AMENDMENT NO. 9 TO AGREEMENT
FOR ARCHITECTURAL DESIGN SERVICES
RENOVATE and EXPAND the GENERAL TERMINAL BUILDING at
MEACHAM INTERNATIONAL AIRPORT
STATE OF TEXAS §
§ CITY SECRETARY CONTRACT NO. M. °"®l
COUNTY OF TARRANT §
WHEREAS, The City of Fort Worth and Hahnfeld Hoffer Stanford (Architect) made and entered into City
Secretary Contract No. 40243 (The Contract) which was authorized by the City Council by M&C C-24215,
the 11th day of May, 2010; and Amendment Nos. 1, 2, 3, 4, 6 and 7 were administratively executed in the
amount of$26,850.00 for additional topographic surveys, cost estimates and underground utilities survey;
and Amendment No. 5 was approved by M&C C-24980 on June 14, 2011 to complete the design and
provide construction administration services in the additional amount of $985,732.50 plus up to
$63,680.00 in reimbursable expenses; and Amendment No. 8 was approved by M&C C-26111 on
February 19, 2013 to redesign the Project's approved site and revise completed drawings; and
WHEREAS, further amendment is necessary to redesign the Project's site and floor plans, and to
revise completed drawings as a result of additional changes in order to accommodate a new FBO within
the terminal building; and
NOW THEREFORE, City and Architect, acting herein by and through their duly authorized
representatives, enter into the following agreement which amends the Contract:
1.
Article 1.1, SECTION I —SERVICES OF THE ARCHITECT, a paragraph is added to read as follows:
"Provide additional design service to modify the Poject's currently approved site plan and floor
plan drawings in order to maintain consistency with the inclusion of a new FBO development
within the renovated terminal building and to adhere to a new City of Fort Worth Development
code - iSWMP analysis. The cost of these additional services is $317,917.00 without additional
reimbursable expense fees. The scope of services are described more fully in the Hahnfeld
Hoffer Stanford's letters dated September 17, 2013 subject: Proposal for Additional Services —
Redesign of Completed Building & Site Plans for New FBO Lease in the Airport Terminal Building,
Meacham Airport Terminal Building Renovation — Phase 2 including this letter's attachments
noted as Exhibits "A", which are all attached hereto, respectively, as Attachment "A" and made a
part of this Agreement."
2.
Paragraph 1 of SECTION V-COMPENSATION TO ARCHITECT, is amended as follows:
"The total compensation for all of the assignments to be performed by Architect to complete the
Projects as described in CHARACTER AND EXTENT of ARCHITECT'S SERVICES as
addressed in City Secretary Contract No. 40243 and Amendment Nos. 1 through 9 and hereof
shall be $1,650,679.50, hereinafter referred to as the 'total fee', plus up to $79,245.00 in
reimbursable expenses."
3.
All other provisions of this Contract which are not expressly amended herein shall remain in full force and
"i effect.
a-mot
XXXXXXXXXXXXXXXX The Remainder of This Page Is Intentionally Left Blank XXXXX X
0Ff"ICIAL RECORD
CITY SECRETARY
Amendment No.9 F1" ,14 TX P e t of 2
General Aviation Terminal Building at Meacham International Airport ""� °"°"'"""""°"' '"'""""""""""�" er 2013
�
EXECUTED this the @y Of 2013. in Fort Worth, Tarrant County, Texas.
`
HohnfekJ Hoffer Stanford APPR
By: y: gernaU �Vta J
Principal Assistant City Manager
APPR RECORD �
By: By:
Transpoffation & Public Works Dept. �'City Secretary
APPR
Contract A th ic U
By:
Douglas VKBlack Date:
Assistant City Attorney
OFFICIAL RECORD
crrySECRETARY
WORTH)"IX
Amendment No.8 Page uo,2
General Aviation Terminal Building at Meacham International Airport October 2013
i
�^
0 Hahnfeld
Stanford
A't`714Gfl MF-N T W i
September 17,2013
Mr. Dalton Murayama
Architectural Service Manager
Facilities Management Group
Transportation and Public Works Department
City of Fort Worth
401 West 13th Street
Fort Worth,Texas 76102
RE: Proposal for Additional Services- Redesign of Completed Building & Site Plans for New FBO
Lease in the Airport Terminal Building
Meacham Airport Terminal Building Renovation-Phase 2
Dear Mr. Murayama:
As requested by the City of Fort Worth Aviation Department I am sending you this proposal for the
redesign and redraw of the building and site drawings of the Meacham Airport Terminal Building
Renovation project. Following notification of the acceptance of an offer by Fort Worth Aviation of a new
FBO operator to be located in the Renovated Terminal Building, and the subsequent meetings with the
new FBO operator, we have prepared this contract amendment to revise completed construction
drawings, to include the FBO operator requested changes. These changes include site parking
changes, new access to the airside for vehicles, dedicated secure and covered parking for FBO
customers, relocation of the exit stair for the building, demolition of the 1979 one story addition, a new
fagade design for the west facing side of the building, floor openings in the FBO lease area to the
second floor, and relocation and redesign of the Aviation Offices suite. Additional changes will also be
required to the building structural, mechanical, electrical, and network systems to accommodate the
new FBO lease.
