HomeMy WebLinkAboutContract 60069-CO3CSC No. 60069-0O3
FORT WORTH City of Fort Worth
Change Order Request
Project Name: Water & Sanitary Sewer Replacement Contract 2019, WSM-O Part 1 City
Sec No.] 60069 9
Project No.(s):� 56002-0600430/0700430/5740010-103381-001780 1 NTP I N/A I City
Proj. No.1 103381-1 1
Project Description: Water and Sewer Lines Replacement and Pavement Improvements
Contractor: Jackson Construction, Ltd. Change Order# 3
Date: 6/12/2025
City Project Mgr. Aaron Nivone City Inspector: Byron McDonald
Phone Number: 817-392-8404 Phone Number: 817-392-8306
Unit I Unit IIA Sewer Unit IIB Unit III
Dept.
Contract
Totals
Water Sewer Paving
Time
Original Contract Amount $2,655,455.00 $1,320,558.00 $530,877.00 $490,533.00
$4,997j423.00 540
Extras to Date $19,312.64 $64,580.00 $0.00 $0.00
$83,892.64 59
Credits to Date
Pending Change Orders (in M&C Process)
I
Contract Cost to Date $2,674,767.64 ��1,3851138.00 1 $530"877.00 $490,533.00 '
Amount Proposed Change Order $7,,000.00 0.00
$51081,315.64 599
�7 000.00
of J-�10,359.75 I $'VV�`�59.75
)
11
Revised Contract Amount $2 b8'1,767.6�4
1,374,778.251 $5 � 236.74
` $4y0,533.06
$5,1,3'i5.6 •610
Original Funds Available for Change Orders � 46,050.00
$101,829.00
�0.00
I $24,527.00
�272,406.00
Remaining Funds Available for this CO $126,737.36
$37,249.00
$0.00
$24,527.00
�188,513.36
Additional Funding (if necessary)
I
CHANGE ORDERS to DATE (INCLUDING THIS ONE) AS % OF ORIGINAL CONTRACT
1.82%
MAXALLOWABLE CONTRA CTA MOUNT (ORIGINAL CONTRACTCOST+ 25%) $6,246,778.75
JUSTIFICATION (REASONS) FOR CHANGE ORDER
Change Order No. 3 primarily provides for the following on the project:
• Additional water services and meter connections.
• Additional manhole adjustments with and without concrete collars.
• Removing and replacing seven (7) watertight gasket manhole rings & covers with hinged rings & covers.
• Additional hydromulch, topsoil, block sod that was not anticipated at the time of project bid.
• The deletion of pay item quantities that are no longer needed on the project.
Staff concurs with the contractors request for 11 additional calendar days for the change order.
It is understood and agreed thatthe acceptance of this Change Order bythe contractor constitutes an accord and satisfaction and represents
payment in full (both time and money) for all costs arising out of, or incidental to, the above Change Order.
Contractor's Company Name
Contractor Name
Contractor Signature
Date
Jackson Construction, Ltd.
Carmen Estep
6061
06/13/2025
Inspector
Date
Project Manager
Date
9�w?ec�ps"
06/23/2025
06/26/2025
Director (Water Dept)
Date
Construction Supervisor (TPW Dept)
Date
aT� T.S.
Christopher H der (Jun 30, 2025 09:53 CDT)
06/30/2025'
-
06/26/2025
Date
Assistant City Manager
Date
07/10/2025 v 07/14/202
Douglas Black (Ju110. 202523:04 CDT)
M&C Number I N/A I
M&C Date Approved
N/A OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
FORT WORTH City of Fort Worth
Change Order Additions
Project Name Water & Sanitary Sewer Replacement Contract 2019, WSM-O Part 1 City Sec No.: 60069
Project No.(s):I 56002-0600430/0700430/5740010-103381-001780 1 DOE No. N/A City Proj. No.: 103381-1
Project Description) Water and Sewer Lines Replacement and Pavement Improvements
Contractor' Jackson Construction, Ltd.
I Change Order: F3 ]
Date:) 6/12/2025
City Project Mgr.
Aaron Nivone
City Inspector
I Byron McDonald
ADDITIONS
ITEM I DESCRIPTION I
DEPT I
Qty (Unit
IUnitCost
Total
1.066 3312.2002 1" Water Service by bore (John T White Road Assessment Tap VA
Unit I Water
1.00 EA
$4,000.00
$4,000.00
1.069 3312.2201 2" Water Service, Meter Reconnection
Unit I Water
2.00 EA
$1,500.00
$3,000.00
3305.0112 Remove and Replace seven (7) watertight gasket manhole rings
Unit llASewer
1.00 LS
$25,774.55
$25,774.55
2A.063 & covers with hinged manhole rings & covers
213.032 Stabilize Existing Oncor Power Pole
Unit 116 Sewer
2.85 EA
$3,635.00
$10,359.75
3.011 3212.0302 2" Asphalt Pvmt Type D (25/25/50)
Unit III Paving
2600.00 SY
$19.00
$49,400.00
3.026 3291.0100 Topsoil (25/25/50)
Unit III Paving
138.00 CY
$70.00
$9,660.00
3.027 3292.0100 Block Sod Placement (25/25/50)
Unit III Paving
654.00 SY
$9.00
$5,886.00
3.028 3305.0107 Manhole Adjustment, Minor W/ Concrete Collar (50/50)
Unit III Paving
12.50 EA
$1,500.00
$18,750.00
3.033 3305.0107 Manhole Adjustment (Minor), No Concrete Collar
Unit III Paving
1.00 EA
$1,440.00
$1,440.00
3.034 3292.0400 Seeding, Hydromulch (25/25/50)
Unit III Paving
7432.00 SY
$5.00
$37,160.00
I
Unit I Water
$7,000.00
Unit llASewer
$25,774.55
Unit 116 Sewer
$10,359.75
Unit III Paving
$122,296.00
Additions Sub Total
$165,430.30
FORT WORTH City of Fort Worth
_~�
Change Order Deletions
Project Namel Water & SanitarySewer Replacement Contract 2019, WSM-O Part 1
CitySec No.:
1 60069 l
Project No.(s):1 56002-0600430/0700430/5740010-103381-001780
DOE
No.1 N/A
City Proj. No.:
l 103381-1
Project Description) Water and Sewer Lines Replacement and Pavement Improvements
1
Contractorl Jackson Construction, Ltd.
1 Change Order:
Date:1 6/12/2025 l
City Project Mgr.I Aaron Nivone I
City Inspector
l Byron McDonald
1
DELETIONS
Qty Unit
Unit Cost
Tota
2A.045 3305.0203 Imported Embedment/Backfill,CLSM
�Unit IIASewer
144.537 Cy
$250.00
$36,134.30
3.002 0241.0401 Remove Concrete Drive (25/25/50)
Unit III Paving
354.000 SF
$5.00
$1,770.00
3.003 0241.1300 Remove Conc Curb & Gutter (25/25/50)
Unit III Paving
202.000 LF
$12.00
$2,424.00
3.008 3123.0101 Unclassified Street Excavation (25/25/50)
Unit III Paving
50.000 Cy
$62.00
$3,100.00
3.013 3212,0401 HMAC Transition (25/25/50)
Unit III Paving
10.000 TN
$350.00
$3,500.00
3.015 3213.0401 6" Concrete Driveway (25/25/50)
Unit III Paving
442.000 SF
$17.00
$7,514.00
3.016 3216.0101 6" Conc Curb and Gutter (25/25/50)
Unit III Paving
202.000 LF
$100.00
$20,200.00
3.017 3216.0301 7" Conc Valley Gutter, Residential (25/25/50)
Unit III Paving
20.000 Sy
$200.00
$4,000.00
3.018 3217.0113 Thermoplastic Contrast Markings - 6" Dashed (W)
Unit III Paving
3580.000 LF
$5.00
$17,900.00
3.019 3217.0203 8" SLD Pvmt Marking Tape (W) -Thermoplastic Contrast
1Unit III Paving
28.6251LF
$8.00
$229.00
3.020 3217.0502Thermoplastic Contrast Markings -24"Crosswalk
I Unit III Paving
75.0001LF
1 $23.00
$1,725.00
3.031 13305.0108 Miscellaneous Utility Irrigation (50/50)
1Unit III Paving 1
0.49671LS
1 $20,000.00
$9,934.00
3.032 19999.1001 Construction Allowance
(Unit III Paving 1
1.0001LS
1 $50,000.00
$50,000.00
Unit I
Water
$0.00
Unit IIA
Sewer
$36,134.30
Unit 116
Sewer
$0.00
Unit III
Paving
$122,296.00
Deletions
Sub Total
$158,430.30
M/WBE Breakdown for this Change Order
MWBE Sub I Type of Service I Amount for this CO
Total $0.00
Previous Change Orders
co # DATE I AMOUNT
Total 1 $0.00 I
6/12/2025
Water & Sanitary Sewer Replacement Contract 2019, WSM-O Part 1
CSC: 60069
CPN 103381-1
Change Order 3 Notes
Staff has reviewed the requested prices and days and considers them to be fair and
reasonable.
Contract Compliance Manager
By signing I acknowledge that I am the person responsible
for the monitoring and administration of this contract, including
ensuring all performance and reporting requirements.
Digitally signed by Aaron Nivone
Date: 2024.11.13 10:17:28-06'00'
Signature
Aaron Nivone
Name of Employee
Professional Engineer
Title
ATTEST:
Jannette S. Goodall
City Secretary
400voR4b
a�. � �o►;T �aad
od
a9a°a
Ov8 0=0
as a
� �'EXASo4
QbIlnuod'�'
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX