Loading...
HomeMy WebLinkAboutContract 43862-A2 CITY SECRETARY AMENDMENT NO-2 CONTRACT Ni. TO CITY SECRETARY CONTRACT WHEREAS, the City of Fort Worth (CITY) and Shield Engineering Group, PLLC. , (ENGINEER) made and entered into City Secretary Contract No. 43862, (the CONTRACT) which was authorized by M&C C-25817 on the 11th day of September, 2012 in the amount of $131, 291.00; and WHEREAS, the CONTRACT was subsequently revised by: Amendment Number 1 in the amount of $28, 369 - 00 which was authorized administratively on August 23, 2013; and WHEREAS, the CONTRACT involves engineering services for the following project: Sanitary Sewer Rehabilitation, Contract 86. WHEREAS, it has become necessary to execute Amendment No. 2 to the CONTRACT to include an increased scope of work and revised fee. NOWTHMEFORE, CITY and ENGINEER, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: 1. Article I of the CONTRACT is amended to include the additional engineering services specified in a proposal dated September 5, 2013, a copy of which is attached hereto and incorporated herein. The cost to City for the additional design services to be performed by Engineer totals $13, 068 . 00 . 2 . Article II of the CONTRACT is amended to provide for an increase in the fee to be paid to Engineer for all work and services performed under the Contract, as amended, so that the total fee paid by the City for all work and services shall be an amount of $172, 728 . 00 . OFFICIAL RECORD C1 rV" SECRETA Iff R E C E G V'E 0 ()U 2 5 2'(113 Page -1- FT., WORTH, -rx 3 . All other provisions of the Contract, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as of the date last written by a signatory, below. APPROVED: ENGINEER City of Fort Worth Shield Engineering Group, PLLC ernando Costa rQ Z� �, Craig :n/t Barnes, P.E . Assistant City Manager Presid DATE: DATE: 07. APPR,U RECD ED S. Frank Crumb, P.E . Director, Water Department APPROVED AS TO FORM AND LEGALITY: M&C : N/A Date : N/A lack Ir., .ke1lt Assistant City Attorney ATTEST: J. Kayser ( $ NO M&C REQUIRED City Secretary AS OFFICIAL FOR Page _2_ FT, WOWnt, ail rX . � September 5. 2O13 Soon Wong Project Manager City of Fort Worth Water Department 1000ThnnckrODd0DStreet Fort Worth, TX701O2 Re: Sanitary Sewer Rehab Contract 08 CPNO1904 Dear Soon, Shield Engineering Group (SEG) is pleased to submit the following as amended services to the original contract shown above: * Prepare Water Plans toreplace existing 8^ lines in 4th and 5th Street $11,880 (approximately 3500 LF). Water line plans were added to this project mo recommended byC{}FVV Water Dept (Kaaavioh) due to recent water main breaks OO both streets. Plans include water details, overall vvmhsr map exhibit, and existing water meter numbers and sizes. (5 plans sheets, 1 overall water map, 3 detail sheets) 1096aUbrnarkup Total change/addendum tD the contract $13,068 Original contract $131.291 Amendment $28.309 Amendment 2 $13,068 Original contract $172.728 The new contract amount will be $172,72O. The revised M/VVBE participation will meet Or exceed the 1DY4 M/VVBE goal established bythe City on the original contract. See Attachment A for detailed scope of Amendment 2 Water Improvements. Please feel free to contact nne with any questions orcomments. SiDCere|V, Jean-Marie Alexander, P.E. CEO Shield Engineering Group, B^X~LC Eno:Attachment A for Amendment 2 Water Improvements OFFICIAL RECORD CITY SECRETARY Shield Engineering Group, PLLC 1200 W, Freeway, Suite 300, Fort Worth, TY 76102 # office (817) 810-0696 * fax (817) 810-0372