HomeMy WebLinkAboutContract 62630-CO1CSC No. 62630-COl
F_ O RT WORTH City of Fort Worth
Change Order Request
Project Name: 1 Downtown Cast Iron Water Main Replacement
Project No.(s)] 060043010700430/105064 1 DOE No. I N/A
City Sec No.: 62630
City Proj. No.: 105064
Project Description: I Cast Iron Water and/or sanitary sewer main replacements and sidewalk improvements in the Downtown area.
Contractor: William J. Schultz Inc. dba Circle C Construction Co. Change Order# 1 1 Date M 6/25/2025
City Project Mgr.1 Dena Johnson, P.E. City Inspector: Fabian Diaz-Aguinaga
Phone Number:l 817-392-7866 Phone Number: 817-392-8371
Sidewalk
Contract Time
Dept, Water Sewer Improvements Totals (Calender days)
iTPW�
Original Contract Amount $18,949,716.50 $227,220.00 $135,10 .00 $19,312,041.50 640
Extras to Date $0.00 1 $0.00 $0.00 $0.00
Credits to Date
Pending Change Orders (in M&C Process)
Contract Cost to Date $18,949``716.50 $227 220.00 $135,105.00 $19,312,041.50 640
Amount of Change Order $384,950.00 I $4000.00 j $0.00 $466,950.00 080
Revised Contract Amount $19,334,666.50 f $309,220.00 $135,105.00 $7,635,394.75 720
Original Funds Available for Change Orders $473,743.00 I $22,722.00 $13,511.00 $509,976.00
Remaining Funds Available for this CO $473,743.00 I $22,722.00 $13,511.00 $509,976.00
Additional Funding (if necessary)
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT 2,42%
MAX ALLOWABLE CONTRACT AMOUNT (ORIGINAL CONTRACT COST+ 25%) 1$24,140,051.88
�WITIFICATION (REASONS) FOR CHANGE ORDER
Change Order No.1 will primarily provide compensation for the following:
•Replacement of industrial type pavement that was encountered during consrtuction on Florence Street and W.
13th Street
• The installation of 24-inch ductile iron pipe to connect to an existing cast iron pipe.
• Increased quantity of ductile iron pipe fittings for existing water main
• Additional 8-inch water line lowering on the project to clear conflicts
• By other than open cut installation to lower a project 8-inch water main under a 90-inch storm drain pipe
conflict on the 13th Street/Henderson Street intersection I
• Repairs to existing storm drain repairs that were encountered during construction and additional traffic control
on the project.
Staff concurs with the contractor's request for 80 additional days on the project for the change order.
Contractor's Company Name I contractor Name
William J. Schultz Inc. dba Circle C Construction Co. Tell Skelly
Inspeclo ; J
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Contractor Signature Date
�scs' cS! .ZS-Z5-
I man a ` _ Date
r2w lKdd/1. Fi/75/�.r, I
uction pe disor ater ept) Date
T.S. 07/01 /202 lc4uv kcs-b� 6l26/2 i t t .City Attorney: Date. ssisf t City Manager Date
.ouglas Black (Jul2, 202511:14 CDT)
07/02/21 25 107/03/2025
ll Actiff lIf RelPed) j
M&C Number 25--06-4-0--1 M&C Date Approved ' 6/2412025
FC-' RT 'CVO RT H City of Fort Worth
Change Order Additions
Project
Name Downtown Cast Iron Water Main Replacement
City Sec No.:
1 62630
Project No.(s): 0600430/0700430/105064
DOE No.1 N/A
City Proj. No.:
1 105064
Project I Cast Iron Water and/or sanitary sewer main replacements and sidewalk improvements in the Downtown area.
Description
Contractor William J. Schultz Inc. dba Circle C Construction Co.
Change Order: I
Date:1 6/25/2025
City
Project Mgr. Dena Johnson, P.E.
City Inspector I Fabian Diaz-Aguinaga
ADDITIONS
11 tm
UESCRIP IIUN
DEPT
Qty Unit
Unit Cost
! Total
68
Traffic Control
Water
1.00 MO
$18,500.00
$18,500.00
110
24" Ductile Iron Pipe w/ CSS Embedment and Backfill
Water
40.00 LF
$1,000.00
$40,000.00
111
Ductile Iron Fitting > 16"
Water
1.00 TN
$25,000.00
$25,000.00
112
Ductile Iron Fitting < 16"
Water
1.00 TN
$18,500.00
$18,500.00
113
CLSM to Below Pavement
Water
150.00 CY
$180.00
$27,000.00
114
Concrete Repair for Reinforced Streets w/ Industrial Repair & 2 SY of HMAC 5'
Water
900.00 LF
$240.00
$216,000.00
115
Masonic Temple Water Meter Retaining Walls
Water
100.00 SF
$65.00
$6,500.00
116
Masonic Temple Water Meter Retaining Walls Fall Protection
Water
15.00 LF
$550.00
$8,250.00
117
18" Water Lowering
Water
12.0t) 1EA
$14,500.00
$29,000.00
118
JFire Hydrant Removal
Water
1.00 JEA
$1,250.00
1$1,250.00
119
IFire Hydrant Elevation
/Water
3.00 VF
I$1,500.00
120
16" Gate Valve
Water
1.00 1EA
1$500.00
$2,200.00
1$2,200.00
121
Casing BOTOC to include launch/ receiving pits excavation and shoring
Water
115.00 ELF
1$275.00
1$4,125.00
122
�6"
" Carrier Pipe
/Water
115.00 JLF
$275.00
1$4,125.00
123
1Storm Drain Box Repairs
/Water
11.00 BLS
$20,000.00
124
Additional 8" Valve at Florence for isolation and testing
/Water
�
1.00 JEA
$18,500.00
1$20,000.00
$18,500.00
13
Drop Manhole
'Sewer
I
I 1.001EA
�
1$15,000.00
$15,000.00
14
14'
8" Ductile Iron Pipe w/ Standard Rock Embedment, Backfilled CLSM @ 12' to
ISewer
60.0001LF
$375,00
1$22,500.00
15
Connect to Existing drop and core manhole
Sewer
I 1.0001EA
1$1,750.00
1$1,750.00
16
1Plug Original Drop Connection
Sewer
I 1.000 EA
1$1,750.00
1$1,750.00
17
(Epoxy Coating for Manhole
(Sewer
20.00 VF
1$525.00
1$10,500.00
18
Parking Meters
Sewer
1.001LS
1$8,500.00
$8,500.00
19
[Traffic Control
ISewer
1.001MO
1$18,500.00
$18,500.00
20
Additional Bypass Pumping
I
Sewer
1
I� 1.001LS
I I
I
1$3,500.00
I
$3,500.00
Water
$440,450.00
Sewer
$82,000.00
Sidewalk Improvement
Page 2 of 4
Additions Sub Total
$522,450.00
FC]RT Wo R_ T H City of Fort Worth
Change Order Deletions
Project Name Downtown Cast Iron Water Main Replacement City Sec No.: 62630
Project No.(s): I 0600430/0700430/105064 , DOE No. I N/A City Proj. No.: 105064
Project Description Cast Iron Water and/or sanitary sewer main replacements and sidewalk improvements in the Downtown area. 1
Contractor f William J. Schultz Inc. dba Circle C Construction Co. Change Order: FFI Date I 6/25/2025
City Project Mgr. Dena Johnson, P.E. City Inspector: I Fabian Diaz-Aguinaga
DELETIONS
ITEM DESCRIPTION DEPT Qty Unit Unit Cost Total
13 8" PVC Water Pipe Water 15.00 LF $275.00 $4,125.00
56 10' Wide Ashphalt Pvmt Repair, Arterial Water 300.00 LF $185.00 $55,500.00
Water $55,500.00
Sewer
Sidewalk Improvements
Page 3 of 4 Deletions Sub Total $55,500.00
' MWBE Sub
Co #
M1WBE Breakdown for this Change Order
f Type of Service Amount for this CO '
Total $0.00
Previous Change Orders
DATE i AMOUNT
Total $0.00
Page 4 of 4
6/25/2025
CPN 105064
16-42 inch Cast Iron Water Main Replacement in Downtown Fort Worth
Chanv,e Order 1 Notes
Staff has reviewed the requested prices and considers them to be fair and reasonable.
City of Fort Worth, Texas
Mayor and Council Communication
DATE: Tuesday, June 24, 2025 REFERENCE NO.: **M&C 25-0640
LOG NAME: 60WMCASTIRONRDOWNTC01-CIRLCEC
SUBJECT:
(CD 9) Authorize Execution of Change Order No. 1 in the Amount of $466,950.00 to a Contract with William
J. Schultz, Inc. dba Circle C Construction Company for the 16-42 Inch Cast Iron Water Main Replacement
in Downtown Fort Worth and Adopt Appropriation Ordinance to Effect a Portion of Water's Contribution to
the Fiscal Years 2025-2029 Capital Improvements Program
RECOMMENDATION:
It is recommended that the City Council:
1. Authorize execution of Change Order No. 1 in the amount of $466,950.00 and an additional 80
calendar days to City Secretary No. 62630, a contract with William J. Schultz, Inc. dba Circle C
Construction Company for the 16-42 inch Cast Iron Water Main Replacement in Downtown Fort
Worth project for a revised contract amount of $19,778,991.50; and
2. Adopt the attached appropriation ordinance increasing estimated receipts and appropriations in the
Water and Sewer Capital Projects Fund in the amount of $466,950.00, transferred from available
PayGo funds within the Water and Sewer Fund, for the purpose of funding the 16-42 inch Cast Iron
Water Main Replacement in Downtown Fort Worth project (City Project No. 105064) and to effect a
portion of Water's Contribution to the Fiscal Years 2025-2029 Capital Improvement Program.
DISCUSSION:
On December 10, 2024 by Mayor and Council Communication (M&C) 24-1137, the City Council
authorized a construction contract with William J. Schultz, Inc. dba Circle C Construction Company in the
amount of $19,312,041.50 for 16-42 inch Cast Iron Water Main Replacement in Downtown Fort Worth.
Change Order No. 1 will primarily provide compensation for the replacement of industrial type pavement
that was encountered during construction on Florence Street and W. 13th Street, the installation of 24-inch
ductile iron pipe to connect to an existing cast iron pipe, ductile iron pipe fittings for existing water main,
additional 8-inch water line lowering on the project to clear conflicts, by other than open cut installation to
lower a project 8-inch water main under a 90-inch storm drain pipe conflict on the 13th Street / Henderson
Street intersection, repairs to existing storm drain that were encountered during construction and
additional traffic control on the project.
It is the practice of the Water Department to appropriate its CIP plan throughout the Fiscal Year (FY),
instead of within the annual budget ordinance, as projects commence, additional funding needs are
identified, and to comply with bond covenants. The actions in the M&C will appropriate funds in support of
the Water's portion of the City of Fort Worth's Fiscal Years 2025-2029 Capital Improvement Program.
Funding is available in the Transfer to Water/Sewer account of the Water and Sewer Fund for the purpose
of funding the 16-42 inch Cast Iron Water Main Replacement in Downtown Fort Worth project within the
Water & Sewer Capital Projects Fund.
FY2025 - Water PAYGO Appropriations per City Ordinance 27107-09-2024
FY2025
FY2025
YTD PayGo This M&C
FY2025
Original
Amended
Approved
Remaining
Adopted
PayGo
for/Moved to
PayGo
PayGo
(includes any
Capital Projects
Balance
council actions
subsequent to
budget
_ adoption)
,$92,597,771.00 $151,458,196.00 ($69,122,695.00) ($466,950.00)A81,868,551.00
Note: There may be other pending actions or recently approved actions that are not reflected in the table
due to timing.
Appropriations for 16-42 inch Cast Iron Water Main Replacement in Downtown Fort Worth project are as
depicted below:
Fund Existing Additional i project Total*
Appropriations � Appropriations
W&S Capital
Projects Fund $21,893,185.00 $466,950.00 $22,360,135.00
56002
General Capital
Projects — Fund $160,505.00 $0.00 $160,505.00
30100
Project Total $22,053,690.00 $466,950.00 J$22,520,640.00
*Numbers rounded for presentation purposes.
Business Equity -William J. Schultz, Inc. dba Circle C Construction Co. agrees to maintain its initial
M/WBE commitment of 10.67 percent that it made on the original contract and extend and maintain that
same M/WBE commitment of 10.67 percent to this first change order. Therefore William J. Schultz, Inc.
dba Circle C Construction Co. remains in compliance with the City's M/WBE Ordinance and attests to its
commitment by its signature on the Acceptance of Previous M/WBE Commitment form executed by an
authorized representative of its company.
This project is located in COUNCIL DISTRICT 9.
FISCAL INFORMATION / CERTIFICATION:
The Director of Finance certifies that funds are currently available in the Water & Sewer Fund and upon
approval of the above recommendations and adoption of the attached appropriation ordinance, funds will
be available in the W&S Capital Projects Fund for the 16 to 42-in Cl WM Dwntwn Repl project to support
the above recommendations and execution of the change order. Prior to any expenditure being incurred,
the Water Department has the responsibility of verifying the availability of funds.
FUND IDENTIFIERS (FIDs):
TO
!Fund' Department IAccoun Project JProgramActivityj Budget Reference # Amount;
ID ID Year (Chartfield 2) 1 1
FROM
Fund Department ccoun Project Program ctivity Budget Reference # �Amount�
ID ID Year , (Chartfield 2)
CERTIFICATIONS:
Submitted for Cite Manager's Office bv: Jesica McEachern (5804)
Originating Department Head: Chris Harder (5020)
Additional Information Contact: Dena Johnson (7866)
ATTACHMENTS,
1. 60WATERMAIN CASTIRON REPLACE DOWNT CO1-CIRCLE-Q pelf (Public)
2. 60WMrASTIRONRDOWNTC 01-CIRCLEC FID Table (WCF 04.30.25).xlsx (CFW Internal)
3. FOWMQASTIRONRDOWNTC01-GIRL CEC funds availability pdf (CFW Internal)
4. A=ptance of Previous Commitment Form CO1 - TS,pdf (CFW Internal)
5. Form 1295,pdf (CFW Internal)
6. ORD.APP 6OWMCASTIRQNRDOWNTCOI-CIRLCEC 56002 AQ25(r2) (1).docx (Public)
7. PBS CPN 105064,W (CFW Internal)
60WMCASTIRONRDOWNfCOI-CIRCLEC FID Table
2
56002
0600430
4956001 105064
2025
j$
384,950.00
2
i 56002
0600430
105064
2025
1 $
384,950.00
2
56002
0700430
4956001 105064
2025
y S
2
56002
0700430
105064
2025
882,000.00
2,000.00
2
56001
0101120
1956001
1 $
384,950.00
2
56002
0600430
4956001 105064 001780 9999
S
(384,950.W)
2
56001
0709020
5956001
I $
82,000.00
2
56002
0700430
4956001 105064 001780 9999
IS
(82.000.00)
1 56002 0600430 5740010 105064 001780 9999 $ 384,950.00 Pay to Contractor
I1 56002 0700430 5740010 105064 001780 9999 $ 82,000.00 Pay to Contractor
I I I I
I
I
I
I
1
I
1
�I I
Contract Compliance Manazer
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Signature
Dena Johnson
Name of Employee
Project Manager
Title
ATTEST: 1
Jannette Goodall
City Secretary
44�o4Q
apdQa� FOX�Rt°Q,a °0
v-0
duo oa-=�1d
d°
p°o°nE°p9d
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX