HomeMy WebLinkAboutContract 54263-AD10CSC No. 54263-AD10
FORT WORTH SPINKS AIRPORT
MASTER PROFESSIONAL SERVICES AGREEMENT
ADDENDUM NO. 10
This Addendum No. 10 - Scope of Work (SOW) is made as of 06/30/2025
under the terms and conditions established in the MASTER PROFESSIONAL SERVICES
AGREEMENT between the City of Fort Worth ("City") and Garver, LLC. ("Engineer"), the
same being Fort Worth City Secretary Contract (CSC) No. 54263 (the "Master
Agreement" or"MSA").
This Scope of Work is made for the following purposes, consistent with the services
defined in the Master Agreement: Automated Weather Observation System (AWOS)
Survey Services for Fort Worth Spinks Airport. In particular, Engineer shall perform those
functions identified in EXHIBIT A: SCOPE OF SERVICES.
Section I. Scope of Services
The Scope of Services is attached as Exhibit A.
Section 2. Compensation, Reimbursable Expenses, and Billinq Terms:
Processing and payment of Fees and Reimbursable Expenses, including the structure of
payments and invoicing therefore, shall be in accordance with the Master Professional
Services Agreement.
The total Fee that shall be paid to Engineer for the services within this Addendum shall
be an amount not to exceed $4,800.00 and will be paid accordance with Article 2(a) and
Article 3 of the Master Service Agreement which will leave $71,420.00 remaining out of
the $99,900 available for this year (Year 5 of 5) under the Agreement. If the City requests
additional documentation of expenses, the Engineer shall provide such information if
available.
A copy of the fee proposal is attached as Exhibit B.
Engineer shall submit invoices for Fees and Reimbursable Expenses to
Tvler Dale in the City's Aviation Department.
On full and final completion of the Services for this Scope of Work, the Engineer shall
submit a final invoice.
Section 3. Counterparts; Electronically Transmitted Siqnature:
This SOW may be executed in one or more counterparts, each of which when so executed
and delivered shall be considered an original, but such counterparts shall together
constitute one and the same instrument and agreement. Any signature delivered by a
party by facsimile or other electronic transmission (including email transmission of a
portable document file (pdf) or similar image shall be deemed to be an original hereto.
Addendum No. 10 to CSC No. 54263 OFFICIAL RECORD
Between the City of Fort Worth and CITY SECRETARY
Garver, LLC FT. WORTH, TX
Page 1 of 5
Executed in multiple originals on 06/30/2025
CITY OF FORT WORTH, TEXAS:
By: Valeri Washington (Ju2025n 30,
09:29 CDT)
Valerie Washington
Assistant City Manager
Date: 06/30/2025
APPROVAL RECOMMENDED:
By:
--4—
Roger Venables
Director, Aviation
aany�
poF FORr�°a
ATTEST:
v°P!`� p•1Ad
aaan nEzpsa4
By: lJ
Jannette Goodall
City Secretary
APPROVED AS TO FORM
AND LEGALITY:
Cwv(ace Taa4laka
By:Candace Pagliara (Jun 30,�625 07:27 CDT)
Candace Pagliara
Assistant City Attorney
GARVER, LLC.
By:
Mitchell McA' ally, PE
Vice President
Date: June 25. 2025
Contract Compliance Manager:
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Katya Flores
Senior Contract Compliance Specialist
Addendum No. 10 to CSC No. 54263 OFFICIAL RECORD
Between the City of Fort Worth and CITY SECRETARY
Garver, LLC FT. WORTH, TX
Page 2 of 5
GARVER
EXHIBIT A
(SCOPE OF SERVICES)
Generally, the Scope of Services includes the following professional services at Fort Worth Spinks
Airport.
• Automated Weather Observing System (AWOS) Survey Services
1. AUTOMATED WEATHER OBSERVING SYSTEM (AWOS) SURVEY SERVICES
1.1. Garver will serve as the Owner's representative for the AWOS survey preparation and
furnish consultation and advice to the Owner during the performance of this service. Garver
will attend conferences along or with the Owner's representatives, local officials, state and
federal agencies, and others regarding the scope of the proposed project, its general design,
functions, and impacts.
1.2. Garver will assist with the AWOS survey services, to include the following:
1.2.1.Garver will review the survey data upon receipt from registered professional land
surveyor (RPLS) subconsultant and provide the RPLS with quality control review
comments if necessary.
1.2.2.Garver will provide a one -page exhibit with the AWOS survey data in .pdf format.
1.2.3.Garver will provide the client with the survey data file in .dwg format.
Exhibit A — Scope of Services
FWS — On -Call Services —Addendum No. 10 Garver Project No. 20A11016
Spinks Airport
On -Call Services - Task Order No. 10
FEE SUMMARY
Title I Service
Automated Weather Observing System (Awos) Survey Services
Subtotal for Title I Service
Estimated Fees
$ 4,800.00
$ 4,800.00
L:\2020\20A11016 - FWS - On -Call 2020\Contracts\Client\Draft\Addendum No. 10 - AWOS Survey\FWS -Addendum No. 10 - Exhibit B -
Garver Fee Spreadsheet
Exhibit B
Spinks Airport
On -Call Services - Task Order No. 10
Automated Weather Observing System (AWOS) Survey Services
WORK TASK DESCRIPTION E-5 E-4 E-1
Aviation Dallas Aviation Dallas Aviation Dallas
hr hr hr
�1. Project Administration
Coordination with Client 1
Internal Coordination 1
Quality Control Review of Survey Data 1 1
AWOS Survey Exhibit Development 3
Subtotal - Project Administration 0 3 4
Hours 0 3 4
SUBTOTAL - SALARIES: $1,527.00
DIRECT NON -LABOR EXPENSES
Document Printing/Reproduction/Assembly $0.00
Office Supplies/Equipment $23.00
Computer Modeling/Software Use $150.00
Travel Costs $0.00
SUBTOTAL - DIRECT NON -LABOR EXPENSES: $173.00
SUBTOTAL: $1,700.00
SUBCONSULTANTS FEE: $2,698.00
ENGINEER MARKUP (15%): $402.00
TOTAL FEE: $4,800.00
FORT WORTH
Routing and Transmittal Slip
Aviation
Department
DOCUMENT TITLE: Addendum No. 10 for Spinks 5-Year Master Services Agreement
M&C CPN CSO # 54263
DATE: 6/25/2025
INITIALS
TO:
1.
Joe Hammond
2.
Roger Venables
3.
Candace Pagliara
4.
Valerie Washington
i
5.
Jannette Goodall
to Goodall
59
DOC#
DATE OUT
06/25/2025
06/25/2025
06/30/2025
06/30/2025
06/30/2025
DOCUMENTS FOR CITY MANAGER'S SIGNTURE: All documents received from any and all City
Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, David will review
and take the next steps.
NEEDS TO BE NOTARIZED: ❑ Yes ❑x No
RUSH: ❑ Yes ❑X No SAME DAY: ❑ Yes ❑ No NEXT DAY: ❑ Yes ❑ No
ROUTING TO CSO: ❑x Yes ❑ No
Action Required:
❑ As Requested
❑ For Your Information
1 Signature/Routing and or Recording
❑ Comment
❑ File
❑ Attach Signature, Initial and Notary Tabs
Return to: Please call Tyler Dale at ext. 5416 for pick up when completed. Thank you.