N .1 TO CITYSECRETARY CONTRACT o. 43082 WHEREAS,, the City of Fort Worth (CITY) and Pacheco Koch Consulting .engineers, Inc. ,, (ENGINEER) made and entered into City Secretary Contract No. 43082, the CONTRACT) which was authorized by M&C C-25443 on the 21 day of February, 2012 in the amount of $ 161, 447 . 00 - WHEREAS, the CONTRACT involves engineering services for the following project White Lake Hills Drainage Improvements Project; and WHEREAS, 'it has become necessary to execute n end. No., 1 to he CONTRACT to include are increased scope of work and remised fee. NOW THEREFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives,, eater into the following agreement, which amends the CONTRACT.- 1 . Article I of the CONTRACT 'is, amended to include the additional engineering services speei i� i proposal dated August 27, 2013, a c op of' which s attached hereto and incorporated herein. T' e cost to City for the additional design services to e performed by Engineer totals $13, 923. 00. See Attached Funding reakdow Sheet, Page -3- 2 Article II o the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as emended, so that the total fee paid by the City, for all work and services shall be an amount of $175,370. 010. 3 All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect . EXECUTED, and EFFECTI"V"E as of the date last written by a signatory, below, City of Fort Worth Professional ServiceIs Agreement Amendment Template OFFICIAL RE,COIRDII PMO Official Release 8/1/2012 012 Page 1 of 3 CITY SECRETARY E., C w FT,WORTH,TX A P P R City of Fart Worth Engineer Pacheco Koch Con,sulting Engine' Fexnand'o Costa Mark A. �acheco, P.E. Assistant City Manager President DATE.1 DATE: /'0 0011113 APPROVAL RECOMMENDED,., Do la W1. Wiersi j g, P El, PhD 'r � epartment Director, Public Work APPROVED AS TO FORM, AND LEGALITY. M&C'.1 oil Date, VAAA t KA., ar-k— y-VI Lt vvj Assistant City Attorney fl)h ATTEST*. 'nmo f ar City Secretary '"�Iooi MMwxpwwMMFpM�Mwpw WON OFFICIAL RECORDI I City of Fort Worth ITY C SECRE TARY Professional Services Agreement Amendment Template I I Pm o official Release 8/1/20'12 FTe WORTH!i TX Page 2 of 3 FUNDING SHEET CaLty Secretary No. 43082 Amendment i. Department Fund-Account-Center TPW 227 531200 20428001850 3 13.... .... .......w. Total . City olf Fort Worth Professional Services Agreement Amendment Temp,late PMO,Official Release 8/1/'2012 Page 3 olf 3 Pacheco Koch iii :11111 A DALLAS FO' R:Ti'W!: ORTH HOUSTON AUgUst 27, 2013 Mr. Russell T. 1-leer, P.E. City of Foil Worth, Storm Water Department I O00 Throckmorton Fort Worth,Texas 76102 Re* Whfte Lake Hills Drainage Improvements; Cl ty Project#:01850 Contract Amendment I for Additional Services Dear Mr. Poer.- Pa o Koch offers additional [Irofessional Engineering Services for this project. This Engineering Services Contract Ametidment includes a detailed Scope of Services and Level of Effort Spreadsheet attached to this letter. The additional services are the addition. of Tasks 5 & 6. Racheco Koch proposes to provide the attached scope of additional services for the lump sum total of$13,8531- All the additional services proposed will be performed iii accordance with the oinginal contract dated April 6,2012. consisting of one page�- and the attached Additional Scope of Set-vices represent the T'his Amendment,, entire amendment to the original agreement between the City of Fort Worth and Pacheco Koch. If the terms of this Amendment are acceptable,please indicate by acluiowledging acceptance of the terms of this document. Summary of Contract Fee for White Lake Hills Drainage Improvements Ortinal Contract Amount $1,619447-00 Amendment No., 1. 1 133923-00 Revised Contract Amount $175,370.00 If you should have any questions, please do not hesitate to call at 817-,412-7155. Sincerely, 0'V .......... ................. Brian D. O'Neill,P.E., C Pacheco Koch ............................. ................ ........................ ATTACHMENT "A" Scope for Engineering Design Related Services for Storm Water Improvements Projects—Additional Services 'The scope set 'forth herein defines the work to be p�erformed by the ENGINEER in completing the project. Both the CITY and ENGINEER have attempted to clearly define the work to be performed and address the needs of the Project. Under this scope, "ENGINEER" is expanded to include any sub-consultant, including surveyor, employed or contracted by the ENGINEER. 01BJECT11VE The objective of 'the, project is to, evaluate the potential for flooding in the White Lake Hills subdivision. The evaluation shall include necessary analysis and modeling, to determine the extent of localized flooding in the area and potential, measures that could be taken to alleviate flooding conditions., The project also includes, the preparation of construction documents, to resolve known flooding issues, on Willow Ridge Road at the northeast corner of the subd ivision. WORK TO BE PERFORMED Task 5. Bid, Phase Services Task 6. Construction Phase Services TASK 5. BID PHASE SERVICES ENGINEER will support the bid phase of the project as follows. 5.1. Bid Support 0 The ENGINEER shall upload all plans and contract documents onto Buzzsaw for access to potential bidders. 0 Contract documents shall be uploaded in a .xIs file. Unit Price Proposal documents are to be created utilizing CFW Bidtools only and combined in a specified spreadsheet workbook, Bid Proposal,Worksheet Template, and will be populated and, configured so that all pages are complete and the Summary Worksheet(si) in the workbook detail' and automatically summarize the totals from the inserted Unit Price Proposal document,worksheets. Plan, Sets,are to be uploaded to Buzzsaw in two formats, pdf and .dv f files. The pdf mill consist of one file of the entire plan set. The dwf will consist of I individual files, one for each plan sheet, and will be numbered and named in a manner similar to that of the plan, set index. 10 The ENGINEER shall sell contract documents and maintain a plan holders list on Buzz,s,aw from documents sold and from Contractor's uploaded Plan Holder Registrations in Buzzsaw. 0 The ENGINEER will develop and implement procedures for receiving and answering bidders' questions and requests for additional, information. The City of Fort Worth,Texas Attachment A PMO Release Date:06/2112010 Page 1 of 6 procedures shall include a log of all significant bidders questions and requests, and the response thereto. The log shall, be housed and maintained in the project's Buzzsaw folder titled Request for Information. The ENGINEER will provide technical interpretation of the contract bid documents and will prepare proposed responses to all bidders,questions and requests, in the form of addenda. The ENGINEER shall upload all approved addenda onto Bu sari and mail addenda to all plan holders. • Attend the prebid conference in support of the CITY. • ,assist the CITY in determining the qualifications and acceptability of prospective ,contractors, subcontractors, and suppliers. • When substitution prior to award of contracts, is allowed in the contract documents, the ENGINEER will advise the CITY as to the acceptability of alternate materials,and equipment proposed by bidders. 40 Attend the bid opening in support of the CITY. • Tabulate and review all bids received for the construction project, assist the CITY in evaluating bids, and recommend award of the contract. A copy of the Bid Tabulation and the CFA" Data Spreadsheet created utilizing CFW Bidtools only are to be uploaded into the project's Bid Results folder on Buzzs,aw. • Assist the CITY with assembling and awarding contracts for construction, materials, equipment, and services. I Incorporate all addenda into,the contract documents and issue conformed sets. 5.2 Final Design Drawings, Final Design Drawings shall be submitted as an Adobe Acrobat P format (version 6.0 or higher)file and D format. There shall be one (1) P file and one (1:) DWF file (created from CAD application of drawing) for the TIPW plan set and a separate PCAF and D file for the Water plan set. Each PDF' and DWF file shall be created from the original CAD drawing filess and shall contain all associated sheets of the particular plan set. S*ingulair PDF and DWIF files for each sheet of a plan set will not be accepted. P and DWIFfiles shall conform to naming conventions as follows'.', 1. TPW file name example — "W-1956_org47-pdf" where "W-1956" is the assigned file number obtained from the CITY, "—or g" designating, the file is of an original plain set, "47" shall be-the total number of sheets in this file. Example: W-0053—org1pelf and K,-, ►320—org5.pdf 11. Water and Sewer file name example �— "X-35667_org36.pdf" where "X- 356,6790 is the assigned file number obtained from the CITY, ".org" designating the file is of an original plan set, '136" shall be the total number of sheets in this file. City of Fort Worth,Texas Attachiment A PMO Release Date:06/21/2010 Page 2 of 7 Example: X-12755—orgl8.pdf Boffi PDF and DWF files shall be uploaded to the project's, Record Drawing folder in Buse . In addition to,the P and DWFfiles, the ENGINEER shall submit each plan sheet as an individual D,WG file with all reference files integrated into the sheet. If the plans were prepared in D,GIN format, they shall be converted to DWG prior to uploading. The naming convention to be used for the DWG files shall be as follows.. 1. TPW files shall use the W number as for PC F and DWF files, but shall include the sheet number in the name—"'W-11956—SHTOl.dwg"I tw_ 1956—SHT012.dwg g19, etc,. 11. Water and Sewer file names shall use the X number as for l and DWF files, but shall include, the sheet number ber in the name — X. 12155—S IT'01.dwg I$, "X-127515—� SHIT02.dwg,P7, etc., For information on the proper manner to submit files and to obtain a file number for the project, contact-the Department of Transportation and Public Works Vault at telephone number(817)392-8426. File numbers will not be issued to a project unless the appropriate project numbers and fund codes have been assigned and are in the Department of Transportation and Public Works database. ASSUMPTIONS 0 The project,will be blid only once and awarded to one contractor. 20 sets of construction documents will be sold to and made available on Buzzsaw for plan holders and/or given to, plan viewing rooms. 20 sets,of construction documents will be printed and made available for pIurcha,se by planholders and/or given to plan viewing rooms,. 18 sets of full-size plans, 51 sets,of half-size plans, 7 sets of conformed specifications aand 5 sets of not executed specifications will be delivered to the, CITY. PD F, DWF and DWG files,will be uploaded, to Buzz,saw. Two CDs containing the conformed plans and specifications will be delivered to the City City of Fort Worth,TeXaS Attachment A PMO Release Date:06121/2010 Page 3 of 7 DELIVERABLES A. Addenda B. Bid tabulations C. Recommendation of award D. Construction, documents (conformed and non-conformed) E. CFW Data Spreadsheet TASK 61. CONSTRUCTION PHASE SERVICES ENGINEER will support the construction phase of the project,as follows., 6.1 Construction Support The ENGINEER shall attend -the preconstruction conference. • After the pre-construction conference, the ENGINEER shall provide project exhibits and attend plubll:ic meeting to help explain, the proposed project to residents. The CITY shall select a suitable location and mail the invitation letters to the affected stomers. • The ENGINEER shall visit the project site at requested intervals as construction proceeds to observe and report on progress. • The ENGINEER shall review shop drawings, samples and other submittals submitted by the contractor for general conformance with the design concepts and general compliance with the requirements of the contract for construction. Such review shall not relieve the Contractor from its responsibility for performance 'in accordance with the contract for construction, nor is such review a guarantee that the work covered by the shop drawings, samples and' submittals is free of errors, inconsistencies nconsistencies or omissions. The ENGINEER shall log and track all shop drawings, samples and other submittals in Buzzsaw. • As requested by the CITY, the ENGINEER shall provide necessary interpretations and clarifications of contract,documents, review change orders, and make recommendations as to the acceptability of the work. The ENGINEER shall,attend,the "Final"project walk through and assist with preparation of final punch list.. 6.2 Record Drawings The ENGINEER shall prepare record drawings from information provided by the CITY depicting any changes, made to the Final Drawings during construction. The following information shall be provided by the CITY: * As-Built Survey * Red-Line Markups from the Contractor * Red-Line Markups from City Inspector * Copies of Approved Change Orders City of Fort Worth,Texas Attachment A PM01 Release Date-O6121/2010 Page 4 of 7 o Approved Substitutions 0 The ENGINEER shall modify the Final Drawings electronically and shall place a stamp on the plans indicating that they represent Record Drawings of the project as constructed. The stamp shall be signed and dated by the ENGINEER and shall be placed on each plan sheet,, whether there are any revisions on the sheet or not. Each sheet shall clearly indicate all changes which apply to that sheet by clouding and numbering, or other suitable means. * The following disclaimer shall be included with the Record Drawing stamp: o These Record Drawings were prepared using information pirolvided by others and represent the as constructed conditions to the extent that documented changes were provided for recording. The ENGINEER assumes no liablifity for undocumented! changes and certifies only that the documented changes are accurately depicted, on these drawings. * The EN' GIN,EER shall submit,a set of sealed Final Drawings, modified and stamped as Record Drawings, on mylar for record storage. The El IG INEER may keep copies of the information provided by the CITY for Mtheir files,, but all original red-lined drawings shall be returned to the CITY with the mylars. Record Drawings shall also be submitted as an Adobe Acrobat PDF format era on 6.0 or higher)file and DWF format. There shall be one (1) PDF file and one (1) DWF file for the TPW plan set and a separate, PDF1 and DWF file for the Water plan, set. Each PDF and DWF file shall contain all associated sheets of the particular plan set. Sin Ovular PDF and DWF filler for each sheet of a plan set will not be accepted. PDF and DWF files shall conform to naming conventions,as follows. 1. TPW file name example — ''W'-1956—ors 47.pdf' where "W-1956" is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "417" shalil be the total number of sheets in this file. Example.- W-0053_org3.pdf and K-0320—org5l.pdf 111. Water and Sewer file name example — "X 356617 org36.pdf" where "X- 35667"' is the assigned file number obtained from the CITY, "_org" designating the file is of an original plan set, "36" shall be the total number of'sheets in this file. Example: X-12755—org18.pdf Both PDF and D,WF files shall be uploaded to the project's Record Drawing folder in Bu sari. For information on the proper manner to submit files and to obtain a file, number for the project, contact the Department of Transportation and Public Works Vault at City of Fort Worth,Texas Attachment A PMO Release Date:06/21/2010 Page 5 of 7 telephone number(817)392,-8426. File numbers will not be issued to a project unless the appropriate project numbers,and fund codes have been assigned and are in the Department of Transportation and Public Works database. ASSUMPTIONS 10 2 site visits are assumed. 0 1 submittal reviews are assumed. 1 RFI's are assumed. 1 Change Orders,are assumed. one copy of record drawings,will be recorded on CD and delivered to the City. DELIVERABLIES, A. Public meeting exhibits B. Response to Contractor's Request for Information C. Review of Change Orders D. Review of shop drawings E. Finali Punch List items F, Record Drawings (CD containing P and DWF Format Record Drawings) ADDITIONAL SERVICES NOT INCLUDED IN THIS SCOPE OF SERVICES AdWit'll'onal Services not "Included 'in the exist-in g Scope of Services — CITY and ENGINEER agree that the following services are beyond the Scope of Services described in the tasks, above., However, ENGINEER, can provide these services, if needed, upon the CITY's written request. Any additional amounts paid to the ENGINEER as a result of any material change to the Scope of the Project shall be agreed upon in writing by both parties before the services are performed. These additional services include the following: • Negotiation of easements or property acquisition including temporary, right-of- entries. • Services related to development of the CITY's project financing and or blu�dgelt. Services related to disputes over pre-qualification,: bid protests, ►li,d rejection and re-bidding of the contract for construction. Construction management and inspection services Periodic site visits during construction phase a Performance of materials testing or specialty testing services., 9 Services necessary due to the default of the Contractor. • Services related to damages used by fire, flood, earthquake or other acts of Gold. Services related to warranty claims, enforcemen�t, and inspection after final completion. City of Fort Worth,Texas Attachment A PMO Release Date,06/21/2010 Page 61 of 7 bervices related to Subsurface Utility Engineering Levels A or B Services related to Survey Construction Staking Services related to acquiring real property including but not limited to easements, right-olf-way, and/or temporary right-of-entries. Services to support,, prepare, document, bring, defend, or assist in litigation undertaken or defended by the CITY. Performance of miscellaneous and supplemental services related to the project as requested by the CITY. City of Fort Worth,Texas Attachment A PMO Release Date:06/21,/2010 Page 7 of 7