HomeMy WebLinkAboutContract 61369-CO4CSC No. 61369-CO4 DEVELOPER -AWARDED -PROJECT CHANGE ORDER, PROJECT NAME: Longhorn Estates Phase 1 CHANGE CONTRACT: Paving Improvements ORDER No: CITY PARTICIPATIONd YES CFA # CFA24-0041 CITY PROJECT# 105087 CITY SECRETARY CONTRACT # 61369 4 FID # 30114-0200431-105087-EO7685 X # X-27933 FILE # W-3002 INSPECTOR: Michael Perkins Phone No: 682-715-7010 PROJECT MANAGER: Khal Jaafari Phone No: 817-392-7872 CONTRACT UNIT WATER SEWER DRAINAGE PAVING STREET LIGHTS 1 CONTRACT Developer Developer Developer DAYS Cost y}y �pst Developer Cost � Developer Cost Cost Cost 0k1y Cost ORIGINAL CONTRACT $2,289,949.98 F1 a49,149.09 $2,739,064.00 $0.00 $4,384,347.00 $6,323,326.70 $606,993.06 ' $D.00 275 EXTRAS TO DATE $61,160.00 p.00 $8,663.00 50.00 S0.00 $0.00 $44,136.70 $0.00 CREDITS TO DATE $0.00 ;0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 CONTRACT TO DATE $2.361,099.98 11,j49,149.69 $2,747,617.00 $0.D0 I $4,394,347.00 $6,323,326.70 $660.129.76 S0.00 275 (AMOUNT OF PROP. CHANGE ORDER $0.00 $P.00 $0.00 $0.00 $0.00 ($20,824,40) $0.00 $0.00 0 79NA Q�Q RACTAMOUNT $2,351,099.98 S7.249,149.69 $7,747,617.00 $0.00 $4,384,347.00 $6,302,601.30 $660,129.76 30.00 275 TOT�12EV1� L'ONTRACT AMOUNT PER UNIT $3,600,249.67 $2.747,617.00 $4,384,347.00 $5,30 501.30 $660.129.76 REVISED COST SHARE Dev. Cost $15,435,695.04 TOTAL REVISED CONTRACT $16,684,844.73 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Revised: 12-17-2018 Page 1 You are directed to make the following changes in the contract documents: UNIT IV: PAVING IMPROVEMENTS CITY BID ITEM Developer PAY ITEM 9 9 QUANTITY UNIT ITEMPISCRJPTIQN CFW Unit Prce UNIT PRICE Cost City Cost TOTAL 10 3213.0105 152 SY 10 one �m NIA $66.55 $10.115.60 $0.00 $10,115.60 I 11 3213.0301 (1016) SF 4" Cone Sidewalk NIA $7.50 (S7.620.00) $0.00 ($7,620.00) 20 3217.0504 310 LF Preformed Thermoplastic Contrast NIA $40.00 $12,400.00 $0.00 $12.400.00 Markings - 24" Crosswalk 36 9999.9999 (152) SY 10" Cone Pvmt (Stamped Concrete N/A 3235.00 (535.720.00) $0.00 ($35.720.00) Type'B') TOTAL UNIT IV: PAVING IMPROVEMENTS ($20.824.40) $0.00 ($20.824.40)1 Asterisk(') indicates New Pay Item REASONS FOR CHANGE ORDER Sidewalk revised along Street 17 per landscaping recommendations. Meandering sidewalk constructed outside of the Public R.O.W. will be considered private infrastructure and maintained by the HOA. Crosswalk markings added in place of stamped concrete between ADA ramps, stamped concrete Type 'B' placed before intersections. RECOMMENDED: APPROVED: — APPROVED: By: Xf 4 p _gy. By: Name: Michelle Lase Name: Justin Bosworth Name: Chad San Juan Title: Senior Proioct Manager, Pape -Damon Engineers Title: Assistant Vlce President, D.R. Horton- Texas, Ltd. Title: Vice President. Glenn Thurman. Inc. APPROVAL RECOMMENDED: APPROVED: APPROVED AS TO FORM AND LEGALITY: srd��d�PC' 06/11/2025 C-C- 06/18/2025 06/11/2025 By By: By. 11 MH Name: Subv Varuahese Name: Jesica McEachem Name: Richard McCracken Title: Engineering Manager Title: Assistant Citv Manager Title: Sr. Assistant City Attorney RECOMMENDED: Khal Taclfaf'PE�6/04/2025 Kha[Ja fa P.E.(Juna,202510:25CDT) By: Name: Khal Jaafari, P.E. Title: Professional Engineer M&C Number: 24-0224 M&C Date Approved: 3/19/2024 ATTEST v"Qie°°m`AT?pLp4 a " Contract Compliance Manager (Project Manager): ` A Tsau ° avog By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, include ensuring all performance and reporting requirements. Jannette S. Goodall City Secretary [There are NO City Funds associated with this Contract �� RonRon 11—Go nzales [There are City Funds associated with this Contract OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Revised: 12-17-2018 Page 2