HomeMy WebLinkAboutContract 58318-CO1CSC No. 58318-COl
FORT WORTH City of Fort Worth
—� = Change Order Request
Project Name: Sanitary Sewer Rehabilitation Contract 99 City Sec No.: 1 58318
Project No.(s):CO2720 I NTP I N/A I City Proj. No.: l CO2720
The replacement of deteriorated water and sanitary sewer mains located in the following streets, alleys, and easement: Angle
Avenue, 29th Street, Prospect Avenue, Frank Felten Street, Loraine Street, Gould Street, Pearl Avenue, Markel Avenue, Oak
Project Description: Grove Road, Easment between Lorain St & 29th St, and Alleys between - Clinton Avenue & Houston Street, Ross Ave &
Clinton Ave, Clinton Ave & Ross Ave, Ellis Ave & Houston St, Ellis Ave & Main, Main St & Commerce St, Clinton Ave & Houstin
St, 29th St & 30th St.
Contractor, William J. Schultz, Inc. dba Circle C Construction Change Order # 1 Date: 6/1112025
City Project Mgr.1 John Kasavich, P.E. City Inspector: Eric Tinner
Phone Number:1 817-392-8480 Phone Number: 817-478-1783
Dept. Water Sewer Totals Contract Time
(Calender days)
Original Contract Amount $1,316,330.00 $5,141,197.00 $6,457,527,00 540
Extras to Date $0.00 $0.00 $0.00
Credits to Dale
Pending Change Orders (in M&C Process)
Contract Cost to Date $1,316,330.00 $5,141 ``197.00 $6,467,527.00 ,540
Amount of Proposed Change Order 1251,240.00 $483,418.75 1734,658.75 330
Revised Contract Amount $ ,667,570.00 $5,624,615.75 $7, 92,185.75 870
Original Funds Available for Change Orders $78,980.00 $179,942.00 $258,922.00
Remaining Funds Available for this CO $78,980.00 $179,942.00 $258,922.OD
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 11.38%
MAXALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) $8,071,908.75
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Change Order No.1 will primarily provide compensation for the following:
Replacement of industrial type pavement that was encountered during construction on Angle Avenue,
The installation of polyvinyl chloride (PVC) pipe in lieu of ductile iron pipe (DIP) due to non -availability of DIP pipe.
8-inch carrier pipe for by other than open cut installation that was inadvertently omitted at the time the project was advertised for bid.
• Replacement of segments of sanitary sewer pipe by trenchless pipe enlargement instead of open cut in order to expedite construction and
additional traffic control on the project.
Staff concurs with the contractor's request for additional 330 calendar days to be added to the project for the change order.
It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full
(both time and money) for all costs arising out of, or incidental to, the above Change Order.
Contractor's Company Name
Contractor Name
Contractor Signature
Date
William J. Schultz, Inc. dba Circle C Consirucuon
I Teri Skelly
+ �� ' �f�
- // • Zs -
Ins ector
Date
Project Manager
"
Date
6/16/25
Director (Water Dept)
Date
Construction Supervisor (TPW Dept)
Date
��!
1 06/18/2025
Sr. Assistant City Attorney
Date
Assistant City Manager_
Dale
06/20/2025
, -,
06/23/2025
Council Action (If
Required)
M&C Number 25-0514
M&C Dale Approved 6/10/2026
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
F0RT `WORTH City of Fort Worth
Change Order Additions
Project Name Sanitary Sewer Rehabilitation Contract 99 J Cily Sec No.: 1 58318
Project No.(s): CO2720 DOE No.I N/A I City Proj. No., I CO2720
The replacement of deteriorated water and sanitary sewer mains located in the following streets, alleys, and easement:
Project Angle Avenue, 29th Street, Prospect Avenue, Frank Felten Street, Loraine Street, Gould Street, Pearl Avenue, Market
Description Avenue, Oak Grove Road, Easment between Lorain St & 291h St, and Alleys between - Clinton Avenue & Houston Street,
Ross Ave & Clinton Ave, Clinton Ave & Ross Ave, Ellis Ave & Houston St, Ellis Ave & Main, Main St & Commerce St,
Clinton Ave & Houson St, 291h St & 30th St.
Contractor I William J. Schultz, Inc. dba Circle C Construction
1
Change Order: [=
Date: I 6/11/2025
City
Project Mgr. I John Kasavich, P.E.
City
Inspector I Eric Tinner
ADDITIONS
ITEM
DESCRIPTION
+ DEPT Qty
Unit
Unit Cost
! Total
Unit 1 -Water Improvements
ADDITIONS
54
17'Wide Industrial Pavement
(Water
12500.00
LF
$130.00
$325,000,00
Unit 2 -
Sanitary Sewer Improvements
6
3305.1103 20" Casing By Other Than Open Cut
Sewer
1140.00
LF
$825,00
$115,500.00
73
8" PVC Class 160 with CSS
ISewer
11212.00
LF
$385.00
$466,620.00
74
8" PVC Class 160 w/out CSS
ISewer
1223.00
LF
$350.00
$78,050.00
75
18" HDPE Pipe Enlargement
ISewer
3371.00
LF
1$200.00
1 $674,200.00
76
!Remove and Replace 21" RCP w/CSS Backfill
ISewer
140.00
ILF
1$275.00
1 $11,000.00
77
IRemove and Replace 18" RCP wICSS Backfill
!Sewer
140.00
ILF
1$250.00
1 $10,000.00
78
1Modify Inlet Connection to Elevate
ISewer
11.00
JEA
1$2,000.00
1 $2,000.00
79
IModify Junction Box Connection to Elevate
(Sewer
11.00
JEA
1$2,000,00
1 $2,000.00
80
ITemporary Pavement Repair for Sewer Line
ISewer
1800.00
ILF
1$30.00
1 $24,000.00
81
18" Carrier Pipe for BOTOC
ISewer
649.00
ILF
1$200.00
1 $129,800.00
82
1Pearl Sewer Servoces
ISewer
14.00
EA
1$3,500.00
1 $14,000.00
83
JGould Retaining Wall
ISewer
11.00
ILS
$3,500.00
$3,600.00
84
Message Boards
ISewer
I36.00
IWK
1$1,500.00
$54,000.00
85
Arrow Boards
ISewer
132.00
JWK
1$1,000.00
1 $32,000.00
86
High Early Concrete
ISewer
125.00
ISY
I$300.00
1 $7,500.00
87
Straw Blanket for Slope Stabilization on top
ISewer
1750.00
ISY
I$10.00
I $7,500.00
88
Icement Increase
ISewer
1100.00
JTN
1$25.00
1 $2,500.00
89
115" CIPP
ISewer
1270.00
LF
$260.00
$70,200.00
90
IMobilizalion
ISewer
I2.00
1EA
1$5,500.00
1 $11,000.00
91
Ilnstaliation of Storm Drain Conflict Structure Over 27" Pipe
ISewer
11.00
EA
I$9,500.00
$9,500.00
92
127" Storm RCP
ISewer
18.00
,LF
I$300.00
'
$2,400.00
Water
$325,000.00
Sewer
1$1,727,270.00
Additions
Sub Total
1
1$2,052,270.00
Page 1 of 3
FORT WORTH City of Fort Worth
Change Order Deletions
Project Name Sanitary Sewer Rehabilitation Contract 99 City Sec No.: 58318
Project No.(s): I CO2720 I DOE No, I N/A City Proj. No.: CO2720
The replacement of deteriorated water and sanitary sewer mains located in the following streets, alleys, and
easement: Angle Avenue, 29th Street, Prospect Avenue, Frank Felten Street, Loraine Street, Gould Street, Pearl
Project Description Avenue, Market Avenue, Oak Grove Road, Easment between Lorain St & 29th St, and Alleys between - Clinton
Avenue & Houston Street, Ross Ave & Clinton Ave, Clinton Ave & Ross Ave, Ellis Ave & Houston St, Ellis Ave & Main,
Main St & Commerce St, Clinton Ave & Houstn St, 29th St & 30th St,
Contractor I William J. Schultz, Inc, dba Circle C Construction Change Order: El Date I 6/11/2025
City Project Mgr. John Kasavich, P.E. City Inspector: I Eric Tinner
DELETIONS
ITEM IDESCRIPTION DEPT Qty Unit jUnit Cost Total
Unit 1 -Water Improvements
24 3201.0151 4' Wide Asphalt Pvmt Repair, Water Service Water 432.00 LF $55.00 $23,760.00
53 9999,0001 Construction Allowance Water 1.00 LS $50,000.00 $50,000.00
Unit 2 - Sanitary Sewer Improvements
3
3331.4119 8" DIP Sewer Pipe w/ Proteccto 401 Coating/CSS Backfill
Sewer
1352.00
EA
$385.00
$520,520.00
4
3331.4119 8" DIP Sewer Pipe with Protecto 401 Coating
Sewer
40.00
LF
$350.00
$14,000.00
8
3331.210412" CIPP
Sewer
265.00
LF
$200.00
$53,000.00
9
3331.4116 8" Sewer Pipe
Sewer
1470.00
LF
$200.00
$294,000.00
39
3201.01114" Wide Asphalt Pvmt Repair, Residential
Sewer
920.00
LF
$75.00
$69,000.00
41
3201.0121 4' Wide Asphalt Pvmt Repair, Arterial
Sewer
1508.75
LF
$95.00
$143,331.25
72
9999.0001 Construction Allowance
Sewer
1.00
LS
$150,000.00
$150,000.00
Water $73,760.00
Sewer $1,243,851.25
Deletions Sub Total $1,317,611.25
Page 2 of 3
MIWBE Breakdown for this Change Order
MWBE Sub Type of Service Amount for this CO
Total $0.00
Previous Change Orders
co# DATE AMOUNT
Total $0.00
Page 3 of 3
CPN CO2720
Sanitary Sewer Rehabilitation Contract 99
Change Order 1 Notes
Staff has reviewed the requested prices and considers them to be fair and reasonable.
City of Fort Worth, Texas
Mayor and Council Communication
DATE: Tuesday, June 10, 2025 REFERENCE NO.: **M&C 25-0514
LOG NAME: 6OSSRC99COl-CIRCLEC
SUBJECT:
(CD 2 and CD 8) Authorize Execution of Change Order No. 1 in the Amount of $734,658,75 to a Contract
with William J. Schultz, Inc. dba Circle C Construction Company for the Sanitary Sewer Rehabilitation,
Contract 99 and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to the Fiscal
Years 2025-2029 Capital Improvements Program
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize execution of Change Order No. 1 in the amount of $734,658.75 and an additional 330
calendar days to City Secretary No. 58318, a contract with William J. Schultz, Inc. dba Circle C
Construction Company for the Sanitary Sewer Rehabilitation, Contract 99 project for a revised
contract amount of $7,192,185.75; and
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Water and Sewer Capital Projects Fund in the amount of $734,659.00, transferred from available
PayGo funds within the Water and Sewer Fund, for the purpose of funding the Sanitary Sewer
Rehabilitation, Contract 99 project (City Project No. CO2720) and to effect a portion of Water's
Contribution to the Fiscal Years 2025-2029 Capital Improvement Program.
DISCUSSION:
On September 27, 2022 by Mayor and Council Communication (M&C) 22-0734, the City Council
authorized a construction contract with William J. Schultz, Inc. dba Circle C Construction Company in the
amount of $6,457,527.00 for Sanitary Sewer Rehabilitation, Contract 99 project.
Change Order No. 1 will primarily provide compensation for the replacement of industrial type pavement
that was encountered during construction on Angle Avenue, the installation of polyvinyl chloride (PVC)
pipe In lieu of ductile iron pipe (DIP) due to non -availability of DIP pipe, 8-inch carrier pipe for by other than
open cut installation that was inadvertently omitted at the time the project was advertised for bid,
replacement of segments of sanitary sewer pipe by trenchless pipe enlargement instead of open cut in
order to expedite construction and additional traffic control on the project.
It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year (FY),
instead of within the annual budget ordinance, as projects commence, additional funding needs are
identified, and to comply with bond covenants. The actions in the M&C will appropriate funds in support of
the Water's portion of the City of Fort Worth's Fiscal Years 2025-2029 Capital Improvement Program, as
follows:
60SSRC99COl-CIRCLEC
Capital project FY2025 CIP Budget Change Revised
Fund Name Appropriations Authority (Increase/Decrease) FY2025
Name Budget
1V&S CO2720 ___
Capital SaniSewer
Projects — Rehab $0.00 This M&C $734,659.00 $734,659.00
Fund Contract
66002 99
Funding is available in the Transfer to Water/Sewer account of the Water and Sewer Fund for the purpose
of funding the SaniSewer Rehab Contract 99 project within the Water & Sewer Capital Projects Fund.
FY2025 - Water PAYGO Appropriations per City Ordinance 27107-09-2024
-- 1=Y2025 — --- - — — - -- --
Amended
FY2025 PayGo YTD PayGo FY2025
Original (includes any Approved This M&C Remaining
Adopted council actions for/Moved to PayGo
PayGo subsequent to Capital Projects Balance
budget
adoption)
$92,597,771.00 $151,458,196.00 ($59,085,878.00) ($734,659.00) $91,637,659.00
Note: There may be other pending actions or recently approved actions that are not reflected in the table
due to timing.
Appropriations for Sanitary Sewer Rehabilitation, Contract 99 project are as depicted below:
Fund Existing Additional project Total*
Appropriations Appropriations
W&S Capital
Projects Fund $7,919,198.00 $734,659.00 $8,653,857.00
56002 _
Project Total $7,919,1913.00 $734,659.00 ,$8,653,867.00
*Numbers rounded for presentation purposes.
Business Equity - William J. Schultz, Inc. dba Circle C Construction Co. agrees to maintain its initial
M/WBE commitment of 16 percent that it made on the original contract and extend and maintain that same
M/WBE commitment of 16 percent to this first change order. Therefore William J. Schultz, Inc. dba Circle
C Construction Company remains in compliance with the City's M/WBE Ordinance and attests to its
commitment by its signature on the Acceptance of Previous M/WBE Commitment form executed by an
authorized representative of its company.
This project is located in COUNCIL DISTRICT 2 and 8.
FISCAL INFORMATION I CERTIFICATION:
The Director of Finance certifies that funds are available in the Water & Sewer Fund, and upon approval of
the above recommendations and adoption of the attached appropriation ordinance, funds will be available
in the W&S Capital Projects Fund, for the SaniSewer Rehab Contract 99 project to support the above
recommendations and execution of the change order. Prior to any expenditure being incurred, the Water
Department has the responsibility of verifying the availability of funds.
FUND IDENTIFIERS (F1Ds),:
TO
Fund
_ _
Department
ID_
"coProject
ID
1�—rogramctivity
I
Budget Reference #
Year (Chartfield 2)
mount
_ I
FROM
Fund
Department
ID
ccounJ
Project
ID
Program
_m
f
ctivity
Budget
Year
Reference #
-
mount
_
_I
(Chartfield 2)
CERTIFICATIONS:
Submitted for Citv Manaqer's Office bw Jesica McEachern (5804)
Originating Department Head: Chris Harder (5020)
Additional Information Contact: John Kasavich (8480)
ATTACHMENTS
1. 25-58318 (APCF C01 Sanitary Sewer Rehabilitation, Contract 99)-NS,pdff
2. 60SSRC99C01-CIRCLEC FID Table (WCF 04.25.25),&I (CFW Internal)
3. 60SSRC99COl-CIRCLEC funds avail.docK (CFW Internal)
4. 60SSRC99COl-CIRCLEC Map.pdf (Public)
5. Form 1295,pdf (CFW Internal)
6.ORD.APP 0SSRC99CO1-CIRCLEC 56002 A0Z5-(t ).docx (Public)
7. PBS CPN CO2720.p-df (CFW Internal)
(CFW Internal)
6OSSRC99COI-CIRCLEC FED Table
2 56002 0600430
2 56002 0700430
2 56002 0600430 4956001 CO2720 C01780 9999
2 56001 0709020 5956001 j
1
1 56002
0600430
5740010
CO2120
C01780 6
9999
1
I
I
56002
I
0700430
574003.0
CO2720
C01780
9999
$251,240.00
$483,419.00
$483,418.75 Pay to Contractor
.Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
12
Signature
John R. Kasavich
Name of Employee
Engineering Manager
Title
goovovQ��
q4 FORT �d
F00000000a�09��0
�"s
do
ATTEST:
acid oxd
pip f °moo °°
da�Il nEXA`oo4p
Jannette Goodall
City Secretary
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX