Loading...
HomeMy WebLinkAboutContract 40672SPECIFICATIONS AND CONTRACT DOCUMENTS FOR ,..., .. __ C011'MC111 z=·--·-·· __ anlMIIAGIRIOMCI HMAC SURFACE OVERLAY (2010-5) ATV ARIOUS LOCATIONS IN THE CITY OF FORT WORTH, TEXAS CITY PROJECT NO: 01469 CITY SECRETARY .m l.-,~ CONTRACT NO. ~ '° s6. ·· TPW PROJECT NO. C293-541200-204620146983 MIKE MONCRIEF MAYOR 2010 DALE A. FISSELER, P.E. CITY MANAGER WILLIAM A. VERKEST, P.E., DIRECTOR TRANSPORTATION AND PUBLIC WORKS DEPARTMENT ANDY ANDERSON, P.E., ASSISTANT DIRECTOR TRANSPORTATION AND PUBLIC WORKS DEPARTMENT PREPARED BY TRANSPORTATION AND PUBLIC WORKS DEPARTMENT INFRASTRUCTURE GROUP 08 -09 -10 P03 :53 IN - - - M&CReview Page 1 of2 Official site of the City of Fort Worth, Texas CITY COUNCIL AGENDA DATE: CODE: COUNCIL ACTION: Approved on 7/13/2010 7/13/2010 REFERENCE NO.: C-24336 LOG NAME: C TYPE: PUBLIC NON-CONSENT HEARING: FORT WORTH ~ 20HMAC 2010- 5 NO SUBJECT: Authorize the Execution of a Contract with JLB Contracting , LLC in the Amount of $1,559,381 .50 for Hot Mix Asphaltic Concrete Surface Overlay 2010-5 at Various Locations (COUNCIL DISTRICTS 4 , 5 and 8) RECOMMENDATION: It is recommended that the City Council authorize the City Manager to execute a contract with JLB Contracting, LLC in the amount of $1,559,381 .50 for 210 calendar days for Hot Mix Asphaltic Concrete Surface Overlay 2010-5 at various locations that are listed on the attachments provided . DISCUSSION: In the Fiscal Year 2009-2010 Contract Major Maintenance Program, various types of street maintenance techniques are grouped into specific contract packages. Hot Mix Asphaltic Concrete (HMAC) Surface Overlay 2010-5 at various locations provides for surface and base rehabilitation , curb and gutter and valley gutter replacements for asphalt streets funded from the Contract Street Maintenance Fund . The City reserves the right to increase or decrease quantities of individual pay items within the contract , provided that the total contract amount remains within plus or minus 25 percent of the contract award . This project was advertised for bid in the Fort Worth Star-Telegram on March 11 , 201 O and March 18 , 2010. On April 15 , 2010, the following bids were received : Bidders JLB Contracting , LLC Peachtree Construction , Ltd. Austin Bridge and Road, LP Quality Excavation, Ltd Amount $1 ,559,381 .50 $1,583,530.00 $1 ,623 ,135.00 $1 ,674 ,366.00 JLB Contracting, LLC is in compliance with the City's M/WBE Ordinance by committing to 21 percent M/WBE participation . The City's goal on this project is 20 percent. These projects are located in COUNCIL DISTRICTS 4, 5 and 8. http://apps.cfwnet.org/council _packet/me _revi ew.asp ?ID=l 361 O&councildate=7/13 /2 010 7/2 1/2010 M&CReview Page 2 of2 FISCAL INFORMATION/CERTIFICATION: The Financial Management Services Director certifies that funds are available in the current capital budget, as appropriated, of the Contract Street Maintenance Fund. TO Fund/Account/Centers FROM Fund/Account/Centers C293 541200 204620146983 $1.559.381 .50 Submitted for City Manager's Office by: Originating Department Head: Additional Information Contact: ATTACHMENTS Fernando Costa (6122) William Verkest (8255) Kristian Sugrim (8902) 20HMAC SURFACE OVERLAY 2Q10-5 Vario_y~Locations .pdf 20HMAC_2010-__§_MAP EAGE_01.pdf 20HMAC_2010-5_MAE_PAGE_02-J)df http://apps.cfwnet.org/council_packet/mc _review.asp?ID= 1361 O&councildate=7/13/201 O 7/21/2010 SPECIFICATIONS AND CONTRACT DOCUMENTS FOR HMAC SURFACE OVERLAY (2010-5) ATV ARIOUS LOCATIONS IN THE CITY OF FORT WORTH, TEXAS CITY PROJECT NO: 01469 TPW PROJECT NO. C293-541200-204620146983 3 -17-/o NAJIB F~ S, P.E. INFRASTRUCTURE MANAGER TRANSPORTATION AND PUBLIC WORKS DEPARTMENT DATE TABLE OF CONTENTS 1. Notice to Bidders 2. Special Instructions to Bidders 3. Minority and Women Business Enterprise Specifications 4. Proposal 5. Special Provisions 6. Item 360, Concrete Pavement (Modified Specification) 7. Prevailing Wage Rates 8. Vendor Compliance 9. Contractor Compliance with Worker's Compensation Law 10. Certificate of Insurance 11. Equipment Schedule 12. Experience Record 13. Performance Bond 14. Payment Bond 15. Maintenance Bond 16. Contract 17. Notice of Construction Detail 18. Project Designation Sign Detail 19. Other Details 20. Street Locations 21. Street by Street Paving Quantity Determination Spreadsheet Sealed Proposals for the following: CITY OF FORT WORTH, TEXAS HMAC SURFACE OVERLAY (2010-5) CITY PROJECT N: 01469 TPW PROJECT NO: C293-541200-204620146983 Submit package to City of Fort Worth, Purchasing Division, in the lower level of the Municipal Building, 1000 Throckmorton , Fort Worth , Texas 76102 until 1:30 P.M., Thursday, April 15, 2010 , and then publicly read aloud at 2 :00 P.M ., in the Council Chambers. Specifications and Contract Documents for this project may be purchased for twenty dollars ($20) per set at the office of the Transportation and Public Works Department, Municipal Office Building, 1000 Throckmorton Street, Fort Worth, Texas 76102. These documents contain additional information for prospective bidders. A pre-bid conference w ill be held at 9:00 A.M. Tuesday, April 6, 2010, in the Transportation and Public Works Conference Room, 2nd Floor, Municipal Building, RM 289 . The major work on the above-referenced project shall consist of the following : Paving Improvements : 16,600 L .F. 79 ,000 S.Y. 58,300 S .Y . 15,000 L.F . 25 ,000 S.Y . 12,450 L .F . 12,300 S .F . Wedge Milling, 2-Inch to 0-Inch Deep, 5 Ft. Wide 2-lnch Surface Course Type "D" Mix 8-Inch HMAC Pavement Pulverization Crack Sealing of Existing Pavement 2-Inch Surface Milling Remove and Replace Existing Curb & Gutters Remove and Replace 6-Inch Concrete Driveways Included in the above will be all other miscellaneous items of construction as outlined in the Plans and Specifications. For additional information , please contact Kristian Sugrim, Project Manager at (817) 392-8902 . DALE A. FISSELER, P.E . CITY MANAGER Advertising Dates : March 11, 2010 March 18, 2010 WILLIAM A . VERKEST, P .E ., DIRECTOR TRANSPORTATION AND PUBLIC WORKS DEPARTMENT By \~ ~(,;._, Kristian Sugrim Project Manager - - 1. SPECIAL INSTRUCTIONS TO BIDDERS BID SECURITY: Cashier's check or an acceptable bidder's bond payable to the City of Fort Worth, in an amount of not less than 5 percent of the largest possible total of the bid submitted must accompany the bid, and is subject to forfeit in the event the successful bidder fails to execute the contract documents within ten days after the contract has been awarded. To be an acceptable surety on the bid bond, the surety must be authorized to do business in the state of Texas . In addition, the surety must (1) hold a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law; or (2) have obtained reinsurance for any liability in excess of $100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City, in its sole discretion, will determine the adequacy of the proof required herein. 2. PROPOSAL: After proposals have been opened and read aloud, the proposals will be tabulated on the basis of the quoted prices, the quantities shown in the proposal, and the application of such formulas or other methods of bringing items to a common basis as may be established in the Contract Documents. 3. The total obtained by taking the sum of the products of unit prices quoted and the estimated quantities plus any lump sum items and such other quoted amounts as may enter into the cost of the completed project will be considered as the amount of the bid. Until the award of the contract is made by the Owner, the right will be reserved to reject any or all proposals and waive technicalities, to re-advertise for new proposals, or to proceed with the work in any manner as maybe considered for the best interest of the Owner. The quantities of work and materials to be furnished as may be listed in the proposal forms or other parts of the Contract Documents will be considered as approximate only and will be used for the purpose of comparing bids on a uniform basis . Payment will be made to the Contractor for only the actual quantities of work performed or materials furnished in strict accordance with the Contract Documents and Plans. The quantities of work to be performed and materials to be furnished may be increased or decreased as hereinafter provided, without in any way invalidating the unit prices bid or any other requirements of the Contract Documents. ADDENDA : Bidders are responsible for obtaining all addenda to the Contract Documents prior to the bid receipt. Information regarding the status of addenda may be obtained by contacting the Transportation and Public Works Department at (817) 392- 8902. Bids that do not acknowledge all applicable addenda will be rejected as non- responsive. SPECIAL INS TRUCTIONS TO BIDDERS -I - 4. AW ARD OF CONTRACT: The contract, if awarded, will be awarded to the lowest responsive bidder. The City reserves the right to reject any or all bids and waive any or all irregularities . No bid may be withdrawn until the expiration of forty-nine ( 49) City business days from the date that the M/WBE UTILIZATION FORM , PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM ("Documentation") is received by the City. 5. PAYMENT, PERFORMANCE AND MAINTENANCE BONDS : The successful bidder entering into a contract for the work will be required to give the City surety in a sum equal to the amount of the contract awarded. The successful bidder shall be required to furnish bonding as applicable in a sum equal to the amount of the contract awarded. The form of the bond shall be as herein provided and the surety shall be acceptable to the City. All bonds furnished hereunder shall meet the requirements of Chapter 2253 of the Texas Government Code, as amended. A. If the total contract price is $25,000 or less, payment to the contractor shall be made in one lump sum. Payment shall not be made for a period of 45 calendar days from the date the work has been completed and accepted by the City. B. If the contract amount is in excess of $25,000, a Payment Bond shall be executed, in the amount of the contract, solely for the protection of all claimants supplying labor and material in the prosecution of the work. C. If the contract amount is in excess of $100 ,000, a Performance Bond shall be executed, in the amount of the contract conditioned on the faithful performance of the work in accordance with the plans, specifications, and contract documents. Said bond shall solely be for the protection of the City of Fort Worth. D. A Two-year Maintenance Bond is required for all projects to insure the prompt, full and faithful performance of the general guarantee as set forth in Paragraph 7 of the Special Provisions. To be an acceptable surety on the performance, payment and maintenance bonds, the surety must be authorized to do business in the state of Texas and meet all requirements of Texas Insurance Code, section 7.19-1. In addition, the surety must (1) hold a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law; or (2) have obtained reinsurance for any liability in excess of $100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be provided to the City upon request. The City, in its sole discretion, will determine the adequacy of the proof required herein. No sureties will be accepted by the City that are at the time in default or delinquent on any bonds or which are interested in any litigation against the City. Should any surety on the contract be determined unsatisfactory at any time by the City, notice will be given to SPECIAL INSTRUCTIONS TO BIDDERS - 2 - the contractor to that effect and the contractor shall immediately provide a new surety satisfactory to the City 6. LIQUIDATED DAMAGES: The Contractor's attention is called to Part 1 -General Provisions, Item 8, Paragraph 8 .6, Standard Specifications for Street and Storm Drain Construction of the City of Fort Worth, Texas, concerning liquidated damages for late completion of projects. 7. 8 EMPLOYMENT AND NON-DISCRIMINATION: The Contractor shall not discriminate against any person(s) because of sex, race, religion, color or national origin and shall comply with the provisions of sections 13A-21 through 13A-29 of the Code of the City of Fort Worth (1986), as amended, prohibiting discrimination in employment practices. WAGE RATES : Section 8.8 of the Standard Specifications for Street and Storm Drain Construction is deleted and replaced with the following: Compliance with and Enforcement of Prevailing Wage Laws A. Duty to pay Prevailing Wage Rates. The contractor shall comply with all requirements of Chapter 2258, Texas Government Code (Chapter 2258), including the payment of not less than the rates determined by the City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such prevailing wage rates are included in these contract documents. B. Penalty for Violation . A contractor or any subcontractor who does not pay the prevailing wage shall, upon demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the day that the worker is paid less than the prevailing wage rates stipulated in these contract documents . This penalty shall be retained by the City to offset its administrative costs, pursuant to Texas Government Code 2258.023. C. Complaints of Violations and City Determination of Good Cause . On receipt of information, including a complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a contractor or subcontractor, the City shall make an initial determination, before the 31st day after the date the City receives the information, as to whether good cause exists to believe that the violation occurred. The City shall notify in writing the contractor or subcontractor and any affected worker of its initial determination. Upon the City's determination that there is good cause to believe the contractor or subcontractor has violated Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference between wages paid and SPECIAL INSTRUCTIONS TO BIDDERS - 3 - 9. wages due under the prevailing wage rates, such amounts being subtracted from successive progress payments pending a final determination of the violation. D. Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023, Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised Statutes) if the contractor or subcontractor and any affected worker do not resolve the issue by agreement before the 15th day after the date the City makes its initial determination pursuant to paragraph ( c) above. If the persons required to arbitrate under this section do not agree on an arbitrator before the 11th day after the date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons. The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all parties and may be enforced in any court of competent jurisdiction. E. Records to be Maintained. The contractor and each subcontractor shall, for a period of three (3) years following the date of acceptance of the work, maintain records that show (i) the name and occupation of each worker employed by the contractor in the construction of the work provided for in this contract; and (ii) the actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection by the City. The provisions of the Audit section of these contract documents shall pertain to this inspection . F. Pay Estimates. With each partial payment estimate or payroll period, whichever is less, the contractor shall submit an affidavit stating that the contractor has complied with the requirements of Chapter 2258, Texas Government Code. G. Posting of Wage Rates. The contractor shall post the prevailing wage rates in a conspicuous place at the site of the project at all times. H. Subcontractor Compliance. The contractor shall include in its subcontracts and/or shall otherwise require all of its subcontractors to comply with paragraphs ( a) through (g) above. I. (Wage rates are attached following the end this section.) FINANCIAL STATEMENT: A current certified financial statement may be required by the Director of Transportation and Public Works Department for use by the CITY OF FORT WORTH in determining the successful bidder. This statement, ifrequired, is to be SPECIAL INSTRUCTIONS TO BIDDERS -4 - prepared by an independent Public Account ant holding a valid permit issued by an appropriate State Licensing Agency. 10. INSURANCE: Within ten days of receipt of notice of award of contract , the Contractor must provide, along with executed contract documents and appropriate bonds , proof of insurance for Workers Compensation (statutory); Comprehensive General Liability ($1,000 ,000 per occurrence, $2,000 ,000 aggregate); and Automobile Insurance ($1 ,000 ,000 each accident on a combined single basis or $250,000 property damage/$500,000 bodily injury per person per occurrence. A commercial business policy shall provide coverage on "any auto", defined as autos owned, hired , and non- owned). Additional lines of coverage may be requested . If such a request is made after bid opening , Contractor shall be entitled to additional compensation equal to 110 % of the additional premium cost. For worker's compensation insurance requirements , see Special Instructions to Bidders -Item 16 . ADDITIONAL INSURANCE REQUIREMENTS: A. The City, its officers, employees and servants shall be endorsed as an additional insured on Contractor's insurance policies excepting employer's liability insurance coverage under Contractor's workers' compensation insurance policy . B. Certificates of insurance shall be delivered to the City of Fort Worth , contract administrator in the respective department as specified in the bid documents, 1000 Throckmorton Street, Fort Worth , TX 76102, prior to commencement of work on the contracted project. C. Any failure on part of the City to request required insurance documentation shall not constitute a waiver of the insurance requirements specified herein . D. Each insurance policy shall be endorsed to provide the City a minimum thirty days notice of cancellation, non-renewal , and/or material change in policy terms or coverage. A ten days notice shall be acceptable in the event of non-payment of premium. E. Insurers must be authorized to do business in the State of Texas and have a current AM. Best rating of A: VII or equivalent measure of financial strength and solvency. F. Deductible limits , or self-funded retention limits, on each policy must not exceed $10 ,000.00 per occurrence unless otherwise approved by the City. G. Other than worker's compensation insurance, in lieu of traditional insurance, City may consider alternative coverage or risk treatment measures through insurance pools or risk retention groups . The City must approve in writing any alternative coverage. H. Workers' compensation insurance policy(s) covering employees employed on the project shall be endorsed with a waiver of subrogation providing rights of SPECIAL INSTRUCTIONS TO BIDDERS -5 - recovery in favor of the City . I. City shall not be responsible for the direct paymen't of insurance premium costs for contractor's insurance. J. Contractor's insurance policies shall each be endorsed to provide that such insurance is primary protection and any self-funded or commercial coverage maintained by City shall not be called upon to contribute to loss recovery. K. In the course of the project, Contractor shall report, in a timely manner, to City's officially designated contract administrator any known loss occurrence which could give rise to a liability claim or lawsuit or which could result in a property loss. L. Contractor's liability shall not be limited to the specified amounts of insurance required herein . M. Upon the request of City, Contractor shall provide complete copies of all insurance policies required by these contract documents . 11. NON-RESIDENT BIDDERS: Pursuant to Texas Government Code, art. 2252.002, the City of Fort Worth will not award this contract to a non-resident bidder unless the non- resident's bid is lower than the lowest bid submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be required to underbid a non-resident bidder to obtain a comparable contract in the state in which the non- resident's principal place of business is located. "Non-resident bidder" means a bidder whose principal place of business is not in this state, but excludes a contractor whose ultimate parent company of majority owner has its principal place of business in this state. "Texas resident bidder" means a bidder whose principal place of business is in this state, and includes a contractor whose ultimate parent company or majority owner has its principal place of business in this state. This provision does not apply if the project is funded in whole or in part with federal funds. The appropriate blanks of the Proposal must be filled out by all non-resident bidders in order for its bid to meet specifications . The failure of a non-resident contractor to do so will automatically disqualify that bidder. 12. MINORITY/WOMEN BUSINESS ENTERPRISE: In accordance with City of Fort Worth Ordinance No. 11923, as amended by Ordinance No. 13471, the City of Fort Worth has goals for the participation of minority business enterprises and women business enterprises in City contracts. You may obtain a copy of the Ordinance from the Office of the City Secretary. SPECIAL INSTRUCTIONS TO BIDDERS -6 - The M/WBE Utilization Form, Prime Contractor Waiver Form and the Good Faith Effort Form, as applicable, must be submitted no later than 5:00 p. m. five (5) City business days after the bid opening date, exclusive of the bid opening date. The bidder shall submit the documentation at the reception area of the Transportation and Public Works Department ("Managing Department"), 2nd floor, City Hall, and shall obtain a receipt. Failure to comply shall render your bid non-responsive . Upon contract execution between the City of Fort Worth and the successful bidder, now known as Contractor, a pre-construction meeting will be scheduled at which time the Contractor is required to submit either Letters of Intent or executed agreements with the M/WBE firm(s) to be utilized on this project. Such Letters of Intent or executed agreements shall include the following information: 1. Name of Contract 2. Name ofM/WBE firm utilized 3 . Scope of Work to be performed by the M/WBE firm 4. Monetary amount of work to be performed by the M /WBE firm 5. Signatures of all parties A notice to proceed will not be issued until the signed letter(s) or executed agreement(s) have been received. Throughout the duration of this project, the Contractor comply with the M/WBE Ordinance by complying with the following procedures: • A M/WBE Participation Report Form must be submitted monthly until the contract is . completed. The first report will be due 30 days after commencement of work . The monthly report MUST have an original signature to ensure accountability for audit purposes. • Reports are to be submitted monthly to the M/WBE Office, regardless of whether or not the M/WBE firm has been utilized. If there was no activity by an M/WBE in a particular month, place a "O" or "no participation" in the spaces provided, and provide a brief explanation. • The Contractor shall provide the M/WBE Office proof of payment to the M/WBE subcontractors and suppliers only. The M/WBE Office will accept the following as proof of payment: 1. Copies of submitted invoices with front and back copies of canceled check(s), OR 2. A notarized letter explaining, in detail : a Subcontractor/supplier Scope of Work b. Date when services were received from subcontractor/supplier c. Amounts paid to the subcontractor/supplier d . Original signatures from both parties must be included on this letter. SPECIAL INSTRUCTIONS TO BIDDERS - 7 - - • If the Contractor foresees a problem with submitting participation reports and /or proof of payment on a monthly basis, the M/WBE Office should be notified. If the Contractor wishes to change or delete an M/WBE subcontractor or supplier, adhere to the following: 1. Immediately submit a Request for Approval of Change Form to the M/WBE Office explaining the request for the change or deletion . 2. If the change affects the committed M/WBE participation goal, state clearly how and why in documentation. a. All requests for changes must be reviewed and pre-approved by the M/WBE Office. b. If the Contractor makes change(s) prior to approval, the change will not be considered when performing a post compliance review on this project. • Upon the Contractor's successful completion of this project, and within ten days after receipt of final payment from the City of Fort Worth, The Contractor will provide the M/WBE Office with a Final Participation Report Form to reflect the total participation from ALL subcontractors/suppliers utilized on the project. • All forms are available at the M/WBE Office, 3rd floor -City Hall. For additional information regarding compliance to the M/WBE Ordinance, call (817) 871-6104. Upon request, Contractor agrees to provide to Owner Complete and accurate information regarding actual work performed by a Minority/Women Business Enterprise (M/WBE) on the contract and payment therefore. Contractor further agrees to permit an audit and/or examination of any books, records or files in its possession that will substantiate the actual work performed by an M/WBE. The misrepresentation of facts ( other than a negligent misrepresentation) and/or the commission of fraud by the Contractor will be grounds for termination of the contract and/or initiating action under appropriate federal, state or local laws or ordinances relating to false statements; further, any such misrepresentation ( other than a negligent misrepresentation) and/or commission of fraud will result on the Contractor being determined to be irresponsible and barred from participating in City work for a period of time of not less than three years. 13. AMBIGUITY: In case of ambiguity or lack of clearness in stating process in the proposal, the City reserves the right to adopt the most advantageous construction thereof or to reject the proposal. 14. PROGRESS PAYMENTS, FINAL PAYMENT, PROJECT ACCEPTANCE AND WARRANTY: a. The contractor will receive full payment (less 5% retainage) from the city for each pay period. SPECIAL INSTRUCTIONS TO BIDDERS - 8 - - b. Payment of the retainage will be included with the final payment after acceptance of the project as being complete. c. The project shall be deemed complete and accepted by the City as of the date the final punch list has been completed, as evidenced by a written statement signed by the contractor and the City. d. The warranty period shall begin as of the date that the final punch list has been completed. e . Bills Paid Affidavit and Consent of Surety shall be required prior to final payment becoming due and payable . f. In the event that the Bills Paid Affidavit and Consent of Surety have been delivered to the city and there is a dispute regarding (i) final quantities, or (ii) liquidated damages , city shall make a progress payment in the amount that city deems due and payable . g. In the event of a dispute regarding either final quantities or liquidated damages, the parties shall attempt to resolve the differences within 30 calendar days . 15 . AIR POLLUTION WATCH DAYS: The Contractor shall be required to observe the following guidelines relating to working on City construction sites on days designated as "AIR POLLUTION WATCH DAYS". Typically, the OZONE SEASON, within the Metroplex area, runs from May 1, through October 31, with 6 :00 a.m. -10:00 a.m. being critical because emissions from this time period have enough time to bake in the hot atmosphere that leads to early afternoon ozone formation. 16. The Texas Commission on Environmental Quality (TCEQ), in coordination with the National Weather Service, will issue the AIR POLLUTION WATCH by 3 :00 p.m . on the afternoon prior to the WATCH day. On designated AIR POLLUTION WATCH DAYS, the Contractor shall bear the responsibility of being aware that such days have been designated AIR POLLUTION WATCH DAYS and as such shall not begin work until 10:00 a.m. whenever construction phasing requires the use of motorized equipment for periods in excess of 1 hour. However, the Contractor may begin work prior to 10:00 a.m . if use of motorized equipment is less than 1-hour, or if equipment is new and certified by EPA as "Low Emitting", or equipment burns Ultra Low Sulfur Diesel (ULSD), diesel emulsions, or alternative fuels such as CNG. If the Contractor is unable to perform continuous work for a period of at least seven hours between the hours of 7:00 a.m. -6:00 p.m., on a designated AIR POLLUTION WATCH DAY, that day will be considered as a weather day and added onto the allowable weather days of a given month. WORKERS COMPENSATION INSURANCE COVERAGE: Contractors compliance with Workers Compensation shall be as follows: SPECIAL INSTRUCTIONS TO BIDDERS -9 - A. Definitions: Certificate of coverage ("certificate") - A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement (TWCC-81, TWCC-82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity employees providing services on a project, for the duration of the project. Duration of the project -includes the time from the beginning of the work on the project until the contractor's/person's work on the project has been completed and accepted by the governmental entity. Persons providing services on the project ("subcontractor" in. 406.096) -includes all persons or entities performing all or part of the services the contractor has undertaken to perform on the project, regardless of whether that person has employees . This includes , without limitation, independent contractors , subcontractors, leasing companies, motor carriers , owner-operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. "Services" does not include activities unrelated to the project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. B. The contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all employees of the contractor providing services on the project, for the duration of the project. C. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the contract. D. If the coverage period shown on the contractor's current certificate of coverage ends during the duration of the project, the contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. E. The contractor shall obtain from each person providing services on a project, and provide to the City: (1) a certificate of coverage, prior to that person beginning work on the project , so the City will have on file certificates of coverage showing coverage · for all persons providing services on the project; and (2) no later than seven days after receipt by the contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project. SPECIAL INSTRUCTIONS TO BIDDERS -10 - E. The contractor shall retain all required certificates of coverage for the duration of the project and for one year thereafter. G. The contractor shall notify the governmental entity in writing by certified mail or personal delivery, within ten days after the contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the project. H. The contractor shall post on each project site a notice, in the text, form and manner prescribed by the Texas Workers' Compensation Commission, informing all persons providing services on the project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage . I. The contractor shall contractually require each person with whom it contracts to provide services on a project, to : (1) provide coverage, based on proper reporting on classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees providing services on the project , for the duration of the project; (2) provide to the contractor, prior to that person beginning work on the project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the project, for the duration of the project ; (3) provide the contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; ( 4) obtain from each other person or entity with whom it contracts, and provide to the contractor: (a) a certificate of coverage, prior to the other person or entity beginning work on the project; and (b) a new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (5) retain all required certificates of coverage on file for the duration of the project and for one year thereafter. (6) notify the governmental entity in writing by certified mail or personal delivery, within ten days after the person knew or should have known , of any change that materially affects the provision of coverage of any person providing services on the project; and SPECIAL INSTRUCTIONS TO BIDDERS -11 - (7) contractually require each person with whom it contracts, to perform as required by paragraphs (1) -(7), with the certificates of coverage to be provided to the person for whom they are providing services. J. By signing this contract or providing or causing to be provided a certificate of coverage, the contractor is representing to the governmental entity that all employees of the contractor who will provide services on the project will be covered by workers' compensation coverage for the duration of the project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self- insured , with the commission's Division of Self-Insurance Regulation. Providing false of misleading information may subject the contractor to administrative penalties, criminal penalties, civil penalties or other civil actions. K. The contractor's failure to comply with any of these provisions is a breach of contract by the contractor which entitles the City to declare the contract void if the contractor does not remedy the breach within ten days after receipt of notice of breach from the City. "The contractor shall post a notice on each project site informing all persons providing services on the project that they are required to be covered, and stating how a person may verify current coverage and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Texas Workers' Compensation Act or other Texas Workers' Compensation commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type, and shall be in both English and Spanish and any other language common to the worker population. The text for the notices shall be the following text, without any additional words or changes : REQUIRED WORKERS' COMPENSATION COVERAGE "The law requires that each person working on this site or providing services related to this construction project must be covered by workers' compensation insurance. This includes persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or other service related to the project, regardless of the identity of their employer or status as an employee." "Call the Texas Workers' Compensation Commission at (512) 440-3789 to receive information on the legal requirement for coverage, to verify whether your employer has provided the required coverage, or to report an employer's failure to provide coverage." 17. AGE DISCRIMINATION: In accordance with the policy ("Policy") of the Executive Branch of the federal government, contractor covenants that neither it nor any officers, members, agents or employees who engage in the performance of this contract shall, in connection with such employment, advancement or discharge of employees or in connection with the terms, conditions or privileges of their employment, discriminate SPECIAL INSTRUCTIONS TO BIDDERS -12 - against any person because of their age except on the basis of a bona fide occupational qualification, retirement plan or statutory requirement. Contractor further covenants that neither it nor its officers, members, agents or employees acting on their behalf, shall specify in solicitations or advertisements for employees to work on those contract a maximum age limit for such employment unless the specified maximum age limit is based upon a bona fide occupational qualification, retirement plan or statutory requirement. Contractor warrants that it will fully comply with the Policy and will defend, indemnify and hold City harmless against any and all claims or allegations filed by third parties against City arising out of Contractor's alleged failure to comply with the Policy in the performance of this contract. 18. DISCRIMINATION DUE TO DISABILITY: In accordance with the provisions of the Americans with Disabilities Act of 1990 ("ADA"), Contractor warrants that it will not unlawfully discriminate on the basis of disability in the provision of services to the general public, nor in the availability, terms or conditions of employment for applicants for employment with, or current employees of, Contractor. Contractor warrants that it will fully comply with the ADA's provisions and any other applicable federal, state, or local laws concerning disability and will defend, indemnify and hold City harmless against any and all claims or allegations filed by third parties against City arising out of Contractor's alleged failure to comply with the ADA in the performance of this contract. END OF SECTION SPECIAL INSTRUCTIONS TO BIDDERS -13 - FORT WORTH ~ 0 4 -.::: 7 -l Up. ~ ATTACHMENT 1A lc :1 ) Page1of4 :~CV) City of Fort Worth Subcontractors/Suppliers Utilization Form PRIME COMPANY NAME: Check applicable block to describe prime JLB Contracting, LLC PROJECT NAME: I M/W/DBE I X I NON-M/W/DBE HMAC Surface Overlay 2010-5 April 15, 2010 City's M/WBE Project Goal: Prime's M/WBE Project Utilization: PROJECT NUMBER 01469 20% 21.11% Identify all subcontractors/suppliers you will use on this project Failure to complete this form , in its entirety with requested documentation , and received by the Managing Department on or before 5:00 p.m. five (5) City business days after bid opening , exclusive of bid opening date , will result in the bid being considered non-responsive to bid specifications. The undersigned Offerer agrees to enter into a formal agreement with the M/WBE firm(s) listed in this utilization schedule , cond it ioned upon execution of a contract with the City of Fort Worth . The intentional and/or knowing misrepresentation of facts is grounds for consideration of disqualification and will result in the bid being considered non-responsive to bid specifications M/WBEs listed toward meeting the project goal must be located in the nine (9) county marketplace or currently doing business in the marketplace at the time of bid. Marketplace is the geograph ic area of Tarrant, Parker , Johnson , Collin , Dallas , Denton , Ellis , Kaufman and Rockwall counties . Identify each Tier level. Tier is the level of subcontracting below the prime contractor, i.e., a direct payment from the prime contractor to a subcontractor is considered 1 st tier, a payment by a subcontractor to its supplier is considered 2 nct t ier ALL M/WBEs MUST BE CERTIFIED BEFORE CONTRACT AWARD. Certification means those firms , located or doing business at the time of bid opening within the Marketplace, that have been determined to be bonafide minority or women businesses by the North Central Texas Regional Certification Agency (NCTRCA), or the Texas Department of Transportation (TX DOT), highway division . Disadvantaged Business Enterprise (DBE) is synonymous with Minority/Women Business Enterprise (M/WBE). If hauling services are utilized , the prime will be given credit as long as the M/WBE listed owns and operates at least one fully licensed and operational truck to be used on the contract. The M/WBE may lease trucks from another M/WBE firm , includ ing M/WBE owner-operators , and receive full M/WBE credit. The M/WBE may lease trucks from non-M/WBEs , including owner-operators , but will only receive credit for the fees and commissions earned by the M/WBE as outlined in the lease agreement. _ ... FORTWORTH --.....,.----J {L 1-2 1-1 nP·,). ,~ '- ~- fl L VJ ATTACHMENT 1A Page 2 of4 Primes are required to identify ALL subcontractors/suppliers, rega rdless of status; i.e., Minority, Women and non-M/WBEs. Please list M/WBE firms first, use additional sheets if necessary. Certification N (check one) 0 SUBCONTRACTOR/SUPPLIER n T Detail Detail Company Name i N T C X M Subcontracting Work Supplies Purchased Dollar Amount Address e M w T D w Telephone/Fax r B B R 0 B E E C T E A TC"2 1 X Miscellaneous $218,886 4 700 Thomas Acres Concrete Joshua, Texas 76058 817-360-8849 817-558-8569 Magnum Trucking 1 X Raw Materials $52,531 Hauler Atco Construction, Inc. 1 X Haul HMACto $57,724 the job TXI 1 X Raw Aggregate $35,622 Supplier Southern Asphalt 1 X Liquid Asphalt $223,767 Supplier FORT WORTH ---....,....--J 4 -) 1 ' ,:, -I OP) 2. r, I l., {J ATTACHMENT 1A Page 3 of 4 Primes are required to identify ALL subcontractors/suppliers , regardless of status ; i.e ., Minority , Women and non-M/WBEs. Please list M/WBE firms first , use additional sheets if necessary . Certification N (check one) 0 SUBCONTRACTOR/SUPPLIER n T T Detail Detail Company Name i N C X M Subcontracting Work Supplies Purchased Dollar Amount Address e M w T D VI Telephone/Fax r B B R 0 B E E C T E A Dustrol 1 ) Milling Sub $50,350 FORT WORTH ~ J4 -21 -1or12: 1 > Total Dollar Amount of M/WBE Subcontractors/Suppliers $329,141 Total Dollar Amount of Non-M/WBE Subcontractors/Suppliers $309,739 TOTAL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $638,880 Rcvo ATTACHMENT 1A Page 4 of 4 The Contractor will not make additions , deletions, or substitutions to this certified list without the prior approval of the Minority and Women Business Enterprise Office Manager or des ignee through the submittal of a Request for Approval of Change/Addition. Any unjustified change or deletion shall be a material breach of contract and may result in debarment in accord with the procedures outlined in the ordinance . The contractor shall submit a detailed explanation of how the requested change/addition or deletion will affect the committed M/WBE goal. If the detail explanation is not submitted , it will affect the final compliance determination . By affixing a signature to this form, the Offeror further agrees to provide , directly to the City upon request , complete and accurate information regarding actual work performed by all subcontractors , including M/W/DBE(s) arrangements submitted with the bid . The Offerer also agrees to allow an audit and/or examination of any books, records and files held by their company . The bidder agrees to allow the transmission of interviews with owners, principals , officers, employees and applicable subcontractors/suppliers/contractors participating on the contract that will substantiate the actual work performed by the M/W/DBE(s) on this contract, by an authorized officer or employee of the City . Any intentional and/or knowing misrepresentation of facts will be grounds for terminating the contract or debarment from City work for a period of not less than three (3) years and for initiating action under Federal , State or Local laws concerning false statements. Any failure to comply with this ordinance and create a material breach of contract may result in a determination of an irresponsible Offeror and barred from participating in City work for a period of time not less than one ( 1) year. President Title JLB Contracting, L.L.C . Company Name PO Box 24131 Address Fort Worth Texas 76124 City/State/Zip James G. Humphrey Printed Signature James G. Humphrey Contact NamefTitle (if different) (817) 261-2991 (817) 261-3044 Telephone and/or fax E-mail Address April 15, 2010 Date .� ti t r r r r r � � � � r � r i r r � r f � Bid Date: Project Name: Project DOE #: MWBE Documentation Received Department of Engineering J4 -21 -'lo?12: 12 City Project#: __ D .... 1 .... t./ ...... l,.,.._9.__ _______________ _ Project Manager: . .J, &~ ~ Forms submitted by: Name: <ff~,-: /~ Title: ?1v,-0 4.,iu» 'Ji Company: 1"~ C&,d\41~; sfc/C Signature of City Sterr receiving: ---/ldL }iJ,, ~ Rcvo TO: CITY OF FORT WORTH PURCHASING DIVISION 1000 THROCKMORTON ST FORT WORTH, TEXAS 76102 FOR: H.M.A.C. SURFACE OVERLAY (2010-5) AT VARIOUS LOCATIONS CITY PROJECT NO: 01469 P R O P O S A L TPW PROJECT NO: C293-541200 -208620146983 Pursuant to the foregoing "Notice to Bidders", the undersigned has thoroughly examined the plans, specifications and the site, understands the amount of work to be done, and hereby proposes to do all the work and furnish all labor, equipment, and materials necessary to fully complete all the work as provided in the plans and specifications, and subject to the inspection and approval of the Director of the Transportation and Public Works Department of the City of Fort Worth. Total quantities given in the bid proposal may not reflect actual quantities; however, they are given for the purpose of bidding on and awarding the contract. The City also reserves the right to increase or decrease quantities of individual pay items within the contract provided that the total contract amount remains within plus or minus (±) 25% of the contract award . The contractor is not entitled to any additional compensation or renegotiation of individual pay item bid prices . Upon acceptance of this proposal by the City Council, the bidder is bound to execute a contract and furnish Performance, Payment and Maintenance Bonds acceptable to and approved by the City of Fort Worth for performing and completing the said work within the time stated and for the following sums, to-wit: SPEC PAY APPROX. ITEM ITEM QUANTITY S.P. S.P. 104 502 S.P. I 2 3 2EA. LUMPSUM 12 ,450 L.F. DESCRIPTION OF ITEMS WITH BID PRICES WRITTEN IN WORDS Project Designation Sign @ .... T ..... w ...... o __ H~u .... n ___ d ___ r .... ed ________ Dollars & No Cents Per Each Utility Adjustment @ Six Thousand Dollars & No Cents Per L .S. Remove and Replace Concrete Curb & Gutter @ ___.A...,J ..... ,.>-"'-rh-'-i::fV1) _____ Dollars & _ __.:(.._.,.,.-r_11a..;,.>;._ __ Cents Per L.F. P-1 UNIT PRICE $200.00 $61000.00 TOTAL AMOUNT BID $400 .00 $6,000 .00 SPEC PAY APPROX. DESCRIPTION OF ITEMS WITH ITEM ITEM QUANTITY BID PRICES WRITTEN IN WORDS 502 S.P. 104 504 S.P. 104 504 S.P. 504 S.P. 104 504 S.P. 104 504 S.P. 504 S.P. 104 504 S.P. 4 5 6 7 8 9 10 11 310 L.F. 12,300 S.F. 350 S.F. 500 S.F. 1,100 S.F. 100 S.F. 100 S.F. 300 S.F. New Concrete Curb & Gutter @ if "'J b-..f:tnr) Dollars & -----"'"----Cents Per L.F. Remove and Replace 6-Inch Concrete Driveway @ -~v_,....._._v_tf ______ Dollars & --4f"'-C=e_11,,_..J--_ _,_7 ___.:f.""u/O,::;...;;_ __ Cents Per S.F. Remove and Replace 6-Inch Exposed Aggregate Concrete Driveway @ ___ if--', 7+'-'-M_· ____ Dollars & ___ ___.:::..::..o ___ Cents Per S.F. New 6-Inch Concrete Driveway @ f-:, v t Dollars & ::r{v , ~J:/ Cents Per S.F. Remove and Replace 4-Inch Concrete Sidewalk@ ___ /c ..... b ....... w .... -«"'------Dollars & $pritd4-1, if'{!; 1-vf Cents Per S.F. Remove and Replace 4-lnch Exposed Aggregate Sidewalk @ _ ___.1~p ..... 1 .... /a,.,,...:.,) _____ Dollars & __ __."'""'"P ____ Cents Per S.F. New 4-Inch Concrete Sidewalk @ --+F_..,,..._u ..... e:::~ _____ Dollars & --r-r--· ...... -C .... · +:;-· ____ Cents Per S.F. Remove Existing Wheelchair Ramp and Install Standard 4-inch ADA Wheelchair Ramp (with detectable warning Dome- Tile surface)@ p 1,J ,1 ..f~J Dollars & r; , sG b Cents Per S.F. P-2 UNIT PRICE /fi> 4.7g 7 - TOTAL AMOUNT BID "7 0 0- SPEC PAY APPROX. DESCRIPTION OF ITEMS WITH ITEM ITEM QUANTITY BID PRICES WRITTEN IN WORDS 504 S.P. 104 360 S.P. 360 S.P. S.P. S.P. 402 500 620 S.P. 275 S.P. 275 S.P. 12 13 14 15 16 17 18 19 100 S.F. 200 S.Y. 100 S.Y. 3EA. 3EA. 300 L.F. 58,300 S.Y. 780 Tons New 4-Inch ADA Wheelchair Ramp (with detectable warning Dome-Tile surface@ __,_µ_,,.1_if_~_~ ______ Dollars & _ __.I(.__, _J!, ___ :q-+-___ Cents Per S.F. Remove and Replace Existing Concrete Valley Gutter@ 2 l"l M tFV h tt?4f,, .. .+· Dollars & f, 1 t'f--7 Cents Per S.Y. New Concrete Valley Gutter@ p e,-J ,-+-7 Dollars & __ _....!,fi?'---____ Cents Per S.Y. Remove and Replace 5-Ft Storm Drainage Inlet Top @ 1 w 0 ~u-,,:;,.....b 4~+:z Dollars & ------'"""--'-o ___ Cents Per Each Remove and Replace IO-Ft Storm Drainage Inlet Top@ 11<-'.w::7 £,.,,, k~ ..J..k1)011ars & ____ __.= __ Cents Per Each 6-Inch Subdrain Pipe@ __ :T.~t<~,.> ______ Dollars & --£.-1, .... ik~q.........,. ____ Cents Per L.F. 8-Inch Pavement Pulverization @ _:th__._=· ;..:44""""'""-------Dollars & -----'z..L.,,._.k'-''f:~f-y'""'----Cents Per S.Y. Cement Modification (26 lbs/sy) @ -k'~'~..1_1J_!J-r-_./e_,;..,,....; ____ Dollars & ___ ___.;:;...o<. ___ Cents Per Ton P-3 UNIT PRICE $ I"!. 9> $ 2-o"z-= - $ Jo, f.6 $ 3 . ~I> TOTAL AMOUNT BID $ /.>72-o - $ qooo - $ 3 Ub e> - $ "Z..cq' . 82,r> - ' SPEC PAY APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL ITEM ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT BID 106 20 1,600 C.Y. Unclassified Street Excavation @ S.P. ,::, £..f~ Dollars & .J f fk:1 Cents Per C.Y. $ IS-.. >-"b $ 2 ;_/, S.oo 247 21 400 C.Y. Crushed Limestone @ S.P. ;::::-&7 ak'-'( Dollars & F · .t-.v 7 Cents Per C.Y. $ 1-fo.5"' $ Jt, '.2-&>0 300 22 320 C.Y. Asphalt Pavement and Base Repair @ 310 ~~J t;,., tr I,.,.,-, ii:> VJ> ~ tff .,: Do Ila rs & 340 ,_/V Cents Per C.Y . 173 -'£S-. 8~o -S.P. $ $ 300 23 260 Tons HMAC Pavement Level-Up @ 310 <ffiq /..>h IV ,,J-,,/' Dollars & 340 Jv'i> Cents Per Ton cq-2-3 1'10 -S.P. $ $ S.P. 24 16,600 L.F. Pavement Wedge Milling 2-Inch to 0- Inch Depth, 5.0 Ft Wide @ 6. tl .L.e::. Dollar & /,D?, qJJ ~ Gh ..5 ''f Cents Per L.F . $ :f:;::f;rD $ t 7/ >CJ~ - ~ S.P. 25 lOEA. Butt Joint Milling @ t t..vo ~ n,-l) fi ,,t:i::J. £,..,v'D ollars & Cents Per Each $ '2,(p~ -$ z_4,~b - S.P. 26 25,000 S.Y. 2-Inch-Surface Milling@ t2. -6.! /J Dollars & ,}e,.t ~ 'f?c,v"" Cents Per S.Y. 1-33 33 -$ $ z.-S-c 300 27 15,000 L.F. Crack Sealing of Existing Pavement @ S.P. A/'° Dollars & +,ven:A::-, Yhazn! Cents Per L.F. 3 L/SC> --$ C> ""Z--.3 $ P-4 SPEC PAY APPROX. DESCRIPTION OF ITEMS WITH ITEM ITEM QUANTITY BID PRICES WRITTEN IN WORDS 300 310 340 S.P. S.P. S.P. 450 S.P. 406 450 S.P. S.P. 450 S.P. 28 29 30 31 32 33 34 79,000 S.Y. 2-Inch HMAC Surface Course Type "D" Mix @ _...;;:6'---•_:j,_Lv_-f-_____ Dollars & '-flv~:] "f{,,,n.,0 Cents Per S.Y. 4 EA. Removal and Replacement of 30-Ft HMAC Speed Cushion w/stripping@ 1 EA. 16 EA. 36 EA. 35EA. 25EA. ~~.~ 1w4 o,, L-~N'~ .\t.v Dollars & -----"-,i,)_'7 __ Cents Per Each Removal and Replacement of 40-Ft HMAC Speed Cushion w/stripping@ , w..-v.1-y > •s& t.,._'i>~--,. +• ~ +·...,.,Dollars & ------'-;,,;_;J ___ Cents Per Each Water Valve Box Adjustment With Steel Riser @ One hundred and twenty five Dollars & No Cents Per Each Water Valve Box Adjustment With Concrete Collar @ Three hundred and fifty Dollars & ________ Cents Per Each Water Meter Box Adjustment@ ..T ... h ..... ir ___ ty._fi ___ tv~e'--------Dollars & ______ N"'-o=--___ Cents Per Each Manhole Adjustment With Steel Riser @ Two hundred and fifty Dollars & -----'-N=o ___ -=Cents Per Each P-5 UNIT PRICE $125.00 $ 350.00 $ 250.00 TOTAL AMOUNT BID $ d:,5"0, / 7 Z> - $2,000.00 $12,600.00 $ 1,225.00 $6,250.00 SPEC PAY APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL ITEM ITEM QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT BID 406 35 55EA. Manhole Adjustment With 450 Concrete Collar @ S.P. Four hundred and fifty Dollars & No Cents Per Each $ 450.00 $24,750.00 S.P. 36 200 EA. Painting House Curb Addresses @ 1 er~ Dollars & j ,..P f:1 Cents Per Each $ I& .i,o $ z (?.o S.P. 37 2,100 S.Y. Grass Sod Replacement @ r:, ..,,,f Dollars & -+:?:::~ Cents Per S.Y. $ .>.3z:, $ i ( I ?Jo - S.P. 38 2EA. Re-Mobilization @ Five hundred Dollars & No Cents Per Each $ 500.00 $1,000.00 TOTAL BID P-6 This contract is issued by an organization which pursuant to the provisions of Article 20. 04 (F) of qualifies for exemption the Texas Limited Sales, Excise and Use Tax Act. Taxes. All equipment and materials not consumed by or incorporated into the project construction, are subject to State sales taxes under House Bill 11, enacted August 15, 1991. The Contractor shall comply with City Ordinance 7278, as amended by City Ordinance 7400 (Fort Worth City Code Sections 13-A-21 through 13-A-29), prohibiting discrimination in employment practices. The undersigned agrees to complete all work covered by these contract documents within two hundred and ten (210) Calendar Days from and after the date for commencing work as set forth in the written Work order to be issued by the Owner, and to pay not less than the "Prevailing Wage Rates for Street, Drainage and Utility Construction" as established by the City of Fort Worth, Texas. Within Ten (10) Calendar Days of receipt of notice of acceptance of this bid, the undersigned will execute the formal contract and will deliver an approved Surety Bond for the faithful performance of this contract . The attached deposit check in the sum of ~------------------------Dollars ($ ___________ ~ is to become the property of the City of Fort Worth, Texas, or the attached Bidder's Bond is to be forfeited in the event the contract and bond are not executed within the time set forth, as liquidated damages for delay and additional work caused thereby . The Contractor shall mobilize within ten (10) working days of the notice given by the Construction Engineer for any of the locations. If the contractor fails to begin the work within ten (10) working days, a $200 dollars liquidated damage will be assessed per Block per day . I (we) acknowledge receipt of the following addenda to the plans and specifications, all of the provisions and requirements of which have been taken into consideration in preparation of the foregoing bid: Addendum No. 1 (Initials) Addendum No. 2 (Initials) Addendum No. 3 (Initials) (Seal) P-7 Respectfully submitted, JLB CONTRA CTING , LLC Company Name By: <P:rd /J ~ ./ Signature ~7n'::! Nii~ tl~P:rt~ P~ib~ Address: P.O. BOX 24131 -----~---------FORT WORTH , TX 76124 E-mail Address: ------------ Telephone: ($17 ) Z,l, I --i.q9 1 SPECIAL PROVISIONS FOR: H.M.A.C. SURFACE OVERLAY (2010-5) ATV ARIOUS LOCATIONS CITY PROEJCT NO: 01469 TPW PROJECT NO: C293-541200-204620146983 1. SCOPE OF WORK: The work covered by these details and specifications consists of the removal (only) of all existing traffic buttons , removal and replacement of existing concrete curb and gutter and driveways and existing base repair and the addition of a new surface layer of H.M.A .C . for those streets designated as Mill Overlay (MOL). For those streets designated as Pulverized Overlay (POL), the work consists of the same removal and replacement items as described above, surface and base rehabilitation of existing pavement with cement and the addition of a new surface layer of H.M.A.C. These items are described in the Special Provisions of these specifications. The work also consists of all other miscellaneous items of construction to be performed as outlined in the details and specifications which are necessary to satisfactorily complete the work. The Contractor shall mobilize within ten (10) working days of the notice given by the Construction Engineer for any locations. If the contractor fails to begin the work within ten (10) working days, a $200 dollars liquidated damage will be assessed per block per day. It shall be the responsibility of the prospective bidder to visit the project sites and make such examinations and explorations as may be necessary to determine all conditions that may affect construction of this project. Particular attention should be given to methods of providing ingress and egress to adjacent private and public properties, procedures for protecting existing improvements and disposition of all materials to be removed. Proper consideration should be given to these details during preparation of the Proposal and all unusual conditions that may give rise to later contingencies should be brought to the attention of the City prior to the submission of the Proposal. The contractor shall verify these locations with the Construction Engineer. For street locations, see list at the back of this document. At the sole discretion of the City, the City reserves the right to add, delete or substitute streets in this contract. The City also reserves the right to increase or decrease quantities of individual pay items within the contract provided that the total contract amount remains within plus or minus (±) 25% of the contract award. The SP-1 contractor is not entitled to any additional compensation or renegotiation of individual pay item bid prices. All short turnouts that intersect with a street to be repaired shall be included in this contract, even though they may not be listed with the street locations at the back of this document, due to their size. The contractor shall verify these locations with the Construction Engineer prior to construction. The construction of these turnouts includes; but, is not limited to, milling, cleaning, tack coating, overlaying and facility adjusting. Total quantities given in the bid proposal may not reflect actual quantities, but represent the best estimate based on a reasonable effort of investigation; however, they are given for the purpose of bidding on and awarding the contract. 2. AW ARD OF CONTRACT: Contract will be awarded to the lowest responsible bidder. 3. SUBMITTALS FOR CONTRACT AWARD: The City reserves the right to require the contractor who is the apparent low bidder(s) for a project to submit such information as the City, in sole discretion may require, including but not limited to manpower and equipment records, information about key personnel to be assigned to the project, construction schedule, to assist the City in evaluating and assessing the ability of the apparent low bidder(s) to deliver a quality product and successfully complete projects for the amount bid within the stipulated time frame. Based upon the City's assessment of the submitted information, a recommendation regarding the award of a contract will be made to the City Council. Failure to submit the information, if requested, may be grounds for rejecting the apparent low bidder as non- responsive. Affected contractors will be notified in writing of a recommendation to the City Council. 4. CONTRACT TIME: The Contractor agrees to complete the Contract within the allotted number of days. If the Contractor fails to complete the work within the number of days specified, liquidated damages shall be charged, as outlined in Part I, Item 8, Paragraph 8.6, of the "General Provisions" of the Standard Specification for Street and Storm Drain Construction of the City of Fort Worth, Texas. SP-2 The contract time will be counted from the date set at the pre-construction conference and will continue until a time the inspector determines the project is ready for a final inspection. At that time a final inspection will be scheduled. If in the opinion of the inspector the project has not been made ready, the final inspection will be cancelled and time will continue to be counted . A five working day period is required for the rescheduling of a final inspection . The Contractor also agrees to complete the final punch li st within ten (I 0) w orking days after receiving it. If the Contractor fails to complete the work within ten ( 10) working days, the counting of the number of days to complete the Contract will resume and liquidated damages shall be charged, as outlined in Part I, Item 8, Paragraph 8 .6, of the "General Provisions" of the Standard Specification for Street and Storm Drain Construction of the City of Fort Worth, Texas. 5. EARLY WARNING SYSTEM FOR CONSTRUCTION: Time is of the essence in the completion of this contract. In order to insure that the contractor is responsive when notified of unsatisfactory performance and/or failure to maintain the contract schedule, the following process shall be applicable : The work progress on all construction projects will be closely monitored . On a bi-monthly basis the percentage of work completed will be compared to the percentage of time charged to the contract. If the amount of work performed by the contractor is less than the percentage of time allowed by 20% or more (example: 10% of the work completed in 30% of the stated contract time as may be amended by change order), the following proactive measures will be taken : A. A letter will be mailed to the contractor by certified mail ; return receipt requested , demanding that within 10 days from the date that the letter is received , to provide sufficient equipment, materials and labor to ensure completion of the work within the contract time . In the event the contractor receives such a letter, the contractor shall provide to the City an updated schedule showing how the project will be completed within the contracted time. B. The Construction Engineer and the Director of the Transportation and Public Works Department will be made aware of the situation. If necessary, the City Manager's Office and the appropriate city council members may also be informed . SP-3 C. Any notice that, in the City's sole discretion , is required to be provided to interested individuals will be distributed by the Construction Engineer. D. Upon receipt of the contractor's response , the appropriate City departments and directors will be notified. The Construction Engineer will, if necessary, then forward updated notices to the interested individuals. E. If the contractor fails to provide an acceptable schedule or fails to perform satisfactorily a second time prior to the completion of the contract; the bonding company will be notified appropriately. 6. RIGHT TO ABANDON: The City reserves the right to abandon, without obligation to the Contractor, any part of the project, or the entire project, at any time before the Contractor begins any construction work authorized by the City . 7. CONSTRUCTION SPECIFICATIONS: This contract and projects are governed by the two following published specifications, except as modified by these Special Provisions: STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION-CITY OF FORT WORTH and STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION-NORTH CENTRAL TEXAS . General Provisions shall be those of the Fort Worth document rather than Division I of the North Central Texas document. A copy of these specifications may be purchased at the Office of the Transportation and Public Works Department, 1000 Throckmorton Street, 2nd floor of the Municipal Building, Fort Worth, Texas 76102. The specifications applicable to each pay item are indicated in the call-out for the pay item in the Proposal. If not shown, then applicable published specifications in any of these documents may be followed at the discretion of the Contractor. 8. CONTRACT DOCUMENTS: Bidders shall not separate, detach or remove any portion, segment or sheets from the contract documents at any time . Failure to bid or fully execute contract without retaining contract documents SP-4 intact may be grounds for designating bids as "non-responsive" and rejecting bids or voiding contract as appropriate and as determined by the Director of the Transportation and Public Works Department. 9. MAINTENANCE STATEMENT: The Contractor shall be responsible for defects in this project due to faulty materials and workmanship, or both, for a period of two (2) years from date of final acceptance of this project by the City of Fort Worth and will be required to replace at his expense any part or all of the project which becomes defective due to these causes. See Special Instructions to Bidders Item No. 14 for further requirements. 10. TRAFFIC CONTROL: The contractor will be required to obtain a "Street Use Permit" prior to starting work. As part of the "Street Use Permit" a traffic control plan is required . The Contractor shall be responsible for providing traffic control during the construction of this project consistent with the provisions set forth in the "Latest Edition Texas Manual on Uniform Traffic Control Devices for Streets and Highways" issued under the authority of the "State of Texas Uniform Act Regulating Traffic on Highways", codified as Article 6701d Vernon's Civil Statues, pertinent sections being Section Nos. 27, 29, 30 and 31. A traffic control plan shall be submitted for review to Mr. Charles R. Burkett, City Traffic Engineer @817-392-8712 at least 10 working days prior to the preconstruction conference. Although work will not begin until the traffic control plan has been reviewed. the Contractor's time will begin in accordance with the time frame established in the Notice to the Contractor. The Contractor will not remove any regulatory sign, instructional sign, street name sign, or other sign which has been erected by the City . If it is determined that a sign must be removed to permit required construction, the Contractor shall contact the Transportation and Public Works Department, Signs and Markings Division (phone number 817-392-7738), to remove the sign. In the case of regulatory signs, the Contractor must replace the permanent sign with a temporary sign meeting the requirements of the above referenced manual and such temporary sign must be installed prior to the removal of the permanent sign. If the temporary sign is not installed correctly or if it does not meet the required specifications, the permanent sign shall be left in place until the temporary sign requirements are met. When construction work is completed to the extent that the permanent sign SP-5 can be re-installed, the Contractor shall again contact the Signs and Markings Division to re-install the permanent sign and shall leave his temporary sign in place until such re-installation is completed. The Contractor shall limit his work within one continuous lane of traffic at a time to minimize interruption to the flow of traffic upon the approval of the City Engineer. Work shall not be performed on certain locations/streets (primarily arterials) during "peak traffic periods (7 a .m. to 9 a.m. and to 4 p.m . to 6 p.m.)"; or, as determined by the City Traffic Engineer and in accordance with the applicable provision of the "City of Fort Worth Traffic Control Handbook for Construction and Maintenance Work Areas." See "Street By Street Quantity Determination Spread Sheet", in the back of this document, for designated locations . The contractor will be responsible for coordination, of proposed construction activities, with public or private school administration . The proposed construction activities shall accommodate school operating schedules , including school bus/parent drop off and pick up periods . The contractor shall provide proper traffic and pedestrian control to ensure safety at all times. Construction areas shall be properly barricaded/fenced to prevent public entry. 11. PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION: Prior to beginning construction on any street in this contract, the contractor shall, prepare and deliver a notice/flyer of the pending construction to the front door of each residence or business that will be impacted by construction. The notice/flyer shall be posted three (3) working days prior to beginning construction activity along each street. The flyer shall be prepared on the Contractor's letterhead and shall include the following: o Project name/Contract name o Project number o Expected dates of construction o Contractors and project inspector's contact information A sample notice/flyer is included in the contract documents. The Electronic version of the notice/flyer can be obtained from the Office of the Transportation and Public Works Department (817) 392-8902 SP-6 It will be the contractor's responsibility to create and distribute a follow-up notice/flyer informing residents if for any reason work should stop on a project for more than five (5) working days after construction begins. The flyer should also include the anticipated date of when the work will begin again. It will be the contractor's responsibility to re-distribute a three (3) working day notification/flyer prior to beginning the construction activity. In addition, all copies of the notice/flyer shall be delivered to the City inspector for his review prior to distribution . The contractor will not be allowed to begin construction on any street until the flyer is delivered to all residents of the street. All work involved with the notice/flyer shall be considered subsidiary to the contract price and no additional compen sation shall be made . 12. PAYMENT: Payment will be made to the contractor twice a month for work completed during the pay periods ending on the 15th and the 30th day of each month . Checks (less 5% retainage) will be sent to the contractor within the two (2) week window following each payment period. Payment of the retainage will be made with the final payment upon acceptance of the project. See Special Instructions to Bidders Item No. 14 for further requirements. 13. DELAYS: The Contractor shall receive no compensation for delays or hindrances to the work, except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City to provide information or material, if any, which is to be furnished by the City . When such extra compensation is claimed a written statement thereof shall be presented by the Contractor to the Engineer and if by him found correct shall be approved and referred by him to the Council for final approval or disapproval; and the action thereon by the Council shall be final and binding. If delay is caused by specific orders given by the Engineers to stop work, or by the performance of extra work, or by the failure of the City to provide material or necessary instructions for carrying on the work, then such delay will entitle the Contractor to an equivalent extension of time, his application for which shall, however, be subject to the approval of the City and no such extension of time shall release the Contractor or the surety on his performance bond from all his obligations hereunder which shall remain in full force until the discharge of the contract. SP-7 14. DETOURS AND BARRICADES: The Contractor shall prosecute his work in such a manner as to create a minimum of interruption to traffic and pedestrian facilities and to the flow of vehicular and pedestrian traffic within the project area. Contractor shall protect construction, as required by Engineer, by providing barricades. Barricades, warning and detour signs shall conform to the Standard Specifications "Barriers and Warning and/or Detour Signs", Item 524, and/or as shown on the plans. Construction signage and barricades shall conform to the latest edition of the "Texas Manual on Uniform Traffic Control Devices, Vol. No. l ". 15. DISPOSAL OF SPOIL/FILL MATERIAL: Prior to the disposing of any spoil/fill material, the Contractor shall advise the Director of the Department of Engineering, acting as the City of Fort Worth's Flood Plain Administrator ("Administrator"), of the location of all sites where the contractor intends to dispose of such material. Contractor shall not dispose of such material until the proposed sites have been determined by the Administrator to meet the requirements of the Flood Plain Ordinance of the City of Fort Worth (Ordinance No. 10056) and a flood plain permit issued. All disposal sites must be approved by the Administrator to ensure the filling is not occurring within a flood plain without a permit. A flood plain permit can be issued upon approval of necessary engineering studies. No fill permit is required if disposal sites are not in a flood plain. Approval of the Contractor's disposal sites shall be evidenced by a letter signed by the Administrator stating that the site is not in a known flood plain or by a Flood Plain Fill Permit authorizing fill within the flood plain. Any expenses associated with obtaining the fill permit, including any necessary engineering studies, shall be at the Contractor's expense. In the event that the Contractor disposes of spoil/fill material at a site without a fill permit or a letter from the Administrator approving the disposal site, upon notification by the Director of the Department of Engineering, Contractor shall remove the spoil/fill material at its expense and dispose of such materials in accordance with the Ordinance of the City and this section. No temporary storage of material, rubble, equipment or vehicles within parkway is allowed. Damage to sodded/landscaped areas shall be replaced at Contractor's expense to the satisfaction of City Engineer. SP-8 16. ZONING REQUIREMENTS: During the construction of this project, the Contractor shall comply with present zoning requirements of the City of Fort Worth in the use of vacant property for storage purposes . 17. PROPERTY ACCESS: Access to adjacent property shall be maintained at all times unless otherwise directed by the Engineer. 18. CONSTRUCTION SCHEDULE: Contractor shall be responsible for producing a project schedule at the pre-construction conference . This schedule shall detail all phases of construction, special coordination with schools (see Item No. 10 Traffic Control for details), including project clean up, and allow the contractor to complete the work in the allotted time. Contractor will not move onto the job site nor will work begin until said schedule has been received and approval secured from the Construction Engineer. However, contract time will start even if the project schedule has not been turned in. Contract start date would be outlined in the pre-construction work order notice. Project schedule will be updated and resubmitted at the end of every estimating period. All costs involved with producing and maintaining the project schedule shall be considered subsidiary to this contract. 19. SAFETY RESTRICTIONS-WORK NEAR HIGH VOLTAGE LINES: The following procedures will be followed regarding the subject item on this contract: (1) A warning sign not less than five inches by seven inches, painted yellow with black letters, that are legible at twelve feet shall be placed inside and outside vehicles such as cranes, derricks, power shovels , drilling rigs , pile drivers, hoisting equipment or similar apparatus. The warning sign shall read as follows: "WARNING --UNLAWFUL TO OPERA TE THIS EQUIPMENT WITHIN SIX FEET OF HIGH VOLTAGE LINES." SP-9 (2) Equipment that may be operated within ten feet of high voltage lines shall have an insulating cage-type of guard about the boom or arm, except back hoes or dippers, and insulator links on the lift hood connections . (3) When necessary to work within six feet of high voltage electric lines, notification shall be given to the power company (TXU Electric Delivery) which will erect temporary mechanical barriers, de-energize the line, or raise or lower the line. The work done by the power company shall not be at the expense of the City of Fort Worth . The notifying department shall maintain an accurate log of all such calls to TXU Electric Delivery and shall record action taken in each case. ( 4) The Contractor is required to make arrangements with TXU Electric Delivery for the temporary relocation or raising of high voltage lines at the Contractor's sole cost and expense. (5) No person shall work within six feet of a high voltage line without protection having been taken as outlined in Paragraph (3). 20. RIGHT TO AUDIT: Contractor agrees that the City shall, until the expiration of three (3) years after final payment under this contract is made by City, have access to and the right to examine and photocopy any directly pertinent books , documents, papers and records of the Contractor involving transactions relating to this contract. Contractor agrees that the City shall have access during normal working hours to all necessary Contractor facilities and shall be provided adequate and appropriate workspace in order to conduct audits in compliance with the provisions of this section. Contractor further agrees to include in all its subcontracts hereunder a provision to the effect that the subcontractor agrees that the City shall, until the expiration of three (3) years after final payment under the subcontract, have access to and the right to examine any directly pertinent books, documents, papers and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this article together with Article VI. City shall give the subcontractor reasonable advance notice of intended audits. Contractor and subcontractor agree to photocopy such documents as may be requested by City. City agrees to reimburse Contractor and/or subcontractor for the cost of copies at the rates as contained in the Texas Administrative Code at the time payment is made. SP-10 21. CONTRACTOR'S RESPONSIBILITY FOR DAMAGE CLAIMS: Contractor Covenants and agrees to indemnify City's Engineer and Architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the City, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees , subcontractors, licensees or invitees, whether or not any such injury, damage or death is caused, in whole or in part, by the negligence or alleged negligence of the City, its officers, servants, or employees. Contractor likewise covenants and agrees to indemnify and hold harmless the City from and against any and all injuries to City's officers, servants and employees and any damage, loss or destruction to property of the City arising from the performance of any of the terms and conditions of this Contract, whether or not any such injury or damage is caused in whole or in part by the negligence or alleged negligence of the City, its officers, servants or employees. In the event the City receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to the City satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides the City with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if deemed appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. 22. SUBSTITUTIONS: The specifications for materials set out the minimum standard of quality that the City believes necessary to procure a satisfactory project. No substitutions will be permitted until the Contractor has received written permission of the Engineer to make a substitution for the material that has been specified. Where the term "or equal", or "or approved equal" is used, it is understood that if a material, product, or piece of equipment bearing the name so used is furnished, it will be approved, as the particular trade name was used for the purpose of establishing a standard of quality acceptable to the City. If a product of any other name is proposed substitutes is procured by the Contractor . Where the term "or equal", or "approved equal" is not used in the specifications, this SP-11 does not necessarily exclude alternative items or material or equipment which may accomplish the intended purpose. However, the Contractor shall have the full responsibility of providing that the proposed substitution is , in fact, equal, and the Engineer, as the representative of the City, shall be the sole judge of the acceptability of substitutions. The provisions of the sub-section as related to "substitutions" shall be applicable to all sections of these specifications. 23. WATER FOR CONSTRUCTION: Water for construction will be furnished by the Contractor, at his own expense. 24. SANITARY FACILITIES FOR WORKERS: The Contractor shall provide all necessary conveniences for the use of workers at the project site. Specific attention is directed to this equipment. 25. MATERIAL STORAGE: Material shall not be stored on private property unless the Contractor has obtained written permission from the property Owner. A copy of the written permit shall be provided to the assigned inspector prior to utilization of the property. 26. PROTECTION OF EXISTING UTILITIES AND IMPROVEMENTS: The Contractor shall take adequate measures to protect all existing structures, improvements and utilities, which may be encountered. And it shall be the contractor's responsibility to call DIG- TESS prior to construction activities on any street. 27. LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC: The Contractor's particular attention is directed to the requirements of Item 7, "Legal Relations and Responsibilities to the Public" of the "Standard Specifications for Street and Storm Drain Construction". SP-12 28. CONSTRUCTION The City of Fort Worth maintains a "CONFINED SPACE ENTRY PROGRAM" for its employees and all contractors and their sub-contractors must comply with this program as a condition of the contract. All active sewer manholes , regardless of depth , are defined, as "permit required confined spaces". Contractors will be required to complete the "CONFINED SPACE ENTRY PERMIT" used by the Fort Worth Water Department (Field Operations Division) for each entry and possess and use the equipment necessary to comply with this program. The cost of complying with this program will be considered subsidiary to the pay items involving work in confined spaces (e .g. vacuum testing, cleaning, televising, construction , etc.). 29. QUALITY CONTROL TESTING: (a) The contractor shall furnish, at its own expense, certifications by a private laboratory for all materials proposed to be used on the project, including a mix design for any asphalt and/or Portland cement concrete to be used and gradation analysis for sand and crushed stone to be used along with the name of the pit from which the material was taken. The contractor shall provide manufacturer's certifications for all manufactured items to be used in the project and will bear any expense related thereto . (b) Tests of the design concrete mix shall be made by the contractor's laboratory at least nine days prior to the placing of concrete using the same aggregate, cement and mortar which are to be used later in the concrete . The contractor shall provide a certified copy of the test results to the City. (c) Quality control testing of in situ material on this project will be performed by the City at its own expense. Any retesting required as a result of failure of the material to meet project specifications will be at the expense of the contractor and will be billed at commercial rates as determined by the City . The failure of the City to make any tests of materials shall in no way relieve the contractor of its responsibility to furnish materials and equipment conforming to the requirements of the contract. (d) Not less than twenty four (24) hours notice shall be provided to the City by the contractor for operations requiring testing . The contractor shall provide access and trench safety system (if required) for the site to be tested and any work effort involved is deemed to be included in the unit price for the item being tested. SP-13 (e) The contractor shall provide a copy of the trip ticket for each load of fill material delivered to the job site . The ticket shall specify the name of the pit supplying the fill materi a l. NON-PAY ITEM NO: 1 -SPRINKLING FOR DUST CONTROL: All applicable provisions of Standard Specifications Item 200, "Sprinkling for Dust Control " shall apply. However, no direct payment will be made for this item and it shall be considered incidental to this contract. NON-PAY ITEM NO: 2 -REMOVAL OF TRAFFIC BUTTONS AND TEMPORARY LANE TAPE: The Contractor shall be responsible for the documentation of all street markings prior to the removal and disposal of the pavement markings. All traffic buttons shall be removed from the existing asphalt surface before resurfacing begins. The contractor shall be responsible for the removal and disposal of all buttons and markings. Upon completion of the job the City will install new buttons after proper notification. The contractor shall also be responsible for all materials , equipment and labor to place temporary adhesive lane marking tape to control and direct traffic in the same way as they were prior to start of construction . Any corrective action required on the temporary lane markings shall be the total responsibility of the Contractor and at no extra cost to the City. The contractor shall notify the Construction Engineer and T/PW Traffic Services to arrange for the replacement of the buttons and adhesive lane markers (arrows, etc .). All costs to the contractor shall be figured as subsidiary to this contract. NON-PAY ITEM NO: 3 -LOCATION AND EXPOSURE OF MANHOLES AND WATER VALVES: The contractor shall be responsible for locating and marking previously exposed manholes, water valves and any other utility cover in each street of this contract before the resurfacing process commences for a particular street. The method used to document locations shall be one in which the covers can be found exactly the first time . Proof of documentation must be provided to the assigned inspector prior to start of any overlay process. SP-14 The contractor shall attempt to include the Construction Engineer or his designee (if available) in the observation and marking activity. In any event, a street shall be completely marked a minimum of five (5) working days before resurfacing begins on the street. Marking the curbs with paint may be allowed if and only if a water base paint is used. It shall be the contractor's responsibility to notify the utility companies that he has commenced work on the project. As the resurfacing is completed (within same day), the contractor shall locate the covered manholes and valves and shall exposed and clean them . Upon completion of a street the contractor shall notify the utilities of this completion and indicate the start of the next one in order for the utilities to adjust facilities accordingly. The following are utility contact persons: Company SBC -Telephone TXU Electric Delivery: Downtown Other than Downtown Atmos Energy (Gas) CFW -Street Light CFW -Light Signal CFW -Pavement Marking CFW -Storm Drain CFW-Water CFW-Sewer Telephone Number 817-338-6202 214-384-3732 Cell 817-215-6424 817-215-6688 817-215-4366 469-261-2314 Cell 817-392-7738 817-392-8775 817-360-6364 cell 817-392-8107 817-392-5196 817-212-2699 817-925-2360 Cell 817-212-2699 817-944-8399 Cell SP-15 Contact Person Mr. Gary Tillory Mr. Scott King Mr. Robert Martinex Mr. John Crane Mr. James Turner Mr. Ken Brock Mr. Chuck Snyder Mr. Juan Cadena Mr. Roger Hauser Mr . Rick Davis Of course, under the tenns of this contract, the Contractor shall complete adjustment of the stonn drain and Water Department facilities, one traffic lane at a time within five (5) working days from the day of completing the H.M .A.C. overlay adjacent to said facilities. Any deviation from the above procedure and allotted working days may result in the shut down of the resurfacing operation. The contractor shall be responsible for all materials, equipment and labor to perfonn a most accurate job and all costs to the contractor shall be figured subsidiary to this contract. NON-PAY ITEM NO: 4 -PROTECTION OF TREES, PLANTS, SOIL, ETC.: All property along and adjacent to the Contractor's operations including lawns, yards, irrigation systems, shrubs, trees, etc. shall be preserved or restored after completion of the work to a condition equal or better than existed prior to start of work . By ordinance, the contractor must obtain a pennit from the City Forester before any work (trimming, removal or root pruning) can be done on trees or shrubs growing on public property including street rights-of-way and designated alleys. This permit can be obtained by calling the Urban Forestry Office at (817) 392-7933. All tree work shall be in compliance with pruning standards for Class II Pruning as described by the National Arborist Association. A copy of these standards can be provided by calling the above number. Any damage to public trees due to negligence by the Contractor shall be assessed using the current formula for Shade Tree Evaluation as defined by the International Society of Arboriculture. Payment for negligent damage to public trees shall be made to the City of Fort Worth and may be withheld from funds due to the Contractor by the City. To prevent the spread of the Oak Wilt fungus, all wounds on Live Oak and Red Oak trees shall be immediately sealed using a commercial pruning paint. This is the only instance when pruning paint is recommended. NON-PAY ITEM NO: 5 -PROJECT CLEAN-UP: SP-16 During the construction of this project, all parkways that are excavated shall be shaped, including bar ditches, and backfilled at the same time the roadway is excavated. Excess excavation will be disposed of at locations approved by the Engineer. The Contractor shall be aware that keeping the project site in a neat and orderly condition is considered an integral part of the contracted work and as such shall be considered subsidiary to the appropriate bid items . Clean up work shall be done as directed by the Engineer as the work progresses or as needed. If, in the opinion of the Engineer it is necessary, clean up shall be done on a daily basis. Clean up work shall include, but not be limited to: • Sweeping the street clean of dirt or debris • Storing excess material in appropriate and organized manner • Keeping trash of any kind off of the roadway and residents' property If it has been determined that the jobsite has not been kept in an orderly condition, the next estimate payment (and all subsequent payments until completed) of the appropriate bid item(s) will be reduced by 25%. The Contractor shall make a final cleanup of each street as soon as the paving and curb and gutter has been constructed. No more than five (5) working days shall elapse after completion of construction before the roadway and right-of-way is cleaned and restored. Failure to do so will be cause to stop the contractor from starting work on other streets. Project time will not be suspended, and a $200 charge per day will be made as liquidation damages. The Contractor shall make a final cleanup of all parts streets before acceptance of the project is made. This cleanup shall include removal of all objectionable rocks, pieces of asphalt or concrete and other construction materials, and in general preparing the site of the work in an orderly manner and appearance. NON-PAY ITEM NO: 6 -CRACK SEALING: All cracks that develop after completion of the street resurfacing and until the end of the 2-year warranty period shall be crack sealed with Rubber Asphalt Crack Sealer, as per the latest edition of the Tx.DOT Specifications for Construction and Maintenance of Highways, Streets, and Bridges, Item 300, "Asphalts, Oils, and Emulsions". The contractor shall be responsible for all materials, equipment and labor to perform a most accurate job and all costs to the contractor shall be figured subsidiary to this contract. SP-17 NON-PAY ITEM NO: 7 -STORM DRAIN INLET PROTECTION: All pulverization and overlay streets with storm drain inlets shall use inlet protection for sediment control, in accordance with the Standard Specifications for Public Works Construction-North Central Texas. The contractor shall be responsible for all materials, equipment and labor to perform a most accurate job and all costs to the contractor shall be figured subsidiary to this contract. NON-PAY ITEM NO: 8 -NO PAVING WORK ON SOLID WASTE WEEKLY PICK-UP DAY In order to eliminate potential rutting of the pavement from solid waste trucks while paving operations are underway, the contractor shall schedule construction on all the identified project streets such that no paving activities are scheduled on the weekly solid waste pick-up day for each street. The solid waste weekly pick-up day for each project street is identified on the "STREET BY STREET PA YING QUANTITY DETERMINATION SPREADSHEET" located at the end of the contract documents. On the spreadsheet, the solid waste weekly pick-up is listed as the day of the week; see "Garbage , Recycling, Yard Trimmings & Brush Weekly Pickup". No paving activities shall be scheduled on this day. The Contractor will be allowed to construct concrete flatwork on solid waste weekly pick-up day. Also on the spreadsheet, the solid waste monthly pick-up is listed as the week of the month; see "Monthly Pickup of Bulky Items". During this week, the day of pick up varies from Monday to Saturday afternoon. The Contractor will be allowed to pave the week of the solid waste monthly pickup. The Contractor, however, will be responsible for any coordination with the City Environmental Department regarding when the monthly pickup day occurs. If new pavement is damaged by the solid waste monthly pickup trucks due to the contractor's failure to adhere to the procedure outlined above ; then, the Contractor shall be solely responsible for any repairs required. Assessment of damage will be determined by the Construction Engineer, or, his authorized representative . The weekly and monthly solid waste pick up schedules are hereby provided for bidding purpose and use by the selected contractor during construction. SP-18 All cost associated with scheduling pavement installation around "solid waste pick-up days" shall be considered incidental to the project contract amount and no additional compensation shall be allowed. NON-PAY ITEM NO: 9 -AGREEMENT OF QUANTITIES The streets will be measured and all quantities per street will be documented , a copy of the measured quantities will be provided to the contractor. If the Contractor in agreement of the measured quantities, then the Contractor is required to sign it and return it with in five (5) working days. If the Contractor is not in agreement, then the Contractor is required to, within five (5) working days, arrange a field trip with the assigned inspector to show proof of the difference. PAY ITEM NO: 1 -Project Designation Sign: The contractor shall construct and install two (2) Project Designation Signs and it will be the responsibility of the contractor to maintain the signs in a presentable condition at all times on each project under construction. Maintenance will include painting and repairs as directed by the Engineer . It will be the responsibility of the Contractor to have the individual project signs lettered and painted in accordance with the enclosed detail. The quality of the paint, painting and lettering on the signs shall be approved by the Engineer. The height and arrangement of the lettering shall be in accordance with the enclosed detail. The sign shall be constructed of% inch fir plywood, grade A-C (exterior) or better. These signs shall be installed on barricades or as directed by the Engineer and in place at the project site upon commencement of construction. The work, which includes the painting of the signs, installing and removing the signs, furnishing the materials , supports and connections to the support and maintenance shall be to the satisfaction of the Engineer. The pre bid unit price per each will be full payment for materials including all labor, equipment, tools and incidentals necessary to complete the work. PAY ITEM NO: 2-Utility Adjustments: SP-19 This item is included for the basic purpose of establishing a contract price which will be comparable to the final cost of making necessary adjustments required due to street improvements to water, sanitary sewer, and natural gas service lines and appurtenances where such service lines and appurtenances are the property owner's responsibility to maintain. An arbitrary figure has been placed in the Proposal; however, this does not guarantee any payment for utility adjustments, neither does it confine utility adjustments to the amount shown in the Proposal. It shall be the Contractor's responsibility to provide the services of a licensed plumber to make the utility adjustments determined necessary by the Engineer. No payment will be made for utility adjustments except those adjustments determined necessary by the Engineer. Should the Contractor damage service lines due to his negligence, where such lines would not have required adjustment or repair otherwise, the lines shall be repaired and adjusted by the Contractor at the Contractor's expense. Contractor shall immediately cap the broken sprinkler system lines , and must notify the inspector prior to replacements. The payment to the Contractor for utility adjustments shall be the actual cost of the adjustments plus ten percent (10%) to cover the cost of bond and overhead incurred by the Contractor in hand! ing the utility adjustments. PAY ITEM NO: 3 ~ Remove and Replace Concrete Curb & Gutter: This item shall include the removal and replacement of all failed existing curb and gutter in sections, as designated by the Construction Engineer with same day haul-off of the removed material to a suitable dumpsite. For specifications governing this item, see City Standard Specifications, Item No. 104 "Removing Old Concrete", Item No . 502 "Concrete Curb and Gutter", and Drawing Nos. S-S2 through S-S5B. Pay limits for laydown curb and gutter are as shown in Drawing No. S-SS of the Standard Specifications. Contractor shall sawcut the curb and gutter and/or pavement prior to removal. The concrete shall be designed to achieve a minimum compressive strength of 3,000 pounds per square inch in seven (7) calendar days. Included, and figured subsidiary to this unit price, will be the required sawcut excavation, as per specification Item No. 106 "Unclassified Street Excavation", into the street to aid in the construction of the curb and gutter. The pay limit will be 9-inch out from the gutter lip. The street void shall be SP-20 filled with H.M.A.C. Type "D" mix (PG 64-22) in accordance with all applicable provisions of TxDOT's "Standard Specifications for Construction and Maintenance of Highways, Streets, and Bridges" Item Nos . 300 "Asphalts, Oils, and Emulsions", 310 "Prime Coat" (referenced), and 340 "Dense-Graded Hot-Mix Asphalt (Method)" (referenced) and compacted to standard densities. Contractor shall backfill behind the curb within five (5) working days from the day of completing the curb and gutter, if the contractor fails to complete the backfill within five (5) working days ,$ I 00 dollar liquidated damage will be assessed per block per day. Required backfilling shall be at finish grade and shall be completed in order for the curb and gutter to be accepted and measured as completed. Top soil as per specification Item No. 116 "Top Soil", if needed, shall be added and leveled to finishing grade. Cost of back filling, top soil, and grading shall be included in this pay item. The unit price bid per linear foot shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. PAY ITEM NO: 4 -New Concrete Curb & Gutter: This item shall include the construction of new standard concrete curb and gutter with same day haul-off of the removed material to a suitable dumpsite. For specifications governing this item, see City Standard Specifications item No. 502 "Concrete Curb and Gutter", and Drawing Nos. S-S2 through S-SSB. Pay limits for laydown curb and gutter are as shown in Drawing No. S-S5 of the Standard Specifications. Contractor shall sawcut the curb and gutter and/or pavement prior to removal. The concrete shall be designed to achieve a minimum compressive strength of 3,000 pounds per square inch in seven (7) calendar days. Included, and figured subsidiary to this unit price, will be the required sawcut excavation, as per specification Item No. 106 "Unclassified Street Excavation", into the street to aid in the construction of the curb and gutter. The pay limit will be 9-inch out from the gutter lip. The street void shall be filled with H.M.A.C. Type "D" mix (PG 64-22) in accordance with all applicable provisions of TxDOT's "Standard Specifications for Construction and Maintenance of Highways, Streets, and Bridges" Item Nos . 300 "Asphalts, Oils, and Emulsions", 310 "Prime Coat" (referenced), and 340 "Dense-Graded Hot-Mix Asphalt (Method)" (referenced) and compacted to standard densities. SP-21 - Contractor shall backfill behind the curb within five (5) working days from the day of completing the curb and gutter, if the contractor fails to complete the backfill within five (5) working days , $100 dollars liquidated damage will be assessed per block per day. Required backfilling shall be at finish grade and shall be completed in order for the curb and gutter to be accepted and measured as completed. Top soil as per specification Item No. 116 "Top Soil", if needed , shall be added and leveled to finishing grade . Cost of back filling , top soil , and grading shall be included in this pay item. The unit price bid per linear foot shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work . PAY-ITEM NO: 5-Remove and Replace 6-Inch Concrete Driveway: PAY-ITEM NO: 6 -Remove and Replace 6-Inch Exposed Aggregate Driveway: Pay items No. 5 and No. 6, shall include the removal and replacement of any type of existing concrete driveways, as designated by the Construction Engineer, due to deterioration or in situations where curb and gutter is replaced to adjust grades to eliminate ponding water with same day haul-off of the removed material to a suitable dump site. For specifications governing these items, see City Standard Specifications Item No. 104 "Removing Old Concrete" and Drawing Nos. S-S5, and Item No. 504" Concrete Sidewalk and Driveways". Pay limits for concrete driveway are as shown in Drawing No. S-S5 of the Standard Specifications . Contractor shall sawcut existing driveway, curb and gutter, and pavement prior to driveway removal Concrete shall be designed to achieve a minimum compressive strength of 3,000 pounds per square inch in seven (7) calendar days . Exposed concrete aggregate driveway surface shall be seeded with pea gravel. Exposed concrete aggregate wash off water is silty, high in alkalinity and may contain harmful chemicals; therefore, wash off water shall not be discharged into storm sewers and drainage ditches or streams. SP-22 - - Temporary expansion joint board at driveway approach edge shall be used to dam off wash water from entering street gutter. Temporary catch basin sealed with impervious diaphragm sump shall be used to collect all wash water until off site disposal is obtained, or, unless otherwise directed by the Engineer or his authorized representative. Included, and figured subsidiary to this unit price, will be the required sawcut excavation, as per specification Item No . 106 "Unclassified Street Excavation", into the street to aid in the construction of the driveway . The pay limit will be 9-inch out from the gutter lip. The street void shall be filled with H.M.A.C. Type "D" mix (PG 64-22) in accordance with all applicable provisions of TxDOT's "Standard Specifications for Construction and Maintenance of Highways, Streets, and Bridges" Item Nos. 300 "Asphalts, Oils, and Emulsions", 310 "Prime Coat" (referenced), and 340 "Dense-Graded Hot-Mix Asphalt (Method)" (referenced) and compacted to standard densities . Contractor shall backfill around the driveway within five (5) working days from the day of pouring the driveway, if the contractor fails to complete the backfill within five (5) working days, $100 dollars liquidated damage will be assessed per block per day. Required backfilling shall be at finish grade and shall be completed in order for the driveway to be accepted and measured as completed. Top soil as per specification Item No . 116 "Top Soil", if needed, shall be added and leveled to finishing grade. Cost of back filling, top soil, and grading shall be included in this pay item. The unit price bid per square feet shall be full compensation for all labor, material, equipment, supplies, and incidentals necessary to complete the replacement work. PAY-ITEM N O : 7 -New 6-Inch Concrete Driveway: This item shall include the construction of new standard concrete driveways, as designated by the Construction Engineer with same day haul-off of the removed material to a suitable dump site. For specifications governing these item, see City Standard Specification Item No. 504" Concrete Sidewalk and Driveways", Drawing Nos. S-S5, and Pay limits for concrete driveway are as shown in Drawing No. S-S5 of the Standard Specifications. Contractor shall sawcut existing driveway, curb and gutter, and pavement prior to driveway removal SP-23 All concrete shall be designed to achieve a minimum compressive strength of 3,000 pounds per square inch in seven (7) calendar days. Exposed concrete aggregate driveway surface shall be seeded with pea gravel. Included, and figured subsidiary to this unit price, will be the required sawcut excavation, as per specification Item No. 106 "Unclassified Street Excavation", into the street to aid in the construction of the driveway. The pay limit will be 9-inch out from the gutter lip. The street void shall be filled with H.M.A.C. Type "D" mix (PG 64-22) in accordance with all applicable provisions of TxDOT's "Standard Specifications for Construction and Maintenance of Highways , Streets, and Bridges" Item Nos. 300 "Asphalts, Oils, and Emulsions", 310 "Prime Coat" (referenced), and 340 "Dense-Graded Hot-Mix Asphalt (Method)" (referenced) and compacted to standard densities . Contractor shall backfill around the driveway within five (5) working days from the day of pouring the driveway, if the contractor fails to complete the backfill within five (5) working days, $100 dollar liquidated damage will be assessed per block per day. Required backfilling shall be at finish grade and shall be completed in order for the driveway to be accepted and measured as completed . Top soil as per specification Item No. 116 "Top Soil", if needed, shall be added and leveled to finishing grade . Cost of back filling, top soil, and grading shall be included in this pay item. The unit price bid per square feet shall be full compensation for all labor, material, equipment, supplies, and incidentals necessary to complete the replacement work. PAY-ITEM NO: 8 -Remove and Replace 4-Inch Concrete Sidewalk: PAY-ITEM NO: 9 -Remove and Replace 4-Inch Exposed Aggregate Sidewalk: Pay items No. 8 and No. 9, shall include the removal and replacement of any type of existing concrete sidewalk, as designated by the Construction Engineer, due to failure or in situation where curb and gutter is replaced to adjust grades to eliminate ponding water with same day haul-off of the removed material to a suitable dumpsite. For specifications governing these items, see City Standard Specifications Item No. 104 "Removing Old Concrete", and Item No. 504 "Concrete Sidewalk and Driveways". SP-24 - All concrete shall be designed to achieve a minimum compressive strength of 3,000 pounds per square inch in seven (7) calendar days. The exposed concrete aggregate sidewalk surface shall be seeded with pea gravel. Exposed concrete aggregate wash off water is silty, high in alkalinity and may contain harmful chemicals; therefore, wash off water shall not be discharged into storm sewers and drainage ditches or streams . Wash water shall be prevented from entering street gutter. Temporary catch basin sealed with impervious diaphragm sump shall be used to collect all wash water until off site disposal 1s obtained, or, unless otherwise directed by the Engineer or his authorized representative. Contractor shall backfill around the sidewalk within five (5) working days from the day of pouring the sidewalk, if the contractor fails to complete the backfill within five (5) working days, $100 dollars liquidated damage will be assessed per block per day . Required backfilling shall be at finish grade and shall be completed in order for the sidewalk to be accepted and measured as completed. Top soil as per specification Item No. 116 "Top Soil", if needed, shall be added and leveled to finishing grade. Cost of back filling, top soil, and grading shall be included in this pay item. The unit price bid per square feet shall be full compensation for all labor, material, equipment, supplies, and incidentals necessary to complete the replacement work. PAY-ITEM NO: 10-New 4-Inch Concrete Sidewalk: This item shall include the construction of new standard concrete sidewalk, as designated by the Construction Engineer with same day haul-off of the excavated material to a suitable dumpsite. For specifications governing this item, see City Standard Specification Item No. 504 "Concrete Sidewalk and Driveways". All concrete shall be designed to achieve a minimum compressive strength of 3000 pounds per square inch in seven (7) calendar days. SP-25 - - Contractor shall backfill around the sidewalk within five (5) working days from the day of pouring the sidewalk, if the contractor fails to complete the backfill within five (5) working days, $100 dollars liquidated damage will be assessed per block per day. Required backfilling shall be at finish grade, and shall be completed in order for the sidewalk to be accepted and measured as completed. Top soil as per specification Item No . 116 "Top Soil", if needed, shall be added and leveled to finishing grade . Cost of back filling, top soil, and grading shall be included in this pay item. The unit price bid per square feet shall be full compensation for all labor, material, equipment, supplies, and incidentals necessary to complete the replacement work. PAY-ITEM NO: 11 -Remove Existing Wheelchair Ramp and Install Standard 4-Inch ADA Wheelchair Ramp (with detectable warning Dome-Tile surface): This item shall include removing the existing wheelchair ramp and installing Standard 4-inch ADA wheelchair ramp that includes a detectable warning Dome-Tile surface at various locations as to be determined in field by the Construction Engineer, due to failure or in situation where curb and gutter is replaced to adjust grades to eliminate ponding water with same day haul-off of the removed material to a suitable dumpsite. For specifications governing this item, see enclosed details for Wheelchair Ramp (with detectable warning Dome-Tile surface, and City Standard Specifications Item No. 104 "Removing Old Concrete", and Item 504 "Concrete Sidewalk Driveways", except as herein modified . All concrete shall be designed to achieve a minimum compressive strength of 3,000 pounds per square inch in seven (7) calendar days. Contractor shall sawcut existing sidewalk, curb and gutter, and pavement prior to wheelchair ramp removal. The removal of existing curb and gutter as required for the replacement of existing wheelchair ramps shall be included in PAY ITEM NO: 3 -Removal and Replacement of Concrete Curb & Gutter, as determined by the Construction Engineer. Pay limits for laydown curb and gutter are as shown in the Accessibility Ramp Pay Limits detail (STR-032). The pay limit will extend from 9-inches outside the lip of gutter to the back of the curb. Any asphalt tie-in shall be subsidiary to the curb and gutter pay item. SP-26 - Pay limits for "Standard Wheelchair Ramp" will start 15 inches back from the face of curb and encompass the remainder of the ramp and sidewalk . Contractor shall furni s h a nd install brick red color pre-cast de tectable warning Dome-Tile, manufactured by StrongGo Industries or approved equal by the construction Engineer. Detectable warning surface shall be a minimum of 24-inch in depth in the direction of pedestrian travel , and extend to a minimum of 48-inch along the curb ramp or landing where the pedestrian access route enters the street, and shall be located so that the edge nearest the curb line is a minimum of 6-inch and a maximum of 8-inch from the extension of the face of curb. Detectable warning Dome-Tile surface maybe curved along the corner radius . The method of Dome-Tile installation shall be in accordance with the manufactures instruction . Cost of detectable warning Dome-Tile and installation , shall be included in this pay item. Contractor shall provide a brick red colored Dome-Tile sample for approval by the Engineer, meeting the aforementioned specification. The sample, upon approval by the Engineer, shall be the acceptable standard to be applied for all construction covered in the scope of this pay item . Included, and figured subsidiary to this unit price, will be the required sawcut excavation, as per specification Item No. 106 "Unclassified Street Excavation", into the street to aid in the construction of the wheelchair ramp . The pay limit will be 9-inch out from the gutter lip . The street void shall be filled with H.M .A .C. Type "D" mix (PG 64 -22) in accordance with all applicable provisions of TxDOT's "Standard Specifications for Construction and Maintenance of Highways , Streets, and Bridges" Item Nos. 300 "Asphalts, Oils, and Emulsions", 310 "Prime Coat" (referenced), and 340 "Dense-Graded Hot-Mix Asphalt (Method)" (referenced) and compacted to standard densities. Contractor shall backfill the wheelchair ramp within five (5) working days from the day of pouring the wheelchair ramp, if the contractor fails to complete the backfill within five (5) working days, $100 dollars liquidated damage will be assessed per block per day. Required backfilling shall be at finish grade, and shall be completed in order for the wheelchair ramp to be accepted and measured as completed . Top soil as per specification Item No. 116 "Top Soil", if needed , shall be added and leveled to finishing grade. Cost of back filling , top soil , and grading shall be included in this pay item . The unit price bid per square feet, as shown on the proposal, will be full compensation for materials, labor, equipment, tools and incidentals necessary to complete the work . SP-27 - - PAY-ITEM NO: 12 -New 4-Inches ADA Wheelchair Ramp: (with detectable warning Dome-Tile surface): This item shall include the construction of new Standard 4-inch ADA wheelchair ramp that includes a detectable warning Dome-Tile surface at various locations as to be determined in field by the Construction Engineer, due to a situation where curb and gutter is replaced to adjust grades to eliminate ponding water with same day haul-off of the removed material to a suitable dumpsite . For specifications governing this item , see enclosed details for Wheelchair Ramp (with detectable warning Dome-Tile surface, and City Standard Specifications Item No. 104 "Removing Old Concrete", and Item 504 "Concrete Sidewalk Driveways", except as herein modified. All concrete shall be designed to achieve a minimum compressive strength of 3,000 pounds per square inch in seven (7) calendar days. Contractor shall sawcut existing sidewalk, curb and gutter, and pavement prior to wheelchair ramp removal. The removal of existing curb and gutter as required for the construction of new wheelchair ramps shall be included in PAY ITEM NO: 3 -· Remove and Replace Concrete Curb & Gutter, as determined by the Construction Engineer. Pay limits for laydown curb and gutter are as shown in the Accessability Ramp Pay Limits detail (STR-032). The pay limit will extend from 9 inches outside the lip of gutter to the back of the curb . Any asphalt tie-in shall be subsidiary to the curb and gutter pay item. Pay limits for "Standard Wheelchair Ramp" will start 15-inches back from the face of curb and encompass the remainder of the ramp and sidewalk. Contractor shall furnish and install brick red color pre-cast detectable warning Dome-Tile, manufactured by StrongGo Industries or approved equal by the construction Engineer . Detectable warning surface shall be a minimum of 24-inch in depth in the direction of pedestrian travel, and extend to a minimum of 48-inch along the curb ramp or landing where the pedestrian access route enters the street, and shall be located so that the edge nearest the curb line is a minimum of 6-inch and a maximum of 8-inch from the extension of the face of curb. Detectable warning Dome-Tile surface maybe curved along the comer radius. The method of Dome-Tile installation shall be in accordance with the manufactures instruction. Cost of detectable warning Dome-Tile and installation, shall be included in this pay item. SP-28 l .... Contractor shall provide a brick red colored Dome-Tile sample for approval by the Engineer, meeting the aforementioned specification. The sample, upon approval by the Engineer, shall be the acceptable standard to be applied for all construction covered in the scope of this pay item . Included, and figured subsidiary to this unit price, will be the required sawcut excavation, as per specification Item No . 106 "Unclassified Street Excavation", into the street to aid in the construction of the wheelchair ramp . The pay limit will be 9-inch out from the gutter lip. The street void shall be tilled with H .M .A .C . Type "D" mix (PG 64-22) in accordance with all applicable provisions of TxDOT's "Standard Specifications for Construction and Maintenance of Highways , Streets , and Bridges" Item Nos. 300 "Asphalts , Oils, and Emulsions", 310 "Prime Coat" (referenced), and 340 "Dense-Graded Hot-Mix Asphalt (Method)" (referenced) and compacted to standard densities . The Contractor shall backfill behind the wheelchair ramps within five (5) working days from the day of pouring the wheelchair ramp, if the contractor fails to complete the backfill within five (5) working days , $100 dollars liquidated damage will be assessed per block per day. Required backfilling shall be at finish grade, and shall be completed in order for the wheelchair ramp to be accepted and measured as completed. Top soil as per specification Item No. 116 "Top Soil", if needed, shall be added and leveled to finishing grade. Cost of back filling , top soil, and grading shall be included in this pay item. The unit price bid per square feet , as shown on the proposal, will be full compensation for materials, labor, equipment, tools and incidentals necessary to complete the work. PAY ITEM NO: 13 ~ Remove and Replace Existing Concrete Valley Gutter: This item shall include the removal and replacement of existing valley gutters, at locations to be determined in field by the Construction Engineer with same day haul-off of the removed material to a suitable dumpsite. Contractor shall sawcut existing sidewalk, curb and gutter and/or pavement prior to valley gutter removal. Sawcutting and removal of asphalt pavement, concrete base , curb and gutter, and necessary excavation to install the concrete valley gutters all shall be included in this pay item . For specifications governing this item, see City Standard Specifications, Item No . 106, "Unclassified Street Excavation", Drawing No . S-S6 and detail enclosed, TxDOT's "Standard Specifications for Construction and Maintenance of Highways , Streets, and Bridges " Item Nos. 247 "Flexible Base SP-29 The unit price bid per cubic yard shall be full compensation for all materials, labor, equipment and incidentals necessary to complete the work. PAY ITEM NO: 23 ~ HMAC Pavement Level Up: This item shall be used to fill ruts, depressions, level up pavement section with Type "D" surface mix (PG 64-22) prior to placing the asphalt surface overlay and where needed as directed by the Engineer in the field . All applicable provisions ofTxDOT's "Standard Specifications for Construction and Maintenance of Highways, Streets, and Bridges" Item Nos. 300 "Asphalts, Oils, and Emulsions" (referenced), 310 "Prime Coat" (referenced), and 340 "Dense-Graded Hot-Mix Asphalt (Method)" (referenced), shall govern work. This item shall be used to fill, to the proper grade, the void created by removing existing brick base, if existing base cannot be wedged or surface milled. The unit price bid per ton shall be full compensation for all materials, labor, placing, equipment, cleaning and incidentals necessary to complete the work. PAY-ITEM NO: 24 ~ Pavement Wedge Milling 2-Inch to 0-Inch Depth, 5.0 Ft Wide 1. Description This item shall consist of milling the existing pavement from the lip of gutter at a depth of 2- inch and transitioning to match the existing pavement (0-inch cut) at a minimum width of 5- feet. The existing pavement to be milled will either be asphalt, concrete, or brick pavement. The milled surface shall provide a uniform surface free from gouges, ridges, oil film, and other imperfections of workmanship and shall have a uniform textured appearance. In all situations where the existing H.M.A.C . surface contacts the curb face, the wedge milling shall include the removal of the existing asphalt covering the gutter up to and along the face of curb. If the existing base is brick and cannot be wedge milled, then the existing brick base, of 5-foot in width, shall be removed under PAY-ITEM NO. 20 -Unclassified Street Excavation and replaced under PAY-ITEM NO. 23 -HMAC Level Up -Install, prior to placing H.M.A.C. SP-37 surface course. See PAY-ITEM NO: 20 -Unclassified Street Excavation, for further description of work. The wedge milling shall be completed within ten (10) working days from day of completing concrete work (curb and gutter, driveways, valley gutter, sidewalk) on any street. If the contractor fails to complete the wedge milling within ten ( I 0) working days, $100 dollar liquidated damage will be assessed per block per day. The wedge milling operations shall be performed in a continuous manner along both sides of the street. Contractor shall complete overlaying the milled street within five (5) working days from the day of completing the wedge milling on any street. If the Contractor fail to complete the overlay within five (5) working days, then the wedge milling operations of new streets will be shut down, and liquidated damage of $200.00 per day per street will be assessed until all wedge milled streets are overlayed. Once the overlay begun on a street, it shall continue uninterrupted until completed . 2. Equipment The equipment for removing the pavement surface shall be a power operated milling machine or other equal or better mechanical means capable of removing, in either one pass or two passes, the necessary pavement thickness in a five-foot minimum width. The equipment shall be self-propelled with sufficient power, traction and stability to maintain accurate depth of cut and slope. The machine shall be equipped with an integral loading and reclaiming means to immediately remove material being cut from the surface of the roadway and discharge the cuttings into a truck, all in one operation. Adequate back-up equipment (mechanical street sweepers, loaders, water truck, etc.) and personnel will also be provided to keep flying dust to a minimum and to insure that all cuttings are removed from street surface daily. Stockpiling of planed material will not be permitted on the project site unless designated by the Engineer. The machine shall be equipped with means to control dust created by the cutting action and shall have a manual system providing for uniformly varying the depth of cut while the machine is in motion thereby making it possible to cut flush to all inlets, manholes, or other obstructions within the paved area. The speed of the machine shall be variable in order to leave the desired grid pattern specified under Surface Texture. SP-38 / Subsidiary to this pay items, the Contractor shall haul-off all milled material to the City yards. The unit price bid per linear feet shall be full compensation for all milling, including milled material haul-off to City yards, tools, labor, equipment and incidentals necessary to complete the required work. PAY-ITEM NO: 25 -Butt Joint Milling: Description: This item requires the contractor to mill "butt joints" into the existing surface, in association with the wedge milling operation (PAY ITEM NO . 24) to the depth and at locations as described below. The butt joint will provide a full width transition section, whereby the new overlay shall maintain constant depth at the point the new overlay is terminated and the new surface elevation matches the existing pavement. The construction activities, performance standards and equipment needed for the butt joints milling operations shall be governed by the special provisions of PAY-ITEM NO . 24 -2- Inch to 0-Inch Pavement Wedge Milling Depth 5-Ft Wide -Install. The configuration of the butt joints is described in more detail below. General details of butt joint locations -along with wedge milling in general -are shown in plan form at the back of this document. Construction Details: Prior to the milling of the butt joints, the contractor shall consult with the construction Engineer for proper location of these joints and verify that the selected limits of the projects street are correct. The general locations for butt joints are at all beginning and ending points of streets listed in the project and as more graphically detailed at the back of this specification book . The joints are also required on both sides of all railroad tracks and concrete valley gutters, bridge decks and culverts and all other items which transverse the street and end the continuity of the asphalt surface. Each butt joint shall be 20-feet long and milled out across the full width of the street section to a tapered depth of 2 inch. This milled area shall be tapered within the 20-feet to a depth from 0-nch to 2-inch at a line adjacent to the beginning and ending points or i'ntermediate transverse items . This butt joint - when overlayed -will consist of an asphalt section that will transition the new overlay to match the existing pavement elevation. The contractor shall provide a temporary wedge of asphalt at all butt joints to provide a smooth ride over the bump. SP-39 Measurement and Payment: Butt joints as prescribed above will be measured by the unit of each butt joint milled . The disposal of excess material involved will not be measured for payment. Each butt joint-milled, measured as above, complete-in place-in accordance with these specifications, will be paid for at the unit price shown in the proposal for "Butt Joints". Subsidiary to this pay items, the Contractor shall haul-off all milled material to the City yards. The unit price bid per each shall be full compensation for all milling, including milled material haul- off to City yards, tools, labor, equipment and incidentals necessary to complete the required work. PAY ITEM NO: 26 ~ 2-Inch Surface Milling: This pay items shall consist of milling the existing pavement at a depth of 2-inch . All applicable provisions of PAY ITEM NO; 24-2-Inch to 0-Inch Wedge Milling Depth, 5-Ft Wide shall apply. If the existing base is brick and cannot be surfaced milled, then the existing brick base shall be removed, under PAY ITEM NO: 20 -Unclassified Street Excavation and replaced under PAY ITEM NO: 23 -HMAC Level Up, prior to placing H.M.A.C. surface course. See PAY ITEM NO: 20-Unclassified Street Excavation, for further description of work. The surface milling shall be completed within ten (10) working days from the day of completing concrete work ( curb and gutter, driveways, valley gutter, sidewalk) on any street. If the contractor fails to complete the surface milling within ten (10) working days, $100 dollars liquidated damage will be assessed per block per day. The surface milling operations shall be perfonned in a continuous manner for the entire block. After completion of the surface milling, Contractor shall complete overlaying the milled street within five (5) working days from the day of completing the surface milling on any street. If the Contractor fails to complete the overlay within five (5) working days, then the milling operations of new streets will be shut down, and liquidated damage of $200 .00 per day per street will be assessed until all milled streets are overlaid. Once the overlay begun on a street, it shall continue uninterrupted until completed . SP-40 Subsidiary to this pay items, the Contractor shall haul-off all milled material to the City yards. The unit price bid per square yard shall be full compensation for all milling, including milled material haul-off to City Yards , tools, labor, equipment and incidentals necessary to complete the work. PAY ITEM NO: 27 ~ Crack Sealing of Existing Pavement: After completion of wedge milling of those streets designated as Mill Overlay (MOL) on the street list in the back of this contract document book, the Contractor shall seal existing cracks 1/i inch and greater, by using cold poured crack sealer Polymer Modified Asphalt Emulsion Crack Sealer, as directed by the Engineer. TxDOT's "Standard Specifications for Construction and Maintenance of Highways, Streets, and Bridges " Item Nos. 300 "Asphalts, Oils, and Emulsions", shall apply . The inside of the cracks shall be cleaned with an air compressor or approved equipment, prior to sealing. Sealant shall be applied with a rubber "V" shaped squeegee where applicable. Provide adequate traffic control during set up and cure time of sealant. The unit price bid per linear foot shall be full compensation for all labor, material , equipment, supplies, and incidentals necessary to complete the work. PAY-ITEM NO: 28 ~ 2-Inch HMAC Surface Course Type "D" Mix: All applicable provisions of TxDOT's "Standard Specifications for Construction and Maintenance of Highways , Streets, and Bridges" Item Nos . 300 "Asphalts, Oils, and Emulsions" (referenced), 310 "Prime Coat" (referenced), and 340 "Dense--Graded Hot-Mix Asphalt (Method)" (referenced) shall govern work of pay items No. 29 & 30 . The following amendments to the above TxDOT's specifications shall govern , take precedence and shall include: Item No. 340 "Dense--Graded Hot-Mix Asphalt (Method)" (referenced): • Under Item 340 .2, Materials. A. Aggregates: The surface aggregate classification (SAC) shall be Class B . SP-41 The Contractor shall perform the Los Angeles abrasion, magnesium sulfate soundness , Micro-Deval and all other aggregate quality tests listed in Table 1. 2. RAP will not be allowed, for use, in surface course Type "D" mix. • Under Item 340.2, Materials, D. Asphalt Binder: Furnish performance-graded PG 64-22 for H .M .A.C. surface course, level up and pavement/base repair or replacement. • Under Item 340.4, Construction, The City of Fort Worth, Texas will perform quality assurance tests and checks on the paving project materials during construction, to ensure compliance with the specifications and approved mixture design . The sampling and testing of the materials shall be made at the expense of the City. In the event the sampling and testing does not comply with the specifications, all subsequent testing of the material, in order to determine if the material is acceptable, shall be furnished and paid by the contractor, as directed by the Engineer. Samples will be taken for determination of asphalt content, aggregate gradation , and maximum theoretical specific gravity as determined by the Engineer. For each hot mix asphalt surface course placed, nuclear gauge in-place density testing will be performed at each 300-ft station. For each hot mix asphalt surface course placed, cores will be obtained to determine in- place density and thickness . The cores will be taken at the maximum interval of 300-ft (to coincide with field density locations). • Under Item 340.4, Construction, A. Mixture Design: The contractor shall furnish mixture design of the proposed hot mix asphalt, at or before the pre-construction meeting. The Contractor shall submit to the Engineer a mixture design prepared by an AASHTO accredited laboratory, for the materials to be used in the project. Using the typical weight design example in Tex-204-F, Part I, the mixture design shall meet the requirements contained in Tables 1 through Table 5 of Item 340 . The Indirect Tensile-Dry (Tex-226-F) and the Hamburg Wheel-tracking (Tex-242-F) tests shall be waived . SP-42 The mixture design report must be certified and signed by a Level II Specialist and submitted on TxDOT's software forms. The Engineer may verify the mixture design at optimum asphalt content. • Under Item 340.4, Construction, B. Job-Mix Formula Approval: The Contractor will perform the Boil Test (Tex-530-C). • Under Item 340.4, Construction, J. Ride Quality: The Ride Quality Surface Type A test (10-foot straight edge) shall be measured. • Under Item 340.5 Measurement: Hot mix will be measured by the square yard of the composite hot mix, which includes asphalt, aggregate and additives. • Under Item 340.6 Payment: The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement", will be paid for at the unit price bid per square yard, for "Dense-Graded Hot Mix Asphalt (Method)". PAY ITEM NO: 29 ~ Remove and Replace 30-Ft HMAC Speed Cushion w/stripping PAY ITEM NO: 30 ~ Remove and Replace 40-Ft HMAC Speed Cushion w/stripping Pay items No. 29 and No 30, shall include the removal of existing Speed Cushions, and installing new standard H.M.A.C Speed Cushions according to the plan and profile as shown on the detail sheet. All excavated material shall be hauled off site the same day as excavated, to a suitable dumpsite. Contractor shall complete the installation of the speed cushion within ten (10) working days from the day of completing the overlay on any street, if the contractor fails to install the speed cushion within ten (10) working days, $100 dollars liquidated damage will be assessed per each speed cushion per day. Contractor shall notify the Construction Engineer 72 hours prior to installing any speed cushions. Contractor shall install speed cushion's pavement markings. SP-43 If the roadway is dam a ged during existing marker removal, the work shall be temporaril y halted until consultation with the Construction Engineer. The pave ment shall be repaired prior to new HMAC overlay . MATERIALS AND QUALITY REQUIREMENTS: I . Speed Cushions The speed cushions shall consist of H.M.A .C. Type "D" surface course (PG 64-22) with tack coat (SS-1) and compacted with vibratory hand roller. All applicable provisions of TxDOT's "Standard Specifications for Construction and Maintenance of Highways , Streets, and Bridges" Item Nos. 300 "Asphalts , Oils, and Emulsions" (referenced), 310 "Prime Coat" (referenced), and 340 "Dense-Graded Hot-Mix Asphalt (Method)" (referenced) shall apply . Kraft brown paper - 36 inch wide 40-lb paper shall be used to keep curb & gutter clean . 2. Pavement Markings Raised Pavement Marking: All materials used shall be pre-approved prior to placement. The brand name and specifications of the materials shall be included in submittal for approval. The approved materials must be used throughout the duration of the contract. In the event that substitute materials need to be used, they must be equal to or e xceed the quality of those currently in use and be approved the Construction Engineer. All markers shall be 4 inch and be installed with epoxy; bituminous adhesive is not approved. A chalk line, chain , or equivalent shall be used during layout to insure that individual markers are properly aligned . All markers shall be placed uniformly along the line to achieve a smooth continuous appearance . Preformed Pavement Marking: All materials used under this agreement shall be pre-approved prior to awarding of the bid. Materials used shall meet TXDOT specifications Item 666 Type II. The approved materials must be used throughout the duration of the bid . In the event that substitute materials need to be used, they must be equal to or exceed the quality of those currently in use , and be approved by Construction Engineer. All material must be equal to or exceed the following: Pre Mark brand Hot Tape which is manufactured by Stimsonite . Stamark A420 , which is manufactured by 3M. SP-44 Stamark A380 , which is manufactured by 3M. All applications shall be in strict compliance with all manufacturer recommendations. Surface Preparation and Application of Pavement Markings Roadway surface shall be clean, dry and free from dirt, grease, and other forms of contamination . All surfaces must be air blasted prior to application of paint. Surface preparation and application shall be in strict compliance with manufacturer recommendations. Equipment and methods used for surface preparation shall not damage the pavement or present a hazard to motorists. Installation of Pavement Markings: Contractor's personnel shall be knowledgeable and sufficiently skilled in the installation of raised pavement markings and preformed pavement markings . Markings that are not properly applied due to faulty application methods or defective product, and markings, which are placed in the wrong position or alignment, shall be removed and replaced by the contractor at the contractor's expense. If the mistake is such that it would be confusing or hazardous to motorists it shall be remedied the same day of notification. Notification will be made by phone and confirmed by fax . Other mistakes shall be remedied within five days of written notification . Traffic Control of Pavement Marking: When markings are applied on roadways open to traffic care will be taken to ensure that proper safety precautions are followed, including the use of signs, cones, barricades, flaggers, etc. Work shall be performed with as little disruption to traffic as possible, and freshly applied markings shall be protected from traffic damage and disfigurement. 3. Measurement and Payment The unit price bid per each shall be full compensation for removal of existing pavement markings , H.M.A.C . Type "D" surface course, tack coat (SS-1), vibratory hand roller, surface preparation, preformed and raised pavement markings, kraft brown paper -36 inch wide 40-lb paper to keep curb & gutter clean , and all materials, labor, equipment and incidentals necessary to complete the work. SP-45 The unit price per bid per each will be full compensation for all labor, equipment, material, tools, and all incidentals necessary to complete the work. PAY ITEM NO: 31 -Water Valve Box Adjustment with Steel Riser: This item shall include adjusting the tops of existing water valve with steel riser manufactured by American Highway Products or approved equal by the construction engineer to match proposed grade, steel water valve riser shall be placed at the time of paving. Specifications and details of steel water valve riser (included at the end of this document), and Standard Specification Item No . 450 "Adjusting Manholes, shall apply except as herein modified. Contractor will be responsible for adjusting water valve boxes to match new pavement grade, the water valves themselves will be adjusted by City of Fort Worth Water Department forces. Prior to beginning of work, the Contractor shall make an inventory of the condition of existing water valve boxes. The Engineer will field verify this inventory and provide the Contractor replacements for broken valve boxes. The contractor shall replace the valve boxes, which are damaged during construction at no cost to the City. Failure of the contractor to perform this inventory will place the total burden of replacement of any broken valve box on the contractor. The pre bid unit price per each will be full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work. PAY ITEM NO: 32-Water Valve Box Adjustment with Concrete Collar: This item shall include adjusting the tops of existing water valve with concrete collar to match proposed grade as shown on the detail at the back of this document or as directed by the Engineer. The concrete collar will be used only in case of steel ring riser CAN NOT be used as determined by the Engineer. Standard Specification Item Nos. 450 "Adjusting Manholes and Inlets" and 406 "Concrete for Structures" shall apply except as herein modified. SP-46 Contractor will be responsible for adjusting water valve boxes to match new pavement grade, the water valves themselves will be adjusted by City of Fort Worth Water Department forces. The concrete shall be designed to achieve a minimum compressive strength of 3 ,000 pounds per square inch in seven (7) calendar days. Contractor shall completed the adjustment of the Water Meter Boxes within five (5) working days from the day of completing the HMAC overlay on any street, and street shall be open to traffic within ten (I 0) working days. If the contractor fails to complete the adjustments within five (5) working days, $100 dollars liquidated damage will be assessed per each water valve box per day. Prior to beginning of work, the Contractor shall make an inventory of the condition of existing Valves. The Engineer will field verify this inventory and provide the Contractor replacements for broken valve covers. The contractor shall replace the valve covers which are damaged during construction at no cost to the City. Failure of the contractor to perform this inventory will place the total burden of replacement of any broken frame and cover on the contractor. The pre bid unit price per each will be full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work. PAY ITEM NO: 33 -Water Meter Box Adjustment: This item only applies when the adjacent curb and gutter has been removed and replaced and has been authorized by the assigned inspector. The adjustment shall include raising or lowering the existing water meter box to the proper grade. The pre bid unit price per each will be full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work. PAY ITEM NO: 34 -Manhole Adjustment with Steel Riser: This item shall include adjusting the tops of existing manhole with steel riser manufactured by American Highway Products or approved equal by the construction engineer to match proposed grade, the steel manhole riser shall be placed at the time of paving. Specifications and details of steel manhole riser (included at the end of this document), and Standard Specification Item No . 450 "Adjusting Manholes, shall apply except as herein modified. SP-47 Prior to beginning of work, the Contractor shall make an inventory of the condition of existing manholes. The Engineer will field verify this inventory and provide the Contractor replacements for broken manhole covers. The contractor shall replace the manhole covers which are damaged during construction at no cost to the City. Failure of the contractor to perform this inventory will place the total burden of replacement of any broken frame and cover on the contractor. Should the contractor identify any utility manholes other than those owned by the City of Fort Worth, TX, the contactor is encouraged to contact the owner and arrange the adjustment of the manhole cover. Payment for the work will be made by the individual Franchise Utility Company. The contractor is not entitled to any additional compensation or renegotiation with the City associated with the construction of this work. The pre bid unit price per each will be full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work. PAY ITEM NO: 35 ~ Manhole Adjustment with Concrete Collar: This item shall include adjusting the tops of existing manhole with concrete collar to match proposed grade as shown on the detail at the back of this document or as directed by the Engineer. The concrete collar will be used only in case of steel rig riser CAN NOT be used as determined by the Engineer. Standard Specification Item Nos. 450 "Adjusting Manholes and Inlets" and 406 "Concrete for Structures" shall apply except as herein modified. The concrete shall be designed to achieve a minimum compressive strength of 3,000 pounds per square inch in seven (7) calendar days. Contractor shall completed the adjustment of the Manholes within five (5) working days from the day of completing the HMAC overlay on any street, and street shall be open to traffic within ten ( I 0) working days. If the contractor fails to complete the adjustments within five (5) working days, $100 dollars liquidated damage will be assessed per each water valve box per day. Prior to beginning of work, the Contractor shall make an inventory of the condition of existing manholes. The Engineer will field verify this inventory and provide the Contractor replacements for SP-48 broken manhole covers . The contractor shall replace the manhole covers which are damaged during construction at no cost to the City. Failure of the contractor to perform this inventory will place the total burden of replacement of any broken frame and cover on the contractor. Included as part of this pay item shall be the application of a cold-applied preformed flexible butyl rubber or plastic sealing compound for sealing interior and/or exterior joints on concrete manhole sections, as per current City Water Department Special Conditions. Should the contractor identify any utility manholes other than those owned by the City of Fort Worth, TX, the contactor is encouraged to contact the owner and arrange the adjustment of the manhole cover. Payment for the work will be made by the individual Franchise Utility Company . The contractor is not entitled to any additional compensation or renegotiation with the City associated with the construction of this work. The pre bid unit price per each will be full compensation for all labor, materials, equipment, tools, and incidentals necessary to complete the work. PAY ITEM NO: 36 -Painting House Curb Address: This item shall include painting of house addresses on curb or driveway radiuses that are removed and replaced in this contract. Contractor shall complete the painting of house curb addresses within ten (10) working days from the day of completing the HMAC overlay on any street, if the contractor fails to complete the work within ten (10) working days, $100 dollar liquidated damage will be assessed per block per day. • • • • • All materials shall be of recent product, and suitable for its intended purpose . Surface preparation and application shall be in strict compliance with manufacturer's recommendations . The paint shall NOT be applied; if the new concrete curb has aged less than a minimum of 28 days , and if weather condition may harm or damage the finish surface. The background paint shall be equal to or exceed #5160 White Latex Striping paint manufactured by K wal Paint or approved equal. The letters paint shall be equal to or exceed #6306 Black Latex Exterior paint manufactured by K wal Paint or approved equal. SP-49 • The minimum size for the background shall be 6" high x 16 " long, and the minimum size for the letters shall be 4" high. The unit price bid per each will be full compensation for all labor, material, tools, and incidentals necessary to complete the work. PAY ITEM NO: 37 -Grass Sod Replacement: This pay item shall consist of the replacements of a like grass sod that was removed under this contract due to the removal and replacement of driveway s, wheelchair ramps, and curb and gutters as determined by the Engineer. All materials shall be of recent production , and suitable for their intended purpose . Contractor shall complete the replacement of the sod within ten (I 0) working days from the day of completing the HMAC overlay on any street, if the contractor fails to replace the sod w ithin ten (10) working days , $100 dollars liquidated damage will be assessed per block per day. Sod Products Specifications: • Sod shall consist of live and growing grass. • Grass shall have a healthy, virile root system of dense, thickly matted roots throughout and approximately one-(I) inch minimum thickness of native soil attached to the roots. • Sod will be free from obnoxious weeds or other grasses and be free from any deleterious matter that might hinder the growth of the grass. • Sod material must be kept moist from the time it is dug until planted. Sod Installation Specifications : • The area to be sodded shall be determined by the City. • The sodded area shall be smoothed down. • The sodded area shall be thoroughly watered immediately after it is planted. The unit price bid per square yard will be full compensation for all labor , material, tools, and incidentals necessary to complete the work . PAY-ITEM NO: 38 -Re-Mobilizations: SP-50 This item shall compensate the Contractor to remobilize personnel , equipment, supplies, and material to perform additional work as directed by the Engineer. Remobilization will be considered when concrete "Flat-work" has been completed, personnel and equipments were demobilized, and the street is clean and ready for overlay. Remobilization shall be determined by the Engineer. Requests for reimbursement of remobilization expenses shall be denied unless prior approval is granted by the Engineer. The pre bid unit price per each will be full compensation for all labor, equipment, material, tools, and all incidentals necessary to complete the work. END OF SECTION SP-51 NOTE: THIS SPECIFICATION HAS BEEN MODIFIED TO DELETE NON- APPLICABLE ITEMS FOR USE AS A GUIDE SPECIFICATION FOR CITY STREETS .. Item 360 CONCRETE PAVEMENT 300.1. Description. Construct Portland cement concrete pavement with or without curbs on the concrete pavement. 300.2. Materials. A. Portland Cement Concrete. Provide Portland cement concrete to meet a minimum compressive strength of 3,000 psi at 28 days; unless shown otherwise in the contract do.cument~. Use Class A concrete for curbs that are placed separately from the pavement. Provide concrete that is workable and cohesive, possesses satisfa9tory finishing qualitles, and conforms to the mix design and mix design slump. B. Reinforcing Steel. Provide Grade 60 deformed steel for bar reinforcement. Provide approved positioning and supporting devices (baskets and chairs) capable of securing and holding the reinforcing steel in proper position before and during p·avlng. Provide corrosion protection when shown on the plans. ! 1. Dowels. Provide Grade 60 smooth, straight dowels of the size shown OJJ the plans, free of burrs or deformations. Coat dowels with a thin film of grease or other approved de-bonding material. ProvidE? dowel caps_ on tne lubricated _end of each dowel bar used In an expansion joint. Provide dowel caps filled with a soft compres~ible material With enOl:JQh range of movement to 'alfOW complete dosure of the expansion joint. 2. Tie B_ars. Provide straight defo~med steel tie bars. Provide either ·multiple-:piece tie bars or slrigl9:piece tie bars as shown on the plans: Provi9e multiple-piece tie bars composed of 2 pieces of deformed reinforcing steel With a couplfng capable of developing a mini"1um tensile strength of 125% of the design yiefd strength of the deformed steel when tensife-tested in the assembled configuratl9n. Provide a minimum length of 33 diameters of the deformed steel In each piece. C. Curing Materials. Provide Type 2 membrane curing compound conforming to DMS-4650, ·Portland Cement Concrete Curing Materials and Evaporation Retardants.• · D. Epoxy. Provide Type Ill epoxy in accordance with DMS-6100, "Epoxies and Adhesives,• for installing all drilled-in reinforcing steel. E. Evaporation Retardant. Provide evaporation retardant conforming to DMS-4650, "Portland Cement Concrete Curing Materials and Evaporation Retardants.• F. Joint Sealants and Fillers. Provide Class 5 or Class 8 joint-sealant materials and fillers unless otherwise shown on the plans or approved and other sealant materials of the size, shape, and type shown on the plans in accordance with DMS-6310, ·Joint Sealants and Fillers.· 300.3. Equipment. Furnish and ma intain all equipment in good working condition. Use measuring, mixing, and delivery equipment conforming to the requirements of Item 421, "Portland Cement Concrete." Obtain approval for other equipment used. 0.. P-\ . . . . ·. r .. A. Placing, Consolidating, and Finishing Equipment. Provide approved self- propelled paving equipment that uniformly distributes the concrete with minimal segregation and provides a smooth machine-finished consolidated concrete pavement conforming to plan line and grade. Provide an approved automatic grade control system on slip-forming equipment. Provide approved mechanically operated finishing floats capable of producing a un iformly smooth pavement surface. Provide equipment capable of providing a fine, light water fog mist . Provide mechanically operated vibratory equipment capable of adequately consolidating the concrete. Provide immersion vibrators on the paving equipment at sufficiently close intervals to provide uniform vibration and consolidation of the concrete over the entire width and depth of the pavement and in accordance with the manufacturer's recommendations. Provide immersion vibrator units that operate at a frequency In air of at least 8,000 cycles per minute. Provide enough hand-operated immersion vibrators.for timely and proper consolidation of the concrete along forms, at joints and In areas not covered by other vibratory equipment. Surface vibrators may be used to supplement equipment-mounted Immersion vibrators. Provide tachometers to verify the proper operation of all vibrators. For small or Irregular areas or when approved, the paving equipment described in this Section is not required. B. Fo1111lng Equipment. 1. Pavement Forms. Provide metal or wood side forms of sufficient cross-section, strength, and rigidity to support the paving equipment and resist the Impact and vibration of the operation without visible springing or settlement. Use forms that are free from detrimental kinks, bends, or warps that could affect ride quality or alignment. Provide flexible or curved metal or wood forms for curves qf 100-~. radius or less. · · 2. Curb Forms. Provide curb forms for separately placed curbs that are not slipformed that conform to the requirements of Item 529, •concrete Curb, Gutter, and Combined Curb and Gutter.• C. Reinforcing Steel Inserting Equipment Provide inserting equipment that accurately Inserts and positions reinforcing steel in the plastic concrete parallel to the profile grade and horizontal alignment in accordance to plan details. · D. Texturing Equipment. 1. Carpet Drag. Provide a carpet drag mounted on a work bridge or a moveable support system. Provide a single piece of carpet of sufficient transverse length to span the full width of the pavement being placed and adjustable so that a sufficient longitudinal length of carpet is in contact with the concrete being placed to produce the desired texture. Obtain approval to vary the lerigth and width of the carpet to accommodate specific applications. Use an artificial grass-type carpet having a molded polyethylene pile face with a blade length of 5/8 in. to 1 in ., a minimum weight of 70 oz. per square yard, and a strong, durable, rot- resistant backing material bonded to the facing. 2. Tining Equipment. Pro~ide a self-propelled transverse metal tine device equipped with 4-in. to 6-in. steel tines and w ith cross-section approximately 1/32 in. thick by 1/12 in . w ide, spaced at 1 in ., center-to -center. Hand-operated tin ing equ ipment that produces an equivalent texture may be used only on small or irregularly shaped areas or, when perm itted, in emergencies due to equipment breakdown . E. Curing Equipment. Provide a self-propelled machine for applying membrane curing compound us ing mechan ically pressurized spraying equipment with atom izing nozzles. Provide equipment and controls that maintain the required uniform rate of application over the entire paving area. Provide curing equipment that is independent of all other equipment when production rates are such that the first applicatlon of · membrane curing compound cannot be accomplished immediately after texturing and aft~r free moisture has disappeared. Hand-operated pressurized spraying · equipment with atomizing nozzles may only be used on small or irregular areas or, when permitted, in emergencies due to equipment breakdown . F. Sawing Equipment Provide power-driven concrete saws to saw the joints shown on the plans. Provide standby power-driven concrete saws during concrete sawing operations. Provide adequate iflumination for nighttime sawing. G. Grinding Equipment. When required, provide .self-propelled powered grinding equipment that is specifically designed to smooth and texture concrete pavement using circular diamond blades. Provide equipment with automatic grade control capable of grinding at least a 3-ft. width longitudinally in each pass without damaging the concrete. 300.4. Construction. Obtain approval for adjustments to plan grad~line to maintain thickness over minor subgrade or base high spots while maintaining clearances and drainage. Maintain subgrade or base in a smooth, clean, compacted condition in . conformity.with the required section and established grade until the pavement concrete Is· placed. Keep subgrade or base damp with water sufficiently fn advance of placing pavement concrete. Adequately lfght the active work areas for all nighttime operations, if . required. · A. Reinforcing Steel and Joint Assemblfes. Accurately place and secure in ·position all reinforcing steel as shown on the plans. Place dowels at mid-depth of the pavement slab, parallel to the surface. Place dowels for transverse contraction joints . parallel to the pavement edge.: Tolerances for location and alignment of dowels will be shown on the plans. Stagger the longitudinal reinforcement splice~ to avoi~ having more than 1 /3 of the splices within a 2-ft. longitudinal length of each f 13ne of the pavement. Use multiple-piece tie bars or drill and epoxy grout tie bars at longitudinal construction Joints. 1. Manual Placement. Secure reinforcing bars at alternate intersections with wire ties or locking support chairs. Tie all splices with wire. 2. . Mechanical Placement. If mechanical pfa'cement of reinforcement results (n steel misalignment or improper location, poor concrete consolidation, or other inadequacies, complete the work using manual methods. B. Joints. Install joints as shown on the plans . Clean and seal joints in accordance with Item 438, ·creaning and Sealing Joints and Cracks (Rigid Pavement and Bridge Decks).· Repair excessive spalllng of the joint saw groove using an approved method before installing the sealant. SeaJ all joints before open ing the pavement to all traffic. When placing of concrete is stopped, install a rigid transverse bulkhead, accurately notched for the reinforcing steel and shaped accurately to the cross- section of the pavement. 1. Placing Reinforcement at Joints. Where the p lans require an assembly of parts at pavement j oints, complete and place the assembly at the required location and elevation with all parts rigidly secured in the required pos ition . Accurately notch j oint materia ls for the re inforcing steel. 2. Curb Joints. Provide joints in the curb of the same type and location as the adjacent pavement. Use expansion joint material of the same thickness, type, and quality required for the pavement and of the section shown for the curb.· Extend expansion joints through the curb. Construct curb joints at all transverse pavement joints. For non-monolithic curbs, place reinforcing steel irito the p·lastic concrete pavement as shown on the plans unless otherwise approved. Form or saw the weakened plane joint across the full width of concrete pavement and through the monolithic curbs. c. Placing ahd Removing Forms. Use clean and oiled forms. Secure forms on ~ base or firm subgrade that is accurately graded and that provides stable support without deflection and movement by form riding equipment. Pin every form at least at the middle and near each end. Tightly join and key form sections together to prevent relative displacement Set side forms far enough in advance of concrete placement to permit inspection. Check conformity of the grade, alignment. and stability of forms immediately before placing concrete, and make all necessary corrections. Use a straightedge or other approved method to test the top of forms to ensure that the ride quality requirements for the completed pavement will be met. Stop paving operations if forms settle or deflect more than 1/8 In. under finishing operations. Reset forms to line and grade, and refinish the concrete surface to ·correct grade. Avoid damage to the edge of the pavement when removing ·forms. Repair damage resulting from form removal and honeycombed areas with a mortar mix within 24 hr. after form removal unless otherwise approved. Clean Joint face and repair honeycombed or damaged areas within 24 hr. after a bulkhead for a transverse construction joint has been removed unless otherwise approved. WhE!n forms are removed before 72 hr. after concrete placement, promptly apply membrane curing compc:>und to the edge .of the concrete pavement Forms that are not the same depth as the pavement but are within 2 in. of that depth are permitted if the subbase is trenched or th~ full width and length of the form base · is supported with a firm material to produce the required pavement thickness: Promptly repair the form trench after use. Use flexible or curved wood or metal forms for curves of 1 00-ft. radius or less. · D. Concrete Delivery. Clean delivery equipment as necessary to prevent accumuiation of old concrete before loading fresh concrete. Use agitated delivery equipment for concrete designed to h~ve a slump of more than 5 In. Segregated concrete is subject to rejection. Place agitated concrete within ao'min. after batching. Place non-ag(t<!ted concrete within 45 min . after batching. In hot weather or under conditions caµ~ing quick setting of the concrete, times may be reduced by the Engineer. Time limitations may be extended if the Contractor can demonstrate that the concrefe can be properly placed, consolidated, and finished without the use of additional water. E. Concrete Placement. Do not allow the pavement edge to deviate from th!:' established paving line by more than 1/2 in. at any point. Place the concrete as near as possible to its frnaf location, and minimize segregation and rehandling. Wfl~ra ; . : hand spreading is necessary, distribute concrete using shovels. Do not use rakes or vibrators to distribute concrete. 1. Pavement. Consolidate all concrete by approved mechanical vibrators operated on the front of the paving equipment. Use immersion-type vibrators that simultaneously consolidate the full width of the placement when machine finishing. Keep vibrators from dislodging reinforcement. Use hand-operated .... :.·. vibrators to consolidate concrete in areas not accessible to the machine-mounted vibrators. Do not operate machine-mounted vibrators while the paving equipment is stationary. · 2. Temp.erature Restrictions. Place concrete that is between 40°F and 95°F at the time of discharge, except that concrete may be used if it was already in transit when the temperature was found to exceed the allowable maximum. Take immediate corrective action or cease concrete production when the concrete temperature exceeds 95°F . Do not place concrete when the ambient temperature in the shade is below 40°F and falling unless approved. Concrete may be placed when the ambient temperature in the shade is above 35°F and rising or above 40°F. ~en temperatures warrant protection against freezing, protect the pavement with an approved insulating material capable of protecting the concrete for the speci~ed curing period. Submit for approval proposed measures to protect the concrete· from anticipated freezing weather for the first 72 hr. after placement. Repair qr replace all concrete damaged by freezing. F. Spreading and Ffnfshlng. Ffnish all concrete pavement with approved self- propelled equipment Use power-driven spreaders, power-driven vibrators, power- driven strike-off, and screed, or·approved alterriate equipment Use the transverse finishing equipment to compact and strike off the cohcrete to the required section. a.nd grade without surface voids. Use float equipment for final finishing. Use cqnc'rete with a consistency that allows completion of all finishing operations without additfon of water to the surface. Use the minimal amount of water fog mist necessary to · maintain a morst surface. Reduce fogging if float or straightedge operations result in excess slurry. 1. Finished Surface. Perform sufficient checks with long-handled 10-ft. and 19'."'ft. straightedges on the plastic concrete to ensure that the final surface .fs'\vit~ln the tolerances specified in the contract documents. Check with the stralghte~g~ parallel to the centerline. ·. 2. Maintenance of Surface Moisture. Prevent surface drying of the pav~~ent · before application of the curing system. Accomplish this by fog applfcatiorw .C?f evaporation retardant on the pavement surface. Apply evaporation retardant at . the rate recommended by the manufacturer. Reapply the evaporation retard~mt as needed to maintain the concrete surface in a moist condition until curing system is applied. Do not use evaporation retardant as a finishing aid. · · . .. 3. Surface Texturing. Perform surface texturing using a combination of a carpet drag and metal tining, if required by the contract documents. Complete final texturing before the concrete has attained its initial set. Draw the carpet drag longitudinally along the pavement surface with the carpet contact surface area adjusted to provide a satisfactory coarsely textured surface. Operate the metal-tine device to obtain grooves spaced at 1 in., approximately 3/16 in. deep, with a minimum depth of 1/8 in., and approximately 1/12 in. wide. Do not overlap a previously tined area. Use manual methods for achieving sfmilar results on ramps and other irregular sections of pavements. Repair damage to the edge of the s!ab and joints immediately after texturing. Do not tine pavement that wirl be over!aid . 4. Small or lrregurar Placements. I/I/here machine placements and finishing of concrete pavement are not practical, use hand equipment and procedures that produce a consolidated and finished pavement section to the line and grade . - - 5. Emergency Procedures. Use hand-operated equipment for applying texture. evaporation retardan~ and cure in the event of equipment break.down. G. Curing. Keep the concrete pavement surface from drying by water fogging until the curing material has been applied. Maintain and promptly repair damage to curfng materials on exposed surfaces of concrete pavement continuously fof at reast 3 curing days. A curing day is defined as a 24-hr. period when either the temperature taken in the shade away from artificial heat is above 50°F for at least 19 hr. or when the surface temperature of the concralB ls maintained above 40°F for 24 hr. Curing begins when the concrete curfog system has been applled. Stop conc~te paving if curing compound is not being applied promptly and maintained adequately. Other methods of curing in accordance with Hem 420. ·eoncrete structures.• may be used . when specifled or approved. 1. Membrane Curing. After texturing and immediately after the frae surface morsture has dfsappearad, spray the concrete surface unlformJy with 2 coats of membrane curing compound at an indMdual applfcaflon rate of not more than 180 sq. ft. per gallon. Apply the first coat within 10 min. after completing texturing operations. Ap&,fy the second coat within 30 min. after completing texturing operatfons. Before and during application. maintain curing compounds In a unlfonnly agitated condition, free of settlement 0a not thin or dilute the curing compound. Where the coating shows discontinuities or other defects or lf rain falls on the newly coated surface before the film ha~ dried enough to rasiat damage, apply · additlonal compound at the same rate of CQverage to correct the damage. J:nsure that the curing compound coats the sides of the tining grooves. H. Sawing Joints. Saw Joints to the depth shown on the plans aa soon ae sawing can be accomplished without damage to the pavement regardless of ffme of day or weather condiUons. Some minor raveling of the saw cut Is acceJ)tabre. Use a chalk lino, sbing &ne, sawing template, or other approved method to provide a frue joint effgnment. Provide enough saws to match the pavtng production rate to ensure sawing corna,fetion at the earfiest possible time to avoid uncontrolled cracking. Reduce paving production if necessary to ensure timely sawing of joint8. Promptly restore membrane cure damaged within the first 72 hr. of curing. I. Protection of Pavement and Opening to Tratrn.. Testing for early opening is 1he responS1birrty of the Contractor regardless of Job-oontrol testing responsibilities unless otherwise shown in tha plans or directed. Testing result interpretation for opening to traffic ie subject to the approval of the Engineer. 1. Profllction of Pavement. Erect and maintain barricades and other standard and approved devfces that win exclude all vehicles and equipment from the newly· p(aced pavement for the periods BJ*=ifled. Before openrng to traffic, protect the pavement from damag-. due to crossings using approved methods. Maintain an adequate supply of sheeting or other materfaJ to cover and protect fresh concrete . surface from weather damage. Apply as needed to protect the pavement surface from weather. , 2. Opening Pavement to Traffic. Before opening to traffic, dean pavement. place stable material against the pavement edges, seal joints, and perform all other traffic safety related work. C P-'=> HEAVY & HIGHWAY CONSTRUCTION PREY AILING WAGE RA TES 2008 Air Tool Ooentor Asphalt Distributor Ooerator Asphalt Pavina Machine Ot>erator Asphalt Raker Asphalt Shoveler Batchina Plant Weilher Broom or Sweeper Operator Bulldozer Ot>erator Caroenter Concrete Finisher Pavina Concrete Finisher Structures Concrete Pavina Curbina Machine Ocerator Concrete Pavina Finishin1 Machine Operator Concrete Pavina Joint Sealer ODerator Concrete pavin1 Saw Operator Concrete Pavina Spreader ODerator Concrete Rubber Crane. Clamshell, Backhoe. Denick Draa.line Shovel 0Derator Electrician FIHIN!I' Form Builder/Setter Structures Form Setter Pavina &. Curb Foundation Drill Ooerator. Crawler Mounted Foundation Drill Operator Truck Mounted Front End Loader Ooerator Laborer, Common Laborer, Utility Mechanic Millina Machine Ooerator Fine Grade Mixer Operator Motor Orader Ooerator Fine Grade Motor Grader Operator. Roullh Oiler Painter, Structures Pavement Markina Machine Ooerator Pi1>elaver Reinforcina Steel Setter. Pavina Reinfon:ina Steel Setter. Structure Roller Operator, Pneumatic Self-Prol)elled Roller Ooerator. Steel Wheel Flat Wheellrann,ina Roller Ooerator, Steel Wheel, Plant Mix Pavement Scraoer Ooerator Servicer SIID Fonn Machine Ooerator Spreader Box Ooerator Tractor -Crawler Tvce Tractor Operator, Pneumatic Travelina Mixer Ooerator Truck Driver, Lowboy -float Truck Driver Sinale Axle Heavv Truck Driver Sinale Axle, Lillht Truck Driver, Tandem Axle, Semi-Trailer Truck Driver, Transit-Mix W11ton Drill Borina Machine, Post Hole Driller Operator Welder Work Zone Barricade Servicer $10 .06 $13 .99 $12.78 SI 1.01 S 8.80 $14 .IS S 9.8& Sl3 .22 $12.80 Sl2 .8S S13 .27 S12 .00 Sl3.63 $12.50 $13 .56 Sl4 .S0 $10.61 $14.12 $18 .12 S 8.43 SI 1.63 SI 1.83 $13 .67 $16 .30 $12.62 S 9.18 $10 .65 $16.97 SI 1.83 Sil.SI SIS .20 $14 .50 $14 .98 $13 .17 $10.04 SI 1.04 $14 .86 $16 .29 SI 1.07 SI0 .92 SI 1.21 SI 1.42 $12.32 $12 .33 $10 .92 $12 .60 $12.91 $12 .03 $14 .93 SI 1.47 SI0.91 Sll.75 $12.01 $14 .00 SIJJ7 $10 .09 CONTRACTOR COMPLIANCE WITH WORKERS' COMPENSATION LAW Pursuant to V .T.C.A. Labor Code §406.96 (2000), as amended, Contractor certifies that it provides workers' compensation insurance coverage for all of its employees employed on City of Fort Worth Department of Transportation and City of Fort Worth Project No. 01461. STATE OF TEXAS COUNTY OF TARRANT § § § CONTRACTOR JLB CONTRACTING, LLC. By ~~~ . "· Name ~~. tfump!irfj, Pfie,itof Title : JLS CONTRACT1Nd:1ctc Date : ?v-1~ ' "' ~ Be?re ~e, the undersigned authority, on this day personally appeared _;,,_/.NmB,S Gz_. ltJ!flif!l/ielnown to me to be the person whose name is subscribed to the foregoing instrument, a~ acknowledged to me that he executed the same as the act and deed of JLB CONTRACTING, LLC. for the purposes and consideration therein expressed and in the capacity therein stated. Given Under My Hand and Seal of Office this =4il(day of JJ,41;,$7 , 20..:...;/t9e-_ UNDi\ OLFHANT NOfNWPUBUC mTEOFTEXAS lffCOIAI. EXP. 3-10-2013 Bond No. _8_8_4~93 __ _ PERFORMANCE BOND THE STATE OF TEXAS § KNOW ALL MEN BY THESE PRESENTS: COUNTY OFT ARRANT § That we (1) JLB Contracting, LLC as Principal herein, and (2) Westfield Insurance Company, a corporation organized under the la ws of the State of (3) Ohio and who is authorized to issue surety bonds in the State of Texas, Surety herein, are held and firmly bound unto the City of Fort Worth, a municipal corporation located in Tarrant and Denton Counties, Texas , Obligee herein, in the s um of: One Million, Five Hundred Fifty-Nine Thousand, Three Hundred Eighty-One and 50/100 ........................ .. ($1,559,381.50) Dollars for the payment of which sum we bind ourselves, our heirs, executors, administrators, successors and assigns , jointly and severally, firmly by these presents. WHEREAS, Principal has entered into a certain contract with the Obligee dated the....!.£'.'._ of July , 2010 a copy of which is hereto attached and made a part hereof for all purposes, for the construction of: HMAC SURFACE OVERLAY (2010-5) NOW THEREFORE, the condition of this obligation is s uch , if the said Principal shall faithfully perform the work in accordance with the plans, specifications and contract documents and shall fully indemnify and hold harmless the Obligee from all costs and damages which Obligee may suffer by reason of Principal 's default , and reimburse and repay Obligee for all outlay and expense that Obligee may incur in making good such default , then this obligation shall be voi d ; otherwise, to remain in full force and effect. ................. ·, Bond No. _8""8'--'4""'93"---- PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provi sions of such statue, to the same extent as if it were copied at length herein . IN WITNESS WHEREOF, the duly authorized representatives of the Principal and the Surety ha ve executed this instrument. SIGNED and SEALED thi s 14 1 h day of July , 2010. (SEAL) ATTEST: (Surety) Secretary (SEAL) JLB Contracting, LLC PRINCIPAL (4) . 1 BY: ~ ,-j l-~ :#"~ Title: James G . Humphrey, President PO BOX 24131 Fort Worth TX 76124 (Address) ttorney-in-Fact 0 NOTE: Date of Bond must not be prior to date of Contract (1) Correct name of Contractor (2) Correct name of Surety (3) State of incorporation of Surety Telephone number of surety mu st be sta ted. In addition, an original copy of Power of Attorney shall be attached to B ond by th e Attorney-in- Fact. The date of bond shall not be pri or to date of Contract. ..... ' -----... ___ ... .. _ -~ .. _ ,-. :::. ... -.. - . . . ;-.... " __ ., .... --,::. -.., -.. .. -:. .... \."-:,. ---... ...---.... _ , -------- "'.. -r-___ ... -'' Bond No. _8_8_4_93 __ _ THE ST ATE OF TEXAS COUNTY OF TARRANT PAYMENT BOND § § § KNOW ALL MEN BY THESE PRESENTS : That we , (1) JLB Contracting, LLC as Principal herein, and (2) Westfield Insurance Company -------' a corporation organized and existing under the laws of the State of(3) _0_h_i_o _____ ~ as surety, are held and firmly bound unto the City of Fort Worth, a municipal corporation located in Tarrant and Denton Counties, Texas, Obligee herein, in the amount of One Million, Five Hundred Fifty-Nine Thousand, Three Hundred Eighty-One and 50/100 ................................................................................. Dollars ($1,559,381.50) for the payment whereof, the said Principal and Surety bind themselves and their heirs , executors , administrators, successors and assigns, jointly and severally, firmly by these presents: WHEREAS , the Principal has entered into a certain written contract with the Obligee dated the 14th day of July , 2010, which contract is hereby referred to and made a part hereof as if fully and to the same extent as if copied at length , for the following project: HMAC SURFACE OVERLAY (2010-5) NOW THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal shall faithfully make payment to each and every claimant (as defined in Chapter 2253 , Texas Government Code , as amended) supplying labor and materials in the prosecution of the work under the contract , then this obligation shall be void; other wise, to remain in full force and effect. PROVIDED, HOWEVER, that this bond is executed pursuant to Chapter 2253 o f the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statue, to the same extent as if it were copied at length herein. IN WITNESS WHEREOF, the duly authorized representatives of the Principal and Surety have executed this instrument. SIGNED AND SEALED this 14th day of July , 2010. ATTEST: Secretary (SEAL) NOTE: Bond No. 88493 ----- (1) Correct name of Principal (Contractor). (2) Correct name of Surety . (3) State of incorporation of Surety JLB Contracting, LLC PRINCIPAL By: (-~./J ~- Name: James G . Humphrey Title : President Address: PO BOX 24131 Fort Worth, TX 76124 Westfield Insurance Company SURETY Address: 555 Republic Drive, Suite 450 Plano, Texas 75074 Telephone Number: 972-516-2600 Telephone number of surety must be stated. In addition, an original copy of Power of Attorney shall be attached to Bond by the Attorney-in-Fact. The date of the bond shall not be prior to date of Contract. .... -~ ~ ~ .. ,._ .. •, .. --.. -....... ... , ..... ,,~ -. -·-... ---,, .. ~ --:. ...... : \ ··-:,>... .-·· '-.::---........... ' -·- Bond No . _8~8~4~93~-- MAINTENANCE BOND THE STATE OF TEXAS § COUNTY OFT ARRANT § That JLB Contracting , LLC (Contractor), as principal , and Wes tfield I nsur ance Company ___ , a corporation organized under the laws of the State of Ohio ,(Surety), do hereby acknowledge themselves to be held and bound to pay unto the City of Fort Worth, a Municipal Corporation chartered by virtue of Constitution and laws of the State of Texas, ("City") in Tarrant County, Texas, the sum of One M illion, F ive Hundred F ifty-N in e T hou sand, T hree Hundred Eighty-On e and 50/100 ........................................................................................ Dollars ($1 ,559,3 81.50) lawful money of the United States, for payment of which sum well and truly be made unto said City and its successors , said Contractor and Surety do hereby bind themselves, their heirs , executors , administrators , assigns and successors , jointly and severally. This ob ligation is conditioned, however; that, WHEREAS , said Contractor has this day entered into a written Contract with the City of Fort Worth, dated the 14th of Jul y , 2010 copy of which is hereto attached and made a part hereof, for the performance of the following described public improvements: HMAC SURF ACE OVERLAY (2 010-5) the same being referred to herein and in said contract as the Work and being designated as project number(s) 01469 and said contract , including all of the specifications , conditions , addenda , change orders and written instruments referred to therein as Contract Documents being incorporated herein and made a part hereof, and, WHEREAS, m said Contract , Contractor binds it self to use such materia ls and to so construct the work that it will remain in good repair and condition for and during a period of Two (2) Years after the date of the final acceptance of the work by the City ; and WHEREAS, said Contractor binds itse lf to maintain said work m good repair and condition for said term of Two (2) Year s; and, WHEREAS , said Contractor b inds itself to repair or reconstruct the work in whole or in part at any time within said period, if in the opinion of the Director of the City of Fort Worth Department of Engineering, it be necessary ; and , Bond No. _8_8_4_9_3 __ _ WHEREAS, said Contractor binds itself, upon receiving notice of the need therefore to repair or reconstruct said Work as herein provided . NOW THEREFORE, if said Contractor shall keep and perform its said agreement to maintain, repa1r or reconstruct said Work in accordance with all the terms and conditions of said Contract, these presents shall be null and void , and have no force or effect. Otherwise , this Bond shall be and remain in full force and effect, and the City shall have and recover from Contractor and Surety damages in the premises as prescribed by said Contract. This obligation shall be a continuing one and successive recoveries may be had hereon for successive breaches until the full amount hereof is exhausted. IN WITNESS WHEREOF, this instrument is executed m 9 counterparts, each one of which shall be deemed an original, this 14 1 h day of ATTEST : (SEAL) Secretary July , AD. 2010. JLB Contracting, LLC Contractor By:L-~ ,,() ~- Name: James G. Humphrey Title: President Westfield Insurance Company 555 Republic Drive, Suite 450 Plano, Texas 75074 Address = ~-: --------- -.. --:: \ .. '~:. ~~~--.. -... · "-- ";,_,,,,""' ,,. --... --...... ---- .. ,~.. ..,. - •,. IMPORTANT NOTICE To obtain information or make a complaint: You may call Westfield Insurance Company's and/or Ohio Farmers Insurance Company's toll-free telephone number for information or to make a complaint at: 1-800-368-3597 You may also write to Westfield Insurance Company and/or Ohio Farmers Insurance Company at: 555 Republic Drive, Suite 450 Plano, Texas 75074-8848 You may contact the Texas Department of Insurance to obtain information on companies , coverages , rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance : P. 0. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web : http://www.tdi.state.tx.us E-mail: ConsumerProtection@tdi.state. tx. us PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact the agent or Westfield Insurance Company and/or Ohio Farmers Insurance Comapny first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR POLICY: This notice is for information only and does not become a part or condition of the attached document. AVISO IMPORTANTE Para obtener informacion o para someter una queja: Usted puede llamar al numero de telefono gratis de Westfield Insurance Company's / Ohio Farmers Insurance Company's para informacion o para someter una queja al : 1-800-368-3597 Usted tambien puede escribir a Westfield Insurance Company/ Ohio Farmers Insurance Company: 555 Republic Drive, Suite 450 Plano, Texas 75074-8848 Puede comunicarse con el Departamento de Seguros de Texas para obtener informacion acerca de companias, coberturas, derechos o quejas al: 1-800-252-3439 Puede escribir al Departamento de Seguros de Texas: P . 0 . Box 149104 Austin , TX 78714-9104 Fax: (512) 475-1771 Web : http://www.tdi.state.tx.us E-mail : ConsumerProtection@td i.state .tx .us DISPUTAS SOBRE PRIMAS O RECLAMOS: Si tiene una disputa concerniente a su prima o a un reclamo, debe comunicarse con el agente o Westfield Insurance Company/ Ohio Farmers Insurance Company primero. Si no se resuelve la disputa, puede entonces comunicarse con el departamento {TOI). UNA ESTE AVISO A SU POLIZA: Este aviso es solo para proposito de informacion y no se convierte en parte o condicion del documento adjunto. THIS POWER OF ATTORNEY SUPERCEDES ANY PREVIOUS POWER BEARING THIS SAME POWER # AND ISSUED PRIOR TO 09/09/09, FOR ANY PERSON OR PERSONS NAMED BELOW. General Power of Attorney CERTIFIED COPY POWER NO. 4220052 06 Westfield Insurance Co. Westfield National Insurance Co. Ohio Farmers Insurance Co. Westfield Center, Ohio Know All Men by These Presents, That WESTFIELD INSURANCE COMPANY, WESTFIE LD NATIONAL I NSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, corporations , hereinafter referred to i ndividually as a ·company· and coll ect i vely as ·companies ," duly organized and existing under the laws of the State of Oh io , and having its pri ncipal o ffice in Westfi eld Ce nte r, Medina County, Ohio, do by these presents ma ke, constitute and appoi nt CHARLES D. SWEENEY, MICHAEL A . SWEENEY , KYLE W. SWEENEY, JENNIFER R. MARSH , JOINTLY OR SEVERALLY of FORT WORTH and State of TX its true and lawful Attorney(s)-i n-Fa ct , w ith full power and authorit y her eby conferred in its name, place and stead , to execute, ack nowledge and deliver any and all bonds , recognizances, undertakings, or other instruments or contracts of suretyship------------ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - --- ---- - - --- - - - - - - - - - LIMITATION : THIS POWER OF ATTORNEY CANNOT BE USED TO EXECUTE NOTE GUARANTEE, MORTGAGE DEFICIENCY, MORTGAGE GUARANTEE, OR BANK DEPOSITORY BONDS. and to bind any of the Companies thereby as fully and to the same extent as if such bonds were signed by the Pres ident, sealed w ith the corporate s eal of the applicable Company and duly attested by its Secretary, hereby ratifying and confirming all that the said Attorney(s )-in-Fact may do in the premises. Said appointment is made under and by authority of the following resolution adopted by the Board of Directors of each of the WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OH IO FARMERS INSURANCE COMPANY: "Be It Resolved, that the President, any Senior Executive, any Secretary or any Fidel ity & Surety Oper ations Executive or other Executive shall be and is hereby vested with full power and authority to appoint any one or mor e s uitable persons as Attorney(s)-i n-Fact to represent and act for and on behalf of the Company subject to the following provisions : The Attorney-in-Fact. may be given full power and authority for and in the name of and on behalf of the Company, to execute, ack nowledge and deliver, any and all bonds, recogn izances, contracts, agreements of i ndemnity and other cond it i on al o r obl igatory undertakings and any and all notices and documents canceling or term i nating the Company's liabi lity thereunder , and any s uch i nst ruments so executed by any such Attorney-in-Fact shall be as b inding upon the Company as if signed by the President a nd sealed and attested by the Cor porate Secretary.· "Be it Further Resolved, that the signature of any such designated person and the seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile, and any power of attorney or certifi cate bearing facsi mi le s ignatures or facsimile seal shall be valid and binding upon the Company with respect to any bond or undertak ing to which it is attached ." (Ea ch adopted at a meeting held on February 8, 2000). In Witnes s Whereof, WESTFIELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY have caused these presents to be signed by their Senior Executive and their corporate seals to be hereto affixed this 09th day of SEPTEMBER A .O., 2009 . Corporate 4;u·R:.~, Seals / ~ ~-···-···· ... "-,. '\ Affix ed J ~/ IIA# "'\ Ct \ l~f SEAL ii1 . ~' /Ji. \-.·· ..... ,_ /~-1 ''-····-/ Stat e of Oh io.........___,., County of Medina ss .: -.... ~•H111,,,,,,,_ ~ \l&Sllo;·~,, ~.,. ;;.~.-.~.,,,,. t~--····~'\ !~/,.11t,1Jra .. ;;~~l : .._. "" ""le, .~ i \\\. 1848 .. f J ~. ··. ~ .... .. ~,,,, ······· ........... , ... ... ,,,,,,;,, .......... .. WESTFIELD INSURANCE COMPANY WESTFIELD NATIONAL INSURANCE COMPANY OHIO FARMERS INSURANCE COMPANY By: Richard L. Kinnaird , Jr., Senior Executive On this 09th day of SEPTEMBER A .O., 2009 , before me personally came Richard L. Kinnaird, Jr. t o me k nown , who, being by me duly sworn , did depose and say, that he res ides in Medina, Ohio; that he is Senior Executive of WE STF I ELD INSURANCE COMPANY, WESTFIELD NATIONAL INSURANCE COMPANY and OHIO FARMERS INSURANCE COMPANY, the compani es described in and which executed the above i nstrument; that he knows the seals of said Companies ; that the seal s affixed to said in strument ar e s uch corporat e sea ls ; that they were so affixed by order of the Boards of Directors of sa id Companies ; and that he signed h is naA;ime theret o b .. y like o r d er . ~ Notarial .,..-·-, Sea l r·•"';~.\~.':: .. ,S , •••• Affi x ed ~--~'IW~-tv \ State of Ohio \ •• ; ) William J. Kahelin, A rney at Law , Notary Publi c My Comm iss ion Does Not Exp ir e (Sec . 147.03 Ohio Revi s ed Code) County of Medina ss .: •• ••• ..q O ~ ,.·· ••••• .,..E: of •••• .......... , ........... ,•" I, Frank A. Carrino, Secretary of WESTFIELD INSURANCE COMPANY , WESTFIE L D NAT IONAL INSURANCE COMPANY and OHIO FARMERS I NSURANCE COMPANY, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said Companies , which is sti ll in full force and effect; and furthermore, the resolutions of t he Board s of Di r ect o r s , set out in the Powe r of Attorney are i n full force and effect. In Witne ss Whereof, I have hereunto set my hand and affi x ed the seal s of s ai d Com pan i es at Westfiel d Cente r , Oh io , t h is 1 f.h day of July A .D.,2Q1Q · . _....-•"•-,,..,._ ,,,,,uu,,.,, -...... tHlli,, • ..-UR .. ., ,,, ONAl 11 '1 .. \IISfUt;,~,. I~ ,"-J.---~-~";,",~ .--~'?---<..\ .••• , .• !tvi'',. • .• -~.7--•• ;-:.~·,, J "l,· -·-. .. et.,. l o ···· ··-.c...;--. /~ .• -·· -··• •. ~\ ~--t.' tffs~JCI \'~\ {1/ \t ~ f~[t'AUTERtg\g\ r;i~ d ' 1 it-t .c..M.L ,._f =>-: SEAL :m : :o• :K: \":.' jli-} "<I>• • -:-~ ·i:: VU..--.O Secntary \. -.··.. ,_ , ~ \.~."?" .. -\...... . ..... /8_."/ \~\ 1848 /~ ! Frank A . Carrino, ecret ~ ~---. ,., .:, ~7 ~. ••• ~ ........ .: '-.... _ ~ ······· ,, ., '",,,,, * ,,,,,...... ,,,,,,,, . ,, .......... " .,,.,,11t1•'' ,,,,,, .... ,,. BPOAC2 (combined) (06-02) CITY OF FORT WORTH, TEXAS CONTRACT THE STATE OF TEXAS KNOW ALL BY THESE PRESENTS COUNTY OFT ARRANT This agreement made and entered into this the 14 day of JULY A.O., 20.!Q, by and between the CITY OF FORT WORTH, a municipal corporation of Tarrant County, Texas, organized and existing under and by virtue of a special charter adopted by the qualified voters within said City on the 11th day of December, A.O. 1924, under the authority (vested in said voters by the "Home Rule" provision) of the Constitution of Texas, and in accordance with a resolution duly passed at a regular meeting of the City Council of said city , and the City of Fort Worth being hereinafter termed Owner, JLB CONTRACTING, LLC., HEREINAFTER CALLED Contractor. WlTNESSETH: That said parties have agreed as follows: 1. That for and in consideration of the payments and agreements hereinafter mentioned to be made and performed by the Owner, and under the conditions expressed in the bond bearing even date herewith, the said Contractor hereby agrees with the said Owner to commence and complete the construction of certain improvements described as follows: HMAC SURFACE OVERLAY {2010-5) 2. That the work herein contemplated shall consist of furnishing as an independent contractor all labor, tools, appliances and materials necessary for the construction and completion of said project in accordance with the Plans and Specifications and Contract Documents prepared by the Department of Engineering for the Transportation and Public Works Department of the City of Fort Worth adopted by the City Council of the City of Fort Worth, which Plans and Specifications and Contract Documents are hereto attached and made a part of this contract the same as if written herein. 3. The Contractor hereby agrees and binds himself to commence the construction of said work within ten ( I 0) days after being notified in writing to do so by the Department of Engineering of the City of Fort Worth. 4. The Contractor hereby agrees to prosecute said work with reasonable diligence after the commencement thereof and to fully complete and finish the same ready for the inspection and approval of the Department of Transportation of the City of Fort Worth and the City Council of the City of Fort Worth within a period of One Hundred and Eighty ilfil!l.days. If the Contractor should fail to complete the work as set forth in the Plans and Specifications and Contract Documents within the time so stipulated, plus any additional time allowed as provided in the General Conditions, there shall be deducted from any monies due or which may thereafter become due him, the sum of $200 Per working day, not as a penalty but as liquidated damages, the Contractor and his Surety shall be liable to the Owner for such deficiency. 5. Should the Contractor fail to begin the work herein provided for within the time herein fixed or to carry on and complete the same according to the true meaning of the intent and terms of said Plans , Specifications and Contract Documents, then the Owner shall have the right to either demand the surety to take over the work and complete same in accordance with the Contract Documents or to take charge of and complete the work in such a manner as it may deem proper, and if in the completion thereof, the cost to the said City shall exceed the contract price or prices set forth in the said plans and specifications made a part hereof, the Contractor and/or its Surety shall pay said City on demand in writing, setting forth and specifying an itemized statement of the total cost thereof, said excess cost. 6 Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to indemnify, hold harmless and defend, at its own expense, the Owner, its officers, servants and employees, from and against any and all claims or suits for property loss, property damage, personal injury, including death, arising out of, or alleged to arise out of, the work and services to be performed hereunder by Contractor, its officers, agents, employees, subcontractors, licensees or invitees, whether or not any such iniury, damage or death is caused, in whole or in part, by the negligence or alleged negligence of Owner, its officers, servants, or employees. Contractor likewise covenants and agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's officers, servants and employees and any damage, loss or destruction to property of the Owner arising from the performance of any of the terms and conditions of this Contract, whether or not any such iniury or damage is caused in whole or in part by the negligence or alleged negligence of Owner, its officers, servants or employees .. In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior to final payment, final payment shall not be made until Contractor either (a) submits to Owner satisfactory evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides Owner with a letter from Contractor's liability insurance carrier that the claim has been referred to the insurance carrier. The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public work from a Contractor against whom a claim for damages is outstanding as a result of work performed under a City Contract. 7. The Contractor agrees, on the execution of this Contract, and before beginning work, to make, execute and deliver to said City of Fort Worth good and s ufficient surety bonds for the faithful performance of the terms and stipulations of the Contract and for the payment to all claimants for labor and/or materials furnished in the prosecution of the work, such bonds being as provided and required in Texas Government Code Section 2253 , as amended , in the form included in the Contract Documents, and such bonds shall be for I 00 percent ( 100%) of the total contract price, and said surety shall be a surety company duly and legally authorized to do business in the State of Texas, and acceptable to the City Council of the City of Fort Worth. 8 . Said City agrees and binds itself to pay, and the said Contractor agrees to receive, for all of the aforesaid work , and for all additions thereto or deductions therefrom , the price shown on the Proposal submitted by the successful bidder hereto attached and made a part hereof. Payment will be made in monthly installments upon actual work completed by contractor and accepted by the Owner and receipt of invoice from the Contractor. The agreed upon total contract amount (including/excluding) alternates n/a , shall be ONE MILLION FIFTY NINE THOUSAND THREE HUNDRED EIGHTY ONE DOLLARS AND FIFTY CENTS ... Dollars, ($1,559,381.50). 9 . It is further agreed that the performance of this Contract, either in whole or in part, shall not be s ublet or assigned to anyone else by said Contractor without the written consent of the Director of the Department of Engineering. 10 . The Contractor agrees to pay at least the minimum wage per hour for all labor as the same is classified, promulgated and set out by the City of Fort Worth , Texas, a copy of which is attached hereto and made a part hereof the same as if it were copied verbatim herein . 11. It is mutually agreed and understood that this agreement is made and entered into by the parties hereto with references to the existing Charter and Ordinances of the City of Fort Worth and the laws of the State of Texas with references to and governing all matters affecting this Contract, a nd the Contractor agrees to fully comply with all the provisions of the same. IN WITNESS THEREOF, the City of Fort Worth has caused this in strument to be s igned in 2 counterparts in its name and on its behalf by the City Manager and attested by its Secretary, with the corporate seal of the City of Fort Worth attached. The Contractor has executed thi s instrument through it s duly authorized officers in 2 counterparts with its corporate seal attached . Done in Fort Worth , Te xas , this the 14 day of JULY, A.O., 2 010. APPROVAL RECOMMENDED: .aQJ/~~~ w1LLIA~ ~ERK~.~ r DlRECTOR, DEPARTMENT OF TRANSPORT A Tl ON/PUBLIC WORKS ATTEST: JLB CONTRACTING, LLC. P0B0X24131 FORT WORTH, TEXAS 76124 CONTRACTOR BY : {~ /j ~::-0 ~ G. ~umphrfti Ptesf deni of aeONTRACTING~ftc T {. Box&t/13/ h£1 t1Jt2ffJ/ 7Y 7 t, I 2. '/ I ADDRESS November 1960 Revised May 1986 Revised September 1992 Revised March 2006 CITY OF FORT WORTH CITY SECRETARY (SE AL) Contract Authorizatioa Date APPROVED AS TO FORM AND LEGALITY: OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX Project Name: HMAC Surface Overlay ( ____ _, DOE Project Number: ___ _ Mapsco Location: ____ _ Street Maintenance Work Notice As part of the City of Fort Worth's Street Maintenance Program, -------- has been contracted to repair your street. During the maintenance work, there will be a brief time that you may not have access to your residence or business. On the days specified below, vehicles can not be parked on the street. Also, please turn off your sprinkler adjacent to the street. If you have any questions or concerns, please contact contractor _______ _ at ___________ ~ If we are not able to resolve your concern to your satisfaction, you may also contact City of Fort Worth Inspector at , Monday- Friday between 7:30 a.m . and 4:30 p.m. After 4:30 p.m. and on weekends, call (817) 392-8100. Block Street Project Limits Name Limits 1100 to 1200 Brown Street Yates Avenue to Keller Springs Parkway Expected Construction Dates Weather Permitting From 6-20-06 to 7-4-06 Nombre del Proyecto: HMAC Surface Overlay ( ____ _, Numero del Proyecto DOE: ___ _ Ublcacion Mapsco: ____ _ Notificacion de Mantenimiento de la Calle Como parte del Programa de Mantenimiento de las Calles de la Ciudad de Fort Worth, -----------ha sido contratado para reparar su calle. Durante este trabajo de mantenimiento, habra un tiempo breve en que no tenga acceso a su hogar o negocio. En los dias especificados abajo, vehiculos no deben estacionarse el la calle. Tambien, por favor apague su sistema de regar el cesped cerca de la calle. Si tiene alguna pregunta o concierne, por favor llame al contratista _______ al Si no resuelve su concierne a su satisfacci6n, puede tambien llamar a la Oficina de lnspecci6n de la Ciudad de Fort Worth al , de lunes a viernes entre las 7:30 a.m. y 4:30 p.m. Despues de las 4:30 p.m. o en los fines de semana llame al (817) 392-8100. Limit•• Nombre Limit•• De Bloquea de Calle De Provecto 1100 a 1200 Brown Street Yates Avenue a Keller Springs Parkway Fechaa de Construcclon Pennltlendo el Estado de Tlempo De 6-20-06 a 7 -4-06 " I \ ::".'l. ., r r fi t r r ,, r ~ f ~' ~ ~ f ti ~ :1 ,J J -- 0 - tj- PROJECT DESIGNATION SIGN --------4 I -0 11--------..i -~1.1/4 11 FORT WORTH--••s 288 PMS 167 3" 3 "!S I BEET MAINT CE 3"1 PROGRAM I 3" 1112 11 j Contractor: I; -'/2" 2~ Contractor's Name-=-y 2 11 1Y2" · TELEPHONE NUMBER FORT WORTH IN LOGO· CHEL TINGHAM BOLD ALL OTHER LETTERING IN ARIAL BOLD LOGO COLORS: FORT WORTH -PMS 288 LONGHORN LOGO· Pt.CS 167 ATTENTION: CURB RA.MPS . SHALL BE CONSTRUCTED PERPENDICULAR TO THE CURB AT STREET CROSSINGS WITH LANDINGS IN UEU OF DIAGONAL CROSSINGS l'fHERE FEASIBLE. SEE FIGS. 58, 59 & 60. WHEELCHAIR RAMPS STANDARD DETAILS CITY OF FORT lfORTR , TEXAS -CONSTRUCTION STA~DARD . OCTOBER, 1992, REDRA1YN OCTOBER 2002 . I I . i i i I I ' ' I ; I I 1 ! I I I ! FLARES AT I I SIDEWALKS SLOPE I I 1":12" MAX \ (TYPICAL) 7" CURB CURB FLUSH W/GUTTER ----10' PA RKW AY-----' ::..:: ....J < 3: w 0 (/) ( ' : I i I · PROPERTY LINE /,. PROPERTY LINE -----• . ••"----,---------------! 'b I <t I SIDEWALK . ..........____. ___ j __________ -···---·-·--···-----. - I ETECTABLE WARNING SURFACE I :2 · x 4' DOME -TILES) I . t> LEVEL LANDING WHEEL CHAIR RAMP l \ ~ I I Ac GUnrR hEXISTTNG CURB ~ 18" OR 2<' 6" SODDING AS REQUIRED TYPE 111 EXISTING 20' R. SCALE 1 " = 4' SIDEWALK RAMP WITH COLORED SURFACE I •• .. .. .J • BROOM FINISH -HMAC TIE-IN I/ARIAS!.; HEIGHT CURB EXISTING CURB & GUTTER SAWCUT FOR CONCRETE PAVEMENT OTY OF FORT WOR'TH, TEXAS DA TE: 09 /2004 ACCESSABILllY RAMP - TYPS:-'" f '>f"I' 0 A. !"\II It"'\ STREET CURB MONOLITHIC SIDEWALK CU~B LINES TO BE 1/4~ DEEP 4 JOINT, 4" GAP ~ R.O.W. CURB PAY LIMIT MAX. LENGTH OF SURFACE TREATMENT (GROOVE) 5' FROU THE BACK OF CURB. EXPANSION · MATERW. RECESSED 1 /4 • ANO SEALED W/ SILICONE (APPLICABLE TO AU. COLD-JOINTS) TYPICAL RAMP X-SECTION CITY OF FORT WORTH, TEXAS -CONSTRUCTION STANDARD OCTOBER, 1992, REDRAWN . ·ocrOBER 2002 NOTES . 1. FOR PARKWAY WITH ELEVATION BELOW STREET ELEVATION, THE SIDEWALK CURB ... UST BE 2" HIGHER THAN THE STREET CURB. 2. SIDEWALK CURB SHAU. NOT ENCROACH ON THE PROPOSED WIDTH Of THE SIDEWALK RAMP . 3. FOR TYPE I RAMP MAXIMUM SIDE.WALK CURB HEIGHT o• TO 7•. cm' Of FORT WORTH, TEXAS ACCESSABIUlY RAMP - Tl'PICAL CROSS SECTION DATE: OU/2004- STR-031 ... ·.·-·.·.· ... ·.·.·:·:··=·=····=·:··:-:··=·=········ .•.·:·:-·:·:··:·:··:·:····:····=·=······ •. CITY~ FORT WORTH, m<AS . ACCESSABILJlY RAMP TYPlr.AI r.RO~~ ~F"r.TinN OAre 09/20C4 ATTENTION: CURB RAMPS SHALL BE CONSTRUCTED PERPENDICULAR TO THE CURB AT STREET CROSSINGS WITH LANDINGS IN LIEU OF DIAGONAL CROSSINGS WHERE FEASIBLE. SEE FlGS. SS, 59 & 60 . \4.2 .1 Vehlc:ular Woy• and Fac:iliti•• 0 ~ (•) o · i I I I . ., 'Co. ... ~ ~ 0 .[ (It) . ,..,,...,.,,.,. piM• ...... ad "'"'" "' ,.,... ......... with ,-tr,,., ,...,......, , ............ a..tt ,_, in pulll• .... . (a) ....u., ,...~u. ,;, •• a11i ~ ,.,..,. ,,. ;,wbN• ,We••" a a a ~ ij (!I) C.,n,bltutf•" JU~I• 1We1P.n. CV,. "°'"II .. ,..... ·~-,11 .iv. , ...... ., · Fig. 60 0 a g (c) c:::: c:::: ,.,~.,,i,r...,r., , ...... ,; ...... 111 ...... "'"' ~, ,,...,ec1,, ;,.teruri.,. i'u ~l ic 'j idcwQ !k Cirb ~o~;,s ~I ~arllcd Cr~U il'<;I CITY OF" FORT WORTH, IDCAS ACCESSABILfTY RAMP - CATE: Oi/2004 RUNNING !LOPI 1:20 MAX ifClffl X --===:::::::::==:=i y (1) SS•p• • 7/s lftler• • l• a l•..-al .,...,. (J) Ca1&&!.ar dap• alt.all a•t aau• l:.11 COONTZ& s:LOPI 1:..20 MU muff· nc. H.1.a W..uuzemuit. of CUl'II Jl&mp Slope 1'0Ta II I < · ... (ldO -) \It.•• Ulla &1•1• •t \It.• 4 ..... -··· 11t.&ll ael -··· l :la PUMTINO oa OTD1t , MOMWALIIKCJ suv~c• sm1 rte, H.7.5 Sl4H of Cw-ll Rampa rte. a,.1 s Built-up C11rb i'a.mp OC"l'CB!R, 1992, R!DRA.lffl oc:-aaER 20oz CITY OF FORT WORTH, TEXAS ACCESSABILITY RAMP -• -.-.-'"'r-T l II C" DATE: 09/2004 ~TR-036 COLLAR CONFIGURATION ., COLLAR CONF"IGURATION FOR PAVED AREA......,. .. ~..,......--IN UNPAVED AREA (8) #4 BARS, PL.ACED AS SHOWN . USE CLASS . "A• (JOOO .LB) CONCRETE. COLL.AR THICKNESS . ......_~~.....,~,,.,+m;1 VARIES, a• MIN. t CASE 11 COLLAR SHALL EXTEND TO sono~ OF' 2 :27 CONCRETE (REBAR REQUIRED). CASE 12 COLLAR SHALL EXTEND 3. EC:LC W BOTTOM t:f" LCWEST r,RAOE RING (REaAR ~ECLi lREO). 4 •-0• (MANHOLE) r2·-o· (WATER VAi.VE) PLAN VIEW GRACE RINGS SECTION •A-A. ('MNHOLE CGLLAR SHOWN) (NOT TO SCALE) 3" -1...1 -> ~~ 0> :r )~ -3: I -.o I I . 0 ,.-I N GROUND CITY OF' FORT 'NORTH, TEXAS DA TE: 09/2004 MANHOLE AND WATER VALVE CONCRETE COLL AR Item N b um I 2 3 Water. _ Valve Riser Cross Section view ~ ~ 12 gage 090 galvanized steel G)~ t Height I new asphalt overlay , ... ~.---3/8" D.O.M. Tube Item Material Description er D ti escr1p on Steel Skirt 12 gage A.I.S .I 1020 Steel (A-36) G-90 Galvanized Weld Lincoln Outcrsheild 71 Elite .045 J/8" wide 0 .0 .M Tube D. 0 . M. Tube A. I.S.I . I 026 (A5 I 3 IY1>e 5) Tensile Yi Id e 33,000 P.S.I. 75 000 PSI. 72 000 P.S.I. Tensile UI i t mate 60,000 P.S.I. 85 000 P.S.I. 87 000 P.S.I . Manhole Riser 3/8" Dia. Hole With 302 Stainless Steel Roll Pin Cross Section view ~ r--IO or 12 gage 090 galvanized steel G)-- Expanding Linkage 2 1/4" 4 I /4" Item Item Material Description um r np1 on N be Desc ' ti I 3/8" Roll Pins 302 Stainics., Steel ( 14 000 LB Double Sheer Strcn2th) 2 Steel Skirt 12 or 10 gagic A.I .S.I . 1020 Sleet (A-36) G-90Galv~ 3 Weld 6S•1. 70-lt circumference \loeldcd 4 J/4" wide Ri9CI Bar Hoc Rolled Steel Al.SJ . 1020 (A-36) s Rod Ends Forging Al.SJ. C-1030 Steel Hear Tn:atcd BHN 240 Zinc Plated with Dichrorndc Finish 6 Tumbudclc A.IS.I. 1020 BHN 149 Zinc Plated dicccd in Linet.deer M1 inhibitor f Height I new asphalt overlay .... ,._.,____ 3/4" thick riser bar \_ 3/4" O.D. 3/8" I. D. 3/8" -16 Thread Tensile y· Id IC 33 .000 P.S.I. 75 000 PS.I. 33,000 PS.I. 70,000 PS.I . 70.000 PS.I Tensile Ulti t ma e 60 .000 P.S.I . 85 000 P SJ . 60 000 P.S.I . 92 ,000 PS.I . 80,000 PS.I. GROUND LINE 0 . co It) . N z j -. - SUITABLE MATERIAL TAMPED IM LIFTS NOT EXCEEDINC 121' LOOSE, PIPE SHALL BE 6 • PERFORATED POLYVINYL CHLORIDE TUBING PEA ASTM 0-1784 UNLESS SPECIFIED OTHERWISE. · ANO GUTTER 1 ~OP OF CUR8 12 • OVER\.AP j_-FILTER FABRIC PER PAY ITEM NO. 1'5 SUBORAIN. CITY Of FORT WORTH, TEXAS-CONSTRUCTION STANOARO ORAWINO HO. S-S It l1001F.. DAT!: 3-7-9 S ------·---------------~.:J..----___.;;;--.,;.__..;....;:;......_ ___ 367 Addendua 3 .. u 4 C ... z 0 u ~ ... u 4 C .. z 0 u ! .. 0 z LE·GEND H.M;A.C. REHABILITATION it · 11 II lg· . WEDGEMILLINO (RECYCLE lOVERLAY ONLY·) NOTE: BUTT JOI_ .. TS NOT REQUIRED WITH REMIXING PROCEs·s. · TYPIC:AL STREET BEGIN OR END POINT • REGARDLESS OF THE INTERSECTING STREETS ANGLE. LAYOUT. fOR RECYCLING ACTIVITES UNLESS NOTED. OTH£1tWISE IN, STll[[T SCHEDULE~ } . BUTT JOINT 0-1 R [VIS CO: lllV.Ne. OATl: 1990 I BUTT JOINT ' ( NOTE :ta)AH ATTEMPT HAS aEENMAOE TOD£TAIL AS Iii ANY STD. fl[LD SITUATIONS AS POSSIIL[ HOW£V£R I THE CONTRACTOR MIGHT HAYE TO OYfllLAP PARTS Of THESE D£'TAIL1 TO CONfllGURE A LAYOUT THAT 1£ST_ APfl\.lES TO A PAIITICULAII SITUATION, C 2) auT T JOINTa NOT R[QUIR(D WITH R[MIXING PROCESS. MEDIAN STREET BEGIN OR END POINT TYPICAL LEGEND . ,1 II II ·14 MEDIAN LAYOUT FOR RECYCLING ACTIVITIES FOR BLVD. SECTION UNLESS NOTED OTH£RWiSE IN STREET SCHEDULE H.M.A.C. REHABILITATION WEOGEMILLING (RECYCLE/ OVERLAY ONLY) D-2 R£V1S£O: ll(V.11•. DAT('. 1990 l I LEGEND I ] H.M.A.C. REHABILITATION •• II II I~ WEDGEMILLING · (RECYCLE/OVERLAY ONLY) NOTE :&IIALL IIIGHT TURN STOAMiE LANES SHALL I[ CONSIDERED AS MIIT o, CONTIIACT . CZ) BUTT JOINTS NOT ll(OUIRED WITH REMIXING ~IIOCEIS. NOTE ·: IF EITHEII IIADIUS DOES NOT HAYE AN ISLAND, IT WILL 8£ TREATED AS INDICATED BY APPLICABLE OE TAIL • BUTT JOINT ( -~STREET BEGIN OR ~END POINT, REGARDLESS Of THE INTERS£~T1NG STREETS ANGLE. D-~ R £ VISCO ~ IIIV. Ne. o.arc , TYPICAL LAYOUT fOR RECYCLINI ACTIVITEI ·. UNL[SS NOT£0 OTH£11WISE IN ST11££T SCH£0UL£. TYPICAL LEGEND . p--H.M.A.C.REHABILITATION J1 . II II II WEDGEMILLING ( RECYCLE /OVERLAY ONLY.) NOTE ~l)IF' AHY COMBINAtlOH OF'ISLAHDS ANO RIGHT TURN LANES ARE Al.SENT TUAN IIADIUS SHALL BE TREATED AS STANOARO. BUTT JOINT SHALL BE SQUARED OFF, IF NEEDED AS A RESULT OF EXISTING CONC. VAi.LEY GUTTER. C2) IUTT JOINTS NOT REQUIRED WITH A[MUUNG P>ft0C£SS. LAYOUT FOR RECYCLING ACTIVITIES WHEN INTERSECTING STREETS ARE RECYCLED SIMULTANEOUSLY U .. l.£SS NOTED OTHERWISE IN STREET SCHlOULE D-4 Rf VISED: lll(V. Ne. OAT(~ 1990 . -------··-__..=------=-==-=·::.=-..=:-----··-----··:=.:.~-··-. ---------------- 1 i Height· . BACK OF /CURB PLAN VIEW (Varies) 2' -7.S- ( Typ.) 12• WHITE HOT TAPE (AVERY DENNISON OR EQUIVALENT) Striping and reflectors to be install by the Contractor BACK OF CURB~ 2' -7.S-(Varies) ( Typ.) 12• WHITE HOT TAPE (AVERY DENNISON OR EQUIVALENT) 2' I") ·' ... I ~ N WHITE TYPE I 1-SIDED REFLECTORS 3-1/2 inches Ramp Gradient: 8.57 in 1 (30 inches / 3-1 /2 inches height) DEPARTMENT OF TRANSPORTATION 3.43 in 1 (12 inches/ 3-1/2 inches heigh1 fnNO PUBLIC WORKS CITY OF Side Gradient: TIW'F1C EHGl'jU~ FOAT WOA TI SPEED CUSHIONS _.,. °""' Jtuuury J 5, 2fHU AJ/l -... O~WINO 'IOT TO SCALI - - CITY OF FORT WORTH CONSTRUCTION SERVICES LABORATORY RESULTS FOR TEST HOLE AND PLASTICITY INDEX Project: HMAC 2010-5 DOE No: 6409 Fund Code : 03 HOLE# 1 LAB NO: LOCATION: 7601 Ripple Creek S/4 7 .50" HMAC 7 .75" Burnt Orange Clay HOLE#2 LAB NO: LOCATION: 7609 Ripple Creek N/4 6.75" HMAC 7.50" Burnt Orange Clay HOLE# 3 LAB NO: 108867 108868 108869 LOCATION: 7616 Ripple Creek center of cul-de-sac 8.25" HMAC 7.50" Burnt Orange Clay HOLE# 1 LAB NO: 108870 LOCATION: 7659 Shallow Water Ct. N/4 8.75" HMAC 6.25" Wash Rocks HOLE#2 LAB NO: 108871 LOCATION: 7654 Shallow Water Ct. S/4 cul-de-sac 8.50" HMAC 6.50" Wash Rocks HOLE# 1 LAB NO: 108872 LOCATION: 7663 Blue Carriage Ct. N/4 6.50" HMAC 8.50" Burnt Orange Sandy Clay HOLE#2 LAB NO: 108873 LOCATION: 7658 Blue Carriage Ct. S/4 cul-de-sac 9.75" HMAC 5.25" Burnt Orange Sandy Clay HOLE# 1 LAB NO: 108874 LOCATION: 7600 Blue Carria2e Lane S/4 7.75" HMAC 4.50" Brown Stabilizer 7 .25" Brown Sandy Clay w /rocks & gravel 7.75" Burnt Orange Sandy Clay 2 HOLE#2 LAB NO: 108875 LOCATION : 7612 Blue Carriage Lane N/4 11.50" HMAC 8.50 " Burnt Orange Sandy Clay HOLE# 3 LAB NO : 108876 LOCATION : 7624 Blue Carriage Lane S/4 7.50" HMAC 5 .25" Brown Stabilizer 5.50" Brown Sandy Clay w /rocks & gravel 4.00" Burnt Orange Sandy Clay HOLE#4 LAB NO: 108877 LOCATION : 7637 Blue Carriage Lane N/4 2.50" HMAC 4.75 " Brown Stabilizer 7 .25 " Brown Sandy Clay w /rocks & gravel 4.75" Burnt Orange Sandy Clay HOLE# 5 LAB NO: 108878 LOCATION : 7652 Blue Carriage Lane S/4 2.50 "HMAC 4 .75" Brown Stabilizer 7 .50 " Brown Sandy Clay w /rocks & gravel 7.25" Burnt Orange Sandy Clay HOLE# 1 LAB NO: 108879 LOCATION: 1000 Blue Carriage Lane N. W/4 11.75" HMAC 6.25" Brown Stabilizer 4.00" Brown Sandy Clay w /rocks & gravel HOLE# 2 LAB NO: 108880 LOCATION: 1013 Blue Carriage Lane N E/4 7 .25"HMAC 3.50" Brown Stabilizer 6.25" Brown Sandy Clay w /rocks & gravel 5.00" Dark Brown Sandy Clay HOLE# 3 LAB NO: 108881 LOCATION: 1033 Blue Carriage Lane N W/4 7.75" HMAC 4.50" Brown Stabilizer 5.75" Brown Sandy Clay w /rocks & gravel .4.00" Dark Brown Sandy Clay HOLE#4 LAB NO: 108882 --LOCATION: 1109 Blue Carriage Lane N E/4 6.50" HMAC 4.75" Brown Stabilizer 3 6.25" Brown Sandy Clay w /rocks & gravel 4.50" Dark Brown Sandy Clay HOLE# 5 LAB NO: 108883 LOCATION: 1121 Blue Carriage Lane N W/4 6 .25" HMAC 4.50" Brown Stabilizer 6.75" Brown Sandy Clay w /rocks & gravel 5.50" Dark Brown Sandy Clay HOLE# 6 LAB NO: 108884 LOCATION: 1133 Blue Carriage Lane N E/4 7.75" HMAC 4.25" Brown Stabilizer 5.75" Brown Sandy Clay w /rocks & gravel 5.25" Dark Brown Sandy Clay HOLE# 1 LAB NO: 108885 LOCATION: 7600 Fox River Ct. S/4 7.25" HMAC 4.25" Brown Stabilizer 6.50" Brown Sandy Clay w /rocks & gravel 4.00" Dark Brown Sandy Clay HOLE# 2 LAB NO: 108886 LOCATION: 7616 Fox River Ct. N/4 cul-de-sac 11.00" HMAC 4.25" Brown Stabilizer 6.75" Brown Sandy Clay w /rocks & gravel HOLE# 1 LAB NO: 108887 LOCATION: 1000 Fox River Lane N/4 -8.50" HMAC 4.50" Brown Stabilizer 5.75" Brown Sandy Clay w /rocks & gravel 4.00" Dark Brown Sandy Clay HOLE# 2 LAB NO: 108888 LOCATION: 1013 Fox River Lane S/4 7.25" HMAC 4.75" Brown Stabilizer 6.75" Brown Sandy Clay w /rocks & gravel 4.25" Dark Brown Sandy Clay HOLE# 3 LAB NO: 108889 LOCATION: 1024 Fox River Lane N/4 7.50" HMAC 4.75" Brown Stabilizer 5.50" Brown Sandy Clay w /rocks & gravel 4.25" Dark Brown Sandy Clay 4 HOLE# 4 LAB NO: 108890 LOCATION: 1044 Fox River Lane E/4 9.25" HMAC 4.75" Brown Stabilizer 5.50" Brown Sandy Clay w /rocks & gravel 4.25" Dark Brown Sandy Clay HOLE# 5 LAB NO: 108891 LOCATION: 1100 Fox River Lane W/4 6.75" HMAC 4.75" Brown Stabilizer 6.25" Brown Sandy Clay w /rocks & gravel 4.25" Dark Brown Sandy Clay HOLE# 6 LAB NO: 108892 LOCATION:1116 Fox River Lane E/4 7.50" HMAC 4.25" Brown Stabilizer 6.25" Brown Sandy Clay w /rocks & gravel 4.00" Dark Brown Sandy Clay HOLE# 7 LAB NO: 108893 LOCATION: 1133 Fox River Lane W/4 7.00" HMAC 4.50" Brown Stabilizer 6.25" Brown Sandy Clay w /rocks & gravel 4.25" Dark Brown Sandy Clay HOLE# 8 LAB NO: 108894 LOCATION: 1141 Fox River Lane E/4 6.50" HMAC 4.75" Brown Stabilizer 6.25" Brown Sandy Clay w /rocks & gravel 4.50" Dark Brown Sandy Clay HOLE# 1 LAB NO: 108895 LOCATION: 6200 Franwood Terrace S/4 3.75" HMAC 6.00" Brown Stabilizer 7 .25" Brown Sandy Clay w /rocks & gravel 5.00" Brown Sandy Clay HOLE# 2 LAB NO: 108896 LOCATION: 6212 Franwood Terrace N/4 3.50"HMAC 5.75" Brown Stabilizer -7.50" Brown Sandy Clay w /rocks & gravel 5.25" Brown Sandy Clay 5 HOLE# 3 LAB NO: 108897 LOCATION: 6221 Franwood Terrace S/4 3.75" HMAC 6.25" Brown Stabilizer 7.00" Brown Sandy Clay w /rocks & gravel 5.00" Brown Sandy Clay HOLE# 4 LAB NO: 108898 LOCATION: 6232 Franwood Terrace N/4 3.00" HMAC 5 .25" Brown Stabilizer 7 .50" Brown Sandy Clay w /rocks & gravel 6.75" Brown Sandy Clay HOLE# 5 LAB NO: 108899 LOCATION: 6300 Franwood Terrace S/4 4.00" HMAC 6.25" Brown Stabilizer 7.25" Brown Sandy Clay w /rocks & gravel 4.75" Brown Sandy Clay HOLE# 6 LAB NO: 108900 LOCATION: 6324 Franwood Terrace N/4 3.50" HMAC 6.25" Brown Stabilizer 7.00" Brown Sandy Clay w /rocks & gravel 5.25" Brown Sandy Clay HOLE# 7 LAB NO: 108901 LOCATION :6404 Franwood Terrace S/4 -6.50" HMAC 5.50" Brown Stabilizer 5.25" Brown Sandy Clay w /rocks & gravel 5.75" Brown Sandy Clay HOLE# 8 LAB NO: 108902 LOCATION: 6416 Franwood Terrace N/4 3.00" HMAC 5.75" Brown Stabilizer 7 .25" Brown Sandy Clay w /rocks & gravel 6.25" Brown Sandy Clay HOLE# 9 LAB NO: 108903 LOCATION :6450 Franwood Terrace S /4 4.25" HMAC 5.50" Brown Stabilizer 6 .75" Brown Sandy Clay w /rocks & gravel 5.50" Brown Sandy Clay - 6 HOLE# 10 LAB NO : 108904 LOCATION: 6500 Franwood Terrace N/4 2.50 " HMAC 6.25 " Brown Stabilizer 7.50" Brown Sandy Clay w /rocks & gravel 5.75" Brown Sandy Clay HOLE# 1 LAB NO: 108905 LOCATION: 20'E of Walker St (@Draper St. S/4 8.75 " HMAC HOLE# 2 LAB NO: 108906 LOCATION:5119 Draper St. N/4 7.75" HMAC HOLE# 3 LAB NO: 108907 LOCATION :20'W of Marlin St (@ Draper St S/4 7.50" HMAC HOLE# 1 LAB NO: 108908 LOCATION:20'S OF Ramey Ave (@Marlin St. W /4 7.50" HMAC HOLE# 2 LAB NO: 108909 LOCATION: 2513 Marlin St E/4 7.25" HMAC HOLE# 3 LAB NO: 108910 LOCATION: 2608 Marlin St W/4 8.50" HMAC HOLE# 4 LAB NO: 108911 LOCATION:20'N ofFitshu2h Ave (@Marlin St. E/4 7.50 " HMAC HOLE# 1 LAB NO: 108912 LOCATION: 20'E of Service Road (@ Manhattan Blvd S/4 6.50" HMAC HOLE#2 LAB NO: 108913 -LOCATION :6800 Manhattan Blvd N /4 6.25" HMAC HOLE# 3 LAB NO: 108914 LOCATION:6850 Manhattan Blvd S/4 6.00" HMAC HOLE# 4 LAB NO: 108915 , .. LOCATION: /4 5.25" HMAC - 7 HOLE# 1 LAB NO: 108916 LOCATION:20'W of Stalcup Rd@ Pinson St. N/4 8.00" HMAC 4. 75" Brown Stabilizer -5.50" Brown Sandy Clay w /rocks & gravel 4.00" Dark Brown Sandy Clay HOLE# 2 LAB NO: 108917 LOCATION: 5416 Pinson St. S/4 7.00" HMAC 4.50" Brown Stabilizer 6.00" Brown Sandy Clay w /rocks & gravel 5.50" Dark Brown Sandy Clay HOLE# 3 LAB NO: 108918 -LOCATION: 5300 Pinson St N/4 6.00" HMAC 4.75" Brown Stabilizer 6.25" Brown Sandy Clay w /rocks & gravel 5.00" Dark Brown Sandy Clay HOLE# 4 LAB NO: 108919 LOCATION:5225 Pinson St S/4 7.25" HMAC -4.50" Brown Stabilizer 5.50" Brown Sandy Clay w /rocks & gravel 4.75" Dark Brown Sandy Clay HOLE# 5 LAB NO: 108920 LOCATION: 5216 Pinson St N/4 8.00" HMAC 4.25" Brown Stabilizer 5.50" Brown Sandy Clay w /rocks & gravel 4.25" Dark Brown Sandy Clay HOLE#6 LAB NO: 108921 LOCATION: 20'E of Dillard St. @Pinson St S/4 8.00" HMAC 4 .50" Brown Stabilizer 5.50" Brown Sandy Clay w /rocks & gravel 4.00" Dark Brown Sandy Clay HOLE# 1 LAB NO: 108922 LOCATION:20'E of S Oakland Blvd@Panola Ave S/4 2.50" HMAC 7.50" Brown Stabilizer 6.75" Brown Sandy Clay w /rocks & gravel 4.25" Brown Sandy Clay 8 HOLE# 2 LAB NO: 108923 LOCATION:4312 Panola Ave N/4 4.00"HMAC 8.75" Concrete 5.50" Brown Sandy Clay w /rocks & gravel 4.00" Brown Sandy Clay HOLE# 3 LAB NO: 108924 LOCATION: 4308 Panola Ave. S/4 4.25"HMAC 8.75" Concrete 7.50" Brown Sandy Clay w /rocks & gravel HOLE#4 LAB NO: 108925 LOCATION: 4333 Panola Ave N/4 3.00" HMAC 5.50" Cement Stabilizer 6 .25" Brown Sandy Clay w /rocks & gravel 6.50" Dark Brown Sandy Clay HOLE#5 LAB NO: 108926 LOCATION: 4400 Panola Ave. S/4 5.50" HMAC 4.50" Brown Stabilizer 6.25" Brown Sandy Clay w /rocks & gravel 5.75" Brown Sandy Clay HOLE#6 LAB NO: 108927 LOCATION: 4501 Panola Ave N/4 5.50" HMAC 7. 00" Concrete 5.25" Lt. Brown Sandy Clay 4.25" Brown Sandy Clay HOLE#7 LAB NO: 108928 LOCATION: 4520 Panola AveS/4 3.50" HMAC 6.50" Concrete 6.75" Brown Sandy Clay w /rocks & gravel 4.25" Brown Sandy Clay HOLE# 8 LAB NO: 108929 LOCATION:4605 Panola Ave N/4 4.00"HMAC 5.50" Concrete 7 .25" Brown Sandy Clay w /rocks & gravel 4.50" Brown Sandy Clay 9 HOLE#9 LAB NO: 108930 LOCATION:20'W of S Edgewood Terrace Ca) Panola Ave. S/4 3.50" HMAC 11.00" Concrete 6.75" Brown Sandy Clay w /rocks & gravel HOLE# 1 LAB NO: 108931 LOCATION :20'S of Fairway Dr Ca) Highpoint Rd W/4 2.00" HMAC 5.25" Brown Stabilizer 7.25" Brown Sandy Clay w /rocks & gravel 7.50" Dark Brown Sandy Clay HOLE# 2 LAB NO: 108932 LOCATION:4559 Highpoint Rd E/4 1.50" HMAC 6 .25" Brown Stabilizer 7.50" Brown Sandy Clay w /rocks & gravel 7 .25" Dark Brown Sandy Clay HOLE# 3 LAB NO: 108933 LOCATION :SO'S of Glen crest St. Ca) Highpoint Rd W /4 2.00" HMAC 6.00" Brown Stabilizer 7.25" Brown Sandy Clay w /rocks & gravel 7.75" Dark Brown Sandy Clay HOLE#4 LAB NO: 108934 LOCATION :20'N of Timberline Dr Ca) Highpoint Rd. E/4 9.75" HMAC 4.25" Brown Stabilizer 7.75" Brown Sandy Clay w /rocks & gravel HOLE# 1 LAB NO: 108935 LOCATION:20'S of Randol Mill Rd Ca) Highwood Tri. W/4 8.25" HMAC 4.50" Brown Stabilizer 5.25" Brown Sandy Clay w /rocks & gravel 4.00" Brown Sandy Clay HOLE# 2 LAB NO: 108936 LOCATION:100 Highwood Tri E/4 8.25" HMAC 4.75" Brown Stabilizer 5.00" Brown Sandy Clay w /rocks & gravel 4.00" Brown Sandy Clay 10 HOLE# 3 LAB NO: 108937 LOCATION: 300 Highwood Tri. W/4 8.25" HMAC 4.25" Brown Stabilizer 5.50" Brown Sandy Clay w /rocks & gravel 4.25" Brown Sandy Clay HOLE#4 LAB NO: 108938 LOCATION :309 Highwood Tri. E/4 7.75" HMAC 4.50" Brown Stabilizer 5.50" Brown Sandy Clay w /rocks & gravel 4.50" Brown Sandy Clay HOLE# 5 LAB NO: 108939 LOCATION: 409 Highwood Tri W /4 8.00" HMAC 4.25" Brown Stabilizer 5 .25" Brown Sandy Clay w /rocks & gravel 4.50" Brown Sandy Clay HOLE#6 LAB NO: 108940 LOCATION:513 Highwood Tri W/4 8.50" HMAC 4.25" Brown Stabilizer 5.25" Brown Sandy Clay w /rocks & gravel 4.25" Brown Sandy Clay HOLE# 7 LAB NO: 108941 LOCATION:613 Highwood Tri W/4 ...... 8.25" HMAC 4.00" Brown Stabilizer 5.25" Brown Sandy Clay w /rocks & gravel 4.75" Brown Sandy Clay HOLE# 8 LAB NO: 108942 LOCATION: 708 Highwood Tri. E/4 -8.50" HMAC 4.00" Brown Stabilizer 5 .25" Brown Sandy Clay w /rocks & gravel 4.50" Brown Sandy Clay HOLE# 9 LAB NO: 108943 LOCATION: 804 Highwood Tri. W/4 3.25" HMAC 8.25" Brown Stabilizer 6.25" Brown Sandy Clay w /rocks & gravel 4.50" Brown Sandy Clay 11 HOLE# 10 LAB NO : 108944 LOCATION: 817 Highwood Tri E/4 2.50" HMAC 7.75" Brown Stabilizer 6.75" Brown Sandy Clay w /rocks & gravel 4.75" Brown Sandy Clay HOLE# 11 LAB NO: 108945 / LOCATION: 904 Highwood Tri W/4 2.00" HMAC 8.00 " Brown Stabilizer 6.50" Brown Sandy Clay w /rocks & gravel 5.75" Brown Sandy Clay HOLE# 12 LAB NO: 108946 LOCATION: 929 Highwood Tri. E/4 2.50" HMAC 8.50" Brown Stabilizer 6.25" Brown Sandy Clay w /rocks & gravel 5.00" Brown Sandy Clay HOLE# 1 LAB NO: 108947 LOCATION: 20'S ofE. Lancaster Ave (a2 Haynes W/4 1.75 " HMAC 7.75" Concrete 7 .25" Brown Sandy Clay w /rocks & gravel 4 .50" Brown Clay HOLE# 2 LAB NO: 108948 LOCATION: 401 Haynes Ave E/4 2.00" HMAC 7.00" Concrete 7.50" Brown Sandy Clay w /rocks & gravel 5.50" Brown Clay HOLE# 3 LAB NO: 108949 LOCATION: 501 Haynes Ave E/4 2.25" HMAC 6.25" Concrete 7.75" Brown Sandy Clay w /rocks & gravel 5.75" Brown Clay HOLE# 4 LAB NO: 108950 LOCATION: 513 Haynes Ave E/4 1.75" HMAC 6 .50 " Concrete 7.75" Brown Sandy Clay w /rocks & gravel 6.00" Brown Clay 12 HOLE#l LAB NO: 108951 LOCATION: 20'E of S. Little John Ave cm N. Little John Ave S/4 7.25 " HMAC 7 .50 " Brown Stabilizer 7.25 " Brown Sandy Clay w /rocks & gravel HOLE# 2 LAB NO: 10895 2 LOCATION:3439 N. Little John Ave. N/4 6.50" HMAC 7.75 " Brown Stabilizer 7.75 " Brown Sandy Clay w /rocks & gravel HOLE# 3 LAB NO : 108953 LOCATION: 200' of 3439 N. Little John Ave S/4 6 .50"HMAC 7.50" Brown Stabilizer 7.75 " Brown Sandy Clay w /rocks & gravel HOLE#4 LAB NO: 108954 LOCATION: 3535 N. Little John Ave N/4 5.50 " HMAC 11.00" Concrete 5.50" Brown Sandy Clay w /rocks & gravel HOLE# 1 LAB NO: 108955 LOCATION: 20' N of Ramey Ave cm Andrew Ave E/4 6.25 "HMAC 4.50" Brown Stabilizer 6.75" Dark Brown Sandy Clay 4 .50" Dark Brown Clay HOLE# 2 LAB NO : 108956 LOCATION:220'N of Ramey Ave cm Andrew Ave W/4 6.75" HMAC 4.25 " Brown Stabilizer 5.75" Dark Brown Sandy Clay 5.25" Dark Brown Clay HOLE#3 LAB NO: 108957 LOCATION: 20'S of Booker T St. cm Andrew Ave E/4 7.00"HMAC 4.25" Brown Stabilizer 5.50" Dark Brown Sandy Clay w 5.25 " Dark Brown Clay HOLE# 1 LAB NO: 108958 LOCATION :20'E of Langston St. cm Sunshine Dr S/4 6.25 " HMAC 5.25" Brown Stabilizer 6.25" Brown Sandy Clay w /rocks & gravel 13 4.25" Brown Clay HOLE#2 LAB NO: 108959 LOCATION: 4819 Sunshine Dr N/4 6.25" HMAC 5.00" Brown Stabilizer 5.75" Brown Sandy Clay w /rocks & gravel 5.25" Brown Sandy Clay HOLE# 3 LAB NO: 108960 LOCATION: 4841 Sunshine Dr S/4 7.25" HMAC 4.50" Brown Stabilizer 5.75" Brown Sandy Clay w /rocks & gravel 4.50" Brown Clay HOLE# 4 LAB NO: 108961 LOCATION: 4913 Sunshine Dr N/4 8.75" HMAC 4.00" Brown Stabilizer 5.25" Brown Sandy Clay w /rocks & gravel 4.00" Brown Clay HOLE# 5 LAB NO: 108962 LOCATION:20'W of Village Creek Rd. (a2 Sunshine Dr S/4 6.00" HMAC 5 .25" Brown Stabilizer 5.75" Brown Sandy Clay w /rocks & gravel 4.25" Brown Clay HOLE# 1 LAB NO: 108963 LOCATION: 20'8 Brentwood Stair Rd (a2 Canterbury Cir. W/4 5.00" HMAC 5.25" Brown Stabilizer 6.25" Brown Sandy Clay w /rocks & gravel 5 .50" Brown Sandy Clay HOLE#2 LAB NO: 108964 LOCATION: 1408 Canterbury Cir E/4 4.25" HMAC 5 .50" Brown Stabilizer 6.50" Brown Sandy Clay w /rocks & gravel 5.75" Brown Sandy Clay HOLE# 3 LAB NO: 108965 LOCATION: 1500 Canterbury Cir W/4 4.00" HMAC 7.75 " Brown Stabilizer 5.50" Brown Sandy Clay w /rocks & gravel 4.75" Brown Sandy Clay 14 HOLE#4 LAB NO: 108966 LOCATION: 1513 Canterbury Cir. E/4 4.75" HMAC 6.25" Brown Stabilizer 5.50" Brown Sandy Clay w /rocks & gravel 5.50" Brown Sandy Clay HOLE#5 LAB NO: 108967 LOCATION: 1529 Canterbury Cir W/4 4.25 " HMAC 6.50" Brown Stabilizer 6.25" Brown Sandy Clay w /rocks & gravel 5.00" Brown Sandy Clay HOLE# 6 LAB NO: 108968 LOCATION: 1601 Canterbury Cir E/4 4 .50" HMAC 6.00 " Brown Stabilizer 6.25 " Brown Sandy Clay w /rocks & gravel 5.25" Brown Sandy Clay HOLE# 7 LAB NO: 108969 LOCATION:1617 Canterbury Cir. W/4 5.50" HMAC 9.00" Brown Stabilizer 7 .50" Brown Sandy Clay w /rocks & gravel HOLE# 8 LAB NO: 108970 LOCATION: 1629 Canterbury Cir E/4 5.50" HMAC 7.50" Brown Stabilizer 8.25" Brown Sandy Clay w /rocks & gravel HOLE# 9 LAB NO: 108971 LOCATION: 1709 Canterbury Cir. W/4 4 .75 " HMAC 7.75" Brown Stabilizer 5.25" Brown Sandy Clay w /rocks & gravel 4.50" Brown Sandy Clay HOLE# 10 LAB NO: 108972 LOCATION: 20'N of Barricade ~ Canterbury Cir. E/4 4.00" HMAC 7 .50" Brown Stabilizer 5.75" Brown Sandy Clay w /rocks & gravel 4.75" Brown Sandy Clay Approval: Ryan Jeri Date Tested: 2 /2/10-2/19/10 Requested by: David Bowers Tested by: Pat Jones Routing: Superintendent Inspector File 15 HMAC SURFACE OVERLAY (H2010-5) Project Name Street Limits Procedure LM CD Mapsco ANDR EW AVE BOOKER T ST-RAMEY AVE POL 0 .25 5 79Q BLUE CARRIAGE CT W CUL-DE-SAC -BLUE CARRIAGE LN N POL 0 .08 4 66V BLUE CARRIAGE LN MORRISON DR -BLUE CARRIAGE LN N POL 0.44 4 66V BLUE CARRIAGE LN N JOHN T WHITE RD -BLUE CARRIAGE LN POL 0 .52 4 66V CANTERBURY CIR (S) BRENTWOOD STAIR RD-BARRICADE POL 1.03 4 66W FOX RIVER CT FOX RIVER LN - E CUL-DE-SAC MOL 0 .14 4 66V FOX RIVER LN BLUE CARRIAGE LN N -BLUE CARRIAGE LN MOL 0 .64 4 66V FRANWOOD TER OAK HILL RD - E DEAD END MOL 1.24 4 BOA HAYNES AVE E LANCASTER AVE -PANOLA AVE POL 0 .24 8 78H HIGH WOODS TRL RANDOL MILL RD-BOCA RATON BLVD FMOL 1.84 4 65R HIGH WOODS TRL BOCA RATON BLVD -LARKSPUR LN POL 0 .59 4 66S N LITTLEJOHN AVE S LITTLEJOHN AVE -CAMPBELL ST POL 0 .38 5 78Q MANHATTAN BLVD EAST LOOP 820 -TO DEAD END POL 0.55 4 66P MARLIN ST RAMEY AVE-FITZHUGH AVE MOL 0.42 5 79P PANOLA AVE S OAKLAND BLVD -S EDGEWOOD TER FMOL 1.08 8 79E PINSON ST DILLARD ST -STALCUP RD POL 0 .66 5 79U RIPPLE CREEK CT FOX RIVER LN - E CUL-DE-SAC FMOL 0 .17 4 66V SHALLOW WATER CT W CUL-DE-SAC -BLUE CARRIAGE LN N POL 0.07 4 66V SUNSHINE DR LANGSTON ST-VILLAGE CREEK RD POL 0.48 5 79S 10.82 HMAC SURFACE OVERLAY AT VARIOUS LOCATIONS (2010-5) CITY PROJECT NO: 01469 TPW PROJECT N: C293-541200-204620146983 STREET BY STREET QUANTITY DETERMINATION SPREAD SHEET W w �. a ' a � � w w zw � � z �a a'� a �� � .zaa � �? � �� w U , � z z H � ww W FF � U'� � R'" Z � F Z �+ � E+ Z z C7 C7 °' ..�'. � � .a a C� a � � W U .� .a vs � La Gi �� o Qa a� °� 3� �3� �W W�� da� a� w�� �� ��� Hz~ �� a��Wa �, ,, o owa pU a a a .a K�G� �t�p ri�ri � �a�iQa�.� �3va�. a'�i�va�, ��va�, ���o oo�� �wa'�iaai� ITEM UNIT ITEM DESCRIPTION QTY QTY QTY QTY Q i Y QTY QTY QTY 1 EA Project Designation Sign 0 0 0 0 0 0 0 0 2 LS Utility Adjustment 0 0 0 0 0 0 0 0 3 LF Remove & Replace Existing Concrete Curb and Gutter 325 140 300 500 1,525 0 60 525 4 LF Install New Concrete Curb and Gutter 0 0 0 0 0 0 0 0 5 SF Remove & Replace 6-Inch Concrete Driveway 0 200 200 500 500 0 0 600 6 SF Remove & Replace 6-Inch Eexposed Aggregate Driveway 0 0 0 0 0 0 0 100 7 SF Install New 6-Inch Concrete Driveway 0 0 0 0 0 0 0 0 8 SF Remove & Replace 4-Inch Concrete Sidewalk 0 0 40 50 100 0 0 40 9 SF Remove & Replace 4-Inch Exposed Aggregate 5idewalkWalk 0 0 0 0 0 0 0 0 10 SF Install New 4-Inch Concrete Sidewalk 0 0 0 0 0 0 0 0 11 SF Remove & Replace Existing Wheelchair Ramp with 4-Inch ADA Ramp fw/ detectable w rr�ina dome-tile surfacel 12 SF �nstali New 4-Inc� ADA Wheelchair Ramp (wl detectable warning dome-tile surfacel 13 SY Remove & Repiace Existing Concrete Valley Gutter 14 SY Install New Concrete Valley Gutter 15 EA Remove & Replace 5-Ft. Storm Drain Iniet-Top 16 EA Remove & Replace 10-Ft. Storm Drain Inlet-Top 17 LF 6-Inch Perforated Pipe - Sub-Drain 18 SY 8-Inch Pavement Pulverization 19 TON 26 Ib/sy Cement Modification 20 CY Unclassified Street Excavation 21 CY Crushed Limestone 22 CY HMAC Pavement & Base RepairHMAC Pavement & Base Repair 23 TON HMAC Pavement Level Up 24 LF Wedge Miling, 2-Inch to 0-Inch Depth, 5-Ft. Wide 25 EA Butt Joint-Milled 26 SY 2-inch HMAC Surface Milling 27 LF Crack Sealing of Existing HMAC Pavement 28 SY 2-Inch Surface Course Type "D" Mix 29 EA Remove & Replace 30-Ft. Speed Cushion w! Striping 30 EA Remove & Replace 40-Ft. Speed Cushion w/ Striping 31 EA Water Valve Box Adjustment With Steel Riser 32 EA Water Valve Box Adjustment with Concrete Coilar 33 EA Water Meter Box Adjustment 34 EA Manhole Adjustment With Steel Riser 35 EA Manhole Adjustment With Concrete Collar 36 EA Painting House Addresses 37 SY Grass Sod Replacement 38 EA Re-Mobilization Monthly Pickup of Bulky Items Garbage, Recycling,Yard Trimmings & Brush Weekly Pickup Days Thursday Thursday Thursday Thursday Thursday Thursday Thursday Thursday Wednesday Thursday Page 1 of 2 0 0 0 0 0 0 0 0 0 0 0 40 0 0 30 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,720 1,100 3,100 4,100 6,200 22 30 40 53 81 20 0 0 0 200 0 0 0 0 20 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1,720 1,100 3,100 4,100 6,200 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 1 3 2 5 0 2 2 2 5 0 0 0 0 0 1 1 5 6 7 0 4 4 8 10 36 20 50 55 250 0 0 0 0 0 Week of the Week of the Week of the 1st Week of the Week of the 2nd Monday of 1st Monday of Monday of the 1st Monday of 1st Monday of the month the month month the month the monih 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 10 20 15 550 1 100 600 1,050 0 0 1 0 0 1 0 0 10 0 � A W W H� 0 o� � a wo�w� QrY 0 0 315 0 130 0 0 80 0 0 0 0 0 0 0 0 0 0 0 0 0 10 10 2,300 1 0 2,200 3,600 0 0 1 0 0 2 0 10 53 0 � >�� ��� �'UQ ���a �waa QrY 0 0 600 0 230 0 0 0 0 0 0 0 0 0 3 0 0 1,550 20 40 20 0 0 0 0 75 � ,� 1,550 '� � 0 0 0 3 0 0 4 6 I 100 I 0 Q U 0 aa � � ��"� 0 o '' � O Z a � °o � �w an 0 0 1,145 0 550 250 0 32 40 0 0 0 70 0 0 0 300 21,500 280 800 100 160 50 0 3 16,500 0 21,500 0 0 3 4 7 5 12 8 200 0 Week of the Week of the Week of the Week of the Week of the 1st Monday of 1st Monday of 1st Monday of 2nd Monday of 1st Monday of the month the month the month the month the month 0 0 0 0 0 0 0 0 0 0 0 40 70 11,200 2 700 5,200 5,100 2 0 2 0 7 3 0 10 90 0 QrY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL 0 0 5,435 0 2,910 350 0 342 40 0 0 0 140 0 3 0 300 39,270 526 1,060 150 230 145 14,050 7 17,375 8,000 49,020 4 0 7 18 25 11 36 60 864 0 HMAC SUIZFACE OVERLAY AT VARIOUS LOCATIONS (2010-5) CITY PROJECT NO: 01469 TPW PROJECT NO: C293-541200-204620146983 STREET BY STREET QUANTITY DETERMINATION SPREAD SHEET d � za � b � u 0 v�v�a` ITEM UNIT ITEM DESCRIPTION 1 EA Project Designation Sign 2 LS Utility Adjustment I3 LF Remove & Replace Existing Concrete Curb and Gutter I4 LF . Install New Concrete Curb and Gutter I5 SF Remove & Replace Existing 6-Inch Concrete Driveway �6 SF Remove & Replace 6-Inch Eexposed Aggregate Driveway 7 SF Install New 6-Inch Concrete Driveway I8 SF Remove & Repiace 4-Inch Concrete Sidewalk I 9 SF Remove & Replace 4-Inch Exposed Aggregate SidewalkWalk I 10 SF Install New 4-Inch Concrete Sidewalk I 11 SF Remove & Replace Existing Wheelchair Ramp and Instail ADA 4-inch Ramo fw/ detectable war 'na �ome-tile surface) � 12 SF �nstall New 4-Inch ADA ��ee chair Ramp (w/ detectabie warning dome-tile surfacel ( 13 SY Remove & Replace Existing Concrete Valley Gutter I 14 SY Install New Concrete Valley Gutter � 15 EA Remove & Repiacef 5-Ft. Storm Drain Inlet-Top I 16 EA Remove & Replace 10-Ft. Storm Drain Inlet-Top 17 LF 6-Inch Perforated Pipe, Sub-Drain 18 SY 8-Inch HMAC Pavement Puiverization 19 TON 26 Ib/sy Cement Modification 20 CY Unclassified Street Excavation 21 CY Crushed Limestone I22 CY HMAC Pavement and Base Repair 23 TON HMAC Pavement Level Up 24 LF Wedge Milling, 2-Inch to 0-Inch, Depth, 5-Ft. Wide 25 EA Butt Joint-Milled 26 SY 2-Inch HMAC Surface Milling 27 LF Crack Sealing of Existing HMAC Pavement I 26 SY 2-Inch HMAC Surface Milling 26 SY 2-Inch Surface Course Type "D" Mix 29 EA Remove & Replace 30-Ft. Speed Cushion w/ Striping 30 EA Remove & Replace 40-Ft. Speed Cushion w/ Striping 31 EA Water Valve Box Adjustment with Steel Riser I32 EA Water Vaive Box Adjustment with Concrete Collar 33 EA Water Meter Box Adjustment 34 EA Manhole Adjustment with Steel Riser 35 EA Manhole Adjustment with Concrete Collar 36 EA Painting House Addresses 37 SY Grass Sod Replacement 38 EA Re-Mobilization Monthly Pickup of Bulky Items Garbage, Recycling,Yard Trimmings & Brush Weekly Pickup Days w W qp., A Z � � P E,.; W d W W Wq x V � U a a �� �W w �Pa � UW W�Z > z � aW � � Hv �oa �� �,� �Qo H� �x 3Ww Az HH`� Fo ��' o�wa o� a� oa� �o� � � o �,a w a a� ��w a,��a aa �wa z � a p� �� � a wa zv�va�., wa �a�a a�.�ww aaa�, a:��� �3t�a�, ��va arY ary Qn Qry QrY Qrr QrY arY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 405 1,450 800 2,550 775 130 235 2,000 0 185 0 0 0 0 0 100 690 400 350 3,000 805 115 500 3,250 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 500 40 0 0 600 0 0 0 80 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 80 0 0 0 0 180 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 105 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3 0 0 0 0 0 0 0 0 0 0 0 0 2,550 4,100 0 0 3,800 0 850 3,500 33 54 0 0 49 0 11 46 30 100 0 0 30 0 40 20 20 25 0 50 0 0 10 50 0 0 25 45 0 30 0 0 0 0 50 40 0 20 0 0 0 0 2,000 0 0 500 0 0 0 0 2 0 0 1 0 0 0 0 0 7,050 0 600 0 0 0 0 1,500 4,500 0 1,000 0 0 0 0 0 7,050 0 600 0 0 2,550 4,100 2,550 7,150 3,800 1,300 850 3,500 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 � 0 0 0 3 5 0 1 0 0 2 6 0 2 3 0 1 2 0 0 0 10 0 0 0 0 0 0 3 4 0 1 0 I 0 3 3 0 3 3 0 1 3 5 0 6 38 10 2 8 56 67 210 133 300 130 22 40 170 0 0 0 0 0 0 0 0 Week of the Week of the Week of the Week of the Week of the Week of the Week of the Week of the 2nd Monday of 1st Monday of 2nd Monday of 2nd Monday of 2nd Monday of 1st Monday of 1st Monday of 2nd Monday of the month the month the month the month the month the month the month the month Thursday Thursday Thursday P��{irZe��ar Thursday Thursday Thursday ( Thursday ary 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Qrir 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 an 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 QrY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL 5435.00 285.00 9110.00 0.00 500.00 720.00 0.00 o.00 260.00 0.00 0.00 50.00 0.00 3.00 0.00 14500.00 193.05 220.00 155.00 100.00 110.00 2500.00 3.00 7650.00 �000.00 7650.00 25800.00 0.00 0.00 9.00 16.00 10.00 8.00 16.00 125.00 1072.00 0.00