Loading...
HomeMy WebLinkAboutContract 29523 vn CITY SECRETARY CONTRACT N 0 -0. ELI' - AMENDMENT STATE OF TEXAS CITY SECRETARY CONTRACT NO. M&C Reference Number C-19886 COUNTY OF TARRANT WHEREAS, the City of Fort Worth (City) and RJN Group, Inc. , (Engineer) made and entered into City Secretary Contract No . 28082 , (the Contract) which was authorized by the City Council by M&C C-19234 on the 10th day of September, 2002 ; and WHEREAS, the Contract involves engineering services for the following project : Wholesale Customer Wastewater Meter Stations Site Selection and Design PROJECT NO. P171-070171250010 WHEREAS, it has become necessary to execute Amendment No . 1 to said contract to include an increased scope of work and revised maximum fee; NOW THEREFORE, City and Engineer, acting herein by and through their duly authorized representatives, enter into the following agreement which amends the Contract : 1 . Article I of the Contract is amended to include the additional engineering services specified in M&C C-19886 , adopted by the City Council on the 9th day of December 2003 , and further amplified in the proposal letter dated August 12 , 2003 , a copy of which is attached hereto and incorporated herein. The cost to the City for the additional services to be performed by Engineer total $96 , 083 . 00 . 2 . Article III of the Contract is amended to provide for an increase in the maximum fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall not exceed the sum of $495, 610 . 12/8/2003 3 . All other provisions of the Contract which are not expressly amended herein shall remain in full force and effect. EXECUTED on this the 9th day December, 2003, in Fort Worth, Tarrant County, Texas . ATTEST: CITY OF FORT WORTH Gloria Pearson City Secretary APPROVAL RECOMMENDE AP, RO Dale Fisseler, P.E. Marc Ott Director, Water Department Assistant City Manager Name:Hugh M. Kelso Contract A thorizati*n Regional Vice President 7524 Mosier View Court, Suite 106 Fort Worth Texas 76118 Date APPROVED AS TO FORM AND LEGALITY: Gary J. Steinberger Assistant City Attorney P e 12/8/2003 -2- �.„,.. fi 7524 Mosier View Court, Suite 106 ROUP, INC. Fort Worth, TX 76118 A ployee-Owned Firm 817.595.2199 a' gi ing and Information fax 817.595.3375 T gy services www.rjn.com August 12, 2003 Mr. Peter Fu, P.E. City of Fort Worth Water Department 1000 Throckmorton Street Fort Worth, TX 76102 RE: Amendment to Wholesale Customer Wastewater Meter Stations Site Selection and Design—FW Project No. P171-070171250010 Dear Mr. Fu: As part of the above referenced project, an additional customer city has been identified for metering along with the replacement of an existing siphon meter. The new customer city is Sansom Park, located on the west side of Fort Worth. The meter replacement is the Haltom City West meter, located near Beach and Broadway Streets on the west side of Haltom City. Metering for Sansom Park was not included in the original scope of services dated October 23, 2002. A preliminary investigation of the Sansom Park collection system has been performed utilizing system maps provided by the Fort Worth Water Department. The following work is anticipated: 1. Meter Sites—Two meter sites are anticipated, one for the west and south sides of the city and a second for the northeast side of the city. While it may be possible to combine the meter sites, extensive re-routing of sewer mains will be required to combine the flows. Survey, civil, and electrical / SCADA design will be required for each meter station site. At this time, it appears that one meter site will be a siphon meter and the second site will likely be a manhole flume due to the anticipated flows. Flow monitoring will likely be required to confirm design flow ranges (minimum and maximum) and CCTV inspection will be required to confirm pipe condition, alignment and service locations. 2. Collection System Modification— In order to consolidate the flows on the northwest and south side of Jacksboro Highway into a single meter location, modification to the sewer collection system is required. This modification includes directing the flow on the south side of Jacksboro Highway east to approximately Cheyenne Road, crossing Jacksboro Highway and combining the flows from the areas north near Skyline Drive. This consists of approximately 3,640 feet of new sanitary sewer main. This keeps the Sansom Park system separate from the City of Fort Worth main along Jacksboro Highway (M-217) until the comiection point from the meter. A second option would be,to install_a deduct meter on the upstream side and a second meter downstream of the xitipg conpections to M-217. Due to the depth of M-217, this option appears to be less '-as1e In adlra ', Mr. Peter Fu, P.E. August 12, 2003 Page Two there is some concern over the volume of flow coming from Sansom Park versus the City of Fort Worth flow — measurements may be difficult due to the small percentage of total flow to the flow of Sansom Park. This will be investigated as part of the design. The Haltom City West site has been problematic since construction back in the early 1990s. Meter readings have been very erratic due to air entrainment in the siphon. RJN performed an investigation of the meter and determined that the significant velocity change at the upstream manhole is causing excessive turbulence in the flow prior to entering the siphon. This turbulence is the source of the air entering the siphon meter. An air release port was installed in the siphon in the meter vault, but grease and other debris caused it to have limited success. Other options such as re-laying the upstream main on a flatter slope would likely be costly due to limited land area and by-pass pumping requirements. RJN has prepared a technical memorandum summarizing the problems at the existing meter station. It is anticipated that the Haltom City West meter station can be constructed immediately downstream of the existing site within the same easement and with a minimum (if any) pipe relocation. This amendment includes the survey and design of a new siphon meter station to replace the existing Haltom City West station. This scope assumes that any relocation of main and easement requirements will be included with the original contract amount. No additional flow monitoring will be required. As requested by the Water Department Staff, RJN has prepared a proposed amendment to the above referenced contract to perform the additional design services required to provide meters for Sansom Park and replace the meter at Haltom City West. The total estimated cost of Amendment No. I is $96,083 and will increase the current not to exceed contract amount from $399,527 to $495,610. These costs are consistent with the current per meter and per footage costs for the original contract. A summary of the proposed amendment is included in the attached Table 1. We appreciate the opportunity to provide these additional services to the Fort Worth Water Department. Should you have any questions, please call. Very truly yours, RJN GROUP, INC. /-0 la4"o Hugh M. Kelso Regional Vice President HMK/kb/I 801 RJN GROUP, INC. Fnainp,i- Table 1 —Revised Costs Fort Worth Wholesale Wastewater Customer Meters FW Project No. P171-070171250010P Design Fees Revised Not Cost Original Not to to Exceed Basis Unit Unit Cost Exceed Max Cost I. Design Meter Station Design T&M $ 191,169.00 $ 227,015 Sewer System Modifications T&M $ 65,360.00 97,081 Roadway/ Driveway Design T&M $ 11,008.00 12,508 Subtotal Design $ 267,537.00 336,604 11 Field Services Flow Monitoring (Weekly) Weekly 12 $1,224.11 $ 11,017.00 14,689 Flow Monitoring (Month) Month 2 $3,070.00 $ 6,140.00 6,140 CCTV Inspection LS 1 $ 25,600.00 27,460 Subtotal Field Services $ 42,757.00 48,289 Ili. Survey Design Survey for Meter Stations T&M $ 36,960.00 43,890 Sewer System Modification Survey T&M $ 28,875,00 42,889 Roadway/ Driveway Survey T&M $ 3,960.00 4,500 Easements T&M $ 6,600.00 6,600 Subtotal Survey $ 76,395.00 97,879 IV. Construction Phase Services Pre Construction Assistance T&M $ 12,838.00 12,838 Subtotal Construction Phase $ 12,838.00 12,838 Total Fee $ 399,527.00 $ 496,610 Revision date: August 12, 2003 The cost for Amendment No. I includes the design of two (2) wholesale customer metering stations for the City of Samson Park and the design of a replacement metering station for the existing Haltom City East Station. Services also include the design of gravity sewers to consolidate existing sewers in Samson Park to facilitate the metering of flows with fewer meter stations. RJN GROUP, INC. Engineering and Information Technology Services -d- Pagel o172 City of Fort Worth, Texas Mayor and Council Communication ......... COUNCIL ACTION: Approved on 12/9/2003 DATE: Tuesday, December 09, 2003 LOG NAME: 60RJNMETER REFERENCE NO.: **C-19886 SUBJECT: Amendment No. 1 to the Engineering Agreement with RJN Group, Inc. for Wholesale Wastewater Customer Meter Stations Site Selection and Design RECOMMENDATION: ... ....... It is recommended that the City Council authorize the City Manager to execute Amendment No. I with RJN Group, Inc. for wholesale wastewater customer meter stations site selection and design, thereby increasing the amount of the contract by $96,083, from $399,527 to $495,610, DISCUSSION: On September 10, 2002 (M&C C-19234), the City Council authorized the City Manager to execute an engineering agreement with RJN Group, Inc. for site selection and design of wholesale customer wastewater meter stations. The extra work to be performed under Amendment No. 1 consists of evaluation of existing points of entry from the City of Sansom Park wastewater collection system into the Fort Worth system, and preparing plans for sanitary sewer main relocation to consolidate multiple points of entry. The existing Haltom City west meter station will also be replaced under this amendment. In addition, the engineer will prepare easement instruments and highway permits. This project is an integral part of the Fort Worth Wastewater program to comply with U.S. Environmental Protection Agency proposed regulations known as Capacity, Management, Operations and Maintenance (CMOM). This project is located in COUNCIL DISTRICTS 4 and 7. RJN Group, Inc. is in compliance with the City's M/WBE Ordinance by committing to an additional 25% participation on this amendment. The City's goal on this amendment is 25%. An additional $5,000 is budgeted for contract overview. FISCAL INFORMATION/CERTIFICATION: The Finance Director certifies that funds are available in the current capital budget, as appropriated, of the Sewer Capital Project Fund. http://www.cfwnet.org/councll_packet/Reports/mc_print.asp 12/12/2003 Page 2 of'2 TO Fund/Account/Centers FROM Fund/Account/Centers P170 531200 070170250010 $96:083.00 Submitted for City Manager's Off ice,by- Marc Ott (8476) Originating,.Pepartment Head: Dale Fisseler (8207) Additional Information Contact: Dale Fisseler (8207) http://www.cfuqiet.org/counci]__packet/Reports/mc_prii)t.asp 12/12/2003