HomeMy WebLinkAboutContract 62955-A1CSC No. 62955-Al
AMENDMENT No . 1
TO CITY SECRETARY CONTRACT No. 62955
WHEREAS, the City of Fort Worth (CITY) and CDM Smith, Inc. (ENGINEER)
made and entered into City Secretary Contract No. 62955, (the CONTRACT)
which was authorized by M&C 25-0155 on the 25th day of February, 2025, in
the amount of $3, 745, 826. 00; and
WHEREAS, the CONTRACT involves engineering services for the following
project:
Mary's Creek Confluence Lift Station and Walnut Creek Lift Station
CPN 104944; and
WHEREAS, it has become necessary to execute Amendment No.l to the
CONTRACT to include an increased scope of work and revised fee.
NOW THEREFORE, CITY and ENGINEER, acting herein by and through their
duly authorized representatives, enter into the following agreement, which
amends the CONTRACT:
1.
Article I of the CONTRACT is amended to include the additional
engineering services specified in proposal attached hereto and incorporated
herein. The cost to City for the additional design services to be performed
by Engineer totals $59,586.00.
2.
Article II of the CONTRACT is amended to provide for an increase in
the fee to be paid to Engineer for all work and services performed under
the Contract, as amended, so that the total fee paid by the City for all
work and services shall be an amount of $3,805,412.00.
3.
All other provisions of the Contract, which are not expressly amended
herein, shall remain in full force and effect.
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
City of Fort Worth, Texas Mary's Creek Confluence LS and Walnut Creek LS
Prof Services Agreement Amendment Template CPN: 104944
Revision Date: 12/08/2023
Page 1 of 2
EXECUTED and EFFECTIVE as of the date subscribed by the City's
designated Assistant City Manager.
APPROVED:
City of Fort Worth
Jesica McEachern
Assistant City Manager
DATE: 07/03/2025
4 ov nnn
� o� pORT�dd
ATTEST:
o-° o
a
/ Cps noa 6GJ4o4
Jannette S. Goodall
City Secretary
APPROVAL RECOMMENDED:
CG 4Y' flro%r
Christopher Hader (Jul 2, 2025 09:34 CDT)
Christopher Harder, P. E.
Director, Water Department
Contract Compliance Manager:
ENGINEER
CDM Smith, Inc.
Jessica Veach, P.E.
Client Services Leader
DATE: 0613012025
By signing, I acknowledge that I am the person responsible for the
monitoring and administration of this contract, including ensuring all
performance and reporting requirements.
Suzanne Abbe, P.E.
Project Manager
APPROVED AS TO FORM AND LEGALITY:
Douglas Black (Jul 2, 2025 11:23 CDT)
Douglas W. Black
Sr. Assistant City Attorney
City of Fort Worth, Texas
Prof Services Agreement Amendment Template
Revision Date: 12/08/2023
Page 2 of 2
M&C No.#: N/A
M&C Date: N/A
OFFICIAL RECORD
Form 1295: N/A CITY SECRETARY
FT. WORTH, TX
Mary's Creek Confluence LS and Walnut Creek LS
CPN: 104944
Smith
May 29, 2025
Ms. Suzanne Abbe, P.E.
Project Manager
City of Fort Worth Water Department
920 Fournier Street
Fort Worth, TX 76102
Subject: Mary's Creek Confluence Lift Station and Walnut Creek Lift Station
Amendment No. 1
CDM Smith Project No.: 0515-306181
City Secretary No. 62955 - City Project No. 104944
Dear Ms. Abbe:
This letter is in reference to the contract between Engineer (CDM Smith Inc.) and the City of Fort Worth
(the City) dated March 13, 2025, referred to herein as the "Contract." CDM Smith is pleased to submit
our Amendment No. 1 for the City's Mary's Creek Confluence Lift Station and Walnut Creek Lift Station —
Project No. 104944.
CDM Smith is adding the following services as requested by the City:
Task 1.4.6 Wastewater Collection System Modeling
As part of the flow management and diversion evaluation, Engineer will perform hydraulic modeling of
the City's wastewater collection system in Mary's Creek service area to assist in determining flow
diversions, bypass flow and control from the collection system to both Mary's Creek Confluence lift
station and Walnut Creek lift station. A total of six scenarios will be modeled: (1) current (2028) average
days flows with lift station not operating, (2) future (2063) average day flows with lift stations not in
operation, (3) current (2028) peak wet weather flows with both lift station offline, (4) future (2063) peak
wet weather flows with both lift stations offline; two additional scenarios are included and will be
defined after the evaluation progresses. The hydraulic modeling will include determination of flows for
the six scenarios along with hydraulic grades for each scenario at each lift station and downstream
limitations within the collection system. Flow data from the hydraulic models will be included in the
Flow Management and Diversion TM (completed as part of Subtask 1.4.1). The collection system
modeling will be completed by Freese & Nichols using the City's wastewater collection system model.
This Task includes a kickoff meeting with the City, and two additional coordination meetings.
TASK 1.4.6 WORK PRODUCTS
A. Collection System Flows for Modeled Scenarios (by email).
B. Meeting Minutes
801 Cherry Street, Unit 33, Suite 1820, Fort Worth, TX 76102 1 tel: 817.332.8727
CDM
Smith
Ms. Abbe
Mary 29, 2025
Page 2
The fee for Task 1.4.6 is summarized in Table 1 below:
Table 1— Task 1.4.6 Wastewater Collection System Modeling Summary Table:
CDM Smith Subconsultant Subconsultant
Task Labor (FNI) Markup Total
(10%)
Task 1.4.6 Wastewater Collection
$5,136.00 $49,500.00 $4,950.00 $59,586.00
System Modeling
Table 2 below summarizes our revisions to the total contract.
Table 2 — Total Contract:
Description
Amount
Original Contract
$3,745,826.00
Amendment No. 1
$59,586.00
Modified Contract
$3,805,412.00
This change does not impact the MWBE percentages for this project.
A Detailed Fee Breakdown (Exhibit B-1) for work included in Amendment No. 1 is attached.
We appreciate the opportunity to be of continued service to the City. Please contact us if we need to
provide any further information.
Sincerely,
�)" 0/c/0-&
Wendy Martinez, P.E.
Project Manager
CDM Smith Inc.
Copy to: Jessi Veach, P.E., CDM Smith
Amy Robinson, P.E., CDM Smith
Chris Harder, P.E. City of Fort Worth
Attachments: Exhibit B-1 Detailed Fee Breakdown - Amendment No. 1
FNI Scope and Fee Proposal
801 Cherry Street, Unit 33, Suite 1820, Fort Worth, TX 76102 1 tel: 817.332.8727
801 Cherry Street, Suite 2800 + Fort Worth, Texas 76102 + 817-735-7300 + FAX 817-735-7491 www.freese.com
Fort Worth Water
Wastewater Collection System Assessment Update
Mary's Creek LS Additional Modeling
Scope of Work
April 11, 2025
PROJECT UNDERSTANDING:
Freese and Nichols, Inc. (ENGINEER) understands that Fort Worth Water (FWW) is requesting additional
hydraulic modeling support for the lift stations servicing the Mary's Creek WRF. The lift stations are under
design by others. The other consultants will use the data provided in this analysis to reference in their
design, and Freese and Nichols will not be involved in the design decisions.
TASK A: PROJECT MANAGEMENT
Al. ADMINISTRATION AND DOCUMENT CONTROL
ENGINEER will perform general administration duties with the project, including progress monitoring,
scheduling, general correspondence, office administration, and invoicing. ENGINEER will establish
document control procedures to ensure proper recordkeeping and retrieval.
A2. PROJECT KICKOFF MEETING
ENGINEER will conduct a project kickoff meeting with FWW and the design consultant to discuss the
project scope, schedule, and scenarios.
A3. PROGRESS MEETINGS
ENGINEER will meet with FWW staff and their design consultant up to two (2) through in -person meetings
and conference calls. These meetings will be in addition to the kickoff meeting in Task A2.
TASK B: WASTEWATER SYSTEM PERFORMANCE ANALYSIS
B1. COLLECTION SYSTEM PERFORMANCE ANALYSIS
The ENGINEER will evaluate the collection system's performance in up to 6 scenarios to be defined by
FWW and CDMSmith. The tentative scenarios are outlined below. The ENGINEER will provide the modeled
flows and a hydraulic profile of the collection system at each lift station for the requested scenarios. The
ENGINEER will provide an email summarizing the modeling results. A technical memorandum is not
included in this assessment.
Page 1
Confluence and Walnut
Average Day
Existing
2028
Creek LSs Offline
Confluence and Walnut
Average Day
WWMP CIP Complete
2063
Creek LSs Offline
Confluence and Walnut
Peak Wet Weather
Existing
2028
Creek LSs Offline
Confluence and Walnut
Peak Wet Weather
WWMP CIP Complete
2063
Creek LSs Offline
TBD
TBD
PROJECT SCHEDULE
• All services are to be completed within 8 months of the Notice to Proceed.
PROJECT FEE
Task
A. Project Management
B. Wastewater System Performance Analysis
Proiect Total (Lump Suml
Budget
$16, 000
$33,500
$49,500
Page 2
EXHIBIT B-1
FOR
Walnut Creek Lift Station and Mary's Creek Confluence Lift Station (City Project No. 104944)
Amendment No. 1: Wastewater Collection System Modeling
Project Design Process- Admin
Management Leader Mechanical Subtotal Labor Subconsultants
HOURLY BILLING RATE- YEAR 2025(PHASE Ill $296 $219 $159 $116
FNI b Suconsiltant
(Wastewater Markup
Hours Hours Hours Hours Hours Cost Collection Modeling) (10%)
Task 1.4.6
1.4.6.1 Task Management 4 0 0 8 12 $ 2,112 $ $ $
1.4.6.2 Wastewater Modeling, Review, Evaluation 8 8 0 16 $ 3,024 $ 49,500 $ 4,950 $
ODCs TOTAL COST
$ 2,112
$ 57,474
Exhibit B - Detailed Fee Breakdown Amendment No 1- 1
5/29/2025