The proposal also includes changes to design and project scope for Landscape and Civil Engineering
due to the recent changes by Fort Worth T/PW for iSWMP and grading plans.This is a recent change to
the city development code, which is now mandatory for all new projects, and was not included in our
base proposal, approved before the adoption of the change to the code. This additional service is
unrelated to the changes for the FBO lease.
Our proposal includes the necessary redesign, and redraw costs to return the drawings to Issue for
Construction completion, and management costs to coordinate the project with the FBO Interiors
Architect and the above mentioned scope, for a lump sum fee of $317,917.00 (three Hundred
Seventeen Thousand, Nine Hundred Nineteen Dollars, and No Cents), not including reimbursables.
No additional Reimbursable Expenses will be required for this amendment beyond the base contract
amount. This proposal includes the assumption redraw and reissue would conclude in late December,
2013.
Our Proposal includes the attached exhibits; Hahnfeld Hoffer Stanford Fee Summary, MYD Fee
Proposal, Leonard Technical Services Cost Proposal, Campos Engineering Inc. Fee Proposal, Teague
Nall Perkins Fee Proposal for FBO Impacts and Improvements, Applied Technology Inc. Fee Proposal
Riddle & Goodnight Fee Proposal, and Teague Nall Perkins Fee Proposal for iSWMP Documents are
attached hereto and part of Exhibit A.
Meacham Terminal Building Renovation September 17, 2013
Professional Services Proposal Page 2 of 2
If you have any questions regarding this Design Amendment Fee Proposal, please give me a call.Thank
you.
Sincerely,
HAHNFELD HOFFER STANFORD
architects planners interiors
Eric A. Claycamp,AI , LEED AVD+(C
Associate Principal/Project Manager
Cc: David Stanford-Hahnfeld Hoffer Stanford
Eric Hahnfeld- Hahnfeld Hoffer Stanford
William Welstead-City of Fort Worth Aviation
Attachments: Exhibit A
EXHIBIT 'Aw
Fee Schedule
Design Amendment for
Expansion and Renovation of the
General Aviation Terminal Building
(Aviation Project 01527)
9/17/2013
0 Hahnfold
Hoffer
Stanford
Hahnfeld
Professional w Reimbursables
0 Stanf000d
Project Manager: Eric Claycamp Date: 9/17/2013
Owner: City of Fort Worth
Project Description: Design Amendment for Aviation Project 01527
4201 North Main Street,Fort Worth,TX 76106
Job Number: 09053-00
Classification Item Firm Fee
Add Service Architectural Hahnfeld Hoffer Stanford $ 145,895
Add Service Structural Engineering MYD Structural Engineers $ 9,400
Add Service Mechanical/Plumbing/Electrical Campos Engineering $ 48,000
Add Service Civil Engineering Teague, Nall, & Perkins $ 26,000
Add Service Landscape/Irrigation LTS Design Group $ 10,588
Add Service Technology Applied Tech Group $ 6,000
Add Service Cost Estimating Riddle&Goodnight $ 6,534
Add Service Tenant Improvement Services Hahnfeld Hoffer Stanford $ 58,000
ADDITIONAL SERVICES (FBO DESIGN CHANGES)TOTAL $ 310,417
Add Service(code change) Civil Engineering Teague, Nall, & Perkins $ 7,500
TOTAL ADDITIONAL SERVICES FOR THIS DESIGN AMENDMENT $ 317,917
REIMBURSABLE SXP NSj 9117/2013
Reimbursable Printing/Postage/Shipping/etc. _
REIMBURSABLE EXPENSE SUBTOTAL $ -
REIMBURSABLE EXPENSE TOTAL $ -
ADDITIONAL+ REIMBURSABLE EXPENSE TOTAL $ 317,917
MAHEINDRA YAJINIK
September 13, 2013
STRUCTURAL ENCINMRS
Mahendra P.Yajnik,P.E. Mr. Eric Claycamp,AIA
President Hahnfeld Hoffer Stanford Architects
200 Bailey Avenue, Suite 200
Fort Worth, TX 76107
RE: Additional Services
General Aviation Terminal Building
Meacham International Airport
Dear Eric:
At your request, we have assembled a proposed scope of services and fees for structural engineering
services for revisions of plans for the General Aviation Terminal Building at the Meacham Internabonal
Airport. Our proposal is based on our discussions with you.
It is our understanding that the extent of additional services will include engineering and plan revisions
to move the exterior stair tower to the north side, add an entry bridge and canopy on the southeast
corner, remove a portion of the second floor for an atrium, provide for new facade and slab at the first
level on the north side.
We propose to provide additional structural engineering services for a fixed fee of$9,400.
All payments are due 30 days from date of invoice.
Should this proposal meet with your approval, please sign below and return one copy to our office for
our files. Acceptance indicates our authorization to proceed.
Sincerely,
MY-D STRUCTURAL ENGINEERS, LLC.
�/r A-k- 5��2
Paul T Lundstrom, Jr., PE
Signature: Title
Date
MY-D Structural Engineers,LLC
305 NE Loop 820,Suite 507-Hurst,TX 76053 -817-284-8056•Fax 817-284-5075
PENN CAMPOS
I I
ENGINEERING, Inc.
V//1 FRO, R, IOWA][,M NOR
V Consufting Engineers
September 12, 2013 Via E-Mail: eclayeamp@hahnfeld.com
HHS Architects
200 Bailey Avenue
Suite 200
Fort Worth, Texas 76107
Attn: Eric Claycamp, AIA, SEED AP BD+C
Associate Principal
Re: Meacham Terminal Building Campos Proposal No. S13-1263.00
Building Revisions Related to New FBO Additional Services
Campos Engineering, Inc. hereby submits this Proposal/Contract for additional professional
Mechanical, Electrical and Plumbing (MEP) Engineering Services in association with the building
revisions to incorporate the requirements for the new FBO that is to be added within the facility.
The proposal is based upon the information in the email from HHS Architects dated September 6,
2013 and the subsequent scope review meeting at your office on September 11, 2013.
SCOPE OF WORK
The Scope of Work shall be as follows:
1. Demolish the existing building addition constructed in 1979 back to the
original building line. The temporary MEP systems connections currently shown for the
area are to be removed.
2. MEP design for build-out of an area on the 1st floor to accommodate relocating the existing
FBO.
3. Relocate the exterior stair tower from the plan east side of the building to plan north.
4. Revise the exist lighting design and evaluate additional lighting for the Public Art display in
the main lobby.
5. Revise the core area on each floor. The core area scope shall consist of relocation and/or
reorientation of the electrical room, IT room and associated corridors. The men's and
women's restroom group in the core is to remain as designed.
6. Provide MEP connections for the relocation of the temporary trailers.
1331 River Bend Drive• Dallas, Texas 75247 • Tel 214.696.6291 • Fax 214.361.6298
HHS Architects
Attn: Eric Claycamp
Campos Proposal No.513-1263,00
September 12,2013
Page 2 of 3
7. Provide new lighting for the canopies at the plan north and south entrances for the new
FBO space. Connect the lighting to the emergency power system.
8. Revise the building exterior lighting as required by the demolition of the 1979 addition.
9. Revise portions of the tenant build-out area on the 2nd floor to facilitate the 2 story
high portion of the new FBO space.
10, Coordinate the stub-outs for sanitary waste and vent, domestic hot and cold water, electrical
and HVAC refrigerant lines into the new FBO space as required by the tenant.
Work Clarifications
1. Plumbing and fire protection is limited to 5 feet outside the building and will be coordinated
with the site civil documents.
2. Based on a preliminary review, a smoke evacuation system does not appear to be required
for the 2 story clear space in the new FBO area. Therefore, a smoke evacuation system for
the area has been excluded, but can be provided as Addition Services.
3. The new FBO tenant space will be finished out as a shell only.
4. Revision of the design for the core men's and women's restrooms has been excluded, but
can be provided as Additional Services.
5. The proposal is based upon issuance of one LEED submittal for the project. Multiple
submittals that may be required due to tenant finish outs is not included, but can be
provided as an Additional Service.
FEES
Campos will provide these Additional Services for the stipulated fee, including reimbursable
expenses as follows:
Redesign to Accommodate the FBO $39,200.00
Site Plan Revisions (Under Current Amendment) $ 8,800.00
Total Fee $48,000.00
This Agreement will constitute an amendment to our Basic Services Agreement. Please return a
HHS Architects
Attn: Eric Claycamp
Campos Proposal No.,S13-1263.00
September 12,2013
Page 3 of 3
copy with your signature acknowledging your acceptance and as our Authorization to Proceed.
Respectfully submitted,
CAMPOS ENGINEERING, INC.
ACCEPTED:
Larry Maynard By: Eric Claycamp, AIA, LEED AP BD+C
MEP Department Leader HHS Architects
Date:
tnp
league nail&parkins www.mpinr cam
wrveyon
September 16, 2013 londscops CfChhftft
Mr. Eric Claycamp
Associate Principal
Hahnfeld Hoffer Stanford
200 Bailey Avenue, Suite 200
Fort Worth, Texas 76107
Re: Meacham Airport Terminal Improvements
Engineering Services - Contract Amendment
FBO impacts and improvements
Mr. Claycamp:
This letter agreement serves as an amendment to the Professional Services Agreement for
Meacham Airport Terminal Improvements to prepare and coordinate the impacts, changes, and
additions for the new FBO improvement. The Contract Amendment also includes the design
services for the removal of the existing single story addition on the west side of the terminal, the
utility coordination, and the addition of air side apron. The additional service also includes
coordination with the American Aero design team, attending FBO coordination meetings and
addressing additional review comments. This additional service will be provided under the terms
of the original agreement.
Based on the additional services identified above, the contract amendment will be:
Twenty Six Thousand Dollars 326,000)
This is for additional engineering services only and no additional surveying or S.U.E. services are
included in the scope of this work. This additional contract amendment is in addition to the
previous contract amendments issued on September 25, 2012 and February 28, 2013. Once
this amendment is signed and returned, the engineering work will begin within five working days.
Should you have any questions or require additional information, please advise.
Sincerely,
tnp
league nall&parkins
Scott A. Gibson, P.E.
Sr. Project Manager
Approved by: Date
s:Lleam_rufledge\proposaiVmnicipallUesVtvAmeacham terminal'Ur-eng service contract amendment-fbo changes.docx
Fort Worth-I 100 Macon Street-Fort Worth,Texas 76102-817.336.S773 Dallas-17304 Preston Road,Suite 1340-Dallas,Texas 75252—214.461.9867
Denton-1517 Centre Plcx*Drive,Suite 320-Denton,Texas 76205-940,383AI77 1, Sherman^200 North Travis Street,Suite 500-Sherman,Texas 75090-901870.1089
Reotst*red by the Texas 8aorcl of Profftilcxral Enai.eors.Fl—W.,F-230� Registered by the Tex.,Board of Professional S.—ev.rs,Firm Nm 100 1 1 6-00
101 Swnmd Ave
S fte 904
Affl",GIVORMIF Fort Woft,TX 76102
MANNANNNEM, 8 17 332-7 913
0 8 C^F2 LE ^N 0 1r F*I a"IA TT 23"NI"179 I ca P,4 .LiapgaLCQ'M L-2M
September 16, 2013
Mr. Eric Claycamp,AIA, LEED AP
Hahnfeld Hoffer Stanford Architects, Inc.
200 Bailey Ave. Suite 200
Fort Worth, Texas 76107
RE: Meacham Terminal Building Renovation Project
Landscape Architecture& Irrigation Modification Design Services
Dear Mr. Claycamp:
We are pleased to submit our priced proposal for landscape and irrigation design modification services on
the above referenced project. My understanding is the scope of work and related site information for the
project are included in the following project design approach.
Landscape, Irrigation, and Urban Forestry requirements are dependent on the developed site's area
(square footage) to determine an artificial lot line(3.1 Acre+/-), minimum site landscape requirements(i.e.
minimum tree and shrub count), and required tree canopy coverage are based on the site's total
developed area and proposed parking area. To perform calculations to ensure compliance with the City's
Landscape and Urban Forestry requirements, and Fort Worth's iSWM criteria is an iterative process that
may require multiple landscape and tree configuration layouts. Our priced fee proposal is based on two
(2) iterations of the site's landscape and urban forestry configuration. In addition, the City requires design
development for the Meacham Terminal Building Renovation and Parking Improvements to meet LEED
Silver certification design criteria.
Scope of Work:
Services to be provided leading to preparation of the construction documents shall include the following:
Preliminary Plan: Preparation of a Preliminary Landscape and Irrigation Plans for the property area that
accommodates the site Landscape, Urban Forestry, iSWM LID requirements, and LEED Silver
requirements. These plans will be site specific in scale and context and shall include all the softscape
components required to comply with City of Fort Worth Landscape and Urban Forestry Ordinances.
Contract Documents:Preparation of the detailed technical drawings and specifications necessary for
construction as well as accurate and cost efficient construction of the approved
Final Construction Plans. Documents will include, landscape plan, urban forestry
plan, irrigation plan, construction details, and specifications for proposed
construction components. Product to be provided will be one reproducible set of
2013-25 Meacham/Mr
the Contract Document package.
Contract Observation:Assisting the Owners agent throughout the bid and construction effort.
Services typically include:
1. Attend pre-construction meeting.
2. Review submittals.
3. Coordinate site landscape, and related work through scheduled meeting at the site to
become familiar with the progress and quality of work and to document, in general, that the
work is proceeding in accordance with the Contract Documents.
Perform final walk through punch list for Substantial Completion and Final Acceptance of the
Our approach to the Landscape and Irrigation Design project will include Schematic Design and
Construction Documents in conformance with U.S. Green Building Council's LEED Silver and City of Fort
Worth's iSWM 5 Low Impact Development design criteria as a alternate design phase. Our priced
proposal is based on preparing Landscape, Urban Forestry, and Irrigation plans, details and
specifications for a 2.10 acre+/- (91,476.00 S.F.) site. The minimum landscape and irrigation design
criteria for this project will include the following:
LANPJWE Mffl:
1. Planting Plan.
2. Landscape tabulation
3. Plant Schedule
4. Landscape specifications and opinion of probable cost.
5. Protected Trees and mitigating information (if necessary).
6. Hardscape plan and/or details, grading, and drainage plans are not included in our design
services.
IRRIG"ON DESIGN:
1. Irrigation Plan(s)
2. Irrigation Details Surface and Subsurface components
3. Landscape Irrigation Surface and Subsurface Irrigation specifications and opinion of probable
costs.
Water conservation is an integral part of the overall landscape and irrigation design process at LTS. To
ensure that we are providing an efficient design for Hahnfeld, Hoffer Stanford. and the City of Fort Worth,
we propose to use drought tolerant plant materials and recommend surface and subsurface irrigation
components we believe will provide the most efficient use of water for site irrigation.
Urban Fometry Plan -Ph. I
1. Show diagram of existing property subject to development.
2. Outline of existing trees to be disrupted or removed.
3. Existing and/or proposed utilities. including calculated areas for right of ways and/or easements.
2
2013-25 Mewharn/P-7r
4. Show proposed site improvements
5. Outline of existing tree canopy area and calculated site area
6. Show locations of all existing large or significant trees, type and canopy areas
7. Forestry plan Ph. I -computation tables.
UrWn F2MVY Plan-Ph. 11
1. Outline of existing tree canopy area and calculated site area.
2, Existing and/or proposed utilities along with easements.
3. Show proposed site improvements
4. Outline of trees to be planted.
5. Forestry plan Ph. 11-computation tables.
To assist LTS in the Forestry Plan preparation Hahnfeld Hoffer Stanford will provide electronic files (.dwg)
for site survey, and tree survey for Phase I & Phase 11 Urban Forestry preparation. Proposed civil
improvements for the Meacham Airport Terminal Building Renovation project will include all existing and
proposed utilities and related utility easements, right of ways, proposed structures, paving and hardscape
areas. The Site survey will include all existing site features, including structures, utilities, right of ways,
easements, existing trees(including tree location, size, type and canopy area), and boundary information
Our estimated fee proposal for landscape, forestry and irrigation design is $6,387.10. Estimated fee
proposal for LEED landscape and irrigation design is$1,169.20. Estimated fee proposal for LOW Impact
Development Design (LIDD) landscape and irrigation design is $3,031.20. Plus reimbursable $530.00
Please, refer to the Itemized cost estimate of Landscape, Urban Forestry, Irrigation, LEED, and LID
design services for additional information and estimated reimbursable costs.
We are confident in our ability to provide quality landscape and irrigation design services for Hahnfeld
Hoffer Stanford and are delighted to have this opportunity to work with you and your staff again. Should
you have any questions or need any additional information, please call our office.
Sincerely,
1,,T Design Group
11 a AS -61 D, LEED AP
nsed I i a #1260
'J"FA
Water ir I s C
Ax ir4 a i
3
2013-25 Mcaeharn/Mr
LTS DESIGN GROUP.
COST ESTIMATE FOR
LANDSCAPE and IRRIGATION MODIFICATION DESIGN SERVICES
MEACHAM AIRPORT TERMINAL BUILDING RENOVATION PROJECT
September 16, 2013
CAST for_LA_NQ$CAPg DESIGN SERVICES:
A. Landscape Plan Re•Design $ 1,545.30
B. Construction Documents $ 960.90
Subtotal Cost for Landscape Design Services $2,606-20
C. Additional services
Services requested, but not specifically included in the scope of services will be considered
additional services. Modifications to drawings, after approval by client, as a result of changes
requested by client or other consultants will be considered additional services and billed at an
hourly rate of $110.00 /hr. *Shop drawing review and construction observation will be invoiced
at $110.00/hr with a 2 hour minimum charge
COST for IRRIGATION DESIGN SERVICES:
D. Irrigation Plan Re-Design $ 1,630.60
E. Construction Documents $ 1,087.10
Subtotal Cost for Irrigation Design Services $2,717.70
F. Additional services
Services requested, but not specifically included in the scope of services will be considered additional
services. Modifications to drawings, after approval by client, as a result of changes requested by client or
other consultants will be considered additional services and billed at an hourly rate of$110.00 /hr. * Shop
drawing review and construction observation will be invoiced at $110.00 [hr with a 2 hour minimum
charge
4
2013-25 Mewhaffi/P-7r
LTS DESIGN GROUP.
COST ESTIMATE FOR
LANDSCAPE and IRRIGATION DESIGN SERVICES
MEACHAM AIRPORT TERMINAL BUILDING RENOVATION PROJECT
September 16, 2013
COST for Mnc_haLn AImyA TeMLinall Building Renovation Project$Ito Forestry Plan Promration:
G. Phase I & 11 Plan calculations $ 650.90
H. Phase I & 11 Plan preparation $ 512.30
Subtotal Cost for Ph-I& 11 Forestry Plan Preparation: $ 1,163.20
Preparation: Meacham Airport Terminal Building Renovation Project
1. Additional services
Services requested, but not specifically included in the scope of services will be considered additional
services. Modifications to drawings, after approval by client, as a result of changes requested by client or
other consultants will be considered additional services and billed at an hourly rate of$100,00/hr.
Total Cost for Landscape,Irrigation,and Forestry Services $1,163.20
COST for Mpacharn ftMd Terminal Building ftUvatio-n.Project Ifte LEED Design Preporatlow
J. Landscape Plan & Plan calculations $ 613.60
K. Irrigation Plan&Calculations $ 655.50
Subtotal Cost for LEED Design Plan Preparation: $ 1,169.20
Preparation: Meacham Airport Terminal Building Renovation Project—LEED DESIGN
L. Additional services
Services requested,but not specifically included in the scope of services YAII be considered additional
services. Modifications to drawings, after approval by client, as a result of changes requested by client or
other consultants will be considered additional services and billed at an hourly rate of$100.00/hr.
CO§T for Meacham&g2rj T pjI Sultding 8"ovation Prolect fte LIDO er2paration:
M. Landscape Plan w/Rain Gardens $ 1,768.20
And/or Bio-Swales
N. Water Budget Calculations $ 1,263.00
For irrigation Water demand and stormwater reduction
Subtotal Cost for ISWM LIDD Plan Preparation: $3,031.20-
2013-25 Meacharn/P-7r 5
*Identified Points for LIDD Landscape
• Use of buffers -4
• Use of Vegetated swales; -3
• Parking Islands
for runoff capture -5
• Drain to pervious areas -4
Preparation: Meacham Airport Terminal Building Renovation Project—LIDD Services
0. Additional services
Services requested, but not specifically included in the scope of services will be considered additional
services. Modifications to drawings, after approval by client, as a result of changes requested by client or
other consultants will be considered additional services and billed at an hourly rate of$100.00/hr.
Total Cost for Landscape, Irrigation,and Forestry Services
LEED&LID Design Services $10,687.60*
P, Reimbursable—LUMP SUM $530-00
2013-25 MewhanVP-7r 6
AmpUedTech Group Luc TECHNOLOGY CONSULTANTS
^
September l2' 2UI3
Mr. Eric& []aycaop
Babnfe|d Hoffer Stanford
200 Bailey Avenue, Suite 200
Fort Worth, Texas 76107
Project: General Terminal Boiluizg- MeachmmKnternmtiomalAirport
Subject: Proposal for Additional Services associated with Technology Re-Design
DeazEzic
' r '
=
Au,`/n The following proposal takes into consideration our recent discussions and review of the
'mmmnc"mxmz^
*v'=z�"smno
5 12 577 2468, anticipated changes to the design of the facility and the impact on the technology designs..
sumroamf
Dallas Applieffech Group's services reflected in this proposal include the following:
m/vcleax Bay
o"u°,.Texas rsz4o
469 688 3800` If Re-Design wf the Telecommunications and Data Infrastructure
o,zz«8moof
mmmo �
wmmoom/oo
Scope ofServices
Our services will focus on re- designs associated with the ce|ocednu on each floor of the IT
Room and the realignment of the associated cable tray and pathways.
Re-Design Services
IN We win coordinate the new designs with 8BS. the MEP and other consultants on the
design team.
* We assume the design elements of the IT backbone feeder and riser cable win not
be modified.
* The revised technology plans will include dctaUed designs and layouts of the
telecommunication rooms, including elevations; and cable tray routing as required..
0111 Coordinate new cable pathway and conduit requirements with other consultants on
the A/£ team.
N Generate updated Construction Documents and Bid Dmcuzueutn,
Meachmmkiermatimma|Airport Page lufZ 89.1220�3
�
AopUedTech Group uc TECHNOLOGY CONSULTANTS
�
Consulting Fee
&ppbedTccb Group's fixed fee for this scope ot work b %S.880. All normal and customary
expenses are included io this amount.
N
Project Assumptions
a This work will be completed within about a two month period.
to Services not included in this scope of work reflect the exclusions in our current
scope ufservices.
�
Summary
Eric, we appreciate the opportunity to continue to work with Hahnfeld Hoffer Stanford on this
project. We look forward to your authorization to proceed. As udvvayx, we are flexible in our
approach $bondd you want to suggest alternatives to the methodology vvphave ouccuoocizrd.
Sincerely,
David Misko
AppUcdTk,h Group LL[-frincipz/
cc: Roberto Mora - /\pp0edTech Group llC- Principal
Meacham |ntcrma,iowa|Aqpm�t Page 2 of 2 09 12.2013
�
�
Riddle & Goodnight Inc-
Construction Cost Estimates/Construction Specifications
PROPOSAL
Date: September 13. 2O13
Attn: ErioC|aynamp
Hahnfe|d Hoffer Stanford
2OO Bailey Street, Ste 2DO
Fort Worth, Texas 761O7
Project: Renovation Meacham Airport Terminal
Service Description:
Provide opinion nf probable cost at following phases:
5O96CDphase $2.574
C[} phase $3,960
We understand you request additional help with the anticipated temporary trailer complex.
The terms and conditions set forth in this quote and attached terms and conditions (if any) for
professional services constitute the agreement between Riddle&Goodnight Inc. and the undersigned
party requesting service.
Payment Terms: Within 30 days following date offirst invoice.
VVe look forward toworking with you on this project!
-g) ,IE:L6�( -
Signature: Riddle & Goodnight Date: September 13. 2O13
Date:
Signature: Purchaser of Professional Service
Printed Name and Title
1sozStag00000hDrive wwx.ndd|e-goodnigh,mm Phone 817.946.7825
Arlington TX 76013
tnp
league nail& perkins www.inpinccw
englneers
svrreyors
February 28, 2013 iendsmpe crchlecia
Mr. Eric Claycamp
Associate Principal
Hahnfeld Hoffer Stanford
200 Bailey Avenue, Suite 200
Fort Worth, Texas 76107
Re: Meacham Airport Terminal Improvements
Engineering Services- Contract Amendment
iSWMP Documents for Grading Permit
Mr. Claycamp:
This letter agreement serves as an amendment to the Professional Services Agreement for
Meacham Airport Terminal Improvements to prepare and coordinate an integrated Storm Water
Management Plan (iSWMP) based on the City requirements to obtain a grading permit. The
Contract Amendment is for the preparation of a Conceptual, Preliminary and Final iSWMP
packages for review and approval by the City of Fort Worth Storm Water Management
Division. This additional service will be provided under the terms of the original agreement.
Based on the additional services identified above, the contract amendment will be:
Seven Thousand Five Hundred Dollars ($7,500)
This is for additional engineering services only and no additional surveying or S.U.E. services are
included in the scope of this work. Once this amendment is signed and returned, the engineering
work will begin within five working days.
Should you have any questions or require additional information, please advise.
Sincerely,
tnp
league nail&perkins
Scott A. Gibson, P.E. �� Tom Rutledge
Sr. Project Manager Principal
Approved by: Date
s:laleam rulledgelproposollmunlclpalitioaMtvArneacham terminaNtr-eng service contract amendment-iswmp.docx
Fort Worth-1100 Macon Street-Fort Worth,Texas 76102-817.336.5773 Dallas-17304 Preston Road,Sulfa 1340-Dallas,Texas 75252.214.461.9867
Donlon�1517 Centre Place Drive,SuNo 320�Dedon,Texas 76285�940.3814177 Sherman-200 North Travis Street,Suite 500�Shannon,Texas 75090.903.870.1089
D ..I.r......1{....J..T....�.q.,...J„t D._1,.,.. _ l e... ..«.. ce..., I_ C nRA o__e..,..._�L,...L_T-.._.e__.�.l O_[...i___I C,._._..... c_ i. .l.A•t t nn
M&C Review Page 1 of 2
Official site of the City of Fort worth, Texas
CITY COUNCIL AGENDA FORTWORT11
w,aumnrvw,rnvamwiuimmvwnurnwnuuowamnuwuwwummoiou�mmummnuirc^enumimurwmMmumssraa!waiu�muwsmuiwnaroiumsuuwu✓nrmiu,rwaeraa�QOaarwwrr.uwnnmuuar�onowmuumntio�aatm!mm�m;w;rMmmrre�!mt awa�tiommmoioonmiwwwmww.nrmarmmmmim000mimiorvmmrapanmtmwmranorurnuaeiianr�mwumirvarroimrcrertoi,:uihturmmuumuiiwan!mmuwmowmmMwrw¢Muwumwvurim
COUNCIL ACTION: Approved on 10/15/2013 - Ordinance No. 20997-10-2013
uiurdvrirar � wvwow0000ttuwwmtmmrv�i oiq;unmwimwti. �mmimmmmimmmmimrumradmwamuouoaamanmam!m�irriiw�rrauwaa,^rwmluetbuui�wmuiuidiNwomurao-rvmemowiwiawmmmwwmmmiomwuwwwiw,wuwmrvmmwmuuiowmmunmww�m,uwuwomm�ammwmmu ,vprµmrwwwdvati�euwozosvdnwawWaumumurrs�imm�vnpuw.ursiwwurommiiwmmuio'
REFERENCE 55FTW MEACHAM
DATE: 10/15/2013 NO.: C-26504 LOG NAME: ADMINBLDG DESIGN AMD
9 (01527)
CODE: C TYPE: CONSENT PUBLIC NO
HEARING:
SUBJECT: Authorize Execution of Amendment No. 9 to City Secretary Contract No. 40243 with
Hahnfeld, Hoffer and Stanford in the Amount Up to $317,917.00 for Additional Design
Documents and Construction Administration Services to Renovate the Meacham
Administration Building at Fort Worth Meacham International Airport and Adopt
Appropriation Ordinance (COUNCIL DISTRICT 2)
�mdwomawav�rrmurnvuwArmvamiaoowmw[rrennnuvnrawmomaanrvannrrnrvr�r Mrnnuiawn v wrwrw,urnimreuu rnn muuir!r.rdeu✓rermiirv�nawranmMUVKmmnrc!�usm,rmmrm�nmro��nrrn¢vmwoomenxnemmrorvivvama r;r,?pmuurrvar,wr„,awimmmnmmwnooiwriumry ai .rx.m:w u!mnvinwwrvirrvinv�mmuxmrmiiii�drncuumruumKnrrw!ireays
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize the use of existing revenue derived from mineral leases on City-owned airports in the
amount of$317,917.00 for the design phase to renovate the Meacham Administration Building at Fort
Worth Meacham International Airport;
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in
the Airports Gas Lease Project Fund in the amount of$317,917.00 from available funds; and
3. Authorize the execution of Amendment No. 9 to City Secretary Contract No. 40243 with Hahnfeld,
Hoffer and Stanford in the amount up to $317,917.00 for additional design documents and
construction administration services to renovate the Meacham Administration Building at Fort Worth
Meacham International Airport.
DISCUSSION:
On May 11, 2010, (M&C C-24215) the City Council authorized the execution of an Architectural
Services Agreement with Hahnfeld, Hoffer and Stanford in the amount of$234,675.00 plus up to
$13,200.00 in reimbursable expenses for a total contract amount of$247,875.00. The Agreement
was for programming and schematic design to renovate and expand the Meacham Administration
Building (Administration Building) at Fort Worth Meacham International Airport (Airport). That Mayor
and Council Communication (M&C) also authorized Transportation and Public Works Architectural
Services project management expenses in the amount up to $50,000.00.
Amendments No. 1, 2, 3, 4, 6 and 7 totaling the amount of$26,850.00, increased the total contract
amount to $274,725.00 and were each administratively executed for additional topographic surveys,
cost estimates for the various schematic design options, and services to locate the underground
utilities.
On June 4, 2011, (M&C C-24980) the City Council authorized the execution of Amendment No. 5 to
City Secretary Contract No. 40243 in the amount of$985,732.50 plus up to $63,680.00 in
reimbursable expenses, increasing the total contract amount to$1,324,137.50 to complete the design
and provide construction administration services to renovate and expand the Administration Building
at the Airport. This M&C also authorized additional Transportation and Public Works Architectura!
Services project management expenses in the amount of$125,000.00 increasing the total amount to
$175,000.00.
httn-Unnnc rfwne.t nro/-nnnr.il na�kP.t/mn rp.vipw acn?TTY-1 RA5Skn_nnnrildntP.10/l 5/ 01'1 10/?.?./?.011
M&C Review Page 20f2
C)O February 13' 2O13` (K8&C (|-26111) the City Council authorized the execution of Amendment No.
8 to City Secretary C0OkraC{ No. 40243 in the amount 0fS85.5O5.0D p|US Up to $2,365.00 in
reimbursable expenses, increasing the total contract amount t0 $1'412'OO8.DD for revisions h] the
previously completed code analysis due tO8n update in the City's policy after the initial code analysis
was drafted. It also |OC\Uded revisions tn site drawings in order to maintain consistency with
surrounding buildings and hangars iO the process of being built.
This Amendment No. 3iStD add tothe plan for the demolition Of the first floor extension OD the west
side of the Administration Bui|ding, design the replacement ofthis area with aircraft rated pavement
for additional apron space, modify the parking layout due to an amendment to an adjacent tenant's
lease space, allow tenants the opportunity tO participate iD the final design and modify construction
phasing b} allow for taxi lane construction north Of the building. The cost pf this amendment,
including reimbursable expenses, iGiO the amount Of$317,917.00 increasing the total contract
amount to $1.729.925.0O. The design for this project ioexpentedtVbeC0mnp|Htedhytheandof
December 2013 with construction Of the renovation tD begin |D spring 0f2O14.
Funding for this project will C0nle from revenue derived from nniOerG| leases on City airports.
K8/VVBEOffiCe: H@hnfeN, H0ffer, and Stanford iSiD compliance with the City's M/VVBE C>[diO3nCe by
committing to an additional 18 percent M/WBE parficipation on this Amendment 9. The City's goal On
this amendment iS18percent.
FISCAL .
The Financial Management Services Director certifies that upon approval O(the above
recommendations, and adoption [dthe attached appropriation ordinance, funds will bg available in
the current capital budget, 8S appropriated, of the Airports Gas Lease Project Fund.
TO Fund/Account/Centers FROM Fund/Account/Centers
2) P240 446100 551929990100 $317,9100 $317J917.00
2) P240 539120 551929990100 $317,917.00 $317,917l0
3) P240 446100 552810152730 $317J917.00
3) P240 539120 552810152730 $317,917.00
Submitted for City Manager's Office by. Fernando Costa (8122)
Originating Department Head: Bill VVe|stead (54D2)
Additional Information Contact: Alfonso Maza0]274\
Ruo8nna Johnson (54O7)
ATTACHMENTS
Meacham Terminal Map.r)df
httn:HoDou.cfwnnLuco/oouncU nmckeKmu l0/77/70| 3