HomeMy WebLinkAboutContract 61741-CO2gp4UUpn�n d1, F°G�RT�dkd P�'o ° °O��Id dv8 °=d ° �d FORTWORTH. an nn56gdCSC No. 61741-0O2 Attest: Jannette S. Goodall, City Secretary City Of Fort Worth Change Order Request Facility and Project Crime Lab Generator Replacement City Sec No. 61741 Description: Funding (FID) No.(s) 30100 0210410 5740010104327 CAPEX 9999 City Project No 105215 Contractor: I SDB INC. I Change Order# 0 Date: 1 6/11/2025 1 City Project Mgr. JJackson Jones I City Inspector: 1John Fowler I Phone Number:1817-269-6578 1 Phone Number: 1(682) 201-1918 1 Contract Time (CD) Original Contract Amount -------------------------------- •-----------------------------------------------------------------1 5813,983.00 0 1 Extras to Dats--------- 1 0.00 0 1 Creditsto Date-----------------------------------------------------------------------------------------• ....................1 0.00 0 1 Pending Change Orders (in M&C Process) --------- 1 0.00 0 1 Contract Cost to Date ------------------------------------------------------------------------------------------- ...........1 5813,9 3.00 0 1 Amount of Proposed Change Order --------- 1 $37,909.00 0 1 Revised Contract Amount ------------------------------------------------------------------------------------------ ........1 5 51,892.00 0 1 Original Funds Available for Change Orders --------- 1 0.00 Remaining Funds Available for this CO ---------------- 1 0.00 1 Additional Funding (if necessary) ------------------------ 1 0.00 I CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 1 4.65 % 1 MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST + 25%) 1 $1,017,478.75 1 JUSTIFICATION (REASONS) FOR CHANGE ORDER The purpose to Change Order #2 is to reconcile the General Contingency Allowance from the Crime Lab Generator Replacement - Early Out Package project to Crime Lab Generator Replacement. This early out project was executed by M&C 24-0053 (CS61183) for the generator procurement for the Police Department's Crime Laboratory. An increase of $37,909.00 to the original contract amount of $813,983.00 to CS61741 for a revised contract amount of $851,892.00, a 4.65% increase to the original contract. This results in a increase in project sum with no change to project duration. M&C 24-0585 (CS61741) authorized the remaining funds and construction contract for the Crime Lab Generator Replacement. SDB, INC. was selected as the Contractor on March 26, 2024, with a Base Bid of $896,727.88 plus General Contingency Allowance of $67,254.59. To expedite the project, an early out package was executed with CS61183 for $150,000.00, which included a General Contingency Allowance of $37,909.00. The remaining construction contract funds were executed with CS61741 for $813,983.00, which included $29,345.59 of General Contingency Allowance. Change Order #2 will add to the General Contingency Allowance from CS61183 ($37,909.00) to CS61741($29,345.59) to combine the total of $67,254.59 for CS61741. Funding provided by Police Department. It is understood and agreed that the acceptance of this Change Order by the contractor constitutes an accord and satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to the above Change Order. Contractor's Company Name I Contractor Na SDB, INC. Madison Ashcroftv,p 06/18/2025 PMD Inspector Date A ector - Properly nt Department Date C 14 06/23/2025 4�•Owr 4. 06/27/2025 PMD Superintendent Date Director -Property Management Department Date ((Project 06/23/2025 ` 07/01 /2025 Manager JAE Date Sr. Assistant City Attorney Date T 1.a&l wlac 1 06/23/2025 07/02/202 Stephen Hines (Jul 2, 202508:32 CDT) kL Project Architec Date As Date 06/23/2025 "� 07/02/2025 Paul Morris (Jun 23, 202519:56 CDT) alaria Washinct— i' lul 7. 9099 10.4R CDTI M&C Number M&C Date Approved Contract Compliance Manager: By signing I acknowledge that I am the person responsible for the monitoring and administration of this contract, including ensuring all performance and reporting requirements. OFFICIAL RECORD CITY SECRETARY N'k� 24 ems 11 -aec0n Nikita Watts FT. WORTH, TX Sr. Capital Projects Officer CONTRACTIP4G SDIBSERVICES SDB, Inc. 8131 Lyndon B Johnson Fwy. #785 Dallas, TX 75251 (469) 619-3753 CHANGE ORDER PROPOSAL CUSTOMER: City of Fort Worth CHANGE PROPOSAL NO.: CONT02 ADDRESS: 200 Texas Street DESCRIPTION: Reallocate Remaining Owner Fort Worth, Texas 76102 Contingency Funds JOB DESC.: Crime Lab Generator Replacement DATE SUBMITTED: 3/28/2025 CONTACT: John Fowler SDB JOB NO.: 10-0210-00/-01 PO #: FW021-0000020727 / FW021-0000022082 PROPOSAL TYPE.: LUMP SUM We are pleased to propose the following: 1) Deduct ($37,909.00) from remaining owner contingency from early out contract - PO #FW021-0000020727 - and reallocate $37,909.00 into owner contingency funds of construction contract - PO #FW021-0000022082. 2) New contract amount for early out - PO #FW021-0000020727 will be $112,091.00. 3) New contract amount for construction contract - PO #FW021-0000022082 will be $851,892.00. 1) 2) 3) 1) Permits 2) Premium time unless otherwise indicated 3) Removeal of Hazardous Waste 4) Unforeseen schedule setbacks due to pandemic measures 5) Expediting material is not included SDB, Inc. CONTRACTOR Mad i yo-w Ay.kc off SIGNATURE 3/2 81202-5 DATE City of Fort Worth OWNER / PRIME SIGNATURE SDB CONFIDENTIAL CO Proposal (OC Moves) 3/28/2025