Loading...
HomeMy WebLinkAboutContract 59397-A1CSC No. 59397-Al AMENDMENT No . 1 TO CITY SECRETARY CONTRACT No. 59397 WHEREAS, the City of Fort Worth (CITY) and McCarthy Building Companies, Inc., (CMAR) made and entered into City Secretary Contract No. 59397, (the CONTRACT) which was authorized by M&C 23-0157 on the 28th day of February, 2023 for preconstruction services in the amount of $158,000.00 and construction services in the estimated amount of $13,256,000.00, inclusive of the CMAR's construction phase fee of 6.250 of the Cost of Work; and WHEREAS, the CONTRACT calls for pre -construction and construction services for the following PROJECT: Ray White Road Widening Improvements Project from Mirage Drive to the Bridge over Bear Creek (CPN 103270); and WHEREAS, it has become necessary to add funds to the PROJECT in the amount of $7,895,775.00 for the completion of the work; and WHEREAS, pursuant to Article 4 of the Contract, the parties desire to execute Amendment No. 1 to the CONTRACT to establish the Guaranteed Maximum Price (GMP) for the construction of the PROJECT; NOW THEREFORE, CITY and CMAR, acting herein by and through their duly authorized representatives, enter into the following agreement, which amends the CONTRACT: Im The construction budget is amended to be increased in the amount of $7,895,775.00 thereby increasing it from $13,256,000.00 to $21,151,775.00; and 2. The Guaranteed Maximum Price of the Project shall be the amount of $21,151,775.00, inclusive of the CMAR's 6.25% fee, as specified in the original agreement. The GMP is within the project budget and Staff finds that the fees and costs are fair and reasonable for the work proposed. OFFICIAL RECORD City of Fort Worth, Texas RAY WHITE ROAD WIDENING IMPROVEMENTS CMAR Amendment Template CITY SECRETARY CPN 103270 Revision Date: 05/06/2024 Page 1 of 3 FT. WORTH, TX 3. All other provisions of the CONTRACT, which are not expressly amended herein, shall remain in full force and effect. EXECUTED and EFFECTIVE as designated Assistant City Manager. APPROVED: City of Fort Worth op�� Jesica McEachern Assistant City Manager DATE: 07/17/25 ATTEST: oFFOB>°waa p A �9dd Pam° .IP PVe °=P pPo*.,. �\ep � aynn��sgg4 JCCannette Goodall City Secretary APPROVED AS. TO FORM AND LEGALITY: 4f&e— Douglas Black (Jul 14, 2025 10:01 CDT) Douglas W. Black Sr. Assistant City Attorney of the date subscribed by the City's CMAR McCarthy Building Companies, Inc. ea�orr�y Shaw Vice President of Operations Southern Region DATE: S/ Z I r z0ZS M&C No.#: 25-0177 M&C Date: 02/25/2025 OFFICIAL RECORD CITY SECRETARY FT. WORTH, TX City of Fort Worth, Texas RAY WHITE 50AD WIDENING IMPROVEMENTS CMAR Amendment Template CPN 103270 Revision Date: 05/06/2024 Page 2 of 3 FUNDING BREAKDOWN SHEET City Secretary No. 59397 Amendment No. 1 Dept Project CF1- CF2 - Fund ID ID Activity Account Bond Amount Reference PRE -CONSTRUCTION PHASE SERVICES: $158,000.00 SUBTOTAL PRE -CONSTRUCTION PHASE SERVICES $158,000.00 CONSTRUCTION PHASE SERVICES (Estimated GMP): $13,256,000.00 30108 0200431 5740010 103270 002380 2,417,662.26 39008 0200431 5740010 103270 002380 487,337.74 34027 0200431 5740010 103270 002380 9999 22010199 4,990,775.00 SUBTOTAL CONSTRUCTION PHASE SERVICES (GMP) $21,151,775.00 TOTAL: $21,309,775.00 City of Fort Worth, Texas RAY WHITE ROAD WIDENING IMPROVEMENTS CMAR Amendment Template CPN 103270 Revision Date: 05/06/2024 Page 3 of 3 Bond No.: Federal Insurance Company, K41991197 Travelers Casualty and Surety Company, 108168861 SECTION 00 61 13 PERFORMANCE BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS., COUNTY OF TARRANT § That we, McCarthy Buildinq Companies, Inc. Federal Insurance Company herein and Travelers Casualty and Suretv Companv , known as "Principal' a corporate surety(sureties, if more than one) duly authorized to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firstly bound unto the City of Fort Worth, a municipal corporation created pursuant to the laws of Texas, known as "City" herein, in the penal stun of, Thirteen Million Forty Five Thousand Thirty Eight and 001100 Dollars ($13,048,038.00--------------- —�), lawful stoney of tile United States, to be paid in Fort Worth, Tarrant County, Texas for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents. WHEREAS, the Principal has entered into a certain written contract with the City awarded the 15th day of May , 2023 , which Contract is hereby referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipnnent labor and other accessories defined by law, in the prosecution of the Work, including any Change Orders, as provided for in said Contract designated as Ray White Road Widening Improvements (Mirage Drive to the bridge north of Camrose Street), CPN 103269 & 103270. NOW, THEREFORE, the condition of this obligation is such that if the said Principal shall faithfully perform it obligations under the Contract and sliall in all respects duly and faithfully perform the Work, including Change Orders, tinder the Contract, according to the plans, specifications, and contract documents therein referred to, and as well during any period of extension of the Contract that may be granted on the part of tine City, then this obligation shall be and become null and void, otherwise to remain in full force and effect. PROVIDED FURTHER, that if any legal action be filed on this Bond, venue shall lie in Tarrant County, Texas or the United States District Court for tine Northern District of Texas, Fort Worth Division. This bond is made and executed in compliance with the provisions of Chapter 2253 of tine Texas Government Code, as amended, and all liabilities on this bond sliall be determined in accordance with the provisions of said statue. City of Fort Worth -- Ray White Road Widening Improvements Project CPN 103270 Page 33 of 50 OMAR RFP (Form 4126122) IN WITNESS WHEREOF, the Principal and the Surety have SIGNED and SEALED this instrument by duly authorized agents and officers on this the 10th day of February , 2025 . ATTE T: Davin Mayerhoff Vice —President, Finance (Principal) Secretary Witness s rincipal mess as to Surety Susan A, Welsh PRINCIPAL: McCarthy Building Companies, Inc. Si ure Jeromy Shaw Seniorr V_ic —Prig yen-L-,----D-perations Name and Title Address, 3400 N Central Expressway, Suite 500 Richardson. TX 75080 SURETY: Federal Insurance Company _ Travelers nCasualtyyaand Surma Company B Y :.1C Signature Christina L. Sandoval, Attorney -in -Fact Name and Title Address: 202E Hall's Mill Road, Whitehouse Station, NJ 08889 One Tower Square, Hartford, CT QgJ83 Telephone Num908-903-2000 ber;-203-277-0111 *Note: If signed by an officer of the Surety Company, titre must be on file a certified extract from the by-laws showing that this person has authority to sign such obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not he prior to the date tilt Contract is awarded. City of Fort Worth — Ray White Road Widening Improvements Project CPN 103270 Page 34 of 50 CMAR RFP (Form 4/26122) Have a complaint or need help? Vene una queja o necesita ayuda? IMPORTANT NOTICE If you have a problem Nvith a claim or your premiums, call your insurance company first. If you can't work out the issue, the Texas Department of Insurance may be able to help. Even if you file a complaint with the Texas Department of Insurance, you should also file a complaint or appeal through your insurance company. If you don't, you may lose your right to appeal. To get information or file a complaint with CHUBB: Call Toll -free: 1-800-36-CHUBB Mail: Eastern Claim Service Center boo Independence Parkway Chesapeake, VA 23320 Attn: Surety Support Phone: 800-252-467o Fax: 800-664-5358 Email: ecsc.claims@chubb.com chubb.com To get help with an insurance question or file a complaint with the state: The Texas Department of Insurance Call with a question: r-800-252-3439 File a complaint: www.tdi.texas.gov E-mail: ConsumerProtection@tdi.texas.gov tdi.texas.gov Mail: MC-iii-1A, P.O. Box 149091 Austin, TX 78714-9091 AVISO IMPORTANTE Si tiene un problema con un reclamo o las primas, llame primero a ]a empresa de seguros. Si no puede resolver el problema, el Departamento de Seguros del estado de Tejas puede ayudar. Si registra una queja con el Departamento de Seguros del estado de tejas, tambien debe presentar una queja o apelacion a traves de su compania de seguros. Si no to pace puede perder su derecho de apelar. Para obtener informacion o registro de una queja con CHUBB: Llame a]:1-800-36-CHUBB Correo: Eastern Claim Service Center boo Independence Parkway Chesapeake, VA 23320 Attn: Surety Support Telefono: 800-252-467o Fax: 800-664-5358 Correo electronico: ecsc.claims@chubb.com Para ayuda con una pregunta de seguros o registrar una queja con el estado: El Departamento de Seguros del Estado de Tejas Preguntas: 1-800-252-3439 Quejas: w«iv.tdi.texas.gov Correo electronico: ConsumerProtectiorl@tdi.texas.gov Correo: MC-11a-.A., P.O. Box 149091 Austin, TX 78714-9091 Form 15-10-0347 (Rev, 2/23) IMPORTANT NOTICE To obtain information or make a complaint: You may call Travelers Casualty and Surety Company of America and its affiliates' toll - free telephone number for information or to make a complaint at: 1-800-328-2189 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance: P. O. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: httr)://www.tdi.state.tx.us E-mail: ConsumerProtection(cDtdi.state.tx.us PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact your Agent or Travelers first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR BOND: This notice is for information only and does not become a part or condition of the attached document and is given to comply with Texas legal and regulatory requirements. (PN•042-B) Ed.10.18.07 CHUBB Power of Attorney Federal Insurance Company j Vigilant Insurance Coinpany I Pacific Indemnity Company Westchester Fire Instrance Company j ACE American Insurance Company Know All by These Presents, that FEDERAL ENSURANCE COMPANY, an Indiana corporation, VIGILANT INSURANCE COMPANY, a New York corporation, PACIFIC INDEMNITY COMPANY, a Delaware corporation, WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY corporations of the Commonwealth of Pennsylvania, do each hereby constitute and appoint; Richard Casas, Corinne Chapman, Samantha Chierici, Jessica B. Dempsey, George F. Douaire V Derek 1. Elston, Kristin L Hannigan, Therese M. Jackson, Jennifer L. Jakaitis, Nicholas Kertesz, Judith A. Lucky-Eftimov, Tara A. Maquinto, James B. McTaggart, Robert Nachreiner, Nicholas Pantazis, Roger Paraison, Christina L. Sandoval, Bartlomiej Siepierski, Jean Torres, Christopher P. Troha, Aerie Walton, Susan A. Welsh, Sandra M. Winsted and Dartonya Wright of Chicago, Illinois -------------------------------------------- each as their true and lawful Attorney -in -Fact to execute under such designation in their names and to affix their corporate seals to and deliver for and on their behalf as surety thereon or otherwise, bands and undertakings and other writings obligatory in the nature thereof (other than bail bonds) given or executed in the course of business, and any Instruments amending or altering the same, and consents to the modification or alteration of any instrument referred to in said bonds or obligations. In Witness Whereof, said FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, PACIFIC INDEMNITY COMPANY, WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY have each executed and attested these presents and affixed their corporate seals on this Ist day of August 2024. ��- %Vlarien Eichhixn. Vice Vrc4dou Rupert HD Swindells, Assistant Secretary �,e!�A �yyutiG Ir11 STATE OF NEW JERSEY County of Hunterdon S On this In day of August, 2024 before me, a Notary Public of New Jersey, personally came Rupert HD Swindells and Warren Eichhorn, to me known to be Assistant Secretary and Vice President, respectively, of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, PACIFIC INDEMNITY COMPANY, WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY, the companies which executed the foregoing Power of Attorney, and the said Rupert HD Swindells and Warren Eichhorn, being by me duty sworn, severally and each for himself did depose and say that they are Assistant Secretary and Vice President, respectively, of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, PACIFIC INDEMNITY CONS PANY, WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY and know the corporate seals thereof, that the seals affixed to the foregoing Power of Attorney are such corporate seals and were thereto affixed by authority of said Companies; and that their signatures as such officers were duly affixed and subscrihed by like authority. Notarial Seal a Albert Contursi NOTARY PUSUC OF NEW JERSEY No S0202369 Commission Expires August 22,2027 Rarity Pu tc CERTIFICATION Resolutions adopted by the Boards of Directors of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY on August 30, 2016; WESTCHESTER FIRE INSURANCE COMPANY on December 11, 2006; and ACE AMERICAN INSURANCE COMPANY on March 20, 2009: 'RESOLVED, that the following authorizations relate to the execution, for and on behalf of the Company, of bonds, undertakings, recognizances, contracts and other written commitments of the Company entered into in the ordinary course of business (each a "Written Commitment'): .(1) Each of the Chairman, the President and the Vice Presidents of the Companyishereby authorized to execute any Written Commitment for and onbehalfoftheCompany, under the seal of the Company or otherwise. (2) Eachdulyappointedattorney-indactoftheCompanyisherebyauthorizedtoexecuteanyWrittenCommitmentforandonbehalfoftheCompany,underthesealoftheCompanyorotherwise, to the extent that such action is authorized by the grant of powers provided for in such person's written appointment as such attorney-in4acL (3) Each of the Chairman, the President and the Vice Presidents of the Company is hereby authorized, farand on behalf of the Company, toappointfnwriting any person the attorney -in - fact of the Company with full power and authority to execute, for and on behalf ofthe Company, under the seal of the Company or otherwise, such Written Commitments ofthe Company as may be specified in such written appointment, which specification may be by general type or class of Written Commitments or by specification of one or more particular Written Commitments. (4) Each of the Chairman, the President and the Vice Presidents of the Company is hereby authorized, for and an behalf of the Company, to delegate in writing to any other officer of the Company the authority -to execute, for and anbehalf of the Company, under the Company's seal or otherwise, such Written Commitments of the Company as are specified in such written delegation, which specification may be by general type or class of Written Commitments or by specification of one or more particular Written Commitments. (5) The signature of any officer or other person executing any Written Commitment or appointment or delegation pursuant to this Resolution, and the seat of the Company, may be affixed by facsimile on such Written Commitment or written appointment or delegation. FURTHER RESOLVED, that the foregoing Resolution shall not be deemed to be an exclusive statement of the powers and authority of officers, employees and other persons to act for and on behalf of the Company, and such Resolution shall not limit or otherwise affect the exercise of any such power or authority othervise validly granted or vested:' 1, Rupert HD Swindells, Assistant Secretary of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, PACIFIC INDEMNITY CUMPANY, WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY (the "Companies") do hereby certify that (i) the foregoing Resolutions adopted by the Board of Directors of the Companies are true, correct and in full force and effect, (iI) the foregoing Power of Attorney is true, correct and in full force and effect. 4 ^ oL N Given under my hand and seals of said Companies at Whitehouse Station, NJ, this f7 e. �J C` �� Y` 1 v(? � Rupert HD Swindells, Assistant Secreta • p r} IN THE EVENT YOU WISH TO VERIFY THE AUTHENTICITY OF THIS BOND OR NOTIFY US OFANY OTHER MATTER, PLEASE CONTACT US AT: Telephone NMI 903- 3493 Fax (908) 903- 3656 e-mail! suretydchuhbcom Combnedi FED-VIG-PI-WFIC-AAIC (rev. 11-19) Travelers Casualty and Surety Company of America AM Travelers Casualty and Surety Company TRAVELERS J St. Paul Fire and Marine Insurance Company POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint CHRISTINA L SANDOVAL of CHICAGO , Illinois , their true and lawful Attorney(s)-in-Fact to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WHEREOF, the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed, this 21st day of Aprit, 2021. "Ty AN" HARTFOFA �? 9N v tL MFOAD. C9 it State of Connecticut City of Hartford ss. By: r Robert L. Rane , enior Vice President On this the 21st day of April, 2021, before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior Vice President of each of the Companies, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of said Companies by himself as a duly authorized officer. IN WITNESS WHEREOF, I hereunto set my hand and official seal My Commission expires the 30th day of June, 2026 P H�i.,k4,i NOTARYJ*-A"An PUWW1a P. Nowik, Notary Public This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of each of the Companies, which resolutions are now in full force and effect, reading as follows: RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys -in -Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attorneys -in -Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys -in - Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. I, Kevin E. Hughes, the undersigned, Assistant Secretary of each of the Companies, do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which remains in full force and effect. Dated this iC T day of Fe— � Y \� 4��y�ri OJ'�iA A40� i i COWL R HAkTFOf�, C if C J C018: S t[kl /_/ I Kevin E. Hughes, Ass Secretary To verify the authenticity of this Power ofAttorney, please call us at 1-800-421-3880. Please refer to the above -named Attorneys) -in -Fact and the details of the bond to which this Powerof Attorney is attached. Bond No.: Federal Insurance Company, K41991197 Travelers Casualty and Surety Company, 108168861 SECTION 00 tit 14 PAYMENT BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § That we, McCarthy Building Companies, Inc. known as "Principal" Federal Insurance Company herein, and Travelers Casualtv and Surety Com gnnv a corporate surety (sureties), duly attthorizcd to do business in the State of Texas, known as "Surety" herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a mtinicipal corporation created pursuant to Thirteen Million Forty Five Thousand the laws of the State of Texas, known as "City" herein, in the penal sum of Thirtv Flght and 001100 Dollars($13,045,038.00----------------------- ), lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for the payment of which stun well and truly be made, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents; WHEREAS, Principal has entered into a certain written Contract with City, awarded the 15th day of May , 2023 , which Contract is hereby referred to and made a part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment, labor and other accessories as defined by law, in the prosecution of the Work as provided for in said Contract and designated as Ray White Road Widening improvements (Mirage Drive to the bridge north of Camrose Street), CPN 103269 & 103270. NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION is such that if Principal shall pay all monies owing to any (and all) payment bond beneficiary (as defined in Chapter 2253 of the Texas Government Code, as amended) in the prosecution of the Work tinder the Contract, then this obligation shall be and become null and void; otherwise to remain in full force and effect. This bond is made and executed in compliance with the provisions of Chapter 2253 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said statute. City of Fort Worth -. Ray White Road Widening Improvements Project CPS! 103270 Page 35 of 50 CMAR RFP (Form 4126122) IN WITNESS WHEREOF, the Principal and Surety have each SIGNED and SEALED this instrument by July authorized agents and officers on this the loth day of February 2025 PRINCIPAL: McCarthy Buildinq Companies, Inc. ATTEST: BY: t'J — naiirrc " Jeromy Shaw, Senior Vice -President (Principal) Scerclary Namc and Title Operations Davin. Mayerhoff, Vice-Presiden6iircS5: 3400 N Central Exoressway. Suite 500 Finance Richardson, TX 75080 t c S. a Pr i cipal ATTEST: Hess as to Strrcty Susan A. Welsh SURETY: -Federal Insurance Company_ Travelers Casuals and Sure mpa_J— BY: Signature Christina L. Sandoval, Attorney -in -Fact Name and Title Address: 202B Hall's Mill Road. Whitehouse Station, NJ 08889 One Tower Square, Hartford, CT 06183 908-903-2000 Telephone Number: 203-277-0111 Note: If signed by an officer of t}lc Surety, there must be on file a certified extract frorn the bylaws showing that this person has authority to sign shell obligation. If Surety's. physical address is different from its mailing address, both must be provided. The date of (lie bond shall not be prior to the date the Contract is awarded. END OF SUCTION City of Fort Worth - Ray White Road Widening Improvements Project CPN 103270 Page 36 of 50 CMAR RFP (Form 4125/22) Have a complaint or need help? Tiene una queja o necesita ayuda? IMPORTANT NOTICE If you have a problem with a claim or your premiums, call your insurance company first. If you can't work out the issue, the Texas Department of Insurance may be able to help. Even if you file a complaint with the Texas Department of Insurance, you should also file a complaint or appeal through your insurance company. If you don't, you may lose your right to appeal. To get information or file a complaint with CHUBB: Call Toll -free: 1-800-36-CHUBB Mail: Eastern Claim Service Center 60o Independence Parkway Chesapeake, VA 23320 Attn: Surety Support Phone: 800-252-467o Fax: 800-664-5358 Email: ecsc.claims@chubb.com To get help with an insurance question or file a complaint with the state: The Texas Department of Insurance Call with a question; 1-800-252-3439 File a complaint: w-%%,w.tdi.texas.gov E-mail: ConsumerProtection@tdi.texas.gov Mail: MC-111-1A, P.O. Box 149091 Austin, TX 78714-9091 AVISO IMPORTANTE Si tiene un problema con un reclamo o las primas, llame primero a la empress de seguros. Si no puede resolver el problema, el Departamento de Seguros del estado de Tejas puede ayudar. Si registra una queja con el Departamento de Seguros del estado de tejas, tambien debe presentar una queja o apelacion a traves de su compania de seguros. Si no to pace puede perder sit derecho de apelar. Para obtener informacion o registro de una queja con CHUBB: I1ame al: 1 -Soo-3 6- CHUBB Correo: Eastern Claim Service Center boo Independence Parkway Chesapeake, VA 23320 Attn: Surety Support Telefono: 800-252-467o Fax: 800-664-5358 Correo electronico: eese.claims@chubb.com Para ayuda con una pregunta de seguros o registrar una queja con el estado: El Departamento de Seguros del Estado de Tejas Pregu ntas: 1-800-252-3439 Quejas: lvwtiv.tdi.texas.gov Correo electronico: ConsumerProtection@tdi.texas.gov Correo: MC-11r-1A, P.O. Box 149091 Austin, TX 78714-9091 Form 15-16-0347 (Rev. 2/23) IMPORTANT NOTICE To obtain information or make a complaint: You may call Travelers Casualty and Surety Company of America and its affiliates' toll - free telephone number for information or to make a complaint at: 1-800-328-2189 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance: P. O. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web. httr)://www.tdi.state.tx.us E-mail: ConsumerProtectionCc6tdi.state,tx.us PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact your Agent or Travelers first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR BOND: This notice is for information only and does not become a part or condition of the attached document and is given to comply with Texas legal and regulatory requirements. (PN-042-B) Ed. 10.18.07 L"J>=E■N=1=7 Power of Attorney Federal Insurance Company I Vigilant Insurance Company I Pacific Indemnity Company Westchester Fire Insurance Company I ACE American Insurance Company Know All by These Presents, that FEDERAL INSURANCE COMPANY, an Indiana corporation, VIGILANT INSURANCE COMPANY, a New York corporation, PACIFIC INDEMNITY COMPANY, a Delaware corporation, WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY corporations of the Commonwealth of Pennsylvania, do eachhereby constitute and appoint; Richard Casas, Corinne Chapman, Samantha Chierici, Jessica B. Dempsey, George F. Douaire V Derek J. Elston, Kristin L Hannigan, Therese M. Jackson, Jennifer L. Jakaitis, Nicholas Kertesz, Judith A. Lucky-Eftimov, Tara A. Maquinto, James B. McTaggart, Robert Nachreirier, Nicholas Pantazis, Roger Paraison, Christina L. Sandoval, Bartlomiej Siepierski, Jean Torres, Christopher P. Troha, Aerie Walton, Susan A. Welsh, Sandra M. Winsted and Dartonya Wright of Chicago, Illinois -------------------------------------------- each as their true and lawful Attorney -in -Fact to execute under such designation in their names and to affix their corporate seals to and deliver for and on their behalf as surety thereon or otherwise, bonds and undertakings and other writings obligatory fit the nature thereof (other than bail bonds) given or executed in the course of business, and any instruments amending or altering the saine, and consents to the modification or alteration of any instrument referred to in said bonds or obligations. in Witness Whereof, said FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, PACIFIC INDEMNITY COMPANY, WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY have each executed and attested these presents and affixed their corporate seals on this 1st day of August 2024. LI'.frrw Eichhc trn. Vice 11rc-4doit Rup erc H D Swindells, Assistant Se ere tary u •ktc STATE OF NEW JERSEY County of Hunterdon S5. On this 1rt day of August, 2024 before me, a Notary Public of New Jersey, personally came Rupert HD Swindells and Warren Eichhorn, to me known to be Assistant Secretary and Vice President, respectively, of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, PACIFIC INDEMNITY COMPANY, WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY, the compan€es which executed the foregoing Power of Attorney, and the said Rupert HD Swindells and Warren Eichhorn, being by me duly sworn, severally and each for himself did depose and say that they are Assistant Secretary and Vice President, respectively, of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, PACIFIC INDEMNITY COMPANY, WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY and know the corporate seals thereof, that the seals affixed to the foregoing Power of Attorney are such corporate seals and were thereto affixed by authority of said Companies; and that their signatures as such officers were duly affixed and subscribed by like authority. Notarial Sear c r4 Albert contursi 9 NOTARY PUBLIC OF NEW JERSEY No 50202369 q AugllcA Commission EVires August 22,2027 - Notarypu6lic CERTIFICATION Resolutions adopted by the Boards of Directors of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY on August 30, 2016; WESTCHESTER FIRE INSURANCE COMPANY on December 11, 2006; and ACE AMERICAN INSURANCE COMPANY on March 20, 2009: "RESOLVED, that the fallowing authorizations relate to the execution, for and on behalf of the Company, of bonds, undertakings, recognizances, contracts and other written commitments of the Company entered into in the ordinary course of business (each a-Wrttten Commitment"): (1) Each of the Chairman, the President and the Vice Presidents of the Company isherehy authorized to execute any Written Commitment for and on behalf of the Company, u rid er the sea] of the Company or otherwise. (2) Each duly appointed attorney-in-factofthe Company is hereby authorized to execute any Written Commitment for and on behal f ofthe Company, under the seal of the Company or othmv�sc, to the extent that such action is authorized by the grant of powers provided for in such person's written appointment as such attorney -in -fact. (3) Each of the Chairman, the President and the Vice Presidents of the Company is hereby authorized, for and on behalf of the Company, to appoint in writing any person the attorney -In - fact of the Company with full power and authority to execute, for and an behalfofthe Company, under the seal oftheCompanyorotherwise, such Written Commitments oftheCompany as may be specified in such written appointment, which specification may be by general type or class of Written Commitments or by specification of one or more particular Written Commitments. (4) Each of the Chairman, the President and the Vice Presidents of the Company is hereby authorized, for and on behalf of the Company, to delegate in writing to any other officer of the Cam pany the authority to execute, for and on behalf of the Company, ender the Company's seal or otherwise, such Written Commitments ofthe Company as are specified in such written delegation, which specification may be by general type or class of Written Commitments or by specification of one or more particular WrittenCummitments. (5) The signature of any officer or other person executing any Written Commitment or appointment or delegation pursuant to this Resolution, and the seal of the Company, maybe affixed by facsimile on such Written Commitment or written appointment or delegation. FURTHER RESOLVED, that the foregoing Resolution shall not be deemed to bean exclusive statement of the powers and authority of officers, employees and other persons to act for and on behalf of the Company, and such Resolution shall not limit or otherwise affect the exercise of any such power or authority otherwise validly granted or vested." 1, Rupert HD Swindells, Assistant Secretary of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, PACIFIC INDEMNITY COMPANY, WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY (the "Companies") do hereby certify that (f) the foregoing Resolutions adopted by the Board of Directors of the Companies are true, correct and in full force and effect, (ii) the foregoing Power of Attorney is true, correct and in full force and effe /� Given under my hand and seals of said Companies at Whitehouse Station, NJ, this {- � r'-'La-'` / lot / �; i,arv'r,�4'� �, fir .�jr♦ ♦.+�a� v �� �dl ., wt � � OrSj it � t eat ��� � •mil. s�`-� Rupert HD Swindells, Assistant Secreta • �J`+ P r5 IN THE EVENT YOU WfSH TO VERIFY THE AUTHENTICITY OF TII1S BOND OR NOT]FY US OF ANY OTHER MATTER, PLEASE CONTACT US AT: Teiephone(9081903- 3493 Fax(9081903-3656 e-mail: surety(achubb,mm Combined: FEO-VIG-PI-WFIC-AAIC (rev. 11-19) Travelers Casualty and Surety Company of America A11111111111111k Travelers Casualty and Surety Company TRAVELERS J St, Paul Fire and Marine insurance Company POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint CHRISTINA L SANDOVAL of CHICAGO , Illinois , their true and lawful Attorney(s)- in -Fact to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WHEREOF, the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed, this 21st day of April, 2021. rnu �wa>�r7y �y'�SY A�yO� MT"Fb u b,D O, a tU1tTFORD, t C+t cow o �y ill State of Connecticut City of Hartford ss. By: , Robert L. Rane eniorVice President On this the 21st day of April, 2021, before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior Vice President of each of the Companies, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of said Companies by himself as a duly authorized officer. IN WITNESS WHEREOF, I hereunto set my hand and official seal. My Commission expires the 30th day of June, 2026 ft TA Y r;orn rris o3 � /!C p1jei1f Anna P. Nowik, Notary Public This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of each of the Companies, which resolutions are now in full force and effect, reading as follows: RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys -in -Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attorneys -in -Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys -in - Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. I, Kevin E. Hughes, the undersigned, Assistant Secretary of each of the Companies, do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which remains in full force and effect. Dated this , C� day of os((", � FINiTfORD, � � CiU0�1�rt t CpA obo t#�LL Kevin E. Hughes, Assistant Secretary To verify the authenticity of this Power of Attorney, please call us at 1-800-421-3880, Please refer to the above -named Attorney(s)-in-Fact and the details of the bond to which this Powerof Attorney is attached. Bond No.: Federal Insurance Company, K41991197 Travelers Casualty and Surety Company, 108168861 SECTION 00 61 19 MAINTENANCE BOND THE STATE OF TEXAS § § KNOW ALL BY THESE PRESENTS: COUNTY OF TARRANT § That we McCarthy Building Companies, Inc. _ known as "Principal" Federal Insurance Company herein and . Travelers Casualty and Surety Company,_, _, a corporate surety (sureties, if more than one) duly authorized to do business in the State of Texas, known as "Surely" herein (whether one or more), are held and firmly bound unto the City of Fort Worth, a municipal corporation created pursuant to the laws Thirteen Million Forty Five Thousand Thirty Eight of the State of Texas, known as "City" herein, in the sum of and 001100 Dollars (513,045,038.00---------- ), lawful money of the United States, to be paid in Fort Worth, Tarrant County, Texas, for payment of which suns well and truly be made unto the City and its successors, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents, WHEREAS, the Principal has entered into a certain written contract with the City awarded the 15th day of May , 2023 , which Contract is hereby referred to and a made part hereof for all purposes as if fully set forth herein, to furnish all materials, equipment labor and other accessories as defined by law, in the prosecution of the Work, including any Work resulting from a duly authorized Change Order (collectively herein, the "Work") as provided for in said contract and designated as Ray Whitc Road Widening lmprovenlents (Mirage Drive to the bridge north ofCatnrose Street), CPN 103269 & 103270; and WHEREAS, Principal binds itself to use such materials and to so construct the Work in accordance with the plans, specifications and Contract Documents that the Work is and will remain free from defects in materials or workmanship for and during the period of two (2) years after the date of Final Acceptance of the Work by the City ("Maintenance Period"); and WHEREAS, principal binds itself to repair or reconstruct the Work in whole or in part upon receiving notice from the City of the need therefor at any time within the Maintenance Period. NOW THEREFORE, the condition of this obligation is such that if Principal shall remedy any defective Work, for which timely notice was provided by City, to a completion satisfactory to the City, then this obligation shall become null and void; otherwise to remain in full force and effect. City of Fort Worth —Flay White Road Widening Improvements Project CPN 103270 Page 37 of 50 CMAR RFP (Form 4126122) PROVIDED, HOWEVER, if Principal shall Lail so to repair or reconstruct any timely noticed defective Work, it is agreed that the City may cause any and all such defective Work to be repaired and/or reconstructed with all associated costs thereof being borne by the Principal and the Surety under this Maintenance bond; and PROVIDED FURTHER, that if any legal action be filed on this Bond, ventic shall lie in Tarrant County, Texas or the United States District Court for the Northern District of Texas, Fort Worth Division, and PROVIDED FURTHER, that this obligation shall be continuous in nature and successive recoveries may be had hercon for successive breaches. City of Fort Worth - Ray White Road Widening Improvements Project CPN 103270 Page 38 of 50 CMAR RFP (Form 4/26122) IN WITNESS WHEREOF, tic Principal and the Surety bave cacti SIGNED and SEALED this instrument by duly authorized agents and officers on this the 10th _ day of February , 2025 ATTEST: (Principal) Secretary Davin Mayerhoff Vice —President, Finance itttess Principal ATTEST: PRINCIPAL: McCarthy Building Companies, Inc. *Wc Jeromy Shaw Senior Vice —President Operations Name and Title Address., 3400 N Central Expressway, Suite 500 Richardson, TX 75080 SURETY: Federal Insurance Companv Travelers Casualty and Surely Com an BY; l Signature Christina L. Sandoval, Attorney -in -Fact Name and Title Address: 2028 Hall's Mill Road, Whitehouse Station, NJ 08889 (6G3 WA)ftWJW1X One Tower Square, Hartford, CT 06183 <a — dG t! / "/,S / - - - - 908-903-2000 mess as to Surety Susan A. Welsh Teleplione Number: 203-277-0111 *Note: If signed by an officer of the Surety Contpany, there Hoist be on file a certified extract from the by-laws showing that this person has authority to sign suci obligation. If Surety's physical address is different from its mailing address, both must be provided. The date of the bond shall not be prior to the date the Contract is awarded, City of Fort Worth — Ray White Road Widening Improvements Project CPN 103270 Page 39 of 50 CMAR RFP (Form 4126122) Have a complaint or need help? Tiene una queja o necesita ayuda? .IMPORTANTNOTICE If you have a problem with a claim or your premiums, call your insurance company first. If you can't work out the issue, the Texas Department of Insurance may be able to help. Even if you file a complaint with the Texas Department of Insurance, you should also file a complaint or appeal through your insurance company. If you don't, you may lose your right to appeal. To get information or file a complaint with CHUBB: Call Toll -free: 1-800-36-CHUBB Mail: Eastern Claim Service Center 600 Independence Parkway Chesapeake, VA 23320 Attn: Surety Support Phone: 800-252-467o Fax: 800-664-5358 Email: eese.clain-is@chubb.com To get help with an insurance question or file a complaint with the state: The Texas Department of Insurance Call with a question:1-800-252-3439 File a complaint: w%tinv.tdi.texas.gov E-mail: ConsumerProtection@tdi.texas.gov Mail: MC-111-iA, P.O. Box 149091 Austin, TX 78714-9091 AVISO IMPORTANT E Si tiene un problema con un reclamo o las primas, llame primero a la empresa de seguros. Si no puede resolver el problema, el Departamento de Seguros del estado de Tejas puede ayudar. Si registra una queja con el Departamento de Seguros del estado de tejas, tambien debe presentar una queja o apelacion a traves de su compania de seguros. Si no to hate puede perder su derecho de apelar. Para obtener information o registro de una queja con CHUBB: Llame al:1-800-36-CHUBB Correo: Eastern Claim Seti4ce Center boo Independence Parkway Chesapeake, VA 23320 Attn: Surety Support Telefono: 800-252-467o Fax: 800-664-5358 Correo clectronico: ecse.claims@chubb.com Para ayuda con una pregunta de seguros o registrar una queja con el estado: El Departamento de Seguros del Estado de Tejas Preguntas:1-800-252-3439 Quejas: N"�wtdi.texas.gov Correo electronico: CoinsumerProtection@tdi.texas.gov tdi.texas.gov Correo: MC-izx-aA, P.O. Box 149091 Austin, TX 78714-9091 Form 15-10-0347 (Rev. 2/23) IMPORTANT NOTICE To obtain information or make a complaint: You may call Travelers Casualty and Surety Company of America and its affiliates' toll - free telephone number for information or to make a complaint at: 1-800-328-2189 You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights or complaints at: 1-800-252-3439 You may write the Texas Department of Insurance: P. O. Box 149104 Austin, TX 78714-9104 Fax: (512) 475-1771 Web: httPJ/www.tdi.state.tx.us E-mail: ConsumerProtectionO-tdi.state.tx.us PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact your Agent or Travelers first. If the dispute is not resolved, you may contact the Texas Department of Insurance. ATTACH THIS NOTICE TO YOUR BOND: This notice is for information only and does not become a part or condition of the attached document and is given to comply with Texas legal and regulatory requirements. (PN-042-B) Ed.10.18.07 CHUBS Power of Attorney Federal Insurance Company I Vigilant Insurance Coi ipany I Pacific Indemnity Company Westchester Fire Insurance Company I ACE American Insurance Company Know All by These Presents, that FEDERAL INSURANCE COMPANY, an Indiana corporation, VIGILANT INSURANCE COMPANY, a New York corporation, PACIFIC INDEMNITY COMPANY, a Delaware corporation, WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY corporations of the Commonwealth of Pennsylvania, do each hereby constitute and appoint; Richard Casas, Corinne Chapman, Samantha Chierici, Jessica B. Dempsey, George F. Douaire V Derek J. Elston, Kristin L Hannigan, Therese M. Jackson, Jennifer L. Jakaftis, Nicholas Kertesz, Judith A. Lucky-Eftimov, Tara A. Maquinto, James S. McTaggart, Robert Nachreiner, Nicholas Pantazis, Roger Paraison, Christina L. Sandoval, Bartlomiej Siepierski, Jean Torres, Christopher P. Troha, Aerie Walton, Susan A. Welsh, Sandra M. Winsted and Dartonya Wright of Chicago, Illinois -------------------------------------------- each as their true and lawful Attorney -in -Fact to execute under such designation in their names and to affix their corporate seals to and deliver for and on their behaIfas surety thereon or otherwise, bonds and undertakings and other writings obligatory in the nature thereof (other than bail bonds) given or executed in the course of business, and any instruments amending or altering the same, and consents to the modification or alteration of any instrument referred to in said bonds or obligations. In Witness Whereof, said FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, PACIFIC INDEMNITY COMPANY, WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY have each executed and attested these presents and affixed their corporate seals on this is' day of Augitst 2024. 1Varrcn l.ichhcrn.Vice ltruvdml Rupetc HD Swindells, Assistant Secretary STATE OF NEW JERSEY County of Hunterdon On this In day of August, 2024 before me, a Notary Public of New Jersey, personally came Rupert HD Swindells and Warren Eichhorn, to me known to be Assistant Secretary andVice President, respectively, of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, PACIFIC INDEMNITY COMPANY, WESTCHESTER FIRE INSURANCE COMPANY andACE AMERICAN INSURANCE COMPANY, the companies which executed the foregoing Power of Attorney, and the said Rupert HD Swindells and Warren Eichhorn, being by me duly sworn, severally and each for himself did depose and say that they are Assistant Secretary and Vice President, respectively, of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, PACIFIC INDEMNITY COMPANY, WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY and know the corporate seals thereof, that the seals affixed to the foregoing Power of Attorney are such corporate seals and were thereto affixed by authority of said Companies; and that their signatures as such officers were duly affixed and subscribed by like authority. Notarial Seal si`z c �G HatagF .y "sre Eta ? a Albert Contur i NOTARY PUBLIC OF NEW JERSEY No502OZ369 Commission Expires August 22,2027 Notary FuLue CERTIFICATION Resolutions adopted by the Boards of Directors of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY on August 30, 2016; WESTCHESTER FIRE INSURANCE COMPANY an December 11, 2006; and ACE AMERICAN INSURANCE COMPANY on March 20, 2009: "RESOLVED, that the following authorizations relate to the execution, for and on behalf of the Company, of bonds, undertakings, recagnizances, contracts and other written commitments of the Company entered into in the ordinary course of business (each a "Written Commitment"): (1) Each of the Chairman, the President and the Vice Presidents of the Companyishereby authorized to execute any Written Commitment forandanbehalfoftheCompany,undertheseal of the Company or otherwise. (2) Each d uly appointed attorney-m-fact of the Company is hereby authorized to execute a ny Written Corn mitin ent for and on behalf of the Company, under the sea] ofthe Company or otherwise, to the extent that such action is authorized by the grant of powers provided for in such person's written appointment as such attorney -in -fact. (3) Each of the Chairman, the President and the Vice Presidents of the Company is hereby authorized, far and on behalf of the Company, to appoint in writing any person the attorney -in - fart of the Company with full power and authoritytoexecute, for and an behalf of the Company, under the seal of the Company or otherwise, s uch Written Commitments of th e Company as may be specified in such written appointment, which specification may be by general type or class of Written Commitments or by specification of one or more particular Written Commimtents. (4) Each of the Chairman, the President and the Vice Presidents of the Company is hereby authorized, for and on behalf of the Company, to delegate in writing to any other officer of the Company the authority to execute, for and on behalf of the Company, under the Company's seal or otherwise, such Written Commitments of the Company as are specified in such written delegation, which speciftcation may be by general type or class of Written Commitments or by specification of one or more particular WrittenCommitments. (5) The signature of any officer or other person executing any Written Commitment or appointment or delegation pursuant to this Resolution, and the seal of the Company, may be affixed by facsimile on such Written Commitment or written appointment or delegation. FURTHER RESOLVED, that the foregoing Resolution shall not be deemed to be an exclusive statement of the powers and authority of officers, employees and other persons to act for and on behalf of the Company, and such Resolution shall not limit arotherw€se affect the exercise of any such power or authority otherwise validly granted or vested." 1, Rupert HD Swindells, Assistant Secretary of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, PACIFIC INDEMNITY COMPANY, WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY (the `Companies") do hereby certify that (i) the foregoing Resolutions adopted by the Board of Directors of the Companies are true, correct and in fill force and effect, (ii) the foregoing Power of Attorney is true, correct and in full force and effe J G � 4_11- Given under my hand and seals ofsaid Companies at Whitehouse Station, NJ, this e 6 r t V, ti / Ru en HD Swindells, P t IN THE EVENT YOU W1Sit TO VERIFY THE AUTHENTICITY OF THIS BOND OR NOTIFY US OF ANY OTHER MATTER, PLEASE CONTACT US AT: Telephone f908) 903- 3493 Fax (9001 903- 3656 e-mail: suretyCachublixom Combined FFD-VIG-PI-WFIC.AAIC (rev. ii-19) Travelers Casualty and Surety Company of America �� Travelers Casualty and Surety Company TRAVELERS J St. Paul Fire and Marine Insurance Company POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut (herein collectively called the "Companies"), and that the Companies do hereby make, constitute and appoint CHRISTINA L SANDOVAL of CHICAGO , Illinois , their true and lawful Attorney(s)-in-Fact to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WHEREOF, the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed, this 21st day of April, 2021. o DIY A/Wa07m&qT 0. O yob` *aap� State of Connecticut City of Hartford ss. By: , Robert L. Rene , enior Vice President On this the 21st day of April, 2021, before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior Vice President of each of the Companies, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of said Companies by himself as a duly authorized officer. IN WITNESS WHEREOF, I hereunto set my hand and official seal. My Commission expires the 30th day of June, 2026 TAFIY � +�AnP, Ut;o�xr Nowik, Notary Public This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of each of the Companies, which resolutions are now in full force and effect, reading as follows: RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys -in -Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attorneys -in -Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys -in - Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. I, Kevin E. Hughes, the undersigned, Assistant Secretary of each of the Companies, do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies, which remains in full force and effect. j Dated this v day or 4�r b�*��ratia+®rr,rf"-,-1A T L7 OWL cow Kevin E. Hughes, Assistant Secretary To verify the authenticity of this Power of Attorney, please call us at 1 -800-421 -3880. Please refer to the above -named Attorneys) -in -Fact and the details of the bond to which this PowerofAttorney is attached. RIDER To be attached to and form part of: Bond Number 108168861, K41991197 TRAVELERS CASUALTY AND SURETY COMPANY issued by the FEDERAL INSURANCE COMPANY on behalf of MCCARTHY BUILDING COMPANIES. INC. (Principal) and in favor of CITY OF FORT WORTH (Obligee) Now therefore, it is agreed that in consideration of the premium charged, the attached bond shall be amended as follows: The BOND AMOUNT shall be amended: FROM: Thirteen Million Forty -Eight Thousand Thirty -Eight and 001100 Dollars ($13,048,038.00) TO: Twenty -One Million One Hundred Fifty -One Thousand Seven Hundred Seventy -Five and 001100 Dollars ($21,151,775.00) It is further understood and agreed that all other terms and conditions of this bond shall remain unchanged. This Rider is to be Effective this 6th day of June, 2025. Signed, Sealed & Dated this 6th day of June, 2025. MCCARTHY BUILDING COMPANIES. INC. (Principal) By: /ERS�CASUALTY TRAVE AND SURETY COMPANY FEDERAL INSURANCE COMPANY (Surety) By. �Willtams,l Je fiferAttorney-in-Fact 1­4 LJ E c. Power of Attorney Federal Insurance Company j Vigilant Insurance Company I Pacific Indemnity Company Westchester Fire Insurance Company I ACE American Insurance Company Know All by These Presents, that FEDERAL INSURANCE COMPANY, an Indiana corporation, VIGILANT INSURANCE COMPANY, a New York corporation, PACIFIC INDEMNITY COMPANY, a Delaware corporation, WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY corporations of the Commonwealth of Pennsylvania, do each hereby constitute and appoint Christina L. 6aratti, Thomas U. Krippene, Barbara Pannier, Eric D. Sauer, Jennifer Williams and Salena Wood of St. Louis, Missouri ------------- —------- ------- ----------------------------- ---------- - -- -- -------------------------------------- ------ ------------------------------ each as their true and iawfuI Attorney -in -Fact to executo undersLich designation in their names and to affix th e i r corpora te s ea I S to and deliver for and on their behalf as su rety thereo n or otherwise, bonds and undertakings and other writings obi igatory in the nature thereof (other than bail bonds) given or executed In the course of business, and any instruments amending or altering the same, and consents to the modification or alteration of any instrument referred to in said bonds or obligations. In Witness Whereof, said FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, PACIFIC INDEMNITY COMPANY, WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY have each executed and attested these presents and affixed thefrcorporate seals on this ISth day of July, 2024. r -t RJ.peI-HDss, rdells A--.ntant3esietam• ea STATE OF NEW IERSEY County of Hunterdon ss. �C:II'I'dl Lichh(wn.l we lln-Ndr7ll lox On this 15th day of July. 2024 before me, a Notary Public of New jersey, persona]Iy came Rupert HD Swindells and Warren Eichharn, to me known to be Assistant Secretary and Vice President, respectively, of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, PACIFIC INDEMNITY COMPANY, WESTCHESTER FIRE INSURANCE COM PANY a nd ACE AMERICAN INSURANCE COMPANY, the companies which executed the foregoing Power of Attorney, and the said Rupert HD Swindells and Warren Eichhorn, being by me duly sworn, severally and each for himself d[d depose and say that they are Assistant Secretary and Vice Pres]dent, respectively, of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, PACIFIC INDEMNITY COMPANY, WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY and know the corporate seals thereof, that the seals affixed to the foregoing Power of Attorney are such corporate seals and were thereto affixed by authority of said Companies; and that their signatures as such officers were duly affixed and subscribed by like authority. Notarial Seal ti�,ti coA.T FTh= y tle�w �' JER Albert Cuntursi NOTARY Pt1RLlC OF NEW JERSEY Tic S0202369 C orrmmissic n Expires August 22.2027 /U iIHou6Ne CERTIFICATION Resolutions adopted by the Boards of Directors of FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, and PACIFIC INDEMNITY COMPANY on August 30, 2016; WESTCHESTER FIRE INSURANCE COMPANY on December 11, 2006; and ACE AMERICAN INSURANCE COMPANY on March 20, 2009: "RESOLVED, that the Following authorixanons relate to the execution, far and on behalf of the Company, of bonds, undertakings, recognizanres, contracts and other written commiLine ms of the Company entered into in the o rdl nary co urse o f business (each a "Written Commitment"): (1) Each of the Chairman, the President and the Vice Presidents of the Company is hereby authorized toexecutoany Written Commitment for and on behalf orthe Company, under the seal o F th a Corn pany or otherwi se. (2) Each dulyappoInted attorney-tn-fact of the Company is hereby authorized toexecuteany Written Commitment for and on behaIFof the Company, under the sea[ of the CompanyorotherwLse. to the extent that such action is authorized by the grant of powers provided for in such person's written appointment as such attorney -in -fact. (3) Each of the Chairman, the President and the Vice Presidents of the Corn pa ny is hereby authorized, For and on behalf of the Company, to appol nt in writing any person the attorney-m- fact of the Company with full power a nd auth ority to execute, For and on behal f o F the Ca m pa ny, under the seal of the Corn pany or otherwise, such Written Com mitments of th a Company as may be specified in such written appointment, which specification may be by general type or class of Written Commitments or by specification of one or more particular Written Commitments- (4) Each of the Chairman, the President and the Vice Presidents of the Company is hereby authorized, for and on behalf of the Company, to delegate in writing to any other officer of the Company the authority to execute, For and on behalf of the Company, under the Company's seal or otherwise, such Written Commitments of the Company as are specified m such written dAeganon,which specification may be by general type or class of Written Commitments or by specification of one or more particular Written Commitments. (S) The s[gnat ure of any officer or other person executing any Written Commitment or appointment or delegation pursuant to this Resolution, and the seal orthe Company, may be affixed by facsi m it a on such W ri aen Cc mmi Iment or written appoi ntmen t or delegation. FURTHER RESOLVED, that the Foregoing Resolution shall not be deemed to be an exclusive statement of the powers and authority of afficers, employees and other persons to act for and on behalf of the Company, and such Resolution shall not limit or otherwise affect the exercise of any such power or authority otherwise validly granted or vested." 1, Rupert HD Swindells, Assistant Secretaryof FEDERAL INSURANCE COMPANY, VIGILANT INSURANCE COMPANY, PACIFIC INDEMNITY COMPANY, WESTCHESTER FIRE INSURANCE COMPANY and ACE AMERICAN INSURANCE COMPANY (the "Companies") do hereby certify that (i) the foregoing Resolutions adopted by the Board of Directors ofthe Companies are true, correct and In fuII force and effect, (h) the foregoing Power of Attorney is true, correct and in Full force and effect. Given under my hand and seals of said Companies at Whitehouse Station, NJ, this ��� Ju n t f 7,O Z,5 r � 'a,•' Rupert H2 an:r ells .�s_istCrt3stars IN THE EVENT YOU WISH TO VERIFYTHEAUTHENTICITY OFTHIS BOND OR NOTIFY IIS OF ANY OTHER MATTER, PLEASE CONTACT US AT: Telephone (908)903.3493 Fax (9081903-3b56 e-mail; surety@chubb.com Combined. FED-VIG-PI-WFiGAAIC (rev. 1i-19y Travelers Casualty and Surety Company of America 491k Travelers Casualty and Surety Company TRAVELERS J St. Paul Fire and Marine Insurance Company POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut [herein collectively tailed the "Companies"), and that the Companies do hereby make, constitute and appoint Jennifer Williams of ST LOUIS , Missouri , their true and lawful Attomey(s)-i n- Fact to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WHEREOF, the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed, this 21st day of April, 2021. A6 3118fry, ,a,IV A11L COW. it CoNk kG E RARTFORD e State of Connecticut City of Hartford ss. By: �obert L. Rane , enior Vice President On this the 21st day of April, 2021, before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior Vice President of each of the Companies, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of said Companies by himself as a duly authorized officer. IN WITNESS WHEREOF, I hereunto set my hand and official seal. My Commission expires the 30th day of June: 2026 SP P Mtlh�`ss uoTartr NnrFc Anna P. Nowik, Notary Public This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of each of the Companies, which resolutions are now in full force and effect, reading as follows: RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys -in -Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her; and it is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary; and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Atto meys-i n- Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one cr more Company officers pursuant to a written delegation of authority; and it is FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys -in - Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. 1, Kevin E. Hughes, the undersigned, Assistant Secretary of each of the Companies, do hereby certify that the above and foregoing is a true and correct copy of the -Plower of Attorney executed by said Companies, which remains in full force and effect. Dated this day of y� rrp �ga!`Tr ape s� �� 10) M = �� 3 . T R C01lfi. o°—/ 'f ar .r' Kevin E. Hughes, Assini Secretary To verify the authenticity of this Power ofAttomey, please call us at 1-800-421-3880. Please refer to the above -named Attorneys) -in -Fact and the details of the Bond to which this Powerof Attorney is attached. I DATE(MM/DD/YYYY) ,4 o CERTIFICATE OF LIABILITY INSURANCE 03/14/2026 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT NAME: Aon Risk Services Central, Inc. St. Louis MO Office (A/C.NNo. Ext): (866) 253-7122 FAX No.): ($00) 363-0105 4220 Duncan Avenue E-MAIL Suite 401 ADDRESS: St Louis MO 63110 USA INSURER(S) AFFORDING COVERAGE NAIC # INSURED McCarthy Building Companies, Inc. 3400 N. Central Expressway, suite 500, Richardson, TX 75080 USA INSURER A: Old Republic Insurance Company 24147 INSURER B: INSURER C: INSURER D: INSURER E INSURER F COVERAGES CERTIFICATE NUMBER: 570111389424 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. Limits shown are as requested INSR ADDL SUBR POLICY EFF POLICY EXP LTR TYPE OF INSURANCE INSD WVD POLICY NUMBER ((MM/DDIyyYyyyYyj fJ MM/DD/YYYYI LIMITS A X COMMERCIAL GENERAL LIABILITY MWZY31825525 U4/0171 5 X01/2U2b EACH OCCURRENCE $5,000,000 DAMAGETO RENTED CLAIMS -MADE X❑ OCCUR PREMISES (Ea occurrence) $1, 000, 000 MED EXP (Any one person) $10, 000 PERSONAL & ADV INJURY $5,000,000 GEN'LAGGREGATE LIMITAPPLIES PER: GENERAL AGGREGATE $10,000,000 POLICY PRO � LOC LJ JECT OTHER: A AUTOMOBILE LIABILITY X ANYAUTO OWNED SCHEDULED — AUTOS ONLY AUTOS HIREDAUTOS NON -OWNED — ONLY AUTOS ONLY UMBRELLA LIAB OCCUR H EXCESS LIAB CLAIMS -MADE DED RETENTION A Wt1RKE S C MPENSATION AND EMPLOYERS' LIABILITY y / N ANY PROPRIETOR / PARTNER / EXECUTIVE OFFICER/MEMBER EXCLUDED? N N / A (Mandatory in NH) If yes, describe under DESCRIPTION OF OPERATIONS below PRODUCTS - COMP/OP AGG $10,000,000 MWTB 318257-25 04/01/2025 04/01/2026 COMBINED SINGLE LIMIT $5,000,000 (Ea accident) BODILY INJURY ( Per person) BODILY INJURY (Per accident) PROPERTY DAMAGE (Per accident) EACH OCCURRENCE AGGREGATE d MWC31825625 04/01/2025 04/01/2026I X I PER STATUTE I IORTH- E.L. EACH ACCIDENT $1, 000, 000 E.L. DISEASE -EA EMPLOYEE $1,000,000 E.L. DISEASE -POLICY LIMIT $1, 000, 000 -- DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) �y Re: Ray White Road. s City of Fort Worth, its Officers and Employees are included as Additional Insureds on the General Liability and Automobile Liability policies on a primary basis when required by written contract. A Waiver of Subrogation is granted in favor of the Additional Insureds in accordance with the policy provisions of the General Liability, Auto Liability, and Workers' Compensation policies when required by written contract and where permissible by law. CERTIFICATE HOLDER CANCELLATION a3 r SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE _Ed EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. MOM City of Fort Worth AUTHORIZED REPRESENTATIVE Transportation and Public works Department } �{ 200 Texas Street Fort worth Tx 76102 USA on ©1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25 (2016/03) The ACORD name and logo are registered marks of ACORD POLICY NUMBER: MWZY31825525 COMMERCIAL GENERAL LIABILITY CG 20 10 04 13 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organization(s) Location(s) Of Covered Operations ALL PARTIES WHERE REQUIRED BY A WRITTEN CONTRACT. Information required to complete this Schedule, if not shown above, will be shown in the Declarations. CG 20 10 04 13 © Insurance Services Office, Inc., 2012 Page 1 of 2 MWZY 318255 25 McCarthy Holdings, Inc. 04/01/25 - 04/01/26 A. Section II — Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by: 1. Your acts or omissions; or 2. The acts or omissions of those acting on your behalf; in the performance of your ongoing operations for the additional insured(s) at the location(s) designated above. However: 1. The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. B. With respect to the insurance afforded to these additional insureds, the following additional exclusions apply: This insurance does not apply to "bodily injury" or "property damage" occurring after: 1. All work, including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the additional insured(s) at the location of the covered operations has been completed; or 2. That portion of "your work" out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project. C. With respect to the insurance afforded to these additional insureds, the following is added to Section III — Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement; or 2. Available under the applicable Limits of Insurance shown in the Declarations; whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. Page 2 of 2 © Insurance Services Office, Inc., 2012 CG 20 10 04 13 MWZY 318255 25 McCarthy Holdings, Inc. 04/01/25 - 04/01/26 POLICY NUMBER: MWZY31825525 COMMERCIAL GENERAL LIABILITY CG 20 37 04 13 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Orqanization(s) ALL PARTIES WHERE REQUIRED BY A WRITTEN CONTRACT. Location And Description Of Completed Operations Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II — Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury" or "property damage" caused, in whole or in part, by "your work" at the location designated and described in the Schedule of this endorsement performed for that additional insured and included in the "products -completed operations hazard". However: 1. The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. B. With respect to the insurance afforded to these additional insureds, the following is added to Section III — Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement; or 2. Available under the applicable Limits of Insurance shown in the Declarations; whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. CG 20 37 04 13 © Insurance Services Office, Inc., 2012 Page 1 of 1 MWZY 318255 25 McCarthy Holdings, Inc. 04/01/25 - 04/01/26 Policy Number: MWZY31825525 COMMERCIAL GENERAL LIABILITY CG 20 01 12 19 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONCONTRIBUTORY - OTHER INSURANCE CONDITION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART The following is added to the Other Insurance Condition and supersedes any provision to the contrary: Primary And Noncontributory Insurance This insurance is primary to and will not seek contribution from any other insurance available to an additional insured under your policy provided that: (1) The additional insured is a Named Insured under such other insurance; and (2) You have agreed in writing in a contract or agreement that this insurance would be primary and would not seek contribution from any other insurance available to the additional insured. CG 20 01 12 19 © Insurance Services Office, Inc., 2018 Page 1 of 1 MWZY 318255 25 McCarthy Holdings, Inc. 04/01/25 - 04/01/26 Policy Number: MWZY31825525 IL 10 (12/06) OLD REPUBLIC INSURANCE COMPANY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. CONTRACTORS WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART/FORM SCHEDULE Name of Person(s) or Organization(s): Any person or organization for whom the Named Insured has agreed by written contract to furnish this waiver. SECTION IV — COMMERCIAL GENERAL LIABILITY CONDITIONS, 8. Transfer Of Rights Of Recovery Against Others To Us is amended by the addition of the following: 1. If we recover any amount as a result of our exercise of these rights, the amount recovered will be divided as follows: a. Any insured or other insurer that paid amounts in excess of the limits of coverage that apply under this policy will be reimbursed for the actual amount paid. b. We will then be reimbursed for any payments we have made. C. Then, if any amount remains, any insured or other insurer who paid amounts before the limits of coverage for this policy applied will be reimbursed for the actual amount paid. Expenses incurred in obtaining a recovery of any payment we make under this policy from someone other than us will be divided in the same ratio as the recovery is shared. However, if we bring legal action against any other party on our own or try to obtain recovery and fail to do so, we will pay all expenses we incur. 2. We waive any right of recovery we may have against the Person(s) or Organization(s) shown in the Schedule above because of payments we make for injury or damage arising out of your ongoing operations or "your work" done under a contract with the Person(s) or Organization(s) and included in the "products and completed operations hazard". This waiver applies only to the Person(s) or Organization(s) shown in the Schedule above. GL 029 008 0424 Page 1 of 1 Includes copyrighted material of Insurance Services Office, Inc., with its permission. MWZY 318255 25 McCarthy Holdings, Inc. 04/01/25 - 04/01/26 Policy Number: MWTB 318257-25 IL 10 (12/06) OLD REPUBLIC INSURANCE COMPANY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM SCHEDULE Name of Person(s) or Organization(s): Where Required by Written Contract With respect to COVERED AUTOS LIABILITY COVERAGE, Who Is An Insured is changed with the addition of the following: Each person or organization shown in the Schedule for whom you are doing work is an "insured". But only for "bodily injury" or "property damage" that results from the ownership, maintenance or use of a covered "auto" by: 1. You; 2. an "employee" of yours; or 3. anyone who drives a covered "auto" with your permission or with the permission of one of your "employees". However, the insurance afforded to the person or organization shown in the Schedule shall not exceed the scope of coverage and/or limits of this policy. Not withstanding the foregoing sentence, in no event shall the insurance provided by this policy exceed the scope of coverage and/or limits required by the contract or agreement. PCA 001 10 13 MWTB 318257 25 McCarthy Holdings, Inc. 04/01/25 - 04/01/26 Policy Number: MWTB 318257-25 COMMERCIAL AUTO CA 04 49 11 16 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONCONTRIBUTORY - OTHER INSURANCE CONDITION This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. A. The following is added to the Other Insurance B. Condition in the Business Auto Coverage Form and the Other Insurance — Primary And Excess Insurance Provisions in the Motor Carrier Coverage Form and supersedes any provision to the contrary: This Coverage Form's Covered Autos Liability Coverage is primary to and will not seek contribution from any other insurance available to an "insured" under your policy provided that: 1. Such "insured" is a Named Insured under such other insurance; and 2. You have agreed in writing in a contract or agreement that this insurance would be primary and would not seek contribution from any other insurance available to such "insured". The following is added to the Other Insurance Condition in the Auto Dealers Coverage Form and supersedes any provision to the contrary: This Coverage Form's Covered Autos Liability Coverage and General Liability Coverages are primary to and will not seek contribution from any other insurance available to an "insured" under your policy provided that: 1. Such "insured" is a Named Insured under such other insurance; and 2. You have agreed in writing in a contract or agreement that this insurance would be primary and would not seek contribution from any other insurance available to such "insured". CA 04 49 11 16 © Insurance Services Office, Inc., 2016 Page 1 of 1 MWTB 318257 25 McCarthy Holdings, Inc. 04/01/25 - 04/01/26 Policy Number: MWTB 318257-25 COMMERCIAL AUTO CA 04 43 11 20 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US (WAIVER OF SUBROGATION) - AUTOMATIC WHEN REQUIRED BY WRITTEN CONTRACT OR AGREEMENT This endorsement modifies insurance provided under the following: AUTO DEALERS COVERAGE FORM BUSINESS AUTO COVERAGE FORM MOTOR CARRIER COVERAGE FORM With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless modified by the endorsement. The Transfer Of Rights Of Recovery Against Others To Us Condition does not apply to any person(s) or organization(s) for whom you are required to waive subrogation with respect to the coverage provided under this Coverage Form, but only to the extent that subrogation is waived: A. Under a written contact or agreement with such person(s) or organization(s); and B. Prior to the "accident" or the "loss." CA 04 43 11 20 © Insurance Services Office, Inc., 2019 Page 1 of 1 MWTB 318257 25 McCarthy Holdings, Inc. 04/01/25 - 04/01/26 WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY WC 00 03 13 (Ed. 4-84) POLICY NUMBER: MWC 318256 25 WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule. (This agreement applies only to the extent that you perform work under a written contract that requires you to obtain this agreement from us.) This agreement shall not operate directly or indirectly to benefit anyone not named in the Schedule. Schedule ANY PERSON OR ORGANIZATION WHERE WAIVER OF OUR RIGHT TO RECOVER IS REQUIRED BY WRITTEN CONTRACT WITH SUCH PERSON OR ORGANIZATION PROVIDED SUCH CONTRACT WAS EXECUTED PRIOR TO THE DATE OF LOSS. DATE OF ISSUE: 01-30-25 WC 00 03 13 (Ed. 4-84) © 1983 National Council on Compensation Insurance. Policy Number: MWZY31825525 IL 10 (12/06) OLD REPUBLIC INSURANCE COMPANY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED ENTITY - NOTICE OF CANCELLATION PROVIDED BY US SCHEDULE Number of Days Notice of Cancellation: 90 Person or Organization: All certificate holders where written notice of the cancellation of this policy is required by written contract, permit or agreement with the Named Insured and whose names and addresses will be provided by the broker or agent listed in the Declarations Page of this policy for the purposes of complying with such request. Address: Provisions If we cancel this policy for any statutorily permitted reason other than nonpayment of premium, and a number of days is shown for cancellation in the schedule above, we will mail notice of cancellation to the person or organization shown in the schedule above. We will mail such notice to the address shown in the schedule above at least the number of days shown for cancellation in the schedule above before the effective date of cancellation. PIL 028 05 10 MWZY 318255 25 McCarthy Holdings, Inc. 04/01/25 - 04/01/26 Policy Number: MWTB 318257-25 IL 10 (12/06) OLD REPUBLIC INSURANCE COMPANY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. DESIGNATED ENTITY - NOTICE OF CANCELLATION PROVIDED BY US SCHEDULE Number of Days Notice of Cancellation: 90 Person or Organization: All certificate holders where written notice of the cancellation of this policy is required by written contract, permit or agreement with the Named Insured and whose names and addresses will be provided by the broker or agent listed in the Declarations Page of this policy for the purposes of complying with such request. Address: Provisions If we cancel this policy for any statutorily permitted reason other than nonpayment of premium, and a number of days is shown for cancellation in the schedule above, we will mail notice of cancellation to the person or organization shown in the schedule above. We will mail such notice to the address shown in the schedule above at least the number of days shown for cancellation in the schedule above before the effective date of cancellation. PIL 028 05 10 MWTB 318257 25 McCarthy Holdings, Inc. 04/01/25 - 04/01/26 Policy Number: MWC 318256 25 OLD REPUBLIC INSURANCE COMPANY WORKERS' COMPENSATION AND EMPLOYERS' LIABILITY POLICY DESIGNATED ENTITY - NOTICE OF CANCELATION PROVIDED BY US ENDORSEMENT SCHEDULE Number of Days Notice of Cancellation: 120 Person or Organization: ALL CERTIFICATE HOLDERS WHERE WRITTEN NOTICE OF CANCELLATION OF THIS POLICY IS REQUIRED BY WRITTEN CONTRACT, PERMIT OR AGREEMENT WITH THE NAMED INSURED AND WHOSE NAMES AND ADDRESSES WILL BE PROVIDED BY THE BROKER OR AGENT LISTED IN THE DECLARATIONS PAGE OF THIS POLICY FOR THE PURPOSE OF COMPLYING WITH SUCH REQUEST. Address: Provisions If we cancel this policy for any statutorily permitted reason other than nonpayment of premium, and a number of days is shown for cancelation in the schedule above, we will mail notice of cancelation to the person or organization shown in the schedule above. We will mail such notice to the address shown in the schedule above at least the number of days shown for cancelation in the schedule above before the effective date of cancelation. WC 99 03 65 (03/11) Page 1 of 1 3400 N. Centrel Expressway. Suite 500. Richardson Texas 75080 v 972-991-55001 r 972-991-9249 arocarthyLown October 18, 2024 City of Fort Worth Purchasing Division — CPN 103270 200 Texas Street Fort Worth, TX 76102 RE: Ray White Road GMP Proposal Dear Ms. Ayala, McCarthy Building Companies, Inc. is pleased to submit the following Guaranteed Maximum Price (GMP) for the Ray White Road Improvements Project. Our price proposal is inclusive of the work included within the documents and subsequent clarifications included with this proposal: Construction Plans for Ray White Rd dated August 2024— Burns & McDonnell Geotechnical Investigation August 5, 2024 - Burns & McDonnell City of Fort Worth Standard Construction Specifications — Revised June 7, 2024 Attached for your review is a recap sheet with a detailed breakdown of general conditions, project clarifications concerning our pricing proposal, bid evaluation ratings, MBE Utilization Plan, selection of Prequalified City Contractors, and a project schedule. Should you have any questions regarding this submission, please do not hesitate to contact me. We look forward to the continued development and successful completion of this important project. /Jeromy sllyy, Shaw Senior Vice President McCarthy Building Companies, Inc. Cc: Dennis Walters Vice President, Operations Colleen Martindale Vice President, Preconstruction David Wallace Project Director A MoCartM .Mom. Company Recap Sheet Issue Dace: 10/18/2024 City of Ft Worth Ray White Road Improvements Ft Worth, TX GMP Unit Cost Total Cost No. Item of Work Quantity Unit per Qty @ GMP Comments 1 General Works XX McCarthy McCarthy General Works 1 LS $ 113,284 $ 113,284 4 WC#1 XX $ - 5 Earthwork & Demolition 1 LS $ 3,187,229 $ - $ $ 3,187,229 6 7 WC#2 XX $ - 8 Concrete Paving 1 LS $ 4,936,642 $ $ 4,936,642 9 10 WC#3 XX $ - Klutz 11 Storm Sewer 1 LS $ 3,331,621 $ $ 3,331,621 - 12 13 WC#4 XX $ - 14 Sanitary Sewer 1 LS $ 412,412 $ 412,412 Klutz 15 $ - 16 WC#5 XX $ - 17 Electrical 1 LS $ 1,529,394 $ $ 1,529,394 - Bean 18 19 WC#6 XX $ - 20 Landscaping 1 LS $ 203,909 $ 203,909 Ruppert 21 $ - 22 WC#7 XX $ - 23 Traffic Control 1 LS $ 370,677 $ $ 370,677 - McCarthy 24 25 WC#8 XX $ - 26 Flatwork 1 LS $ 956,791 $ 956,791 McCarthy _ ' = Direct Cost Subtotal ' $ 15,041,959 General Conditions $ 2,876,296 Subcontractor Bonds $ 70,214 Owner's Protective/General Liability & Umbrella Insurance $ 398,073 Builder's Risk Insurance 0.00 % $ - Included in GC's Cost of The Work Subtotal $ 18,386,543 Fee 6.25 % $ 1,149,159 Subtotal $ 19,535,701 McCarthy Performance & Payment Bond $ 151,703 Subtotal $ 19,687,404 Construction Contingency 5.00% $ 984,370 Design Contingency 0.00% $ - Owner Allowance $ 480,000 Grand Total $ 21,151,775 MNCARliNY 3400 N Central Expressway, Ste 500, Richardson, TX 75080 972-991-5500 1 mccarthy.com Clarifications The following items provide additional clarifications regarding the scope of work included in our proposal: 1. This proposal is based on a Ray White Rd work package scope of work published within the McCarthy Front Ends advertised on September 5, 2024. The project duration will be 24 months, with an assumed start date of January 6, 2025, and a Final Completion date of January 19, 2027. 2. Bids received on October 3, 2024, are valid for 120 days from that date. We anticipate a December 10, 2024, council approval which allows subcontracts to be issued within the 120-day bid period. We have not included any measures for rebidding or for cost increases if the 120-day bid period is exceeded prior to Owner authorization. 3. We have assumed a maximum two -week (14 calendar days) turnaround for the critical path submittals from the city. 4. We have assumed a maximum two -week (14 calendar days) turnaround for critical path submittals from the Engineer of Record (EOR). 5. We assume electronic versions of the contract plans/documents will be made available to assist in building the project. 6. We have assumed a maximum one -week (7 calendar days) turnaround time of all RFIs. 7. Subcontractor pricing is for the advertised work packages as detailed within the front-end documents. Any deductions from the scope after the contract is executed may be subject to reevaluation and repricing. 8. Construction water will be sourced from an on -site fire hydrant. Cost of purchase of water is included in the proposal. Exclusions: The following items have been excluded from our Guaranteed Maximum Price: 1. Permits and Fees (beyond the construction trailer and street use permit fees) 2. Third Party Inspection, IE testing of dirt, compaction densities, concrete, etc. McCarthy will coordinate testing, but all costs of testing are to be borne by the Owner. 3. Architect/Engineer Contingencies and Allowances General Conditions Breakdown Bond & Description Qty Units Total Labor Material Equipment Subs Ins Total IPROJECTSTAFF 1 LS $1,584,995 $195,501 $183,140 $0 $0 $1,963,636 IPROJECTCLEANUP 55 HR $0 $0 $0 $0 $0 $0 ILD, HL& DUMP DEBRIS 10 LD $0 $0 $0 $0 $0 $0 ISITE LAYOUT 1 LS $40,138 $12,853 $12,216 $0 $0 $65,206 ICONTRACTOR TRAILERS 24 MO $0 $51,960 $0 $0 $0 $51,960 (OFFICE -LAND RENT 24 MO $0 $77,940 $0 $0 $0 $77,940 IMOVE & SETUP OFFICE 2 EA $14,307 $41,867 $0 $0 $0 $56,174 (OFFICE-UTIL INSTALL 1 LS $0 $0 $0 $18,375 $0 $18,375 (OFFICE -UTILITY CHRGS 24 MO $0 $37,411 $0 $0 $0 $37,411 (OFFICE -CLEANUP 24 MO $0 $15,588 $0 $0 $0 $15,588 (OFFICE-EQPT RENT 24 MO $0 $10,106 $0 $0 $0 $10,106 (OFFICE SUPPLIES 24 MO $0 $9,820 $0 $0 $0 $9,820 (OFFICE POSTAGE 24 MO $0 $5,304 $0 $0 $0 $5,304 ISTORAGE CONTAINER 24 MO $153 $119 $2,600 $0 $0 $2,871 ISANITARY FACILITIES 24 MO $0 $10,392 $0 $0 $0 $10,392 IDRINKING WATER 24 MO $0 $2,457 $0 $0 $0 $2,457 IFIRST AID 1 LS $0 $1,083 $0 $0 $0 $1,083 IPROJECTSIGNS 3 EA $2,071 $1,137 $0 $0 $0 $3,208 IFIRE PROTECTION SUPPLIES 1 LS $0 $1,083 $0 $0 $0 $1,083 (DRAWINGS/BLUEPRINTS 1 LS $0 $1,083 $0 $0 $0 $1,083 IPROGRESS PHOTOS/DRONE 24 MO $0 $12,990 $0 $0 $0 $12,990 ISTREET CLEANUP 24 MO $36,544 $0 $108,223 $0 $0 $144,767 ILOCATE UTILITIES 1 LS $503 $0 $90,081 $0 $0 $90,584 (OFFICE SITE FENCE 1 LS $0 $0 $0 $10,000 $0 $10,000 ISCHEDULING COSTS 1 LS $0 $10,000 $0 $0 $0 $10,000 IPROGRESS SCHEDULES 24 MO $0 $36,000 $0 $0 $0 $36,000 ISAFETY EQUIPMENT 1 LS $0 $13,514 $0 $0 $0 $13,514 ISAFETY INCENTIVE 1 LS $0 $1,229 $0 $0 $0 $1,229 IDRUG SCREENINGS 1 LS $0 $89 $0 $0 $0 $89 (EQUIPMENT 1 LS $0 $8,000 $161,722 $0 $0 $169,722 IEQUIPMENTTRANSPORTATION & MAINTENANCE 1 LS $6,343 $0 $6,097 $16,466 $0 $28,906 IMEALS 1 LS $0 $0 $0 $0 $0 $0 IMISC PERMITS & FEES 1 LS $0 $0 $0 $0 $0 $0 IBUILDER'S RISK INSUR 1 LS $0 $0 $0 $0 $28,051 $24,797 $2,876,296 General Conditions Breakdown Staff Breakdown Bond & Description Qty Units Total Labor Material Equipment Subs Ins Total PROJECT MANAGER 24 MO $408,230 $46,861 $59,834 $0 $0 $514,925 GENERAL SUPERINTENDENT 24 MO $424,798 $39,496 $59,834 $0 $0 $524,128 ASSISTANT SUPERINTENDENT 24 MO $54,881 $6,583 $9,972 $0 $0 $71,436 PROJECT ENGINEER 24 MO $282,833 $40,041 $5,813 $0 $0 $328,687 INTERNS 6 MO $38,502 $16,971 $1,453 $0 $0 $56,926 FIELD ENGINEER 5 MO $90,936 $7,103 $13,403 $0 $0 $111,442 SAFETY SUPERVISOR 12 MO $165,781 $20,021 $29,917 $0 $0 $215,719 CLERICAL 12 MO $119,034 $18,426 $2,912 $0 $0 $140,372 $1,584,995 $195,501 $183,140 $0 $0 $1,963,636 On October 3rd McCarthy received bids for all work categories. The below values represent the un-scoped bid category totals. Ray White Road - U'n Scoped Proposal Values 1WC#1 Earthwork & Demolition Axis Contracting IMc.Carthy 0-bra Ramos Construction Ironwill Earthworks RPMx Construction $ 2,163,000.00 $ 2,970,113.00 3,000,000.00 $ 3,355,371.00 $ 4,078,000.00 i WC#3 - Underground Storm Drainage Company UValue DDM Construction $ 2,956,630.00 Klutz Construction $ 3,331,621.00 McCarthy $ 3,581,336.00 North Texas -Contracting $ 3,638,497.00 Fortorth CiviL $ 5,130,516.00 i WC#5 Electrical & Lighting Company Evalue .t Bean ELectricaL $ 1,521,893.85 Highway Intelligent Service $ 1,974,659.00 WC#7 - Traffic Control Barricades Plus $ 163,560.00 McCarthy $ 370,677.00 4 Horn Traffic $ 378,202.44 Barricades UnLimited $ 828,050.00 WC#2 - Concrete Paving 71 FX Concrete $ 3,665,000.00 DDM $ 4,201,860,00 McCarthy $ 4,989,021.00 i WC#4 Sanitary Sewer &'Water Company UVatue _t DDM Construction $ 342,500.00 Klutz Construction $ 412,412.00 Fort Worth Civi l $ 852,180.00 McCarthy $ 889,837.00 North Texas Contracting $ 929,120.00 WC#G Landscaping Companyr T.I. Ruppert Landscape $ 87,532.00 Texas EnvironmentaL Mar $ 262,144.15 C1 Seeding $ 507,814.34 WC#8 - Flatwork McCarthy $ 956,791.00 DDM Construction $ 1,041,430.00 FX Concrete $ 1,075,000.00 Axis Contracting $ 1,149,343.50 Fort Worth Civil $ 2,029,030.00 McCarthy conducted interviews the following week (10/8-10/11) to ensure all aspects of the scope were included with the proposal. If it was determined that scope or documents were missing, bidders had the opportunity to provide documents and post bid adds within 24 hours of the interview. The values depicted in the following Summary sheet include costs that were discovered to be missing during the interview process. Ray White Rd - Recommendations NECARTHY f WC # WC Desc WC1 Earthwork and Demolition WC2 Concrete Paving WC3 Underground Storm Drainage WC4 Sanitary Sewer and Water WC5 Electrical and Lighting WC6 Landscape WC7 Traffic Control WC8 Flatwork Post Interview Scoped Values Summary Companies McCarthy Building Companies McCarthy Building Companies Klutz Construction Klutz Construction Bean Electrical Ruppert Landscape McCarthy Building Companies McCarthy Building Companies Total Value $ 3,187,229.00 $ 4,936,642.00 $ 3,371,600.00 $ 417,361.00 $ 1,552,335.00 $ 206,254.00 $ 370,677.00 $ 956,791.00 Ray White Rd - Recommendations WC #1- Earthwork & Demolition Best Value McCarthy Building Categories Axis Contracting Obra Ramos Scoring Companies Scoped Price $ 3,187,229.00 $ 2,987,638.00 $ 3,876,000.00 Proposed Construction Price 40.00 37.30 40.00 28.10 Safety, Accident Rates and OSHA 20.00 20.00 6.00 9.50 Record Schedule and Planning 15.00 14.50 6.00 14.00 Financial Strength 10.00 10.00 - 7.00 Qualifications / Experience / 15.00 14.50 13.00 14.00 References TOTAL 100.00 96.30 65.00 72.60 Ironwill Earthworks RPMx Construction $ 3,355,371.00 $ 4,078,000.00 1. Pricing of SW3P items per the erosion control plans was provided by McCarthy as an add alternate within our sealed proposal within the qualifications and not a part of our base bid. During interviews with work category bidders, we requested bidders to provide a post bid add for SW3P items per the erosion control plans. 2. Axis received 0 points in the Financial Strength category due to their refusal to complete our subcontractor pre -qualification. Pre -qualification is a requirement for all bidders. 3. If Axis were to have received full points for Schedule & Planning, Financial Strength, and Qualifications/Experience/References, they would not be the best value. 1141 WC #2 - Concrete Paving Best Value McCarthy Building DDM Categories FX Concrete Scoring Companies Construction Scoped Price $ 4,936,642.00 $ 4,452,284.00 $ 4,925,125.00 Proposed Construction Price 40.00 35.60 40.00 35.80 Safety, Accident Rates and OSHA 20.00 20.00 - 4.50 Record Schedule and Planning 15.00 14.00 13.00 12.00 Financial Strength 10.00 10.00 9.00 - Qualifications / Experience / 15.00 14.00 15.00 13.00 References TOTAL 100.00 93.60 77.00 65.30 Ray White Rd - Recommendations 1. DDM was not the best value. DDM received 0 points for Safety due to their average EMIR of 1.26 compared to McCarthy's 0.49 and FX Concrete 0.87. Ray White Rd - Recommendations WC #3 - Underground Storm Drainage Categories Best Value Klutz McCarthy Building DDM North Texas Fort Worth Civil Scoring Construction Companies Construction Contracting Scoped Price $ 3,371,600.00 $ 3,581,336.00 $ 3,006,893.00 $3,638,497.00 $5,130,516.00 Proposed Construction Price 40.00 35.10 32.40 40.00 Safety, Accident Rates and OSHA Record 20.00 9.50 20.00 - Schedule and Planning 15.00 15.00 12.00 14.00 Financial Strength 10.00 8.00 10.00 9.00 Qualifications / Experience / References 15.00 15.00 4.00 8.00 TOTAL 100.00 82.60 78.40 71.00 Ray White Rd - Recommendations WC #4 - Sanitary Sewer and Water Best Value Klutz DDM Categories Scoring Construction Construction Scoped Price $ 417,361.00 $ 348,323.00 Proposed Construction Price 40.00 32.10 40.00 Safety, Accident Rates and OSHA 20.00 19.60 5.60 Record Schedule and Planning 15.00 15.00 14.00 Financial Strength 10.00 8.00 9.00 Qualifications / Experience / 15.00 15.00 8.00 References TOTAL 100.00 89.70 76.60 Fort Worth Civil McCarthy Building North Texas Contracting $ 852,180.00 $ 889,837.00 $ 929,120.00 Ray White Rd - Recommendations Categories Scoped Price WC #5 - Electrical & Lighting Best Value Bean Electrical Scoring $ 1,552,335.00 Highway ITS $ 2,044,879.00 Road Solutions (Late) $ 1,674,826.00 Proposed Construction Price 40.00 40.00 27.60 Safety, Accident Rates and OSHA 11.30 20.00 20.00 Record Schedule and Planning 15.00 14.50 13.00 2.00 Financial Strength / Experience / 10.00 10.00 Qualifications 15.00 14.00 12.00 References TOTAL 100.00 98.50 65.90 Ray White Rd - Recommendations Categories Scoped Price Proposed Construction Price Safety, Accident Rates and OSHA Record Schedule and Planning Financial Strength Qualifications / Experience / References WC #6 - Landscaping Best Value Ruppert Scoring Landscape $ 206,254.00 40.00 20.00 15.00 10.00 15.00 TOTAL 100.00 40.00 20.00 13.00 10.00 14.00 97.00 Texas Environmental GJ Seeding $ 262,144.15 $ 523,048.77 19.90 5.00 24.90 Ray White Rd - Recommendations WC #7 - Traffic Control Categories Best Value Scoring McCarthy Building 4 Horn Traffic Barricades Plus Barricades Unlimited $ 163,560.00 $ 828,050.00 Scoped Price $ 370,677.00 $ 378,202.00 Proposed Construction Price 40.00 40.00 38.70 Safety, Accident Rates and OSHA Record 20.00 20.00 - Schedule and Planning 15.00 14.00 12.50 Financial Strength 10.00 10.00 - Qualifications / Experience / References 15.00 12.50 15.00 TOTAL 100.00 96.50 66.20 Ray White Rd - Recommendations WC #8 - Flatwork Best Value McCarthy Building DDM Categories FX Concrete Axis Contracting Fort Worth Civil Scoring Companies Construction Scoped Price $ 956,791.00 $ 1,059,134.00 $ 1,101,875.00 $ 1,149,343.50 $ 2,029,030.00 Proposed Construction Price 40.00 40.00 35.70 33.90 Safety, Accident Rates and 20.00 20.00 - 4.50 OSHA Record Schedule and Planning 15.00 14.00 13.00 12.00 Financial Strength 10.00 10.00 9.00 - Qualifications / Experience / 15.00 14.00 15.00 13.00 References TOTAL 100.00 98.00 72.70 63.40 Ray White Rd - 100% Reflection - MC Review Activity Name RW.8UM.1040 12222 2 RW.SUM.1050 Phase 3 RW.SUM.1010 I Substantial RW.SUM.1020 Final Aocep PRE1000 Award Preoonstruction PRE6000 Kick Off Meeting Utility 609/0-100 Urban Foresty Permit - Bums & Me 601/0-110 Drainage (Flood) Study Permit - Bums & Me 609/0-120 Collaboration with FW Art Committee - CoFW 600/0-200 VE/Constnrctibility, Review -McCarthy 60%D-210 60& Cost Model - McCarthy 60%D-220 Updated Construction Schedule - McCarthy 609/0-230 Logistics and Phasing Plan - McCarthy 600/0-240 Construction Easements Review- McCarthy 600/0-260 Identify Early Works Packages 601/0-140 MTP Variance Request - Bums & Me 601/0-250 60%Team Workshop - McCarthy 60%uD-130 Deliverables 901/0-100 Art Related Support Plan - Bums & Me 90& Bums & McDonnell Design Delivembles 90%D-110 90%McCarthy Review At 000 Fragnet - City Approval of Plans & Signature k 900/0-120 90% McCarthy GMP & Deliverables 901/0-140 Public Advertisement 901/0-150 Public Advertisement 2nd 901/.D-160 Subs Bid Due 90%D-170 I Interview and Scope Subs 90%D-180 Finalize GMP 900/0-130 100%COFW Review Approval, Council Meet _NTP10 Preeonstmction Meeting - CoFW _NTP Notice to Proceed -Construction ROW 100 I Fraqnet - CoFW UR200 Original I Start Duration 684 152 21 allov-26 33 18Sep-23 A 33 18Sep-23A 33 18Sep 23 A 33 18Sep23 A 33 18Sep 23 A 27 10-W-23 A 1 15-Nov-23A 13 16-W-24 r 75 02-Nov-23A 33 26-Feb-24A 10 16 Aug24 A 26 05Sep24A 5 05Sep24A 5 12-Sep-24 A 7 19Sep24 A 5 08-Oct24 A 4 14-Oct-24 A 56 24 16 11 D C-24 0 O6Jan-25 r r o-.r.. 10 20Sep-23A 10 1 16-Oct23 A Remaining Level of Effort PrimaryBaseline RemainingWork Actual Level of Effort Actual Work Critical Remaining Work Finish Qtr 4, 2024 Qtr 1, 2025 Qtr 2, 2025 Qtr 3, 2025 Qtr 4, 2025 t Nov Dec Jan Feb Apr May Jun Sep Oct Nov Dec .&Aug 20-Nov-26 05Sep-25 Phase 1 (Fxdudling 29-Apr-26 _;_____ :______-_____:______ - _______ _____ _____________----------- _____ _____ - 21Sep-26 Summer Clbsure Sassari 2025: 20-Nov-26 ' 19Jan-27 16-May-23A 17-Aug-23 A 18Sep-23 A 18-Oct-24 Orban Forest, Permit - Bums&Me 19Jan-24 A 17-Apr-24A -COFW -•------'— — ----- ----- �--- -- ----- 01-Nov-23A - - 01-Nov-23 A 01-Nov-23A thy 01-Nov-23A y j 01-Nov23A v; McCa}IhY _____________J_ -•----- - -----•- -----'--- -- ----- 01-Nov-23A .sl ---' ----' 24Jan-24 A 15-Nov-23A by 01-Nov-24 Art Ftelatei I Support PIOn - Bums & Mc ® ---- ---- ---- ---- ----- ----- L Bums & McDonnell besigd Delive � - f 23-Feb-24A ����'rable9 ', 05-Apr-24A zaView 04Sep24 A - CityNproval of Plans & Sgnatute of Cover Page 17-0ct-24 A 90% AcCarl6y GMp & Dglivem4les 11Sep-24A IPubliCAdve6,sement ____,____ ;__- ____ -I ------ :_____:_____:_____;_____ 181ep-24A PublicAdvertisembnt grid 03-0ct-24 A p Subs Bid Due 11-Oct24A ledervielvand ScopelSubsl 17-0ct-24A rinal¢a GMP, 10-Dec-24--'------------- •----,__--__IApproVal, COundl lNeetin �_ __ 1�d%COFW Review 03Ja •Pre: netnpcion �vleetirq - Cow O Notice to:Proceed - Construction 1616-Au :it Relocation Je n _ 16-Aug24A )FWROWAoquisrtion; g, 18-NOV24 A FIIIIIL.6�I Frontier lD444-140+00 Page 1 of 9 18-Oct-24 13:14 Qtr 1, 2026 Qtr 2, 2026 Qtr 3, 2026 Qtr 4, 2026 Qtr 1, 2027 Qtr 2, 2027 Jan Feb M May Jun Jul Aug Sep Oct Nov Dec Jan Feb �May Consti uction'Summary -7otal Calende W ather)I _______ __--___--___---Phase 2_{EJcdudid�Weather)-�___--�-___-:- Phase, 3 (Excluding Weather I I $ubst meal Completion (indudir� Wea Final Aces tdnce__:__ Ray White Rd - 100 % Reflection - MC Review 18-Oct-24 13:14 Activity ID Activity Name Original Start Finish Qtr 4, 2024 Qtr 1, 2025 Qtr 2, 2025 Qtr 3, 2025 Qtr 4, 2025 Qtr 1, 2026 Qtr 2, 2026 Qtr 3, 2026 Qtr 4, 2026 Qtr 1, 2027 Qtr 2, 2027 Duration t Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May • UR180 Spectrum lD#36a-131+95 72 30-Mar-24A 27Jul-24A Spectrum lD#366-131+95 'L UR160 OneSource / Tri Co ID#28-29-120+00 72 30-Apr-24 A 28Jul-24 A ;_ One6oumG / Tri oo IDA�E 29 j 120+q0 i I I I I I UR170 OneSource /Tri Co ID#32-122+50 72 -AP 30 r-24 A 28Jul-JulA _ _ _ _ _ _ i / Tri Co ID#32-122+50 OneSourc6 - UR190 OneSource /Tri Co ID#3738-131+g5 72 30-Apr-24 A 28Jul-24 A OneBource / Tri Co ID#3738=131+g5' UR110 OnSource ID# 12-114+30 72 01-May-24 A 21-May-24 A , j OnSDurce ID# 12-114t30 UR120 OneSource / TriCo ID#13-14-111+80 to 116 72 01_May-24 A 21-May-24 A OneSource /Tri Co ID#13-14 ;111+g0 to 116+p0 ' OneSoume/TriCoID#18-19-117+60to11E 72 vUR140 014ay-24A 21- OneouoQ-19-'117+rD Oto 1�8+pp; ____; - -----'------------'----'----'-----'-----'- --------- ----- --- ---- ----- ----------- -----'----- ----- UR100 Onoor Conflict ID# 2-101+00 to 103+90 72 16Sep-24A 13-Deo-24 QOCOr Conflict ID# 2-101+00ito 103+90 UR130 Onoor ID# 15-16-113+60 to 137+90 72 16Sep-24A 13-Deo-24 Oncor ID# h15-16 113+60 to 1:37+90 UR150 CoFW Watvlre W1 D#21-27, 3031 -114+; 52 16-0d-24 31-Deo-24 COFN/ Watarlre W1 D#21-27, 3031 -114; 50to: 119+30 UR210 ATMOS Gas Line 10 01-Nov-24A 29Jan-25 ATMOS Gas Line - --, - MP1000 Award of Contracts 0 06Jan-Jan ------------- --- ---- ---- ----- ----- ----- AwSrd of Contrdds a : Lime MP1070 Submittals 1 10 1. 06Jan-25 - 17Jan-25 Submittals MP1140 Review & Approve 10 20Jan-25 31Jan-25 Revew&ApproJe MP1210 Procurement 10 03-Feb-25 14-Feb-25 curement j MP1250 Available for Use On -Site 0 14-Feb-25 `-----'------------''--O Availab ---------- -----'-----`---- ----- ----- ----- ----------------- ---- ---- -----------'------------ ---- --- ---- ----------'----- -----'---- ----- le for Use Orl,Site 30 8irra�3 MP1010 Submittals 10 O6Jan-25 17Jan-25 ❑ $ubmi(tals MP1090 Review & Approve 10 20Jan-25 31Jan-25 Q Review&Approve MP1170 Procurement 10 03-Feb-25 14-Feb-25 ID '---------------`- `---`----- MP1220 Available for Use On -Site 0 14-Feb-25 — — _procurement ----- ----- ----- ------------ ---- ----- ----- ----- ------'----- ----- ----- --- ---- ----- ------ ----------- '----- ---- ----'----- ----- j a Available for Use Orr -Site ,MP1020 1 06 - , Submittals 5 06Jan-25 10Jan-25 Submittals MP1080 Review&Approve 15 13Jan-25 31 Jan-25 Review&Approve MP1180 Procurement 10 03-Feb-25 14-Feb-25 IE R_ro_cu_re_ment;'-----'-----'----- MP1230 Available for Use On -Site 0 14-Feb-25 -----'------------`--'---------------- ----- ----------------- ---- ----- ----- ----------------- ----- ----- ----- ----- ---------------------'----- ----- Qvailable for lase OrySite j MP1060 Submittals 5 1, 06Jan-25 10Jan-25 Sdbmittals MP1130 Review&Approve 10 13Jan-25 24Jan-Jan a ]Review&Approve] MP1160 Available for Use On -Site 0 24Jan-Jan f------------%--- Concrete 20 1. - ---t- ---- MP1030 Submittals 10 06Jan-Jan 17Jan-25 ❑ $ubmi{tals MP1100 Review 10 20Jan-Jan 31Jan-Jan , ❑ Review &Approve MP1150 Available for Use On -Site 0 31 Jan-25 a Available for Use OnSite , Poles MP1040 Submittals 95 10 1• 06Jan-25 17Jan-Jan -'-----------------Submittals ------ -- ------ -----------+-----'------`----`----'----'----- ----------- -----'----- ----- ---`-----f-----'-----'-----JI ---'-----'-----'----------I MP1110 Review&Approve 10 20Jan-25 31Jan-25 ❑ Review&Approve MP1190 Procurement 75 03feb-Feb 16-May-25 procurement MP1260 Available for Use On -Site 0 16-May-25 g Available for Use OnSite Permanent . 1 YlrYiiril -'------ '--- --- .-------------•. - _-------- - - - -- -- -- - - - - --- .--- - - - __- MP1050 1O6Jan-25 17Jan-25 8 gubmittals MP1120 Approve 7Avail.ble 10 20Jan-25 31Jan-25 8 Review&ApproveMP1200nt 10 03-=eb-25 14-Feb-25 IO f rocurementj240 or Use On -Site 0 14-Feb-25 s Available for Use On'Site Construclon ®®® `----`----'-----'----- Mobilization l ----'- ------ ----- ------------ ---- ---- ----- ----- ------'----- ----- ----- --- ---- ----- ----------- ----- ----- ----- M130 p®®® Tem Utilities 10 02Jan-25 0 15Jan-25 ❑ 7em Utilities' M150 I Set Initial SWPPP 3 l 16Jan-Jan l 20Jan-Jan Setlndial SW PPP Remaining Level of Effort Primary Baseline Remaining Work Page 2 of 9 Actual Level of Effort I♦ Actual Work I♦ Critical Remaining Work Ray White Rd - 100 % Reflection - MC Review Activity Activity Name Original Finish Qtr Export Illegal Dumping Duration I 5 21 Jan-25 t 27Jan-25 M100 M110 Place Agg Base 2 28Jan-Jan 29Jan-Jan M120 Set Trailers 3 30Jan-25 03-Feb-25 M140 Fence &Gates 2 04feb-Feb 05-Feb-25 TEMP100 NB Widening at Wall Rice Keler 2 27Jan-Jan 28Jan-25 TEMP110 Sputter Islands 3 29Jan-Jan 31 Jan-25 TC100 Set Traffic Control Phase 1 2 -Feb-25 SPD100 SWPPP-Phi-A 2 -Feb-25 SPD130 Demo&Remove-Anguilla St-Ph1-A 2 1113-Feb-25-Feb-25 -Feb-25 SPD110 Tree & M'se Removals-Ph1-A 3 Feb-2SPD120 Strip & Stockpile Topsoil-Phl-A 3 -Feb-25 UGU100 Disconnect & Drop Light Poles - Phl-A (5) 3 07-Feb-25 11-Feb-25 UGU110 Expose Box&Knockouts -Phi-A 1 21 Feb-25 21-Feb-25 UGU120 ELB Lateral Lines IStub-outs -Ph1-A(6) 3 244-eb-25 26-Feb-25 UGU130 Place Storm Inlets - Phi -A 5 27-Feb-25 05-Mar-25 UGU125 Manholes Adjustments-Phi-A(2) 2 18-Mar-25 19-Mar-25 UGU140 Set Inlet Top s&Aprons - Phi -A 5 16-Apr-25 22-Apr-25 UGU150 Install Electrical Conduit - Phi -A 3 16-Apr-25 18-Apr-25 Earthb- 5 EW100 Cut/Fill - Phi -A 4 17-Feb-25 20-Feb-25 Roadway -Mar-25 23-Apr- RW100 Rough Grade - Phi -A 2 06-Mar-25 07-Mar-25 RW110 Lime Stabilized Subgrade - Phi -A 5 10-Mar-25 14-Mar-25 RW120 Bluetop Lime -Phl -A 1 17-Mar-25 17-Mar-25 RW130 Concrete Pavement&Curb -Phl -A 11 20-Mar-25 03-Apr-25 RW140 Leaveouts Cnct Pavement -Phl-A 3 04-Apr-25 08-Apr-25 RW150 FPFC Anguilla Ln - Phi -A 5 09-Apr-25 15-Apr-25 RW155 FPFC Dnvewey at Yana - Phi -A 4 16-Apr-25 21-Apr-25 RW160 Saw& Seal Cnct Pavement -Phl-A 2 22-Apr-25 23-Apr-25 r-25�y-May-� F100 Trail&Curb Ramps -Phl-A 8 23-Apr-25 02-May-25 F120 Install Penn Signage -Phi-A 1 05-May-25 05-May-25 F115 Seeding/Sodding - Phi -A 2 05-May-25 06-May-25 F110 Install Light Poles and Bases -Phl-A 5 19-May-25 23-May-25 F130 Temp Striping - Phi -A 1 27-May-25 27-May-25 coo SPD140 SWPPP-Ph1-B 4 07-Feb-25 _ 12-Feb-25 SPD150 Tree & Misc Removals -Ph1$ 5 13-Feb-25 19-Feb-25 SPD160 Strip& Stockpile Topsoil -Ph1-B 5 21 Feb-25 27-Feb-25 SPD180 Temp Agg Driveways - Phi -B 3 02-Apr-25 04-Apr-25 SPD170 Demo & Remove-Scheumack Dr 1 - Phl-B 2 07-Apr-25 08-Apr-25 SPD190 Demo Driveways-Ph1$ 6 07Jul-25 14Jul-25 SPD200 Demo & Remove-Scheumadk Dr 2 - Ph1-B 2 24Jul-25 25Jul-25 Remaining Level of Effort PrimaryBaseline 0 Remaining Work Actual Level of Effort Actual Work Critical Remaining Work 18-Oct-24 11.14 4, 2024 Qtr 1, 2025 Qtr 2, 2025 Qtr 3, 2025 Qtr 4, 2025 Qtr 1, 2026 Qtr 2, 2026 Qtr 3, 2026 Qtr 4, 2026 Qtr 1, 2027 Qtr 2, 2027 4ov Dec Jan Feb I Mar Apr I May I Jun Jul I Aug j Sep Oct j Nov j Dec Jan j Feb j Mar Apr j May j Jun Jul I Aug I Sep Oct I Nov I Dec Jan I Feb I Mar Apr May U Export Illegal DurAping _______________PlacpA49 a J______ _,_____._____,_____ ___________ _ __ __ __ ___ ____ Set Trailers Fence & Gates' 1:: NB Widening at Well Pios Keler ---- ------Spliher Islands---------'---- -------- - - - -- -- -- - - - - --- ---- - - - --- Sef Traffic Control Phase 1 ;I SWPPPJPh1-A -- --- ------ - - ----- ----- ----- ----- ---- ---- ----- ----- Demo&,Remgve -Anguilla 6t-PHI-A ____, 1 Tree&Msc Removals -Phl-A Strip & Stockpile Topsoil - FIhl-A ;1 Disconnect&DroLght Plies-Phl-A(5)--__,----_,_ -------- ----- ------------ ----- —---- ------ ----- ----------- --- ----- ;Expose Box:& Knockouts- Phl-A �j ELB Lateral Lines,/ Stublouts Phl-AI(6) Placee Stohn inlets - Pi1-A wlanhglesAdjustmepts - Phi -A (�) O;Setlnlet Tops&Aprons-Ph1-A; ---- A Install Elechl6al Coridult -Phl-A 1 ;Cut/Fill-PH1-A Rough Grade - Ohl -A: ----;------------5---- '-----------5------------------------------------------------------------------ - - - - -- ------------T-----. 1 Lime Stabilize ----------- -m d Subgmde-Phl-A; Bluetop Lime'. Phl-A Concrete Pavement & Curb -Phl-A: IO Leaveouts Cnci Pavement -Phi -A; ----- B--F;pFC pnguill�Ln-Ph_l-A-`-----'-----'-----' ---- --- ---- --- ---- ----- ---'---- ----- ___I __-; O ;FPFC IDrivevMyat Yard-Ph1-A; Saw & Seal Inct Pavement - Pli1-A a Trail&Curd Ramps-Pn1-A Sgdage- Phl-Aj -----'-----' Ins ------ Seeding t, Sodding - Phl-A Install Light Poles and Bases - Phl-A Temp Striping - Phi -A --- .O SWPPP --- ---- ----- ----- ----- ----- ----- --- ---- ---- -Ph1:B I I I A ;Tree&IMsc Removals-F0-B 01 Strip:&Stockpile Topsoil:-Ph1-� Temp Agg Drivep✓ays - ph143 DBmo & Remove - Scheumack Dr 1 - Ph11-B demo fJrivewzys-Pli1-B I ; Demo & Refnove : Scheumack Dr2 - Phi-B! Page 3 of 9 Rav White Rd - 100 % Reflection - MC Review Activity Activity Name Original Start Finish IQtr Duration I I I t UGU170 Sewer Main - Phi$ 10 13-Feb-25 26-Feb-25 UGU180 Sewer Laterals - Phi$ 5 27-Feb-25 05-Mar-25 UGU210 ELB Storm Trunk Lines - Phi S 25 06-Mar-25 09-Apr-25 UGU190 Sewer Cutover&Connections - Phi -B 4 06-Mar-25 11-Mar-25 UGU200 Water Male rAdjustments-Phi S 15 12-Mar-25 01-Apr-25 UGU220 ELB Storm Lateral Lines - Ph1-B 10 10-Apr-25 23-Apr-25 UGU230 Place Storm Inlets -Ph1$ 6 24-Apr-25 01-May-25 UGU240 Set Inlet Tops &Aprons - Phi $ 10 24Jul-25 06-Aug-25 UGU250 Install Electrical Conduit - Phi $ 3 24Jul-25 28-Jul-25 9 25-Mar-25 04-Apr- EW110 Cut/Fill-Phi-B 9 25-Mar-25 04-Apr-25 j)24v1a RW170 Rough Grade -Phi$ 4 02-May25 07-May-25 RW180 Lime Stabilized Subgrade - Phi$ 12 08-May25 23-May-25 RW190 Bluetop Lime -Ph1$ 3 27-May25 29-May-25 RW200 Concrete Pavement&Curb - Phi -B 25 30-May25 03Jul-25 RW220 Leaveouts Cnct Pavement - Phi $ 3 15-Jul-25 17Jul-25 RW210 FPFC Scheumack Dr l - Phi 43 4 18Juk25 23Ju1-25 RW230 FPFC Scheumack Dr 2-Phi S 4 28Jul-25 31Jul-25 RW235 FPFC Pinellas Ave-Ph1$ 5 01Aug25 07-Aug-25 RW240 FPFC Dmeways-Phi $ 12 08Aug-25 25-Aug-25 RW250 Saw& Seal Cnd Pavement -Phl-B 2 26Aug-25 27-Aug-25 29Ju1-2W�ep-25 F150 Install Light Poles & Bases -Ph1-B 3 29Jul-25 31Jul-25 F160 Install Penn Signage - Phi -B 1 01Aug-25 01-Aug-25 F140 Trail &Curb Ramps-Phl-B 20 07Aug-25 04Sep-25 F155 Seeding / Sodding -Ph1-B 4 05Sep-25 10Sep-25 F170 Temp Striping - Phi$ 1 11Sep-25 11Sep-25 128 13-Feb-25 r 13-Aug-25 SPD210 SWPPP-Ph1-0 2 13-Feb-25 14-Feb-25 SPD240 Demo & Remove - RWR Rt Lane - Ph1-D 5 17-Feb-25 21-Feb-25 SPD220 Tree & M'sc Removals -Ph1-0 1 20-Feb-25 20-Feb-25 SPD230 Strip & Stockpile Topwil-Ph1-0 4 21-Feb-25 26-Feb-25 SPD250 Demo & Remove - RWR Epsting SB - Ph1-0 4 08Aug-25 13Aug-25 nd Utilities 115 17-Feb-� UGU260 Disconnect & Drop Light Poles -Phl-D 1 17-Feb-25 17-Feb-25 UGU270 ELB Storm Trunk Lines - Phi -0 15 02-May25 22-May-25 UGU280 ELB Storm Lateral Lines - Ph1-0 3 23-May25 28-May-25 UGU290 Place Storm Inlets -Ph1-0 4 29-May25 03Jun-25 UGU300 Set Inlet Tops &Aprons-Ph1-0 4 03Jul-25 09Jul-25 UGU320 ELB Lateral Line E)dentions - Phi -D 5 03Jul-25 10Jul-25 UGU310 Install Electrical Conduit - Phi -0 3 25Jul-25 29Jul-25 07Apr-2 -Apr- EW120 Cut /Fill-Ph1-0 6 07Apr-25 14-Apr-25 04Jun a -2 RW260 Rough Grade -Phi -0 3 04Jun-25 06Jun-25 RW270 Lime Stabilized Subgrade-Phi -0 4 09Jun-25 12-Jun-25 RW280 Bluetop Lima - Phi -0 2 13Jun-25 16Jun-25 RW290 Concrete Pavement & Curb Outside - Ph1-0 12 177un-25 o2Ju1-25 Remaining Level of Effort Primary Baseline 0 Remaining Work Actual Level of Effort Actual Work Critical Remaining Work 18-Oct-24 1314 4, 2024 Qtr 1, 2025 Qtr 21 2025 Qtr 3, 2025 Qtr 4, 2025 Qtr 1, 2026 Qtr 2, 2026 Qtr 3, 2026 Qtr 4, 2026 Qtr 1, 2027 Qtr 2, 2027 Vov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct I Nov I Dec Jan I Feb I Mar Apr I May LJ+ Sewer Mairl - Ph1S ..... a I�S-wr Laterals !Ph1�B _ --------- ____I_---- __--- ----__ ELB Storm Trunk Line 6-Ph143 Sever Cutover&Corined'ahs-Phi $ W Water MetsrAdjdstmenis-Ph1$ ELB Storm Lateral Lines : Ph1$ _____,____ r__PlaGe Story'n Inlets -Phi;$ --- '-----'--- ----- --- ---- -----'----- ----- e SeInlet Taps &Apron-Ph1 ----, -----: I I � s$ I I I ------- ----- t I I I I I I I AI Instate Electrical Conduit%Ph1-fl 'Ph1431 ___.____.___� Cut/Fill'_______________________________ - ------- ---- , � Rtiugh Grade - ph1B j '�, Lime Stabilized Subgrade - Phi 43 I Bluetop Lime - Plii -B Corcrete Paverrient & 6rb - Ph1-B I_ Leaveouts Crict Pat! ----I-- j ------ FPFC: Scheymack Or l - Ph i-B I FPFC Sch4umack Dr 2' Phi-11 r FPFCPiriellas A've-Phl-B FPFQ Dnveµays- Ph 1-B Saw SeaC Cnd Phi Pavem ant-P Install Light Poles & Bases - Ph1 -B Install Perth Sign�ge - Ph1-B Tral&Cuj Ramps-Pn1$ j I� SQ ding l/Sodding-Ft1$ e _ _ Temp Striping Ph1-E SWPPP-Ph1-D Dema,&RemoveRWR:Rt Larje-Phjl-0_______________ (Tree&Mist Removals-Ph1-0 D; Strip ;& Sto*pile Yopeoil=Ph1 A Demo SI Remove - RWR Elting $B - P,h1-D ---'-----------`--I--¢iscon'lted&DropLightpoles_ PM-0:----- -- `--- - - -- -- -- - - - - --- ---- - - - --- -- ---- -- -- -- -- -- -- -- — -- -- ---- -- -- -- -- -- -- IELB Storm Trunk Lines - Phi -D II ELB$tortm Lateral Lines - Phi -0 Pla{:e Stopnlnle(s-Phil-D ID Set Inlet Tops &AprorS-Phi -D IQ ELB Lateral Line Extehtions'� Ph1a) 0' ----------- '----------- ' Install ElecAical Conduit, Ph14) 6ut/FiQ-Ph1=D Rough Glade _F'h1-0I--- --- — �----1-----�-----�----- ----- ----- --- ---- ---- ---- j j j---- ---- Lime Stabilized Subg1hade-Ph1-D, 1 Bluetop Lime; Phl-D W codonete Pavembnt & Curb Outside - Phl-D Page 4 of 9 Ray White Rd - 100 % Reflection - MC Review ' 'ty. Activity Name Original Start Finish IQtr Duration I [f RW300 Saw& Seal Outside Cnct Pavement -Ph1-0 2 03Juh25 07Jul-Jul RW310 Rough Grade Inside Lane - Phi-D 1 14Aug-Aug 14-Aug-25 RW320 Lime Stabilized Subgrade Inside Lane- Phi{ 5 15-Aug-25 21-Aug-25 RW330 Bluetop Lime Inside Lane-Phi-0 2 22Aug25 25-Aug-25 RW340 Concrete Pavement & Curb Inside - Ph 1-0 5 26Aug-Aug 02Sep-Sep RW350 Saw &Seal Inside Cnd Pavement - Phi-0 2 03Sep-Sep 045ep-Sep 41 F180 Trail&CurbRamps -Phi-D 11 10,1ul-25 24Jul-Jul F200 Install Perin Signage-Phil -D 1 25Jul-25 25Jul-25 F190 Install Light Poles and Bases -Ph1-D 3 30Juh25 01-Aug-25 F195 Seeding/Sodding -Phi-D 3 04Aug25 06Aug-25 F210 Temp Interim Striping - Ph1-0 1 07-Aug25 07Aug25 F220 Temp Striping head to head - Phil -D 1 05Sep-25 05Sep-25 i:Gru:NGi o5'dri.�r:d RNDABT1000 Summer Closure Season 2025 53 27-May-25` 08-Aug-25' site Pre— SPD260 SWPPP-Ph1C 1 1 28-May25 28-May-25 SPD280 Strip& Stodrpile Topwil-Phil C 1 2 29-May 25 I 30-May-25 SPD270 Tree & M'sc Removals -Ph1C 1 29-May25 29-May25 SPD285 Demo & Remove - Roundabout - Ph1C 5 29-May-25 04Jun-25 29Tv1ay 25 22Ju1-25 r UGU330 Disconnect & Drop Light Poles -Ph1C 1 29-May-25 29-May-25 UGU380 Connections to Main Boxes - Phil C 2 12Jun-25 13Jun-25 UGU390 ELB Storm Lateral Lines - Phil 3 16Jun-25 18Jun25 UGU400 Place Storm Inlets -Ph1C 2 19Jun-25 20Jun-25 UGU420 Set Inlet Tops &Aprons-Ph1C 2 21Juh25 22Jul-25 UGU410 Install Electrical Conduit - Phil C 1 21Jul-25 21Jul-25 EarthmJ 05,Jun- un-25 EW130 Cut/Fill-Ph1C 5 05Jun-25 11Jun-25 Roadway 21 23Jun-25 22Ju12 RW360 Rough Grade - Phil 1 23Jun-25 23Jun-25 RW370 Lime Stabilized Subgrade-Ph1C 4 24Jun-25 27Jun25 RW380 Bluetop Lime -PhlC 1 30Jun-25 30Jun-25 RW390 Concrete Pavement & Curb -Ph1C 10 01Jul-25 15Jul-25 RW400 Leaveouts Cnd Pavement -PhlC 3 16JuI-25 18Jul-25 RW440 Saw& Seal Cnd Pavement -Ph1C 2 21Ju1-25 22Jul-25 F240 Install Light Poles & Bases -Ph1C 3 22Jul-25 24Jul-25 F235 Trail &Curb Ram ps-Ph1C 5 23Jul-25 29Jul-25 F250 Install Perm Signage -Phi-C 1 30JuF25 30Jul-25 F245 Seeding / Sodding -Ph1C 1 30JuV25 30Jul-25 F260 Temp Striping -PhlC 1 31Jup25 31Jul-25 TC200 Set Traffic Control Phase 2-OnlyArea D 5 08Sep25 A. 12Sep-25 TC210 Set Traffic Control Phase 2 - Entire Pmejct 5 12Sep25 18Sep-25 e- Site Prep 13 1 01-0ct-25 _ SPD290 h2-0 7rm& 1 15Sep25 15Sep-25 SPD300 Removals-Ph2-0 3 16_Sep-25 1 18Sep-25 SPD320 Demo & Remove - Mainline Lanes- Ph2-D 1 4 1 16Sep25 19Sep25 Remaining Level of Effort PrimaryBaseline 0 Remaining Work Actual Level of Effort Actual Work Critical Remaining Work 18-Oct-24 11.14 4, 2024 Qtr 1, 2025 Qtr 2, 2025 Qtr 3, 2025 Qtr 4, 2025 Qtr 1, 2026 Qtr 2, 2026 Qtr 3, 2026 Qtr 4, 2026 Qtr 1, 2027 Qtr 2, 2027 4ov 1 Dec Jan I Feb I Mar Apr I May I Jun Jul I Aug j Sep Oct j Nov j Dec Jan j Feb j Mar Apr I May � Jun Jul I Aug I Sep Oct I Nov I Dec Jan I Feb I Mar Apr May Saw & Seal Outside Chd Pavemen . - Ph1,D ..____..___ _____ ' ----- _Rou h e nsidejLane-Phl-d__ __ __ _ _ _ _ ___ ____ 0 'Lime 3tabilizl:d Subgrade InsidelLane; Phi-0 0 Bluetop Lime Inside Lane - Phil -D Q Concrete Pavem�,ent & Curb Inside Ph14.1 Say & Seal lr ide Cna Pavement; Phi-0 ' ---'------ -----'----'- ----'- ---- '--� ------ --Ram- Phi----------- — `------------- ----- ------'--- —- ----- ----- --- ---- ----- ------ ----------------- Trail Cu----- '�D Install Perin,Signi - Ph,1-D Install Liglt< Poley and oases - Phl-d, , ; 1 Seeding G Sodding - Ph 1-D ---'------ ----`----'------'-----'------'----- `-----`I- Tervnp Interim Striping j Ph1---------'--- - -- -- -- - - - - --- ---- - - - --- ;� Terpp SMping head to lead Ph1-D Summerbosure Season 2Q?5 ' II SWPPP-Ph1-C -----_--- _;____;_ -----' ____; ______________________-_____ ____________ ____ ___ ____ ___ _____,____ _____ _____ ____ ____ _____ ___,_____ ___,_____ Shtp&Sto4ile Topsoil:-Phl ICI TreeA M'sc Removals -Phl-C: I Demo&Remove-Roundabout-Phl-C --- �------ ------ IDisconnect, ---------- --------------- --- ---- ----- -----------------T----- ----- ---------- ll �---� Dp nedbdManeoxes-Ph1C ALB Storm Lateral {ines - phi L', Place Storm Inlets; Phil -C :Set Inlet Tops &Aprons - PhiC jInstall Electrical Conduft - Ph1-C Cut / FiII;- Phi Rough Gradis - Phi-0 ----'---- ----'----'------'-----'------'---- OL Lime: Stabil¢ed S6bgra4-PM-C--------- `----'-- - -- -- -- - - - - --- ---- - - - --- --'-- --'-- - -- --�-- -- -- -- -- -- -- - - -- -- --r- --�— --�-- -- -- Bluetop Lime - Plil-C 0 Concrete Pavement & Curb - Phil C 4eavecuts Crjct Pavement - Phi Z, Saw 8 Seal Cnd Pevemea'nt - Ph 1-C ----------------- '------ -------- ------------------ -- ------------ ^--- :Install Light poles $ Bases - Phi-C, Q Tral8Cudl Ramps-Ph�1C Install Penn Signage - P;h1L I Seeding/$odding-Ph1C ------ -----I ------ ---- '----------- Tem Stn 11 Ph1C y p p.-s--' - -- - - --- ---- - - Set Tmic Control Ph ise 2 J OnlyArea D $et Traffic Control P iris 2 - Entity Prorrjct --- ----�- -----;- ---- -I-----I ----- --�-SWPPP-Ph2-D ---- ----- ----- ----- ----- ------ ----- ----- --- ---- ----- -----T---- ---- Tree&;Msc Removls-Ph2-D Demo & Remove - I dainlirie Lanes - Ph2-0 Page 5 of 9 White Rd - 100 % Reflection - MC Review y ID Activity Name Original Start Finish 6 Duration SPD310 Strip& Stockpile Topsoil -Ph2-0 4 19Sep-25 24Sep-25 SPD325 I Demo & Remove - Prairie, Malibu, Archer- Ph i 8 22Sep-25 01-0ct-25 Oct-25 ;425-Nov-Q UGU440 ELB Storm Laterals -Ph2-D 3 07-0ct-25 09-0ct-25 UGU470 Place Storm Inlets - Ph2-0 2 10Oct-25 13-Oct-25 UGU460 Manholes Adjustments -Ph2-0 2 23-W-25 24-0ct-25 UGU480 Set Inlet Tops &Aprons - Ph2-0 2 21 Nov-25 24-Nov-25 UGU490 Install Electrical Conduit -Ph2-0 3 21 Nov-25 25-Nov-25 Ea 02-0ct-25 EW140 Cut / Fill -Ph2-0 3 02-0ct-25 06-Oct-25 Roadway 31 14-W-25,&1�5-1\1ov-25 RVV450 Rough Grade --Ph2-0 2 14-0ct-25 15-0ct-25 RW460 Lime Stabilized Subgrade-Ph2-0 4 16-0ct-25 21-0ct-25 RW470 Bluetop Lime -Ph2-0 1 22-W-25 22-0ct-25 RW480 Concrete Pavement & Curb - Ph2-D 13 27-W-25 12-Nov-25 RW490 Leaveouts Cnct Pavement -Ph2-0 3 13Nov25 17-Nov25 RW500 FPFC Anguilla Ln-Ph2-0 3 18Nov-25 20-Nov-25 RW510 Saw& Seal Cnct Pavement -Ph2-D 3 21Nov-25 25-Nov-25 Deo-25 F270 Trail &Cu rb Ram ps-Ph2-D 9 25Nov-25 09-Dec-25 F280 Install Light Poles and Bases -Ph2-D 3 26Nov-25 02-Dec-25 F290 Install Perm Signage - Ph2-D 1 10-Deo-25 10-Deo-25 F285 Seeding / Sodding - Ph2-D 4 10-Dec25 15-Deo-25 F300 Temp Striping - Ph2-0 1 16-Dec25 16-Deo25 SPD370 SWPPP - Ph2-E 1 17-Deo-25 17-Dec-25 SPD400 Demo & Remove - Wall Price Kela Rd - Ph2 3 18-Deo-25 22-Deo-25 SPD380 Tree & Misc Removals -Ph2-E 1 18-Dec-25 18-Dec-25 SPD390 Strip & Stockpile Topsoil -Ph2-E 1 19-Dec-25 19-Dec-25 FarUrwork 3 23-0eo-25 26-Deo-25 EW160 Cut / Fill -Ph2-= 3 23-Deo-25 26-Dec25 Roadway 18 29-Deo-25 22-Jan-26 RW590 Rough Grade -Ph2-E 1 29-Dec25 29-Dec25 RW600 Lime Stabilized Subgrade - Ph2-E 4 30-Deo-25 05Jan-26 RW610 Bluetop Lime -Ph2-= 1 06Jan-26 06Jan-26 RW620 Concrete Pavement & Curb - Ph2-E 10 07Jan-26 20Jan-26 RW650 Saw & Seal Cnct Pavement - Ph2-E 2 21 Jan-26 22Jan-26 7 21 9Jan-26 F350 Trail&Curb Ramps-Ph2-E 4 21 Jan-26 26Jan-26 F370 Install Perm Signage-Ph2-E 1 27,1an-26 27Jan-26 F360 Seeding / Sodding - Ph2-E 2 27,1an-26 28Jan-26 F380 Permanent Striping - Ph2-E 1 29Jan-26 29Jan-26 SPD330 SWPPP - Ph243 1 19Sep-25 19Sep-25 SPD361 Demo & Remove -Anguilla St - Ph2-B 3 22Sep-25 24Sep-25 SPD340 Tree & M'sc Removals -Ph2-B 4 22Sep-25 25Sep-25 SPD360 Demo & Remove - Mainline Lanes- Ph2-B 12 22Sep-25 07-0ct-25 SPD350 Strip & Stockpile Topsoil -Ph243 6 26Sep-25 03-Oct-25 Remaining Level of Effort PrimaryBaseline Remaining Work Actual Level of Effort Actual Work Critical Remaining Work 18-Oct-24 13:14 r i------ -----------`----' - '------------I----- ----- Demo & �� ----- R&F gmov r{e r ph2 Aqh --------M ----- ----- -----------1------ ----- ----- --- -- ----�-----'----- ---- EGB Sto Lat rals�Rh2-0libu, Puce Storm In ets - Ph2-D j, ManholesA, ljustments - Ph2-0: '-----'------ `---------- 0 j Set lq( Tops &_Aprons -Ph20 —-----------------'------------'----- _ - - --- --- - - - -- -- -- - - - - --- ---- - - - --- —, A' Instal Electri,cal Conduit: Ph2-E) r Cut / Fill Ph2-E -------- �----- I Rough Grade - - Phi-D' ----- _ ------- _ ----- ----- ----- ----- ----- ---- ----- ----- ----- ------------ ----- ----- ----- ----- ----- -----•----- ----- I7 Lime 8 abiliad Sub mde - PU2 D :Bluetgp Lim( - Ph2;D 0 C'oncret r Paveirnent & Curb - PhZD 0 t'.eavec uts Crjct Payemenj - Ph4D '------ AIFPFC, inguilla Ln IPh24D ----- ------ ---- ----�------'�----�------ -----I ----- ----- -- ---------------- ----- ----- - ------------- ----- ---- --- ---- ----- ----------- ----- ---- ----- 0 Saw i Seal;Cnct Pavement - Ph2-0 Q Tin it&COib Ramps-Ph2-0' r Instill Light Poles and Bases Ph2-0 n3 nn Signage,L Ph2 b aed _ _ _ _ _ o� n /Sodding =.Ph2-D mp Striping PU2,D '-----------------`----'- `-----`-----'----- i WPPP-Ph'-E -----'- ----- ----- ---------------------- ----- ----- ----------------- ----- ----- ----- ----- ----------'----------'----- ----- emo:& Remove�Wall Price Keler Rd-PhZE i ree & Mac Removals-Ph2 i Mp &Stod�ile Topsoil-ph24=', A cut / RI - Ph24= i Rough Grade - P02-E Line Stabilized Subgrade - Ph2-E i Bluetop 4me - Ph2-E:, Connate PaVement & Curb - Ph2-E _______ -----'_______ ____ -----', -_____,_____;_____ _____ _____ _____ _____ _____ __________________ _____ _____ ____ _____ _____ _____,____ ,', I Saw& Seal Gnct pavement-Ph2-E '- ; Trail & Cu ib Ramps -Ph2-E Install Pemi Signage - Ph2-E i_ _ i; Perthanent Stripig Ph2-E SWPPP-Ph2-B '------ '----'------ ; Dem& Remove - Anguila St -Ph2-8 ------------ '------------- '................. _ -o - ------ - - - -- -- -- - - - - --- ---- - - - --- � 1 Tree & M'scIRemc ids - Ph2$ I I I Demo & Remote - Mainline Lanes:- Ph2 3 0 Strip & Stockpile Topsoil - Ph�-B Page 6 of 9 Ray White Rd - 100 % Reflection - MC Review Activity IDS Activity Name Original Start Finish IQtr Duration I I I t 70 10-0ct25 .10Cct-25 21Jan-26 UGU510 ELB Storm Laterals -Ph2-B 8 21 Cct-Oct UGU540 Place Storm Inlets - Ph2-B 6 22Lc-Oct 29-Oct-25 UGU530 Manholes Adjustments -Ph243 2 264Nov-25 01-Deo-25 UGU550 Set Inlet Tops &Aprons-Ph243 6 15Jan-26 21Jan-26 UGU560 Install Electrical Conduit -Ph2-B 3 15Jan-26 19Jan-26 EW 150 Cut / Fill - Ph2-B 4 06-Oct-25 09-Oct-25 30-0ct-25 mmffn10Jan-26 RW520 Rough Grade --Ph2$ 4 30-Oct-25 04-Nov-25 RW530 Lime Stabilized Subgmde - Ph2-B 12 054Vov-25 20-Nov-25 RW540 Bluetop Line -Ph2$ 3 214Vov-25 25-Nov-25 RW550 Concrete Pavement & Curb - Ph2-B 21 02-Dec-25 31-Dec-25 RW560 Leaveouts Cnct Pavement -Ph2-B 5 02Jan-26 08Jan-26 RW570 FPFC Hillcroft Rd-Ph2$ 4 09Jan-26 14Jan-26 RW580 Saw& Seal Cnct Pavement -Ph2-B 4 15Jan-26 20Jan26 20Jan-eb-26 'I F320 Install Light Poles and Bases -Ph2-B 3 20Jan-26 22Jan-26 F310 Trail&Curb Ramps -Ph2-B 16 22Jan-26 12-Feb-26 F330 Install Penn Signage-Ph2-B 1 13-Feb-26 13-Feb-26 F325 Seeding / Sodding - Ph2-B 2 13-Feb-26 16-Feb-26 F340 Temp Striping - Ph2-B 2 17feb-26 18-Feb-26 SPD410 SWPPP - Ph2-C 1 19Feb-26 19-Feb-26 SPD420 Tree & M'sc Removals -Ph2L 2 20feb-26 23-Feb-26 SPD435 Demo & Remove - Roundabout - Ph 2L 4 ZOfeb-26 25-Feb-26 SPD430 Strip & Stockpile Topsoil -Ph2C 2 24-Feb-26 25-Feb-26 0 20-Feb-26 16- - UGU640 Disconnect & Drop Light Poles - Ph2-C 2 20-Feb-26 23-Feb-26 UGU650 ELB Storm Laterals -Ph2-C 6 04-Mar-26 11-Mar-26 UGU670 Place Storm Inlets - Ph2-C 4 12-Mar-26 17-Mar-26 UGV690 Set Inlet Tops &Aprons-Ph2L 4 13-Apr-26 16-Apr-26 UGU680 Install Electrical Conduit -Ph2L 2 13-Apr-26 14-Apr-26 EgEartlr 4 2:-F -Mar- EW170 Cut/Fill-Ph2C 4 26-Feb-26 03-Mar-26 11111111�oadwa 20 M-Mar- -Apr-2 - ,- RW660 Rough Grade -Ph2L 2 18-Mar-26 19-Mar-26 RW670 Lime Stabilized Subgrade - Ph2-C 6 204Nar-26 27-Mar-26 RW680 Bluetop Lima -Ph2L 2 30-Mar-26 31-Mar-26 RW690 Concrete Pavement & Curb - Ph2-C 6 01-Apr-26 08-Apr-26 RW700 Leaveouts Cnct Pavement -Ph2L 2 09-Apr-26 10-Apr-26 RW710 Saw& Seal Cnct Pavement -Ph2L 2 13-Apr-26 14-Apr-26 11 1 F400 Install Light Poles & Bases - Ph2-C 2 15-Apr-26 16-Apr-26 F390 Trail&Curb Ramps -Ph2-C 5 17-Apr-26 23-Apr-26 F410 Install Perm Signage-Ph2L 2 22-Apr-26 23-Apr-26 F405 Seeding / Sodding - Ph2-C 2 24-Apr-26 27-Apr-26 F420 Temp Striping - Ph2-C 2 28-Apr-26 29-Apr-26 Remaining Level of Effort PrimaryBaseline 0 RemainingWork Actual Level of Effort Actual Work Critical Remaining Work 18-Oct-24 11.14 1, 2024 Qtr 1, 2025 Qtr 2, 2025 Qtr 3, 2025 Qtr 4, 2025 Qtr 1, 2026 Qtr 2, 2026 Qtr 3, 2026 Qtr 4, 2026 Qtr 1, 2027 Qtr 2, 2027 Vov Dec Jan j Feb j Mar Apr j May j Jun Jul Aug j Sep Oct j Nov j Dec Jan j Feb j Mar Apr j May j Jun Jul I Aug j Sep Oct j Nov j Dec Jan I Feb I Mar Apr May �_LB Storm L 3temis Ph2B --- - -- -- --'-- ---------- -- -- -- -- -- - - -- — ---- -- -- -- -- -- -- �j Place Stop, Inlets - Ph2-B Manholes Adjustinents: Ph243 ¢et Inlet Taps & Aprons - ph2-13 , Install Electrical Conduft - Ph2-13 ---- ------------ - ----- ------- ---- ---- ----- —— — ------------- ---- ------- ----- ----------- ----- ----- --- ---- ----- ----------- -----•----- ----- Cyt / Fill, Ph241 Rough Grade - : Ph243 . Lime Stabilized Supgrad�-Ph2%B -I------ �---------------:----- a Bluetop Lima-Ph2-B ---- _ _ ------- ----- ----- ----- ----- ----- ----- ------------ ----- ----- ----- ---------- -----•----- ----- Concrete pavement & Curb - Ph2-B' '- Leaveouls Cnct Pavement ;Ph2-a FPFC Hilcroft;Rd - Rh2-B $aw & Seal Cnct Ppvemej t - Pj243 Install) Light Poles 9nd Bases- Rh2-B Thal& u1b Ramps jPh2-p Instal Fenn Slgnagrw- Ph2:B Seeding / Sodding ; Ph2-8 TernStripin Ph2-B SWPr1.P - Ph2-C Tree & M'sclRemovas- Ph2-C `-----`-----'--- g_____'_____'dabout-Ph2-0 e, Demo&R'moveLRoun____ I I ----'------------`----'-----------'----------- __1__ __1__ -' ___ __ �__ _�__ _�__ - --------- - - - - --- ---- - - - --- �j Strip l& Stockpile TO pso it Ph2 -- -- -- -- - r- ---- - -- -- -- ' Disconnect $ Dmp Light'Poles 'Ph2-C '0 ELB Stops Laterals-Ph2C!', ;__________-;__-J_ __________________:___ PlaceStorm lhlets - Ph2L: ------------- ____J_ _____ _____ __________ ____ ____ _____ ____________ _____ _____ ____ ____ _____ ------ ----------- ._____ _____ 1 $et lnlGt Taps&Aprgns P�2C Install E7ectdcdl Conduit - Ph2-C ■ Cut;/Fill -Ph2-C: Rough Grad6 - Ph2.0 a Lime: Stabilised S4bgrade - Ph�L Bluetop Lirhe - Ph2-C `Concrete Pavement & Curb 'Ph2-C j Leaveouts Cnrt Pavement -;Ph2L I Saw & Seal Chct Pavement - Ph2:C Ipsfall Light Poles & BasesPh2-C � :Trail &Curb ,Ramps-PhZC '------'----'------`-----'--- Install: Per � ;Install Perm Signage - Ph�L ----'------ -----`---'------'----- --7-- - - -------- - - - - --- ------------------------------ —;-- --r- ---- ----- --------- ---- -- --------------- - - ------ Sealing / Soddinq - Ph2:C Temp Striping - Plt2C Page 7 of 9 Ray White Rd - 100 % Reflection - MC Review Activity Activity Name Original Start LQtr Duration t I Site Prep & Demo 5 30-Apr-26 06-May-26 SPD440 I Demo & Remove -Temp Paving 5 30-Apr-26 06-May-26 Underground Utilities 2 19-May-26 20-May-26 UGU710 ManholesAdjushnents-Ph3 2 19-May-26 20-May-26 Ea 3 07-v1ay2 May-26 EW180 Earthwork/Median Fill-Ph3-A 3 07-May-26 11-May-26 Roadwa 13 12-May-7 -May-26 RW720 Rough Grade -Ph3-A 1 12-May26 12-May-26 RW730 Li me Stabilized Subgrade-Ph3-A 3 13-May26 15-May-26 RW740 Bluetop Lime -Ph3-A 1 18-May26 18-May26 RW750 Concrete Pavement & Curb -Ph3-A 4 21-May26 27-May-26 RW780 Saw& Seal Cnct Pavement -Ph3-A 2 28-May-26 29-May-26 284v1ay26 08Jun-26 F430 Curb & Curb Ramps - Ph3-A 5 1 28-May26 I 03Jun-26 F440 linstallPerm Signage-Ph3-A 1 1 04Jun-26 04Jun-26 F435 Seeding / Sodding - Ph3-A 1 2 04Jun-26 I 05Jun-26 F450 Permanent Striping - Ph3-A 1 1 108 un-26 08Jun-26 Site Prep & De 3 0 SPD450 Demo & Remove -Temp Paving - Ph3-B 3 07-May-26 11-May-26 Underground Utill 4 09Jun-Jun12Jun-Jun UGU730 Manholes Adjustments -Ph35 4 09Jun-26 12Jun-Jun Eartltwork 8 12-May26 21-May-26 EW190 Earthwork/Median Fill -Ph35 8 12-May-26 21-May-26 Roadway 25 EM-May2§'6Jun-26 RW790 Rough Grade -Ph3$ 2 22-May-26 26-May-26 RW800 Lime Stabilized Subgmde-Ph3$ 6 27-May-26 03Jun-26 RW810 Bluetop Lime -Ph3$ 3 04Jun-26 08Jun-26 RW820 Concrete Pavement & Curb - Ph3-B 8 15Jun-26 24Jun-26 RW830 Saw& Seal Cnct Pavement -Ph3-B 2 25Jun-26 26Jun-26 F460 Curb & Curb Ramps - Ph3-13 25Jun-26 02Jul-Jul F470 Install Perm Signage-Ph3-B;:7 06Jul-26 08Jul-Jul F465 Seeding / Sodding - Ph3506Jul-26 14Jul-26 F480 Permanant Striping -Ph3515Jul-26 20Jul-26 Site Prep & Demo 3 21Jul-26 23Ju1• SPD470 Demo & Remove -Temp Paving - Ph3D 3 21 Jul-26 23Jul-26 Underground Utilities 5 14-Aug-26 20-Aug-26 UGU770 Manholes Adjustments -Ph3-0 5 14-Aug-26 20-Aug-26 Earthwo 4 24Jul-26 29Jul-26 EW210 Earthwork/Median Fill -Ph3-0 4 _ 24Jul-26 29Jul-26 Roadway 123 30Jup26 31-Aug-26 RW890 Rough Grade -Ph3-0 1 30JuV26 30Jul-26 RW900 Lime Stabilized Subgrade-Ph3-0 6 31JuV26 07-Aug-26 RW910 Bluetop Lime -Ph3-0 4 10-Aug26 13-Aug-26 RW920 Concrete Pavement & Curb - Ph3-D 5 21-Aug-26 27-Aug-26 RW930 Saw& Seal Cnct Pavement -Ph3-D 2 28-Aug-26 31-Aug-26 6 28-Aug26 21 Sep-26 F520 Curb & Curb Ramps - Ph3-D 6 28-Aug26 1 04Sep-26 Remaining Level of Effort PrimaryBaseline Remaining Work Actual Level of Effort Actual Work Critical Remaining Work 18-Oct-24 1314 4, 2024 Qtr 1, 2025 Qtr 2, 2025 Qtr 3, 2025 Qtr 4, 2025 Qtr 1, 2026 Qtr 2, 2026 Qtr 3, 2026 Qtr 4, 2026 Qtr 1, 2027 Qtr 2, 2027 Nov I Dec Jan I Feb I Mar Apr i May l Jun Jul I Aug 1 Sep Oct 1 Nov 1 Dec an 1 Feb 1 Mar Apr I May l Jun Jul I Aug I Sep Oct I Nov I Dec Jan I Feb Apr I May -------------^----�- --- �'� -----� -----, -----�----------- ----- ----- ----- ----------------- ---- ----- ----- ---------------- ----- ----- ----- ----- ------------------------- ----- m Dejno & ate ove -Temp Paling I ManhdlesAdjustmehts-Ph3 ---- ;---------------- -- _____, ---- �------------ -------------------------------------------------------- Earthwork/Median Fill Ph3-A ----- ------------------------- ----- ----- ---------------------- Rough Grade 'Ph3-A Lime Stabilized Subgrade ;Ph3-A j Bluetoo Lime:- Ph3-A 0 ConGrete Pi3vemeht & Cprb - Ph3-A j ---- ------ -----F------ - - -- ------- - - - ------ I ------ - -- -- ------------------ --------- --------------------------------------------------------- ;----- ------�-----------r----------- �; Sawl& Seal Cnct Pavement -Rh3-A Curb & CGrb Rar 1ps - Ph3-A Install Perin Signage - Ph3-A ----'----------------------'------------- '----- `------------'--- _ __;� - - -------- - - Seeding/Sodding_-Ph3-A - -- -- - - ------- - - - --- Permanam Stnping - Ph3-A : Dimo &, Remove - Teinp Paving - ph3-13! ---- =-------------- -�------�� --__;_ ----_ ;_____�____-;-----;-------____ ---------____---_ ----------- ----- _---------------- - ----- ------____-----T----- � Man ol9s Adj T h ul;tments-Ph35 a ;Earthwork /Median:Fill-Ph3-B �j_Rough_Grade-Ph3$__ _'_ Lime Stabilized 3ubgmde - Ph35 Bluetop Lime - Ph35: Concrete Pavement & Ct rb - Pn35 , Saw & Seal:Cnct Pavement - Ph3-B ------------ ----�- -----�- --- -I-----I ---- ----- ----- ------------ ---- ---- ---- ----- ----- �------ ----- ----- --- -- -------------- ----- ---- ---- ----- e Cur(r & Cujb Rarhps Ph35 Install Pe" Sighage ;Ph3 Seeding / Socloing - Ph35: Pernahant Striping Ph3$ j Demo, & Remove Temp Pawl; - Ph3jD ManhdlesAdjustmehts-Pi3-D ----'------ ---- `----'- -----'- ----- `----`-----'-----'----- ----- ------------ ---- ----- ----- ----- ------'------ ----- ----- --- ---- ---------- '----- -----'----- ----- �; Earthwork /;Mediafr Fill-Oh3-13 Rough Grade - Ph3-D : Lime Stabilized Subgrade - FT3-D �------ -I-----I----- Bluetop Lime?Ph3-0 ---- ----- ----- --- - - -------- - - _ - -- -- -- - - - --- �: Concrete Ppvement & C irb Ph3-D A Saw&Seal Cnct:Pavement-Ph3D! Curb & Curb Rarnps- lilh3-D � Page 8 of 9 White Rd - 100 % Reflection - MC Review Duration F530 Install Perm Signage - Ph3-D 2 08Sep-26 09Sep-26 F525 Seeding / Sodding - Ph3-D 4 08Sep-26 11Sep-26 F540 Pennanant Striping -Ph3-0 6 1 14Sep-26 I 21Sep-26 3 SPD460 Demo & Remove - Temp Paving - Ph3-C 3 2 UGU750 Manholes Adjustments -Ph3C 2 2 EW200 Earthwork/Median Fill -Ph3-0 2 Fi 72 F490 Curb & Curb Ramps - Ph3C 5 F500 Install Penn Signage-Ph3-0 1 F495 Seeding / Sodding / Landscaping - Ph3C 6 F510 I Pennanant Striping - Ph3C 1 PL100 SUB.COMP Substantial Completion PL110 Punch List and Close Out PL120 FINAL.COMP Final Completion WEATHER.2026 I Weather DelayAlocation 30-Apr-26 104-May-26 14-Aug-24W-Aug-26 14-Aug-26 17-Aug-26 05-May-26 ­ 06-May-26 05-May-26 06-May-26 07-May-26 18-Aug-26 07-May-26 13-May-26 14-May-26 14-May-26 14-May-26 21-May-26 18-Aug-26 18-Aug-26 0 20-Nov-26 60 21-Nov-26 I 19Jan-27 0 19Jan-27 60 22Sep-Sep20-Nov-26 Remaining Level of Effort PrimaryBaseline Remaining Work Page 9 of 9 Actual Level of Effort Actual Work Critical Remaining Work 18-Oct-24 13:14 : ____'�II Install Perm Signage Ph3-D ---- ------^---- ------- -- - --- --- - - , 1 S�edin ;/ Sod�in F'h3-0 , Permanent Striping - Ph3-0 ----------------------- .____ .,_____T_____T_____ 0 ManholesAdj6skne6ts-PI3-C Earthwork / Median FilC- Ph3-0 ---- '----'-----'-----'-Q Curb &- -------'-----'-----'-----'----- ---- Curb Ramps:- Ph3C j Install Perm Si nage,- Ph3-0 0 Seeding / Sodding 1 Landscaping - Ph3C Permaoant Stnping Ph3- _____ ---- -ialCompletion __- __ _ $ Punch) List and Close Out E Final Completion Weat r DelyyNlopation Ray White Rd - Quantity Trend (60% vs GMP) ROADWAY CONSTRUCTION 60% Set GMP Set ITEM # DESCRIPTION UNIT QNTY QNTY Delta 3,123.01 Unclassified Excavation By Plan CY 21,138.00 20,894.00 (244.00) 3,124.01 Embankment By Plan CY 6,195.00 8,254.00 2,059.00 3,213.01 10" Conc Pavement SY 32,472.00 32,393.00 (79.00) 3,211.05 8" Lime Treatment (Stabalized Subgrade/Subase) SY 34,987.00 36,055.00 1,068.00 3,211.04 8" Hydrated Lime TON 700.00 721.00 21.00 3,213.05 Barrier Free Ramp, Type R-1 EA 15.00 14.00 (1.00) 3,213.05 Barrier Free Ramp, Type M-3 EA 5.00 6.00 1.00 3,213.05 Barrier Free Ramp, Type P-1 EA 4.00 5.00 1.00 3,213.05 Barrier Free Ramp, Type C-3 EA 4.00 4.00 - 3,213.03 4" Conc. Sidewalk SF 28,599.00 55,090.00 26,491.00 3,213.03 4" Conc Sidewalk, Adjacent to Curb SF 36,868.00 12,339.00 (24,529.00) 3,213.03 Conc Sidewalk, Adjacent to Ret Wall SF 6,540.00 - (6,540.00) 3,213.03 Conc Curb at Back of Sidewalk LF 4,273.00 2,765.00 (1,508.00) 3,213.01 11" Conc. Pvmt (Truck Apron) SY 341.00 469.00 128.00 9,999.00 Truck Apron Roll Curb (4" Mountable) LF 263.00 235.00 (28.00) 9,999.00 Monolithic Median Nose EA 19.00 4.00 (15.00) 3,213.04 8" Conc Driveway SF 9,269.00 10,557.00 1,288.00 3,213.02 8" Conc Pvmt HES SY 418.00 - (418.00) Ray White Rd - Quantity Trend (60% vs GMP) Id , i 3,216.01 6" Conc Curb and Gutter LF 19,260.00 17,548.00 (1,712.00) 9,999.00 6" Mountable Curb LF - 120.00 120.00 9,999.00 6" Conc Curb CY - 198.00 198.00 3,291.01 Topsoil (6") CY 2,869.00 3,249.00 380.00 3,292.02 Seeding, Broadcast SY 17,211.00 19,990.00 2,779.00 3,292.05 Seeding, Soil Retention Blanket SY 17,211.00 19,990.00 2,779.00 3,292.06 Mowing (for Final Acceptance) EA 1.00 1.00 - 3,125.01 SWPPP > 1 Acre LS - 1.00 1.00 9,999.00 River Rock, 5" SF 1,070.00 590.00 (480.00) 9,999.00 Decomposed Gra nite SF - 577.00 577.00 9,999.00 Splitter Island, Stamped Intregral Concrete SF - 1,612.00 1,612.00 9,999.00 Install Native Plants SF 2,882.00 - (2,882.00) 9,999.00 Conc Mow Strip SF 458.00 108.00 (350.00) DRAINAGE 60%Set GMP Set ITEM # DESCRIPTION UNIT QNTY QNTY Delta 3,341.02 21" RCP, Class III LF 295.00 1,126.00 831.00 3,341.02 24" RCP, Class III LF 1,940.00 935.00 (1,005.00) 3,341.03 30" RCP, Class III LF 385.00 722.00 337.00 3,341.03 36" RCP, Class III LF 537.00 123.00 (414.00) Ray White Rd - Quantity Trend (60% vs GMP) , 3,341.03 36" RCP, Class IV LF - 89.00 3,341.04 42" RCP, Class III LF - 424.00 3,341.04 48" RCP, Class III LF 195.00 29.00 3,341.06 60" RCP, Class III LF 376.00 - 3,341.06 66" RCP, Class III LF - 336.00 3,341.13 6x5 Box Culvert LF 407.00 435.00 3,341.15 8x4 Box Culvert LF 510.00 - 3,341.20 10x4 Box Culvert LF 124.00 633.00 3,349.50 10' Curb Inlet EA - 2.00 3,349.60 10' Recessed Inlet EA 46.00 8.00 3,349.80 10' Type 2 Inlet EA - 32.00 3,349.80 15' Type 2 Inlet EA - 2.00 9,999.00 Modified 10' Type 2 Curb Inlet EA - 1.00 3,349.70 3' Drop Inlet EA 7.00 - 3,349.70 4' Drop Inlet EA 1.00 2.00 3,350.70 5' Drop Inlet EA - 3,349.00 4' Storm Junction Box EA 5.00 4.00 3,349.00 5' Storm Junction Box EA 1.00 1.00 3,349.00 6' Storm Junction Box EA 2.00 2.00 3,349.00 Storm Junction Structure (8' Square Junction Box) LS - 2.00 Ray White Rd - Quantity Trend (60% vs GMP) 3,349.00 Storm Junction Structure (10' Square Junction Box) LS - 1.00 1.00 3,349.00 Storm Junction Structure (5'x12') LS 2.00 1.00 (1.00) 3,305.01 Manhole Adjustment, Major w/ Cover EA - 2.00 2.00 3,305.01 Manhole Adjustment, Minor EA - 1.00 1.00 9,999.00 Connect to existing Box Culvert/ Storm Line EA 4.00 - (4.00) 111111LJ[UMI [11i ITEM # DESCRIPTION UNIT 2,605.30 2" CONDT PVC SCH 80 (T) (Furnish and Instal[) LF 2,605.30 2" CONDT PVC SCH 80 (B) (Furnish and Install) LF 3,441.14 NO 2 Insulated Elec Condr LF 3,441.15 Ground Box Type B, w/Apron EA 3,441.16 Furnish/Install Type33AArm EA Furnish/Install240-480 Volt Signle Phase Transocket 3,442.18 EA Metered Pedestal Furnish/Install LED Lighting Fixture (137 watt ATB2 Cobra 3,441.31 EA Head) 3,441.33 Rdwy Ilium Foundation TY 3 EA 3,441.34 Furnish/Install Rdway Ilium TY 18 Pole EA 60% Set GMP Set QNTY QNTY Delta 9,895.00 7,545.00 (2,350.00) 1,080.00 960.00 (120.00) 33,740.00 26,050.00 (7,690.00) 42.00 34.00 (8.00) 60.00 61.00 1.00 3.00 3.00 - 73.00 61.00 (12.00) 59.00 45.00 (14.00) 59.00 45.00 (14.00) TRAFFIC SIGNAL 60% Set GMP Set ITEM # DESCRIPTION UNIT QNTY QNTY Delta Ray White Rd - Quantity Trend (60% vs GMP) 2,605.01 Furnish/Install Elec Sery Pedestal EA - 1.00 2,605.30 2" CONDT PVC SCH 80 (T) LF 105.00 270.00 2,605.30 2" CONDT PVC SCH 80 (B) LF - 250.00 2,605.30 3" CONDT PVC SCH 80 (T) LF 150.00 100.00 2,605.30 4" CONDT PVC SCH 80 (B) LF 460.00 250.00 3,441.10 Furnish/Install3-Sect Signal Head Assembly EA 10.00 7.00 3,441.10 Ped Signal Head Assembly EA 4.00 4.00 3,441.10 Furnish/Install Audible Pedestrian Pushbutton Station EA 4.00 4.00 3,441.12 Furnish/Install BBU System Station EA 1.00 1.00 3,441.12 3441.1215 Furnish/Install Hybrid Detection Device EA - 3.00 3,441.12 Furnish/Install Model711 Preemption Detector EA 3.00 3.00 3,441.12 Furnish/Install Preemption Cable EA 839.00 888.00 3,441.13 Furnish/Install PZT Camera EA 1.00 1.00 3,441.13 Furnish/Install Communication Modem2 EA 1.00 1.00 3,441.13 Furnish/Install CAT 5 Ethernet Cable LF 82.00 420.00 3,441.12 Furnish/Install Radar Presence Detection System APR 3.00 - 3,441.12 Furnish/Install Radar Advance Detection System APR 3.00 - 3,441.12 Furnish/Install Radar Cable LF 1,348.00 - 3,441.13 5/C 14 AWG Multi -Conductor Cable LF 469.00 520.00 3,441.13 7/C 14 AWG Multi -Conductor Cable LF 623.00 314.00 Ray White Rd - Quantity Trend (60% vs GMP) 3,441.13 20/C 14 AWG Multi -Conductor Cable LF 647.00 240.00 3,441.13 3/C 14 AWG Multi -Conductor Cable LF 724.00 500.00 3,441.14 NO 6 Insulated Elec Condr LF 36.00 30.00 3,441.14 NO 10 Insulated Elec Condr LF 282.00 - 3,441.14 NO 6 Bare Elec Condr SLID LF 21.00 - 3,441.14 NO 8 Bare Elec Condr LF 707.00 425.00 3,441.15 Furnish/Install Ground Box Type B EA 3.00 2.00 3,441.15 Furnish/Install Ground Box Type B, w/Apron EA - 1.00 3,441.15 Furnish and Install Ground Box Type D, w/Apron EA - 1.00 3,441.15 Furnish/Install Ground Box Type D EA 2.00 2.00 3,441.16 Furnish/Install 10'-20' PED Pole Assembly EA 2.00 3.00 3,441.16 Furnish/Install Type 44 Signal Pole EA 1.00 - 3,441.16 Furnish/Install Type 45 Signal Pole EA 1.00 - 3,441.16 Furnish/Install Type 46 Signal Pole EA 1.00 - 3,441.16 Furnish/Install Type 41 Signal Pole1 EA - 1.00 3,441.16 Furnish/Install Type 42 Signal Pole1 EA - 1.00 3,441.16 Furnish/Install Type 43 Signal Pole1 EA - 1.00 3,441.16 Furnish/Install Mast Arm 16'-36' EA - 2.00 3,441.16 Furnish/Install Mast Arm 40'-48' EA 1.00 1.00 3,441.16 Furnish/Install Mast Arm 52'-60' EA 2.00 - Ray White Rd - Quantity Trend (60% vs GMP) Uj HT7., I,4111 3,441.17 TY 1 Signal Foundation EA 2.00 3.00 1.00 3,440.17 TY 3 Signal Foundation EA - 2.00 2.00 3,441.17 TY 4 Signal Foundation EA 1.00 1.00 - 3,441.17 TY 5 Signal Foundation EA 2.00 - (2.00) 3,441.17 Furnish/I nstall Signal- Screw in Base Foundation EA - 16.00 16.00 3,441.17 Signal Cabinet Foundation on-352i & BBU EA 1.00 1.00 - 3,441.17 Furnish/InstallATC Signal Controller EA 1.00 1.00 - 3,441.18 Furnish/Install 120-240 Volt Single Phase Metered Pdestal EA 1.00 1.00 - 3,441.17 Furnish/Install352i Controller Cabinet Assembly EA 1.00 1.00 - 3,441.19 Powder Coat Sig Pole and MA 40'-48' EA 1.00 - (1.00) 3,441.19 Powder Coat Sig Pole and MA 52'-60' EA 2.00 - (2.00) 3,441.19 Powder Coat Ped Pole EA 2.00 - (2.00) Furnish/Install LED Lighting Fixture (137 Watt ATB2 Cobra 3,441.31 EA 3.00 2.00 (1.00) Head) 3,441.40 Furnish/Install Alum Sign Mast Arm Mount EA 3.00 4.00 1.00 SIGNING AND STRIPING 60%Set GMP Set ITEM # DESCRIPTION UNIT QNTY QNTY Delta 3,217.01 6" SLD Pvmt Marking HAS (W) LF - 581.00 581.00 3,217.01 6" SLD Pvmt Marking HAS (Y) LF 1,752.00 1,289.00 (463.00) 3,217.01 6" BRK Pvmt Marking HAS (W) LF 10,800.00 9,759.00 (1,041.00) Ray White Rd - Quantity Trend (60% vs GMP) 3,217.02 8" SLD Pvmt Marking HAS (W) LF 4,127.00 6,931.00 2,804.00 9,999.00 REFL PAV MRKTY 1(B) (6") (SLD) - 816.00 816.00 9,999.00 REFL PAV MRKTY 1(B) (8") (SLD) LF 700.00 - (700.00) 9,999.00 REFL PAV MRKTY 1(W) (8") (DOT) LF 224.00 110.00 (114.00) 9,999.00 REFL PAV MRK TY 1(W) (18") (DOT) LF 151.00 148.00 (3.00) 3,217.04 18" SLD Pvmt Marking HAE (W) LF - 56.00 56.00 3,217.04 18" SLD Pvmt Marking HAE (Y) LF 52.00 47.00 (5.00) 3,217.05 24" SLD Pvmt Marking HAE (W) LF 443.00 566.00 123.00 3,217.10 Lane Legend Arrow EA 25.00 24.00 (1.00) 3,217.10 Lane Legend Only EA 9.00 11.00 2.00 9,999.00 Lane Legend Roundabout Arrow EA 12.00 14.00 2.00 3,217.10 Preformed Thermoplastic Contrast Markings- Legend Yiel( EA 6.00 6.00 - 3,217.10 Preformed Thermoplastic Contrast Markings- Legend Yiel( EA - 10.00 10.00 3,217.10 Preformed Thermoplastic Contrast Markings - Legend Bike EA - 5.00 5.00 3,217.10 Preformed Thermoplastic Contrast Markings- Legend Bike EA - 5.00 5.00 3,217.21 REFL Raised Marker TY II -A -A EA 7.00 49.00 42.00 3,217.21 REFL Raised Marker TY II-C-R EA 376.00 390.00 14.00 3,441.40 Furnish/Install Alum Sign Ground Mount City Std. EA 33.00 27.00 (6.00) REMOVALS 60% Set GMP Set Ray White Rd - Quantity Trend (60% vs GMP) ITEM # DESCRIPTION UNIT QNTY QNTY Delta 241.11 Remove Ashpalt Pvmt SY 15,350.00 15,078.00 (272.00) 241.10 Remove Concrete Pvmt SY 3,286.00 3,459.00 173.00 241.13 Remove Conc Curb & Gutter LF 4,016.00 4,292.00 276.00 241.01 Remove Sidewalk SF 13,077.00 11,360.00 (1,717.00) 241.03 Remove ADA Curb Ramp EA 16.00 18.00 2.00 241.04 Remove Concrete Drive SF 13,445.00 14,280.00 835.00 241.04 Remove Asphalt Drive SF 2,019.00 2,043.00 24.00 241.05 Remove Fence LF 1,069.00 1,372.00 303.00 241.07 Remove and Replace Mailbox -Traditional EA 12.00 12.00 - 241.08 Remove Rip Rap SF - 2,393.00 2,393.00 9,999.00 Tree Removal EA - 79.00 79.00 3,110.01 Site Clearing AC 8.00 8.00 - 241.09 Remove Misc Conc Structure EA 17.00 17.00 - 3,441.41 Remove Sign Panel and Post EA 15.00 12.00 (3.00) 3,441.41 Remove and Reinstall Sign Panel and Post EA 35.00 25.00 (10.00) 3,217.43 Remove 6" Pvmt Marking LF 4,341.00 4,341.00 - 3,441.35 Salvage Street Light Pole EA 10.00 12.00 2.00 3,441.20 Salvage Traffic Signal EA 1.00 - (1.00) 241.45 Remove 6" Storm Line LF 11.00 - (11.00) Ray White Rd - Quantity Trend (60% vs GMP) 241.45 Remove 8" Storm Line LF 10.00 - (10.00) 241.45 Remove 12" Storm Line LF 12.00 - (12.00) 241.30 Remove 15" Storm Line LF 86.00 - (86.00) 241.30 Remove 18" Storm Line LF 160.00 - (160.00) 241.30 Remove 21" Storm Line LF 149.00 190.00 41.00 241.30 Remove 24" Storm Line LF 386.00 - (386.00) 241.31 21" Storm Abondonment Plug EA - 2.00 2.00 241.31 24" Storm Abondonment Plug EA - 1.00 1.00 241.30 Remove 36" Storm Line LF 17.00 11.00 (6.00) 241.30 Remove 48" Storm Line LF 106.00 - (106.00) 9,999.00 Remove 5x3 Box Culvert LF 210.00 - (210.00) 9,999.00 Remove 8x4 Box Culvert LF 85.00 - (85.00) 9,999.00 Remove 10x4 Box Culvert LF 57.00 - (57.00) 241.44 Remove Headwall/SET EA 10.00 15.00 5.00 241.40 Remove 10' Curb Inlet EA 4.00 2.00 (2.00) RETAINING WALLS ITEM # DESCRIPTION 3,232.01 Conc Ret Wall Adjacent to Sidewalk 3,346.01 6" Pipe Underdrain, Type 6 0.60 1.00 UNIT QNTY QNTY Delta SF 5,010.00 - (5,010.00) LF 775.00 - (775.00) Ray White Rd -Quantity Trend (60% vs GMP) 9,999.00 Anti -Graffiti Coating (Permanent)(TP III) SF 3,460.00 - (3,460.00) 3,137.01 Concrete Riprap SY 215.00 - (215.00) WASTE WATER 60%Set GMP Set ITEM # DESCRIPTION UNIT QNTY QNTY Delta 3,123.01 Unclassified Excavation by Plan CY 1,179.00 1,864.00 685.00 3,301.00 Pre -CCTV Inspection LF 1,000.00 1,007.00 7.00 3,301.00 Post -CCTV Inspection LF 1,000.00 1,007.00 7.00 3,301.01 Manhole Vacuum Testing EA 5.00 5.00 - 3,305.01 Trench Safety LF 1,000.00 1,007.00 7.00 3,305.01 Utility Markers LS 1.00 1.00 - 3,305.01 Concrete Collar for Manhole EA 4.00 4.00 - 3,305.01 Vacuum Excavation EA 2.00 2.00 - 3,331.41 8" Sewer Pipe - SDR-35 PVC LF 1,000.00 1,007.00 7.00 3,331.41 8" Sewer Pipe, CSS Backfill LF 1,000.00 1,007.00 7.00 3,331.41 8" Sewer Pipe, Select Backfill LF 1,000.00 1,007.00 7.00 3,339.00 Epoxy Manhole Liner VF 24.00 24.00 - 3,339.10 4' Manhole EA 4.00 4.00 - 3,339.10 4' Tee Base Manhole EA 1.00 1.00 - Ray White Rd -Quantity Trend (60% vs GMP) STRUCTURES ITEM # DESCRIPTION 438-6005 Clearing and Sealing Joints ITEM # DESCRIPTION 170.01 Mobilization 171.01 Construction Staking 3,125.01 SWPPP > 1 Acre UTILITY ADJUSTMENT ITEM # DESCRIPTION 3,305.01 Manhole Adjustment, Major 3,305.01 Manhole Adjustment, Minor 3,305.01 Residential Water Meter Relocation / Adjustment 9,999.00 Adjust Water Valve Riser 9,999.00 Fire Hydrant Adjustment 9,999.00 Adjust Access Manhole 9,999.00 Adjust 16" Gate Valve & Vault 60%Set GMP Set UNIT QNTY QNTY LF - 23.00 UNIT LS LS LS UNIT EA EA EA EA EA EA EA 60%Set GMP Set QNTY QNTY 1.00 1.00 1.00 1.00 1.00 1.00 60% Set GMP Set QNTY QNTY Delta 23.00 Delta Delta 6.00 2.00 (4.00) 7.00 3.00 (4.00) - 16.00 16.00 24.00 11.00 (13.00) - 4.00 4.00 - 2.00 2.00 - 2.00 2.00 Ray White Rd - Quantity Trend (60% vs GMP) TRAFFIC CONTROL 60% Set GMP Set ITEM # DESCRIPTION UNIT QNTY QNTY Delta 3,212.05 8" ASPHALT BASE TYPE B (TEMP. PAVEMENT) SY 2,125.00 1,118.00 (1,007.00) 9,999.00 WK ZN PAV MRK REMOV (W)4"(SLD) LF - 30,761.00 30,761.00 9,999.00 WK ZN PAV MRK REMOV (Y)4"(SLD) LF - 85.00 85.00 9,999.00 WK ZN PAV MRK REMOV (W)24"(SLD) LF - 230.00 230.00 9,999.00 WK ZN PAV MRK REMOV (Y)4"(DBL) LF - 11,479.00 11,479.00 9,999.00 WK ZN PAV MRK REMOV (W)4"(BRK) LF - 619.00 619.00 9,999.00 PORT CTB (FUR & INST)(LOW PROF)(LPTB-22) LF - 655.00 655.00 9,999.00 PORT CTB (REMOVE)(LOW PROF)(LPTB-22) LF - 655.00 655.00 9,999.00 FLAGGING OPERATIONS LS - 1.00 1.00 9,999.00 CRASH CUSH ATTEN (REMOVE) EA - 4.00 4.00 9,999.00 CRASH CUSH ATTEN (INSTL)(S)(N)(TL2) EA - 4.00 4.00 9,999.00 CHANNELIZING DEVICES EA - 988.00 988.00 9,999.00 PREFORME D YIELD EA - 2.00 2.00 9,999.00 TEMPORARY STOP SIGN EA - 12.00 12.00 9,999.00 TYPE III BARRICADE EA - 71.00 71.00 9,999.00 VERTICAL PANEL LF - 4,583.00 4,583.00 3,471.00 TRAFFIC CONTROL MO - 24.00 24.00 9,999.00 CONSTRUCTION SIGNS (36" X 36") SF - 288.00 288.00 Ray White Rd - Quantity Trend (60% vs GMP) 9,999.00 CONSTRUCTION SIGNS (36" X 18") SF - 45.00 45.00 9,999.00 CONSTRUCTION SIGNS (30 X 24") SF - 350.00 350.00 9,999.00 CONSTRUCTION SIGNS (24" X 18") SF - 54.00 54.00 9,999.00 CONSTRUCTION SIGNS (24" X 24") SF - 28.00 28.00 9,999.00 CONSTRUCTION SIGNS (48" X 30") SF - 60.00 60.00 9,999.00 CONSTRUCTION SIGNS (48" X 18") SF - 24.00 24.00 9,999.00 CONSTRUCTION SIGNS (60" X 30") SF - 13.00 13.00 9,999.00 CONSTRUCTION SIGNS (VARIES X 12") EA - 74.00 74.00 9,999.00 PORTABLE MESSAGE SIGN EA - 6.00 6.00 FOORRTWO�RTH CITY OF FORT WORTH CMAR MBE UTILIZATION FORM i City of Fort Worth acceplscertifietl MBE firms from NCTRCA to address the staled CMAR MBE goal. Interested bidders must Ms.i. MBE listings from the City of Fort Worth'sM (PRIME COMPANY NAME: MCCanhy Building Companies, Inc. CMAR BID DATE: 3-OCt-24 (,LADD,(;DDREE1SSSS`:P3400 N�[g]CCeennry�tral Expressway, 500 Richarson, TX 7508D NAME OSld At OFF}SIOLICITATION: Ray Whkx Rd IPM9E�AN IIGIPIUN I:OMMITMENT PERCENTAGE: 36.16 % MBE G�jf{L RFSS:Oporale6ccarthy.com Other than 11 Tier plaaae provide the firm name and the tier f5 V level from whom the MBE firm will reclving payment for good. antllor services TIER MBE WBE NON -MBE AREA DETAIL ORIGINAL I MBE FIRM? SUBCONTRACTOR/SUPPLIER LEVEL SUBS SUBS SUBS SUBCONTRACTINGWORK DETAIL SUPPLIES PURCHASED DOLLARAMOUNTI YES INO %OF WORK ICo nv Name McCarthy Builtll�}`� Companies. Inc. (Address IPhonelFax 3400 N Cerrtral}�DresswaV. 500 Richardson, TX 75080 1 General Works $113,284.00 NO 0% (Email: (Contact Person �(9p72L�y991�-�55�07 Hie b I�Mo'rr", can :Company Name McCarthyy Bulldlr�yl Companies, Inc. Central IAddress :Phon.IFax MW N Expressway. 500 Richardson, TX 750BO (972Iry1�91�91x-(�55(�0(0y� 1 WC 1: EaRhwork and $3,187,229.00 NO 0% (Email: rthY.colm cioD Demolition Icomaa Person M�Sf9l!$ R �e i�6 Maf91 $ ICompany Name GJ Seedlnn��,, :AddreeS IPhonelFax PO Box, 1, Burleson. TX 76097 (817)426-8184 1 1 Erosion Control $130,000.00 YES 100% (Email: ppI -duvAq alLonm IContact Person l.ayle Juraschek ICompany Name Treenewal :Address 1712 FM 407, vie. TX 76226 IPhonelFax (8171l329-24511 1 Tree Clearing $111,058.62 YES 100% :Email: L4.ap(�aCaNreenewal �,vr, �� IConmct Person DD'"�ddddd����'''a��"' IC.?r99ga y Name KLP Construction Suu(P�(�' :Atldress :Phone Fee 2509 Decatur Ave. IF . Wonh, TX 76106 866-629-3627 1 Lime Supply $237,930.00 YES 100% :Email: Iatj1HJ�PV.cOm (Comm, Person R bbii :Company Name yy BuJtll99yy Canpan,es, Inc. :Address IPhonelFax 3400 N CerXral ExDresswev. 500 R,chartlson. TX 75080 1972 991-5500 1 WC 2: Concrete Paving $4,936, NO 0% IEmail: c, b com IContact PersIca Person Moror., R o al s ICompany Name Cowlown Red, MIX, Inc :Address PO Box 162327. Fort Worth, TX 76161 ,Phone/Fax 80�1r�7,�-�45y4�-y2371 1 1� Concrete Ready— Supply $647,846.75 YES 100% ,Email: :Contact Person MOk i1T(fE avai Mlkio :Company Name XEGR. LLC :Address PO Box 850261, Mesouits. TX ,Ph onelFax 1 Rebar Tying $30,518.49 YES 100% IEmail: 1469)589-0899 //��]]XXqqNN Ic.COm IGomct Person a Ja ICompany Name q(��g�"�fIU$hlnez fQr[] i'1551 IAtltlreaa :Phon.IFax Ravetnv�iew Rd. DaID011as. TX 75253 i,12 (972 557-8585 1 Pam veent Marking $71..50000 YES 100% IEmail: ndl ncanstr,mnq.net null IGomact Person Ran re :Company Name Klutz Construction, LLC ,Address PO Box 185, Kennedale, TX 76060 :PhanelFax :Email 817 561-5591 1;yjtyconstruction.com 1 WC 3: Underground Storm Drainage $3,331,821 YES 100% IComact Person C :company Name Klutz Construction. LLC (Address IPhonelFax PO Box 185. Kennedale, TX 76060 81711561-5591 1 WC 4: Sanitary Sewer and $412,412.00 VES 100% :Email: ��� K�mnnnsm,..n ohm Water :Gomact Person g r (() :Company Name Bean Electrical, LLC IAdtlress 821 E.Enon. Fort Worth. TX 76140 IPhanelFax C(g�c171`561-7400 1 WC 5: Electrical and Lighting $1,529,393.85 NO 0% IEmail: Icpmapt Person {;J1P�QCO111pn,me COm I v I1I :Company Name Duran Industries, Inc ,Adtlrass 504 Business Parkway. Richardson. TX 75081 IPhonelFax ((9M97j2r)238-7123 2 $229,407.00 VES 100% IEmail: :Contact Person H chal�^Uraanco.Com r� �J ICompany Name :Address j it Land seeJle• LLC F2oatl. Spnnq, TX 77373 :Ph...IFax jjpp��rr ({''jry+,u NfLb'116 1 WG6:Land scape $203, NO 01 :Email: 2U(IDertcom,an,es.com Iepman Person MO :Company Name Gusren sed Hoj(�romUlch (Address :PhonelFax 6554 E State Hm 114, Rhome, TX 76078 2 Hyrdo Mulching $22,198.00 YES 100% :Email: lumntlo,'.gnF jaedhydmmulch.com IComact Person Brantlon HOm eK ICompany Name LOnestar Demolition Services :An rass 4200 S Freeway Ste 225, Fort Worth, TX 76115 ,Phone/Fax (817)945-1223 2 Grading $14,126.00 YES 100% :Email: y.ys lchavez1011onesta..c com IComact Person Lrys.1 Chavez ICo?any Name McCarthyy Buildiry� Companies, Inc. C'entral Expressway. :Address IPhonelFax 3400 N 500 Richardson, TX 75080 (972 991-5500 1 WC 7: Traffic Cordrol NO 0% :Email: civi iQteix(priptarlhv.com Ieomapt Person Ricardo ((1�� Ile ICo any Name Bamcades Pro Solutions :Address :PhonelFax 2450 Lakeside PkwV. S1e150, Flower Mound, TX 75022 214-290-3221 1 1� Traffic Control Devices/Sgns $55,998.96 VES 100% :Email: taeastroltcl p ,cadesplueb, com ang IComact Person Tobias S1eas :Company Name McCarthy Builtl,� Companies. Inc. Cen[ral}�pressway. :Address IPhonelFax 3400 N 500 Richardson. TX 75080 (972/1 991-550 1 WC 6: Flatwork $956,791.00 NO )% :Email: c, �inn'lIoex�9r�r7l Can (Contact Person Sarlhv RlcarO M ml ICo ny Name COwlown Red, Mix, Ino (Address IPhonelFax PO Box 162327. Fort Worth, TX 76161 817-454-2371 2 Concrete Remlymix Supply $145.000.00 VES 100% :Email: xcowtown(aysho0.com Cmucei Person Max Ulrich I Respondents shall use this form to identity ALL subcontractors/suppliers, regardless of status; i.e., Disadvantaged, Minority, Women and non-D/WWBEs. List MBE Arms first and coo, this sheet to continue list. ORIGINAL Total MBE Project Cost $5,439,616.82 Total GMP Project Cast $15 041 958.85 MBE %1 36,16% CITY COUNCIL AGENDA Create New From This M&C DATE: 2/25/2025 REFERENCE NO.. CODE: C TYPE: Official site of the City of Fort Worth, Texas FAR_ H **M&C 25- LOG NAME: 2025 RAY WHITE ROAD 0177 AMENDMENT 1 CONSENT PUBLIC NO HEARING: SUBJECT. (CD 4) Authorize Execution of Amendment Number 1 to the Construction Manager at Risk Agreement with McCarthy Building Companies, Inc., to Establish the Guaranteed Maximum Price in the Amount of $21,151,775.00 for Construction of the Ray White Road Widening Improvements Project from Mirage Drive to the Bridge Over Bear Creek (2022 Bond Program) RECOMMENDATION: It is recommended that the City Council authorize execution of Amendment No. 1 to the Construction Manager at Risk contract with McCarthy Building Companies, Inc. (City Secretary Number 59397) establishing the Guaranteed Maximum Price in the amount of $21,151,775.00 for construction of the Ray White Road Widening Improvements project (City Project No. 103270) from Mirage Drive to the Bridge Over Bear Creek. DISCUSSION: The purpose of this Mayor and Council Communication (M&C) is to authorize the execution of Amendment No.1 to the City Secretary Contract Number 59397, the Construction Manager at Risk (CMAR) Agreement with McCarthy Building Companies, Inc. (McCarthy), establishing the guaranteed maximum price (GMP) in the amount of $21,151,775.00 for the construction of the Ray White Road Widening Improvements from Mirage Drive to the Bridge Over Bear Creek with a roundabout modification at Wyndrook Street, a signalized intersection at Wall Price Road, streetlights, and shared used paths. The GMP includes the CMAR Construction Management Fee. It also includes an Owner's Allowance and CMAR Contingencies. Staff evaluated the CMAR's GMP proposal and had an Independent Cost Estimate (ICE) performed. The ICE found the GMP's elements to be competitive and reasonable, therefore staff recommends approval of the GMP. The GMP consists of General Works and 8 work categories (WC) to complete the project: WC1 - Earthwork and Demolition, WC2 - Concrete Paving, WC3 - Storm Sewer, WC4 - Sanitary Sewer, WC5 — Electrical, WC6 — Landscaping, WC7 — Traffic Control, and WC8 - Flatwork. On February 28, 2023 (M&C 23-0157), the City Council authorized a CMAR Agreement with McCarthy with a pre -construction phase fee of $158,000.00, and a construction phase fee of 6.25\% of the cost of work within a then -projected construction budget of $13,256,000.00 and project budget of $25,855,000.00. The original construction budget was a preliminary engineering estimate of construction costs and was based upon 30\% design development. The estimate did not include construction contingencies, CMAR fees, or General Conditions costs. During development of the final design and the GMP, costs have increased in the amount of $7,895,775.00. The construction budget has been increased to align with the GMP. The total overall project budget is now $29,255,000.00 (see table, below), which includes planning, design, land acquisition, project administration, construction inspection and materials testing, utility relocations, and contingencies. The project is funded through the City's 2022 Bond Program, Transportation Impact Fees, Developer Contributions, and Street Improvement fees. There remains $8,103,225.00 in the project budget for the additional costs, contingencies and City obligated expenditures described above. On September 5 and September 12, 2024, McCarthy advertised the work categories seeking Best Value proposals in the Fort Worth Star -Telegram, as well as employed enhanced measures to alert the North Texas contracting community of this bidding opportunity. On September 27, 2024, proposals were received and evaluated by McCarthy based on published factors such as ability to start and complete the project within the project schedule, construction techniques, ability to perform the work and other specific criteria including but not limited to cost, safety and accident rates, schedule and working planning, financial strength, business diversity ordinance compliance, qualifications, experience and references. McCarthy selected contractors representing the best value to the project and the City based on the proposal evaluations. Staff has reviewed the recommendations and concurs with the results of the procurement. Where McCarthy is the recommended contractor for certain work categories (self - performance), the Director of Transportation and Public Works has determined that McCarthy provides the best value for the City, as recommended by staff. During the pre -construction phase, the team's evaluation included an analysis of the construction schedule to ensure an efficient timeline was being projected by McCarthy. The following table demonstrates the funding history for the project: Fund Existing Funding Additional Funding Project Total 34027- 2022 Bond Program $23,305,000.00 $0.00 $23,305,000.00 30108 — Transportation Impact $1,000,000.00 $0.00 $1,000,000.00 Fee Cap 30104 - Developer $1,800,000.00 $0.00 $1,800,000.00 Contribution 39403 - Street $250,000.00 $0.00 $250,000.00 Improvements Transportation Impact Fee Capital and Capital Legacy Fund $2,900,000.00 $0.00 $2,900,000.00 (M&C 25-0032) Project Total $29,255,000.00 $0.00 $29,255,000.00 The actions in this M&C will not amend the 2025-2029 Capital Improvement Program. All funds are currently in the project budget as shown in the table above. Funding is budgeted in the 2022 Bond Program Fund for the TPW Dept Highway & Streets Department for the purpose of funding the Ray White Road project, as appropriated. The Business Equity Division placed a 15\% business equity goal on this solicitation/ contract. McCarthy Building Companies, Inc., will be exceeding the goal at 16.10\%, meeting the City's Business Equity Ordinance. Any changes in subcontractors will be reviewed by the Business Equity Division. This project is included in the 2022 Bond Program. The City's Extendable Commercial Paper (ECP) (M&C 22-0607; Ordinance 25675-08-2022) provides liquidity to support the appropriation. Available resources will be used to actually make any interim progress payments until the debt is issued. Once debt associated with a project is sold, debt proceeds will reimburse the interim financing source in accordance with the statement expressing official Intent to Reimburse that was adopted as part of the ordinance canvassing the bond election (Ordinance 25515-05-2022). The project is in COUNCIL DISTRICT 4. FISCAL INFORMATION/CERTIFICATION: The Director of Finance certifies that funds are available in the current capital budget, as previously appropriated, in the 2022 Bond Program Fund for the Ray White Road project to support the approval of the above recommendation and execution of the amendment. Prior to any expenditure being incurred, the Transportation and Public Works Department has the responsibility to validate the availability of funds. TO Fund Department Account Project Program Activity Budget Reference # Amount ID ID Year (Chartfield 2) 1 FROM Fund Department Account Project Program Activity Budget Reference # Amount ID ID I , Year (Chartfield 2) Submitted for Citv Manager's Office by_ Jesica McEachern (5804) Originating Department Head: Lauren Prieur (6035) Additional Information Contact: Monty Hall (8662) ATTACHMENTS 103270 Form 1295 Certificate of Interested Parties.pdf (CFW Internal) 103270 McCarthy Building Companies Inc SAM REPORT.Ddf (CFW Internal) 103270 Rav White Road CMAR FID Table A#1.xlsx (CFW Internal) 2025 RAY WHITE ROAD AMENDMENT 1 funds avail.docx (CFW Internal) 25-103270 (CMAR Ray White Road Widening ImDrovements)CM-NS.Ddf (CFW Internal) MC MAP RAY WHITE ROAD.pdf (CFW Internal) 103270-EPAM-Ray White Road Widening Improvements —Amendment No. 1 Interim Agreement Report 2025-06-17 Created: 2025-05-30 By: Andrea Munoz (Andrea. Mu noz@fortworthtexas.gov) Status: Out for Filling Transaction ID: CBJCHBCAABAAgWoF4AIxrx7yAFleDtspt7gjrjwPaXpU Agreement History Agreement history is the list of the events that have impacted the status of the agreement prior to the final signature. A final audit report will be generated when the agreement is complete. "103270-EPAM-Ray White Road Widening Improvements — Ame ndment No. 1" History Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) 2025-05-30 - 2:58:14 AM GMT- IP address: 204.10.90.100 Form filling automatically delegated to Jaylyn Harrelson (Jaylyn.Harrelson@fortworthtexas.gov) by Wendi Hedlund (wend i.hedlund@fortworthtexas.gov) 2025-05-30 - 1:03:37 PM GMT Document emailed to Wendi Hedlund(wendi.hedlund@fortworthtexas.gov) for filling 2025-05-30 - 1:03:38 PM GMT Document emailed to Jaylyn Harrelson (Jaylyn.Harrelson@fortworthtexas.gov) for filling 2025-05-30 - 1:03:38 PM GMT 24 Document emailed to Alejandra Ayala (Alejandra.Ayala@fortworthtexas.gov) for filling PZIY�..tlii1s llm I[fxl[ i l k �L [el �k r I P-► Document emailed to Donnette Murphy (don nette. m u rphy@fortworthtexas.gov) for approval 2025-05-30 - 1:03:39 PM GMT C'y Document emailed to Leonel Rios(Leonel.Rios@fortworthtexas.gov) for approval 2025-05-30 - 1:03:39 PM GMT Email viewed by Jaylyn Harrelson (Jaylyn.Harrelson@fortworthtexas.gov) 2025-05-30 - 1:04:38 PM GMT- IP address: 20.159.64.152 FDRTW❑RTHg I P—md6y Adobe Acrobat Sign Email viewed by Donnette Murphy (donnette.murphy@fortworthtexas.gov) 2025-05-30 - 1:04:51 PM GMT- IP address: 52.244.129.126 Email viewed by Leonel Rios(Leonel.Rios@fortworthtexas.gov) 2025-05-30 - 1:05:07 PM GMT- IP address: 20.159.64.152 Email viewed by Alejandra Ayala (Alejandra.Ayala@fortworthtexas.gov) 2025-05-30 - 1:05:52 PM GMT- IP address: 20.159.64.138 Form filled by Wendi Hedlund(wendi.hedlund@fortworthtexas.gov) Form filling Date: 2025-05-30 - 1:22:38 PM GMT - Time Source: server- IP address: 204.10.90.100 Form filled by Alejandra Ayala (Alejandra.Ayala@fortworthtexas.gov) Form filling Date: 2025-05-30 - 1:34:05 PM GMT - Time Source: server- IP address: 208.184.124.181 Document approved by Donnette Murphy (donnette.murphy@fortworthtexas.gov) Approval Date: 2025-05-30 - 3:26:55 PM GMT - Time Source: server- IP address: 204.10.90.100 Document approved by Leonel Rios(Leonel.Rios@fortworthtexas.gov) Approval Date: 2025-05-30 - 5:58:03 PM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Raul Lopez Roura (Raul.LopezRoura@fortworthtexas.gov) for filling 2025-05-30 - 5:58:08 PM GMT Email viewed by Raul Lopez Roura (Raul.LopezRoura@fortworthtexas.gov) 2025-05-30 - 5:58:15 PM GMT- IP address: 20.159.64.152 Email viewed by Raul Lopez Roura (Raul.LopezRoura@fortworthtexas.gov) 2025-06-06 - 5:40:39 PM GMT- IP address: 20.159.64.152 FDRTW❑RTHg I P—md6y Adobe Acrobat Sign 103270-EPAM-Ray White Road Widening Improvements — Amendment No. 1 Interim Agreement Report 2025-07-11 Created: 2025-06-17 By: Andrea Munoz (Andrea. M unoz@fortworthtexas.gov) Status: Out for Signature Transaction ID: CBJCHBCAABAAXMBgXv-_KeYKBF9ogQyNKoLyMHsvc4og Agreement History Agreement history is the list of the events that have impacted the status of the agreement prior to the final signature. A final audit report will be generated when the agreement is complete. "'I 03270-EPAM-Ray White Road Widening Improvements — Ame ndment No. 1" History Document created by Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) 2025-06-17 - 9:19:57 PM GMT- IP address: 204.10.90.100 Document emailed to Leonel Rios(Leon el. Ri os@fortworthtexas.gov) for approval 2025-06-17 - 9:32:38 PM GMT Email viewed by Leonel Rios (Leone1.Rios@fortworthtexas.gov) 2025-06-17 - 9:32:48 PM GMT- IP address: 52.244.179.71 Document approved by Leonel Rios(Leonel.Rios@fortworthtexas.gov) Approval Date: 2025-06-25 - 4:50:28 PM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Raul Lopez Roura (Raul.LopezRoura@fortworthtexas.gov) for filling 2025-06-25 - 4:50:36 PM GMT Email viewed by Raul Lopez Roura (Raul.LopezRoura@fortworthtexas.gov) 2025-06-25 - 4:50:46 PM GMT- IP address: 52.244.129.126 Form filled by Raul Lopez Roura (Raul.LopezRoura@fortworthtexas.gov) Form filling Date: 2025-06-25 - 6:12:31 PM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Lissette Acevedo (Lissette.Acevedo@fortworthtexas.gov) for filling 2025-06-25 - 6:12:39 PM GMT FoRTW❑RTHg I rp1Nem"v Adobe Acrobat Sign Email viewed by Lissette Acevedo (Lissette.Acevedo@fortworthtexas.gov) 2025-06-25 - 6:13:43 PM GMT- IP address: 52.244.129.126 Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) added alternate form filler Raul Lopez Roura (raul.lopezroura@fortworthtexas.gov). The original form filler Lissette Acevedo (Lissette.Acevedo@fortworthtexas.gov) can still fill the form. 2025-06-27 - 1:52:52 PM GMT- IP address: 204.10.90.100 Document emailed to Raul Lopez Roura (raul.lopezroura@fortworthtexas.gov) for filling 2025-06-27 - 1:52:53 PM GMT Uo Form filled by Raul Lopez Roura (raul.lopezroura@fortworthtexas.gov) Form filling Date: 2025-07-01 - 6:15:41 PM GMT - Time Source: server- IP address: 208.184.124.181 Form filling automatically delegated to Lissette Acevedo (lissette.acevedo@fortworthtexas.gov) by Patricia Wadsack (patricia.wadsack@fortworthtexas.gov) 2025-07-01 - 6:15:48 PM GMT Document emailed to Patricia Wadsack (patricia.wadsack@fortworthtexas.gov) for filling 2025-07-01 - 6:15:49 PM GMT Document emailed to Lissette Acevedo (lissette.acevedo@fortworthtexas.gov) for filling 2025-07-01 - 6:15:49 PM GMT Andrea Munoz (Andrea.Munoz@fortworthtexas.gov) added alternate form filler Mary Hanna (Mary.Hanna@fortworthtexas.gov). The original form filler Lissette Acevedo (lissette.acevedo@fortworthtexas.gov) can still fill the form. 2025-07-01 - 10:13:26 PM GMT- IP address: 204.10.90.100 Document emailed to Mary Hanna (Mary. Hanna@fortworthtexas.gov) for filling 2025-07-01 - 10:13:26 PM GMT Email viewed by Mary Hanna (Mary.Han na@fortworthtexas.gov) 2025-07-01 - 11:58:27 PM GMT- IP address: 104.47.64.254 Form filled by Mary Hanna (Mary.Hanna@fortworthtexas.gov) Form filling Date: 2025-07-02 - 0:30:25 AM GMT - Time Source: server- IP address: 204.10.90.100 Document emailed to Lauren Prieur (Lauren. Prieur@fortworthtexas.gov) for filling 2025-07-02 - 0:30:27 AM GMT Email viewed by Lauren Prieur (Lauren.Prieur@fortworthtexas.gov) 2025-07-02 - 0:30:35 AM GMT- IP address: 20.159.64.138 Form filled by Lauren Prieur (Lauren.Prieur@fortworthtexas.gov) Form filling Date: 2025-07-07 - 2:49:02 PM GMT - Time Source: server- IP address: 208.184.124.181 FoRTW❑RTHg I r°Ne""v Adobe Acrobat Sign Document emailed to Lorita Lyles (Lorita.Lyles@fortworthtexas.gov) for approval 2025-07-07 - 2:49:11 PM GMT Email viewed by Lorita Lyles (Lorita.Lyles@fortworthtexas.gov) 2025-07-07 - 2:49:16 PM GMT- IP address: 20.159.64.138 Document approved by Lorita Lyles (Lorita.Lyles@fortworthtexas.gov) Approval Date: 2025-07-07 - 3:33:28 PM GMT - Time Source: server- IP address: 208.184.124.181 Document emailed to Douglas Black (Douglas.Black@fortworthtexas.gov) for signature 2025-07-07 - 3:33:41 PM GMT Email viewed by Douglas Black (Douglas.Black@fortworthtexas.gov) 2025-07-07 - 3:33:46 PM GMT- IP address: 52.244.129.126 FoRTW❑RTHg I rp1N m"Y Adobe Acrobat Sign FORTWORTH. Routing and Transmittal Slip Transportation & Public Works Department DOCUMENT TITLE: Ray White Road Widening Improvements — Amendment No. 1 M&C: 25-0177 Date: 5/22/2025 To: Name Jeromy Shaw — McCarthy 1' ishaw(d0ccarthv.com CPN: 103270 CSO: 59397 Department CMAR - Signature DOC#: Initials 2. Wendi Hedlund — Bus. Sup. WR TPW — Initial 11 3. Alejandra Ayala TPW - Signature A 4. Raul Lopez TPW — Initial 6c-z 5. Lissette Acevedo TPW — Initial 6. Patricia Wadsack TPW — Initial m� 7. Lauren Prieur TPW — Signature xer 8. Doug Black Legal - signature Douglas Black 9. Jesica McEachern CMO - signature 10. Jannette Goodall CSO - signature 11. TPW Contracts TPW Donnette Murphy Risk � DOCUMENTS FOR CITY MANAGER'S SIGNTURE: All documents received from any and all City Departments requesting City Manager's signature for approval MUST BE ROUTED TO THE APPROPRIATE ACM for approval first. Once the ACM has signed the routing slip, Jay will review and take the next steps NEEDS TO BE NOTARIZED: ❑ Yes X No RUSH: ❑ Yes X No SAME DAY: ❑ Yes ❑ No NEXT DAY: ❑ Yes ❑ No ROUTING TO CSO: X Yes ❑ No Action Required: ❑ As Requested ❑ For Your Information X Signature/Routing and or Recording ❑ Comment ❑ File ❑ Attach Signature, Initial and Notary Tabs Return To: Aleiandra.Avala(afortworthtexas.gov email executed document when completed.