HomeMy WebLinkAboutContract 50570-A3CSC No. 50570-A3
AMENDMENT No . 3
TO CITY SECRETARY CONTRACT No. 50570
WHEREAS, the City of Fort Worth (CITY) and James DeOtte Engineering,
Inc., (ENGINEER) made and entered into City Secretary Contract No. 50570, (the
CONTRACT) which was authorized by M&C C-28631 on the 201h day of March, 2018,
in the amount of $469,270.00; and
WHEREAS, the CONTRACT was subsequently revised by Amendment No. 1 in the
amount of $99,454.00 authorized administratively on June 25th, 2019 and
Amendment No. 2 in the amount of $26,010.00 authorized by M&C 22-0098 on
February 8th, 2022 ; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
Lake Arlington Lift Station Upstream and Downstream Parallel Relief
Sanitary Sewer Gravity Mains, CPN 101311; and
WHEREAS, it has become necessary to execute Amendment No. 3 to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional engineering
services specified in proposal attached hereto and incorporated herein. The
cost to City for the additional design services to be performed by Engineer
totals $68,900.00 (Sewer).
2.
Article II of the CONTRACT is amended to provide for an increase in the
fee to be paid to Engineer for all work and services performed under the
Contract, as amended, so that the total fee paid by the City for all work and
services shall be an amount of $663, 634.00. OFFICIAL RECORD
CITY SECRETARY
3 FT. WORTH, TX
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
City of Fort Worth, Texas Lake Arlington LS Parallel Relief SS GM
Prof Services Agreement Amendment Template CPN 101311
Revision Date: 12/08/2023
Page 1 of 2
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
APPROVED:
City of Fort Worth
Jesi ca McEachern
Assistant City Manager
DATE: 07/03/2025
ATTEST: q
Jannette Goodall
City Secretary
APPROVAL RECOMMENDED:
( Y a4zlG
ChristoI2 Pr H r�,(Io ?n?r) f1935 (-DT)
Christopher Harder, P. E.
Director, Water Department
Contract Compliance Manager:
�44 -Qntju
p of FOR %
o �09•i a
l.o
dvo o=d
Qa�� �E4p5� a
ENGINEER
James
sDDeOOttte Engineering, Inc.
�LJ`
Brian Darby, P.E.
Vice President
DATE. 6/26/25
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
TorSholola, P.E.
Project Manager
APPROVED AS TO FORM AND LEGALITY:
fj�
Douglas Black (Jul 2, 202511:25 CDT)
Douglas W. Black
Sr. Assistant City Attorney
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: 121'08/2073
Paqe 2 of 2
M&C No.#:N/A
M&C Date: N/A
Farm 1295: N/A
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Lake Arlington LS Parallel Relief SS GM
CM 101311
James..... ......
=:. DeOtte
`:. En ineerin
ENGINEERING Inc. .............................
.tune 23, 2025
Mr. Tony Sholola, P.E.
Assistant Water Director
Water Department
City of Fort Worth
100 Fort Worth Trail
Fort Worth, Texas 76102
Ref: Amendment No. 3
Lake Arlington Lift Station Gravity Sewer Mains
City Secretary No. 50570
City Project No. 101311
Mr. Sholola,
Civil Engineadng
Lond Surveying
Conslruclion MPnpgsm4n!
Hyd[alaglc and Hydraulic ModeDng
Due to additional services requested by the City as part of the referenced project,
James DeGtte Engineering, Inc. will perform the work outlined in the following
items:
Scope of Work
Project Management:
1. Additional required monthly BE reports will be required for the duration of
this Amendment #3 that exceeds the number of reports already submitted
that were included in the original scope of services and Amendment # 1
and Amendment #2.
2. Additional coordination was requested by the City to manage the updates
required to incorporate our revised & updated plans and quantities into
another on -going construction project.
Construction Phase Services:
The City has requested for us to update our completed construction project
to prepare and provide revised plans and quantities that will be used in
another on -going construction project.
2?R Dot lie Lynn Pal kwaySre, 119 ■ RA War 11s. Ix, 76120 ............... phtvs� 617,�6.EE77
t$PRS rlrm Rap Su[v.Ho. i0$0i4Q7 ......................................
I ... iOPELS Fiinl deg. E,ts}. NO.
June 23, 2025
Amendment No. 3
Lake Arlington Lift Station Gravity Sewer Mains
Page 2
Fee
JDEI anticipates the fees listed above for the project to be a not to exceed
amount of $68,900.00. All costs, associated with the identified scope of work, will
be lump sum for the scope provided and will be billed as a percentage of
completed work as determined by J DEL
Contract Amount: $469,270.00
Amendment # 1 Amount: $ 99,454.00
Amendment #2 Amount: $ 26,010.00
Amendment #3 Amount: $ 68,900.00
Revised Total Amount: $663,634.00
This scope of work assumes any services not specifically listed as part of this
contract will be treated as an additional service. The owner will be notified before
any additional services are performed.
Sincerely
w
MMM
Brian Darby, P.E.
Vice President
fcnc8l7.y3G.UCd5 2''�k Wnffe!•rnnt'r.Fkr.oy5re.114 Ftxr Wcsrlfr !><.Ydl2� pt�erry811.;4d.EB77
WaSFlrrviPop-Sung.Nu-i010140(i..••....•.•...•• •.� •......�.•....,. J1Q�......�•....•..•....•........................
.TSPELSEimR%,i-Eu1.No. 8917
E.,.:rv1.V.�'
I Task No. Task Description
Rate
11.0 Project Management
m Managing the I.
1.2 Communications and Reporting
Expense
Total Expense
Principal EIT RPLS subconsultanf Task Sub Total
Manatt]jpr Enoineer Crew Cost Travel Reproduction Cost
$260 $235 $170 S160 $260 $250 BE Nan -BE
10 92 80 0 D 0 S37,820 So $0 s0 so so $37,820
SD so $0
Level of Effort Spreadsheet
TASK/HOUR BREAKDOWN
Design Services for
Lake Arlington Lift Station Gravity Sewer Mains
Amendment #3
City Project No, 101311
Labor(hours)
Project Project Survey Field Total Labor
Prepare Monthly BE Reports (assumes 6
1.2.3
months)
12
1.2.7
Coordination Meetings
101
8o
Sol
1
2.0
Conceptual Design (3o-Percent)
01
o1
D1
01
3.0
Preliminary Design (60 Percent)
0
01
01
DI
4.0
Final Design
0
01
o1
01
5.0
Bid Phase
of
01
of
01
6.0
Construction Phase Services
81
40
401
80
6.1
Construction Support
I
Change Order Preparation (plans and
6.1,B
quantities
8
40
40
80
7.0
ROWlEasement Services
01
0
DI
01
8.0
Survey
01
01
01
Di
.0
Additional Services
0
D
O
0
I
Totals
181
.
1201
80
(A)
Total Fee
$68,96D
(B)
Survey Fee
s0
(C
Total Fee (-)
survey Fee
$68.900
Water
Fee
(D % of C)
Sewer Fee (100% of
C)
$0.00 I
$68,900.00
Description
WP
Water
Sewer 1
Conceptual Design (30%)
31
$0.00
$37,820.00 l
Preliminary Design (60%)
32
$0.00
$0.00 1
Final Design (10%)
33
$0,00
$31,080.00 1
Survey
51
$0.00
$0.00 1
1
1 Subtotal
1
$0.00 1
1
$68.900.00
1 Total I
$68,900.00
1
City of Fort Worth, Texas
Attachment 3 - Level of Effort Supplement
$2.820
so
S2.820
$35.000
s0
S35,000
01 0
So
Sol
$ol
$0
So $0
so
of 0
$o
Sol
Sol
s0
so so
$0
0 0
$0
Sol
Sol
so
so $o
$o
0 0
s0
i
so1 l
$0
Sol
So $0
$o
D 0
$31,080
Sol
$oj
I
5o�
I
so $o
$31.080
S31.0B0
I
SO
S31,0Bo
0 0
$0
$0
$01
$01
$0 $0
$0
0 0
Sol
$0
$0
sot
$0 $0
$0
0 0
Sol
$01
Sol
Sol
$0 $o
so
0 0
568,gD01
$ol
Sol
Sol
so Si)
S68,900.00
Project Summary
Total hours
350
Total Labor
$68.900
Total Expense
s0
BE Subconsultant
so
Nan -BE Subconsultant
so
10% Sub MarkupI
s0
S BE Participation 1
0.0 %
Total Project Costl
$68,900.00