SPECIFICATIONS AND CONTRACT DOCUMENTS
MISCELLANEOUS STORM DRAIN IMPROVEMENTS
CONTRACT 2011
PROJECT NUMBERS:
CITY PROJECT NO. -01635
TPW -PE69 539120 0209203
PREPARED: OCTOBER 2010
MIKE MONCRIEF
MAYOR
Off ,Cl.I\ RECO RD
CITY SECRE RY
FT. WOH.'fH, TX
DALE FISSELER, P .E.
CITY MANAGER
1.
M&C Review Page 1 of 2
Official site of the City of Fort Worth, Texas
CITY COUNCIL AGENDA
FORT WORTH -...,..---
COUNCIL ACTION: Approved on 3/22/2011 -Ord. No. 19612-03-2011
DATE:
CODE:
3/22/2011 REFERENCE NO.: C-24803
C TYPE: NON-
CONSENT
LOG NAME:
PUBLIC
HEARING:
20SWM-M ISCSTORM-
2011
NO
SUBJECT: Authorize Execution of a Contract with the Lowest Responsive and Responsible Bidder,
Tri-Tech Construction, Inc., in an Amount Up to $2,000,000.00 for the Miscellaneous
Storm Drain Improvements Contract-2011 and Adopt Appropriation Ordinance (ALL
COUNCIL DISTRICTS}
RECOMMENDATION:
It is recommended that the City Council :
1. Authorize the City Manager to execute a Contract with the lowest responsive and responsible
bidder, Tri-Tech Construction, Inc., in an amount up to $2 ,000,000 .00 for Miscellaneous Storm Drain
Improvements Contract-2011;
2. Authorize the transfer of $1,500,000.00 from the Storm Water Utility Operating Fund to Storm
Water Capital Projects Fund; and
3. Adopt the attached supplemental appropriation ordinance increasing estimated receipts and
appropriations in the Storm Water Capital Projects Fund in the amount of $1,500,000 .00 from
available funds .
DISCUSSION:
The Storm Water Management program was established to reduce flooding in Fort Worth, preserve
streams, minimize water pollution and to operate the storm water system in a more effective manner
to fully comply with state and federal regulatory requirements . This will be accomplished by
infrastructure reconstruction and system maintenance , master planning, enhanced development
review and increased public education and outreach.
The $1,500,000.00 authorized for transfer, per this M&C will be combined with existing funding to fully
fund the contract plus the funds necessary for right-of-way and easement acquisition, inspection and
survey services.
The work to be performed under this Contract consists of minor extensions, replacements and/or
improvements to existing storm water systems and other pertinent construction required to provide a
more effective drainage system to neighborhoods within the City limits of Fort Worth. There is not a
pre-defined single project scope for this Contract, but rather work orders will be issued on the
Contract as needs arise. The price of each work order will be based on the unit prices bid with the
cumulative amount of all work orders issued under this Contract capped at $2 ,000 ,000 .00. This
contracting tool will enhance the City's responsiveness to minor drainage infrastructure needs that
arise periodically by precluding the need to conduct an independent solicitation and award process
for each small project.
The bid amounts cited below were based on hypothetical quantities for the purpose of establishing
unit prices for each work item. The bid specifications stipulate that regardless of the dollar amount
bid, the Contract would be awarded in an amount up to $2,000 ,000.00. Final payments will be made
based on actual measured quantities . Funding will be verified individually for each work order prior to
its release. The bid documents do not include provisions for the City to exercise renewal options.
http://apps.cfwnet.org/council_packet/mc_review.asp?ID=l4820&councildate=3/22/2 011 3/24/2011
M&C Rev iew Page 2 of2
This Contract was advertised for bid in the Port Wo rth Star-Telegram on November 18, 2010, and
November 25, 2010. On December 16, 2010, the following bids were received:
Bidders
Conatser Contstruction TX, LP*
Tri-Tech Construction, Inc.
City Staff Probable Cost
Bid Amount
$2,387,300.00
$3,115,550.00
$3,392,880.00
Time of Contract
365 Calendar Days
* Conatser Construction TX, LP, has been determined to be non-responsive to the specifications and
contract documents due to the fact that they failed to complete the proposal in its entirety. Therefore,
staff recommends the Contract be awarded to the lowest responsive and responsible bidder, Tri-Tech
Construction, Inc.
M/WBE -Tri-Tech Construction, Inc., is in compliance with the City's M/WBE Ordinance by
committing to 17 percent M/WBE participation. The City's goal on this Contract is 16 percent.
In addition to the cost of construction, $300,000.000.00 is required for right-of-way and easement
acquisition , inspection and survey services.
This Contract is located in ALL COUNCIL DISTRICTS.
FISCAL INFORMATION/CERTIFICATION:
The Financial Management Services Director certifies that upon approval of the above
recommendations and adoption of t he attached supplemental appropriation ordinance, funds will be
available in the current capital budget, as appropriated, of the Storm Water Capital Projects Fund and
the Storm Water Capital Projects Bond 2009 Fund.
TO Fund/Account/Centers
2.}
P228 541200 201280163583
12.)_
P228 476069 201280163583
$1 .500.000.00
$1 .500.000.00
Submitted for City Manager's Office by:
Originating Department Head:
Additional Information Contact:
ATTACHMENTS
20$WMM1SC$TO RM20llAO .d oc
FROM Fund/Account/Centers
1) PE69 538040 0209203 $1 .500.000 .00
fil
P228 541200 201280163583 $1,500 .000.00
fil
P227 541200 201280163583
Fernando Costa (6122)
Greg Simmons (7862)
Johnny T. Jasper (7343)
$500.000 .00
http://apps.cfwnet.org/council _packet/me _review .asp ?ID= 14820&councildate=3/22/2011 3/24/2011
t ;
139.
CITY OF FORT WORTH
DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS
STORM WATER MANAGEMENT DIVISION
ADDENDUM NO. 1
MISCELLANEOUS STORM DRAIN IMPROVEMENTS -2011
PROJECT NUMBERS:
RELEASE DATE: November 18 , 2010
CITY PROJECT NO.· 01635
TPW -PE69 539120 0209203
BID RECEIPT DATE: 1:30 PM , December 16, 2010
INFORMATION TO BIDDERS :
The Specifications and Contract Documents for the above mentioned project are revised and amended as
follows :
1. Bid Item 117 Adjust Sewer Main Line delete the words "All sizes" replace with 8"
2. Bid Item 118 Adjust Water Main Line delete the words "All sizes" replace with 8"
Clarification :
Bid item 120 is for using existing fence material. Not to be confused with bid Items 136 & 137 for NEW
fences .
2. Current standard detail for embedment is being revised and will be approved during the time of this
contract. Therefore please keep in mind the following changes :
a. Embedment for RCP shall include rock to the top of the pipe or box, cover with filter fabric , then
native material placed and compacted for depth of sub-grade for width of trench.
b. Embedment for Single or Multi-Barrel Boxes shall include rock placed along the sides of the box up
to the top for the width of the trench . Then native material shall be placed and compacted to fill in the
remainder trench to the sub -grade .
Embedment is a NON-PAY ITEM and is subsidiary to pipe and box installation .
Add the following bid Item
1 TON Cast Iron I Ductile Iron Water Main fittings 4"-
16" Diameter -Install
Per Ton:
(l.;vc-1/;6',t.J, ~ollars
and ~4' Cents
s 5P'?.DD sS.{)d).oo r i
Th is Addendum No . 1 forms a part of the Contract Documents referenced above and modifies the Original
Contract Documents and Plans . Acknowledge receipt of th is Addendum in the space provided below , in the
Proposa l and acknowledge receipt on the outer enve lope of your bid. Fa ilure to acknowledge receipt of this
Addendum could subject the bidder to be rejected as being non-responsive .
By :
NT OF TRANSPORTATION AND PUBLIC WORKS
r -;:;c:::ant:n-:-t.tt::n::::::. ~==-------
Fielcj Engine g Manger
Department of Transportation and Public Works/
Storm Water Management
TABLE OF CONTENTS
1. Notice to Bidders
2. Special Instructions to Bidders
3. Proposal
4. Vendor Compliance
5. Minority and Women Business Enterprises Specifications
6. Prevailing Wage Laws and Rates
7. Special Provisions
8. Project Sign and Details
9. Contractor Compliance with Worker's Compensation Law
10. Certificate of Insurance
11. Maintenance Bond
12. Payment Bond
13. Performance Bond
14. Contract
- 1 -
NOTICE TO BIDDERS
NOTICE TO BIDDERS
Sealed proposals fo r the following :
FOR: MISCELLANEOUS STORM WATER IMPROVEMENTS-2011
Project Numbers :
TPW -PE69 539120 0209203
CITY PROJ . NO. -01635
Bids should be addressed to Purchasing Division of the City of Fort Worth , Texas and will be received at
the Purchasing Office until 1 :30 PM, Thursday, December 16, 2010 and the n public ly opened and read
aloud at 2:00 PM in the Counc il Chambers .
Specifications and Contract Documents for this project may be viewed free of charge at the City of Fort
Worth 's online document management system (Buzzsaw). A link to this system can be found on the City
of Fort Worth 's Purchasing Division website at http://www.fortworthgov.org/purchasing/. Th is link will take
you to t he advertised project folders on the City's Buzzsaw site , where the specifications and contract
documents may be viewed , downloaded , and printed.
Bid security is required in accordance with the Special Instruction to Bidders .
Bidders are hereby informed that the Director of the Department of Transportation and Public Works
reserves the right to evaluate and recommend to the City Council the best bid that is considered to be in
the best interest of the City.
The City reserves the right to reject any and/or all bids and waive any and/or all irregularities. No bid may
be withdrawn until the expiration of ninety (90) days from the date the M/WBE UTILIZATION FORM,
PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM ("Documentation ") as
appropriate is received by the City. The award of contract, if made , will be within ninety (90) days after this
documentation is received , but in no case will the award be made until the responsibility of the bidder to
whom it is proposed to award the contract has been verified .
Bidders are responsible for obtaining all Addenda to the contract documents and acknowledging receipt of
the Addenda by initialing the appropriate spaces on the PROPOSAL form. Bids that do not acknowledge
receipt of all Addenda may be rejected as being non-responsive . Information regarding the status of
Addenda and the Project Engineer's estimate may be obtained by contacting the Division of the Storm
Water Management at (817) 392-7343 .
Bidders shall not separate, detach or remove any portion, segment or sheets from the contract document
at any time . Bidders must complete the proposal section(s) and submit the complete specifications book
or face rejection of the bid as non-responsive . It is recommended that the bidder make a copy of the forms
included in the Minority and Women Business Enterprise section for submittal within the time -line stated
below or the bidder may request a copy of said forms from the City Project Manager named in this
solicitation .
In accord with City of Fort Worth Ordinance No . 15530 , the City of Fort Worth has goals for the
participation of minority business enterprises and women business enterprises in City contract. A copy of
the Ordinance can be obtained from the Office of the City Secretary. The bidder shall submit the
MBE/WBE UTILIZATION FORM, PRIME CONTRACTOR WAIVER FORM and/or the GOOD FAITH
EFFORT FORM ("Documentation ") as appropriate. The documentation must be rece ived no later than
5 :00 PM, five (5) City bus iness days after the bid opening date . The bidder shall obtain a receipt from the
appropriate employee of the managing department to whom delivery was made. Such receipt shall be
evidence that the documentation was received by the City . Failure to comply shall render the bid
non responsive.
For additional information, contact Johnny T. Jasper at (817) 392-7343
DALE FISSELER, P.E .
CITY MANAGER
William Verkest, P.E.
Director, Department of Transportation and Public Works
Advertising Dates:
November 18, 201 O
November 25, 201 O
MARTY HENDRIX
CITY SECRET ARY
esney, P.E.
, Storm Water Management
- 2 -
SPECIAL INSTRUCTIONS TO BIDDERS
SPECIAL INSTRUCTIONS TO BIDDERS
1. BID SECURITY: Cashier's check or an acceptable bidder's bond payable to the City of Fort Worth, in an
amount of not less than 5 percent of the largest possible total of the bid submitted must accompany the bid , and is
subject to forfeit in the event the successful bidder fails to execute the contract documents within ten days after
the contract has been awarded.
To be an acceptable surety on the bid bond , the surety must be authorized to do business in the state of Texas.
In addition , the surety must (1) hold a certificate of authority from the Untied States secretary of the treasury to
qualify as a surety on obligations permitted or required under federal law ; or (2) have obtained reinsurance for any
liability in excess of $100,000 from a reinsurer that is authorized and admitted as a reinsurer in the state of Texas
and is the holder of a certificate of authority from the Untied States secretary of the treasury to qualify as a surety
on obligations permitted or required under federal law. Satisfactory proof of any such reinsurance shall be
provided to the City upon request. The City, in its sole discretion , will determine the adequacy of the proof
required herein.
2. PROPOSAL: After proposals have been opened and read aloud, the proposals will be tabulated on the basis
of the quoted prices , the quantities shown in the proposal, and the application of such formulas or other methods
of bringing items to a common basis as may be established in the Contract Documents .
The total obtained by taking the sum of the products of unit prices quoted and the estimated quantities plus any
lump sum items and such other quoted amounts as may enter into the cost of the completed project will be
considered as the amount of the bid .
Until the award of the contract is made by the Owner , the right will be reserved to reject any or all proposals and
waive technicalities, to re-advertise for new proposals, or to proceed with the work in any manner as maybe
considered for the best interest of the Owner.
The quantities of work and materials to be furnished as may be listed in the proposal forms or other parts of the
Contract Documents will be considered as approximate only and will be used for the purpose of comparing bids
on a uniform basis. Payment will be made to the Contractor for only the actual quantities of work performed or
materials furnished in strict accordance with the Contract Documents and Plans . The quantities of work to be
performed and materials to be furnished may be increased or decreased as hereinafter provided, without in any
way invalidating the unit prices bid or any other requirements of the Contract Documents.
3. ADDENDA: Bidders are responsible for obtaining all addenda to the Contract Documents prior to the
bid receipt. Information regarding the status of addenda may be obtained by contacting the Division of
Storm Water Management at (817) 392-7343. Bids that do not acknowledge all applicable addenda will be
rejected as non-responsive.
4. AWARD OF CONTRACT: The contract, if awarded, will be awarded to the lowest responsive bidder. The
City reserves the right to reject any or all bids and waive any or all irregularities . No bid may be withdrawn until
the expiration of NINETY (90) City business days from the date that the M/WBE UTILIZATION FORM, PRIME
CONTRACTOR WAIVER FORM and/or the GOOD FAITH EFFORT FORM ("Documentation ") are received by the
City .
5. PAYMENT, PERFORMANCE AND MAINTENANCE BONDS: The successful bidder entering into a contract
for the work will be required to give the City surety in a sum equal to the amount of the contract awarded. The
successful bidder shall be required to furnish bonding as applicable in a sum equal to the amount of the contract
awarded. The form of the bond shall be as herein provided and the surety shall be acceptable to the City. All
bonds furnished hereunder shall meet the requirements of Chapter 2253 of the Texas Government Code, as
amended .
A. If the total contract pr ice is $25 ,000 or less, payment to the contractor shall be made in one lump
sum . Payment shall not be made for a period of 45 calendar days from the date the work has been
completed and accepted by the City.
If the contract amount is in excess of $25,000 , a Payment Bond shall be executed , in the amount of the
contract, solely for the protection of all claimants supplying labor and material in the prosecution of the
work.
If the contract amount is in excess of $100 ,000 , a Performance Bond shall be executed , in the amount
of the contract conditioned on the faithful performance of the work in accordance with the plans,
specifications , and contract documents. Said bond shall solely be for the protection of the City of Fort
Worth.
A Two-year Maintenance Bond is required for all projects to insure the prompt , full and faithful
performance of the general guarantee as set forth in Paragraph 7 of the Special Provis ions .
To be an acceptable surety on the performance , payment and maintenance bonds , the surety must be
authorized to do business in the state of Texas and meet all requirements of Te xas Insurance Code ,
section 7.19-1 . In addition , the surety must (1) hold a certificate of authority from the Untied States
secretary of the treasury to qualify as a surety on obligations permitted or required under federal law ; or
(2) have obtained reinsurance for any liability in excess of $100 ,000 from a reinsurer that is authorized
and admitted as a re insurer in the state of Texas and is the holder of a certificate of authority from the
Untied States secretary of the treasury to qualify as a surety on obligations permitted or required under
federal law . Satisfactory proof of any such reinsurance shall be provided to the City upon request. The
City, in its sole discretion , will determine the adequacy of the proof required herein.
No sureties will be accepted by the City that are at the time in default or delinquent on any bonds or which
are interested in any litigation against the City. Should any surety on the contract be determined
unsatisfactory at any time by the City , notice will be given to the contractor to that effect and the
contractor shall immediately provide a new surety satisfactory to the City
6. LIQUIDATED DAMAGES: The Contracto r's attention is called to Part 1 -General Provisions , Item 8 ,
Paragraph 8.6, Standard Specifications for Street and Storm Drain Construction of the City of Fort Worth,
Texas , concerning liquidated damages for late completion of projects except as modified by these
specifications.
7. EMPLOYMENT AND NON-DISCRIMINATION: The Contractor shall not discriminate against any person(s)
because of sex, race, religion, color or national origin and shall comply with the provisions of sections 13A-21
through 13A-29 of the Code of the City of Fort Worth (1986), as amended , prohibiting discrimination in
employment practices.
8. WAGE RATES: All bidders will be required to comply with provision 5159a of "Vernons Annotated Civil
Statutes" of the State of Texas with respect to the payment of prevailing wage rates as established by the City
of Fort Worth, Texas, and set forth in Contract Documents for this project.
9. FINANCIAL STATEMENT: A current certified financial statement may be required by the Director of the
Department of Transportation and Public Works for use by the City in determining the successful bidder. This
statement , if required, is to be prepared by an independent Public Accountant holding a valid permit issued by
an appropriate State Licensing Agency .
10. INSURANCE: Within ten days of receipt of notice of award of contract , the Contractor must provide , along
with executed contract documents and appropriate bonds, proof of insurance for Workers Compensation
(statutory); Comprehensive General Liability ($1 ,000 ,000 per occurrence, $2 ,000 ,000 aggregate); and
Automobile Insurance ($1,000 ,000 each accident on a combined single bas is or $250 ,000 property
damage/$500,000 bodily injury per person per occurrence. A commercial business policy shall provide
coverage on "any auto ", defined as autos owned , hired, and non-owned). Additional lines of coverage may be
requested . If such a request is made after bid opening , Contractor shall be entitled to additional
compensation equal to 110% of the additional premium cost. For worker's compensation insurance
requirements , see Special Instructions to Bidders -Item 16.
11. ADDITIONAL INSURANCE REQUIREMENTS:
A . The City , its officers , employees and servants shall be endorsed as an additional insured on Contractor's
insurance policies excepting employer's liability insurance coverage under Contractor's workers'
compensation insurance policy.
B. Certificates of insurance shall be delivered to the City of Fort Worth , contract administrator in the
respective department as specified in the bid documents, 1000 Throckmorton Street, Fort Worth, TX 76102 ,
prior to commencement of work on the contracted project.
C. Any failure on part of the City to request required insurance documentation shall no t constitute a waiver of
the insurance requ ireme nts specified herein.
D. Each insurance policy shall be endorsed to provide the City a minimum thirty days notice of cancellation,
non-renewal, and/or material change in policy terms or coverage . A ten days notice shall be acceptable in the
event of non -payment of premium .
E. Insurers must be authorized to do business in the State of Texas and have a current AM . Best rating of
A: VII or equivalent measure of financial strength and solvency.
F. Deductible li mits , or self-funded retention limits, on each policy must not exceed $10,000 .00 per
occurrence unless otherwise approved by the City .
G . Other than worker 's compensation insurance , in lieu of tradi ti onal insurance, City may consider alternative
coverage or risk treatment measures through insurance pools or risk retention groups. The City must approve
in writing any alternative coverage.
H. Workers' compensation insurance policy(s) covering employees employed on the project shall be
endorsed with a waiver of subrogation providing rights of recovery in favor of the City.
I. City shall not be responsible for the direct payment of insurance premium costs for contractor's insurance .
J . Contractor's insurance policies shall each be endorsed to provide that such i nsurance is primary
protection and any self-funded or commercial coverage maintained by City shall not be called upon to
contribute to loss recovery.
K. In the course of the project, Contractor shall report, in a timely manner, to City's officially designated
contract administrator any known loss occurrence which could give rise to a liability claim or lawsuit or which
could result in a property loss.
L. Contractor's liability shall not be limited to the specified amounts of insurance required herein.
M. Upon the request of City, Contractor shall provide complete copies of all insurance policies required by
these contract documents.
12. NON-RESIDENT BIDDERS: Pursuant to Texas Government Code, art. 2252 .002 , the City of Fort Worth will
not award this contract to a non-resident bidder unless the non-resident's bid is lower than the lowest bid
submitted by a responsible Texas resident bidder by the same amount that a Texas resident bidder would be
required to underbid a non-resident bidder to obtain a comparable contract in the state in which the non-
resident's principal place of bus iness is located.
"Non-resident bidder" means a bidder whose principal place of business is not in this state, but excludes a
contractor whose ultimate parent company of majority owner has its principal place of business in this state .
"Texas resident bidder" means a bidder whose principal place of business is in th is state , and includes a
contractor whose ultimate parent company or majority owner has its principal place of business in this state .
This provision does not apply if the project is funded in whole or in part with federal funds .
The appropriate blanks of the Proposal must be filled out by all non-resident bidders in order for its bid to
meet specifications. The failure of a non-resident contractor to do so will automatically disqualify that bidder.
13. MINORITY/WOMEN BUSINESS ENTERPRISE: In accordance with City of Fort Worth Ordinance No. 13550 ,
the City of Fort Worth has goals for the participation of minority business enterprises and women business
enterprises in City contracts. You may obtain a copy of the Ord inance from the Office of the City Secretary.
The M/WBE Utilization Form , Prime Contractor Waiver Form and the Good Faith Effort Form, as appl icable ,
must be submitted no later than 5 :00 p. m. five (5) City business days after the bid opening date , exclusive of
the bid opening date . The bidder shall submit the documentation at the reception area of the Department of
Transportation and Public Works ("Managing Department"), 2nd floor, City Hall , and shall obtain a receipt.
Failure to comply shall render your bid non-responsive.
Upon contract execution between the City of Fort Worth and the successful bidder , now known as Contractor ,
a pre-construction meeting will be scheduled at which time the Contractor is required to submit either Letters
of Intent or executed agreements with the M/WBE firm(s) to be utilized on this project. Such Letters of Intent
or executed agreements shall include the following information :
1 . Name of Contract
2. Name of M/WBE firm ut ilized
3 . Scope of Work to be performed by the M/WBE firm
4. Monetary amount of work to be performed by the M/WBE firm
5 . Signatures of all parties
A notice to proceed will not be issued until the signed letter(s) or executed agreement(s) have been
received.
Throughout the duration of this project , the Contractor comply with the M/WBE Ordinance by complying with
the following procedures :
A M/WBE Participation Report Form must be submitted monthly until the contract is completed. The first
report will be due 30 days after commencement of work . The monthly report MUST have an original
signature to ensure accountability for audit purposes .
Reports are to be submitted monthly to the M/WBE Office, regardless of whether or not the M/WBE firm has
been utilized. If there was no activity by an M/WBE in a particular month , place a "O" or "no participation" in
the spaces provided , and provide a brief explanation.
The Contractor shall provide the M/WBE Office proof of payment to the M/WBE subcontractors and suppliers
only. The M/WBE Office will accept the following as proof of payment:
1. Copies of submitted invoices with front and back copies of canceled check(s), OR
2. A notarized letter explaining, in detail:
a Subcontractor/supplier Scope of Work
b. Date when services were received from subcontractor/supplier
c. Amounts paid to the subcontractor/supplier
d. Original signatures from both parties must be included on this letter.
If the Contractor foresees a problem with submitting participation reports and/or proof of payment on a
monthly basis, the M/WBE Office should be notified.
If the Contractor wishes to change or delete an M/WBE subcontractor or supplier, adhere to the following:
1. Immediately submit a Request for Approval of Change Form to the M/WBE Office explaining the
request for the change or deletion .
2. If the change affects the committed M/WBE participation goal, state clearly how and why in
documentation.
a. All requests for changes must be reviewed and pre-approved by the M/WBE Office .
b. If the Contractor makes change(s) prior to approval, the change will not be considered when performing a
post compliance review on this project.
Upon the Contractor's successful completion of this project, and within ten days after receipt of final payment
from the City of Fort Worth, The Contractor will provide the M/WBE Office with a Final Participation Report
Form to reflect the total participation from ALL subcontractors/suppliers utilized on the project.
All forms are available at the M/WBE Office, 1150 South Freeway, Fort Worth, TX. For additional information
regarding compliance to the M/WBE Ordinance, call (817) 212-2674.
Upon request, Contractor agrees to provide to Owner Complete and accurate information regarding actual
work performed by a Minority/Women Business Enterprise (M/WBE) on the contract and payment therefore .
Contractor further agrees to permit an audit and/or examination of any books, records or files in its
possession that will substantiate the actual work performed by an M/WBE. The misrepresentation of facts
(other than a negligent misrepresentation) and/or the commission of fraud by the Contractor will be grounds
for termination of the contract and/or initiating action under appropriate federal, state or local laws or
ordinances relating to false statements; further, any such misrepresentation (other than a negligent
misrepresentation) and/or commission of fraud will result on the Contractor being determined to be
irresponsible and barred from participating in City work for a period of time of not less than three years .
14. AMBIGUITY: In case of ambiguity or lack of clearness in stating process in the proposal, the City reserves
the right to adopt the most advantageous construction thereof or to reject the proposal.
15. PAYMENT, FINAL PAYMENT PROJECT ACCEPTANCE AND WARRANTY: Because of the unique
nature of this contract, section 9. 7 of the Standard Specifications for Street and Storm Drain Construction
shall not apply and shall be superseded by the following:
Whenever the improvements prescribed by an individual Work Order have been completed , the Contractor
shall notify the Project Engineer or representative. The Project Engineer or other appropriate official of the
Owner will, within a reasonable time, perform the inspections. If such inspection reveals that the
improvements are in an acceptable condition and have been completed in accordance with the terms of the
Contract Documents and all approved modifications thereof, the Project Engineer will recommend acceptance
of the work under that particular Work Order and recommend payment therefore .
If the Project Engineer finds that the work has not been completed as required, the Contractor shall be
advised in writing and will be furnished with an itemized list of all known items that have not been completed
or which are not in an acceptable condition. When the Contractor has corrected all such items, he shall again
notify the Project Manager that the improvements are ready for inspection, and the Project Engineer shall
proceed as outlined above.
Whenever the improvements prescribed by the individual Work Order have been completed and all
requirements of the Contract Documents have been fulfilled on the part of the Contractor as to that Work
Order , an estimate showing the value of the work will be prepared by the Project Engineer as soon as the
necessary measurements , computations, and checks can be made .
The amount of the estimate w ill be paid to t he Contractor after acceptance by the Transportation and Public
Works Director, provided the Contractor has furnished to the Owner satisfactory evidence of payment as
follows: Prior to submiss ion of the estimate for payment , the Contractor shall execute an affidavit, as
furnished by the City , certifying that all persons , firms , associations , corporations, or other organizations
furnishing labor and/or materials under that Work Order have been paid in full , that the wage scale
established by the City Council in the City of Fort Worth has been paid , and that the re are no claims pending
for personal injury and/or property damages.
The acceptance by the Contractor of the individual payment as aforesaid shall operate as and shall release
the Owner from all claims or liabil ities under the Contract for anything done or furnished or relating to the work
under that Work Order or any act or neglect of said City relating to or co nnected with the Contract.
The making of the payment by the Owner shall not relieve the Contractor of any guarantees or other
requirements of the Contract Documents that specifically continue thereafter .
For purposes of this section, the Work Order shall be deemed complete and accepted by the City as of the
date the punch list for the particular Work Order has been completed , as evidenced by a written statement
signed by the contractor and the City. The warranty period shall begin as of the date that the final punch list
for the particular Work Order has been completed.
16. AIR POLLUTION WATCH DAYS : The Contractor shall be required to observe the following guidelines
relating to working on City construction sites on days designated as "AIR POLLUTION WATCH DAYS ".
Typically , the OZONE SEASON , within the Metroplex area , runs from May 1, through OCTOBER 31 , with
6:00 a.m. -10 :00 a.m . being critical BECAUSE EMISSIONS FROM THIS TIME PERIOD HAVE ENOUGH
TIME TO BAKE IN THE HOT ATMOSPHERE THAT LEADS TO EARLY AFTERNOON OZONE
FORMATION ..
The Texas Commission on Environmental Quality (TCEQ), in coordination with the National Weather Serv ice,
will issue the Air Pollution Watch by 3:00 p.m . on the afternoon prior to the WATCH day. On designated Air
Pollution Watch Days, the Contractor shall bear the responsibility of being aware that such days have been
designated Air Pollution Watch Days and as such shall not begin work until 10:00 a.m. whenever construction
phasing requires the use of motorized equipment for periods in excess of 1 hour. However , the Contractor
may begin work prior to 10:00 a.m. if use of motorized equipment is less than 1 hour , or if equipment is new
and certified by EPA as "Low Emitting ", or equipment burns Ultra Low Sulfur Diesel (ULSD), diesel
emulsions , or alternative fuels such as CNG .
If the Contractor is unable to perform continuous work for a period of at least seven hours between the hours
of 7 :00 a.m. -6:00 p.m., on a designated Air Pollution Watch Day, that day will be considered as a weather
day and added onto the allowable weather days of a given month.
17. WORKERS COMPENSATION INSURANCE COVERAGE: Contractors compliance with Workers
Compensation shall be as follows:
A. Definitions:
Certificate of coverage ("certificate ") - A copy of a certificate of insurance , a certificate of authority to self-
insure issued by the comm ission, or a coverage agreement (TWCC-81 , TWCC-82 , TWCC-83 , or TWCC-
84), showing statutory workers' compensation insurance cove rage for the person's or entity employees
providing services on a project , for the duration of the project.
Duration of the project -includes the time from the beginning of the work on the project until the
contractor's/person's work on the project has been completed and accepted by the governmental entity.
Persons providing services on the project ("subcontractor" in. 406.096) -includes all persons or entities
performing all or part of the services the contractor has undertaken to perform on the project, regardless
of whether that person has employees . This includes , without limitation, independent contractors ,
subcontractors, leasi ng companies, motor carriers , owner-operators, employees of any such entity, or
employees of any entity which furnishes persons to provide services on the project. "Services " include,
without limitation, providing , hauling, or delivering equipment or materials, or providing labor,
transportation, or other service related to a project. "Services" does not include activities unrelated to the
project, such as food/beverage vendors, office supply deliveries, and del ivery of portable toilets.
B. The contractor shall prov ide coverage , based on proper reporti ng of classification codes and
payroll amounts and filing of any coverage agreements , which meets the statutory requirements of Texas
Labor Code, Section 401.011 (44) for all employees of the contractor providing services on the project, for
the duration of the project.
C . The Contractor must provide a certificate of coverage to the government-al entity prior to being
awarded the contract.
D. If the coverage period shown on the contractor's current certificate of coverage ends during the
duration of the project, the contractor must, prior to the end of the coverage period, file a new certificate of
coverage with the governmental entity showing that coverage has bee n extended.
E. The contractor shall obtain from each person providing services on a project, and provide to the
City:
(1) a certificate of coverage, prior to that person beginning work on the project, so the City will have
on file certificates of coverage showing coverage for all persons providing services on the project ; and
(2) no later than seven days after receipt by the contractor, a new certificate of coverage showing
extension of coverage , if the coverage period shown on the current certificate of coverage ends duri ng
the duration of the project.
The contractor shall retain all required certificates of coverage for the duration of the project and for one
year thereafter.
G . The contractor shall notify the governmental entity in writing by certified mail or personal delivery ,
within ten days after the contractor knew or should have known , of any change that materially affects the
provision of coverage of any person providing services on the project.
H. The contractor shall post on each project site a notice, in the text, form and manner prescribed by
the Texas Workers' Compensation Commission, informing all persons providing services on the project
that they are requ ired to be covered , and stating how a person may verify coverage and report lack of
coverage.
I. The contractor shall contractually require each person with whom it contracts to provide services
on a project, to:
(1) provide coverage , based on proper reporting on classification codes and payroll amounts and
filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code , Section
401 .011 (44) for all of its employees providing services on the project , for the duration of the project ;
(2) provide to the contracto r, prior to that person beginning work on the project , a certificate of
coverage showing that coverage is being provided for all employees of the person providing services on
the project, for the duration of the project ;
(3) provide the contractor , prior to the end of the coverage period , a new certificate of coverage
showing extension of coverage, if the coverage period shown on the current certificate of coverage ends
during the duration of the project;
(4) obtain from each other person or entity with whom it contracts , and provide to the contractor :
(a) a certificate of coverage , prior to the other person or entity beginning work on the project ; and
(b) a new certificate of coverage showing extension of coverage , prior to the end of the coverage
period , if the coverage per iod shown on the current certificate of cove rage ends during the duration of the
project ;
(5) retain all required certificates of coverage on file for the duration of the project and for one year
thereafter.
(6) notify the governmental entity in writing by certified mail or personal delivery , within ten days after
the person knew or should have known , of any change that materially affects the provision of coverage of
any person provid ing services on the project ; and
(7) contractually require each person with whom it contracts , to pe rform as required by paragraphs
(1) -(7), with the certificates of coverage to be provided to the person for whom they are providing
services.
J. By signing this contract or providing or causing to be prov ided a certificate of coverage , the
contractor is representing to the governmental entity that all employees of the contractor who will provide
services on the project will be covered by workers' compensation coverage for the du ration of the project,
that the coverage will be based on proper reporting of classification codes and payroll amounts, and that
all coverage agreements will be filed with the appropriate insurance carrier or , in the case of a se lf-
insured , with the commission's Division of Self-Insurance Regulation. Providing false of misleading
information may subject the contractor to administrative penalties , crim inal penalties , civ il penalties or
other civil actions .
K. The contractor's failure to comply with any of these provisions is a breach of contract by the
contractor which entitles the City to declare the contract void if the contractor does not remedy the breach
within ten days after receipt of notice of breach from the City.
"The contractor shall post a notice on each project site informing all persons prov iding services on the
project that they are required to be covered, and stating how a person may verify current coverage and
report failure to provide coverage . This notice does not satisfy other posting requirements imposed by
the Texas Workers' Compensation Act or other Texas Workers' Compensation commission rules . This
notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type ,
and shall be in both English and Spanish and any other language common to the worker population. The
text for the notices shall be the following text , without any additional words or changes:
REQUIRED WORKERS' COMPENSATION COVERAGE
"The law requires that each person working on this site or providing services related to this construction
project must be covered by workers' compensation insurance . This includes persons providing , hauling ,
or delivering equipment or materials , or providing labor or transportation or other service related to the
project , regardless of the identity of their employer or status as an employee."
"Call the Texas Workers' Compensation Comm ission at (512) 440-3789 to receive information on the
legal requirement for coverage , to verify whether your employer has provided the required coverage , or to
report an employer's failure to provide coverage."
18. AGE DISCRIMINATION: In accordance with the policy ("Policy") of the Executive Branch of the
federal government, contractor covenants that neither it nor any officers, members , agents or employees
who engage in the performance of this contract shall, in connection with such employment, advancement
or discharge of employees or in connection with the terms, conditions or privileges of their employment ,
discriminate against any person because of their age except on the basis of a bona fide occupational
qualification, retirement plan or statutory requirement.
Contractor further covenants that neither it nor its officers, members, agents or employees acting on their
behalf, shall specify in solicitations or advertisements for employees to work on those contract a
maximum age limit for such employment unless the specified maximum age limit is based upon a bona
fide occupational qualification , retirement plan or statutory requirement.
Contractor warrants that it will fully comply with the Policy and will defend, indemnify and hold City
harmless against any and all claims or allegations filed by third parties against City arising out of
Contractor 's alleged failure to comply with the Policy in the performance of this contract.
19. DISCRIMINATION DUE TO DISABILITY: In accordance with the provisions of the Americans with
Disabilities Act of 1990 ("ADA "), Contractor warrants that it will not unlawfully discriminate on the basis of
disability in the provision of services to the general public, nor in the availability, terms or conditions of
employment for applicants for employment with, or current employees of, Contractor. Contractor warrants
that it will fully comply with the ADA's provisions and any other applicable federal, state , or local laws
concerning disability and will defend, indemnify and hold City harmless against any and all claims or
allegations filed by third parties against City arising out of Contractor's alleged failure to comply with the
ADA in the performance of this contract.
. 3.
PROPOSAL
PART B -PROPOSAL
This proposal must oot be removed from this book of Contract Documents .
TO : Dale Fisseler , P.E.
City Manager
Fort Worth , Texas
PROPOSAL FOR: The furnishing of all materials, except materials specified to be furnished by the City ,
equipment and labor for the installation of storm drain lines or structures along with any and all necessary
appurtenances and incidental work to provide a complete and serviceable project designated as:
MISCELLANEOUS STORM DRAIN IMPROVEMENTS • 2011
Project Numbers :
TPW -PE69 539120 0209203
CITY PROJ . NO . -01635
Pursuant to the foregoing 'Notice to Bidders', the undersigned Bidder , having thoroughly examined the
Contract Documents , including plans , special contract documents , and the Standard Contract Documents
and Standard Spec ifications for Street and Storm Drain Construction for Transportation and Public Works
Department Projects , the site of the project and understanding the amount of work to be done , and the
prevailing conditions , hereby proposes to do all the work , furnish all labor , equipment and material except
as specified to be furnished by the City , which is necessary to fully complete the work as provided in the
Plans and Contract Documents and subject to the inspection and approval of the Project Engineer of the
TPW/Storm Water Management Division of the City of Fort Worth , Texas; and binds himself upon
acceptance of this Proposal to execute a contract and furnish an approved Performance Bond, Payment
Bond, Maintenance Bond, and such other bonds , if any, as may be required by the Contract Documents
for the performing and completing of the said work. Contractor proposes to do the work within the time
stated and for the following sums:
FORT WORTH
. . ......
City of Fort Worth
Disadvantaged Business Enterprise Specifications
SPECIAL INSTRUCTIONS FOR BIDDERS
APPLICATION OF POLICY
If the total dollar value of the contract is $25,000 or more, the DBE goal is applicable. If the total dollar value of
the contract is less than $25,000, the DBE oal is not a licable.
POLICY STATEMENT
It is the policy of the City of Fort Worth to ensure the full and equitable participation by Disadvantage Business
Enterprises (DBE) in the procurement of all goods and services to the City on a contractual basis. The objective of the
Policy is to increase the use of DBE firms to a level comparable to the availability of DBEs that provide goods and
services directly or indirectly to the City. All requirements and regulations stated in the City's current Disadvantage
Business Enterprise Program apply to th is bid .
DBE PROJECT GOALS
The City's DBE goal on this project is _16 %_ of the base bid value of the contract.
COMPLIANCE TO BID SPECIFICATIONS
On City contracts of $25 ,000 or more , bidders are required to comply with the intent of the City's DBE program by either
of the following :
1. Meet or exceed the above stated DBE goal, or;
2. Good Faith Effort documentation, or;
3. Waiver documentation, or;
4. Joint Venture.
SUBMITTAL OF REQUIRED DOCUMENTATION
The applicable documents must be received by the Managing Department , within the following times allocated , in order
for the entire bid to be considered responsive to the specifications. ifhe Offerer shall deliver the DBE documentation in
erson to the appropriate employee of the managing department and obtain a date/time receipt. Such rece iRt shall b.e
~vidence1hat the City received the documentation in the time allocated. AJaxed co~~ will not be accimted.
1. Subcontractor Utilization Form , if received by 5:00 p.m., five (5) City business days after the bid
qoal is met or exceeded : openinq date , exclusive of the bid openinq date.
2. Good Faith Effort and Subcontractor received by 5:00 p .m ., five (5 ) City business days after the bid
Utilization Form , if participation is opening date , exclusive of the bid opening date.
less than stated goal :
3. Good Faith Effort Form , if no received by 5:00 p.m., five (5) City business days after the bid
participation : openinq date , exclusive of the bid opening date.
4. Prime Contractor Waiver Form: received by 5:00 p.m ., five (5) City business days after the bid
opening date , exclus ive of the bid openinq date .
5. Joint Venture Form , if goal is met or rece ived by 5:00 p.m ., five (5) City business days after the bid
exceeded: openinq date , exclusive of the bid openinq date .
FAILURE TO COMPLY WITH THE CITY'S DBE PROGRAM, WILL RESULT IN THE BID BEING
CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS
Any questions , please contact the M/WBE Office at (817) 392-6104.
Rev. 11 /11/05
-•
PAY CPMS
ITEM RECORD
NUMBER
APPROX.
QUANTITY
DESCRIPTION OF ITEMS WITH
BID PRICES WRITTEN IN WORDS
UNIT
PRICE
(Furnish and install , including all appurtenant work, complete in place , the following items)
1. BID-00424 500
2 . BID-00474 100
3. BID -00529 500
4. BID -00533 200
...
5. BID-00457 500
6. BID-00102 100
7 . BID-00116 10
8. BID-00070 500
L.F . Curb & Gutter -Remove
Per Linear Foot:
S.Y.
___ _,,_/"--~""'"". -=----Dollars
and ___ _,_,,,,.~A~•----Cents
Pavement-Valley Gutter -Remove
Per Square Yard :
__ -R'----'~'-'-/.-~~-fue.='I=~=---Dollars
and --,7'11-·''-"4 .... o,e___ ___ Cents
S.F. Walk -Remove
Per Square Foot:
S .F.
--T$o Dollars
and t·•• Cents
Walk-ADA W ~elchair Ramp -Remove
Per Square Foot:
___ '71J-4--'--=o'--------Dollars
and __ ___;~-L..!lr1.Ji<.o ___ Cents
S.Y. Pavement-Concrete -Remove
(Saw-cut Subsidiary) Per Square Yard:
EA
EA
C.Y.
---4-~J_,~"-~'--.,)='------Dollars
and ----fi.._; .... "'"'"""'-----Cents
Inlet -All sizes -Remove
Per Each :
~ tL~h6 L.---1)ollars
and 1.,.• p Cents
Manhole -Al l Sizes -Remove -
Per Each:
5;/~Dollars
and Cents
Headwall , Wingwalls , Toewalls , and Aprons , -
Remove Pe r Cubic Yard :
B -2
$ //," I)
$ ':J-o.PP
TOTAL
AMOUNT
$ /';y~"-'o
$ / dPI). 00
PAY CPMS APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL
ITEM RECORD QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT -
NUMBER
(Furnish and install, including all appurtenant work, complete in place , the following items)
9. BID-00054 100 L.F. Box Culvert -Remove ,
Per Linear Foot:
~~ Dollars
$ #!~. ao d:/)(NJ.~ and
-~~) Cents •
10 . BID-00080 1000 L.F. Pipe -All Sizes -Remove ,
Per Linear Foot:
~ofvfL.-/ Dollars
$ I 1,. t,O $ /tet:c.t() and j¥1c~ Cents
11. 100 L.F . Pipe-15 Inch-Class Ill (Non-Standard) -Replace ,
Per Linear Foot:
anf',~~~ Dollars
$ b'5. DO $ t. 5 ()l)/)0 Cents •
12. BID-00908 100 L.F . Pipe-18 Inch-Class Ill (Non-Standard) -Replace
Per Linear Foot: Jvut:tJVu Dollars
$ f/5.PO $'(,5Moo Cents arid ~ .(,
13 . BID-00908 100 L.F. Pipe-18 Inch-HOPE -Install
Per Linear Foot: w~&J Dollars
$1S.oo $~5"10r£. Cents anti ~
14. BID-00081 500 L.F . Pipe-21 Inch-CL Ill -Install
Per Linear Foot:
i·~ Dollars
$ g~-()0 $~~ Cents and 'l ,.cJco
15. BID-00082 1000 L.F . Pipe-24 Inch-CL Ill -Install
Per Linear Foot:
IY Ut~ ~; !lV Dollars
$ 95.o C, f/5,ooo °;!?. Cents and .. f,
16 . 750 L.F . Pipe-24 Inch HOPE -Install
Per Linear Foot:
ff~ Dollars fo.()0 $~'(,7t?d) and Cents $
B-3
PAY CPMS APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL
ITEM RECORD QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT
NUMBER
(Furnish and install , including all appurtenant work, complete in place , the following items)
17. BID-01092 300 L.F. Pipe -27 Inch-Class Ill -Install
Pe r Linear Foot:
~~vuJ Dollars
$ 91-"" $ fft,D,.()() Cents and ~Jc•
18 . BID-00083 300 L.F . Pipe -30 Inch-~ -Install
Pe r Linear Foot:
tJ,µ'4;/lt. .. ,L, Dollars
$ /t'tJ. ~&) O') DtJO. «J Cents and JcD
19 . BID-00908 100 L.F. Pipe-30 Inch-HOPE -Install
Pe r Linea r Foo t:
and ~51·,~ Dollars
$ 9~-,;() $ ~5oP,00 Cents
20 . BID-00084 300 L.F . Pipe-33 Inch-CL Ill -Install
Pe r Linear Foo t:
~r/~Dollars
$ /~5. '" $ !r4 ~#~·"'" · ,Cents
21 . BID-00085 1000 L.F . Pipe -36 In
Pe r Linea r Foot:
~<J1.uJ.Jud;4 Dollars
,r
$ //Jl,~0 $/)O.~oo and f-1 & , Ce nts ,
22. 750 L.F . Pipe-36 Inch HOPE -Install
Pe r Linea r Foo t:
~,~f;;;J Dollars
$ u~. ~I) $ if;. 5a, .oo Cents nd 1""J,.o ,
23. BID-01101 100 L.F. Pipe-39 Inch-Class Ill -Install
Pe r Linear Foo t:
~ollars and Cents $ ;:Z5. f)/) $I"). Soo.o o •
24 . BID 0 0Q086 500 L.F . Pipe-42 Inch-CL Ill -Install
Per Linear Foot:
{.#fi_Jld1t~ut.~~lla rs
and jv,1c.1> Cents $ 1!J6.e,o $ t'ftSo~.o~
25 . BID-00908 100 L.F . Pipe-42 Inch-HOPE -Install
Per Linear Foot:
~~uf!iM)~:~~. $ Jt5.co $L~~.oo
'
B-4
..
PAY CPMS
ITEM RECORD
NUMBER
APPROX.
QUANTITY
DESCRIPTION OF ITEMS WITH
BID PRICES WRITIEN IN WORDS
UNIT
PRICE
TOTAL
AMOUNT
(Furnish and install, including all appurtenant work, complete in place, the following items)
26. BID-01106 100
27. BID-00087 1000
28. 750
29. BID-00919 250
I 30 . 100
31. 100
32. BID-00870 100
33 . BID-00871 100
34. BID-00872 100
L.F . Pipe-45 Inch-Class Ill -Install
Per Linear Foot:
~"*Dollars nd~ Cents
L.F. Pipe-48 Inch-CL Ill -Install
Per Linear Foot:
~d.JDollars and~ ~ Cents
L.F. Pipe-4~-:;E ~Install
Per Linear Foot:
~~~ollars an -~---Cents
L.F. Pipe-54 Inch-Class Ill -Install
Per Linear Foot:
~~~ollars and____ =-~ Cents
L.F. Pipe-60 Inch-Class Ill -Install
Per Linear Foot:
~ I cAJul.,LJ~J-1 Dollars
and f ,o,, Cents
L.F . Pipe-60 Inch HOPE -Install
Per Linear Foot:
and P __ Cents {k~~,.,bo11ars
L.F. Box c=fu 2 Ft -Install
Per Linear Foot:
~d~~~~~s
L.F . Box Culvert-3 Ft x 3 Ft -Install
Per Linear Foot:
~±ollars ad_~~Cents
L.F. Box Culvert-4 Ft x 2 Ft -Install
Per Linear Foot:
/)µ,~#?Dollars
and-~__ Cents
B-5
$ lt/o,IJ()
$ /Sp.,P
$/fe~.t>O
$/~.()()
$ 15. /)()f.,I){)
I
PAY CPMS
ITEM RECORD
NUMBER
APPROX .
QUANTITY
DESCRIPTION OF ITEMS WITH
BID PRICES WRITIEN IN WORDS
UNIT
PRICE
(Furnish and install , including all appurtenant work , complete in place , the following items)
35 . BID-00873 100
36. BID-00874 100
37 . BID-00875 100
38 . BID-00876 100
39 . BID -00877 100
40. BID-00878 100
41 . BID-00879 100
42 . 810-00880 100
43 . 100
L.F .
L.F .
L.F .
L.F .
L.F .
L.F.
L.F .
Box Culvert-4 Ft x 3 Ft -Install
Per Linear Foot:
a,,c~~~1A;vlr Dollars and ; Cents
Bo x Culvert-4 Ft x 4 Ft -Install
Per Linear Foot:
~~V•dy.Dollars and • Cents
Box Culvert -5 Ft x 2 Ft -Install
Per Linear Foot:
~-~!!#Dollars
ad ~ Cents
Bo x Culvert-5 Ft x 3 Ft -Install
Per Linear Foot:
o'fn~~Q<AJ~~~~s
Bo x Culvert-5 Ft x 4 Ft -Install
Pe r Linea r Foot:
~~ ~nd~
Dollars
Cents
Bo x Culvert-5 Ft x 5 Ft -Install
Per Linear Foot:
-pe~..,J;ollars
an Cents
Bo x Culvert-6 Ft x 3 Ft -Install
Pe r Linear Foo t:
'$J,"§1f#±g/fe11ars and ~~~ Cents
L.F. Bo x Culvert-6 Ft x 4 Ft -Install
Per Linear Foot:
? <tu.t:!fo-Jt//6~~~s
L.F . Extra Trench Depth for 45 -Inch Pipe or Less
(pe r trench 8 FT . -1 O FT.) pe r Linear Foot 4•{~ .I Dollars andl!u Cents
B-6
$ /!,,t;o . {) c
TOTAL
AMOUNT
PAY CPMS
ITEM RECORD
NUMBER
APPROX.
QUANTITY
DESCRIPTION OF ITEMS WITH
BID PRICES WRITIEN IN WORDS
UNIT
PRICE
(Furnish and install , including all appurtenant work, complete in place, the following items)
44 . 100
45. 100
46. 100
47. 100
48 . 100
49. BID-00065 1500
50 . 500
51. 500
52 . 500
L.F. Extra Trench Depth for 48 -Inch Pipe or Greater
(per trench 8 FT . -1 O FT.) per Linear Foot
L.F .
:::742.u..::$ Dollars
and r•• Cents
Extra Trench Depth for 45 -Inch Pipe or Less
(per trench 10 FT. -12 FT.) per Linear Foot
-~-~M..--k_,._~--'"""'o"-----Dollars
and~+"• Cents
L.F. Extra Trench Depth for 48 -Inch Pipe or Greater
(per trench 1 0 FT. -12 FT.) per Linear Foot
L.F .
L.F .
C.Y.
:JiJ'~lr ~ Dollars
and Gen~
Extra Trench Depth for 45 -Inch Pipe or Less
(per trench 12 FT . -15 FT.) per Linear Foot
~.Qtffe;: Dollars
and &11 Cents
Extra Trench Depth for 48 -Inch Pipe or Greater
(per trench 12 FT. -15 FT.) per Linear Foot
~-~ /If Dollars
and f'-' Cents
Channel-Uncla=~ Excavation -Remove
Per Cubic Yard :
---~--1/c...a~r~~!!IW!,,,,-.,.,_CL:b ___ Dollars
and --~-r-,t-,....e=_.t._•-~~----Cents
S.Y . RipRap-12 Inch Rock -Install
Per Square Yard:
S.Y.
an~•-2
RipRap-18 Inch Rock -Install
Per Square Yard :
Dollars
Cents
--~'-+-' /}_~~4~------Dollars
and Tf u Cents
S.Y. RipRap-24 Inch Rock -Install
Per;;~",;~ Dollars
and
2
-----i:t.= Cents
B-7
$ io.()o
$1,t.()O
$ ~.~D
$ All)/)
$k-
$ '/5.00
TOTAL
AMOUNT
$ i tl()P. Of) ,
PAY CPMS
ITEM RECORD
NUMBER
APPROX.
QUANTITY
DESCRIPTION OF ITEMS WITH
BID PRICES WRITTEN IN WORDS
UNIT
PRICE
TOTAL
AMOUNT
(Furnish and install , including all appurtenant work , complete in place , the following items)
53 . 300
54 . BID-00544 200
55. BID-00101 5 ,000
56 . BID-00106 50
57. BID -00107 30
58 . BID-00108 50
59 . BID-00111 10
60 . BID-00112 10
S.Y.
C.Y.
RipRap-30 Inch Rock -Install
Per Square Yard:
and Cents $1~w Dollars
Low Stre::=:ncrete -Flowable Fill -Install
Per Cubic Yard:
4',. •. '4'#f:L/oollars
and Cents
C.Y. Unclassified Trench Excavation & Backfill -
Install
Per Cubic Yard :
---~-+-=~="-----Dolla rs
and -----;,.,,.?'l-"i"'f'..._«..,.,,c....__ __ Cents
EA lnlet-lnline-10 Ft -Install
Pe r Each:
~~ollars
and '17'"' · Cents
EA lnlet -lnline-15 Ft -Install
Per Each :
~---~liars
and --,.;At> Cents
EA lnlet -lnline-20 Ft -Install
Per Each :
~liars an Cents
EA lnlet-Recessed-10 Ft -Install
Per Each :
~j:;±MJ011ars and . Cents
EA lnlet-Recessed-15 Ft -Install
Per Each :
Jjlp~~llars
and ~~ Cents
B -8
$/~9/)f).()~
$ jl)tJ. 1)0 $ ~~().tJt) .
$ i,()().{)t') $ ~()l)().00
PAY CPMS
ITEM RECORD
NUMBER
APPROX.
QUANTITY
DESCRIPTION OF ITEMS WITH
BID PRICES WRITTEN IN WORDS
UNIT
PRICE
(Furnish and install, including all appurtenant work , complete in place, the following items)
61. BID-00113 10
62 . BID-00104 20
63. BID-00118 50
64 . 20
65. 20
66 . 20
67. 5
68 . 10
69. BID-00372 5 ,000
EA
EA
EA
VF
EA
VF
EA
VF
lnlet-Recessed-20 Ft -Install
Per Each:
f/pk~o~ huMollars
and t•a Cents
lnlet-Drop-4 ~nstall
Per Each : ~1#-~MS and~ Cents
Manhole-4 Ft -Install
Per Each :
and Cents J#1~Dollars
Addrtion= =Ov~ Std . 4 Ft. Dia.
Manhole -Install Per Vertical Foot:
fe~I_ ~Dollars
and . r; Cents
Manhole-5 Ft -Install
Per Each :
~~~~~s
Additional Depth Over 6 Ft. Of Std. 5 Ft. Dia .
Manhole -Install Per Vertical Foot:
'J4~ollars ancJCents
Manhole-6 Ft -Install
~·v~~~~s
Additional Depth Over 6 Ft. Of Std. 4 Ft. Dia.
Manhole -Install Per Vertical Foot:
'Jlt~~ollars an Cents
L.F . Trench Safety System 5 Foot Depth -Install
Per Linear Foot:
___ ___.x<------'-~-#--)<-----=~=~--Dollars
and ------?,,!ii~~-------Cents
B -9
J~.oo
TOTAL
AMOUNT
PAY CPMS
ITEM RECORD
NUMBER
APPROX .
QUANTITY
DESCRIPTION OF ITEMS WITH
BID PRICES WRITTEN IN WORDS
UNIT
PRICE
TOTAL
AMOUNT
(Furnish and install , including all appurtenant work, complete in place , the following items)
70 . BID-00069 150
71 . BID-00401 5 ,000
72 . BID-00425 250
73 . BID-00426 100
74. BID-00842 1000
75. BID-00843 1000
76. BID-00458 100
77 . BIP-00459 1000
C.Y.
S.F .
L.F .
L.F .
L.F .
Headwall -Install , Wingwalls , Toewall , and
Aprons
Per Cubic Yard :
$11.v~ollars
and ~Cents
Driveway -Install
Per Square Foot:
---~~~-II----..,,,_).---~-Dollars
and ~Jt• Cents
Curb & Gutter-6 Inch w/18 Inch Gutter -Install
Replacement ,
Per Linear Foot: -Ji)#V&/ Dollars
and Cents
Curb & Gutter-? Inch w/18 Inch Gutter -Install
Replacement ,
Per Linear Foot:
~~ t'vv Dollars
and~~ Cents
Curb-6 Inch -Install
Per Linear Foot:
___ _,{)~~---,.__).-----Dollars
and ---~ff._'""'AE-=---·--Cents
L.F. Curb-? Inch -Install
Per Linear Foot:
S.F.
S .Y.
____ ....,{),~~""+"12 .... L~--Dollars
and ----'1"""'¥4-=JL=o ___ Cents
Pavement-8-lnch Concrete on 2/27 Concrete
Base (2000-2) -Install
Per Square Foot: .
ft> l.llrlu ~ Dollars
and F Cents
Pavement-Concrete Replacement on Existing
Base -Install
Per Square~~:_ .J.-
------=v'-'k7-'--'-"1'f.,___ __ Dollars
and ~A; Cents
B-10
$ ~/().OD
$ '/. () f)
$ J'S.Do $ /,, ~'StJ.()O
$£5.oO $~ Sot,. (')0
$ j.l)() $ /~.()()
$ t ()() $ 1.~. ()()
I
$ l#.oo $ lo, (¥)P. ()/)
PAY CPMS APPROX. DESCRIPTION OF ITEMS WITH UNIT TOTAL
ITEM RECORD QUANTITY BID PRICES WRITTEN IN WORDS PRICE AMOUNT
NUMBER
(Furnish and install , including all appurtenant work, complete in place , the following items)
78 . BID-00467 100 S.F. Pavement-Paver On Reinforced Concrete Base -
Install
Per Square Foot:
,1.1.k&_._I Dollars $ /~/) $ j th,.oo
and ?'" Cents
79 . BID-00443 10 ,000 S.F. Pavement-2 Inch Min HMAC on 2/27 Concrete
Base (2000-1 A) -Permanent -Install
Per Square Foot:
Dollars $~~D $ 1~ at> .. 00
and Cents
,
80. BID-00444 5000 S.F. Pavement-2 in HMAC Replacement on
Existing Base -Install
Per Square Foot i L if,,_.) Dollars $ 5. ()(') $~$ IJDO.D6
and tb Cents
81. 200 S.F . Pavement-2 Inch Min HMAC on Reinforced
Concrete Base -Install
Per Square Foot:
and~$.:
.Dollars $ ;PY_ rJI> $,., bx;.(){)
Cents
82. BID-00442 1000 S.F. Pavement-2 Inch HMAC on 6 Inch Flex Base-
Temporary -Install
Per Square Foot:
$~ ~ Dollars $ JoD
and Cents
83 . BID-00495 1000 S.Y. Subgrade-Flexbase -Install
Pe r Square Yard:
Ji.IL ti~ Dollars //.~/) $ 11« tt:t,. t)t) $ and t·V Cents •
84. BID-00473 200 S.Y. Pavement~Val~utter -Install
Per Square Yard :
Dollars
$ 5;ioo $ / /,l)d). a) and Cents •
85 . BID-00528 1000 S.F. Standard 4-Ft Wa k -lnstall-4-lnch
Per Square Foot: I-. Dollars
$ ~So $ 5 5/)tJ. ()/) and 3~ Cents
B-11
PAY CPMS
ITEM RECORD
NUMBER
APPROX.
QUANTITY
DESCRIPTION OF ITEMS WITH
BID PRICES WRITTEN IN WORDS
UNIT
PRICE
(Furnish and install , including all appurtenant work , complete in place , the following items)
86. BID-00532 500
87. BID -00119 200
88. BID -00922 200
89. BID-00923 10
90. BID-00943 10
91. 200
92 . 200
93 . 10
S.F. Walk-ADA Wheelchair Ramp -Install
Per Square Foot:
--~.,__._,_..ilda"""". -"--"'-'//..=~=---Dollars
and 4-> o Cents r-
L.F . Pipe -Sub Drain -6 Inch Perforated -Install
Per Linear Foot:
Dollars
Cents
L.F . Pipe-6 Inch Drain (Non-Perforated ) -Install
Per Linear Foot:
E.A.
E.A.
L.F .
L.F .
E.A.
-~-+--~"""-~~--~()_L_· i.l,__ __ Dollars
and ~:_;; Cents
Pipe-6 Inch PVC Subdrain to Existing Inlet
Connection -Service CS
Per Each:
a~#o~:~~s
Pipe -Cleanout tor 6 Inch Subdrain w / Rise r and
Cap -Install
Pe r Each :
~o t;.~v Dollars
and 1='4.• Cents
Pipe-Sub Drain -8 Inch Perforated -Instal l
Per Linear Foot:
--@1.t/qk Dollars
and ,111]1: Cents
Pipe-8 Inch D rain (Non-Perforated) -Install
Per Linear Foot:
and ~ Cents
~~ij/& Dollars
Pip.:::~ubdrain to Existing Inlet
Connection -Service
Per Each :
~.c/_,~,lJ#ollars
arid If=, ~ents . .
B -12
TOTAL
AMOUNT
$ S /p).00
PAY CPMS
ITEM RECORD
NUMBER
APPROX .
QUANTITY
DESCRIPTION OF ITEMS WITH
BID PR ICES WRITTEN IN WORDS
UNIT
PRICE
(Furnish and install , including all appurtenant work , complete in place , the following items)
94. 10
95. 200
96 . 200
97. 10
98. 10
99. 200
100 200
101 10
E.A.
L.F.
L.F.
Pipe-Cleanout for 8 Inch Subdrain w / Riser and
Cap -Install
Per Each:
41,~L.eo11ars
a~ ~ Cents
Pipe-Sub Drain-10 Inch Perforated -Install
Per Linear Foot:
__ ;r:f/1--.µi:1:ip,,....L...&•d~_ Dollars
and:!o Cents
T
Pipe-10 Inch Drain (Non-Perforated) -Install
Per Linear Foot:
--12J-4--'~;=-=-J.-:-~-~-=----Dollars
and~~k" Cents
E.A. Pipe-10 Inch PVC Subdrain to Existing Inlet
Connection -ServiceCS
Pe r Each :
~~J_,&&61Dollars and -~ _ /~ Cents
E.A. Pipe-Cleanout for 1 O Inch Subdrai n w / Riser and
Cap -Install
Per Each : .J,V~~~~~s
L.F . Pipe-Sub Drain-12 Inch Perforated -Install
Per Linear Foot:
Dollars
Cents
L.F . Pipe-12 Inch Drain (Non-Perforated ) -Install
Per Linear Foot:
--~~~~,.....w~--Dollars
and ----L<~o.&tL-..--Cents
E.A. Pipe-12 Inch PV Subdrain to Ex isting Inlet
Connection -ServiceCS
Pe;:~;49 Dalla~
and ---1!.._ _ Cents
B-13
$ ~.()0
$ '!)1. ()()
$ 55P. 00
TOTAL
AMOUNT
$ ~ ~().00
PAY CPMS
ITEM RECORD
NUMBER
APPROX.
QUANTITY
DESCRIPTION OF ITEMS WITH
BID PRICES WRITTEN IN WORDS
UNIT
PRICE
TOTAL
AMOUNT
(Furnish and install, including all appurtenant work, complete in place , the following items)
102 10
103 BID-00124 20
104 BID-00125 5
105 BID-00134 1,000
106 BID-00137 5 ,000
107 BID-00147 5000
108 BID-00470 20
109 BID-00539 50
E.A.
EA.
EA .
S.F .
S .F.
C.Y.
Pipe-Cleanout for 12 Inch Subdrain w / Riser and
Cap -Install
F)r Each·
Pfi'~,~ Dollars
and~ Cents
Mobilization -Services
Per Each:
afi1t##4h~~;:s
Mobilization-Emergency Situation Job Move In -
Services
Per Each:
a~~~~;:s
Grass -Hydromulch Seeding in Undeveloped
Areas-Install
Per Square Foot:
--------'()---'J'/=-,. =~'----Dollars
and ----1-'"fL-',t""---.::..o ___ Cents
Grass -Sod in Developed Areas-Install
Per Square Foot:
~D Dollars
and -/;;)=tv._, Cents
Topsoil -Install
Per Cubic Yard :
t}.q41F · Dollars
and__ -~' · ~ -Cents
E.A. Pavement-Traffic Permit for Utility Street Cut
-Install Per Each :
Fifty Dollars
and No Cents
E.A. Dehole-0 to 5 Ft Depth -Study
Per Each :
{/,iJL,,,'~JJ Dollars
and .f "-' Cents
B-14
$ 5.~.a, $ lt>I> a,r;.(J{) •
$ S' $«;. DO $ ~ Soc. OD ,
$ /. t)O $ /U)(). oo
$ I, 00
$ 50.00 $ 1000.00
PAY CPMS
ITEM RECORD
NUMBER
APPROX.
QUANTITY
DESCRIPTION OF ITEMS WITH
BID PRICES WRITTEN IN WORDS
UNIT
PRICE
TOTAL
AMOUNT
(Furnish and install, including all appurtenant work, complete in place , the following items)
110 BID-00541 10
111 BID-00540 5
112 BID-00099
113 BID-00061 100
114 BID-00062 1000
115 BID-00068 100
116 BID-00067 100
117 200
E.A. Dehole-5 to 10 Ft Depth -Study
Per Each:
andd,4 ~·~~:~~s $ to..oo $,&d.M
E.A. Dehole-1 O to 20 Ft Depth -Study
Per Each :
anl/l!_•~oClleanrsts _ _ _ _ $ ~ ~co.co $ (? ~ce,.t>t>
E.A. Storm Water Pollution Prevention Plan < than 1
Ac -Install
Per Each :
and~u~:~~. $~~-00 $~~""·""
C .Y . Channel-Concrete Pilot -Install
Per Cubic Yard :
C.Y.
C.Y.
C.Y.
L.F.
~ollars '1. and _ -~ Cents $ 7/d.O()
Channel-Earthen -Install
Per Cubic Yard:
and ~ o~:~s $ t_ oo
Erosion Control-Gabio,:i Mattress -Install
Per Cubic Yard :
~-f.µ o~:~. $/,~.'"'
Erosion Control-Gabion Basket -Install
Per Cubic Yard : ·
O..u~oonars / ()
and ~ ~-Cents $ /~. O()
Adjust Sewer Main Line -All Sizes Complete and
In Place-Install
Per Linear F ot:
-----"'---+r--J~'#<'------Dol.lars
and ---<Hlr;.s.="""""'-------Cents
B-15
$ b~-tJO
$ 2~.fJO
'
$ I~ /)pt)J)O
PAY CPMS
ITEM RECORD
NUMBER
APPROX.
QUANTITY
DESCRIPTION OF ITEMS WITH
BID PRICES WRITTEN IN WORDS
UNIT
PRICE
(Furnish and install , including all appurtenant work , complete in place , the following items)
118 BID-01152 300
119 2
120. BID-00127 500
121 10
122 10
123 BID-00124 10
124 BID-00125 10
125 BID -00134 10
L.F .
EA .
Adjust Water Main Line -All Sizes Complete and
in Place -Install
Per Linear Foot:
~-/;;;J Dollars
and .t • Cents
PROJECT DESIGNATION SIGNS
Three Hundred Dollars &
No Cents Per EA. -------=
LF . Fence -Up To 6' Height -All types -Remove
and Replace Existing
E.A.
E.A.
E.A.
E.A.
E.A.
Pe r Linear Foot:
___ 1i}_-+--'~.c.«.:_d!;__,__ ___ Dollars
and 2f,Ac Cents
18" RCP Plug -Install
Pe r Each:
04._,'-ij~~,L/ Dollars
and ~ Cents
21 " RCP Plug -Install
Per Each :
[).//& tJ~,-,~ollars
and 1iA' Cents
24" RCP Plug -Install
Pe r Each :
(2u,,~ ~,I_-/ Dollars '
and ~Ill Cents
27" RCP Plug -Install
Per Each :
O~.,_J_/ Dollars
and rM Cents
~~·~ :;~~lug -Install ~
--t1'..-----~~--f'T-,-,-Dollars
and= Cents
B -16
$ //(). ()0
$ 300.00
$ /~ .. tJ.0
$ /PP.00
$ /P~.()()
$ ll(). ()(}
$ /~/.Pl}
TOTAL
AMOUNT
$ 600.00
$ 1.~,. t)~ ,
$ I, b/'I{) .tJtJ
I
$ /ppP,¢
I
PAY CPMS
ITEM RECORD
NUMBER
APPROX.
QUANTITY
DESCRIPTION OF ITEMS WITH
BID PRICES WRITTEN IN WORDS
UNIT
PRICE
(Furnish and install, including all appurtenant work, complete in place , the following items)
126. 10 E.A.
127 10 E.A.
128 10 E.A.
129 10 E.A.
130 10 E.A.
131 BID-00124 10 EA.
132 BID-00125 10 EA.
133 BID-00134 10 EA .
134 . 100 C.Y.
24" Pre-Cast End Treatments (TXDOT SETS
Std .) -Install
p~~rs
an ~Je, Cents
27" Pre-Cast End Treatments (TXDOT SETS
Std.)~stall
·c ara PerE •~
and Cents
36" Pre-Cast End Treatments (TXDOT SETS
Std .) -Install
Pe~~~ollars
and ~.fr" Cents
42" Pre-Cast End Treatments (TXDOT SETS) -
Install
o ~JJkJilars p~~ anfi*o Cents
Tree 6" to 18" -Removal and Disposal
PerE~-~ ·
/)µ ~Dollars
and r.Jeo Cents
Tree greater than 18" -Removal and Disposal
Per ach :
_!::.~~~~~~~t/1.:ii Dollars
--v.~=---+---1--"'_:_-Cents
~~\u~ice and Box -Install
Dollars
and~ Cents
~~:"f;;;;z:'/ ~ollars
and~ Cents
Import Borrow Fill -Install
Per Cubic Yard:
and??,-J;~~
B-17
Dollars
Cents
$ /ffe.oo
TOTAL
AMOUNT
$~
PAY CPMS
ITEM RECORD
NUMBER
APPROX.
QUANTITY
DESCRIPTION OF ITEMS WITH
BID PRICES WRITTEN IN WORDS
UNIT
PRICE
TOTAL
AMOUNT
(Furnish and install, including all appurtenant work, complete in place, the following items)
135 500 L.F. Post CCTV Inspection -Service
Per Linear Foot:
and
~.It£~ 14P~ Dollars
Cents $3.oo $ /~.(J()
136. BID-00128 200 LF. Fence -Chain link -New Complete and in Place
-Install
Per Linear Foot: ~. Dollars $ ~.DO $ tt~.D()
and Cents
137 BID-00129 200 L.F . Fence -Wood (Privacy) -New Complete and in
Place -Install
Per Linear Foot:
~ Dollars $ ~.DO $ 4a;e,oo
and Cents
138. BID-00908 100 L.F . Standard Walk -5 FT -Install
Per Square Foot:
and~~
Dollars $4~-~o $~ ~.DC Cents
po
TOTAL AMOUNT BID $ 5,115,550 . --
r '
B-18
PART B -PROPOSAL (Cont.)
Within ten (10) days after acceptance of this Proposal , the undersigned will execute the formal contract
and will deliver an approved Surety Bond and such other bonds as required by the Contract Documents ,
for the faithful performance of the Contract. The attached bid security in the amount of 5% is to become
the property of the City of Fort Worth , Texas , in the event the contract and bond or bonds are not
executed and delivered within the time above set forth , as liquidated damages for the delay and additional
work caused thereby.
The undersigned bidder certified that he has been furnished at least one set of the General Contract
Documents and General Specifications for Water Department Projects dated January 1, 1978 , and that he
has read and thoroughly understands all the requirements and conditions of those General Documents
and the specific Contract Documents and appurtenant plans.
The undersigned assures that its employees and applicants for employment and those of any labor
organization , subcont ractors , or employment agency in either furnishing or referring employee applicants
to the undersigned are not discriminated against as prohibited by the terms of City Ord inance No . 7278 as
amended by City Ordinance No . 7400.
The Bidder agrees to begin construction within 10 calendar days after issue of each work order , and to
complete the contract within 365 calendar days after beginning construction as set forth in the wr itten
work order to be furnished by the Owner.
(Complete A or B below , as applicable :)
__ A. The principal place of business of ou r company is in the State of ___ _
Nonresident bidders in the State of , our principal
place of bus iness , are required to be __ percen t lowe r than resident bidders
by state law . A copy of the statue is attached .
Non resident bidders in the State of , our principal
place of business , are not required to underbid res ident bidders .
{Jhe principal place of business of our company or our parent company or
V majority owner is in the State of Texas .
B-19
I (we) acknowledge receipt of the following addenda to the plans and specifications , all of the provisions
and requirements of which h~ ~aken into consideration on preparation of the foregoing bid:
Addendum No. 1 (Initials)~ Addendum No . 3 (Initials) ___ _
Addendum No. 2 (Initials) __ _ Addendum No . 4 {Initials) ___ _
Respectfully submitted ,
Telephone: fj( J-YtJ£ ~~_36 I
B-20
VENDOR COMPLIANCE TO STATE LAW
The 1985 Session of the Texas Legislature passed House Bill 620 relative to the award of contracts to
nonresident bidders. This law provides that , in order to be awarded a contract as low bidder , nonresident
bidders (out-of-State contractors whose corporate offices or principal place of business are outside of the
State of Texas) bid projects for construction , improvements , supplies or services in Texas at an amount
lower than the lowest Texas resident bidder by the same amount that a Texas resident bidder would be
required too underbid a nonresident bidder in order to obtain a comparab le contract in the State in which
the nonresident's principal place of business is located . The appropriate blanks in Section A must be filled
out by all out-of-State or nonresident bidders in order for your bid to meet specifications. The failure of
out-of-State or nonresident contractors to do so will automatically disqualify that bidder. Resident bidders
must check the box in Section B.
A. Nonresident vendors in (give State), our principal place of business , are required to
be percent lower than resident bidders by State law. A copy of the Statute is
attached .
Nonresident vendors in __________ (give State), our principal place of business , are
not required to underbid resident bidders.
0jur principal place of business or corporate offices are in the State of Texas . D
BIDDER:
Or .
2£otR
City State Zip
THIS FORM MUST BE RETURNED WITH YOUR QUOTATION
- 5 -
MINORITY AND WOMEN BUSINESS ENTERPRISE SPECIFICATIONS
FORT WORTH • City of Fort Worth
Disadvantaged Busmess Enterprise Specifications
SPECIAL INSTRUCTIONS FOR BIDDERS
APPLICATION OF POLICY
If the total dollar value of the contract is $25,000 or more, the DBE goal is applicable. If the total dollar value of
the contract is less than $25,000, the DBE oal is not a licable.
POLICY STATEMENT
It is the policy of the City of Fort Worth to ensure the full and equitable participation by Disadvantage Business
Enterprises (DBE) in the procurement of all goods and services to the City on a contractual basis. The objective of the
Policy is to increase the use of DBE firms to a level comparable to the availability of DBEs that provide goods and
services directly or indirectly to the City . All requirements and regulations stated in the City's current Disadvantage
Business Enterprise Program apply to this bid.
DBE PROJECT GOALS
The City's DBE goal on this project is _16 %_ of the base bid value of the contract.
COMPLIANCE TO BID SPECIFICATIONS
On City contracts of $25,000 or more, bidders are required to comply with the intent of the City's DBE program by either
of the following :
1. Meet or exceed the above stated DBE goal, or;
2. Good Faith Effort documentation, or;
3. Waiver documentation, or;
4. Joint Venture.
SUBMITIAL OF REQUIRED DOCUMENTATION
The applicable documents must be received by the Managing Department, within the following times allocated, in order
for the entire bid to be considered responsive to the specifications. Jhe Offeror shall deliver the DBE documentation in
person to th"e appro1:xiate employee of tlie maoaging department and obtain a'date/time receipt. Such · recei~t sflall be
evidence that the City received the documentation in the time allocated. A faxectco~ will not be acceRted .
1. Subcontractor Utilization Form , if received by 5:00 p.m., five (5) City business days after the bid
goal is met or exceeded: opening date, exclusive of the bid opening date.
2. Good Faith Effort and Subcontractor received by 5:00 p.m ., five (5) City business days after the bid
Utilization Form, if participation is opening date, exclusive of the bid opening date .
less than stated goal :
3. Good Faith Effort Form , if no received by 5:00 p.m., five (5) City business days after the bid
participation: opening date, exclusive of the bid opening date.
4. Prime Contractor Waiver Form: received by 5:00 p.m., five (5) City business days after the bid
opening date, exclusive of the bid opening date.
5. Joint Venture Form, if goal is met or received by 5:00 p.m., five (5) City business days after the bid
exceeded: opening date, exclusive of the bid opening date.
FAILURE TO COMPLY WITH THE CITY'S DBE PROGRAM, WILL RESULT IN THE BID BEING
CONSIDERED NON-RESPONSIVE TO SPECIFICATIONS
Any questions, please contact the M/WBE Office at (817) 392-6104.
Rev. 11/11/05
FORT WORTH
~ City of Fort Worth
Subcontractors/Suppliers Utilization Form
ATTACHMENT 1A
Page 1 o f4
PRIME COMP A..'l'\"Y K.-UvIE: Check applicable block to describe prime
Tr i -kc.i, c,," ~ 'f. .:z::,, {..
PROJECT NAME:
lf/'i1'C-, ~f~ /),.q,'r, -:;::-,;,y1r"v,
\ Ww/DBE \x\ NON-MIWIDBE
City's M/WBE:?rojecr Goal: Prime's M!WBE Project Utiliution.: PROJECT NUMBER
lb % II,, t 0/o
7ofo( Co11fro6f for -#1,·~ b,'J ,'S ,l;l/lJ~tJIJt?. ,~
Identify all_ subcontractors/suppliers you will use on this project
Failure to cornplete this form , in its entirety with requested documentation, and received by the Managing
Department on or before 5:00 .p.m. five (5) City business days after bid opening, exclusive of bid opening date ,
wm result in the bid being considered non-responsive to bid specifications.
The undersigned Offeror agrees to enter into a formal agreement with the M/WBE fum(s) listed in this
uUlization schedule, conditioned upon execution of a contract with -the Ctty of Fort Worth. The intentional
and/or knowing misrepresentation of facts is grounds ior consideration of disqualification and will resutt in the
bid being considered non-responsive to bid specifications
MIWBEs listed toward .meeting the project goal must be located in the nine (9) county marketplace or currently doing
business in the marketplace .at the time of bid. Marketplace is the geographic area ofTa:rnmt, Paiker, }oJ:m.son, Collin, Dallas,
Denton, Ellis, Kaufman and Rockwall counties.
Identify each Tier level. Tier is the level of subcontracting below the prime contractor, i.e., a direct paym.errt :from the
prime conttactor to a subcontractor is considered 1st tier, a pap:nent by a subcontractor to its supplier is considered '?0
tier
.ALL M!WBEs MUST BE CERTIFIED BEFORE CO:NTRA.CT A W."\RD.
Certification means those :fu:m.s, located or doing business at the time of b.id o p e:oiog withm the Maiketplace, tbaI have been
d.etemrined to be bona.fide minority or women businesses b y the North Central Texas R egional Cerrificati.on Agency (NCTRCA), or
the Texas Depanm.ent of Tnmsportati.on (TX DOT), highway division. Disadvantaged Business Enbpri.se (DBE) is synonymous
with. :Mm.ority/W omen Business Enterprise (:M/'NBE).
If banliDg services are utilized, the prime will be given credit as long as the M/'WBE lisr.ed ovms m d ope:rares at least
one fully licensed and onerarional truck to be used on the contract. Toe M/WBE mav lease uucks from another
M!WBE ~ including M/WBE owner -operators, and receive full M/W"BE credit The WWBE n:my lease trucks from
n.OIJ.-M'WBEs , :i:nclndm.g owner-operators, bur will only receive credit for fue fees and commi.,sions eam.ed by the
M/WBE as ourl:ined in the lease a2reemem.
Rev_ 5/30/D3
fORTWORTH ---..,..--
ATTACHMENT 1A
Page 3 of 4
Primes are required to identify ALL subcontractors/suppliers, regardless of Slatus; i .e~ Minority, Women and non-M/WBEs.
Please list M/WBE firm s first, use additional sheets if necessary .
Certification t
(check one) (
SUBCONTRACTOR/SUPPLIER T
r ,
Company Name N T Detail Detail i C X :., . Subcontracting Work Supplies Purchased Dollar Amount Address e M w
Telephone/Fax r B B T D \
R 0 E E E C T E .
A
J/)1 ;nak,(0/5 'Sand ;, 001). ()!..
f). O A,o,c 'flt
41 V(J,'tl I /'JC ?()) s ,~
X t /<P cK ;;. a po P-()~
91//)-«/)7-;() :1:J
J~OOO . ot-91/ IJ -";.? ... ' ? 3'1 Trw. ck/,.,_
f</1<-h.. c,~ ~,.. ,,
CO"'~ f. 0-/$OK J l)l'J I, J .-? t,~v1-w~ $ IL-f'q,f W11rfl, T >< 7tl 7~ 1J J. g 0, tJtJl. X f -y,1-9;1-()49/J x Cpttcr<P-j17-9;1--QIJ'II plo~/k
(.gwfOwtl ~d,'-flllX
C,/)tU..~ /(). ~ox 1t;J;,7
{uJ,· 0" fL-v· J flC' I '76/b(
d~ y JO, CJ~~--it7-f8K-3/jg \
1117 -1ff-l ?lb
P}t )(
S~tt-z,"'~ u.,,c. /hi)( ,,, j oh .
/:5'00 wYd ~,+,~fl i-<J;,fl)fy
fw· ' r "" •) .. 'f [t/>tl~ 7DO, Ql-zn-, f 3 .. ,it J
..
[e4'Jf1~ { ~ ~I>' QII jqh
~,, 'f ;;,-( ;r--e f I (l.gJ: ,. th: ~ §tJ, ~ loffu~, /?' "lf)f'/ IY Co vi e, r<A-+ 817-, 3 7-4'-1 '1 0
Ourtwf!r :J;,1__"'1 · C011e,,,,.d:£ "3 ~ llo-i x Cu tf-,'1 . 4000.~ Ot.(14,, '" ?f~f 7
~('i-' 3q$-/6)1
Re v. 5/30/03
FORTWORTH --.,..--
ATIACHMENT 1A
Page 3 of 4
Primes are required to identify ALL subcontractors/suppliers, regardless of Slatus; i.e., Minority, Women and non-M/WBEs .
Please list M/WBE firms first, use additional sheets if necessary .
Certification r
(check one) (
SUBCONTRACTOR/SUPPLIER T .r .
Company Name N T Detail Detail i X Subcontracting Work Supplies Purchased Dollar Amount Address e M w C 'f
Telephone/Fax r B B T D \
R 0 E E E C T r .
A
-:J""i,. /3 CP~CI c,./-,7-
l()-~e' X ,'f I :H 1/-1/h,lf ()i Qt-pw. ix: 731;'; ,~ 1 JO, {Ji ~-y11 ... ;11-,,,1
,,, .. )tl-3~'1'1
~1Jl'lt1{d1 JI,~• If-
P.11-~"" 17t:7
/Jt,/4dff If--t'-' Ce ~f 1 /',t; 7 WI/ I? ,1 J 0, O()fJ. '917 • J t?-1111 \ ~ 117-,, 7-/i71
/1-(14 C /-e_a }
/. d. /J.Jt1 'I< r&I ? l
\I ~ /r'l/t ff It-Fw /)t: 7,11.? /0,fJ!}tl tj I? -3 pJ -() f J I I
Ha 11 "4" It'µ f' froJ ·
Cont~ /00 A,. /A.c.,"A,+ht.,r ·
~l (). '" 6r(lr,J /,",'r,'"'-I 'l'y ?fd]"d \ ~ f,e-(47/, ~00,0d f'J;-~IJ-'?t31
97;>.-,. ,()-3613
;if). ~1;t,. wowl~~. ?/1? #id,,,..
IV t,h l '1A,1 H /(" ' 7 t~ I~ ~ f ;µ., f Iv
111 .. ~,,. pt:, gg
F=a+~"' '?
7000,
i,7-51>9., 01 11
/Ylc..utJ"'J (J ,· t ft:~
'y fl-0 · IJ IJ'J(' 7/'f{ y (~
gf_,.,
ft./ I T'I< &D, ooo, '7 /7 .. ,i,-l(O,I
1r1-, ~6 -l(OO';,-
Rev. 5/30/03
FORT WORTH -----,.---
ATTACHMENT 1A
Page 3 of 4
Primes are required to identify ALL subcontractors/suppliers, regardless of S1atus; i.e., Minority, Women and non-M/WBEs.
P lease list M/WBE firms first, use additional sheets if necessary .
Certification t
(check one) C
SUBCONTRACTOR/SUPPLIER T .r
Company Name i N T Detail Detail
C X :~ Subcontracting Work Supplies Purchased Dollar Amount Address e M w T D \ Telephone/Fax r B B R 0 E E E C T r .
A
/jK'JC-4"7 /J.;orr.'-t.t.-4
• ~I-?/J~7 l· I -I> I OPIJ. I!.-f1N· I 7)c ?t//1 lj: ~ b~rr~,q~~ <j/J .. ~J,--J?J1
11? -3 ) f -? / 'lf
Pr<>J'-e cf (:Ot"/44*'-'L---. (
'2_,J 4 / t,.{p,ft?'I , /: rtJ '7/1///J
~(}t! ,1£., ~~"f lf~'II~ ,_Tx 7t11? rr ',c e,11~-1-r-,I i,, ... ;)~f-/~,,
106 ;' ~;g .. /&;-f6
Rev . 5/30/03
foRTWORTH ---...-----r
Total Dollar Amount of M/WBE Subcomractors/Suppliers
Total Dollar _t\moml! ofNon-MJWBE Subcontractors/Suppliers
$
$
ATTACHMENT 1A
Page4 of 4
3 3~ {)CtJ. ~~
'-If t, (l /tl.
17!-
TOT AL DOLLAR AMOUNT OF ALL SUBCONTRACTORS/SUPPLIERS $ t% )_) I tJ (/ v', /)a-,
The Contractor will not make additions, deletions, or snbsrimtions to this certified list w.i:tb.out tbe prior approval of fue
:Minority and Women Business E:nteqrrise Office Manager or designee through tb.e submittal of a Request for Appruval o
Change/Addition. A:rry unjnsri:fied change or deletion shall be a material breach of com:ract and may reso.l! m debrnem: m
accord wifu 1:he mocednres outlined m fue ordinance. The coil!IaCtor shall submir a detailed ~lamuicm of how fue
requested ch.a:ngeiaddition or deletion will affect the committed M/vVBE goal If fue de.ail explanation is not subm±tted, :i:r
will affect fue :6naJ. compliance detP-rnriuarion.
By affixing a si.gnamre to this form, the Off eror further agrees to provide, directly to the Cizy upon request, complete and
ac..."llrate mfomari.on regardro~ acmal. wrn:k performed by all subcontractors, including M/W/DBE(.s) arrangem.~
submitted w.i:tb. the bid. The Offerer also agrees to allow an audit a:nd/or examination of arry books, records and files held
by fuei:r company. The bidder agrees to allow the transmission of interviews with owners, principals, officers, employees
and applicable subcomractors/suppliers/coIJlractors participating on the cOI1tract that will substm:i:iate the actual wo:rk.
performed by the M/W/DBE(s) on this contract, by .an allih.orized officer or employee offue City . _4my :intentional and/or
knowmg misrepresemation of facts will be grounds for tenninating the comract or. debarment from City wo:rk. for a period
of not less than 1irree (3 ) y ears and for initiating action under Federal, Stare or Local laws concerning false statements.
Acy failure to comply with this ordinance and create a material breach of contract may I""..suh in. a det .. uninarion of an
:irrespons1bie. Offeror and barred from participating m City work for a r..riod of time not less than one (1) year.
Contact NameTI'"rtle (if different)
Company Name Telephone and/or F=
E-mail Address
1;2-~o-!O
Date
Rev. 5/30/03
TRANSPORTATION AND PullllC WORKS
BUSINESS SUPPOA'T DMSION
W/MBE REQUIRED DOCUMENTATION RECEIPT
Official Date and Time
1'.2 -21 -1 0 AJl :)7 I M
Bid Date: ____ IJ----+-L .i...;;ilo.........,.I \.;..._O ________ _
Project Name: _c:r_u_-_s t--_._,_S""-+dn ....... R:M--.......__·:r:&----=-.... , -~-· ·_tJ __ _
Project Manager: --~-~-~-o ~---\j--~ __ X2.-L __ a...-----
Forms Submitted By
Name: __ rt ....... \.__.f?--,,,,..(J'r---W_0e,_~~--------
Company: --~-{Gt_--'_:}e........._..,_(N\.-............ ________ _
- 6 -
2006 PREVAILING WAGES LAWS AND RATES
Compliance with and Enforcement of Prevailing Wage Laws
(a) Duty to pay Prevailing Wage Rates . The contractor shall comply with all requirements of Chapter 2258,
Texas Government Code (Chapter 2258), including the payment of not less than the rates determined by the
City Council of the City of Fort Worth to be the prevailing wage rates in accordance with Chapter 2258. Such
prevailing wage rates are included in these contract documents.
(b) Penalty for Violation. A contractor or any subcontractor who does not pay the prevailing wage shall, upon
demand made by the City, pay to the City $60 for each worker employed for each calendar day or part of the
day that the worker is paid less than the prevailing wage rates stipulated in these contract documents . This
penalty shall be retained by the City to offset its administrative costs , pursuant to Texas Government Code
2258.023 .
(c) Complaints of Violations and City Determination of Good Cause. On receipt of information, including a
complaint by a worker, concerning an alleged violation of 2258.023, Texas Government Code, by a contractor
or subcontractor, the City shall make an initial determination, before the 31 51 day after the date the City
receives the information, as to whether good cause exists to believe that the violation occurred. The City
shall notify in writing the contractor or subcontractor and any affected worker of its initial determination . Upon
the City's determination that there is good cause to believe the contractor or subcontractor has violated
Chapter 2258, the City shall retain the full amounts claimed by the claimant or claimants as the difference
between wages paid and wages due under the prevailing wage rates, such amounts being subtracted from
successive progress payments pending a final determination of the violation.
(d) Arbitration Required if Violation Not Resolved. An issue relating to an alleged violation of Section 2258.023,
Texas Government Code, including a penalty owed to the City or an affected worker, shall be submitted to
binding arbitration in accordance with the Texas General Arbitration Act (Article 224 et seq., Revised
Statutes) if the contractor or subcontractor and any affected worker do not resolve the issue by agreement
before the 15th day after the date the City makes its initial determination pursuant to paragraph (c) above. If
the persons required to arbitrate under this section do not agree on an arbitrator before the 11th day after the
date that arbitration is required, a district court shall appoint an arbitrator on the petition of any of the persons.
The City is not a party in the arbitration. The decision and award of the arbitrator is final and binding on all
parties and may be enforced in any court of competent jurisdiction.
(e) Records to be Maintained . The contractor and each subcontractor shall, for a period of three (3) years
following the date of acceptance of the work, maintain records that show (i) the name and occupation of each
worker employed by the contractor in the construction of the work provided for in this contract; and (ii) the
actual per diem wages paid to each worker. The records shall be open at all reasonable hours for inspection
by the City. The provisions of the Audit section of these contract documents shall pertain to this inspection.
(f) Pay Estimates. With each partial payment estimate or payroll period, whichever is less, the contractor shall
submit an affidavit stating that the contractor has complied with the requirements of Chapter 2258, Texas
Government Code.
(g) Posting of Wage Rates. The contractor shall post the prevailing wage rates in a conspicuous place at the site
of the project at all times.
(h) Subcontractor Compliance. The contractor shall include in its subcontracts and/or shall otherwise require all
of its subcontractors to comply with paragraphs (a) through (g) above.
CITY OF FORT WORTH PREVAILING WAGE RATES -ADOPTED
HEAVY & HIGHWAY CONSTRUCTION
PREY AILING WAGE RA TES 2008
Air Tool Ooerator
Asphalt Distributor Operator
Asphalt Paving Machine Operator
Asphalt Raker
Asphalt Shoveler
Batching Plant Weigher
Broom or Sweeper Operator
Bulldozer Operator
Carpenter
Concrete Finisher Paving
Concrete Finisher, Structures
Concrete Paving Curbing Machine Operator
Concrete Paving Finishing Machine Operator
Concrete Paving Joint Sealer Operator
Concrete paving Saw Operator
Concrete Paving Spreader Operator
Concrete Rubber
Crane, Clamshell, Backhoe, Derrick, Dragjine, Shovel Operator
Electrician
Flagger
Form Builder/Setter, Structures
Form Setter, Paving & Curb
Foundation Drill Ooerator, Crawler Mounted
Foundation Drill Operator, Truck Mounted
Front End Loader Operator
Laborer, Common
Laborer, Utility
Mechanic
MillinJ? Machine Onerator, Fine Grade
Mixer Operator
Motor Grader Operator, Fine Grade
Motor Grader Ooerator RouJ:?;h
Oiler
Painter, Structures
Pavement Marking Machine Operator
Pipe layer
Reinforcing Steel Setter, Paving
Reinforcing Steel Setter, Structure
Roller Operator, Pneumatic, Self-Propelled
Roller Operator, Steel Wheel, Flat Wheel!famping
Roller Operator, Steel Wheel, Plant Mix Pavement
Scraper Operator
Servicer
Slip Form Machine Operator
Spreader Box Operator
Tractor Operator, Crawler Type
Tractor Operator, Pneumatic
Traveling Mixer Operator
Truck Driver Lowboy-Float
Truck Driver Single Axle, Heaw
Truck Driver Single Axle, Light
Truck Driver, Tandem Axle, Semi-Trailer
Truck Driver Transit-Mix
Wagon Drill, Boring Machine, Post Hole Driller Operator
Welder
Work Zone Barricade Servicer
$10.06
$13 .99
$12.78
$11.01
$ 8.80
$14.15
$ 9.88
$13.22
$12.80
$12.85
$13 .27
$12.00
$13 .63
$12.50
$13.56
$14 .50
$10.61
$14.12
$18.12
$ 8.43
$11.63
$11.83
$13 .67
$16.30
$12.62
$ 9.18
$10.65
$16.97
$11.83
$11.58
$15 .20
$14.50
$14.98
$13 .17
$10.04
$11.04
$14 .86
$16.29
$11.07
$10.92
$11.28
$11.42
$12.32
$12.33
$10.92
$12.60
$12 .91
$12.03
$14.93
$11.47
$10.91
$11.75
$12.08
$14.00
$13.57
$10.09
CITY OF FORT WORTH PREVAILING WAGES: CONT. -ADOPTED
Class1f1cat1on
AC Mechanic
AC Mechanic Helper
Acoustical Ceiling Mechanic
Bricklayer /Stone Mason
Bricklayer /Stone Mason Helper
Carpenter
Carpenter Helper
Concrete Finisher
Concrete Form Builder
Drvwall Mechanic
Drvwall Helper
Drywall Taper
Drywall Taper Heloer
Electrician (Journeyman)
Electrician Helper
Electronic Technician
Electronic Technician Helper
Floor Layer {Resilient)
Floor Layer Helper
Glazier
Glazier Helper
Insulator
Insulator Heloer
Laborer Common
Laborer Skilled
Lather
Painter
Painter Helper
Pipefltter
Plpefitter Helper
Plasterer
Plasterer Helper
2008 PREVAILING WAGE RATES
CONSTRUCTION INDUSTRY
Hrly Rate Cla ss1 f1cation
$21.69 Plumber
$12.00 Plumber Heloer
$15.24 Reinforcin11 Steel Setter
$19 .12 Roofer
$10,10 Roofer Helper
$16.23 Sheet Metal Worker
$11.91 Sheet Metal Worker Heloer
$13.49 Sprinkler System Installer
$13 .12 Sprinkler System Installer Helper
$14.62 Steel Worker Structural
$10 .91 Concrete Pump
Crane, Clamsheel, Backhoe, Derrick, D'Line
$13.00 Shovel
$9.00 Forklift
$20.20 Front End Loader
$14.43 Truck Driver
$19.86 Welder
$12 .00 Welder Helper
$20 .00
$13.00
$18.00
$13.00
$14.78
$11.25
$10.27
$13.18
$16.10
$14 .83
$8.00
$18.85
$12 .83
$17.25
$12 .25
Hrly Rate
$20 .43
$14 .90
$10 .00
$14.00
$10.00
$16.96
$12.31
$18.00
$9 .00
S17.43
$20 .50
$17 .76
$12.63
$10.50
$14 .91
$16 .06
$9.75
SNOISIJ\O~d 1Vl~3dS
• L •
SPECIAL PROVISIONS FOR
STORM DRAIN IMPROVEMENTS
Table of Contents
1. SCOPE OF WORK
2 . AWARD OF CONTRACT
3 . PRECONSTRUCTION CONFERENCE
4. BID SUBMITTAL
5. WATER FOR CONSTRUCTION
6. SANITARY FACILITIES FOR WORKERS
7 . PAYMENT
8 . SUBSIDIARY WORK
9. LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC
10. WAGE RATES
11 . EXISTING UTILITIES
12. MATERIAL STORAGE
13. PROTECTION OF EXISTING UTILITIES AND IMPROVEMENTS
14. BID QUANTITIES
15. CONTRACTORS RESPONSIBILITY FOR DAMAGE CLAIMS
16. EQUAL EMPLOYMENT PROVISIONS
17. MINORITY AND WOMENS BUSINESS ENTERPRISE (M/WBE) COMPLIANCE
18. CONTRACTOR 'S COMPLIANCE WITH WORKER 'S COMPENSATION LAW
19. SUBSTITUTIONS
20. MECHANICS AND MATERIALSMEN 'S LIEN
21. CONSTRUCTION SPECIFICATIONS
22. MAINTENANCE STATEMENT
23. DELAYS
24. DETOURS AND BARRICADES
25. DISPOSAL OF SPOIUFILL MATERIAL
26. QUALITY CONTROL TESTING
27. PROPERTY ACCESS
28. SAFETY RESTRICTIONS-WORK NEAR HIGH VOLTAGE LINES
29. WATER DEPARTMENT PRE-QUALIFICATIONS
30 . RIGHT TO AUDIT
31. CONSTRUCTION STAKES
32. EARLY WARNING SYSTEM FOR CONSTRUCTION
33. AIR POLLUTION WATCH DAYS
34. NON -EXCLUSIVE CONTRACT
35. DETERMINATION AND INITIATION OF WORK
36. WORK ORDER COMPLETION TIME
37. LIQUIDATED DAMAGES
38. PAYMENT
39. LIFE OF CONTRACT
40. TERMINATION
SP-1
CONSTRUCTION ITEMS :
41. NON-PAY ITEM -SPRINKLING FOR DUST CONTROL
42. NON-PAY ITEM -PROTECTION OF TREES, PLANTS AND SOILS
43. NON-PAY ITEM -CONCRETE COLORED SURFACE
44. NON -PAY ITEM -PROJECT CLEAN-UP
45. NON-PAY ITEM -PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION
46. NON-PAY ITEM -PRE -CONSTRUCTION NEIGHBORHOOD MEETING
47. NON-PAY ITEM -WASHED ROCK
48. NON-PAY ITEM -SAWCUT OF EXISTING CONCRETE
49. NON-PAY ITEM -TIE-IN INTO STORM DRAIN STRUCTURE
50 . NON PAY ITEM -TEMPORARY EROSION , SEDIMENT AND WATER POLLUTION
CONTROL (FOR DISTURBED AREAS LESS THAN 1 ACRE)
51 . NON PAY ITEM -TRAFFIC CONTROL
52. NON PAY ITEM -SILICONE JOINT SEALING FOR CONCRETE PAVEMENT
53. NON PAY ITEM-REINFORCED CONCRETE COLLAR CONNECTION FOR PIPE
54. PRE-BID ITEM -FEE FOR STREET USE PERMIT
55. PAY ITEM -TOP SOIL
56. PAY ITEM -6 " & 7" CONCRETE CURB
57. PAY ITEM -TRENCH SAFETY
58. PAY ITEM -CONCRETE FLAT WORK (CURB , CURB & GUTTER , SIDEWALKS ,
LEADWALKS, WHEELCHAIR RAMPS AND DRIVEWAYS)
59 . PAY ITEM -REMOVE EXISTING CURB AND GUTTER
60 . PAY ITEM -REMOVE EXISTING CURB INLET
61 . PAY ITEM -CONCRETE DRIVEWAY REPLACEMENT
62. PAY ITEM -STANDARD CONCRETE SIDEWALK, LEADWALK AND
WHEELCHAIR RAMP
63 . PAY ITEM -CONCRETE CURB AND GUTTER REPLACEMENT
64 . PAY ITEM -NEW 8 ' CONCRETE VALLEY GUTTER
65. PAY ITEM -STORM DRAIN INLETS
66. PAY ITEM -TRENCH EXCAVATION AND BACKFILL
FOR STORM DRAIN
67. PAY ITEM-BRICK PAVEMENT REPAIR
68. PAY ITEM-DEHOLES
69. PAY ITEM -MOVE IN CHARGES
70 . PAY ITEM-FLOWABLE FILL
71. PAY ITEM -EMERGENCY SITUATION JOB MOVE IN
72. PAY ITEM-GABION BASKETS AND GABION MATTRESSES
73. PAY ITEM-SUBDRAINS
74 . PAY ITEM-REMOVE AND REPLACE EXISITING FENCE
75 . PAY ITEM -REMOVE AND REPLACE EXISTING TREES
76 . PAY ITEM -FILL MATERIAL-BORROW
77. PAY ITEM-POST CONSTRUCTION TELEVISION INSPECTION (CCTV)
SP-2
SPECIAL PROVISIONS
FOR: MISCELLANEOUS STORM WATER IMPROVEMENTS-2011
Project Numbers :
TPW -PE69 539120 0209203
CITY PROJ . NO . -01635
1. SCOPE OF WORK : The work covered by these plans and specifications consist of storm drain
extensions and replacements along with any and all other miscellaneous items of construction to
be performed as outlined in the specifications which are necessary to satisfactorily complete the
work .
2. AWARD OF CONTRACT: Contract may not necessarily be awarded to the lowest bidder. The City
Engineer reserves the right to evaluate and recommend to the City Council the best bid, which is
considered to be in the best interest of the City . The contract will be awarded to the lowest
responsive and responsible bidder.
Total quantities given in the bid proposal may not reflect actual quantities; however , they are given
for the purpose of bidding and awarding the contract. A contract in the amount of $2,000,000 shall
be awarded with the final payment based on actual measured quantities and the unit price bid in
this proposal. Moreover, there is to be no limit on the variation between the estimated quantities
shown and actual quantities performed.
It is understood and agreed that the scope of work contemplated in this contract is that which is
designated by the City but will in no case exceed $2,000,000 including all change orders.
3 . PRE -CONSTRUCTION CONFERENCE: The successful Contractor , Project Engineer, and other
City staff as needed , shall meet at the call of the City for a preconstruction conference before any
of its work begins on this project. At this time, details of sequencing of the work , contact
individuals for each party, request for survey, and pay requests will be covered.
4. BID SUBMITTAL: Bidders shall not separate, detach or remove any portion, segment or sheets
from the contract documents at any time. Failure to bid or fully execute contract without retaining
contract documents intact may be grounds for designating bids as "non-responsive" and rejecting
bids as appropriate and as determined by the Director of the Department of Transportation and
Public Works .
5 . WATER FOR CONSTRUCTION : Water for construction will be furnished by the Contractor at his
own expense.
6 . SANITARY FACILITIES FOR WORKERS: The Contractor shall provide all necessary
conveniences for the use of workers at the project site. Specific attention is directed to this
equipment.
7 . PAYMENT: The Contractor shall receive full payment from the City for all the work based on unit
prices bid on the proposal and specified in the plans and specifications and approved by the
Project Engineer per actual field measurement.
SP-3
8. SUBSIDIARY WORK: Any and all work specifically governed by documentary requirement for the
projects, such as condit ions imposed by the Plans, the General Contract Documents or these
special Contract Documents, in which no specific item for bid has been provided for in the
Proposal, shall be considered as a subsidiary item or work, the cost of which shall be included in
the price bid in the Proposal for each bid item, including but not limited to surface restoration
cleanup .
9 . LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC: The Contractor's particular
attention is directed to the requirements of Item 7, "Legal Relations and Responsibilities to the
Public" of the "Standard Specifications for Street and Storm Drain Construction ".
10 . WAGE RATES: The labor classifications and minimum wage rates set forth herein have been
predetermined by the City Council of the City of Fort Worth , Texas , in accordance with statutory
requirements , as being the prevailing classifications and rates that shall govern on all work
performed by the Contractor or any subcontractor on the site of the project covered by these
Contract Documents . In no event shall less than the following rates be paid. (Attached at the end
of this section .)
11 . EXISTING UTILITIES: The locations and dimensions shown on the plans relative to existing
utilities are based on the best information available . It shall be the Contractor's responsibility to
verify location of adjacent and/or conflicting utilities sufficiently in advance of construction in order
that he may negotiate such local adjustments as are necessary in the construction process in order
to provide adequate clearance . The Contractor shall take all necessary precautions in order to
protect all services encountered .
Any damage to utilities and any losses to the utility owner due to disruption of service resulting
from the Contractor's operations shall be at the Contractor's expense.
12. MATERIAL STORAGE: Material shall not be stored on private property unless the Contractor has
obtained permission from the property owner.
13 . PROTECTION OF EXISTING UTILITIES AND IMPROVEMENTS: The Contractor shall take
adequate measures to protect all existing structures , improvements and utilities, which may be
encountered .
The utility lines and conduits shown on the plans are for information only and are not guaranteed
by the City or the Engineer to be accurate as to extent, location and depth , they are shown on the
plans as the best information available at the time of design , from the Owners of the utilities
involved and from evidences found on the ground .
14. BID QUANTITIES: Bid quantities of the various items in the proposal are for comparison only and
may not reflect the actual quantities. There is no limit to which a bid item can be increased or
decreased .
Contractor shall not be entitled to renegotiation of unit prices regardless of the final measured
quantities . No claim will be considered for lost or anticipated profits based upon differences in
estimated quantities versus actual quantities.
15. CONTRACTOR 'S RESPONSIBILITY FOR DAMAGE CLAIMS: Contractor Covenants and agrees
to indemnify City's Engineer and Architect , and their personnel at the project site for Contractor's
sole negligence . In addition , Contractor covenants and agrees to indemnify, hold harmless and
defend , at its own expense, the City, its officers, servants and employees, from and against any
and all claims or suits for property loss, property damage, personal injury, including death, arising
out of, or alleged to arise out of , the work and services to be performed hereunder by Contractor ,
its officers , agents, employees, subcontractors, licensees or invitees, whether or not any such
injury, damage or death is caused, in whole or in part, by the negligence or alleged
SP-4
negligence of City, its officers, servants, or employees. Contractor likewise covenants and
agrees to indemnify and hold harmless the City from and aga inst any and all injuries to City's
officers , servants and employees and any damage , loss or destruction to property of the City
arising from the performance of any of the terms and conditions of this Contract, whether or not
any such injury or damage is caused in whole or in part by the negligence or alleged
negligence of City, its officers, servants or employees.
In the event City receives a written claim for damages against the Contractor or its subcontractors
prior to final payment , final payment shall not be made until Contractor either (a) submits to City
satisfactory evidence that the claim has been settled and/or a release from the claimant involved ,
or (b) provides City with a letter from Contractor's liability insurance carrier that the claim has been
referred to the insurance carrier.
The Director may, if deemed appropriate, refuse to accept bids on other City of Fort Worth public
work from a Contractor against whom a claim for damages is outstanding as a result of work
performed under a City Contract.
16. EQUAL EMPLOYMENT PROVISIONS : Contractor shall comply with City Ordinance Number 7278
as amended by City Ordinance Number 7400 (Fort Worth City Code Sections 13 -A-21 through 12-
A-29) prohibiting discrimination in employments practices.
The Contractor shall post the required notice to that effect on the project site , and at his request,
wll be provided by assistance by the City of Fort Worth 's Equal Employment Officer who will refer
any qualified applicant he may have on file in his office to the Contractor. Appropriate notices may
be acquired from the Equal Employment Officer.
17 . MINORITY AND WOMEN BUSINESS ENTERPRISE (M/WBE) COMPLIANCE: In accordance
with City of Fort Worth Ordinance No. 15530, the City has goals for the participation of minority
business enterprises and women business enterprises in City contracts . The Ordinance is
incorporated in these specifications by reference. A copy of the Ordinance may be obtained from
the Office of the City Secretary. Failure to comply with the ordinance shall be a material breach of
contract.
M/WBE UTILIZATION FORM, M/WBE GOALS WAIVER FORM AND GOOD FAITH EFFORT
FORM , as applicable , must be submitted within fine (5) city business days after bid opening .
Failure to comply shall render the bid non-responsive.
Upon request, Contractor agrees to provide the City complete and accurate information regarding
Actual work performed by a Minority or Women Business Enterprise (M/WBE) on the contract and
payment thereof. Contractor further agrees to permit an audit and/or examination of any books ,
records or files in its possession that will substantiate the actual work performed by an MBE and/or
WBE . The misrepresentation of acts (other than a negligent misrepresentation) and /or the
commission fraud by the Contractor will be grounds for termination of the contract and/or initiating
action under appropriate federal, state, or local laws or ordinances relating to false statement.
Further , any such misrepresentation (other than a negligent misrepresentation) and/or commission
of fraud will result in the Contractor being determined to be irresponsible and barred from
participating in City work for a period of time not less than three years.
The City will consider the Contractor's performance regarding its M/WBE program in the evaluation
of bids . Failure to comply with the City 's M/WBE Ordinance, or to demonstrate "good faith effort",
shall result in a bid being rendered non-responsive to specifications.
Contractor shall provide copies of subcontracts or co -signed letters of intent with approved M/WBE
subcontractors prior to issuance of the Notice to Proceed. Contractor shall also provide monthly
reports on utilization of the subcontractors to the City's M/WBE office.
SP-5
The Contractor may count first and second tier subcontractors and/or suppliers toward meeting the
goals. The Contractor may count toward its goal a portion of the total dollar amount of the contract
with a joint venture equal to the percentage of the M/WBE participation in the joint venture for a
clearly defined portion of the work to be performed . All M/WBE Contractors used in meeting the
goals must be certified prior to the award of the Contract. The M/WBE Contractor(s) must be
certified by either the North Central Texas Regional Certification Agency (NCTRCA) or Texas
Department of Transportation (TxDOT), Highway Division and must be located in the nine (9)
county market place or currently doing business in the marketplace at time of bid . The Contractor
shall contact all such M/WBE subcontractors or suppliers prior to listing them on the M/WBE
utilization or good faith effort forms as applicable. Failure to contact the listed M/WBE
subcontractor or supplier prior to bid opening may result in the rejection of bid as non -responsive .
Whenever a change order affects the work of an M/WBE subcontractor or supplier , the M/WBE
shall be given an opportunity to perform the work. Whenever a change order exceeds 10% of the
original contract , the M/WBE coordinator shall determine the goals applicable to the work to be
performed under the change order
During the term of the contract the contract shall :
1. Make no unjustified changes or deletions in its M/WBE participation commitments
submitted with or subsequent to the bid, and,
2 . If substantial subcontracting and/or substantial supplier opportunities arise during the
term of the contract which the Contractor had represented he would perform with his
forces , the Contractor shall notify the City before subcontracts or purchase orders are
let , and shall be required to comply with modifications to goals as determined by the
City , and ,
3. Submit a REQUEST FOR APPROVAL OF CHANGE FORM, if the Contractor desires
to change or delete any of the M/WBE subcontractors or suppliers. Justification for
change may be granted for the following :
a. Failure of Subcontractor to provide evidence of coverage by Worker's
Compensation Insurance.
b. Failure of Subcontractor to provide required general liability of other insurance.
c . Failure of Subcontractor to execute a standard subcontract form in the amount
of the proposal used by the Contractor in preparing his M/WBE Participation plan .
d. Default by the M/WBE subcontractor or supplier in the performance of the
subcontractor.
Within ten (10) days after final payment from the City, the Contractor shall provide the
M/WBE Office with documentation to reflect final participation of each subcontractor
and supplier used on the project, inclusive of M/WBEs.
18 . CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW:
A. Workers Compensation Insurance Coverage
a. DEFINITIONS:
b. Certification of cove rage ("Certificate"). A copy of a certificate of insurance, a certificate of
authority to self-insure issued by the commission, or a coverage agreement (TWCC -81 , TWCC-
82, TWCC-83 , OR TWCC-84), showing statutory workers ' compensation insurance coverage for
SP-6
the person's or entity's employees providing services on a project, for the duration of the project.
Duration of the project-includes the time from the beginning of the work on the project until the
Contractor's/person's work on the project has been completed and accepted by the
governmental entity.
Persons providing services on the project ("subcontractor" in §406 .096)-includes all persons or
entities performing all or part of the services the Contractor has undertaken to perform on the
project, regardless of whether that person contracted directly with the Contractor and regardless
of whether that person has employees . This includes, without limitation, independent
Contractors, subcontractors , leasing companies , motor carriers , City-operators , employees of
any such entity, or employees of any entity which furnishes persons to provide services on the
project. "Services" include, without limitation, providing, hauling , or delivering equipment or
materials, or providing labor, transportation, or other services related to a project. "Services"
does not include activities unrelated to the project, such as food/beverage vendors, office supply
deliveries, and delivery of portable toilets .
The Contractor shall provide coverage, based on proper reporting of classification codes and
payroll amounts and filing of any coverage agreements , which meets the statutory requirements
of Texas Labor Code, Section 401.011 (44) or all employees of the Contractor providing services
on the project, for the duration of the project.
c. The Contractor must provide a certificate of coverage to the governmental entity prior to being
awarded the contract.
d. If the coverage period shown on the Contractor's current certificate of coverage ends during the
duration of the project, the Contractor must, prior to the end of the coverage period, file a new
certificate of coverage with the governmental entity showing that coverage has been extended .
e. The Contractor shall obtain from each person providing services on a project, and provide to the
governmental entity:
(1) a certificate of coverage, prior to that person beginning work on the project , so
the governmental entity will have on file certificates of coverage showing
coverage for all persons providing services on the project ; and
(2) no later than seven days after receipt by the Contractor, a new certificate of
coverage showing extension of coverage , if the coverage period shown on the
current certificate of coverage ends during the duration of the project.
f. The Contractor shall retain all required certificates of coverage for the duration of the project and
for one year thereafter.
g. The Contractor shall notify the governmental entity in writing by certified mail or personal delivery,
within ten (10) days after the Contractor knew or should have known , or any change that
materially affects the provision of coverage of any person providing services on the project.
h. The Contractor shall post on each project site a notice, in the text , form and manner prescribed by
the Texas Worker's Compensation, informing all persons providing services on the project that
they are required to be covered , and stating how a person may verify coverage and report lack of
coverage.
i. The Contractor shall contractually require each person with whom it contracts to provide services
on a project, to:
(1) provide coverage, based on proper reporting on classification codes and
payroll amounts and filing of any coverage agreements, which meets the
SP-7
j.
k .
B.
statutory requirements of Texas Labor Code, Section 401.011 (44) for all of its
employees providing services on the project , for the duration of the project;
(2) provide to the Contractor, prior to that person beginning work on the project, a
certificate of coverage showing that coverage is being provided for all
employees of the person providing services on the project , for the duration of
the project;
(3) provide the Contractor, prior to the end of the coverage period, a new
certificate of coverage showing extension of coverage, if the coverage period
shown on the current certificate of coverage ends during the duration of the
project ;
(4) obtain form each other person with whom it contracts, and provide to the
Contractor:
(a) a certificate of coverage, prior to the other person beginning work on
the project; and
(b) a new certificate of coverage showing extension of coverage, prior to
the end of the coverage period , if the coverage period shown on the
current certificate of coverage ends during the duration of the project ;
(c) retain all required certificates of coverage on file for the duration of the
project and for one year thereafter.
(d) notify the governmental entity in writing by certified mail or personal
delivery, within ten (10) days after the person knew or should have
known, of any change that materially affects the provision of coverage
of any person providing services on the project ; and
(e) contractually require each person with whom it contracts , to perform
as required by paragraphs (1 )-(7), with the certificates of coverage to
be provided to the person for whom they are providing services .
By signing this contract or providing or causing to be provided a certificate of
coverage, the Contractor is representing to the governmental entity that all employees
of the Contractor who will provide services on the project will be covered by worker's
compensation coverage for the duration of the project, that the coverage will be based
on proper reporting of classification codes and payroll amounts, and that all coverage
agreements will be filed with appropriate insurance carrier or, in the case of a self-
insured, with the commission's Division of Self-Insurance Regulation. Providing false
or misleading information may subject the Contractor to administrative, criminal, civil
penalties or other civil actions.
The Contractor's failure to comply with any of these provisions is a breach of contract
by the Contractor which entitles the governmental entity to declare the contract void if
the Contractor does not remedy the breach within ten day after receipt of notice of
breach from the governmental entity.
The Contractor shall post a notice on each project site informing all persons providing
services on the project that they are required to be covered, and stating how a person
may verify current coverage and report failure to provide coverage. This notice does
not satisfy other posting requirements imposed by the Texas Worker's Compensation
Act or other Texas Worker's Commission rules. This notice must be printed with a title
in at least 30 point bold type and text in at least 19 point normal type, and shall be in
both English and Spanish and any other language common to the Worker population.
SP-8
The text for the notices shall be the follow ing text, without any additional words or
changes:
"REQUIRED WORKER 'S COMPENSATION COVERAGE
The law requires that each person work ing on this site or providing services related to
this construction project must be covered by worker's compensation insurance . This
includes persons providing, hauling , or de livering equipment or materials , or providing
labor or transportation or other service related to the project , regardless of the identify
of their employer or status as an employee."
Call the Texas Worker's Compensation Commission at 512-440-3789 to receive
information on the legal requirement for coverage , to verify whether your employer has
provided the required coverage , or to report an employer's failure to provide
coverage".
19. SUBSTITUTIONS: The specifications for materials set out the minimum standard of quality that
the City believes necessary to procure a satisfactory project. No subst itutions will be permitted
until the Contractor has received written permission of the Project Engineer or assigned
representative to make a substitution for the material that has been specified . Where the term "or
equal ", or "or approved equal " is used , it is understood that if a material , product , or piece of
equipment bearing the name so used is furnished , it will be approvable, as the particular trade
name was used for the purpose of establishing a standard of quality acceptable to the City . If a
product of any other name is proposed substitutes is procured by the Contractor. Where the term
"or equal ", or "approved equal " is not used in the specifications , this does not necessari ly exclude
alternative items or material or equipment which may accomplish the intended purpose . However ,
the Contractor shall have the full responsibility of providing that the proposed substitut ion is , in fact ,
equal , and the Project Eng ineer , as the representative of the City, shall be the sole judge of the
acceptability of substitutions. The provisions of the sub-section as related to "substitutions " shall
be applicable to all sections of these specifications .
20 . MECHANICS AND MATERIALMEN 'S LIEN: The Contractor shall be required to execute a release
of mechanics and materialmen 's liens upon receipt of payment.
21. CONSTRUCTION SPECIFICATIONS : This contract and project are governed by the two following
published specifications , except as modified by these Special Provisions:
STANDARD SPECIFICATIONS FOR STREET AND STORM DRAIN CONSTRUCTION CITY OF
FORT WORTH
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION NORTH CENTRAL
TEXAS
A copy of either of these specifications may be purchased at the Office of the Department of
Transportation and Public Works, 1000 Throckmorton Street, 2"d Floor, Municipal Building, Fort
Worth, Texas 76102. The specifications applicable to each pay item are indicated in the call -out
for the pay item by the Project Engineer. If not shown , then applicab le published specifications in
either of these documents may be followed at the discretion of the Contractor. General Provisions
shall be those of the Fo rt Worth document rather than Divis ion 1 of the North Central Texas
document.
22 . MAINTENANCE STATEMENT : The Contractor shall be responsib le for defects in this project due
to faulty materials and workmanship, or both, for a period of two (2) years from date of final
acceptance of this project and will be required to replace at his expense any part or the entire
project which becomes defective due to these causes.
SP-9
23. DELAYS : The Contractor shall receive no compensation for delays or hindrances to the work ,
except when direct and unavoidable extra cost to the Contractor is caused by the failure of the City
to provide information or material , if any, which is to be furnished by the City. When such extra
compensation is claimed a written statement thereof shall be presented by the Contractor to the
Director of the Department of Transportation and Public Works and if by him found correct shall be
approved and referred by him to the Council for final approval or disapproval; and the action
thereon by the Council shall be final and binding . If delay is caused by specific orders given by the
Project Engineers to stop work or by the performance of extra work or by the failure of the City to
provide material or necessary instructions for carrying on the work, then such delay will entitle the
Contractor to an equivalent extension of time , his application for which shall , however , be subject
to the approval of the City Council; and no such extension of time shall release the Contractor or
the surety on his performance bond form all his obligations hereunder which shall remain in full
force until the discharge of the contract.
24. DETOURS AND BARRICADES: The Contractor shall prosecute his work in such a manner as to
create a minimum of interruption to traffic and pedestrian facilities and to the flow of vehicular and
pedestrian traffic within the project area. Contractor shall protect construction as required by
Engineer by providing barricades.
Barricades , warning and detour signs shall conform to the Standard Specifications "Barriers and
Warning and/or Detour Signs ," Item 524 and/or as shown on the plans.
Construction signing and barricades shall conform with "1980 Texas Manual on Uniform Traffic
Control Devices , Vol. No. 1."
25. DISPOSAL OF SPOIUFILL MATERIAL: Prior to the disposing of any spoil/fill material , the
Contractor shall advise City of Fort Worth 's Flood Plain Administrator ("Administrator''), of the
location of all sites where the Contractor intends to dispose of such material. Contractor shall not
dispose of such material until the proposed sites have been determined by the Administrator to
meet the requirements of the Flood Plain Ordinance of the City of Fort Worth (Ordinance No.
10056). All disposal sites must be approved by the Administrator to ensure the filling is not
occurring within a flood plain without a permit. A flood plain permit can be issued upon approval of
necessary engineering studies. No fill permit is required if disposal sites are not in a flood plain.
Approval of the Contractor's disposal sites shall be evidenced by a letter signed by the
Administrator stating that the site is not in a known flood plain or by a Flood Plain fill Permit
authorizing fill within the flood plain. Any expenses associated with obtaining the fill permit,
including any necessary engineering studies, shall be at the Contractor's expense. In the event
that the Contractor disposes of spoil/fill materials at a site without a fill permit or a letter from the
administrator approving the disposal site, upon notification by the Administrator, Contractor shall
remove the spoil/fill material at its expense and dispose of such materials in accordance with the
Ordinance of the City and this section.
26. QUALITY CONTROL TESTING:
(a) The Contractor shall furnish, at its own expense , certifications by a private laboratory for all
materials proposed to be used on the project, including a mix design for any asphaltic and/or
Portland cement concrete to be used and gradation analysis for sand and crushed stone to be
used along with the name of the pit from which the material was taken . The Contractor shall
provide manufacturer's certifications for all manufactured items to be used in the project and
will bear any expense related thereto .
(b) Tests of the design concrete mix shall be made by the Contractor's laboratory at least nine
days prior to the placing of concrete using the same aggregate, cement and mortar which are
to be used later in the concrete . The Contractor shall provide a certified copy of the test
results to the City.
SP-10
(c) Quality control testing of on site material on this project will be performed by the City at its own
expense. Any retesting required as a result of failure of the material to meet project
specifications will be at the expense of the Contractor and will be billed at commercial rates as
determined by the City. The failure of the City to make any tests of materials shall in no way
relieve the Contractor of its respons ibility to furnish materials and equipment conforming to the
requirements of the contract.
(d) Not less than 24 hours notice shall be provided to the City by the Contractor for operat ions
requir ing testing . The Contractor shall provide access and trench safety system (if required)
for the site to be tested and any work effort involved is deemed to be included in the unit price
for the item being tested .
(e) The Contractor shall provide a copy of the trip ticket for each load of fill material delivered to
the job site. The ticket shall specify the name of the pit supplying the fill material.
27 . PROPERTY ACCESS : Access to adjacent property shall be maintained at all times unless
otherwise directed by the Project Engineer.
28 . SAFETY RESTRICTIONS -WORK NEAR HIGH VOLTAGE LINES:
The following procedures will be followed regarding the subject item on this contract:
(a) A warning sign not less than five inches by seven inches , pa inted yellow with black letters that
are leg ible at twelve feet shall be placed inside and outside vehicles such as cranes , derricks ,
power shovels , drilling rigs , pile drivers , hoisting equipment or similar apparatus . The warning
sign shall read as follows :
"WARNING-UNLAWFUL TO OPERATE THIS EQUIPMENT WITHIN SIX FEET OF HIGH
VOLTAGE LINES ."
(b) Equipment that may be operated within ten feet of high voltage lines shall have an insulating
cage-type of guard about the boom or arm , except back hoes or dippers and insulator links on
the lift hood connections .
(c) When necessary to work within six feet of high voltage electric lines , notification shall be given
the power company (TU Electric Service Company) which will erect temporary mechanical
barriers , de -energize the line or raise or lower the line. The work done by the power company
shall not be at the expense of the City of Fort Worth. The notifying department shall maintain
an accurate log of all such calls to TU Electric Service Company and shall record action taken
in each case .
(d) The Contractor is required to make arrangements with the TU Electric Service Company for
the temporary relocation or raising of high voltage lines at the Contractor's sole cost and
expense.
(e) No person shall work within six feet of a high voltage line without protection having been taken
as outlined in Paragraph (c).
29. WATER DEPARTMENT PRE-QUALIFICATIONS: Any Contractor performing any work on Fort
Worth water or sanitary sewer facilities must be pre-qualified with the Water Department to
perform such work in accordance with procedures described in the current Fort Worth Water
Department General Specifications which general specifications shall govern performance of all
such work.
SP -11
30. RIGHT TO AUDIT:
(a) Contractor agrees that the City shall , until the exp i ration of t hree (3) years after final payment
under this contract have access to and the right to examine and photocopy any directly
pertinent books , documents , papers and records of the Contractor involving transactions
relating to this contract. Contractor agrees that the City shall have access during normal
working hours to all necessary Contractor facilities and shall be provided adequate and
appropriate workspace in order to conduct audits in compliance with the provisions of this
section. The City shall give Contractor reasonable advance notice of intended audits.
(b) Contractor further agrees to include in all its subcontracts he reunder a provision to the effect
that the subcontractor agrees that the City shall , under the expiration of three (3) years after
final payment under the subcontract, have access to and the right to exam ine and photocopy
any directly pertinent books , documents , papers and records of such subcontractor i nvolving
transactions to the subcontract and further, that City shall have access during normal working
hours to all subcontractor facilities and shall be provided adequate and appropriate work space
in order to conduct audits in compliance with the provisions of this article together with
subsection (c ) hereof. City shall give subcontractor reasonable advance notice of intended
audits .
(c) Contractor and subcontractor agree to photocopy such documents as may be requested by the
City. The C ity agrees to reimburse Contractor for the cost of copies at the rate published in the
Texas Administrative Code in effect as of the time copying is performed.
31. CONSTRUCTION STAKES:
The City, through its Surveyor or agent , will provide to the Contractor construction stakes or other
customary methods of markings as may be found consistent with professional practice to establish
line and grade for roadway and utility construction and centerlines and benchmarks for bridgework.
These stakes shall be set sufficiently in advance to avoid delay whenever practical. One set of
stakes shall be set for all util ity construction (water , sanitary sewer, drainage , etc.), one set of
excavation/or stabilization stakes , and one set of stakes for curb and gutter and /or paving. It shall
be the sole responsibility of the Contracto r to preserve , maintain , transfer, etc., all stakes furnished
until completion of the construction phase of the project for which they were furnished.
If , in the op i nion of the Project Engineer , a sufficient number of stakes or markings provided by the
City have been lost, destroyed , or distu rbed , that the proper prosecution and control of the work
contracted for in the Contract Documents cannot take place , then the Contractor shall replace
such stakes or markings as required . An individual registered by the Texas Board of Professional
Land Surveying as a Registered Professional Land Surveyor shall replace these stakes , at the
Contactor's expense . No claims for delay due to a lack of replacement of construction stakes will
be accepted, and time will continue to be charged in accordance with the Contract Documents .
32. EARLY WARNING SYSTEM FOR CONSTRUCTION : T ime is of the essence in the completion of
the work orders in this contract. In order to insure that the Contractor is responsive when notified
of unsatisfactory performance and/or of fa ilure to maintain the contract schedule , the following
process shall be applicable :
The work prog ress on all work orders will be closely monitored . On a bi-monthly basis the
percentage of work completed will be compared to the percentage of time charged to the contract.
If the amount of work performed by the Contractor is less than the percentage of time allowed by
20% or more (example: 10% of the work completed in 30% of the stated contract time as may be
amended by change order), the following proactive measures w ill be taken :
1. A letter will be mailed to the Contractor by certified mail; return receipt requested
demanding that, within 10 days from the date that the letter is received , it provide
sufficient equipment, materials and labor to ensure completion of the work within the
contract time . In the event the Contractor receives such a letter, the Contractor shall
SP -12
provide to the City an updated schedule showing how the project will be completed
within the contract time .
2. The Project Engineer and the Directors of the Water Department, and Department of
Transportation and Public Works will be made aware of the situation. If necessary, the
City Manager's Office and the appropriate city counc il members may also be informed.
3. Any notice that may, in the City's sole discretion , be requ ired to be provided to
interested individuals will distributed by the Transportation and Public Works
Department's Public Information Officer.
4. Upon receipt of the Contractor's response , the appropriate City departments and
directors will be notified. The Transportation and Public Works Department's Public
Information Officer will , if necessary, then forward updated notices to the interested
individuals.
5 . If the Contractor fails to provide an acceptable schedule or fails to perform
satisfactorily a second time prior to the completion of the contract , the bonding
company w ill be notified appropriately.
33. AIR POLLUTION WATCH DAYS : The Contractor shall be required to observe the following
guidelines relating to work ing on City construction sites on days designated as "AIR POLLUTION
WATCH DAYS". Typically, the OZONE SEASON , within the Metroplex area , runs from May 1 ,
through OCTOBER 31 , with 6:00 a.m . -10:00 a.m . being critical BECAUSE EMISSIONS FROM
THIS TIME PERIOD HAVE ENOUGH TIME TO BAKE IN THE HOT ATMOSPHERE THAT LEADS
TO EARLY AFTERNOON OZONE FORMATION .
The Texas Commission on Environmental Quality (TCEQ), in coordination with the National
Weather Service , will issue the Air Pollution Watch by 3:00 p.m . on the afternoon prior to the
WATCH day. On designated Air Pollution Watch Days , the Contractor shall bear the respons ibility
of being aware that such days have been designated Air Pollution Watch Days and as such shall
not begin work until 10:00 a .m . whenever construction phasing requires the use of motorized
equipment for periods in excess of 1 hour. However, the Contractor may begin work prior to 10:00
a.m . if use of motorized equ ipment is less than 1 hour, or if equipment is new and certified by EPA
as "Low Emitting ", or equipment burns Ultra Low Sulfur Diesel (ULSD), diesel emulsions , or
alternative fuels such as CNG.
If the Contractor is unable to perform continuous work for a period of at least seven hours between
the hours of 7:00 a.m . -6:00 p.m ., on a designated Air Pollution Watch Day, that day will be
considered as a weather day and added onto the allowable weather days of a given month.
34 NON-EXCLUSIVE CONTRACT: This contract is non-exclusive. During the term of this contract or
any renewal hereof, the City reserves the right to advertise and award another contract for like or
similar work. If a second contract is awarded, the City further reserves the right to issue work
orders under either contract as it deems in its best interest, without recourse.
SP-13
35 DETERMINATION AND INITIAITON OF WORK: The Project Engineer shall determine and
designate to the Contractor the location of the storm drain requiring replacement by a Work Order
together with a sketch for each such replacement, giving the limits, size and nature of work
required. The Project Engineer will notify the Contractor that a Work Order is ready and fax or
email the Contractor a copy of the Work Order notification. The Contractor is to provide his contact
information to the Project Engineer at the pre-construction conference. Single or several Work
Orders may be issued at one time. The Contractor shall initiate work on an improvement
within ten {10} calendar days of the date the Work Order is faxed or emailed to the
Contractor, and continue work on the Work Order until it has been completed, not including
paving. The Contractor shall furnish and supply sufficient equipment and personnel to complete
the Work Order in the amount of time provided for in the Work Order. Should the Contractor fail to
start any Work Order within the time specified, he shall add the necessary work crews and
equipment to prosecute the work to complete the Work Order or Work Orders in the time provided
therefore.
36 WORK ORDER COMPLETION TIME: Should the contractor fail to complete an individual work
order in the given amount of days as specified on each individual work order, liquidated damage
charges will be subtracted from the final pay estimate of that particular work order. The estimated
amount for each particular work order will be used for determining the amount of damages
charged per day of time exceeding the specified amount.
The time of completion of each individual work order is an essential element of this contract. Each
work order issued will have the maximum allowed number of days allowed for the completion of
that specific work.
The number of days specified will generally be calculated as follows: The total estimated cost for
the specific work order divided by 2000 (rounded up) + 10 days = Number of Days allowed for
Construction of Individual Work Order.
37 LIQUIDATED DAMAGES: The Contractor shall pay liquidated damages of one hundred dollars
($100.00) per day per Work Order, for failure to begin a Work Order within ten (10) calendar days
of the date the Work Order is faxed to the Contractor. Failure to complete project within the
stipulated construction time on the Work Order, the Contractor will pay liquidated damages in the
amount stipulated in these contract documents.
38 PAYMENT: Whenever the improvements prescribed by an individual Work Order have been
completed, the Contractor shall notify the Project Engineer or City representative. The Project
Engineer or other appropriate official of the Owner will, within a reasonable time, perform the
inspections. If such inspection reveals that the improvements are in an acceptable condition and
have been completed in accordance with the terms of the Contract Documents and all approved
modifications thereof, the Project Engineer will recommend acceptance of the work under that
particular Work Order and recommend payment therefore .
If the Project Engineer or representative finds that the work has not been completed as required,
he shall so advise the Contractor in writing, furnishing him an itemized list of all known items which
have not been completed or which are not in an acceptable condition. When the Contractor has
corrected all such items, he shall again notify the Project Engineer that the improvements are
ready for inspection, and the Project Engineer shall proceed as outlined above.
Whenever the improvements prescribed by the individual Work Order have been completed and
all requirements of the Contract Documents have been fulfilled on the part of the Contractor, an
estimate showing the value of the work will be prepared by the Project Engineer or representative
as soon as the necessary measurements, computations, and checks can be made.
The amount of the estimate will be paid to the Contractor after acceptance by the Owner , provided
the Contractor has furnished to the Owner satisfactory evidence of payment as follows: Prior to
submission of the estimate for payment, the Contractor shall execute an affidavit, as furnished by
SP-14
the City, certifying that all persons, firms, associations, corporations, or other organizations
furnishing labor and/or materials under that Work Order have been paid in full , that the wage scale
established by the City Council in the City of Fort Worth has been paid , and that there are no
claims pending for personal injury and/or property damages.
The acceptance by the Contractor of the individual payment as aforesaid shall operate as and shall
release the Owner from all claims or liabilities under the Contract for anything done or furnished or
relating to the work under that Work Order or any act or neglect of said City relating to or
connected with the Contract.
The making of the payment by the Owner shall not relieve the Contractor of any guarantees or
other requirements of the Contract Documents which specifically continue thereafter.
Bidder's Initials _______ _
39 LIFE OF CONTRACT: It is contemplated that Work Orders will be issued to the Contractor for
work to be performed under this Contract for not to exceed 365 calendar days following the date of
the Contract nor to exceed the limit of the bid price, whichever should occur first. The Contractor
shall be required to complete any work covered by a Work Order issued prior to that date of
termination but will not be required to accept any work order for execution dated after that date of
termination. If the cost of the work performed under this Contract is less than the limit of the bid
price at the end of the 365 calendar day period , at the City's option and the Contractor's
concurrence, the Project may be extended to the limit of the bid price .
40 TERMINATION: The City reserves the right to abandon, without obligation to the Contractor , any
part of the project, or the entire project, at anytime before the contractor begins any work
authorized by the City.
SP-15
CONSTRUCTION ITEMS
41 NON-PAY ITEM -SPRINKLING FOR DUST CONTROL:
All applicable provisions of Standard Specifications Item 200, "Sprinkling for Dust Control " shall
apply. However, no direct payment will be made for this item and it shall be considered incidental
to this contract.
42 NON-PAY ITEM -PROTECTION OF TREES, PLANTS AND SOIL :
All property along and adjacent to the Contractor's operations including lawns, yards, shrubs, trees,
etc. shall be preserved or restored after completion of the work to a condition equal or better than
existed prior to start of work.
By ordinance, the Contractor must obtain a permit from the City Forester before any work
(trimming, removal or root pruning) can be done on trees or shrubs growing on public property
including street rights-of-way and designated alleys . This permit can be obtained by calling the
Forestry Office at 871-5738. All tree work shall be in compliance with pruning standards for Class
II Pruning as described by the National Arborist Association . A copy of these standards can be
provided by calling the above number. Any damage to public trees due to negligence by the
Contractor shall be assessed using the current formula for Shade Tree Evaluation as defined by
the International Society of Arboriculture . Payment for negligent damage to public trees shall be
made to the City of Fort Worth and may be withheld from funds due to the Contractor by the City.
To prevent the spread of the Oak Wilt fungus , all wounds on Live Oak and Red Oak trees shall be
immediately sealed using a commercial pruning paint. This is the only instance when pruning paint
is recommended.
43 NON-PAY ITEM -CONCRETE COLORED SURFACE :
Concrete wheelchair ramp surfaces, excluding the side slopes and curb, shall be colored with
LITHOCHROME color hardener or equal. A brick red color, a dry-shake hardener manufactured
by L.M. Scofield Company or equal, shall be used in accordance with manufacturer's instructions.
Contractor shall provide a sample concrete panel of one foot by one foot by three inches
dimension, or other dimension approved by the Engineer, meeting the aforementioned
specifications . The sample, upon approval of the Engineer, shall be the acceptable standard to be
applied for all construction covered in the scope of this Non-Pay Item. No direct payment will be
made for this item and it shall be considered incidental to this contract.
The method of application shall be by screen, sifter, sieve, or other means in order to provide for a
uniform color distribution .
44 ON-PAY ITEM -PROJECT CLEAN-UP:
The Contractor shall be aware that keeping the project site in a neat and orderly condition is
considered an integral part of the contracted work and as such shall be considered subsidiary to
the appropriate bid items. Clean up work shall be done as directed by the Engineer as the work
progresses or as needed. If, in the opinion of the Engineer it is necessary, clean up shall be done
on a daily basis. Clean up work shall include, but not be limited to :
• Sweeping the street clean of dirt or debris
• Storing excess material in appropriate and organized manner
• Keeping trash of any kind off of residents' property
If the Project Engineer or representative does not feel that the jobsite has been kept in an orderly
condition, on the next estimate payment (and all subsequent payments until completed) of the
appropriate bid item(s) will be reduced by 25%.
SP-16
45 NON-PAY ITEM -PUBLIC NOTIFICATION PRIOR TO BEGINNING CONSTRUCTION:
Prior to beginning construction on any work order, the Contractor shall, on a block by block basis ,
prepare and deliver a notice or flyer of the pending construction to the front door of each res idence
or business that will be impacted by construction. The notice shall be prepared as follows:
The notification notice or flyer shall be posted seven (7) days prior to beginning any construction
activity on each block in the project area. The flyer shall be prepared on the Contractor's letterhead
and shall include the following information: Name of Project, DOE No., Scope of Project (i.e. type
of construction activity), actual construction duration within the block, the name of the Contractor's
foreman and his phone number , the name of the City's inspector and his phone number and the
City's after-hours phone number. A sample of the 'pre-construction notification ' flyer is attached.
A copy of the flyer shall be delivered to the City Inspector for his review prior to being distributed .
The Contractor will not be allowed to begin construction on any work order until the flyer is
delivered to all residents and/or businesses that will be impacted by construction of the work order .
An electronic version of the sample flyer can be obtained from the construction office at 392-
8306.
All work involved with the pre-construction notification flyer shall be considered subsidiary to the
contract price and no additional compensation shall be made .
46 NON-PAY ITEM -PRE -CONSTRUCTION NEIGHBORHOOD MEETING:
After the pre-construction conference has been held but before construction is allowed to begin on
individual work orders , a public meeting will be held as determined by the Project Engineer. The
Contractor, inspector, and project manager shall meet with all affected residents and present the
projected schedule, including construction start date, and answer any construction related
questions . In no case will construction be allowed to begin until this meeting is held.
47 NON-PAY ITEM -WASHED ROCK :
All washed rock used for embedment or backfill or as otherwise directed by the Project Engineer
shall be washed, crushed stone and shall meet the following gradation and abrasion: (Actual
washing not required if gradation is met)
Sieve Size % Retained
1" 0-10
1/2" 40-75
3/8 " 55-90
#4 90-100
#8 95-100
Los Angeles Abrasion Test: 50% Maximum wear per A.S .T .M. Designation C-131 .
48 NON-PAY ITEM-SAWCUT OF EXISTING CONCRETE :
When existing concrete or H.M.A.C. is cut, such cuts shall be made with a concrete saw . The
Contractor may break out curb and gutter to the nearest joint if he chooses. All sawing shall be
subsidiary to the unit cost of the respective item.
49 NON PAY ITEM -TIE IN INTO STORM DRAIN STRUCTURE: The cost for making lateral tie-ins
(subdrains not included) to the storm drain structure shall be subsidiary to the bid price for the
respective lines.
SP-17
50 NON PAY ITEM -TEMPORARY EROSION, SEDIMENT AND WATER POLLUTION CONTROL
(FOR DISTURBED AREAS LESS THAN 1 ACRE):
A. DESCRIPTION : This item shall consist of temporary soil erosion sediment and water pollution
control measures deemed necessary by the Engineer for the duration of the contract. These
control measures shall at no time be used as a substitute for the permanent control measure
unless otherwise directed by the engineer and they shall not include measures taken by the
CONTRACTOR to control conditions created by his construction operations . The temporary
measures shall include dikes, dames , berms, sediment basins , fiber mats , jute netting,
temporary seeding, straw mulch , asphalt mulch, plastic liners, rubble liners, baled-hay retards,
dikes, slope drains and other devices.
B. CONSTRUCTION REQUIRMENTS: The Project Engineer has the authority to define erodible
earth and the authority to limit the surface are of erodible-earth material exposed by preparing
right-of-way, clearing and grubbing, the surface area of erodible -earth material exposed by
excavation, borrow and to direct the CONTRACTOR to provide temporary pollution -control
measures to prevent contamination of adjacent streams , other water course , lakes , ponds or
other areas of water impoundment. Such work may involve the construction of temporary
berms , dikes, dams, sediment basins , slope drains and use of temporary mulches , mats ,
seeding or other control devices or methods directed by the Project Engineer as necessary to
control soil erosion. Temporary pollution-control measures shall be used to prevent or correct
erosion that may develop during construction prior to installation of permanent pollution control
features , but are not associated with permanent control features on the project. The Project
Engineer will limit the area of preparing right-of-way, clearing and grubbing, excavation and
borrow to be proportional to the CONTRACTOR 'S capability and progress in keeping the finish
grading, mulching, seeding , and other such permanent pollution-control measures current in
accordance with the accepted schedule . Should seasonal conditions make such limitations
unrealistic, temporary soil-erosion-control measures shall be performed as directed by the
Project Engineer.
1. Waste or disposal areas and construction roads shall be located and constructed in a
manner that will minimize the amount of sediment entering streams .
2. Frequent fording of live streams will not be permitted; therefore, temporary bridges or other
structures shall be used wherever an appreciable number of stream crossing are
necessary. Unless otherwise approved in writing by the Project Engineer , mechanized
equipment shall not be operated in live streams .
3 . When work areas or material sources are located in or adjacent to live streams, such
areas shall be separated from the stream by a dike or other barrier to keep sediment from
entering a flowing stream . Care shall be taken during the construction and removal of
such barriers to minimize the muddying of a stream.
4. All waterways shall be cleared as soon as practicable of false work , piling , debris or other
obstructions placed during construction operations that are not part of the finished work .
5. The Contractor shall take sufficient precautions to prevent pollution of streams, lakes and
reservoirs with fuels, oils, bitumens, calcium chloride or other harmful materials. He shall
conduct and schedule his operations so as to avoid or minimize siltation of streams , lakes
and reservoirs and to avoid interference with movement of migratory fish .
C . SUBMITTAL: Prior to the start of the applicable construction, the Contractor shall submit for
approval his schedules for accomplishment of soil-erosion-control work and his plan to keep
the area of erodible -earth material to a minimum. He shall also submit for acceptance his
proposed method of soil-erosion control on construction and haul roads and material sources
and his plan for disposal of waste materials. No work shall be started until the soil-erosion
SP-18
control schedules and methods of ope rations have been reviewed and approved by the
Engineer.
D. MEASUREMENT AND PAYMENT : All work , materials and equipment necessary to provide
temporary erosion control shall be considered subsidiary to the contract and no extra pay will
be g iven for this work .
51 NON PAY ITEM -TRAFFIC CONTROL: The Contractor may be required to obtain a "Street
Use Permit" prior to starting work. As part of the "Street Use Permit " a traffic control plan
is required. The Contractor shall be responsible for providing traffic control during the
construction of this project consistent with the provisions set forth in the "Latest Edition
Texas Manual on Uniform Traffic Control Devices for Streets and Highways (TxMUTCD)"
issued under the authority of the "State of Texas Uniform Act Regulating Traffic on
Highways," codified as Article 6701 d Vernon's Civil Statutes, pertinent sections being
Section Nos. 27, 29, 30 and 31.
A traffic control plan shall be submitted for review to Mr. Charles R. Burkett , City Traffic Engineer
at (817) 392-8712 , at the pre-construction conference. Although work will not begin until the traffic
control plan has been reviewed , the Contractor's time will begin i n accordance with the time frame
established in the Notice to the Contractor.
The Contractor will not remove any regulatory sign , instructional sign , street name sign or other
sign, which has been erected by the City. If it is determined that a sign must be removed to permit
required const ruction , the Contractor shall contact the Transportation and Public Works
Department , Signs and Markings Division , (Phone Number 871-7738) to remove the sign . In the
case of regulatory signs, the Contractor must replace the permanent sign with a temporary sign
meeting the requirements of the above-referenced manual and such temporary sign must be
installed prior to the removal of the permanent sign . If the temporary s ign is not installed correctly
or if it does not meet the required specifications, the permanent sign shall be left in place until the
temporary sign requirements are met. When construction work is completed to the extent that the
permanent sign can be reinstalled , the Contractor shall again contact the Signs and Markings
Division to reinstall the permanent sign and shall leave his temporary sign in place until such
reinstallation is completed.
Work shall not be performed on certain locations/streets during "peak traffic pe ri ods" as
determination by the City Traffic Engineer and in accordance with the applicable provision of the
"City of Fort Worth Traffic Control Handbook for Construction and Maintenance Work Areas."
52 NON PAY ITEM -SILICONE JOINT SEALING FOR CONCRETE PAVEMENT :
CITY OF FORT WORTH , TEXAS
TRANSPORTATION AND PUBLIC WORKS DEPARTMENT SPECIFICATION for SILICONE
JOINT SEALING
(Revision 1, October 18 , 1989)
(Revision 2 , May 12, 1994)
1. SCOPE
Th is specification for silicone joint sealing Portland Cement Concrete pavement and curbs
shall supersede Item 314 .2 . (11) "Joint Sealing Materials" of STANDARD SPECIFICATIONS
FOR STREET AND STORM DRAIN CONSTRUCTION -CITY OF FORT WORTH , and Item
2.210 "Joint Sealing" of STANDARD SPECIFICATIONS FOR PUBLIC WORKS
CONSTRUCTION -NORTH TEXAS COUNCIL OF GOVERNMENTS.
SP-19
2. MATERIALS
2.1 The silicone joint sealant shall meet Federal Specification TT-S-001543A for Class A
sealant except as modified by the test requirements of this specification. Before the
installation of the joint sealant, the Contractor shall furnish the Engineer certification by
an independent testing laboratory that the silicone joint sealant meet these
requirements.
2.2 The manufacturer of the silicone joint sealant shall have a minimum two-year
demonstrated , documented successful field performance with Portland Cement
Concrete pavement silicone joint sealant systems . Verifiable documentation shall be
submitted to the Engineer. Acetic acid cure sealants shall not be accepted. The
silicone sealant shall be cold applied.
2.3 Self-Leveling Silicone Joint Sealant
The joint sealant shall be Dow Corning 890-SL self-leveling silicone joint sealant as
manufactured by Dow Corning Corporation , Midland , Ml 48686-0994, or an approved
equal.
Test Method
AS SUPPLIED
****
MIL-S-8802
ASTM D 1475
****
****
****
AS CURED -AFTER
ASTM D 412 , Die C
ASTM D 3583
(Sect. 14 Mod.)
ASTM C 719
ASTM D 3583
(Sect. 14 Mod.)
ASTM D 3583
(Sect. 14 Mod.)
Self-Leveling Silicone Joint Sealant
Test
Non Volatile Content, % min.
Extrusion Rate, grams/minute
Specific Gravity
Skin-Over Time, minutes max.
Cure Time, days
Full Adhesion, days
Mod. Elongation, % min.
Modulus @ 150% Elongation, psi max .
Movement, 10 cycles @ + 100/-50%
Adhesion to Concrete , % Elongation min .
Adhesion to Asphalt, % Elongation min.
Requirement
96 to 99
275 to 550
1.206 to 1.340
60
14 to 21
14 to 21
1400
9
No Failure
600
600
2.4 The joint filler sop shall be of a closed cell expanded polyethylene foam backer rod
and polyethylene bond breaker tape of sufficient size to provide a tight seal. The back
rod and breaker tape shall be installed in the saw-cut joint to prevent the joint sealant
from flowing to the bottom of the joint. The backer rod and breaker tape shall be
compatible with the silicone joint sealant and no bond or reaction shall occur between
them . Reference is made to the "Construction Detail " sheet for the various joint details
with their respective dimensions.
SP-20
3. TIME OF APPLICATION
On newly constructed Portland Cement Concrete pavement , the joints shall be initially saw
cut to the required depth with the proper joint spacing as shown on the "Construction Detail "
sheet or as directed by the Engineer within 12 hours of the pavement placement. (Note that
for the "dummy'' joints , the initial 1/4 inch width "green " saw-cut and the "reservoir" saw cut
are identical and should be part of the same saw cutting operation. Immediately after the
saw cutting pressure washing shall be applied to flush the concrete slurry from the freshly
saw cut joints.) The pavement shall be allowed to cure for a minimum of seven (7) days .
Then the saw cuts for the joint sealant reservoir shall be made , the joint cleaned , and the
joint sealant installed . During the application of the joint sealant , the weather shall not be
inclement and the temperature shall be 40F (4C) and rising.
4. EQUIPMENT
4.1 All necessary equipment shall be furnished by the Contractor. The Contractor shall
keep his equipment in a satisfactory working condition and shall be inspected by the
Engineer prior to the beginning of the work . The minimum requirements for
construction equipment shall be as follows :
4.2 Concrete Saw: The sawing equipment shall be adequate in size and power to
complete the joint sawing to the required dimensions.
4.3 High Pressure Water Pump: The high pressure cold water pumping system shall be
capable of delivering a sufficient pressure and volume of water to thoroughly flush the
concrete slurry from the saw-cut joint.
4.4 Air Compressors : The delivered compressed air shall have a pressure in excess of 90
psi and 120 cfm. There shall be suitable reaps for the removal of all free water and oil
from the compressed air. The blow-tube shall fir into the saw-cut joint.
4.5 Extrusion Pump: The output shall be capable of supplying a sufficient volume of
sealant to the joint.
4.6 Injection Tool : This mechanical device shall apply the sealant uniformly into the joint.
4. 7 Sandblaster : The design shall be for commercial use with air compressors as
specified in Paragraph 5.4 .
4.8 Backer Rod Roller and Tooling Instrument: These devices shall be clean and free of
contamination . They shall be compatible with the join depth and width requirements .
5. CONSTRUCTION METHODS
5.1 General: The joint reservoir saw cutting, cleaning , bond breaker installation , and joint
sealant placement shall be performed in a continuous sequence of operations
5.2 Sawing Joints : The joints shall be saw-cut to the width and depth as shown on the
"Construction Detail " sheet. The faces of the joints shall be uniform in width and depth
along the full length of the joint.
5.3 Clean ing Joints: Immediately after sawing, the resulting concrete slurry shall be
completely removed from the joint and adjacent area by flushing with high pressure
water. The water flushing shall be done in one-direction to prevent joint contamination.
SP-21
When the Contractor elects to saw the joint by the dry method , flushing the joint with
high pressure water may be deleted. The dust resulting from the sawing shall be
removed from the joint by using compressed air. (Paragraph Rev. 1, October 18 ,
1989)
After complete drying , the joints shall be sandblasted . The nozzle shall be attached to
a mechanical aiming device so that the sand blast will be directed at an angle of 45
degrees and at a distance of one to two inches from the face of the joint. Both joint
faces shall be sandblasted in separate , one directional passes. Upon the termination
of the sandblasting , the joints shall be blown -out using compressed air. The blow tube
shall fit into the joints.
The blown joint shall be checked for residual dust or other contamination . If any dust
or contamination is found, the sandblasting and blowing shall be repeated until the
joint is cleaned . Solvents will not be permitted to remove stains and
contamination.
Immediately upon cleaning, the bond breaker and sealant shall be placed in the joint.
Open , cleaned joints shall not be left unsealed overnight.
Bond Breaker Rod and Tape : The bond breaker rod and tape shall be installed in the
cleaned joint prior to the application of the joint sealant in a manner that will produce
the required dimensions.
5.4 Joint Sealant: Upon placement of the bond breaker rod and tape, the joint sealant shall
be applied using the mechanical injection tool. The joint sealant application shall not
be permitted when the air and pavement temperature is less than 40F (4C). Joints
shall not be sealed unless they are clean and dry.
Unsatisfactorily sealed joints shall be refilled. Excess sealant left on the pavement
surface shall be removed and discarded and shall not be used to seal the joints.
The pavement surface shall present a clean final condition .
Traffic shall not be allowed on the fresh sealant until it becomes tack-free.
Approval of Joints: A representative of the sealant manufacturer shall be present at
the job site at the beginning of the final cleaning and sealing of the joints. He shall
demonstrate to the Contractor and the Project Engineer the acceptable method for
sealant installation. The manufacturer's representative shall approve the clean, dry
joints before the sealing operation commences.
6. WARRANTY
The Contractor shall provide the Project Engineer a manufacturer's written guarantee
on all joint sealing materials. The manufacturer shall agree to provide any
replacement material free of charge to the City. Also , the Contractor shall provide the
Project Engineer a written warranty on all sealed joints. The Contractor shall agree to
replace any failed joints at no cost to the City. Both warranties shall be for two years
after final acceptance of the completed work by the Project Engineer.
53 NON PAY ITEM -REINFORCED CONCRETE COLLARS
For Poured Concrete Pipe Collars, provide a pipe collar as shown on plans at locations requiring
replacement of pipes for repair (point repair or otherwise) and at all changes in pipe sizes in the
conduit line except at manholes . Concrete collars shall be constructed and installed as shown in
standard details. Collar cost is considered subsidiary to bid price for furnishing and installing
SP-22
reinforced concrete pipe . No extra payment will be made for installation of concrete pipe collars
shown on the Plan-Profile Sheets. Where Plan -Profile sheets are not provided (i.e. field
judgments), collars shall be called out and installed as needed to make the repair to the pipe .
54 PRE -BID ITEM TRAFFIC PERMITS FOR UTILITY STREET CUTS :
A fee for street use permits is in effect. The street permit fee is $50.00 per permit with payment
due at the time of permit application .
The price bid per each for "Traffic Permits for Utility Street Cuts " as shown in the Proposal will be
considered full paymen t.
55 PAY ITEM -TOP SOIL :
The proposed quantities shown are calculated to provide topsoil 4 to 6 inches in depth
(compacted) over the parkway area and do not include deeper than design depth behind the curb.
The pay item is intended to pay for topsoil that must be imported where suitable material is either
not available on the job or cannot reasonably be stored on -site. Payment will be made on the
basis of loose truck volume (full truck with sideboards up) tickets and material must meet City of
Fort Worth standards for topso il. Only the volume imported will be paid for and may be
substantially less than the proposal quantities listed.
56 PAY ITEM - 6" & 7" CONCRETE CURB:
The Contractor may, at his option , construct either integral or superimposed curb. Standard
Specification Item 502 shall apply except as follows : Integral curb shall be constructed along the
edge of the pavement as an integral part of the slab and of the same concrete as the slab . The
concrete for the curb shall be deposited not more than thirty (30) minutes after the concrete in the
slab.
If the Contractor fails to backfill behind the curb within seven (7) calenda r days of pouring the curb
and gutter , the amount paid for the curb shall be reduced by 25% until the backfill operation is
complete.
57 PAY ITEM -TRENCH SAFETY:
Description: This item will consist of the basic requirements which the Contractor must comply
with in order to provide for the safety and health of workers in a trench . The Contractor shall
develop, design and implement the trench excavation safety protection system . The Contractor
shall bear the sole responsibility for the adequacy of the trench safety system and providing "a safe
place to work" for the workman .
The trench excavation safety protection system shall be used for all trench excavations deeper
than five (5) feet. The Excavating and Trenching Operation Manual of the Occupational Safety
and Health Administration , U.S. Department of Labor, shall be the minimum governing requirement
of this item and is hereby made a part of this specification. The Contractor shall , in addition ,
comply with all other applicable Federal , State and local rules , regulations and ordinances.
Measurement and Payment: All methods used for trench excavation safety protection shall be
measured by the linear foot of trench and paid at the unit price in the Proposal, which shall be total
compensation for furnishing design, materials, tools, labor, equipment and incidentals necessary,
including removal of the system .
Trench depth for payment purposes for Trench Safety Systems is the vertical depth as measured
from the top of the existing ground to the bottom of the pipe.
Because of the unique nature of this contract, the number of trench safety system designs required
is not known at the time bids are received. While the contractor is still bound by the latest version
of the U.S . Department of Labor , Occupational Safety and Health Administration Standards, 29
SP-23
CFR Part 1926, Subpart P-Excavations, it is the City 's intention that all costs incurred by the
Contractor in acquiring trench safety designs be included in the unit price bid for Job Move in.
58 PAY ITEM -CONCRETE FLAT WORK (CURB. CURB & GUTTER. SIDEWALKS. LEADWALKS.
WHEELCHAIR RAMPS AND DRIVEWAYS):
Concrete flatwork is defined as curb, curb and gutter , sidewalks, leadwalks , wheelchair ramps and
driveways as shown in the plans . This provision governs the sequence of work related to concrete
flatwork and shall be considered a supplement to the specifications governing each specific item .
Required backfilling and finished grading adjacent to flatwork shall be completed in order for the
flatwork to be accepted and measured as completed.
No payment will be made for flatwork until the pay item has been completed, which includes
backfilling and finished grading .
59 PAY ITEM -REMOVE EXISTING CURB AND GUTTER:
Where shown on the plans or where designated by the Engineer, existing curb and or gutter and
existing laid down curb shall be removed and disposed of in a manner satisfactory to the Project
Engineer . Measurement will be by the linear foot for curb and gutter, laydown curb removed , and
for all labor , tools , and incidentals necessary to complete the job.
60 PAY ITEM-REMOVE EXISTING CURB INLET :
This item shall include all labor, materials, and equipment necessary to remove and dispose of the
existing inlet and removal and connection of the existing RCP lead pipe inlet as shown on the
Plans and as directed by the Project Engineer.
61 PAY ITEM-CONCRETE DRIVEWAY REPLACEMENT:
See Standard Specification Item No. 504 , "Concrete Sidewalks and Driveways " for specifications
governing this item as well as details S-S5 and S-S5A.
The price bid per square foot for "CONCRETE DRIVEWAY REPLACEMENT" as shown in the
Proposal will be full payment for materials including all labor , equipment , tools and incidentals
necessary to complete the work .
The Contractor shall salvage all brick pavers behind driveway approaches and secure them in a
proper location, which will be re-used after new driveway approaches are constructed.
62 PAY ITEM -STANDARD CONCRETE SIDEWALK. LEADWALK AND ADA WHEELCHAIR
RAMP:
All applicable provisions of standard Specifications Item 104 "Removing Old Concrete " and Item
504 "Concrete Sidewalk Driveways " shall apply except as herein modified.
The Contractor shall construct standard concrete wheelchair ramps as shown on the enclosed
details , or as directed by the Project Engineer.
The Contractor shall not remove any regulatory sign, instruction sign , street name and sign or
other sign , which has been erected by the City. The Contractor shall contact Signs and Marking
Division , TPW (Phone 871-7738).
All concrete flared surfaces shall be colored with LITHOCHROME color hardener as manufactured
by L.M. Scofield Company or equal. The color hardener shall be brick red color and dry-shake
type, and shall be used in accordance with manufacturer's instructions.
"Contractor shall provide a colored sample concrete panel of one foot by one foot by three inches
dimension, or other dimension approved by the Engineer, meeting the aforementioned
specification. The sample , upon approval by the Engineer, shall be the acceptable standard to be
applied for all construction covered in the scope of this pay item.
SP-24
The method of application shall be by screen , sifter, sieve or other means in order to provide for a
uniform color distribution ."
63 PAY ITEM-CONCRETE CURB AND GUTTER REPLACEMENT:
All provisions of Standard Specification No . 502 'Concrete Curb and Gutter' shall apply except as
modified herein:
Subsidiary to the unit price bid per linear foot shall be the follow i ng :
a. A minimum of 5" or greater as required depth of stabilized subgrade properly compacted
under the proposed curb and gutter as shown in the construction details.
b. If the Contractor fails to backfill either in from of the gutter or behind the curb within seven
(7) calendar days of pouring the curb and gutter, the amount paid for the curb and gutter
shall be reduced by 25% until the backfill operation is complete .
Standard Specifications Item No . 502 , shall apply except as herein modified. Concrete shall have
min imum compressive strength of three thousand (3 ,000) pounds per square inch in twenty-eight
(28) days. The quantity of mixing water shall not exceed seven (7) gallons per sack (94 lbs .) of
Portland Cement. The slump of the concrete shall not exceed three (3) inches. A minimum
cement content of five (5) sacks of cement per cubic yard of concrete is required .
64 PAY ITEM-NEW 8' CONCRETE VALLEY GUTTER :
This item shall include the construction of concrete valley gutters at various locations to be
determined in field.
Removal of existing, asphalt pavement, concrete base , curb and gutter, and necessary excavation
to install the concrete valley gutters all shall be subsidiary to this pay item. Furnishing and placing
of 2:27 concrete base and crushed limestone to a depth as directed by the Engineer and
necessary asphalt transitions as shown in the concrete valley gutter details shall be subsidiary to
this Pay Item.
See standard specification Item No . 314", Concrete Pavement", Item 312 "Hot-Mix Asphaltic
Concrete", Item No . 104, "Removing Old Concrete", Item No. 106 , "Unclassified Street Excavation"
Item No. 208 "Flexible Base." Measurement for final quantities of valley gutter will be by the square
yard of concrete pavement and the curb and gutter section will be included .
Contractor may substitute 5" non-reinforced (2 :27) Concrete Base in lieu of Crushed Stone at no
additional cost. See Item 314" Concrete Pavement".
The concrete shall be designed to achieve a minimum compressive strength of 3000 pounds per
square inch . Contractor shall work on one-half of Valley gutter at a time, and the other half shall be
open to traffic. Work shall be completed on each half within seven (7) calendar days.
65 PAY ITEM -STORM DRAIN INLETS :
An alternative method of construction for these items will be "Pre-Cast" manholes and inlets. If the
Contractor desires to use this method, he must submit details for the construction to the
Transportation and Public Works Department Storm Water Management Division for review and
approval if said details are acceptable . The Pre-Cast construction must be equal or superior to the
strength requirements for this item as set out in Item 444 , "Manholes and Inlets" and said
construction shall be in compliance with all other requirements of Item 444 where applicable.
66 PAY ITEM-TRENCH EXCAVATION AND BACKFILL FOR STORM DRAIN :
Work under this item includes all the proposed excavation and backfill in the project area and the
necessary fill area. Payment will be made for the quantity of earth excavated/backfilled. The
placing of fill shall be subsidiary to the trench excavation/backfill price . Excess material which is
SP-25
obtained from excavating the trench shall be used for fill placement subject to the provis ions of
Item 114 of the City of Fort Worth Standard Specifications.
All excavated material which is unacceptable as fill material shall become the property of the
Contractor to be hauled off the site and disposed of properly. Unacceptable material shall be , but
not lim ited to: rocks , concrete , asphalt , debris , etc . The cost for removal and disposal of
unacceptable material shall be subsidiary to the un it prices .
67 PAY ITEM -BRICK PAVEMENT REPAIR :
Contractor shall take all precautions to carefully remove all existing brick pavers . The brick pavers
shall be handled with extreme care to avoid chipping and/or breaking of pavers . Until insta ll ed ,
they shall be cleaned and neatly stacked on pallets (not to exceed 3 feet in height). If necessary ,
all new brick pavers used on this project shall meet the specifications for ASTM C1272. The brick
shall be a Type F heavy vehicular paving brick a min imum 2 5/8 " thick , with spacer nibs or lugs ,
and match the existing brick in size , shape, and color.
The brick pavers will be set on a %-inch sand/cement bedding mixture . The sand used shall
conform to ASTM C33 excluding all stone screenings that may pass the C33 sieve analysis . The
cement sand ratio shall be 1 sack of cement per 1 CY of sand or as directed by the Engineer.
Filter fabric 12-inches wide will be installed over every construction , and /or expansion joint as well
as all vertical surfaces.
Once the brick pavers have been installed they will be vibrated into the sand bed. Sand
conforming to C33 will then be swept into joints and vibrated again . All brick shall be installed per
the manufacturer's recommendations . The resulting repair shall provide a smooth driving surface
and match all applicable street grades , cross slopes , and crowns .
The price bid per linear foot for "BRICK PAVEMENT REPAIR " as shown in the Proposal will be full
payment for materials including all labor, equipment, tools and incidentals necessary to complete
the work .
68 PAY ITEM-DEHOLES :
The Contractor excavates for existing storm drain improvements as detailed by work order
together with a sketch. The location and dimensions shown on the plans relative to othe r existing
utilities are based on the best information available. Omiss ion from , or the inclusion of utility
locations on the Plans is not to be considered as the nonexistence of , or a definite location of,
existing underground util ities . It shall be the Contractor's responsibility to verify locations of
adjacent and/or conflicting utilities sufficiently in advance of construction in order that he may
negotiate such local adjustments as necessary in the dehole process to provide adequate
clearances . The Contractor shall take all necessary precautions in order to protect all services
encountered . Any damage to utilities resulting from the Contractor's operations , shall be restored
at his expense .
Payment for work such as backfill and all other associated appurtenants required , shall be included
in the price of the appropriate bid item .
69 PAY ITEM -MOVE IN CHARGES:
A Work Order may contain one or more locations. One move-in fee will pa id to the contractor per
Work Order issued. Locations for multiple sites per Work Order will be in the same general vicinity,
if possible , and if so , only one mobilization charge will be paid.
70 PAY ITEM-FLOWABLE FILL :
1. Description :
The flowable fill material shall be mixed on site , free flowing and self-leveling and shall have a
consistency enabling it to fill all vo ids without tamping , vibrating or compacting. Material shall be
capable of supporting foot traffic in less than twenty (20) minutes after the pour reaches finished
SP-26
grade and shall be ready to receive a concrete cap in less than eighty (80) minutes, regardless
of site and weather conditions.
The flowable fill material shall have an in place density of not less than 95 and not more than
115 lbs ./cu. ft., with a maximum twenty-eight (28 ) day compression strength of not less than 60
and not more than 85 PSI allowing the material to be removed with hand tools such as picks
and shovels . The height of free fall of the flowable fill shall not exceed four (4) feet.
2. Material Specifications :
Flowable fill shall consist of :
A. An appropriate amount of Portland Cement meeting ASTM C-150 (with other additives as
necessary).
B. Aggregates meeting ASTM C-33
C. Sand or fine aggregates as per City of Ft. Worth Standard Specifications for Street and
Storm Drain Construction Item 406
D. Flyash, Class C or F, meeting ASTM C-618
E. Admixtures
1) Mineral admixtures will be pozzolanic
2) Chemical admixtures shall be in liquid or powder form used in standard ready -
mix concrete products unless specifically designed for flowable fill.
Permissible types of admixtures are :
a . High air generators , as manufactured by Grace Construction Products
or approved equal , which are spec ifically designed for flowable fill to
lower unit weights , reduce shrinkage and subsidence , and control
compressive strength .
b . Air entraining admixtures conforming to ASTM C-260 .
c . High range water reducers conforming to ASTM C-494 Type For G.
d. Accelerating admixtures conforming to ASTM C-494 , Type C.
1. Non-chloride , non-corrosive accelerators used where
metals are present in concrete or embedded members .
2. Calcium chloride .
71 PAY ITEM -EMERGENCY SITUATION JOB MOVE IN :
The Owner or Engineer shall determine when an emergency situation shall exist. When
emergency work is required , the Contractor shall mobilize to the said location within twenty-four
(24) hours after given notification from the Inspector and/or Project Manager. The Contractor shall
make all necessary arrangements for setting up barricades, notifying citizens , etc ., while waiting for
other utilities to be located as directed by the Engineer . The Contractor shall work continuously
until the emergency work order has been completed at a time agreed to by the Project Manager,
Inspector, and Contractor. After the emergency work order has been completed, there will be no
additional "Job Move-In " charges paid to remobilize back to the previous project location site .
72 PAY ITEM -GABION BASKETS AND GABION MATTRESSES :
Gabion structures consist of rectangular, compartmented , woven wire mesh baskets filled with
stone used to build earth retaining and erosion control structures such as : retaining walls , channel
linings , headwalls and flexible aprons for pipes, slope protection , bridge revetme nts and we irs as
shown in the plans or as directed by the Engineer.
1.0 MATERIALS:
1.1 Gabions shall be prefabricated in accordance with ASTM A975-97 to the size called for on the
plans , or as otherwise approved. Gabions shall consist of galvanized wire or galvanized wire
with an additional PVC coating woven into a uniform , hexagonal-shaped double twist pattern
with openings approximately 3-1/4 " x 4-1/2". The mesh shall be fabricated in such a manner
as to be non-raveling and to provide the required flexibility and strength .
SP -27
All wire used for gab ions , includ ing lacing wire , shall have a tensile strength of 54 ,039 -68 ,259
psi in accordance with ASTM A641 -92 Class 3 , soft temper. Elongation shall not be less than
12% in accordance with ASTM A370-92 . The zinc coating shall meet the requirements of
ASTM A641 -92 , Class 3 , soft temper coating and shall be a minimum quantity of 0. 70 oz/ft2 for
wire 0.087" in diameter, 0.80 oz/ft2 for wire 0.106 " in diameter , 0.85 oz/ft2 for wire 0.120" and
0.134" in diameter and 0.90 oz/ft2 for wire 0.154 " in diameter.
Mesh wire , selvage wire and lacing wire diameters for galvan ized gabions and galvanized
gabions with a PVC coating shall be in accordance with the nominal diameters listed below.
Tolerances of all wire diameters shown shall be +/-0.004". All testing of wire diameters shall
be prior to fabrication.
NOMINAL GABION WIRE DIAMETERS :
Galvanized Wire Galvanized Wire with PVC Coating
Mesh Wire 0.120" (US 11 gauge) 0.106" (US 12 gauge)
Selvage Wire 0.154" (US 9 gauge) 0.134" (US 10 gauge)
Lacing Wire 0.087 " (US 13-1/2 gauge) 0.087" (US 13 -1/2 gauge)
Polyvinyl Chloride (PVC) used to coat gabion wire shall meet the following specifications:
Color -gray; Nominal Thickness -0.020 inches ; Minimum Thickness -0.015 inches ; UV
Resistance -3000 hours us ing apparatus Type E when tested according to ASTM D1499 and
ASTM G23 ; Salt Spray Test -3000 hours when tested according to ASTM 8117 ; Abrasion
Resistance -weight loss not more than 12% according to ASTM D1242. The PVC coating
shall be uniformly applied and shall be free from cracks , splits , stretched or stressed areas .
Assembled gabions will form a rectangular unit with a minimum thickness of twe lve inches
(12"). The base and sides are to be woven into a single unit. The bottom of the end panels
shall be factory connected to the body in such a manner that the strength and flex ibility at the
point of connection is approximately equal to that of the mesh. The lid for spec ially fabricated
gabions may be separate construction . The gabion shall be divided into cells of
approximately equal size by factory connected diaphragm panels using mesh of the same
type and gauge as the body of the gabion. The diaphragm panels shall be secured in proper
position on the base in such a manner that no additional tying is necessary. The length of the
cell shall not exceed its horizontal width . All perimeter edges of the wire mesh forming the
body, end and diaphragm panels shall have a heavier gauge selvage wire woven into the
edge of the mesh panel. All cut edges of the mesh panels fo rming the body , tops of ends and
diaphragms shall be securely attached to a heavier gauge selvage wire by a minimum of two
complete turns of the wire mesh around the selvage wire .
Lacing wire shall be supplied for securely fastening the gabions during all steps of assembly
and construction. Lacing wire shall be included with the gabions in sufficient quantity for tying
gabions in accordance with the specifications . No other wire except of the type supplied with
the gabions may be used .
Gabions furnished by a manufacturer shall be of uniform size and subject to dimension
tolerance limits of +/-5%. The gabions shall be cert ified by a notarized , sworn affidavit from
the manufacturer showing compliance with the specification requirements.
1.2 Gabion Rock used to fill the gabions shall be clean , hard , durable , 4" to 8" well-graded
crushed limesto ne. Not more than 15% of the rock (by weight) shall pass a 4" opening . For
12" gabions, 4" to 6" well-graded crushed limestone may be used. The rock shall be clean
and shall be stored and handled in a manner to prevent contamination. Prior to placing the
rock , samples shall be del ivered to site and shall be approved for gradation and appearance
by the engineer .
SP-28
2.0 CONSTRUCTION:
2.1 General -The gabions shall be installed in accordance with the size, type, and alignment as
shown on the plans . PVC coated gabions shall be used in the areas as specified and shown
on the plans. The placement of the gabions shall be in close conformity to the lines and
grades shown on the plans and shall be in strict accordance with these specifications .
2.2 Geotextile Fabric Placement -After excavation to the subgrade elevation has been
performed , the geotextile fabric (when specified) shall be placed to the limits as shown on the
plans . Care shall be taken not to place the fabric in a manner exceeding the limits shown on
the plans. Where splices occur , adjacent pieces of geotextile shall be overlapped a minimum
of eighteen inches (18"). Fabric shall be secured , when necessary, by pins or other suitable
means before placing the gabions. Excess fabric protrud ing past the finished gabions shall
be cut off.
2.3 Gabion Assembly -Gabions are assembled in the following steps :
1. Unfold the baskets on a hard , flat surface and stamp out all kinks .
2. Fold up the front , back , and end panels and fasten the panels together with the projecting
heavy gauge selvage wire by twisting the selvage wire around the selvage wire of the other
panel two complete turns .
3. Fold the inner diaphragm panels up and secure in the same manner.
4. Tie all edges of the diaphragms and end panels to the sides of the gabion by the tying
method as specified below.
2.4 Tying Method -PROPER TYING OF GABIONS AT ALL STEPS IN THE ASSEMBLY AND
CONSTRUCTION OF THE GABION STRUCTURE IS CRITICAL TO THE PERFORMANCE
OF THE FINISHED GABION STRUCTURE .
1. Gabions must be tied in the specified manner at each step of construction :
a.) Initial assembly
b.) Tying to adjacent gabions along all contacting edges
c.) Tying of lid to sides
d.) Tying of lid to top of diaphragms
e.) Re-tying of cut gabions
2. All tying of gabions shall be performed in the following manner (See Fig .1 ): (1 .) Cut a
length of lacing wire approximately five feet long. (2.) Secure the lacing wire onto the
gabion at the end by looping and twisting the tie wire together. (3 .) Proceed tying with
double loops (made at the same point) every five inches apart. The basket pieces should
be pulled tightly together during the tying operation . (4 .) Secure the other end of the
lacing wire by again looping and twisting the wire around itself. No other wire except of the
type supplied with the gabions may be used for tying the gabions.
2 .5 Gabion Placement -After each gabion has been assembled , it shall be placed in position
empty and shall be tied to adjacent gabions along all contacting edges in order to form a
continuously connected structural unit.
2.6 Filling Gabions -IT IS CRITICAL TO THE PERFORMANCE OF THE FINISHED GABION
STRUCTURE THAT GABIONS ARE FILLED TO THEIR MAXIMUM DENSITY WITH VOIDS
IN THE GABION MINIMIZED.
When the assembled empty gabions have been installed and tied together , the gabions shall
be filled in the following manner:
1. The gabions may be filled by machine , but shall be filled in layers or lifts not exceeding
twelve inches (12"). Care shall be taken when plac ing the rock into the gabions to
insure that the gabions are not damaged or bent. Do not drop rock from a height
greater than three feet (3'). Suitable sized and appropriate machinery will help prevent
SP-29
damage to the gabions during the filling operation. Edges of gabions and diaphragms may
be protected when necessary by tying steel reinforcement to the edges of the gabions or
other suitable guard mechanisms to prevent damage or deformation of the gabions.
2. After a twelve inch (12") layer of rock has been placed in the cell, sufficient hand
manipulation for the rock shall be performed to minimize vo ids and result in a maximum
density of rock in the gabion.
3. Gabions that are three feet (3') high shall have a looped inner tie wire installed in each cell
connecting the front and back faces of any unsupported face at the vertical third points , or
12" and 24" from the base of the gabions (See Fig.2). Individual cells may not be filled to a
height greater than twelve inches (12") above any adjacent cell unless looped inner tie wires
are installed in both directions .
4. Each gabion shall be filled to its maximum density, which is slightly higher than the sides
and the surface smoothly leveled minimizing voids.
2. 7 Closing Gabions -After the rock has been leveled , the lids shall be pried down and over with
a bar or lid closing tool until the edge of the lid and the edge of the gabion are together. Care
shall be taken so that the mesh is not excessively deformed. It should require a light
stretching in order to bring the two gabion pieces together. The heavy projecting selvage wire
of the lid shall then be twisted around the heavy selvage wire on the sides two (2) complete
turns. The lid shall then be tied to the sides of the gabions and the tops of the diaphragms in
the specified tying method. The lids of the gabions shall also be tied to adjacent gabions
along all contacting edges to insure the formation of a continuous, connecting structural unit.
Special attention shall be given that all projecting sharp ends of wire are turned in on the
completed gabion structure.
2.8 Cutting Gabions -Gabions may be cut to form curves or bevels. Overlap the cut pieces and
re-tie in the specified manner. Re-tying shall be in a manner so as to produce a closed cell
when completed. Excess mesh wire shall be cut off or shall be tightly and neatly laced down.
Care shall be taken that all projecting wire ends are turned inwards or cut off.
73 PAY ITEM -SUBDRAINS:
Pipe shall be perforated Schedule 40 PVC. Where subdrains are installed by boring or otherwise
installed under pavement, non-perforated Schedule 40 PVC shall be used. Cleanouts shall be
installed at upper end of system and at intervals no greater than 200 '. Cleanouts shall line up with
lot lines and be placed in a vault similar to a water meter box or placed flush with a concrete collar
2-3 inches beyond the edge of the pipe. Any cleanouts in the pavement need to have traffic-rated
covers. Private trench drains shall be plumbed into the subdrain anywhere it is practical. In all
cases , a cleanout shall be provided ay the private trench drain connection or as directed by the
Engineer. In the event of multiple pipes at one location or other unusual configuration, a box or
vault or a small grate inlet may be used as a junction structure to tie into the public storm drain .
74 PAY ITEM-REMOVE AND REPLACE EXISTING FENCES:
Contractor shall furnish all labor, materials and equipment necessary to remove and replace
fences within the street right of way as noted in the Special Provisions . Within 14 days (unless an
earlier notice in needed) prior to any construction in the area the Contractor shall contact the
property owners . If the property owners do not remove the fences, the Contractor shall do so in
accordance with these special provisions.
Existing material shall be reused if not damaged in the process of removal. The Contractor is to
furnish any additional material required to fulfill the special provisions.
The contractor shall remove existing fences and post to prevent damage and shall reconstruct
fences at the locations specified. When completed the fence shall be in proper alignment with the
post , plumb , and all wire taut.
SP-30
--
This item will be measured by the linear foot of fence, in place , for all fences necessary to be
removed and relocated to clear the construction area.
The amount of completed and accepted work measured as provided above will be paid for at the
contract price of "Fence -Up To 6' Height -All types -Remove and Replace Existing " for all labor ,
materials , tools , equipment and incidentals necessary to complete the work as shown on the plans
and specified therein .
The Contractor will provide temporary fences during period of time required for fence construction .
The temporary fence will be constructed to prov ide security and contain pets within the yard.
75 PAY ITEM-TREES 6" TO 18 " AND TREES GREATER THAN 18 " -REMOVAL AND DISPOSAL
"Desirable Trees " generally. include , but are not limited to, any tree with a trunk diameter of six
inches (6 ") or more that is determined to be of environme ntal and aesthetic value. To preserve the
natural environment and protect wildlife habitat, bor ing or tunneling may be required when
underground utility lines are place within the "protected root area" of "desirable trees " located within
the right of way or utility easement. Perform all required boring underneath trees or other
vegetation designated for preservation at a minimum depth of three feet (3 '). The protected root
area is defined as the area between the trunk and five feet (5 ') from the tree trunk or 2/3 the actual
distance from the tree trunk to the dripline , whichever is greater. In the event of a tree or trees
needing to be removed
76 PAY ITEM-FILL MATERIAL-BORROW -INSTALL:
The non-expansive earth fill should consist of soil materials with a liquid lim it of 35 or less , a
plasticity index between 8 and 20 , a minimum of 35 percent passing the No. 200 sieve, a minimum
of 85 percent passing the No. 4 sieve, and which are free of organics or other deleterious
materials . When compacted to the recommended moisture and density, the material should have
a maximum free swell value of 0.5 percent and a max imum hydraulic conductivity (permeability) of
1 E-05 cm/sec, as determined by laboratory testing of remolded specimens of the actual materials
proposed for the non-expansive earth fill.
77 PAY ITEM-POST CONSTRUCTION TELEVISION INSPECTION (CCTV):
After construction , ALL sections of storm drain lines shall have a television inspection performed
by an independent sub-contractor hired by the prime Contractor. Work shall consist of furnishing
labor , material, and equipment necessary for inspection of the storm drain lines by means of
closed circuit television (CCTV). The television camera used for the inspection shall be one
specifically designed and constructed for such inspection . The camera , television monitor, and
other components of the video system shall be capable of producing picture quality to the
satisfaction of the Project Engineer or representative , and if unsatisfactory, equipment shall be
removed and no payment will be made for an unsatisfactory inspection. Television inspection logs
shall be made available upon completion of the inspections .
SP-31
• 8 •
PROJECT SIGN & DETAILS
(To be printed on Co nt rac tor's Letterh ead )
Date : ____ _
DOE No:
PROJECT NAME: Water/Sanitary Sewer and Paving/Storm Drain Improvements for:
MAPSCO LOCATION: __
LIMITS OF CONST.: ____________ _
Estimated Duration of Construction on your Street : _ days
THIS IS TO INFORM YOU THAT UNDER A CONTRACT WITH THE
CITY OF FORT WORTH, OUR COMPANY WILL< REPLACE WATER
AND/OR SEWER AND/OR STORM DRAIN LINES -RECONSTRUCT
THE STREET> ON OR AROUND YOUR PROPERTY.
CONSTRUCTION WILL BEGIN APPROXIMATELY SEVEN DAYS
FROM THE DATE OF THIS NOTICE.
IF YOU HA VE QUESTIONS ABOUT ACCESS, SECURITY, SAFETY
OR ANY OTHER ISSUE, PLEASE CALL:
Mr. <CONTRACTOR 'S SUPERINTENDENT> AT <TELEPHONE NO.>
OR
Mr. <CITY INSPECTOR> AT <TELEPHONE NO.>
AFTER 4:30 PM OR ON WEEKENDS, PLEASE CALL 871-7970
PLEASE KEEP THIS FLYER HANDY WHEN YOU CALL.
SP-32
2.25"
2.25"
C
4.5"
r-PMS 725 (Brown)
I
I
3" 3' -1.5" I
I
I
I I /
~PMS 288 (Blue)
8' -O"
3"
I
I
I
I
I
I
~PMS 288 (Blue)
I \
I
\
\
4' -1.5"
-FoRr\WoRru I \
Your~Storm Water
\
\
'--White
\
Funds In Action
\
\
\_PMS 288 (Blue)
Fonts Used
Your Storm Water Funds In Action (Cheltenham Bold Italic)
Project Block of text (Cheltenham Bold)
3"
3.75"
~
~
I
~
3.75"
~
I
~
N
I
~
4.5"
STORM DRAIN DETAILS
FIGURE I TITLE
SD-001 ! Standard 1 O' Storm Drain Inlet ------!-----·-·-·----·-·--·-·-----·--·-·-·--·-·--·----·----·-·-·-·-·--·-·--·--·--·-·-·---·-·---·-----·----··-·-·--·--·-·-·-·--·-·-----·-·-·---·----·-·-·-·-·-·-·-·-·--"--·--·-·-· SD-002 i Standard Double 1 O' Storm Drain Inlet
__ SD-003 _ l_ Recessed _ Double 1 O' _Storm _ Drain _In let ___________________________________________________________ _
S D-004 I Standard Storm __ Ora in _ Drop In let ------------·----·----------·--·------------·-·--------------·------·---·---
S D-005 1. Two-Stage . Constructed . Cu rb _l nlet ----·---·---------------·----------·-·--·-·---·---·--------·----------
~~~~~~ ---1-~~=~~=~~ :: .~}~=~=~: ~=~~~:=:=:::~~=::~==::~=:=::=~=:=:~==::~==:::===::::==::==:=~=~~:=:=:=:===:=:~===:==
S D-008 I_ Standard 6' Square _ Manhole ----------·---------·--------------·--------------------------------·------
S D-009 L Manhole _ Detail T}'.'p~s 1_ thru _ 7 --------------------------------------------------------------------
SD-010 I Stacked Manhole
SD-011 1 Reinforced Concrete Collar
SD-012 I Standard Cast Iron Frame & Cover
-~g~~ ~ H~: ~=f~f~~c:~~~~~~:t!t~;e :: Plug ·-=~:~=~==:~:::=:=:~~:~::==~:=:=:::~:~:~:=:::~:=~~~~=::===~::===:~~:=:==~:
SD-015 i Con _crete Ap;on .-Sloping __ Headwall_ ______________________________________________________________ _
S D-016 I Concrete Apron -Vertical _ Headwall ___ ·--·-·-·---·--·----------·---·----·-----------·--·--··------·--------
SD-017 I Concrete Headwall
SD-018 I Concrete Headwall Dimensions --·---·-----·---------·---·-·--·------------·---·--··----·------------------~g~~~6 ~-~:~~o~~:~ ~~~~~~e;~fn~*let··---·---·---------·-------·----·--·------·----·----·-----·------·-------
SD-021 I Standard 20' Storm Drain Inlet
~g~~~; I ~~~~~~~e1~~~l~~t:~1~:~~~~o~astic PiP.e Trench Installation Detail
so-024--rRes"icfonHaTRoilove _r _curb·-a·n·,fGutier------·----·---------·-·------·-----·------·------------
8"
USE #3 BARS X 3'-2" @ 22"
O.C., UNLESS CONNECTING TO
PAVEMENT, THEN USE #3 BARS
X 5'-3" @ 22" O.C.
24"
A~
A ::=_j
PLAN VIEW
#3 BARS @ 12" 0.C.
(REAR FACE, REAR WALL)
#3 BARS @ 18" O.C.
(NEAR FACE, REAR WALL)
8"~
#4 BAR X 11'-0"
NOTES:
1. DIMENSION "D" (DEPTH) FOR ALL STANDARD 10'
INLETS SHALL BE 4' -0" AT THE UPPER END AND
4' -8" AT THE OUTLET END (MEASURED FROM THE
TOP OF CURB). FOR NON-STANDARD INLETS THE
DEPTH WILL BE SHOWN ON THE PLANS .
2. DIMENSION "A" SHALL BE THE GUTIER DIMENSION IN
USE ON THE PROJECT.
(2) #4 BARS X 15'-9" 3. IF MANHOLE DEPTH IS OVER 5'-0", STEPS WILL BE
REQUIRED AND SHALL BE CONSTRUCTED PER
DRAWING SD-013.
B
J
4. GUTTER CONSTRUCTION IN FRONT OF INLET (AS
SHOWN) IS TO BE CONSIDERED AS PART OF SAME.
5 . ALL EXPOSED SURFACES ARE TO BE WELL FINISHED.
EXCAVATION FOR INLET IS TO BE INCLUDED IN PRICE
BID FOR SAME .
#3 BARS @ 18" 0.C.
(FRONT FACE, FRONT WALL)
A
1 · -0" ---4----~
VARIES (SEE FACE OF CURB
#3 BAR X 15'-9"
RADIUS AND-
SLOPE AS
STD. CURB
NOTE 2)
}..
34" CHAMFER TOP OF CURB END OF INLET TO BE
NEAR CURB CORNER 7"
GRADE OF GUTIER
AT INLET C/L
co
3'-0" 10'-0" OPENING 3'-0"
PAY LIMIT OF INLET
ELEVATION VIEW
TOP OF GUTIER \
2
• TOP OF CURB ~
OO~~ED~ \ : _
I ~ ] r: L J_
1:o
T
-' =====-=+ -----==rFL~ u:,---:~~-;_·~-[,.
STD . CURB AND
GUTTER -#3 BARS
BENT INTO WALL
#4 BARS AT 8" O.C. ~ BOTH WAYS
1 "x4" KEYWA Y ---
OR #3 L-BAR @ 3'-4
8" 0.C. IN LIEU OF
KEYWAY
SECTION A-A
~
~
0 0 z
(/) w
w w
a:: e
~
8"
OF GUTIER REVISED DATE: 11-2009
CITY OF FORT WORTH, TEXAS
STANDARD 10' STORM DRAIN INLET
DATE : 06-2007
SD-001
0
I
N
RING AND COVER TO
BE CONSTRUCTED
OVER OUTLET
_....L_--+~---------------'--1 ________________ ___,__ } (SEE NOTE 3)
, ..
FACE OF CURB
EDGE OF GUTTER
(2) #3 BARS
@ 6" o.c . A
3'-0"
8" THICK WALL AT CENTER
OF DOUBLE 10' INLET
.__ __ __,_____,__ (2) #6 BARS @ 6" O.C . ONLY
IN CENTER WALL OF DOUBLE
10' INLET
3'-4" .. ,
SECTION A-A
.
CD
I
LA
PLAN VIEW
20'-8" 3'-0"
TOP OF CURB
iJ I I 10'-o" I
8"~ --------
ELEVATION VIEW
NOTES:
1. ONE DOUBLE 10' INLET SHALL CONSIST OF TWO STANDARD 10'
REINFORCED CONCRETE INLETS CONSTRUCTED TOGETHER AS A
SINGLE UNIT WITH THE ADJACENT ENDS OF THE TWO INLETS
REMOVED AND JOINED TOGETHER SO AS TO FORM A CONTINUOUS
BOX INLET HAVING A 20'-8" LENGTH OPENING . PROVIDE AN 8"
CENTER WALL AS SHOWN IN SECTION A-A.
2 . SEE DRAWING NO. SD-001 FOR FINISHED INLET DETAILS.
3 . DIMENSION 'A' SHALL MATCH GUTTER DIMENSION IN USE ON THE
PROJECT.
REVISED DATE: 07-2009
CITY OF FORT WORTH, TEXAS DATE: 06-2007
STANDARD DOUBLE 1 O' STORM DRAIN INLET SD-002
RING AND COVER TO
BE CONSTRUCTED
OVER OUTLET
0
I
N
FACE OF CURB
I·
(2) #3 BARS
@ 6" o.c.
3'-4" -1
SECTION A-A
------1--------------
18" DEPRESSED } (SEE NOTE 3)
18"
PLAN VIEW
5'-0"
A
(SEE
NOTE 3)
FACE OF CURB
8" THICK WALL AT CENTER
OF DOUBLE 1 O' INLET
(2) #6 BARS @ 6" O.C. ONLY
IN CENTER WALL OF DOUBLE
10' INLET
20'-8" 5'-0"
TOP OF CURB
iJ I I 10'-Q" I 8"-j i.--.. ------
ELEVATION VIEW
NOTES:
1. ONE DOUBLE 10' INLET SHALL CONSIST OF TWO STANDARD 10'
REINFORCED CONCRETE INLETS CONSTRUCTED TOGETHER AS A
SINGLE UNIT WITH THE ADJACENT ENDS OF THE TWO INLETS
REMOVED AND JOINED TOGETHER SO AS TO FORM A CONTINUOUS
BOX INLET HAVING A 20'-8" LENGTH OPENING . PROVIDE AN 8"
CENTER WALL AS SHOWN IN SECTION A-A.
2. SEE DRAWING NO . SD-001 FOR FINISHED INLET DETAILS .
3 . DIMENSION "A" SHALL MATCH GUTTER DIMENSION IN USE ON THE
PROJECT.
CITY OF FORT WORTH, TEXAS
RECESSED DOUBLE 1 O' STORM DRAIN INLET
DATE: 06-2007
SD-003
4'-0"
-.......
W+2T
w
(OPENING)
TROWEL FINISH 7
(TYP . ALL SIDES)
4'-o"
#4 BARS X 3'-0"
@ 18" O.C. (TYP .) CONSTRUC TION JOINT
AT CORNERS
#4 BARS @
18" O.C.B.W .
(TYP . ALL SIDES)
SECTION A-A
NOTES :
1. MATERIAL AND WORKMANSHIP SHALL CONFORM WITH
THE REQUIREMENTS OF FORT WORTH STANDARD
SPECIFICATIONS FOR STANDARD CONCRETE MANHO LES.
2. ALL STEEL RE INFORCING SHALL HAVE A 2" CONCRETE
COVER (MINIMUM), UNLESS OTHERWISE NOTED.
3 . EXCAVATION FOR MANHOLE TO BE INCLUDED IN THE
UNIT PRICE BID FOR MANHOLE .
4 . FOR DETAILS OF REINFORCING OF LOWER PORTIONS
OF INLET, SEE APPROPRIATE SQUARE MANHOLE DETAIL.
5 . DEPTH OF DROP INLET FROM FINISHED GRADE TO
FLOW LINE OF INLET IS VARIABLE . APPROXIMATE
DEPTH WILL BE SHOWN ON PLANS AT LOCATION OF
INLET.
6 . ALL STANDARD DROP INLETS SHALL HAVE ONE OPENING
ON EACH SIDE UNLESS SHOWN ON PLANS.
7 . DECK MAY BE REINFORCED SAME AS 4' SQUARE
MANHOLE (SEE DRAWING NO. SD-006).
8 . IF DEPTH OVER 5'-0" AT MANHOLE, STEPS SHALL BE
CONSTRUCTED PER DRAWING NO. SD-013).
I-
N + 3:
I-
S' A
z L 3: z w
Q.
0
'-'
I-
I W + 2T I
~~1-•~(-0P-E:-IN-G)~--1~i--
PLAN VI EW
INLET SIZE T w
2 ' SQUARE 7" 2'-0"
4' SQUARE 7• 4'-0"
5' SQUARE 8 " 5'-o"
6' SQUARE g" 6'-0"
7' SQUARE g • 7 '-0"
8' SQUARE g • 8'-0"
A
J
TOOLED EDGES
(TYP . ALL SIDES)
REVISED DATE: 11-2009
CITY OF FORT WORTH, TEXAS
STANDARD STORM DRAIN DROP INLET
DATE: 06-2007
SD-004
2" X 8" X 10'-3" 12" (TYP .)
10'-3"
(FOR 10' INLET)
2 " X 8 " X 2 '-3"
WOOD TIES
8 (TYP. 3) J_ WOOD PLANKS
~-~--...-.o----r--------.--,..-., ~
-~--r,1 1 r, J A Ill Ill A
2" (TYP.) tt:i:t====::~:::::==::::jc:jt:t::t==============t:t:t:l L l+++=r--rr ~=====rt=~===-==-==:::p:::t::1 J ~
I
N
--'---L...J I
2 " (TYP .) J
2"
I 1 2 14" SPACE -l 1-2" (TYP .)
B
2 " X 4 " X 1'-11 "
WOOD TIES
(TYP . 2)
WOOD GRATE
2" X 8" X 2'-3"
WOOD TIES
(TYP. 3)
4 '-9 3,('
2 " X 8" X 10'-3"
WOOD PLANKS
2" X 4 " X 1'-11"
WOOD TIES
2"
(TYP. 2)
7 ~ ..
SECTION A-A
2" x 8" WOOD PLANK BEND REINFORCING
BARS DOWN TO HOLD
WOOD GRATE IN PLACE z oO ~G ~ I:::>
~. t5~
" <( U)
t--Z
U)Q u
1" x 4" KEYWAY
(TYP . 4)
2'-0"
NOTES:
1. THE TWO-STAGE CONSTRUCTION SHALL BE USED
WHEN DENOTED ON THE PROJECT PLANS , OR WHEN
DIREC TED BY THE ENGINEER. THIS SHALL BE A
SUBSIDIARY ITEM TO THE PROJECT CONTRACT.
2. THE WOOD GRATE SHALL BE MADE OF NEW, NO. 2
YELLOW PINE LUMBER, OR MA TERI AL APPROVED BY
THE ENGINEER. ROUGH LUMBER MAY BE USED.
3 . THE 2" x 4 " WOOD TIES SHALL BE CONNECTED TO
EACH PLANK WITH (4) 16d NAILS . THE 2 x 8 WOOD
TIES SHALL BE CONNECTED TO EACH PLANK WITH AT
LEAST FOUR 16d NAILS. ALL NAILS TO BE CEMENT
COA TED.
4 . THE REINFORCING STEEL USED FOR THE FIRST STAGE
SHALL BE BILLET-STEEL DEFORMED BARS,
INTERMEDIATE GRADE, ASTM DESIGNA TI ON A-15-57T.
SECTION 8-8 5 . SEE STANDARD INLET CONSTRUCTION DE TAIL FOR
FINISHED INLET DETAILS (SD-001 ).
CITY OF FORT WORTH, TEXAS
TWO-STAGE CONSTRUCTED CURB INLET
REVISED DATE: 11-2009
DATE : 06-2007
SD-005
'ix>
~ b
I I
in ~ 3-#4 BARS,
AS SHOWN
'ix>
CITY STANDARD MANHOLE
FRAME AND COVER
FINISHED STREET
TOP OF PIPE
#4 BARS c--
8 " O.C.8 .W.
5'-4"
4'-0" 8"-------8"
PLAN VIEW
8"
BARS T
#4 BARS C
6 " O.C.B .W.
HOOKED AT
EACH END
8"
2 ~· TYP ICAL--! f--
TYPICAL CORNER DETAIL
PLAN VIEW
BARS E--~
#4 BARS C 18"
OUTSIDE FACE
@IES;
1. MATERIALS AND WORKMANSHIP SHALL
CONFORM WITH THE REQUIREMENTS
OF CITY OF FORT WORTH STANDARD
SPECIFICATIONS FOR STANDARD
CONCRETE MANHOLES.
2 . LAYERS OF REINFORCING STEEL
NEAREST THE INTERIOR AND EXTERIOR
SURFACE SHALL HAVE A COVER OF
2" TO THE CENTER OF BARS, UNLESS
OTHERWISE NOTED .
3 . EXCAVATION FOR MANHOLE TO BE
INCLUDED IN THE UNITS PRICE BID
FOR MANHOLE.
~--BARS C
#4 BARS C 18"
INSIDE FACE
T 18" MAX.
J
BARS T-#4 BARS
C 6 " O.C.B .W. ~
0 z
BARS D ----+.+++-+-, #4 BARS C 18" ..L.LI..L.....1-!---.J'--+--'_._..~
SECTION 8-8
.
U)
VERTICAL BARS
#4 BARS AT 18"
(IF WALL HEIGHT IS
OVER 6 ' USE STEEL
REBAR SPACERS)
SLOPE 3.~;" TO DRA IN
w w en . p
NOTE: DEPTH "D" SHALL BE SHOWN
ON STORM DRAIN P L AN AND
PROFILE SHEETS .
OUTSIDE FAC E
4------1.-..--+----'---4--#4 DOWELS C
18" ALL AROUND
EXCEPT IN WAY
OF PIPE
-J12 ·f--j12·~
#4 BARS 0
6 " O.C.B .W.
SECTION A-A
NOTE : SLOPE INVERT OF
M.H. AS IND ICATED ON
PLAN & PROFI LE SHEET.
CITY OF FORT WORTH, TEXAS
STANDARD 4' SQUARE MANHOLE
DATE : 06-2007
SD-006
.
ID
;;. b
I I
"' in 3 -/14 BARS,
AS SHOWN
CX)
CITY STANDARD MANHOLE
FRAME AND COVER
FINISHED STREET
MORTAR COVER
ONE OR MORE
C.I. MANHOLE STEPS COURSES 2 ~·
AT 12"-12" SPREAD VITRIFIED BRICK
6'-4"
PLAN VIEW
STAGGERED (REINF. BARS F-#4
PLASTIC STEPS MAY J---"-'BA..;;.R.;..:S_A'-'-Tc..;...;;.18"--"--......,i':==
BE USED)
TOP OF PIPE
8 "
BARS T
2 W TYPICAL--j 1---
TYPICAL CORNER DETAIL
PLAN VIEW
/15 BARS 0
8" O.C.B.W.
HOOKED AT
EACH END
5-#4 x 9 " BARS
TO BIND BRICK TO
TOP SLAB
,n-----VERTICAL BARS /14 BARS
AT 18" (IF WALL HE IGHT
IS OVER 6' USE STEEL
REBAR SPACERS)
SLOPE 3-'" TO DRAIN
~
0 z
w w
V)
BARS E---
/14 BARS C 18"
OUTSIDE FACE
BARS D -----l-++++-,
/14 BARS C 18"
OUTSIDE FACE
~
1. MATERIALS AND WORKMANSHIP SHALL
CONFORM WITH THE REQUIREMENTS
OF CITY OF FORT WORTH STANDARD
SPECIFICATIONS FOR STANDARD
CONCRETE MANHOLES.
2. LAYERS OF REINFORCING STEEL
NEAREST THE INTERIOR AND EXTER IOR
SURFACE SHALL HAVE A COVER OF
2 " TO THE CENTER OF BARS, UN LESS
OTHERWISE NOTED .
3. EXCAVATION FOR MANHOLE TO BE
INCLUDED IN THE UNITS PRICE BID
FOR MANHOLE.
.----BARS C
#4 BARS C 18"
INSIDE FACE
p
_ t~i----tt----++--t--t+t--+---+-#4 DOWELS @
18" ALL AROUND
EXCEPT IN WAY
OF PIPE
/15 BARS C ---1 "x4" KEY OR #4 BARS O ~ ~ 8 " O.C.B. W. 8" c-c IN LIEU OF KEYWA y ID
NOTE: DEPTH "D" SHALL BE SHOWN
ON STORM DRAIN PLAN AND
PROFILE SHEETS .
NOTE : SLOPE INVERT OF
M.H. AS INDICATED ON
PLAN & PROFILE SHEET. SECTION B-B SECTION A-A
CITY OF FORT WORTH, TEXAS
STANDARD 5' SQUARE MANHOLE
DATE : 06-2007
SD-007
• ' a,
8
' '° I
a
I L
i--'° I
3-#5 BARS, _;-
AS SHOWN
' a,
' . NOTE. 60 DIAMETER
PIPE SHOWN
CITY STANDARD MANHOLE
FRAME AND COVER
MORTAR COVER
ONE OR MORE
COURSES 2 ~-
VITRIFIED BRICK
C.I. MANHOLE
STEPS AT
12"-12" SPREAD
STAGGERED
(REINF. PLASTIC
STEPS MAY BE
USED)
REINFORCING
TYPICAL ALL WALLS
#4 BARS C 18" VERT.
#4 BARS @ 12" HOR. #5 BARS c--
12" O.C.B . W.
7'-6"
9"
6-0
~A
I V I
I I
,--,.... I/
~I~ / L//
~ /
, __
........
j I\. / ~ I/ -r ..,
,I ----I/ J
-"' I
(
--~1
I I
I I 1:= A
9" l-
8 u
~ ~ BARS T
#5 BARS C
8" O.C.B.W.
HOOKED AT
EACH END
9•
2 W TYPICAL--j f--
TYP IC AL CORNER DETAIL
PLAN VIEW
t:iQIES;
1. MATERIALS AND WORKMANSHIP SHALL
CONFORM WITH THE REQUIREMENTS
OF CITY OF FORT WORTH STANDARD
SPECIFICATIONS FOR STANDARD
CONCRETE MANHOLES.
2. LAYERS OF REINFORCING STEEL
NEAREST THE INTERIOR AND EXTERIOR
SURFACE SHALL HAVE A COVER OF
2" TO THE CENTER OF BARS, UNLESS
OTHERWISE NOTED .
3 . EXCAVATION FOR MANHOLE TO BE
INCLUDED IN THE UNITS PRICE BID
FOR MANHOLE.
PLAN VIEW
5-#4 x 9" BARS
TO BIND BRICK TO
TOP SLAB
~---BARS C
SECTION 8-8
18" MAX .
~
VERTICAL BARS ~
#4 BARS AT 18" w
(IF WALL HEIGHT IS ~
OVER 6' USE STEEL 1
REBAR SPACERS)
BARS E---,.
#4 BARS @ 18"
OUTSIDE FACE
BARS D ----++++---+-o
#4 BARS @ 18" ~~..._--.,~-~-~~
OUTSIDE FACE
#4 BARS @ 18"
INSIDE FACE
p _l__~'!::::~'!::::=*°'!:::l:=*''!::±::=+----+-#4 DOWELS @
' '° NOTE: DEPTH "D" SHALL BE SHOWN
#4 BARS @
6" 0 .C.B.W.
ON STORM DRAIN PLAN AND
PROFILE SHEETS .
SECTION A-A
CITY OF FORT WORTH, TEXAS
STANDARD 6' SQUARE MANHOLE
18" ALL AROUND
EXCEPT IN WAY
OF PIPE
NOTE : SLOPE INVERT OF
M.H. AS INDICATED ON
PLAN & PROFILE SHEET.
DATE: 06-2007
SD-008
9"-TYPICAL---...
ALL WALLS
1
PIPE DIA . 18"-24"
A 4'-11 ~ ..
z B 3'-3 ~fo" 0
vi z C 2'-5" w ::.
i5 D 3'-0"
E 4'-2"
2
27"-33"
4 '-11 !ls "
3'-9 ~ ..
2'-8"
3'-10 ~ ..
5'-1"
B
PLAN VIEW
MANHOLE TYPE
3 4 5
36"-42" 48"-54" 60"-66"
5'-5 !ls .. 5·-1 ~-6'-9 7-fi"
4'-3 'l\s " 4'-11 w 5 '-7 !ls"
2·-11 · 3'-3" 3'-7"
4'-9" 5 '-11" 7'-1 "
5'-11 14" 7 '-1 14" 8 '-3 14"
0 w
3-#5 BARS AT
OPENING AS SHOWN
6 7
72"-78" 84"-96"
7'-6" 8'-6 ~-
6'-3 ~ .. 7'-3 7-{i"
3'-11" 4'-5 w
8'-3" 10'-o"
9'-5 14" 11·-2 14"
a w en
:)
~
:,,::
()
~ en
w z ..J
CD w
-ct J:
a:: 3::
~ ::.
:)
::. z
:Si
~
Cl
I
t:,
FINISHED STREET SURFACE
• I I I I
#5 BARS AT 5 •
C-C EACH WAY
2 DIAGONAL #4 BARS
OVER PIPES, EACH FACE x_
~ ~
#5 BARS AT 12" C-C
EACH WAY
CITY STANDARD MANHOLE
FRAME AND COVER
6" MINIMUM
MORTAR COVER
5-#4 x O' -9" BARS
AROUND RING TO BIND
BR ICK TO TOP SLAB
C.I. MANHOLE STEPS
AT 12" C-C
STAGGERED 12" C-C
(REINF. PLASTIC STEPS
MAY BE USED)
REINFORCING TYPICAL
ALL WALLS :
#4 BARS AT 18" VERT.
EACH WAY
#4 BARS AT 18"
HORIZ . EACH WAY
IF WALL HEIGHT IS
OVER 6 ' USE STEEL
REBAR SPACERS
#4 BARS AT 8 " C-C IN LIEU OF KEYWAY
SECTION A-A
NOTE :
THE 2' -8" DIMENSION SHALL IN ALL CASES BE
THE CONTROL DIMENSION AND ANY DEVIATION IN
OTHER DIMENSIONS ENCOUNTERED IN THE FIELD
SHALL BE ADJUSTED BY THE ENGINEER .
CITY OF FORT WORTH, TEXAS
MANHOLE DETAIL TYPES 1 thru 7
DATE : 06-2007
SD-009
CITY STANDARD MANHOLE
FRAME AND COVER
FIN ISHED STREET
2 OR MORE COURSES OF
2 ~ .. VITRIFIED BRICK
#4 BARS @ 12"
EACH WAY TOP
#4 BARS @ 6 " EACH
WAY BOTTOM
48" EXTRA STRENGTH
REINFORCED CONCRETE
CULVERT PIPE
#4 BARS AT 6"
EACH WAY
SEE NOTE 3 08"
2'-0"
MANHOLE FRAME
ONLY
NOTES :
2'-9"
1'-3"
2'-0"
(5) #4 x 0'-9" BARS
AROUND RING TO BIND
BRICK TO TOP SLAB
MORTAR COVER
C)
I
U)
18" MAX.
_-MANHOLE FRAME &
COVER T. V.I.B .S. CO .
w
_J
CD
<(
a:::
<( >
6"
PATTERN N-4607 OR
EQUAL.
NOTE:
REBAR 2" CLEAR
FROM FACE TYPICAL
r-COLLAR AROUND PIPE
(2) #4 BARS
CIRCUMFERENTIALLY
DOWELS-#4x24" @
12" AROUND PIPE
1. STACK CONSTRUCTION SHALL BE OPTIONAL WITH THE CONTRACTOR IN THE CASE
WHERE DEPTH OF THE M.H . FROM FINISHED GRADE TO F.L. IS 12' -0" OR LESS .
IN CASES WHERE M.H. DEPTH IS GREATER THAN 12'-0", STACK CONSTRUCTION
IS REQUIRED .
2 . INTERMEDIATE SLAB AND MANHOLE COVER AND FRAME TO BE USED ONLY WHEN
DEPTH FROM FINISHED GRADE TO TOP OF PIPE EXCEEDS 12' -0".
3 . ON STACKED MANHOLE, THE REINFORCED CONCRETE TOP SHALL BE INCREASED
TO 12" THICKNESS, AND THE REINFORCED STEEL INCREASED TO #7 BARS.
CITY OF FORT WORTH, TEXAS
STACKED MANHOLE
DATE: 06-2007
SD-010
1/4 I.D .
(LARGE PIPE)
1/8
CIRCUMFERENCE
(TYP .)
,______._ 1/4 I.D.
(LARGE PIPE)
O.D. (LARGE PIPE)
+ 1'-0"
• •
• a..
(0 >-t:,
3"
(TYP .)
,-... w a.. a::
wo c., I a::: • <{ ~
.2-+
Cl
ci
#3 BARS BEN T
AS SHOWN
•
Cl
ci
#3 BARS @ 14" O.C.
(CIRCUMFERENTIAL)
1'-6"
•
g" g"
SECTION A-A
CITY OF FORT WORTH, TEXAS
REINFORCED CONCRETE COLLAR
-1
I-
I
I
I
DATE: 06-2007
SD-011
MANHOLE FRAME & COVER
SHOWN, (NEENAH R-1688 OR
EQUAL 280 LBS .) FOR INLET,
COVER MAY BE 20" (NEENAH
R-1737 OR EQUAL, 185 LBS.)
PLAN OF FRAME
22 ~ ..
32"
SECTION C-C
14" CORRUGATION
CITY OF FORT WORTH, TEXAS
STANDARD CAST IRON FRAME & COVER
DATE: 06-2007
SD-012
A
L
: ~
lO
L.. ~6" _·1· 51..i" -11..i" 1" 1" 1" I· ·I· -I· -I 16666 ~
SECTION A-A
12"
6" 5 1..i" i------------+-----=------1..i"
3 1..i" 7 " ~----"--... J4" r-----------
PLAN VIEW
~ .. ]_
NOTE : AL TERNA TE DESIGNS MAY
BE SUBM ITTED FOR APPROVAL
BY THE ENGINEER .
~6 1~
CITY OF FORT WORTH, TEXAS
CAST IRON MANHOLE STEPS
A
J
DATE: 06-2007
SD-013
1----------~--~.-----·--1-·-·-,
I 11-6" I ~+-~i-.
II f L. ~3" l+-~L,
#4 BAR (SEE NOTE)
I I I I 1,.,..-SEE REINFORCEMENT FOR -H !/1 s CONCRETE PLUG
Irr
I .. I ·I T
0
I I I ~-----L-----L_L_J T = LENGTH OF PIPE GROOVE
~--------____ -_-_:::J_
REINFORCEMENT FOR CONCRETE PLUG
PIPE SIZE REINFORCED DISTANCE s BAR c-c
18"-33" #2 12" BOTH WAYS 1/2 T
36"-54" #3 12" BOTH WAYS 1/3 T
60"-84" #4 12" BOTH WAYS 1/4 T
NOTE: STEEL HANDLE FOR REINFORCED CONCRETE PIPE
PLUG SHALL BE LOCATED 1/4 I.D . ABOVE CENTER
POINT OF PLUG . TWO STEEL HANDLES WILL BE
REQUIRED ON PLUGS OF 36" PIPES OR LARGER
AND SHALL BE PLACED 1/4 1.0. APART AND 1/4
1.0. ABOVE CENTER OF PLUG .
CITY OF FORT WORTH, TEXAS
REINFORCED CONCRETE PIPE PLUG
DATE: 06-2007
SD-014
........
~ a... • w
_<t:. 0
"I ~u oz w
Cl::'.
I-..__,
MUST BE GREATER
WITH LATERALS
UNDER PAVEMENT
NOTES :
:
(0
I
1'-6" MIN .
WASHED ROCK
PER ITEM 402
, L~ SEE NOTE 1
~~~
DIM . 'B '
(TRENCH WIDTH)
SEE TABLE 1
TABLE 1
LIMITS OF EXCAVATION
DIM. A DIM. 8
2 .5' TO 6' 1'-7"
6 ' TO 10' 2'-1"
10' TO 15' 2'-7"
OVER 15' 3 '-1"
1. FIELD INSTALLATION SHALL BE IN ACCORDANCE WITH STORM WATER DETAIL SD-023.
2 . PIPE SHALL BE : (A) 6" DIAMETER PERFORATED SCHEDULE 40 PVC; (B) 6" DIAMETER
PERFORATED TYPE S (DUAL-WALL) HDPE PIPE PER AASHTO M252; OR, (C) CORRUGATED
PVC PIPE PER ASTM F949 . NOTE THAT CORRUGATED POLYETHYLENE TUBING (ASTM F405)
IS NO LONGER PERMITTED FOR SUBDRAINS .
CURB &
GUTTER
REVISED: 11-2009
CITY OF FORT WORTH, TEXAS
SUBDRAIN
DATE: 08-2006
STR-015
#4 @ 12" c-c
5"
~-B
C A ---jJ -------, r-+ ___ _J
-----
FLOW
---------
1·
[
20+2.o·
#3 BARS @ 18"
C-C BOTH WAYS OR
6x6-#6 WIRE MESH
5"
SEE DETAIL "D" -e--c -j f-5"
L__-B
PLAN VIEW
#4 @ 12" C-C
#3 BARS @ 18"
#3 BARS @ 18"
C-C BOTH WAYS OR
6x6-#6 WIRE MESH
C-C BOTH WAYS OR
6x6-#6 WIRE MESH
SECTION A-A
MAX . SLOPE 2 : 1
0+2.0·
SECTION 8-B
#3 BARS @ 18" C-C
BOTH WAYS OR
6x6-#6 WIRE MESH
5"
MAX . SLOPE 2: 1
~
+ 0
5"
D MINUS 4" ---+-1--<1-.l
6"
DETAIL D
CONSTRUCTION JOINT
CITY OF FORT WORTH, TEXAS
CONCRETE APRON -VERTICAL HEADWALL
SECTION C-C
DATE: 06-2007
SD-016
<(
l ____ , ____ J__ ---~
._._1 __.__ _____ -1,-_____ ...L......LJI 1
ELEVATION
t
co
w
__ _§ARS_A _14_
BARS D #4
BARS C 4"@
12" c-c
------i---+->-----t-o.-t-+-+-BARS V #4 12"@ C-C
BARS F 4"
~6"f-
BARS B 4" @
12" c-c
PROVIDE A 12" FOOTING
AS SHOWN WHERE
REQUIRED TO MAINTAIN 4"
MIN . COVER FOR PIPES
I 3"1
I
~\ ~t 15,(6
"\;112
BARS C
BAR DETAIL
TYPICAL WING ELEVATION
-----=
A1 = W+4 ~"
THIS DIMENSION REDUCED
1'-1 7..f!," FOR EACH
SUCCESSIVE BAR .
BARS A1-A2
_.._B_=_Y_+_4_"__.--i ~ l
8 1 = 8" I
I
THIS DIMENSION INCREASED
2' -7" FOR EACH
SUCCESSIVE BAR.
BARS B & 8 1 -8 2
NOTES :
1. ALL CONCRETE SHALL BE CLASS A. ALL EXPOSED
CORNERS SHALL BE CHAMFERED 74".
2 . REINFORCING STEEL SHALL BE PLACED WITH THE
CENTER OF THE OUTSIDE LA YER OF BORE 2"
FROM THE SURFACE OF THE CONCRETE.
3 . SEE SUPPLEMENTAL DRAWING SD-018 FOR
VARIABLE DIMENSIONS.
REVISED DATE: 11-2009
CITY OF FORT WORTH, TEXAS
CONCRETE HEADWALL
DATE: 06-2007
SD-017
CONCRETE HEADWALLS DIMENSIONS
HEADWALL A 8* C D E SIZE
18" 2'-6" 4 1 -0 7,a" 18" 4 '-0"
24" 3 '-0" 5'-9 34" 24" 6'-0"
30" 3'-6" 7'-6 5,a" 30" 8'-0"
36" 4'-0" 9'-3 ~ .. 36" 10 '-o"
39" 4'-3" 10'-2" 39" 11 '-o"
42 " 4 '-6" 11 ·-o 14" 42" 12·-o"
48" 5'-3" 12'-9 1,a" 48" 15'-o"
54" 5'-9" 14'-6" 54" 17'-0"
60" 6'-3" 16'-2 7,a" 64" 19'-0"
66" 6'-9" 17' -11 34" 66" 21'-o"
72" 7'-3" 19'-8 5,a" 72 " 23'-o"
NOTE: THIS DRAWING SUPPLEMENTS DRAWING SD-017.
* LENGTH OF B TO BE DETERMINED BY STEEL FABRICATOR
REVISED DATE: 11-2009
foRT.;oRTQ CITY OF FORT WORTH, TEXAS DATE: 06-2007
CONCRETE HEADWALL DIMENSIONS SD-018
ct
SYM . 0 w
Li: u w
Cl.. en
en
<(
I
I-
Cl.. w
0 3"
• •
g" g" 1--3"
#3 BARS @ 18" C-C
BOTH WAYS
•
CONCRETE
(5 SACK)
#3 BAR
NOTE:
1. CONCRETE SHALL BE CLASS 'A' PER
SPECIFICATIONS ITEM 406 CONCRETE FOR
STRUCTURES .
CONSTRUCTION JOINT #3 L BAR
@ 18" c-c
2. RIPRAP TO BE FORMED ON UNDISTURBED
SOIL CUT TO GRADE. IF TO BE PLACED
ON FILL, ALL FILL SHALL BE PLACED ON
BENCHES CUT IN UNDISTURBED SOIL AND
FILLED IN 8" LOOSE LIFTS, EACH
COMPACTED TO 957. STANDARD PROCTOR
NOTE:
DENSITY. THE FILL SO COMPACTED
SHALL THEN BE CUT TO GRADE.
TYPICAL TRANVERSE SECTION
(SEE BOTH FOR COMPLETE DETAIL)
TRANSVERSE EXPANSION JOINTS ARE REQUIRED 100' ON CENTERS OR LESS; SAME SHALL INCLUDE
3,f' REDWOOD COMPLETELY COVERING THE JOINT FACES (EXCEPT 34" EDGE RELIEF FOR DEALING
COMPOUND) AND 24" #8 SMOOTH DOWELS ON 18" CENTERS COATED 16" AND CAPPED WITH 1 14"
MIN . CLEARENCE ON ONE END AND WITH 12" SPAN DOWEL SUPPORT AND HOT POURED RUBBER
TYPE SEALING COMPOUND 3,('' THICK
ct
SYM .
SLOPE UNLESS~~~
SPECIFIED OTHERWISE
2" PROJECTION
@ 20' C-C 2" SCH
40 P. V.C. CUT FLUSH
AS SHOWN
6" MIN.--j AS REQUIRED FOR 1 SQ FT.
14• PER FT. 1,4" PER FT. (1 CU . FT. PER FT. CONTINUOUS;
12" FOR 2: 1 SIDE SLOPE) ---
6" MIN.
BOTTOM WIDTH
AS SPECIFIED
-~-
NOTE : 12" WASHED ROCK TO BE COVERED WITH STAKED
BURLAP OR OTHER SUITABLE MEANS , APPROVED
BY THE ENGINEER, TO HOLD IN PLACE WHILE
CONCRETE IS BEING PLACED .
TYPICAL TRANVERSE SECTION
(SEE BOTH FOR COMPLETE DETAIL)
CITY OF FORT WORTH, TEXAS
REINFORCED CONCRETE RIPRAP
DATE: 06-2007
SD-019
o· I~
°N~
. en
#3 BARS
AT 6" C-C
3"
6"
\ ..,,.__2-#6 BARS AT 6" C-C
\
ONLY IN CENTER OF 15'
INLET
,_-____ -_.I\_ 8" THICK WALL AT CENTER
OF 15' INLET
SECTION A-A
.-----A
-A
15'-8"
8" CENTER WALL
SEE SECTION A-A
AND NOTE
T ,·-o· ·1
I .... I -----------.
PLAN
NOTE: ONE 15' INLET SHALL CONSIST OF TWO 7 .5'
REINFORCED CONCRETE INLETS CONSTRUCTED TOGETHER AS A
SINGLE UNIT WITH THE ADJACENT ENDS OF THE TWO INLETS
REMOVED AND JOINED TOGETHER SO AS TO FORM A CONTINUOUS
BOX INLET HAVING A 15' -8" LENGTH OPENING . PROVIDE AN 8"
CENTER WALL AS SHOWN IN SECTION A-A
SEE DRAWING SD-001 FOR FINISHED INLET DETAILS.
REVISED DATE: 07-2009
CITY OF FORT WORTH. TEXAS
STANDARD 15' STORM DRAIN INLET
DATE: 03-2009
SD-020
RING AND COVER TO~ BE CONSTRUCTED
OVER OUTLET I -_ -_ -_ -_ -_ ---
1
C.I. -~
COVER _____ v
---.,---11
3'-0"
. -
"'
#3 BARS
AT s• C-C
I I
I
10'-0"
7"-s·-
\ -2-#6 BARS AT 6 " C-C
I\. ONLY IN CENTER OF 15'
I\ INLET
SECTION A-A
8 " THICK WALL AT CENTER
OF 15' INLET
REPEAT AS REQUIRED FOR
LONGER INLETS
8" CENTER WALL
SEE SECTION A-A
AND NOTE
1---~.I. T ------~.I. l
COVER COVER I
J-- - - - - -Ld-- - - - --i----1-r--
--A
8"
31'-4" 3'-o·
10'-0" 8" 10'-0"
PLAN
NOTE: ONE 30' INLET SHALL CONSIST OF THREE 1 O'
REINFORCED CONCRETE INLETS CONSTRUCTED TOGETHER AS A
SINGLE UNIT WITH THE ADJACENT ENDS OF THE TWO INLETS
REMOVED AND JOINED TOGETHER SO AS TO FORM A CONTINUOUS
BOX INLET HAVING A 31 '-4 • LENGTH OPENING . PROVIDE AN 8"
CENTER WALL AS SHOWN IN SECTION A-A
SEE DRAWING SD-001 FOR FINISHED INLET DETAILS .
REVISED DATE: 07-2009
CITY OF FORT WORTH, TEXAS
STANDARD 30' STORM DRAIN INLET
DATE: 03-2009
SD-021
UNDISTURBED
EARTH
MIN. DISTANCE
TO SIDE WALL
6" (15"-18" PIPEi
9" (24" -36" PIPE
12" ( 42" -60" PIP )
THERMOPLASTIC
PIPE
FOUNDATION
MIN . TRENCH WIDTH
FINAL BACKFILL
INITIAL BACKFILL,
6" ABOVE TOP
OF PIPE OUTSIDE
OF PAVEMENT, 12"
ABOVE TOP OF
PIPE UNDER
PAVEMENT .
HAUNCHING TO
SPRINGUNE OF
PIPE
BEDDING MATERIAL
TYPICAL TRENCH CROSS-SECTION
(N.T .S.)
GENERAL NOTES :
1. ALL CONTRACTORS SHALL BE TRAINED AND CERTIFIED BY THE MANUFACTURER
PRIOR TO INSTALLING THERMOPLASTIC PIPE . A COPY OF THE TRAINING
CERTIFICATION AND PROOF OF INSURANCE SHALL BE PROVIDED TO THE CITY
BEFORE ANY WORK SHALL COMMENCE.
2. AT THE ENGINEER'S DISCRETION, ALL PIPE EXCEEDING 7 .5% DEFLECTION
(AS PER AASHTO SECTION 30) WILL REQUIRE REPLACEMENT OR RE-COMPACTION
AT THE CONTRACTOR'S EXPENSE WHEN MEASURED OR INSPECTED NOT LESS
NQIE5.;
1. ALL PIPE SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH ASTM D2321,
"STANDARD PRACTICE FOR UNDERGROUND INSTALLATION OF THERMOPLASTIC PIPE
FOR SEWERS AND OTHER GRAVITY FLOW APPLICATIONS", LATEST ADDITION, AND
IN ACCORDANCE WITH TEXAS DEPARTMENT OF TRANSPORTATION SPECIAL SPECIFICATION
7609, ''THERMOPLASTIC PIPE"
( ftp://ftp.dot.state.tx.us/pub/txdot-info/cmd/cserve/specs/1993/spec/es7609.pdf )
t:XCEPT AS NOTED BELOW . CORRUGATED THERMOPLASTIC PIPE WITH SMbOTH INNER
WALL SHALL MEET THE REQUIREMENTS OF AASHTO M294, TYPE S AND ASTM F2306.
2 . BEDDING AND BACKFILL MATERIAL : PIPE EMBEDMENT SHALL BE CRUSHED STONE
OR ROCK, OR CRUSHED GRAVEL, 100% PASSING 1-1 /2 INCH SIEVE , < 10% PASSING
N0.4 SIEVE AND <5% PASSING N0 .200 SIEVE, NON-PLASTIC EQUAL TO NORTH
CENTRAL TEXAS COUNCIL OF GOVERNMENTS AGGREGATE GRADE 4 OR CITY OF
FORT WORTH SPEC IFICATION 402 .2.
3 . FOUNDATION WHERE THE TRENCH BOTTOM IS UNSTABLE, THE CONTRACTOR SHALL
EXCAVATE TO A DEPTH REQUIRED BY THE ENGINEER AND REPLACE WITH A FOUNDATION
OF BEDDING AND BACKFILL MATERIAL. AS AN ALTERNATIVE AND AT THE DISCRETION
OF THE ENGINEER . THE TRENCH BOTTOM MAY BE STABILIZED USING A WOVEN
GEOTEXTILE FABRIC .
4. MEASURES SHOULD BE TAKEN TO PREVENT MIGRATION OF NATIVE FINES INTO
BACKFILL MATERIAL, WHEN REQUIRED AND AS DIRECTED BY ENGINEER.
5. BEDDING : UNLESS OTHERWISE SPECIFIED BY THE ENGINEER, MINIMUM BEDDING
THICKNESS SHALL BE 6 INCHES .
6 . HAUNCHING: FOR PIPE DIAMETER 36 INCH AND LARGER, EMBEDMENT
MATERIALS SHOULD BE WORKED UNDER THE HAUNCHES BY HAND .
7 . MINIMUM TRENCH WIDTHS :
NOMINAL PIPE SIZE TRENCH WIDTH
(INCHES) (INCHES)
15*** 36
18***
24
30
39
48
56
***DRIVEWAY CULVERTS ONLY
NOMINAL PIPE SIZE TRENCH WIDTH
(INCHES) (INCHES)
36 64
42 72
48 80
54 88
60 96
8. FILTER FABRIC : FILTER FABRIC MEETING TXDOT SPECIFICATION DMS-6200 SHALL
BE INSTALLED ALONG THE TOP OF THE INITIAL BACKFILL FOR THE FULL TRENCH
WIDTH PRIOR TO THE PLACEMENT OF FINAL BACKFILL.
9. MINIMUM COVER :
SURFACE UVE LOAD CONDITION
UNPAVED (GRASS, LANDSCAPE)
H25 (FLEXIBLE PAVEMENT)
H25 (RIGID PAVEMENT)
HEAVY CONSTRUCTION
MINIMUM COVER CINCHES}
18" TO TOP OF GROUND
24" TO .6.0ilQ.M OF ASPHALT COURSE
24" TO TOP OF PAVEMENT
48" TO TOP OF GROUND
THAN 30 DAYS FOLLOWING COMPLETION OF INSTALLATION . DEFLECTION IS REVISED DA TE: 11-2009
DEFINED PER ASTM D 2321 . r---------------C-ITY--0-F_F_O_R_T_W_O_RTH-.-TE-X_A_S ________ T"""_D_A_T_E_: _0_8 ___ 2_0..,0 ... 9-4
)
fORT,jl'IJ CORRUGATED DUAL WALL THERMOPLASTIC
PIPE TRENCH INSTALLATION DETAIL SD-022
Ol Ol
0 0
0 0
N N C")
I I I N
1. USE SUBDRAIN DETAIL DRAWING STR-015. ~ I") 0 ~ 0 I
ACCEPTABLE PIPE MATERIAL INCLUDES : I ci 8 Cl
(A) 6" DIAMETER PERFORATED SCHEDULE Lu (/)
40 PVC; (B) 6" DIAMETER PERFORATED U) <(
I 5 Cl 1YPE S (DUAL-WALL) HOPE PIPE PER Lu
AASHTO M252; OR, (C) CORRUGATED a:::
PVC PIPE PER ASTM F949. NOTE THAT I CORRUGATED POLYETHYLENE TUBING
(ASTM F405) IS NO LONGER PERMITIED I (/) FOR SUBDRAINS . w
I z
2. CLEANOUTS SHALL BE INSTALLED AT _J
UPPER END OF SYSTEM AND AT I w
U) Cl INTERVALS NO GREATER THAN 200'. <(
CLEANOUTS SHALL LINE UP WITH I X ::J
LOT LINES AND BE PLACED IN A VAULT Lu (9 I-
SIMILAR TO A WATER METER BOX ._ z OR PLACED FLUSH WITH A CONCRETE I 0 ~--I-COLLAR 2-3 INCHES BEYOND THE a::: ~ EDGE OF THE PIPE . --0
3:
I-
) a::: _J
0 ~ LL
LL (/)
3. IF PAVEMENT IS BEING REPLACED AND 0 z
THERE ARE OBSTRUCTIONS IN THE >-
PARKWAY SUCH AS BRICK MAILBOXES I-z
OR TREES, A SUBDRAIN CAN BE c3 ~ ROUTED UNDER THE CURB . ANY
CLEANOUTS IN THE PAVEMENT Cl
NEED TO HAVE TRAFFIC-RATED CD
COVERS . ::J
(/) ~
4. WHERE SUBDRAINS ARE INSTALLED
BY BORING UNDER EXISTING DRIVEWAYS ,
NON-PERFORATED SCHEDULE 40 PVC
1 SHALL BE USED . OTHER PIPE MATER IALS
WILL BE CONSIDERED ON A CASE-BY-CASE
BASIS USING THE REQUEST FOR VARIANCE
FORM CFW-7 FOUND IN THE STORM WATER j MANAGEMENT DESIGN MANUAL.
DRIVEWAY I
I
5 . PRIVATE FRENCH DRAINS OR YARD l_ DRAINS SHALL BE PLUMBED INTO THE
SUBDRAIN WHERE IT IS PRACTICAL.
IN ALL CASES, A CLEANOUT SHALL BE
PROVIDED ON THE PRIVATE DRAIN . IN --
THE EVENT OF MULTIPLE PIPES AT ONE
LOCATION OR OTHER UNUSUAL
CONFIGURATION, A BOX OR VAULT OR A 0 SMALL GRATE INLET MAY BE USED AS A
JUNCTION STRUCTURE TO TIE INTO THE
PUBLIC SUBDRAIN . 0
!"R
I t
'I, "I
I I
L1 .
t')
!"R
4" CURB HIGHT
' <]
.. <]
<] L'l • L'l ·<] .
~-2-#3BARS~·
.. L1. . . . <] . .
(0
'-
. _/ 15" GUTIER FACE OF CURB PLANE ~--.-:..:"--'::.=..=-----i
30"
FORT WORTH ~
CITY OF FORT WORTH, TEXAS
RESIDENTIAL ROLLOVER
CURB AND GUTTER
1
DATE: 03-2009
SD-024
MUST BE GREATER
WITH LATERALS
UNDER PAVEMENT
NOTES :
DIM . 'B '
(TRENCH WIDTH)
SEE TABLE 1
TABLE 1
LIMITS OF EXCAVATION
DIM. A DIM . B
2 .5' TO 6' 1'-7"
6' TO 10' 2'-1"
10' TO 15' 2 '-7"
OVER 15' 3'-1 "
1'-6" MIN.
WASHED ROCK
PER ITEM 402
1. FIELD INSTALLATION SHALL BE IN ACCORDANCE WITH STORM WATER DETAIL SD-023.
2. PIPE SHALL BE : (A) 6" DIAMETER PERFORATED SCHEDULE 40 PVC ; (B) 6" DIAMETER
PERFORATED TYPE S (DUAL-WALL) HDPE PIPE PER AASHTO M252; OR, (C) CORRUGATED
PVC PIPE PER ASTM F949 . NOTE THAT CORRUGATED POLYETHYLENE TUBING (ASTM F405)
IS NO LONGER PERMITTED FOR SUBDRAINS .
CURB &
GUTTER
REVISED: 11-2009
CITY OF FORT WORTH, TEXAS
SUBDRAIN
DATE: 08-2006
STR-015
-9
CONTRACTOR COMPLIANCE WITH WORKER'S COMPENSATION LAW
CONTRACTOR COMPLIANCE WITH
WORKERS' COMPENSATION LAW
Pursuant to V.T.C.A. Labor Code §406.96 (2000), as amended , Contractor certifies that
it provides workers' compensation insurance coverage for all of its employees employed
on City of Fort Worth Project No . 01635
STATE OF TEXAS
COUNTY OF TARRANT
§
§
§
Title: -----------
Date : -~3_-_z~9_-..... l,_I ___ _
me , the undersigned authority, on this day personally appeared
---ll..jL..Jll,,=:::........Wl£.....!:"~Loa<J.-' known to me to be the person whose name is subscribed to the
for ,going instrume t , a d .ac~n wledg d to m~ that e executed the same as the act
and deed o ,' --.-.e. V, nJ c..-for the purposes and
considerat ion there in expressed and in the capacity therein stated.
Given Under My Hand and Seal of Office this M day ai r e 4 011 .
d~,,n.) t,~"-JJ
Notary Public in and for the State of
Texas
-10 -
CERTIFICATE OF INSURANCE
•
-11 -
MAINTENANCE BOND
Bond No. 8219-05-97
MAINTENANCE BOND
THE STATE OF TEXAS
COUNTY OF TARRANT
§
§
§
KNOW ALL BY THESE PRESENTS:
That -"""T ....... r.;..i-""""T""'e"""c"""h"""C __ o ___ n ...... s ___ t __ ru ___ c ___ t ___ io ....... n ..... 1 __ 1 ..... n"""c __ . __ ("Contractor"), as principal, and Vigilant Insurance
Company ,a corporation organized under the laws of the State of New
York , ("Surety"), do hereby acknowledge themselves to be held and bound to pay unto the City of Fort
Worth, a Municipal Corporation chartered by virtue of Constitution and laws of the State of Texas , ("City") in
Tarrant County, Texas , the sum of Two Million Dollars and No Cents Dollars ($2,000,000.00), lawful
money of the United States ,for payment of which sum well and truly be made unto sa id City and its
successors, said Contractor and Surety do hereby bind themselves , the ir heirs , executors , administrators,
assigns and successors, jointly and severally.
This obligation is conditioned , however, that:
WHEREAS , said Contractor has this day entered into a wr itten Contract with the City of Fort Worth ,
dated the 22"d of March , 201:L, a copy of which is hereto attached and made a part
hereof, for the performance of the following described public improvements :
MISCELLANEOUS STORM DRAIN IMPROVEMENTS -2011
the same being referred to herein and in said contract as the Work and being designated as project
number(s) 01635 and said contract, including all of the specifications , conditions , addenda ,
change orders and written instruments referred to therein as Contract Documents being incorporated herein
and being made a part hereof; and ,
WHEREAS , in said Contract, Contractor binds itself to use such materials and to so construct the
work that it will remain in good repair and condition for and during the period of after the date of the final
acceptance of the work by the City; and
WHEREAS , said Contractor binds itself to maintain said work in good repair and cond ition for said
term of 2 (Two) Year(s); and
WHEREAS, said Contractor binds itself to repair or reconstruct the work in whole or in part at any
time within said period , if in the opinion of the Director of the City of Fort Worth Department of Engineer ing, it
be necessary; and ,
WHEREAS , said Contractor binds itself, upon receiving notice of the need therefore to repair or
reconstruct said work as herein provided.
NOW THEREFORE , if said Contractor shall keep and perform its said agreement to maintain , repair
or reconstruct said work in accordance with all the terms and conditions of said Contract , these presents shall
be null and void, and have no force or effect. Otherwise , this Bond shall be and remain in full force and effect,
and the City shall have and recover from Contractor and Surety damages in the premises as prescribed by
said Contract.
Bond No. 8219-05-97
This obligat ion shall be a continuing one and successive recoveries may be had hereon for success ive
breaches until the-fu ll amount hereof is exhausted.
IN WITNESS WHEREOF, th is ins trument is executed in Eight counterparts , each of which shall be
deemed an original , this 22"d day of _---"M=a=r;..;;c;.:.;h;...__, A.O . 2011_.
ATIEST:
ATIEST:
(SE AL)
Secretary
Tri -Tech Construction, Inc.
Contractor
Sur ty
By : --~~..a....:,..c::..~.......i......=:~L....-~~-
Name :---"~~..;;;.a....;..;;.;...;.;.:.;;;~:.a.......-------
Title: ---a...;.;;.;;.~1-"--&-....a.a.a....;....;;=.a.--------
2001 Bryan Street, Suite 3400
Dallas, Texas 75201
Address
-12 •
PAYMENT BOND
THE STATE OF TEXAS
COUNTY OF TARRANT
§
§
§
Bond No. 8219-05-97
PAYMENT BOND
KNOW ALL BY THESE PRESENTS:
That we, (1) Tri-Tech Construction, Inc. , as Principal herein, and (2) Vigilant Insurance
..:C..::o.a.:mc:.ip;;.;:a;;:.:,n.:...,y.__ _____________ , a corporation organized and existing under the laws of
the State of (3) ___ N;..;..;.ew.;.:_Y.:...o=r:..;..k=----· as surety, are held and firmly bound unto the City of Fort Worth, a
municipal corporation located in Tarrant and Denton Counties, Texas, Obligee herein, in the amount of
Two Million Dollars and No Cents Dollars ($ 2,000,000.00 ) for the payment whereof, the said
Principal and Surety bind themselves and their heirs, executors, administrators, successors and assigns,
jointly and severally, firmly by these presents:
WHEREAS, the Principal has entered into a certain written contract with the Obligee dated the
22nd day of ---=-M=a=r-=-c.:.:.h __ , 2011.._, which contract is hereby referred to and made a part hereof as if fully
and to the same extent as if copied at length, for the following project:
MISCELLANEOUS STORM DRAIN IMPROVEMENTS -2011
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said
Principal shall faithfully make payment to each and every claimant (as defined in Chapter 2253, Texas
Government Code, as amended) supplying labor or materials in the prosecution of the work under the
contract, then this obligation shall be void; otherwise, to remain in full force and effect.
PROVIDED , HOWEVER, that this bond is executed pursuant to Chapter 2253 of the Texas
Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the
provisions of such statute, to the same extent as if it were copied at length herein.
IN WITNESS WHEREOF, the duly authorized representatives of the Principal and the Surety have
executed this instrument.
SIGNED and SEALED this 22"d day of -----=-M=-=-a=r-=-c..:.:h ____ , 2011_.
Bond No. 8219-05-97
Tri-Tech Construction, Inc.
PRI~
By: ~
N~
Title : Vice President
(SEAL) Address : 650 Tower Drive
Kennedale, Texas 76060
Witness as to Principal
ATIEST:
Secretary
Address: 2001 Bryan Street, Suite 3400
Dallas, Texas 75201
Witness as to Surety Gala Harris Telephone Number: 214-754-0777
NOTE : ( 1)
(2)
(3)
Correct name of Principal (Contractor).
Correct name of Surety.
State of incorporation of Surety
Telephone number of surety must be stated. In addition , an original copy of Power of
Attorney shall be attached to Bond by the Attorney-in-Fact.
The date of bond shall not be prior to date of Contract.
-13-
PERFORMANCEBOND
THE STATE OF TEXAS
COUNTY OF TARRANT
Bond No. 8219-05-97
PERFORMANCE BOND
§
§
§
KNOW ALL BY THESE PRESENTS:
That we, (1) Tri-Tech Construction, Inc. ,as Principal herein , and (2) Vigilant Insurance
Company , a corporation organized under the laws of the State of (3) New York , and
who is authorized to issue surety bonds in the State of Texas , Surety herein, are held and firmly bound
unto the City of Fort Worth, a municipal corporation located in Tarrant and Denton Counties , Texas ,
Obliges herein , in the sum of Two Million Dollars and No Cents Dollars ($2,000,000.00) for the
payment of which sum we bind ourselves, our heirs , executors , administrators, successors and assigns ,
jointly and severally , firmly by these presents .
WHEREAS , Principal has entered into a certain written contract with the Obliges dated the 22nd
day of March , 2011_, a copy of which is attached hereto and made a part hereof for all
purposes, for the construction of
MISCELLANEOUS STORM DRAIN IMPROVEMENTS -2011
NOW , THEREFORE, the condition of this obligation is such , if the said Principal shall faithfully
perform the work in accordance with the plans, specifications and contract documents and shall fully
indemnify and hold harmless the Obliges from all costs and damages which Obliges may suffer by
reason of Principal's default, and reimburse and repay Obligee for all outlay and expense that Obliges
may incur in making good such default, then this obligation shall be void ; otherwise, to remain in full force
and effect.
PROVIDED , HOWEVER , that this bond is executed pursuant to Chapter 2253 of the Texas
Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the
provisions of such statute , to the same extent as if it were copied at length herein .
IN WITNESS WHEREOF , the duly authorized representatives of the Principal and the Surety
have executed this instrument.
SIGNED and SEALED this 22nd day of ____ M_a_rc_h ___ , 2011_.
(SEAL)
ATIEST:
Secretary
Bond No. 8219-05-97
Tri-Tech Construction, Inc.
Title : Vice President
Address : 650 Tower Drive
Kennedale, Texas 76060
Vigilant Insurance Company
(SE UD ~ .
0. ~
Witness as to Suretya1a Harris
Address : 2001 Bryan Street, Suite 3400
Dallas, Texas 75201
Telephone Number: 214-754-0777
NOTE: ( 1)
(2)
(3)
Correct name of Principal (Contractor).
Correct name of Surety.
State of incorporation of Surety
Telephone number of surety must be stated . In addition , an original copy of Power of
Attorney shall be attached to Bond by the Attorney-in-Fact.
The date of bond shall not be prior to date of Contract.
Policyholder Information Notice
IMPORTANT NOTICE
To obtain information or make a complaint:
You may call Chubb's toll-free telephone number
for information or to make a complaint at
1-800-36-CHUBB
You may contact the Texas Department of
Insurance to obtain information on companies,
coverages, rights or complaints at
1-800-252-3439
You may write the Texas Department of Insurance
P.O. Box 149104
Austin, TX 78714-9104
FAX# (512) 475-1771
Web: http://www.tdi.state.tx.us
E-mail: ConsumerProtection@tdi.state.tx.us
PREMIUM OR CLAIM DISPUTES:
Should you have a dispute concerning your premium
or about a claim you should contact the agent fir st.
If the dispute is not resolved , you may contact the
Texas Department of Insurance.
ATTACH THIS NOTICE TO YOUR POLICY:
This notice is for information only and does not
become a part or condition of the attached
document.
Fo rm 99-10-0299 (Rev. 1-08)
AV/SO IMPORTANTE
Para obtener informaci6n o para someter una
queJa:
U sted puede llamar al numero de telefono gratis
de Chubb's para informaci6n o para someter una
queja al
1-800-36-CHUBB
Puede comunicarse con el Departamento de
Seguros de Texas para obtener informaci6n acerca
de compafifas, coberturas, derechos o quejas al
1-800-252-3439
Puede escribir al Departamento de Seguros de
Texas
P.O. Box 149104
Austin, TX 78714-9104
FAX# (512) 475-1771
Web: http://www.tdi.state.tx.us
E-mail: ConsumerProtection@tdi.state.tx.us
DISPUTAS SOBRE PRIMAS O RECLAMOS:
Si tiene una disputa concerniente a su prima o a un
reclamo, debe comunicarse con el agente primero.
Si no se resueve la disputa, puede entonces
comunicarse con el departamento (TDI).
UNA ESTE AV/SO A SU POLIZA:
Este aviso es solo para prop6sito de informaci6n y
no se convierte en parte o condici6n del documento
adjunto.
Chubb
Surety
POWER
OF
ATTORNEY
Federal Insurance Company
Vigilant Insurance Company
Pacific Indemnity Company
Attn: Surety Department
15 Mountain View Road
Warren, NJ 07059
Know All by These Presents, That FEDERAL INSURANCE COMPANY, an Indiana corporation, VIGILANT INSURANCE
COMPANY, a New York. corporation, and PACIFIC INDEMNITY COMPANY, a Wisconsin corporation, do each hereby constitute and
appoint Jennifer R. Marsh, Charles D. Sweeney, Kyle W. Sweeney and Michael A. Sweeney of Fort Worth, Texas -----
each as their true and lawful Attorney-In-Fact to execute under such designation in their names and to affix their corporate seals to and deliver for and on their behalf as surety
thereon or otherwise, bonds and undertakings and other writings obligatory in the nature thereof (other than bail bonds) given or executed in the course of business, and any
Instruments amending or altering the same, and consents to the modification or alteratiOn of any Instrument referred to In said bonds or obllgatfons .
In Witness Whereof, said FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY have each executed and attested
-;;:·~~~;:; ,~m Sep~mber, 2009. (__/
ennethC.Wendel, Assistant Secretary
STATE OF NEW JERSEY
ss .
County of Somerset
On this 3rd day of September, 2009 before me, a Notary Public of New Jersey, personally came Kenneth C. Wendel , to me
known to be Assistant Secretary of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY, the companies which
executed the foregoing Power of Attorney, and the said Kenneth C. Wendel, being by me duly sworn, did depose and say that he is Assistant Secretary of FEDERAL
INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY and knows the corporate seals thereof, that the seals affixed to the
foregoing Power of Attorney are such corporate seals and were thereto affixed by authority of the By-Laws of said Companies ; and that he signed said Power of Attorney as
Assistant Secretary of said Companies by like authority; and that he i s acquainted with David B. Norris, Jr., and knows him to be Vice President of said Companies ; and that the
Signature of David B. Norris, Jr., subscribed to said Power of Attorney is in the genuine handwriting of David B. Norris, Jr., and was thereto subscribed by authority of said By-
laws and in deponent's presence .
Notarial Seal KATHERINE J. ADELMR
NOTARY PUBLIC OF NEW JERSEY
No 2316685
Commission Expires July 16, 201 ~
CERTIFICATION
~ ~ . , ~P Jt'vjV----r Notary Public
Extract from the By-Laws of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACiFIC INDEMNITY COMPANY:
"Ali powers of attorney for and on behalf of the Company may and shall be executed in the name and on behalf of the Company, either by the Chainnan or the
President or a Vice President or an Assistant Vice President, jointly with the Secretary or an Assistant Secretary, under their respective designaUons . The
signature of such officers may be engraved , printed or lithographed . The signature of each of the following officers : Chairman, President. any Vice President, any
Assistant Vice President, any Secretary, any Assistant Secretary and the seal of the Company may be affixed by facsimile to any power of attorney or to any
certificate relating thereto appointing Assistant Secretaries or Attorneys-in-Fact for purposes only of executing and attesUng bonds and undertakings and other
writings obligatory In the nature thereof, and any such power of attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding
upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding upon the Company
with respect to any bond or undertaking to which it is attached ."
I, Kenneth C. Wendel, Assistant Secretary of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY , and PACIFIC INDEMNITY COMPANY
(the "Companies") do hereby certify that
(i) the foregoing extract of the By-Laws of the Companies Is true and correct,
{II) the Companies are duly licensed and authorized to transact surety business in all 50 of the United States of America and the District of Columbia and are
authorized by the U.S. Treas,..ry Departmert; further, Federal and Vigilant are licensed In Puerto Rico and the U.S. Virgin Islands, and Federal is licensed In
American Samoa, Guam, and each of the Provinces of Canada except Prince Edward Island; and
(iii) the foregoing Power of Attorney Is true, correct and In full force and effect
Given under my hand and seals of said Companies at Warren, NJ this March 22, 2011
~ad~ ~ Ken~e,Assln!Secretary
IN THE EVENT YOU WISH TO NOTIFY US OF A CLAIM, VERIFY THE AUTHENTICITY OF THIS BOND OR NOTIFY US OF ANY OTHER
MATIER, PLEASE CONTACT US AT ADDRESS LISTED ABOVE, OR BY Telephone (908) 903-3493 Fax (908) 903-3656
e-mail: surety@chubb.com
Form 15-10-02258-U (Ed . 5-03) CONSENT
-14 -
CITY CONTRACT
THE STATE OF TEXAS
COUNTY OF TARRANT
CITY OF FORT WORTH, TEXAS
CONTRACT
§
§
§
KNOW ALL MEN BY THESE PRESENTS:
MAR 22 2011
This agreement made and entered into this the day of , 20_, by and
between the CITY OF FORT WORTH, a municipal corporation of Tarrant County, Texas, organized and
existing under and by virtue of a special charter adopted by the qualified voters within said City on the 11th
day of December, A.O . 1924, under the authority (vested in said voters by the "Home Rule" provision) of the
Constitution of Texas, and in accordance with a resolution duly passed at a regular meeting of the City
Council of said city, and the City of Fort Worth being hereinafter termed Owner , and Tri-Tech
Construction, Inc. , HEREINAFTER CALLED Contractor.
WITNESSETH : That said parties have agreed as follows:
1.
That for and in consideration of the payments and agreements hereinafter mentioned to be made and performed
by the Owner, and under the conditions expressed in the bond bearing even date herewith , the said
Contractor hereby agrees with the said Owner to commence and complete the construction of certain
improvements described as follows :
MISCELLANEOUS STORM DRAIN IMPROVEMENTS -2011
Designated as project number, 01635 .
2.
That the work herein contemplated shall consist of furnishing as an independent contractor all labor,
tools, appliances and materials necessary for the construction and completion of said project in accordance
with the Plans and Specifications and Contract Documents prepared by the Department of Engineering for
the Transportation and Public Works Department of the City of Fort Worth adopted by the City Council of the
City of Fort Worth , which Plans and Specifications and Contract Documents are hereto attached and made a
part of this contract the same as if written herein .
3 .
The Contractor hereby agrees and binds himself to commence the construction of said work within
ten (10) days after being notified in writing to do so by the Department of Engineering of the City of Fort
Worth.
4.
The Contractor hereby agrees to prosecute said work with reasonable diligence after the
commencement thereof and to fully complete and finish the same ready for the inspection and approval of
OFFICIAL RECORD
CITY SECRETARY
FT. WORTH, TX
the Department of Engineering of the City of Fort Worth and the City Council of the City of Fort Worth within a
period of 365 (Three Hundred Sixty Five) working days .
If the Contractor should fail to complete the work as set forth in the Plans and Specifications and
Contract Documents within the time so stipulated , plus any additional time allowed as provided in the General
Conditions , there shall be deducted from any monies due or which may thereafter become due him, the sum
of $ _$630.00_per calendar day , not as a penalty but as liquidated damages , the Contractor and his
Surety shall be liable to the Owner for such deficiency.
5 .
Should the Contractor fail to begin the work herein provided for within the time herein fixed or to carry
on and complete the same according to the true meaning of the intent and terms of said Plans ,
Specifications, and Contract Documents , then the Owner shall have the right to either demand the surety to
take over the work and complete the same in accordance with the Contract Documents or to take charge of
and complete the work in such a manner as it may deem proper, and if, in the completion thereof, the cost to
the said City shall exceed the contract price or prices set forth in the said Plans and Specifications made a
part hereof, the Contractor and/or its Surety shall pay said City on demand in writing , setting forth and
specifying an itemized statement of the total cost thereof, said excess cost.
6.
Contractor covenants and agrees to indemnify City's engineer and architect, and their personnel
at the project site for Contractor's sole negligence. In addition, Contractor covenants and agrees to
indemnify, hold harmless and defend , at its own expense , the Owner, its officers , servants and
employees , from and against any and all claims or suits for property loss , property damage , personal
injury, including death , arising out of, or alleged to arise out of, the work and services to be performed
hereunder by Contractor, its officers , agents, employees , subcontractors , licensees or invitees, whether
or not any such iniurv, damage or death is caused, in whole or in part, by the negligence or
alleged negligence of Owner, its officers, servants, or employees. Contractor likewise covenants and
agrees to indemnify and hold harmless the Owner from and against any and all injuries to Owner's
officers , servants and employees and any damage, loss or destruction to property of the Owner arising
from the performance of any of the terms and conditions of this Contract, whether or not any such
iniurv or damage is caused in whole or in part by the negligence or alleged negligence of Owner,
its officers, servants or employees.
In the event Owner receives a written claim for damages against the Contractor or its subcontractors prior
to final payment , final payment shall not be made until Contractor either (a) submits to Owner satisfactory
evidence that the claim has been settled and/or a release from the claimant involved, or (b) provides
Owner with a letter from Contractor's liability insurance carrier that the claim has been referred to the
insurance carrier.
The Director may, if he deems it appropriate, refuse to accept bids on other City of Fort Worth public work
from a Contractor against whom a claim for damages is outstanding as a result of work performed under a
City Contract.
7 .
The Contractor agrees, on the execution of this Contract, and before beginning work, to make ,
execute and deliver to said City of Fort Worth good and sufficient surety bonds for the faithful performance of
the terms and stipulations of the Contract and for the payment to all claimants for labor and/or materials
furnished in the prosecution of the work, such bonds being as provided and required in Texas Government
Code Section 2253, as amended, in the form included in the Contract Documents, and such bonds shall be
OF FICIAL RECOR D
CITY SECRETARY
FT. WORTH, TX
100 percent ( 100%) of the total contract price, and the said surety shall be a surety company duly and legally
authorized to do business in the State of Texas, and acceptable to the City Council of the City of Fort Worth .
8 .
Said City agrees and binds itself to pay, and the said agrees to receive , for all of the aforesaid work,
and for all additions thereto or deductions therefrom , the price shown on the Proposal subm itted by the
successful bidder hereto attached and made a part hereof. Payment will be made in monthly installments
upon actual work completed by contractor and accepted by the Owner and receipt of invoice from the
Contractor. The agreed upon total contract amount (including/excluding) alternates N/A , shall be $
TWO MILLION DOLLARS AND NO CENTS
$2,000,000.00.
9.
It is further agreed that the performance of this Contract, either in whole or in part, shall not be sublet
or assigned to anyone else by said Contractor without the written consent of the Director of the Department
of Engineering .
10.
The Contractor agrees to pay at least the minimum wage per hour for all labor as the same is
classified , promulgated and set out by the City of Fort Worth , Texas , a copy of which is attached hereto and
made a part hereof the same as if it were copies verbatim herein.
11 .
The Contractor shall procure and shall maintain during the life of this contract insurance as specified
in paragraph 8 of Special Instruction to Bidders of this contract documents.
12 .
It is mutually agreed and understood that this agreement is made and entered into by the parties
hereto with references to the existing Charter and Ordinances of the City of Fort Worth and the laws of the
State of Texas with references to and governing all matters affecting this Contract, and the Contractor agrees
to fully comply with all the provisions of the same.
IN WITNESS WHEREOF, the City of Fort Worth has caused this instrument to be signed in Six (6)
counterparts in its name and on its behalf by the City Manager and attested by its Secretary, with the
corporate seal of the City of Fort Worth attached . The Contractor has executed this instrument through its
duly authorized officers in Six (6) counterparts with its corporate seal attached .
OF FICIAL RECO RD
CITY SECRETARY
FT. WORTH, TX
HAR 22 2011
Done in Fort Worth, Texas, this the _____ day of , 20 .
(Contractor)
(Addr ss)
/~~IL, ~1ttJ t ti
(City/State/Zip)
November 1960
Revised May 1986
Revised September 1992
Revised January 1993
Revised April 1999
Revised June 1999
Revised June 2001