Construction Allowance Request
Project Name I Keller Hicks - Lauren Way to US 377 I City Sec # I 60585
Client Project #(s)I 100146
Project Keller Hicks - Lauren Way to US 377 - Roadway, Drainage, Illumination and Traffic Improvements
Description
Contractorl McMahon Contracting, LP I CA#I 10 I Datel 7/7/2025
City Project Mgr.I Mitch Alton I City Inspectorl Curtis Hollingsworth
UNIT or DEPT
Original Contract Amount
Extras to Date
Credits to Date
Current Contract Amount
Amount of Proposed Allocation
Original Allowance Available to Allocation
Allowance Funds Previously Allocated
Revised Allowance Balance
Unit I - CFW
$5,685,582.88
Unit II - Keller
$1,041,186.09
Unit III - Signal
$477,855.28
I Totals
$7,204,624.25
$5,685,582.88
$1,041,186.09
1 $477,855.28
$7,204,624.25
8,684.91
$0.00
$0.00
1 sro-0--
8,684.91
200,000.00
176,219.59
$200,000.00
$176,219.59
$15,095.50
$0.00
$0.00
$0.00
$15,095.50
JUSTIFICATION (REASONS) FOR CONSTRUCTION ALLOWANCE
IN ACCORDANCE WITH THIS CONSTRUCTION ALLOWANCE REQUEST, THE CONTRACT SHALL:
A car accident at the Keller Hicks and Katy intersection resulted in necessary replacement of a Pedestrian Signal Pole. This Construction
Allowance request authorizes adding a pay item for the contractor to remove the existing signal pole and repair the anchor bolts on the foundation
The contractor has proposed to do the work for $2,000.00/EA. On Unit Price contract CSC 59040, Signal pole removals were bid at a cost of
$2,000.00/EA. Staff deems the price reasonable. This construction allowance will also authorize the overrun of existing Item 145 Furnish/Install
Ped Signal Head Assembly, Item 146 Furnish/Install Audible Pedestrian Pushbutton Station and Item 164 Furnish/Install 10'-20' Ped Pole
Assembly by 1 EA to replace the necessary items.
It is understood and agreed that the acceptance of this Construction Allowance Request by the contractor constitutes an accord and
satisfaction and represents payment in full (both time and money) for all costs arising out of, or incidental to, the above Construction
Allowance Request. The Project/Program Manager signing below acknowledges that he/she is the person responsible for the monitoring and
administration of this contract, including ensuring all performance and reporting requirements.
McMahon Contracting, LP IChris Young
07/08/25
Inspector/inspection Supervisor
Wate
Project and Contract Compliance Manager
07/07/25
AGht qhi --
07/07/25
Progra
Date
07/08/25
Senior Capital Project Officer
=k�"' J
Date
07/10/25
ept)
Date
ontracting Department (Dept)
Date
�0"—
07/10/25
44_
07/10/25
Date
lAssistant City Manager
Date
�,..�. Za„
07/11/25
07/17/25
nn4�
ATTEST: p o...... a
>o 0
oe9=e
Jannette Goodall, City Secret ry
aaa4��X654ga
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
Construction Allowance SUMMARY
Page 1 of 4
FORT WORTH® City of Fort Worth
Construction Allowance Additions
Project Name I Keller Hicks - Lauren Way to US 377 jty Sec # 1 60585
Client Project # 1 100146 1
Contractorl McMahon Contracting, LP I PMI Mitch Aiton I Inspectorl Curtis Hollingsworth
Construction Allowance Submittal # 10 ite 1 7/712025 1
ADDITIONS
ITEM
DESCRIPTION
DEPT
Qty
Unit
Unit Cost
1-85G
3441.2000 Remove Signal Pole
Unit I - CFW
1.0000
EA
$2,000.00
III-145
3441.1012 Furnish/Install Ped Signal Head Assembly
Unit I - CFW
1.0000
EA
$1,181.44
III-146
3441.1031 Furnish/Install Audible Pedestrian Pushbutton Station
Unit I - CFW
1.00000000
EA
$3,039.67
III-164
3441.1603 Furnish/Install 10'-20' Ped Pole Assembly
Unit I - CFW
1.00000000
EA
$2,463.80
Unit I - CFW
Unit II - Keller
Unit III - Signal
Total Additions
Total 1
$2,000.001
$1,181.441
$3,039.671
$2,463.801
1
I
1
1
I
1
$8,684.911
$0.001
$0.001
$0.001
$8,684.911
Construction Allowance Additions
Page 2 of 4
FORT WORTH. City of Fort Worth
-11*10- Construction Allowance Value
Project Name Keller Hicks - Lauren Way to US 377 City Sec # 60585
Client Project # 100146 1
Contractorl McMahon Contracting, LP I PMI Mitch Aiton Inspectorl Curtis Hollingsworth I
Construction Allowance Submittal # 10 Date 1 7/7/2025
CONSTRUCTION ALLOWANCE VALUE BEING USED
ITEM DESCRIPTION Qty Unit Unit Cost Total
Unit 1
Item 85 9999.0000 Construction Allowance 0.043425 EA $200,000.00 $8,684.91
Construction Allowance Value
3of4
M/SBE for this Construction Allowance Request
M/SBE Sub I Type of Service I Amount for this CAR
Total $0.00
Previous Construction Allowance Requests
CAR #
DATE
AMOUNT
CA #1
2/20/2024
$1,252.90
CA #2
3/25/2024
$11,747.71
CA #3
5/9/2024
$49,514.43
CA #4
6/26/2024
$13,429.22
CA #5
7/9/2024
$3,327.00
CA #6
10/11 /2024
$10,816.42
CA #7
12/4/2024
$25,963.20
CA #8
2/18/2025
$55,714.61
CA #9
5/9/2025
$4,454.10
Total I $176,219.59
Construction Allowance MSBE Data
Page 4 of 4
KELLER HIC
1Y4
ON MA51 ARM
2i CABINET
ONTROLLER
TTERY BACKUP
NAL POLE i MAST ARM
ASE NUMBER
BRID DETECTOR
l'Z CAMERA
Iv05 DETECTION ZONE
3 ROPO5E0 CONDUIT RUN
Proposed Sign
I
® INSTALL NO RIB
TURN ON TRAI
I QI BLACK -OUT
O SIGN (36"X48").
{
Y
07 f7J4
�1N0 h CLAMP SIGN ON MAST
ARM ORAS DIRECTED
F BY ENGINEER
i ll� +19
I
I
�
C
I
ca0
I
Er,:CKGROUP
L9 EBxa91DiD Ymrgm
41DB Amon Cater Blvd.. SUI[a 206
FOR Worth. T-5 76155
WARNING TO CONTRACTOR
w�
GENE�RLNOTTE ewacrPss
KLL
0 20 40 so
A�c
gag
"ua
GRAPHIC$CALL IN FEET
n6'
F�W
�i
�aGBONNA IBUI AYARIKWU/
rl 95267 k
�.%�y
Ttls'�[QW1L Etf'�
1waBrzozz
6 6
� � W
¢
1
ECT ND.: K-2T19 REYRNINe NO.: p
. Na: Pry ND.' 1001ue K
WATER PRaw Ne
WATER BASE MAP Ne. POT2-0YO �M 6PoZJJ Y
SEWER BASE MAP No.20T2-0YO U
CITY OF FORT WORTH, TEXAS
TRANSPORTATION AND PUBLIC WORKS DEPT.
Y
ARTERIAL ROADWAY IMPROVEMENTS 66
1
KELLER HICKS ROAD z
IFROM LAURHN WAY TO US 37) I
7
C
TRAFFIC SIGNAL LAYOUI m
p
TBPERe'4151
2A2t WF5T?TN 87, SUITE 00 ¢
H WORTH, TIX45 7B1o7
Mlle®LTwTCC�! lem en-ssn
rnew.
s�erru
K-2799
T1.04 �
c am, a
a
FORT WORTH.
Routing and Transmittal Slip
Transportation & Public Works
Department
DOCUMENT TITLE: Keller Hicks CA #10
M&C: N/A CPN: 100146 CSO: 60585
Date: 7/1/2025
To:
Name
1.
Jessica Rodriguez
2.
Mitch Aiton
3.
Chris Young
4.
Curtis Hollingsworth - Inspector
5.
Raul Lopez
6.
Lissette Acevedo
7.
Patricia Wadsack
8.
Lauren Prieur
9.
Doug Black
10.
Jesica McEachern
11.
Jannette Goodall
12.
TPW Contracts
Department
Initials
TPW - Review
R 1�1
TPW - Signature
A1Q
McMahon - Signature
TPW - Signature
1}:
;=„0,7" lingsworth
TPW - Signature
TPW — Signature
TPW — Signature
A
TPW — Signature
Xxv
Lauren Prieur
Legal — Signature
�oug�Black
CMO — Signature
CK
CSO - Signature'"
ooa
DOC#: N/A
Date Out
07/07/25
07/07/25
07/08/25
07/07/25
07/08/25
07/10/25
07/10/25
07/10/25
07/11/25
07/17/25
07/17/25
CC: Program Manager, Sr. CPO, TPW BSPAP Recon Team, TPW Records Room, TPW
Contracts
DOCUMENTS FOR CITY MANAGER'S SIGNATURE: All documents received from any and all
City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE
APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review
and take the next steps.
NEEDS TO BE NOTARIZED: DYES ®No
RUSH: DYES ®No SAME DAY: DYES ®No NEXT DAY: DYES ®No
ROUTING TO CSO: ®YES ❑No
Action Required: ❑ Attach Signature, Initial and Notary Tabs
❑ As Requested
® For Your Information
® Signature/Routing and or Recording
® Comment
❑ File
Return To: Please notify TPWContracts(afortworthtexas.gov for pickup when complete. Call ext.
7233 or ext. 8363 with questions. Thank you!